NORWEA – Driftsrisiko innen vindkraft. Lilleaker – 30.08.11 Eivind Torblaa, Head of Asset Management, Wind. WITHIN RENEWABLES IN EUROPE. No. 1. RENEWABLE ENERGY. 89%. 283. POWER AND DISTRICT HEATING PLANTS. 33%. OF NORWAY’S POWER GENERATION . ...IN MORE THAN 20 COUNTRIES. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: NORWEA – Driftsrisiko innen vindkraft

NORWEA – DRIFTSRISIKO INNEN VINDKRAFT

Lilleaker – 30.08.11

Eivind Torblaa, Head of Asset Management, Wind

Page 2: NORWEA – Driftsrisiko innen vindkraft

3300 EMPLOYEES...

89%283 POWER AND DISTRICT

HEATING PLANTS

33% OF NORWAY’S POWER GENERATION

RENEWABLEENERGY

...IN MORE THAN20 COUNTRIES

WITHIN RENEWABLES IN EUROPENo. 1

Page 3: NORWEA – Driftsrisiko innen vindkraft

Small-scale hydropower

DELIVER GROWTH IN PURE ENERGY

Flexible European generation and market operations

Wind power

International hydropower

District heating

3

Page 4: NORWEA – Driftsrisiko innen vindkraft

STATKRAFT’S WIND POWER STRATEGY

Geography

Value chain

TechnologyContinue onshore development and expand into offshore wind power

Geographic focus on the North Sea Area

Full value chain participation, with main focus on securing sites and projects in early stage developments

4

Page 5: NORWEA – Driftsrisiko innen vindkraft

5 Statkraft presentation

GROWTH IN ONSHORE WIND POWER

NORWAY• In operation : 245 MW• Under development: ~2500 MW

(SAE Vind)

SWEDEN• In operation: 10 MW• Under construction: 145 MW• Under development : ~1800 MW

(Industrial partnerships)

UK• In operation: 23 MW• Under construction: 52.5 MW• Under development:

~200 MW

Page 6: NORWEA – Driftsrisiko innen vindkraft

Hitra 24 wind turbines á 2,3 MWInstalled capacity 55 MWAnnual output: 138 GWhIn operation since 2004

Smøla 68 wind turbines á 2 og 2,3 MWInstalled capacity 150 MWAnnual output: 356 GWhIn operation since 2002 and 2005

Kjøllefjord 17 wind turbines á 2,3 MWInstalled capacity 40 MW Annual output: 119 GWhIn operation since 2006

IN OPERATION, NORWAY

Page 7: NORWEA – Driftsrisiko innen vindkraft

Totoral, Chile(SNPower)

Alltwalis,UK

Em,Sweden

10 wind turbines á 2,3 MWInstalled capacity 23 MWAnnual output: 64 GWhIn operation since 2009

23 wind turbines á 2,0 MWInstalled capacity 46 MWAnnual output: 106 GWhIn operation since 2010

4 wind turbines á 2,3 MWInstalled capacity 6,3 MW Annual output: 23 GWhIn operations since 2011

IN OPERATION, ABROAD

Page 8: NORWEA – Driftsrisiko innen vindkraft

SCIRA - FIRST OFFSHORE POWER

side 8

August 2, 2011

Page 9: NORWEA – Driftsrisiko innen vindkraft

OFF-SHORE SUB-STATIONS

side 9

Two sub-stations

Transforms 33 kV to 132 kV

Weight: 900 tons

Page 10: NORWEA – Driftsrisiko innen vindkraft

side 10

SHERINGHAM SHOAL VINDPARK

Nøkkeldata: 88 vindturbiner – Siemens 3,6 MWTo offshore substasjoner (koblingsstasjoner)Substasjon i Salle317 MW installert kapasitet1,1 TWh estimert årsproduksjon

Tidsplan:Legging av landkabel i 2009Installasjon av fundamenter og sjøkabler i 2010Installasjon av turbiner i 2011Prognose for ferdigstillelse Q2 2012

Prosjektledelse under bygging: Statoil

Driftsansvarlig: Scira Offshore Energy Ltd.

Døgnkontinuerlig overvåking og avmelding: Statkraft

Page 11: NORWEA – Driftsrisiko innen vindkraft

BAILLIE WIND FARM, SCOTLAND

Installed capacity 52.5 MWWind turbines 21 turbinesAnnual generation 170 GWhStatkraft’s ownership : 80 %Partner (20 %): Local partners

Page 12: NORWEA – Driftsrisiko innen vindkraft

MÖRTTJÄRNBERGET, SWEDEN

Installed capacity 85 MWWind turbines 37 turbinesAnnual generation 280 GWhStatkraft’s ownership : 60 %Partner (40 %): SCA

Page 13: NORWEA – Driftsrisiko innen vindkraft

STAMÅSEN 1, SWEDEN

Installed capacity 60 MWWind turbines 26 turbinesAnnual generation 200 GWhStatkraft’s ownership : 60 %Partner (40 %): SCA

Page 14: NORWEA – Driftsrisiko innen vindkraft

STATKRAFT’S WIND POWER ACTIVITES

NorwayIn operation: 245 MWUnder development: ~2500 MW

SwedenIn operation: 9 MWUnder development: ~1800 MW

UK - onshoreIn operation: 23 MWUnder development: ~200 MW

UK - offshoreUnder construction: ~157 MWUnder development: ~2300 MW

14

Page 15: NORWEA – Driftsrisiko innen vindkraft

TSA

BOP

CapexO&M

Main components

Insurance

Tax

Land rent

Imbalance cost

Grid costs

OpexProjectcharacteristics Wind, topography , grid, roads, conflict level etc

Turbine category, size, height

Frame work conditions

LCOE

CAPITAL INTENSIVE WITH LOW MARGINS

15

Page 16: NORWEA – Driftsrisiko innen vindkraft

OPERATIONS EXPERIENCE

Lower yearly production than expected

More repair work of main components than expected

High availability achieved

Positive experience with internalizing the O&M work

Synergies between hydro and wind

Introduction of WMS

Plan to introduce the Day 1 concept over the next few years

Grid tariffs extremely high in certain regions Eg) Kjøllefjord in Finnmark

16

Page 17: NORWEA – Driftsrisiko innen vindkraft

CURRENT MAIN O&M FOCUS - RDS-PP AND RCM

Taken important decision to implement RDS-PP to all wind power plants in Norway in 2009.

Summer 2010 starting to convert old EBL code to RDS-PP.(110 000 tag)

Post converting to RDS-PP, RCM methodology introduced.

17

Page 18: NORWEA – Driftsrisiko innen vindkraft

Statkraft presentasjon

18

Zonal Breakdown of F1 Digits

A transformation of wind energy to electrical power through mechanical energy.

Page 19: NORWEA – Driftsrisiko innen vindkraft

WORKING GROUP MEMBERS• DONG Energy

• E.ON

• Statkraft

• Statoil

• Centrica

• Siemens Wind Power

• Potensial New Group Members.• Vestas.

• Nordex.

• Vattenfall.

• RWE.

19

Page 20: NORWEA – Driftsrisiko innen vindkraft

RCM

RCM analysis creates basis for the preventive maintenance plan

Performed RCM analysis on three wind farms in Kjøllefjord, Hitra and Smøla carried out with good result

20

Page 21: NORWEA – Driftsrisiko innen vindkraft

PA’S ANNUAL BENCHMARKING SURVEY

21

Page 22: NORWEA – Driftsrisiko innen vindkraft

side 22 STATKRAFT 2008

Thank you

THANK YOU FOR YOUR ATTENTION!

Page 23: NORWEA – Driftsrisiko innen vindkraft

Doggerbank

Water depth 18-63 metres

Agreed 9GW target installed capacity

Zone has potential for 13GW, or c.10% of UK electricity needs

Zone located 125-290km off Yorkshire coast

Extends over nearly 9,000 km²

Equivalent in size to North Yorkshire

23 15 June 2011