northwest area contingency plan committee meeting sector columbia river on-scene coordinator report...

20
Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD SECTOR COLUMBIA RIVER Incident Management Division

Upload: douglas-flowers

Post on 12-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD

Northwest AreaContingency Plan Committee MeetingSector Columbia RiverOn-Scene Coordinator Report

Tuesday, June 24, 2015Kellogg, ID

U.S. COAST GUARD SECTOR COLUMBIA RIVERIncident Management Division

Page 2: Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD

AREA OF RESPONSIBILITY33 CFR 3.65-15 / ACP 1000-8 thru 1000-12

Page 3: Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD

OSC REPORTFebruary – June 2015

F/V FOUR FORTY (Cape Disappointment, WA)

F/V FEATHER (Warrenton, OR)

Outfall #22 (Portland, OR)

Page 4: Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD

INCIDENT MANAGEMENT DIVISIONMission

The 20-person Incident Management Division at Sector Columbia River responds to all pollution threats along the Columbia River, and the coastlines and navigable waters of Oregon and southern Washington state.

TYPICAL CASES:• Mystery sheens• Sunken vessels• Grounded vessels• Mystery drums• Facility discharges

and releases• Vessel discharges

and releases• Exercises• Derelict vessels• Japan Tsunami

marine debris

Page 5: Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD

U.S. COAST GUARD SECTOR COLUMBIA RIVEROSC Report – June 24, 2015

Product/Amount Date Case Details

Diesel/sheen Feb. 13 200’ x 400’ sheen in West Haven Marina (Grays Hbr, WA). NOFIs issued to 3 vsls; source undetermined.

Diesel/unknown Feb. 15 Paper mill de-construction IVO Hoquiam, WA, w/ large 500-yd sheen in Grays Hbr via small slough. Fund: $2K

Transmission oil/2 quarts

Feb. 19 Mystery sheen IVO Willamette River led to discovery of submerged truck; floated/removed. Fund: $10K.

Unknown/sheen Feb. 19 Sheen reported near facilities in Portland near known Superfund site; NRCES hired for clean up. Fund: $2K

Diesel/1 ounce Mar. 23 Forklift cap unsecured at work site along Willamette River in Portland. Notice of Violation issued for less than 1 oz.

Unknown/sheen Mar. 24 Report of sheen at Outfall 22, Portland, samples taken.

Hydraulic oil/4 gal Mar. 25 Discharge at loading tower of Roseburg Forest Products facility in Coos Bay, OR. RP skimmed. LOW.

Unknown/sheen Mar. 31 25 x 25’ sheen IVO Swan Island, Willamette River. From Outfall #22. Coordinated w/city, state responders.

Page 6: Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD

U.S. COAST GUARD SECTOR COLUMBIA RIVEROSC Report – June 24, 2015

Product/Amount Date Case Details

Hydraulic oil/1 cup Apr. 1 Released at St. Helens city dock by 23’ P/C. LOW.

Unknown/sheen Apr. 2 200 x 200’ sheen Yaquina Bay, OR. 25’ P/C. NOV.

Hydraulic oil/3 gal Apr. 14 Tractor trailer leak into storm drain leading to Columbia River; RP cleaned and reported. LOW.

Diesel/500 gal Apr. 18 Derelict vsl in a derelict boat house on Skipanon River in Warrenton, OR. Clean Harbors and Ballard hired w/fund.

Motor oil/2 quarts Apr. 18 100 x 100’ sheen at Columbia Park Marina (Richland, WA) caused by failure of outboard on small P/C. LOW.

Oil/sheen May 8 Residual oils released during boat work on Umpqua River; RP response; NOV.

Unknown/3 drums May 20 CERCLA opened for mystery drum IVO Cape Disappointment, WA (Cowlitz Clean Sweep hired).

Diesel/5 gal May 20 C/S PORTLAND SPIRIT discharged while re-fueling.

Petroleum based paint/sheen

May 22 1000-yd sheen IVO Vigor Shipyard on Willamette R. Paint from unknown source dissipated and unrecoverable.

Page 7: Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD

POSSIBLE DERELICT/ABANDONED VESSELPortland, OR – Feb. 11, 2015

Fred Devine hired for ‘barge’ removal but O/O removed vsl from site before work began; no pollution. Joint op w/Oregon.

Page 8: Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD

HARBOR PAPER MILL SPILLHoquiam, WA – Feb. 15, 2015

Grays Hbr Public Utilities Dept dismantling Harbor Paper Mill: subcontractor pumped out a secondary tank to a culvert/ditch, causing 500x50-yd sheen in Hoquiam River.

Page 9: Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD

VEHICLE IN WILLAMETTE RIVERPortland, OR – Feb. 18-19, 2015

Ballard hired with $10K OSLTF for mystery sheen produced from axles of submerged truck.

Page 10: Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD

SHEEN NEAR PORTLAND, OR, “OUTFALL #22”)Willamette River, Portland, OR – Feb. 19, 2015 (on-going)

NRCES hired to clean up brown oil recoverable product near Portland superfund site on Willamette. River.

Page 11: Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD

DERELICT VESSEL/DERELICT BOAT HOUSESkipanon River, Warrenton, OR – Apr. 18, 2015

OSLTF opened for M/V FEATHER w/500 gal of diesel on board and large sheen in tributary of Columbia R.

Page 12: Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD

DERELICT VESSEL/DERELICT BOAT HOUSESkipanon River, Warrenton, OR – Apr. 18, 2015

OSLTF opened for M/V FEATHER w/500 gal of diesel on board and large sheen in tributary of Columbia R.

Page 13: Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD

BOAT ENGINE WORK ON PIER, COLUMBIA RIVERColumbia River Mile 108, Portland, OR – May 11, 2015

RP removed engine from boat at dock and dripped oil into the Columbia River. RP very responsive; LOW issued. ½ gal.

Page 14: Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD

RIVER QUEEN SITE / DREDGE MULTNOMAHGoble, OR – May 19, 2015

Joint field inspection with Oregon DEQ, State Police, Marine Board & State Lands & USCG Pacific Strike Team. No imminent threat.

Page 15: Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD

C/S PORTLAND SPIRIT, WILLAMETTE RIVERCaruthers Landing (south of Ross Island Bridge), Portland, OR – May 20, 2015

Fuel line burst during refueling ops, 1 gal. diesel discharged; vsl placed boom and absorbent pads immediately. Letter of Warning issued for <1 gal diesel.

Page 16: Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD

MYSTERY DRUMSSand Island, Cape Disappointment, WA – May 27, 2015

3 mystery drums reported on Sand Island near Cape D., WA. OSLTF opened for $1K and Cowlitz Clean Sweep hired for removal and disposal.

Page 17: Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD

F/V FOUR FORTYCape Disappointment, WA – May 27, 2015

44’ wood F/V with 350+ gal diesel on board allides with “A” Jetty near Cape Disappointment, WA. Vsl sank, OSLTF opened for Ballard salvage ops. Minimal impact to environment as contractor recovered 350 gallons!

Page 18: Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD

SUNKEN WORK BOAT, WILLAMETTE RIVERPortland, OR – June 9, 2015

Work boat sank, discharged 10 gallons gasoline into Willamette River. Vsl righted by Gunderson Marine & towed to Sauvie Island for removal. 10 gal gas discharged; LOW.

Page 19: Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD

U.S. COAST GUARD SECTOR COLUMBIA RIVEROSC Report June 24, 2015

Sector Columbia River issued 13 Letters of Warning (down from 15 last RRT OSC Report) and 2 Notices of Violation (down from 7). However, Sector Columbia River “federalized” more (13 cases) during this time period than in the same period in 2014 (8).

Since last RRT (Feb – June 2015) Last RRT Avg (2010-15)

77 NRC reports 85 76

19 Mystery sheens 17 18

5 Sunken vessels 8 6

2 Grounded vessels 2 4

9 Mystery drums 18 7

5 Facility discharges/releases 6 5

8 Vessel discharges/releases 10 6

5 Exercises 10 6

5 Derelict vessels 5 5

3 Reports Japan tsunami debris 0 3-5

Page 20: Northwest Area Contingency Plan Committee Meeting Sector Columbia River On-Scene Coordinator Report Tuesday, June 24, 2015 Kellogg, ID U.S. COAST GUARD

U.S. COAST GUARD SECTOR COLUMBIA RIVERQuestions?