Telefonkabel TAT 14 as laid 2000 Må ikke kopieres uden tilladelse fra FOGA ApS Week 20 EUROPIPE 2 Atlantic crossing 1 (N) telephone cable system ODIN telephone cable, segment 3 ODIN telefonkabel, segment 2 May 12, 2015 Mast Cecilie-2 feltet Horns Rev 1 Wind Farm Horns Rev 1 Wind Farm 7 Reproduced from Admiralty Chart 2182B by permission of the Controller of Her Majesty’s Stationery Office and Hydrographic Offices of Denmark and United Kingdom. Reproduced from Admiralty Chart 2182B by permission of the Controller of Her Majesty’s Stationery Office and Hydrographic Offices of Denmark and United Kingdom. Tyra SE Field Trafo Signatures: NORNED cable laid and trenched HORNS REV 2 Wind farm HORNS REV 2 Wind farm FINO 3 500 meter safety zone FINO 3 500 meter safety zone FARSUND Cable route Valhall to Farsund Cable route Valhall to Farsund Danice kommunikationskabel Danice kommunikationskabel pipeline, no protective zone existing pipeline, 200 meter protective zone communication cable, established 1995-2008 survey line/ pipeline inspection/planned cable route existing installation subsea construction diving activity construction- or research vessel navigational warning 1 Drilling rig NOBLE SAM TURNER is in pos. at XANA. 2 Acc.p/f ATLANTIC ESBJERG on Stand off positin at DAN-B, will be moved to final position at first given weather window. 3 Drilling rig ENSCO 72 in pos at TYRA SE-A. 4 Acc. rig COSL RIGMAR to be moved from SYD ARNE WHP N. to Kristianssand at first given weather window. 5 Acc.p/f ATLANTIC LABRADOR is in pos at the TYRA E Field. To be moved internally at Tyra, mid-summer. 6 Drilling rig ENSCO 71 in position at HCE. 7 Drilling rig ENERGY ENHANCER in post at SVEND. 8 Drilling rig MÆRSK RESOLVE in pos at the Hejre Field. 9 Drilling rig MÆRSK RESOLUTE South Arne field 10 SEAFOX 5 in pos. at VALDEMAR BA. 11 Acc.rig ATLANTIC AMSTERDAM in pos at DAN FA Vessels/activities: The vessel EDDA FLORA expected to conduct ROV inspections at DONG installations/piplines + DUC Fields/SOURTH ARNE, 30/4. The vessel M/V BIBBY POLARIS working at the TYRA Field from wk 15. The vessel M/V ANETTE CHRISTINA conducting gaurdduties at TYRA E. To be relieved by VENUS II at 13/05. The ATLANTIS DWELLER is expected to finish the job at the DUC field during this week. ESVAGT KAPPA conducting guard duties at the HEJRE Platform site. PACIFIC OSPREY has finished the job and left the GNSC B11 Gas platform, German Sector. The buoys on station to be recovered ASAP. The vessel STADISLAN YUDIN expected at the VALDEMAR WNW field for installing a new platform. Approx. 10. - 24/5. 5 Norpipe Europipe 1 Europipe 2 GECO TRITON DAN TYSK Wind farm 500 m safety zone DAN TYSK Wind farm 500 m safety zone Akademik Shatskiy conducting D2 survey Akademik Shatskiy conducting D2 survey 9 TRYM field Subsea contruction Subsea contruction 11 NORTH SEA ACTIVITIES Overview chart based on offshore-operator‹s information of ongoing and planned activities. Please notice descriptions at the back with updates this week. NORTH SEA ACTIVITIES Overview chart based on offshore-operator‹s information of ongoing and planned activities. Please notice descriptions at the back with updates this week. Chart not to be used for navigation FOGA ApS Fishermens Information of Oil- and Gas Activities Tlf. +45 75 451144 m/v SKANDI NOVA Survey EKOFISK Field m/v SKANDI NOVA Survey EKOFISK Field Gas pipeline Syd Arne-Harald-Nybro Gas pipeline Syd Arne-Harald-Nybro Oil pipeline Gorm - Nybro Gas pipeline Tyra - Nybro 0,49" 0,12" 1,24" DANY-1X SIAH-1X SIAH-1X DANY-1X 8 VENUS II gaurd vessel at TYRA East (13/05) VENUS II gaurd vessel at TYRA East (13/05) ESVAGT KAPPA guard vessel for Platform site HEJRE ESVAGT KAPPA guard vessel for Platform site HEJRE SEAFOX 5 VALDEMAR BA SEAFOX 5 VALDEMAR BA 1 ENSCO 72 TYRA SE-A ENSCO 72 TYRA SE-A 3 MÆRSK RESOLVE HEJRE Jacket MÆRSK RESOLVE HEJRE Jacket NOBLE SAM TURNER XANA 02/12 NOBLE SAM TURNER XANA 02/12 Lille John 2 XANA ESVAGT KAPPA ENERGY ENHANCER In position at SVEND ENERGY ENHANCER In position at SVEND Stine SCB 2 Stine SCB 1 4 Acc. Rig COSL RIGMAR from SYD ARNE WHP N to Kristianssand Acc. Rig COSL RIGMAR from SYD ARNE WHP N to Kristianssand NINI E Nini-A 6 M/V ATLANTIS DWELLER Inspection of pipelines at the DUC fields M/V ATLANTIS DWELLER Inspection of pipelines at the DUC fields ATLANTIS DWELLER BIBBY POLARIS M/V BIBBY POLARIS To the TYRA Field M/V BIBBY POLARIS To the TYRA Field 7 ANETTE CHRISTINA/VENUS II 2 10 ANETTE CHRISTINA guard vessel at TYRA East ANETTE CHRISTINA guard vessel at TYRA East ESVAGT CARPATHIA EDDA FLORA ROV inspections at DONG, DUC & SYD ARNE EDDA FLORA ROV inspections at DONG, DUC & SYD ARNE EDDA FLORA VALDEMAR OIL FIELD WNW VALDEMAR OIL FIELD WNW STADISLAN YUDIN VALDEMAR WNW STADISLAN YUDIN VALDEMAR WNW

Upload: phamdien

Post on 21-Jul-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NORTH SEA ACTIVITIES Week 20 - foga.dk oversigtskort 2015/Week 20 2015 ENG.pdf · FOGA NORTH SEA ACTIVITIES FOGA ApS FISHERMENS INFORMATION OF OIL‐AND GAS ACTIVITIES Trafikhavnskaj19

Telefonkabel TAT 14 as laid 2000

Må ikke kopieres uden tilladelse fra FOGA ApS

Week 20

EU

RO

PIP

E2

Atlanticcrossing

1(N

) telephonecable

system

Kortet må ikke anvendes til navigation

ODIN telephone cable, segment 3

OD

INte

lefo

nka

be

l, se

gm

en

t 2

May 12, 2015

Mast

Cecilie-2 feltet

Horns Rev 1Wind FarmHorns Rev 1Wind Farm

7

Reproduced from Admiralty Chart 2182B by permission of theController of Her Majesty’s Stationery Office andHydrographic Offices of Denmark and United Kingdom.

Reproduced from Admiralty Chart 2182B by permission of theController of Her Majesty’s Stationery Office andHydrographic Offices of Denmark and United Kingdom.

Tyra SE Field

Trafo

3

Signatures:

NO

RN

ED

cable

laid

and tre

nch

ed

HORNS REV 2Wind farmHORNS REV 2Wind farm

FINO 3500 metersafety zone

FINO 3500 metersafety zone

FARSUND

Cable

rout

e Valh

all to

Far

sund

Cable

rout

e Valh

all to

Far

sund

Danice

komm

unikationskabel

Danice

komm

unikationskabel

pipeline, no protective zoneexisting pipeline, 200 meter protective zonecommunication cable, established 1995-2008survey line/ pipeline inspection/planned cable routeexisting installationsubsea constructiondiving activityconstruction- or research vesselnavigational warning

1 Drilling rig NOBLE SAM TURNER is in pos. at XANA.2 Acc.p/f ATLANTIC ESBJERG on Stand off positin at

DAN-B, will be moved to final position at first givenweather window.

3 Drilling rig ENSCO 72 in pos at TYRA SE-A.4 Acc. rig COSL RIGMAR to be moved from SYD ARNE WHP N.

to Kristianssand at first given weather window.5 Acc.p/f ATLANTIC LABRADOR is in pos at the TYRA E Field.

To be moved internally at Tyra, mid-summer.6 Drilling rig ENSCO 71 in position at HCE.7 Drilling rig ENERGY ENHANCER in post at SVEND.8 Drilling rig MÆRSK RESOLVE in pos at the Hejre Field.9 Drilling rig MÆRSK RESOLUTE South Arne field10 SEAFOX 5 in pos. at VALDEMAR BA.11 Acc.rig ATLANTIC AMSTERDAM in pos at DAN FA

Vessels/activities:The vessel EDDA FLORA expected to conduct ROV inspections at DONGinstallations/piplines + DUC Fields/SOURTH ARNE, 30/4.The vessel M/V BIBBY POLARIS working at the TYRA Field from wk 15.The vessel M/V ANETTE CHRISTINA conducting gaurdduties at TYRA E.To be relieved by VENUS II at 13/05.The ATLANTIS DWELLER is expected to finish the job at the DUCfield during this week.ESVAGT KAPPA conducting guard duties at the HEJRE Platform site.PACIFIC OSPREY has finished the job and left the GNSC B11 Gas platform,German Sector. The buoys on station to be recovered ASAP.The vessel STADISLAN YUDIN expected at the VALDEMAR WNW fieldfor installing a new platform. Approx. 10. - 24/5.

4 DSV Constructor

Kranfartøj BALDER

Installationsarbejdepå Syd Arne Feltetfra ultimo august

5

NorpipeEuropipe

1

Europipe 2

Afviserfartøj NINI Øst feltetSALLING

MÆRSKASSISTER

Afviserfartøj GORM-TYRA EVEGA II

CONSTRUCTOR

GECO TRITON

Afviserfartøj BOJE 2 feltetMALLEMUKKEN

RENÉ DESCARTESUdlægning af fiberkabelved VALDEMAR felter

fra ca. 23/7

CECILIEguard vessel atTYRA VALDEMAR

1

m/v EDT PTOTEADAN A

HAVILA CRUSADER

Forsyningsfartøjved Syd Arne feltetca. 30/8 - 12/9

DANTYSKWindfarm500 msafetyzone

DANTYSKWindfarm500 msafetyzone

SEVEN FALCONSIRI Field

SEVEN FALCONSIRI FIELD

Akademik Shatskiyconducting D2 surveyAkademik Shatskiyconducting D2 survey

VEGA IIguard vessel atTYRA VALDEMARuntil 21/7

OLYMPIC COMMANDERDUC fields

M/V CECILIE

9

TRYM field

SubseacontructionSubseacontruction

11

NEXANS SKAGERRAKCable works

ELEKTRONCable works

NORTH SEA ACTIVITIESOverview chart based on offshore-operator‹sinformation of ongoing and planned activities.Please notice descriptions at the back with updates this week.

NORTH SEA ACTIVITIESOverview chart based on offshore-operator‹sinformation of ongoing and planned activities.Please notice descriptions at the back with updates this week.

Chart not to be used for navigation

FOGA ApSFishermens Informationof Oil- andGas ActivitiesTlf. +45 75 451144

VENUS II

guard vessel atTYRA VALDEMAR

VEGA IIguard vessel atSkagerrak 4 cable

ENERGY ENHANCERDAN FE

NEXANS SKAGERRAK& ELEKTRON conductingcable works from 20/7Guard vessel: ANETTE DAHL

SEVEN OSPREYSIRI Field

ENSCO 72TYRA EAST B

4

SEVEN OSPREY

MÆRSK RESOLVESOLSORT-2

TOISA INVINCIBLETYRA SE Project

AUDACIATYRA SE Project

ENERGY SWANTYRA SE Project

HIGHLAND ROVERTYRA SE Project

UP JASPERTYRA SE Project

SAIPEM 7000

Installationworkat GORM E

VENUS II

guard vessel atTYRA VALDEMAR

CECILIEguard vessel at

TYRA VALDEMAR

ANETTE DAHLguard vessel atSkagerrak 4 cable

SKANDI OLYMPIAto the DUC fields

ENSCO 71HALFAN A

ENERGY ENHANCERGORM A

THOR CHASER

M/V REMUSsupport vsl forATLANTIC EXPLORER

Guard vessel forATLANTIC EXPLORER

VEGA IIguard vessel atTYRA VALDEMAR

JOHN SHAWPort of EsbjergDTD: 2/4-2014

1

2

NORDSØEN MOB vesselat CECILIE

m/v SKANDI NOVASurvey EKOFISK Fieldm/v SKANDI NOVASurvey EKOFISK Field

ATLANTIC ESBJERGGORM

Gas pipeline Syd Arne-Harald-Nybro

Gas pipeline Syd Arne-Harald-Nybro

Oil pipeline Gorm - Nybro

Gas pipeline Tyra - Nybro 0,49"0,12"

1,24

"

DANY-1X

SIAH-1XSIAH-1X

DANY-1X

SKANDI CARLASurvey atHejre Export Pipeline

ATLANTIC AMSTERDAMDAN FA

8

ISLAND VALIANTTil DUC felterne

CASTORO SEIGORM HEJRE PIPELINE

MAERSK TRANSPORTERCASTORO SEITug for

MAERSKCASTORO SEITug for

MAERSK TRACERCASTORO SEITug for

FAR SUPERIORSupplying pipes forCASTORO SEI

SBS CIRRUSSupplying pipes forCASTORO SEI

HIGHLAND STARSupplying pipes forCASTORO SEI

LORELAYPIPELINETYRA - VBA

VENUS IIgaurd vessel atTYRA East (13/05)

VENUS IIgaurd vessel atTYRA East (13/05)

F/V PERNILLE KIMGuard vessel forCASTORO SEI

SKANDI CARLASupport for CASTORO SEI

F/V KRISTINAguard vessel forHEJRE Project

OLEG STRASHNOVTYRA W & E

WELL SERVICERROAR & GORM

UNION SOVEREIGNSupport for HERMOD CARLO MAGNO

Support for HERMOD

KOLGASupport for HERMOD

ANETTE CHRISTINAguard vessel forHEJRE Project

JANGA BORKguard vessel forHEJRE projektet

ESVAGT KAPPAguard vessel for

Platform siteHEJRE

ESVAGT KAPPAguard vessel for

Platform siteHEJRE

FUGRO SALTIREHEJRE Project

SEAFOX 5VALDEMAR BASEAFOX 5VALDEMAR BA

1

ENSCO 72TYRA SE-AENSCO 72TYRA SE-A

3

DEEP HELDERInspection ofDONG assets

M/V ANETTE CHRISTINAgaurd vessel forTYRA-VALDEMARPipeline

SEAHORSETo TYRA EB &TYRA SE

MÆRSK RESOLVEHEJRE JacketMÆRSK RESOLVEHEJRE Jacket

NOBLE SAM TURNERXANA 02/12NOBLE SAM TURNERXANA 02/12

Lille John 2

XANAESVAGT KAPPA

ENERGY ENHANCERIn position at SVENDENERGY ENHANCERIn position at SVEND

Stine SCB 2

Stine SCB 1

4

Acc. Rig COSL RIGMAR fromSYD ARNE WHP N to KristianssandAcc. Rig COSL RIGMAR fromSYD ARNE WHP N to Kristianssand

NINI E

Nini-A

6

M/V ATLANTIS DWELLERInspection of pipelinesat the DUC fields

M/V ATLANTIS DWELLERInspection of pipelinesat the DUC fields

ATLANTIS DWELLER

M/V CECILIEMOB preparednessat the CECILIE Field

BIBBY POLARIS

M/V BIBBY POLARISTo the TYRA FieldM/V BIBBY POLARISTo the TYRA Field

7

ANETTE CHRISTINA/VENUS II

2

10

ANETTE CHRISTINAguard vessel atTYRA East

ANETTE CHRISTINAguard vessel atTYRA East

ESVAGT CARPATHIA

EDDA FLORAROV inspections at DONG,DUC & SYD ARNE

EDDA FLORAROV inspections at DONG,DUC & SYD ARNE

EDDA FLORA

VALDEMAR

OIL FIELD WNW

VALDEMAR

OIL FIELD WNW

STADISLAN YUDINVALDEMAR WNWSTADISLAN YUDINVALDEMAR WNW

Page 2: NORTH SEA ACTIVITIES Week 20 - foga.dk oversigtskort 2015/Week 20 2015 ENG.pdf · FOGA NORTH SEA ACTIVITIES FOGA ApS FISHERMENS INFORMATION OF OIL‐AND GAS ACTIVITIES Trafikhavnskaj19

NORTH SEAACTIVITIES

FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES

Trafikhavnskaj 19DK‐6700 EsbjergTel.:               +45 75 45 11 44

e‐mail:      [email protected] page:       www.foga.dk

Update of informationWeek  20May 12 ‐ 18, 2015Next FOGA‐info is distributedMay 19, 2015

FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:

MAERSK OIL

Vessels: 

The vessel BIBBY POLARIS conducting diving operations at the DUCfields from end of week 15 entering the safety zones at VALDEMAR BA, ROAR & TYRA EAST. 

The vessel ANETTE CHRISTINA  conducting guard duties at the TYRA East field. VENUS II is expected to relieve ANETTE CHRISTINA in the evening 13/05. 

The the ROV inspections carried out by the vessel ATLANTIS DWELLER at the DUC fields are expected to be finished within this week. 

Rigmoves: 

The acc. rig ATLANTIC ESBJERG is on a stand off position at DAN‐B

Survey at the DAN Field:

During the next couple of years Maersk Oil and the University of Aarhus are conducting a survey regarding the influence of noise from the oil platforms  on the harbour porpoises. In connection with the project a number of yellow  buoys have been deployed south and east of the DAN Field.

6 Dan800E   55° 28.423'N 005° 07.228'E

 

The safety zones are 500 meters from the positions.

Illustration of hose when idle.

DONG Energy Installations

56o 28.96' N  04o 54.67' E56o 24.13' N  04o 45.58' E56o 38.45' N  05o 19.27' E56o 40.49' N  05o 24.74' E

56o 30.96' N  05o 02.46' E56o 30.95' N  05o 03.56' E

SIRI‐field:CECILIE‐A field:NINI A‐field:NINI B‐field:STINE fields ‐ Subsea installations:STINE SCB‐1:STINE SCB‐2:

DONG Energy

The acc. rig ATLANTIC ESBJERG is on a stand off position at DAN‐Band will be finally positioned at first given weather window. 

The rig ENERGY ENHANCER is in position at the SVEND Field.

The rig ENSCO 72 is in position at the TYRA SE‐A Field.

SEAFOX 5 is on position at VALDEMAR BA. 

Rigs:

Drilling rig MÆRSK RESOLVE is in position at the HEJRE Jacket. Position:   56°14'51 N ‐ 003° 57'37 E.

Vessels: 

The vessel EDDA FLORA is expected to carry out ROV inspections at the DONG assets as well as TYRA E, HARARLD,GORM and

SIRI Tanker Loading Facility

6 Dan800E   55° 28.423'N 005° 07.228'E

7 Dan800S   55° 28.158'N 005° 06.411'E

8 Dan1600E   55° 29.168'N 005° 07.637'E

9 Dan1600S  55° 27.733'N 005° 06.282'E

10 Dan3200E   55° 29.751'N 005° 08.758'E

11 Dan3200S   55° 26.893'N 005° 05.892E

12 Dan6400E   55° 28.473'N 005° 12.591'E

13 Dan6400S   55° 25.823'N 005° 10.165'E

14 Dan9600E   55° 28.422'N 005° 15.626'E

15 Dan12800S  55° 23.097'N 005° 13.705'E

FINO 3 ‐ Research Platform

The research platform FINO 3was established in 2007/2008 approx. 45 nautical miles west of the island Sylt at the position 55° 11,7' N 007° 09,5' E.A 500 meter safety zone has been established around the platform, which in the future will be situated inside of the DAN TYSK wind farmarea.

Please see the web page from the "Forschungs‐ und Entwicklungs zentrum, Fachhochscule Kiel Gmbh" www.fino3.de for more information.

HESS DenmarkSouth Arnefield development

The drilling rig MÆRSK RESOLUTE is established at the South Arne field'sWHP

FINO  3

55°11,7' N

 7°09,5' E

DAN TYSK wind farmAcc. to the Danish Notices to Mariners No. 1154 the wind farm  DAN TYSK  will be established andmarked by cardinal buoys, stated by the  positions 1‐9). During the building phase a 500 meter wide safety zone will be established around the wind park. In the area will be prohibition of navigation,anchoring,  fishery and trawl equipment at theseabed.The prohibition period will be in force from1. december 2012. The wind farm , when completed, implies80 wind mills, a powerplatform, an accomodationplatform and  power‐ and communication cables.

The vessel EDDA FLORA is expected to carry out ROV inspections at the DONG assets as well as TYRA E, HARARLD, GORM and SYD ARNE starting at GORM approx. 30/4. For further information, please see www.foga.dk

Hejre Project:

In connection to the establishment of the HEJRE Platform a safety zone of 500 m has been established around the position: 56°14,809' N ‐003°57,534' E . The safety zone has been established according to the Energy Ministry Order No 657 of 30 December 1985. The guard vessel ESVAGT KAPPA are conducting guard duties at the HEJRE Platform site. Position: 56°14'51 N ‐ 003°57'37 E. 

 

Syd ArneSAL system56 05,549 N04 15,368 E

o

o

Syd ArneWHPN platform56 05,744 N04 13,154 E

o

o

Cardinal buoys Degrees Minutes Degrees Minutes

N (Q) 1)       55o

15,763 N       7o

07,691 E

N (Q) 2)       55o 14,806 N       7o 14,406 E

W (Q(9)15s) 3)       55o 11,301 N       7o 07,828 E

W (Q(9)15s) 4)       55o 06,839 N        7o 07,963 E

E (Q(3)10s) 5)       55o 10,482 N        7o 15,421 E

E (Q(3)10s) 6)       55o 06,877 N        7o 16,432 E

S (Q(6)+Lfl.15s) 7)       55o

02,912 N       7o

17,044 E

S (Q(6)+Lfl.15s) 8)       55o 02,646 N       7o 12,769 E

S (Q(6)+Lfl.15s) 9)       55o 02,377 N       7o 08,098 E

    

SOUTH ARNE fieldThe storage tank and top site of  SOUTH ARNE field is installed at position 56o 04,72' N  004o 13,82' E, connected with a new bridge and platform South Arne WHPE at position 56o 04,693' N  004o 13,85' E.Satellitplatform Syd Arne WHP N is installed at the position 56o 05,744' N  004o 13,154' E, where a safety zone of 500 meter is established acc. to DEA regulation No. 657. 

SOUTH ARNE's tanker loading  facility,  where tankers are  loaded at  8 ‐ 10 day  intervals  is located at WGS‐84 pos. 56o 05,55' N  004o 15,37' E.

RESOLUTE is established at the South Arne field's WHP E platform.

The standby vessel ESVAGT CARPATHIA is servicing at the North platform with MOB‐preparedness.

The accommodation rig COSL RIGMAR is espected moved from the South Arnefield's WHP N to Kristianssand . 

,04 15,368 Eo

Syd ArneWHPE platform56 04,694 N04 13,852 E

o

o

Syd ArneGBS platform56 04,702 N04 13,731 E

o

o

During May 2015 the oil company Wintershall expect to etablish a new platform called RAVN at the VALDEMAR WNW oil field at the position:55°52,912'‐ N 004°14,078' E.  The work is carried out from the vessel STADISLAN YUDIN.  

A prohibited area with a radius of 500 m from the position will be established. Within the area unauthorized navigation, anchoring, diving and fishing is prohibited. 

This newsletter and infochart has been prepared on request from the cooperation Oil Gas Denmark and is distributed vai E‐mail to all fishing vessels and interested parties around the North Sea. Please also visit FOGA's website www.foga.dk. E‐mail [email protected] to subscribe or unsubscribe. Please also notice that the size of the newsletter as a pdf file is approx. 1 mb.

AF GruppenPACIFIC OSPREY has finished the decommisioning of the GNSC B11 gas platform on app. 55°27.45 N 004°33.00 Eand the vessels have left the site.  The cardinal buoys at the perimeter of the 500 m safety zone will be revocered as soon as possible weatherpermitting. 

p p g , g, g gprohibited.