foga aps dk north sea week 11 11 2018 eng.pdf · foga aps fishermens information of oil‐and gas...

4
FOGA ApS FISHERMENS INFORMATION OF OILAND GAS ACTIVITIES Trafikhavnskaj 19 DK6700 Esbjerg Tel.: +45 75 45 11 44 EMail: [email protected] Web page: www.foga.dk NORTH SEA ACTIVITIES Week 11 March 13, 2018 FOGA ApS has on basis of information received from offshoreoperators at the North Sea prepared the following newsletter describing present activities: Info 1.1 Info 2.1 Info 3.0 Info 4.0 Info 5.0 Info 6.0 Info 7.0 © Crown Copyright and/or database rights. Reproduced by permission of the Controller of Her Majesty’s Stationery Office and the UK Hydrographic Office (www.GOV.uk/UKHO). "Unter Verwendung von Datenmaterial des Bundesamtes für Seeschifffahrt und Hydrographie (BSH) hergestellt (Lizenznr. 201706)". Do not copy without permission from FOGA ApS Signatures: Warning Safety zone Pipeline with 200 meter protective zone Buoy Existing installation Mobile rig 1 MAERSK RESOLUTE: ESBJERG HAVN. 2 NOBLE SAM TURNER in position at DAN FF. 4 CROSSWAY EAGLE in position at TYRA West. 5 MAERSK GUARDIAN in position at TYRA East. 6 MAERSK RESILIENT is in position at GORM F. 8 MÆRSK GIANT: ESBJERG HAVN. 10 PARAGON C20051: ESBJERG HAVN. 11 PARAGON HZ1: ESBJERG HAVN. 12 ATLANTIC LABRADOR: ESBJERG HAVN. Within the 500 zone at TYRA E a pipeline at the seabed has been exposed. Fishing vessels are to keep clear of the position. Vessels: The vessel SEAHORSE Horns Rev III, Scour campaign. The vessel NORDSØEN conducting guard duties at Horns Rev III. The vessel MÆRSK TRACKER is working at the DUC Fields. The vessel SKANDI OLYMPIA ROV survey at the DUC Fields. Cable trenching & diving operations at the Cobra Cable near Fanø. Info 2.0 Info 6.0 Info 6.0 Info 9.0 Info 10.0 1 af 4

Upload: ngonhu

Post on 27-Apr-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES

Trafikhavnskaj 19DK‐6700 EsbjergTel.:               +45 75 45 11 44

E‐Mail:      [email protected] page:       www.foga.dk

NORTH SEAACTIVITIES

Week 11March 13, 2018

FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:

Info 1.1

Info 2.1

Info 3.0

Info 4.0

Info 5.0

Info 6.0

Info 7.0

© Crown Copyright and/or database rights. Reproduced by permission of the Controller of Her Majesty’s Stationery Office and the UK Hydrographic Office (www.GOV.uk/UKHO). "Unter Verwendung von Datenmaterial des Bundesamtes für Seeschifffahrt und Hydrographie (BSH) hergestellt (Lizenznr. 2017‐06)". Do not copy without permission from  FOGA ApS

Signatures:Warning

Safety zone

Pipeline with 200 meter protective zone

Buoy

Existing installation

Mobile rig

1 MAERSK RESOLUTE: ESBJERG HAVN. 2 NOBLE SAM TURNER in position at DAN FF.4 CROSSWAY EAGLE  in position at TYRA West.5 MAERSK GUARDIAN in position at TYRA East. 6 MAERSK RESILIENT is in position at GORM F.8 MÆRSK GIANT: ESBJERG HAVN.10 PARAGON C20051: ESBJERG HAVN.11 PARAGON HZ1: ESBJERG HAVN.12 ATLANTIC LABRADOR: ESBJERG HAVN.

Within the 500 zone at TYRA E a pipeline at the seabed has been exposed. Fishing vessels are to keep clear of the position.

Vessels:The vessel SEAHORSE Horns Rev III, Scour campaign.The vessel NORDSØEN conducting guard duties at Horns Rev III.The vessel MÆRSK TRACKER is working at the DUC Fields.The vessel SKANDI OLYMPIA ROV survey at the DUC Fields.Cable trenching & diving operations at the Cobra Cable near Fanø.  

Info 2.0

Info 6.0Info 6.0

Info 9.0

Info 10.0

1 af 4

Rigs in the Port of Esbjerg

Info 1.0

Info 2.0

Info 2.1

Info 3.0

Rigs:MÆRSK GIANT, PARAGON C20051, PARAGON HZ1, ATLANTIC LABRADOR, MAERSK RESOLUTE

Within the 500 zone at TYRA E a pipeline at the seabed has been exposed. Fishing vessels are to keep clear of the position.Vessels:The vesselMAERSK TRACKER is working at the DUC Fields.The vessel SKANDI OLYMPIA is expected to undertake a ROV survey at the DUC fields during weeks 12‐18.SKANDI OLYMPIA vil inspect pipelines and structures.

TYRA FUTURE:Both new pipelines between TYRA W & TYRA E has been deployed and trenched into the seabed.

More information on this project can be found on page 4.

Rigmoves: NOBLE SAM TURNER expected to be moved from DAN FF to VALDEMARBA primo April.The accommodation rig CROSSWAY EAGLE expected to be moved fromTYRA W A to DAN FG primo April.The accommodation rig MAERSK GUARDIAN is in position at TYRA East A. MAERSK RESILIENT expected to be moved from GORM F to HALFDAN BA ultimoMarch.

FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES

Trafikhavnskaj 19DK‐6700 EsbjergTel.:               +45 75 45 11 44

E‐Mail:      [email protected] page:       www.foga.dk

NORTH SEAACTIVITIES

FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:

SIRI‐field:  56o 28.96' N  004o 54.67' E

CECILIE‐A field: 56o 24.13' N  004o 45.58' E

NINI A‐field:  56o 38.45' N  005o 19.27' E

NINI B‐field: 56o 40.49' N  005o 24.74' E

STINE field ‐ Subsea installations:STINE SCB‐1:  56o 30.96' N  005o 02.46' E

STINE SCB‐2:  56o 30.95' N  005o 03.56' E

The safety zones are 500 mfrom the positions.

Vessels: 

Hejre Project: 

In connection to the establishment of the HEJRE Platform a safety zone of 500 m has been established around the position: 56°14,809' N ‐ 003°57,534' E. The safety zone has been established according to the Offshore safety order. 

FINO 3 ‐ Research PlatformThe research platform FINO 3 was established in 2007/2008 approx. 45 nautical miles west of the island Sylt at the position: 55° 11,7' N 007° 09,5' E. A 500 meter safety zone has been established around the platform. 

Please see the web page from the "Forschungs‐ und Entwicklungs zentrum, Fachhochschule Kiel Gmbh" www.fino3.de for more information.

DAN TYSK windfarmThe DAN TYSK  windfarm has been etablised at the shown site.  

SANDBANK windfarm The SANDBANK windfarm has been etablised.  

Update of informationWeek 11March 13 ‐ 19, 2018Next FOGA Info to be distributedMarch 20, 2018

Illustration of hose when idle.

SIRI tanker loading facility.

HEJREField

NOBLE SAM TURNER

CROSSWAY EAGLE

MAERSKGUARDIAN

MAERSKRESILIENT

MAERSK GIANT

PARAGON HZ1 PARAGON C20051 ATLANTIC LABRADOR

FINO 3

MAERSKRESOLUTE

MAERSK TRACKER

MAERSK OILA company of Total

SKANDI OLYMPIA

2 af 4

Info 4.0

Info 5.0

Info 6.0

Info 7.0

Info 8.0

Info 9.0

SYD ARNE field

The storage tank and top site of  SOUTH ARNE field is installed at position 56o 04,72' N  004o 13,82' E, connected with a new bridge to the platform South Arne WHP E (Well Head Panel) at position 56o 04,693' N  004o 13,85' E.

The satellitplatform Syd Arne WHP N is installed at the position 56o 05,744' N  004o 13,154' E, where a safety zone of 500 meter is established acc. to Offshore safety order.  SOUTH ARNE's tanker loading  facility,  where tankers are  loaded at  8 ‐ 10 day  intervals  is located at WGS‐84 pos. 56o 05,55' 

 

Syd ArneSAL system56 05,549 N04 15,368 E

o

o

Syd ArneWHPN platform56 05,744 N04 13,154 E

o

o

Syd ArneWHPE platform56 04,694 N04 13,852 E

o

o

Syd ArneGBS platform56 04,702 N04 13,731 E

o

o

The oil company Wintershall has established a new platform called RAVN; at the position: 55°52,912' N ‐ 004°14,078' E. 

A safety zone with a radius of 500 m from the position has been established. Within the zone unauthorized navigation, anchoring, diving and fishing is prohibited.  

The company Vattenfall has  finished the installation of the  49 windturbine foundations at the Horns Rev III windfarm. A buoyed prohibited area has been established at the site for the coming windfarm HORNS REV III. Within the area unauthorized navigation, anchoring, diving and fishing is prohibited. 

The vessel SEAHORSE is performing scour deployment at several foundations. Duration app. 2‐3 weeks.

The vessel NORDSØEN is on site conducting guard duties and  listening on VHF ch. 10 & 16. 

Horns Rev 3 Marine Coordination Centre has been established by Vattenfall and is in operation 24/7. HR3 MCC can be contacted by VHF can 16 and 10 or by duty‐phone no.: +45 27 87 50 50. HR3 MCC is monitoring traffic in the area and at the construction site.

A string of 39 m CPT rods, 4 cm in diameter has been lost and is now laying at the seabed at approx. position 56°01,29 N ‐ 008°02,00 E. Fishing vessels are to keep clear of the position. 

Danish navigational warning no. DK‐214‐16

At the below mentioned position a wreck of a submarine has been discovered containing dangerous ammunition.Due to safety reasons, Danish Maritime Authority prohibit all unauthorized fishing, anchoring and diving on and within 100 m radius of the wreck in pos. 55 30,62 N ‐ 007 56,84 E. Please note that the size of the prohibited area has been changed. Violation of the prohibition is punishable by fine or prison.

FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES

Trafikhavnskaj 19DK‐6700 EsbjergTel.:               +45 75 45 11 44

E‐Mail:      [email protected] page:       www.foga.dk

NORTH SEAACTIVITIES

Update of informationWeek 11March 13 ‐ 19, 2018Next FOGA Info to be distributedMarch 20, 2018

FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:

SYD ARNE Field

RAVN Platform

Orsted operates 3 pipelines in the Danish North Sea sector: 

20” Oil pipeline from GORM to Filsø24” Gas pipeline from SYD ARNE to Blåbjerg. (via subsea Y‐connection with a split from HARALD)30” Gas pipeline from TYRA E‐E to Kærgård

Monopile NORDSØEN

Cable burial work of the Cobra Cable, on the near shore part close to Fanø is expected to comence on or around 01/03 2018. This will include trenching & diving operations in the area.The work is performed from the vessels NORMAND PACIFIC & DIABLO.Guard vessels CECILIE or ANETTE CHRISTINA will guide and advise other vessels working  in the area, Ch 16.

SEAHORSE

DIABLONORMAND PACIFIC

3 af 4

Info 10.0

TYRA FUTURE:

This newsletter and infochart has been prepared on request from the cooperation Oil Gas Denmark and is distributed via E‐mail to all fishing vessels and interested parties around the North Sea. Please also visit FOGA's website www.foga.dk. E‐mail [email protected] to subscribe or unsubscribe. Please also notice that the size of the newsletter as a pdf file is approx. 1 mb.

FOGA ApSFISHERMENSINFORMATIONOF OIL‐ ANDGAS ACTIVITIES

Trafikhavnskaj 19DK‐6700 EsbjergTel.:               +45 75 45 11 44

E‐Mail:      [email protected] page:       www.foga.dk

NORTH SEAACTIVITIES

Update of informationWeek 11March 13 ‐ 19, 2018Next FOGA Info to be distributedMarch 20, 2018

FOGA ApS has on basis of information received from offshore‐operators at the North Sea prepared the following newsletter describing present activities:

The charts below shows the new pipelines between the TYRA Fields.

MAERSK OILA company of Total

4 af 4