north of ig ar on the fraser river august 4, 2019 updates · passage on the river’s edge. •...

1
UPDATES The scaling crew connue to manipulate rocks at water level. These personnel use hydraulic jacks and inflatable air bags to strategically move the large boulders in predetermined areas. Crews are making encouraging progress in building a natural fish passage on the rivers edge. Genec tesng has been completed from the Early Stuart Sockeye Pilot Enhancement Project. All salmon involved were successfully captured and transported to the Cultus Lake lab. Bio-sampling for stress tesng connues on the salmon, alongside the radio tagging operaons. Stress tesng, which involves measuring their fat content, lacc acid levels, hormone levels and a blood analysis, allows biologists to monitor and assess the salmons health before transport. Two helicopters connue to transport salmon in holding tanks upstream, past the obstrucon. This relocaon operaon connues to be successful, and remains ongoing. As of today approximately 4,300 Sockeye and Chinook salmon have been transported upstream from the slide. Addional salmon holding tanks arrived to Lillooet yesterday. They will be transported to the capture site to improve helicopter transport capacity. The implementaon of the Fish Wheel connues, with addional on-water resources arriving tomorrow. Once integrated, the wheel will increase the efficiency of the capturing process, and will increase the number of fish transported upstream of the obstrucon. INCIDENT LOCATION North of Big Bar on the Fraser River DATE PREPARED August 4, 2019 INCIDENT NAME Big Bar Landslide Incident Webpage BC River Forecast A meeng at the Environmental Unit. Scalers on the rockface above the landslide.

Upload: others

Post on 31-Aug-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: North of ig ar on the Fraser River August 4, 2019 UPDATES · passage on the river’s edge. • Genetic testing has been completed from the Early Stuart Sockeye Pilot Enhancement

UPDATES • The scaling crew continue to manipulate rocks at water level. These personnel use hydraulic jacks and inflatable air bags to

strategically move the large boulders in predetermined areas. Crews are making encouraging progress in building a natural fish

passage on the river’s edge.

• Genetic testing has been completed from the Early Stuart Sockeye Pilot Enhancement Project. All salmon involved were

successfully captured and transported to the Cultus Lake lab.

• Bio-sampling for stress testing continues on the salmon, alongside the radio tagging operations. Stress testing, which involves

measuring their fat content, lactic acid levels, hormone levels and a blood analysis, allows biologists to monitor and assess the

salmon’s health before transport.

• Two helicopters continue to transport salmon in holding tanks upstream, past the obstruction. This relocation operation

continues to be successful, and remains ongoing. As of today approximately 4,300 Sockeye and Chinook salmon have been

transported upstream from the slide.

• Additional salmon holding tanks arrived to Lillooet yesterday. They will be transported to the capture site to improve helicopter

transport capacity.

• The implementation of the Fish Wheel continues, with additional on-water resources arriving tomorrow. Once integrated, the

wheel will increase the efficiency of the capturing process, and will increase the number of fish transported upstream of the

obstruction.

INCIDENT LOCATION

North of Big Bar on the Fraser River

DATE PREPARED

August 4, 2019

INCIDENT NAME

Big Bar Landslide

Incident Webpage BC River Forecast

A meeting at the Environmental Unit. Scalers on the rockface above the landslide.