Page 1: Nexans - Olivier Angoulevant

Offshore Wind China 2010Bergen, 15th March 2010

Olivier Angoulevant

Nexans Norway AS

Page 2: Nexans - Olivier Angoulevant

At the core of performance

Page 3: Nexans - Olivier Angoulevant

At the core of performance :

a worldwide leader

* Based on sales at current metal prices (Proforma Madeco cables and Intercond over 12 months)

Sales by destination *

Worldwide leader in cables, cabling systems and related services

Sales in 2008 of 6.8 billion Euro

Listed on the NYSE Euronext Paris

Europe

North America

Middle East,

Russia, Africa

Asia-Pacific

South America

Page 4: Nexans - Olivier Angoulevant

At the core of performance

in infrastructure, industry and building markets

Sales by key market *

* Based on sales at current metal prices (Proforma Madeco cables and Intercond over 12 months)

A global player in the infrastructure, industry and building markets

with energy as the basis of its leadership development

Building

Industry

Infrastructure

Page 5: Nexans - Olivier Angoulevant

At the core of performance :

a worldwide presence

Industrial presence in 39 countries and commercial activities worldwide

22,400 local experts

Mastery of national and international standards

Page 6: Nexans - Olivier Angoulevant

Nexans Norway AS

1915 -

Page 7: Nexans - Olivier Angoulevant

N e x a n s N o r w a y A S

Telecom and Building Energy Networks Energy

Employees January 2008: 1139

Rognan

Namsos

Oslo (HQ)

Langhus

Karmøy Halden

Page 8: Nexans - Olivier Angoulevant

8Energy

Tokyo Bay

N e x a n s N o r w a y i n J a p a n

Page 9: Nexans - Olivier Angoulevant

A submarine history aslong as applied electricity

Challenging coastline, deep

water (500 m)Offshore exploration in

35 years,

water depth >2000 m

1500 submarine power

cables in 100 years

Submarine Cables

ranging from

12 to 550 kV

Power cables and

umbilicals for the

offshore industry for 35

years

Page 10: Nexans - Olivier Angoulevant

Specialised in submarine projects -Cable and Umbilical systems

for Offshore applications

H a l d e n , N o r w a y

Page 11: Nexans - Olivier Angoulevant

Platform or Onshore

Cable design and

manufacture

Offshore wind

power

generation

Overview of “offshore cable system”

0 - 2000 m water depth

Transport & Laying

Cable Accessories

Hang-off, jointing &

termination

Additional

Protection

Oil & gas Umbilical design and

manufacture

Protection by

Trenching

The task: Power, telecom from here

to here

Page 12: Nexans - Olivier Angoulevant

State of the art and latest technology developments in HVAC transmission

2002 Horns Rev 1 and 2

Offshore Wind Farm, 170kV

3x630 mm2

2003 Smola Wind Farm,

132kV 3x500 mm2

2005 Barrow Offs Wind

Farm, 132kV 3x300 mm2

2006 Lynn and Inner

Dowsing

36kV 3x185-240-630-1000

mm2

2008 Wolfe Island Wind

Farm, 245kV 3x500 mm2

Conductor

XLPE

insulation

system

Lead

sheath

Fibre optic

cable

Armour wires

Outer

corrosion

protection

Combined cables: 3-core Power Cable with Fibre Optic

Page 13: Nexans - Olivier Angoulevant

Voltage

quality: + 10%

change

between no

load and full

load

Max. 10% loss

Buried 1 m

Temp. 10 C

XLPE

Per circuit (3-phases):

400kV 1-core cable:1000 MW to 100 km

230kV 3-core cable: 300 MW to 200 km

400 MW to 75 km

Cable Technology – AC possibilities

0 MW

200 MW

400 MW

600 MW

800 MW

1000 MW

1200 MW

0 km 50 km 100 km 150 km 200 km 250 km 300 km 350 km 400 km

Un=400 kV

Un=132 kV

Un=150 kV

Un=230 kV

Page 14: Nexans - Olivier Angoulevant

State of the art and latest technology developments in HVDC transmission

500 kV 800 MW

Mass Impregnated

“Three in one cable”.

Mass Impregnated (MI) DC cable with

Integrated Return Conductor =>

eliminates the use of Sea return electrodes.

Fibre Optic element integrated

Next step :

500 kV extruded polymer alloy

=>

lighter in weight and reduced cost

Page 15: Nexans - Olivier Angoulevant

Technological status

Nexans installed the worlds first 170 kV 3-core XLPE insulated submarine cable to the Horns Rev offshore wind farm in 2002. Cable length 21 km Power transmission capacity 160 MW Step 2 (210 MW) of this wind mill farm “Horns Rev II” (43 km) was installed

in Oct. 2008

AC submarine cables Horns Rev 1 and 2 experience

Page 16: Nexans - Olivier Angoulevant

AC submarine cables

Page 17: Nexans - Olivier Angoulevant

Location: Canada

Customer: Canadian Renewable Enregy Corporation (CREC)

Description / Challenge World’s first 3-core 245kV XLPE submarine cable Supply of related accessories

Nexans Solution / Technology 8 km of TKRA 245kV 3x1x500mm2 Spare cable joints Onshore accessories

Wolfe Island Submarine Power Cable

Page 18: Nexans - Olivier Angoulevant

Location: Norway

Customer: Statoil Hydro

Description / Challenge Supply of subsea cable for the world’s

first floating windmill Supply of related accessories

Nexans Solution / Technology 11 km of XLPE 24kV

+ 24 FO submarine cable Spare cable joints Other accessories Marine installation

Hywind Project

Page 19: Nexans - Olivier Angoulevant

Location: UK

Scope of work: 4 export cables TKRA 170kV 3x1x630mm2 TKRA 170kV 3x1x800mm2 800mm2 at each 3km end 47-48km 630mm2 main length

Delivery: 2 Cables in 2011 2 Cables in 2012

London Array

Page 20: Nexans - Olivier Angoulevant

Location: UK

Customer: Centrica (Lincs) Ltd

Scope of work: 250 MW TKRA 145kV 3x630/1000mm2 Two lengths of 49km, 98km total Including a Fiber Optic element 84 fibers Joints, drum for spare length and accessories

Lincs, Offshore Windfarm

Page 21: Nexans - Olivier Angoulevant

Location: UK

Customer: SCIRA, Statoil (50 %) and Statkraft (50 %)

Scope of work: 315 MW 2 x 21km TKRA 145 kV 3x1x630 mm² 2 x 0.2km TKRA 145 kV 3x1x1000 mm² Including a FO element Joints, spare length and accessories

Sheringham Shoal, Offshore Windfarm

Page 22: Nexans - Olivier Angoulevant

Nyhamna

Transformer station

420 kV cable

Transformer

station

Location: UK

Customer: Statnett

Scope of work: 1000 MW TKRA 420kV 1x1200 mm² 4-500m land sections on both sides 2.4km submarine cable Maximum water depth of 210 m

Ormen Lange Grid Connection

Page 23: Nexans - Olivier Angoulevant

Location: China

2x80 MW capacity

2x9km, TKRA 123kV 3x1x400mm2

China’s largest XLPE submarine cable(78 kg/m, 189 mm)

Nexans design, manufacturing, transport

Chong Ming – Chang Xing

Page 24: Nexans - Olivier Angoulevant

Location: China

600 MW capacity

3x31km, 525kV, 800mm2, single core

China’s largest submarine cable system

Nexans design, manufacturing, installation and transport

Hainan

3 cables

2009

4 cables

2014?

Primary coatedfibre

Steel tube

Inner sheath, polyethylene

Armour, steel wire

Outer yarn serving

Page 25: Nexans - Olivier Angoulevant

Dynamic AC cables

Nexans Norway has experience with dynamic MV XLPE AC cables since 1980’ies

Platforms, FPSO

In-house expertise on dynamic analyses and cross section analyses by Riflex, UFLEX

Dynamic applications

Page 26: Nexans - Olivier Angoulevant

Very long cables(> 120 km, 7000 MT)

Marine Installation – Laying

Page 27: Nexans - Olivier Angoulevant

Protection against hazards, such as

Fishing

Anchoring

Dropped objects

Protection

Page 28: Nexans - Olivier Angoulevant

Very small risk of cable or

pipeline damage during

operation

• Trenching in soft to hard sediments

• Trench depth 0.5-3 m

• Operation to 1000 m water depth

No external forces imposed to

cable or pipeline during

trenching

Operational close to

cables/pipelines/platforms

without risk of damage

Trenching of pipeline

crossings

Protection –

The CAPJET® ROV system, by Nexans

Page 29: Nexans - Olivier Angoulevant

Concrete bagsMattresses

Rock dumping

Extra protection

Page 30: Nexans - Olivier Angoulevant

Thank you for your attention!

Olivier [email protected]+47.47.67.75.11