news from elan

Download News from ELAN

Post on 20-Jan-2016

33 views

Category:

Documents

0 download

Embed Size (px)

DESCRIPTION

News from ELAN. SC of CARE. News from ILC. At LCWS05 (March at Stanford: 400 participants with MDI+ACCEL) B. Barish has accepted to lead the GDE http://www.fnal.gov/directorate/icfa/ Costing document due end of 2006 - PowerPoint PPT Presentation

TRANSCRIPT

  • News from ELANSC of CARE

  • News from ILCAt LCWS05 (March at Stanford: 400 participants with MDI+ACCEL) B. Barish has accepted to lead the GDE http://www.fnal.gov/directorate/icfa/ Costing document due end of 2006 3 GDE regional Directors+costing engeneers+30 CORE team (distributed)

    Snowmass meeting 2 weeks in August to reach ILC configuration Physics (Aspen), Detector, Accelerator (after KeK) EUDET: I3 for detector 8.6 M ESFRI priorities for FP7: acknowledges ILC among Global projects:http://www.cordis.lu/era/esfri_home.htm - International Large Collider (ILC) - Square Kilometre Array (SKA) radio telescope - International Fusion Materials Irradiation Facility (IFMIF) - ITER

  • ROADMAP shown at the KeK ILC meeting

  • ELAN Meetings in 2005Procedure: relevant European WS +acknowledgement of ELAN support (logo) Document(s) ELAN issuedList in http://esgard.lal.in2p3.fr/Project/Activities/Current/Networking/N2/ELAN/Workshops/ Support for international (ILC) meetings: LCWS05 (MDI, ACCEL)+SNOWMASS

  • Workshops Supported by ELAN

    Avoid duplication with EUROTeV

    2005WIGGLE2005 - Mini-Workshop on Wiggler Optimization for Emittance Control 21 - 22 FebruaryFrascati, ItalyMetrology and Stabilisation - for Linear Colliders Workshop 10 - 11 MarchLAPP, Annecy le Vieux, FranceLCWS05 - International Linear Collider Workshop 18 - 22 MarchStanford, USATESLA Collaboration Meeting30/3 - 1/4/2005DESY, GermanyPositron Sources for International Linear Collider 11 - 13 AprilDaresbury, UKHEEAUP2005 - International Workshp on High Energy Electron Acceleration Using Plasmas 2005 8 - 10 JuneInstitut Henri Poincar, Paris, FranceILC-BDIR London Beam Delivery Systems 20 - 23 JuneLondon, UKThe 2005 International Linear Collider Physics and Detector Workshop and Second ILC Accelerator Workshop 14 - 27 AugustSnowmass, Colorado, USA

  • Program for a day ELAN programAt the London ILC Meeting (June 20-23 2005)

    Talk on GDE Plans of the GDE X 35+5 Talk on ELAN Future plans of ELAN FR 20+5 Talk on NC CTF, PHIN, Alignt meeting of Annecy GG 35+10 Plans for Snowmass

    Break 15 minutes

    Talk on SC TTF,SRF,recent workshops LL 35+10 Plans for Snowmass Talk on ANAD The Paris workshop, future plans BC 35+10 Talk on DR Frascati workshop Maria Enrica Biagini (Frascati) 35+10Parallel sessions: WP6 only (SC RF)

    General comments: These talks are meant to be interesting for a general public,giving the general picture but also focusing on some well chosen items which have critical implications

  • ILC-BDIR + ELAN + EUROTeV Workshop

    Start:Mon 20Tue 21Wed 22Thu 230900ELANPlenary NewsLaser-WireMiniWSWP1WP10/T3WP11/T6WP2WP4WP5/T5WP7WP1/T10930WP21000WP3Break1100ELANPlenary NewsLaser-WireMiniWkshpWP1WP10/T3WP11/T6WP2WP4WP5/T5WP7WP4 /T41130WP5/T51200WP61230WP7Break1400-B1 IntroATF2WP3WP6WP12/T7WP1/T1WP4/T4WP8WP9/T2WP81430B2 IntroWP9 /T21500B3 IntroWP10/T3Break1600B4 IntroATF2WP3WP6WP12/T7WP1/T1WP4/T4WP8WP9/T2WP11/T61630B5 IntroWP12/T7

  • ELAN MoneyUnder spent in 2004 mainly DESY INFN CERN 100k/168k More activity expected in 2005254k requested for 18 months (+15 %)Concern with CNRS money (Comptable from University not accepted, Clause 23 allows UMR-Orsay to be considered as a contractor TG)

  • ELAN ManagementG. Blair has replaced S. Smith Web page for INSTR Two non UE associates: - US: SLAC (M. Ross) - Israel: Technion (S. Tarem) Support for students for an ANAD school in Scotland ?ANAD launching a NEST outline proposal EUROLEAP: European Laser Electron controlled Acceleration in Plasmas to GeV energy range

  • ConclusionAfter a first year with centralized workshops we are moving to a more distributed organization to cope with the ILC and ANAD effortsThere will be an ELAN dedicated meeting in London (BDYN-INSTR WS) and also an other one at the end of the year Priority to catch up on INSTRELAN and EUROTeV complementarities are carefully discussedFlexibility to cope with the ILC evolving situation

  • Participant (cost model)Permanent Staff including indirect cost (Euros)Additional Staff including indirect cost (Euros)Durable Equipment including indirect cost (Euros)Consumables and Prototyping including indirect cost (Euros)Travel including indirect cost (Euros)Executed costs including indirect cost (Euros)Direct costSubcontractIndirect costRequested funding (Euros)CEA(FC)00004 2804 2804 280006 000xCNRS(FC)000029 28229 28224 40204 88031 500xDESY(AC)000024 21024 21020 17504 03547 250xFZJ(AC)00001 0021 0021 002001 500xFZR(AC)00002 3712 3711 97603955 226xINFN(AC)00002 5152 5152 096041918 000xTEU(FC)00001 7971 7971 797001 500xTUL(AC)00001 8551 8551 54603092 250xIPJ(AC)00002 6462 6462 20504412 250xWUT-ISE(AC)0000000002 250xCSIC(FC)00001 9021 9021 58503172 250xCERN(AC)000017 07717 07714 23102 84625 500xPSI(FC)00001 8661 8661 866000xCCLRC(FC)00002 7762 7762 776009 000xICL(AC)000080680667201343 750xUMA(AC)00005 6245 6244 68709379 750xGrand total0000100 009100 00985 296014 713167 976