1 news from elan sc of care paris sept 5 2005. 2 news from ilc gde structure founded under b....

22
1 News from ELAN News from ELAN SC of CARE SC of CARE Paris Sept 5 2005 Paris Sept 5 2005

Post on 18-Dec-2015

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

11

News from ELANNews from ELAN

SC of CARESC of CARE

Paris Sept 5 2005Paris Sept 5 2005

Page 2: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

22

News from ILCNews from ILC

GDE structureGDE structure founded under B. Barish: 3 GDE regional Directors + founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from ELAN managt) under ILCSC ‘oversight’~40 CORE team (4 from ELAN managt) under ILCSC ‘oversight’

SnowmassSnowmass meeting (ALCPG->Intal) 2 weeks in August to reach ILC meeting (ALCPG->Intal) 2 weeks in August to reach ILC configuration configuration

- Physics (Aspen), Detector, Accelerator (after KeK) - Physics (Aspen), Detector, Accelerator (after KeK) - 640 participants (1/3 machine)- 640 participants (1/3 machine) - 10 critical recommendations/decisions - 10 critical recommendations/decisions EUDETEUDET: I3 for detector approved 7 M€ 21 partners: I3 for detector approved 7 M€ 21 partners

Page 3: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

33

GDE – StaffingGDE – Staffing Staff the GDEStaff the GDE

Administrative, Communications, Web staffAdministrative, Communications, Web staff Regional Directors (one per region)Regional Directors (one per region) Accelerator Experts (covering all technical areas)Accelerator Experts (covering all technical areas) Senior Costing Engineer (one per region)Senior Costing Engineer (one per region) Civil/Facilities Engineer (one per region)Civil/Facilities Engineer (one per region) Detectors (WWS chairs)Detectors (WWS chairs) Fill in missing skills (later)Fill in missing skills (later)

Total staff size about 20 FTE (2005-2006) about 40 heads.Total staff size about 20 FTE (2005-2006) about 40 heads. The internal GDE organization and tasks will be organized The internal GDE organization and tasks will be organized

internationally, not regionallyinternationally, not regionally

Page 4: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

44

GDE – Near Term PlanGDE – Near Term Plan

ScheduleSchedule• Begin - define Configuration (Snowmass Aug 05) Begin - define Configuration (Snowmass Aug 05) • Baseline Configuration Document (end of 2005)Baseline Configuration Document (end of 2005)

----------------------------------------------------------------------------------------------------------------------------------------------• Baseline under Configuration Control (Jan 06) Baseline under Configuration Control (Jan 06) • Develop Reference Design (end of 2006)Develop Reference Design (end of 2006)• Coordinate the supporting R&D programCoordinate the supporting R&D program

Three volumes -- 1) Reference Design Report; 2) Shorter Three volumes -- 1) Reference Design Report; 2) Shorter glossy version for non-experts and policy makers ; 3) glossy version for non-experts and policy makers ; 3) Detector Concept ReportDetector Concept Report

Page 5: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

55

The GDE Plan and ScheduleThe GDE Plan and Schedule

2005 2006 2007 2008 2009 2010

Global Design Effort Project

Baseline configuration

Reference Design

ILC R&D Program

Technical Design

Bids to Host; Site Selection;

International Mgmt

LHCPhysics

Page 6: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

66

ELAN and ILCELAN and ILC

Support relevant for European WS with Support relevant for European WS with acknowledgement of ELAN support (logo) acknowledgement of ELAN support (logo)

Document(s) ELAN issuedDocument(s) ELAN issued List in List in http://esgard.lal.in2p3.fr/Project/Activities/Current/Networking/N2/http://esgard.lal.in2p3.fr/Project/Activities/Current/Networking/N2/

ELAN/WorkshopsELAN/Workshops// Support for international (ILC) meetings:Support for international (ILC) meetings:

LCWS05 (MDI, ACCEL)+SNOWMASS LCWS05 (MDI, ACCEL)+SNOWMASS

Page 7: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

77

Workshops Supported by ELAN

20052005

WIGGLE2005WIGGLE2005 - - Mini-Workshop on Wiggler Optimization for Emittance Control Mini-Workshop on Wiggler Optimization for Emittance Control 21 - 22 February21 - 22 February Frascati, ItalyFrascati, Italy

Metrology and StabilisationMetrology and Stabilisation - - for Linear Colliders Workshopfor Linear Colliders Workshop 10 - 11 March10 - 11 MarchLAPP, Annecy le Vieux, LAPP, Annecy le Vieux, FranceFrance

LCWS05LCWS05 - - International Linear Collider WorkshopInternational Linear Collider Workshop 18 - 22 March18 - 22 March Stanford, USAStanford, USA

TESLA Collaboration MeetingTESLA Collaboration Meeting 30/3 - 1/4/200530/3 - 1/4/2005 DESY, GermanyDESY, Germany

Positron Sources for International Linear ColliderPositron Sources for International Linear Collider 11 - 13 April11 - 13 April Daresbury, UKDaresbury, UK

HEEAUP2005HEEAUP2005 - - International Workshp on High Energy Electron Acceleration International Workshp on High Energy Electron Acceleration Using Plasmas 2005Using Plasmas 2005

8 - 10 June8 - 10 JuneInstitut Henri Poincaré, Institut Henri Poincaré, Paris, FranceParis, France

ILC-BDIRILC-BDIR London Beam Delivery Systems London Beam Delivery Systems 20 - 23 June20 - 23 June London, UKLondon, UK

The 2005 International Linear Collider Physics and Detector Workshop and Second ILThe 2005 International Linear Collider Physics and Detector Workshop and Second ILC Accelerator WorkshopC Accelerator Workshop

14 - 27 August14 - 27 AugustSnowmass, Colorado, Snowmass, Colorado, USAUSA

 

Page 8: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

88

SRF WSSRF WSCornellCornell

OutreachOutreach

SRF WSSRF WSCornellCornell

OutreachOutreach

Metrology &Metrology &StabilisationStabilisation

AnnecyAnnecy

Metrology &Metrology &StabilisationStabilisation

AnnecyAnnecy

ILC-RegionalILC-RegionalLondonLondon

ELAN PlenaryELAN Plenary+ 4 Parallel+ 4 Parallel

ILC-RegionalILC-RegionalLondonLondon

ELAN PlenaryELAN Plenary+ 4 Parallel+ 4 Parallel

LCWS05LCWS05MDIMDI

StanfordStanfordDoc-05-05Doc-05-05

LCWS05LCWS05MDIMDI

StanfordStanfordDoc-05-05Doc-05-05

TTCTTCSR TechnoSR Techno

DESYDESYDoc-05-09Doc-05-09

TTCTTCSR TechnoSR Techno

DESYDESYDoc-05-09Doc-05-09

DRDRFrascatiFrascati

Doc-05-12Doc-05-12

DRDRFrascatiFrascati

Doc-05-12Doc-05-12

E+ SourcesE+ SourcesDaresburyDaresburyDoc-05-06Doc-05-06Doc-05-07Doc-05-07

E+ SourcesE+ SourcesDaresburyDaresburyDoc-05-06Doc-05-06Doc-05-07Doc-05-07

ILC-WWILC-WWSnowmassSnowmass

ILC-WWILC-WWSnowmassSnowmass

Page 9: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

99

Main decisions/recommendationsMain decisions/recommendations

1 beam and luminosity parameters

2 main linac starting gradient, upgrade gradient, and upgrade path

3 straight or follow earth's curvature?

4 1 or 2 IRs, if two, run interleaved?

5 1, 1.5, or 2 tunnel

6 DR size and shape

7 e+ source type conv/undulator/Compton

8 is there an e+ pre damping ring

9 DR location: 1st half tunnel, 2nd half, ceiling, under cryomodules, separate tunnel

10 cavity shape/material/processing

Page 10: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

1010

1.3GeV S-band linac

180 m laser-Compton ring

~100 MeV Accumulator Ringpol. e+

~100 MeV Accumulator Ringpol. e-

to 5 GeV ring

to 5 GeV ring

Polarized e+/e- sourcePolarized e+/e- sourcebased on Compton back scatteringbased on Compton back scattering

T. Omori, J. Urakawa, KEKK. Moenig, A. Variola, F. Zomer, LALP. Raimondi Frascati

accumulate >100 bunchlets to make nominal bunch;→needs large-acceptance accumulator ring & fast cooling

J. Urakawa

highly polarized e+ and e- (>90%);generation decoupled from collider

ATF proof-of-principle experimentproduced ~104 pol. e+ per pulse

Frank Zimmermann, CERN LP05

Page 11: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

1111

Cavity shape/material/processingCavity shape/material/processing

Summary Talk London (L. Lilje)Summary Talk London (L. Lilje) https://ilcsupport.desy.de/cdsagenda/askArchive.php?https://ilcsupport.desy.de/cdsagenda/askArchive.php?

base=agenda&categ=a0522&id=a0522s53t3/transparencies/base=agenda&categ=a0522&id=a0522s53t3/transparencies/Summary_of_SRF_WG_LL_.pdfSummary_of_SRF_WG_LL_.pdf

BCD Proposal for Cavity preparation (short)BCD Proposal for Cavity preparation (short)

http://alcpg2005.colorado.edu:8080/alcpg2005/program/accelerator/http://alcpg2005.colorado.edu:8080/alcpg2005/program/accelerator/WG5/helen_edwards20050821164419.pptWG5/helen_edwards20050821164419.ppt

BCD Proposal for Cavity preparation (long)BCD Proposal for Cavity preparation (long)

http://alcpg2005.colorado.edu:8080/alcpg2005/program/accelerator/http://alcpg2005.colorado.edu:8080/alcpg2005/program/accelerator/WG5/helen_edwards20050819140512.pptWG5/helen_edwards20050819140512.ppt

Page 12: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

1212

Next stepsNext steps

European GDE meeting in Oxford European GDE meeting in Oxford

GDE meeting in Frascati to finalize GDE meeting in Frascati to finalize decisions for the baselinedecisions for the baseline

-> ELAN support is asked by the B. Foster-> ELAN support is asked by the B. Foster Prepare for FP7Prepare for FP7 Contribute to ILC outreach (presentation L. Contribute to ILC outreach (presentation L.

Lilje at Cornell & Snowmass) Lilje at Cornell & Snowmass)

Page 13: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

1313

Outreach and Tutorials supported Outreach and Tutorials supported ELANELAN

Snowmass SRF Cavity tutorial (L. Lilje)Snowmass SRF Cavity tutorial (L. Lilje)

http://alcpg2005.colorado.edu:8080/alcpg2005/program/ENO/Superhttp://alcpg2005.colorado.edu:8080/alcpg2005/program/ENO/Superconductingcavitiestutorial_new.pdfconductingcavitiestutorial_new.pdf

Srf Tutorials at SRF 2005Srf Tutorials at SRF 2005 Workshop WWW-Link: http://www.lns.cornell.edu/public/SRF2005/Workshop WWW-Link: http://www.lns.cornell.edu/public/SRF2005/ Tutorial session on Sunday:Tutorial session on Sunday: http://www.lns.cornell.edu/public/SRF2005/program.htmlhttp://www.lns.cornell.edu/public/SRF2005/program.html Especially talk by D. Reschke on cleaning (paid by ELAN):Especially talk by D. Reschke on cleaning (paid by ELAN):

http://www.lns.cornell.edu/public/SRF2005/talks/sunday/SuP03_talkhttp://www.lns.cornell.edu/public/SRF2005/talks/sunday/SuP03_talk_srf2005.pdf_srf2005.pdf

Page 14: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

1414

ELAN ManagementELAN Management

New adsociates New adsociates - US: SLAC (M. Ross)- US: SLAC (M. Ross) - Technion (S. Tarem)- Technion (S. Tarem) - Center for the Advancement of Natural Discoveries using Light - Center for the Advancement of Natural Discoveries using Light

Emission, Yerevan , ArmeniaEmission, Yerevan , Armenia - Cracow University of Technology, (Institute of Applied Mechanics), - Cracow University of Technology, (Institute of Applied Mechanics),

Krakow, PolandKrakow, Poland - University of Ankara (K. Ciftci)- University of Ankara (K. Ciftci) Support ICFA school on ILC ?Support ICFA school on ILC ? ANAD has launched a NEST proposal 1st ANAD has launched a NEST proposal 1st level selectionlevel selection EUROLEAP:EUROLEAP: EuroEuropean pean LLaser aser EElectron controlled lectron controlled AAcceleration cceleration

in in PPlasmas to GeV energy rangelasmas to GeV energy range

Page 15: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

1515

HEEAUP 2005 Paris

Page 16: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

1616

Page 17: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

1717

ELAN DocumentsELAN Documents

Page 18: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

1818

ConclusionConclusion ELAN activity is mainly driven by the international ELAN activity is mainly driven by the international

GDE (WG 3-4) GDE (WG 3-4) ELAN support has been instrumental in preparing ELAN support has been instrumental in preparing

and supporting the Snowmass meetingand supporting the Snowmass meeting European support has been essential and European support has been essential and

should be maintained within FP7should be maintained within FP7

Interesting prospects of collaboration with the Interesting prospects of collaboration with the laser-plasma communitylaser-plasma community

Page 19: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

1919

From ECFA (T.A.)From ECFA (T.A.)

ICFA beam dynamics panel, Weiren Chou, ICFA beam dynamics panel, Weiren Chou, European co-sponsoring of a linear collider European co-sponsoring of a linear collider (more specifically ILC) school in spring 2006 in (more specifically ILC) school in spring 2006 in Japan. He has contacted JapanJapan. He has contacted Japan

(JSPS) and the USA (DOE) about co-sponsoring (JSPS) and the USA (DOE) about co-sponsoring and sent a mail to T.A. about "which European and sent a mail to T.A. about "which European agency to contact". Quantitatively we talk aboutagency to contact". Quantitatively we talk about

40-55'000 euros, assuming 20-25 students and 40-55'000 euros, assuming 20-25 students and 6-8 lecturers from Europe.6-8 lecturers from Europe.

Page 20: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

2020

Page 21: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

2121

Nº Task Name Début

1 Review of network activity Sam 01/01/05

2 Annual Meeting Lun 02/05/05

3 Annual Report Jeu 01/12/05

4 Coordination with EUROTeV Sam 01/01/05

5 WP 1 Sam 01/01/05

6 Progress on CTF3 Lun 03/01/05

7 CTF3 Review Lun 03/10/05

8 CTF Proceedings Lun 02/01/06

9 Review of benchmarks and workplan Sam 01/01/05

10 Progress on LTECNC topics, incl. topics common with other WP Lun 03/01/05

11 Workshop on topical activity status Ven 01/04/05

12 Workshop report Ven 01/07/05

13 Workshop on topical activity status Lun 03/04/06

14 Workshop report Lun 03/07/06

15 Complementing data base and documentation Ven 02/09/05

16 Review of structure prototype results Lun 02/01/06

17 Review on sources including outcome of PHIN Sam 01/01/05

18 Report on status of sources Ven 01/07/05

19 Report on status of sources Lun 03/07/06

20 WP 2 Sam 01/01/05

21 ILC Technology Development Sam 01/01/05

22 Monitor ILC preparation Sam 01/01/05

23 Coordinate Work together with EUROTeV Sam 01/01/05

24 Courses on SC technology at CERN Accelerator School Lun 03/10/05

25 Build Database for SRF Sam 01/01/05

26 MS: Database Jeu 23/02/06

27 Develop cavity reliability roadmap Sam 01/01/05

28 MS: Workshop (TESLA Meeting II) Jeu 06/10/05

29 Evaluation of quality control Mar 01/02/05

30 Evaluation of cleaning methods Mar 01/02/05

31 MS: Workshop (TESLA Meeting I) Mar 07/06/05

01/12

01/07

02/09

01/07

03/07

23/02

06/10

07/06

Tri 1 Tri 2 Tri 3 Tri 4 Tri 1 Tri 2 Tri 3 Tri 4 Tri 1 Tri 2 Tri 3 Tri 42005 2006 2007

Doc-05-09Doc-05-09

Snowmass+ReportSnowmass+Report

Cornell WS Cornell WS SnowmassSnowmass

Page 22: 1 News from ELAN SC of CARE Paris Sept 5 2005. 2 News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from

2222

Nº Task Name Début

32 WP 3 Sam 01/01/05

33 Identification of code extensions Sam 01/01/05

34 Definition of interfaces Sam 01/01/05

35 Workshop on Emittance preservation Lun 04/04/05

36 ID: Report Lun 02/05/05

37 Interations on code extensions/interfaces Mar 03/05/05

38 EUROTeV / ELAN Workshop Lun 05/12/05

39 WP 4 Lun 03/01/05

40 Coordinate R&D Lun 03/01/05

41 Create WWW site Mer 01/06/05

42 WP 5 Sam 01/01/05

43 Monitor and coordinate strudies on short pulse injectors Sam 01/01/05

44 Compare status of all-optical and RF injectors in view of recent progress Sam 01/01/05

45 ID: Report Lun 03/04/06

46 Extended plasma wave excitation Sam 01/01/05

47 Evaluate existing laser guiding techniques Sam 01/01/05

48 MS: Database Lun 02/01/06

49 ID: Document Mar 03/01/06

50 Identify optical diagnostics Lun 03/01/05

51 MS: Database Lun 02/01/06

52 ID: Document Mar 03/01/06

53 Electron beam focusing and transport Lun 03/01/05

54 Identify main issues Lun 03/01/05

55 MS: Workshop Lun 01/08/05

56 Coordinate European Proposals Lun 03/01/05

57 Meeting Lun 04/07/05

58 RTN proposal Ven 02/09/05

02/05

01/06

03/04

02/01

03/01

02/01

03/01

01/08

04/07

02/09

Tri 1 Tri 2 Tri 3 Tri 4 Tri 1 Tri 2 Tri 3 Tri 4 Tri 1 Tri 2 Tri 3 Tri 42005 2006 2007

London+SnowmassLondon+Snowmass

Report expectedReport expected

Paris meetingParis meeting

EuroleapEuroleap