New Solid Waste Management System in

Lahore (Technical Aspects)

Page 2: New Solid Waste Management System in Lahore (Technical Aspects)

Contents of Presentation

Vision Behind New SWM System in Lahore Formation of Lahore Waste Management

Company (LWMC) Why was Company needed? Transition from old to new SWM System Other Initiatives & Way Forward

Page 3: New Solid Waste Management System in Lahore (Technical Aspects)

Vision Behind New SWM System

To modernize the SWM system in

Lahore

To transform Lahore into one of the

cleanest cities of the world

Page 4: New Solid Waste Management System in Lahore (Technical Aspects)

Impediments

Lack of institutional capacity

Faulty outsourcing model

Financial constraints

Page 5: New Solid Waste Management System in Lahore (Technical Aspects)

Reasons for the Change

Page 6: New Solid Waste Management System in Lahore (Technical Aspects)

Formation of Company

CM Punjab envisaged establishment

of a company on the basis of Turkish

model.

LWMC established on March 19,

2010 under section 42 of the

Companies Ordinance 1984.

Page 7: New Solid Waste Management System in Lahore (Technical Aspects)

Services And Asset Management Agreement (SAAMA) signed on June 25, 2011

Assets, resources and functions were transferred to LWMC

Residual functions like;

Enforcement, regulation and levy of tax

Page 8: New Solid Waste Management System in Lahore (Technical Aspects)
Page 9: New Solid Waste Management System in Lahore (Technical Aspects)

Agreement signed on 27th December 2010 for technical support;

Waste characterization study

Capacity building of professionals

Identification and designing of integrated waste disposal facility

Designing of new waste management system

Agreement with M/s. ISTAC

Page 10: New Solid Waste Management System in Lahore (Technical Aspects)

Design of New System

Turkish experts of ISTAC identified the

gaps in the existing system

New system was designed to outsource

SWM services to international companies

Page 11: New Solid Waste Management System in Lahore (Technical Aspects)

Competitive and transparent bidding

process adopted

Tenders floated in Financial Times

and Gulf News

Contractors selected after detailed

technical and financial evaluations

International Bidding

Page 12: New Solid Waste Management System in Lahore (Technical Aspects)

Turkish Companies

Page 13: New Solid Waste Management System in Lahore (Technical Aspects)

Zoning of Lahore

Page 14: New Solid Waste Management System in Lahore (Technical Aspects)
Page 15: New Solid Waste Management System in Lahore (Technical Aspects)

Poor quality of sweeping

Inadequate & obsolete

equipments

No health & safety gadgets

Current System – Street Sweeping

Page 16: New Solid Waste Management System in Lahore (Technical Aspects)

New System – Street Sweeping

Improved quality of sweeping

Improved design of tools and

equipments

Proper health & safety gadgets

and uniforms for workers

Page 17: New Solid Waste Management System in Lahore (Technical Aspects)

Current System – Mechanical Sweeping

Obsolete & inefficient

technology

High emissions of dust

Inadequate coverage

Poor quality of sweeping

Page 18: New Solid Waste Management System in Lahore (Technical Aspects)

New System – Mechanical Sweeping

Modern, efficient technology

Less / no dust emissions

Coverage of all main roads of Lahore

Better sweeping quality

Page 19: New Solid Waste Management System in Lahore (Technical Aspects)

Current System – Waste Storage

Littering & open heaps in the

absence of door to door

collection

Inadequate and improper

storage equipments

Open storage of waste

Page 20: New Solid Waste Management System in Lahore (Technical Aspects)

New System – Waste Storage

Introduction of door to door

collection through bags

Installation of adequate number

of new type of containers &

waste bins

Page 21: New Solid Waste Management System in Lahore (Technical Aspects)

Current System – Waste Transportation

Open waste transportation

More than 20 years old machinery

Inefficient waste transportation

fleet

Lack of fleet monitoring

Page 22: New Solid Waste Management System in Lahore (Technical Aspects)

New System – Waste Transportation

No littering during transportation

New, modern & efficient vehicles

Fleet monitoring through advanced

technologies

Page 23: New Solid Waste Management System in Lahore (Technical Aspects)

Current System – Washing

No specialized vehicles for

washing

Manual drainage after washing

Rare washing of squares/

walkways

Page 24: New Solid Waste Management System in Lahore (Technical Aspects)

New System – Washing

Specialized washing vehicles

with high pressure

Very less drainage effort

Regular washing of major

squares / walkways

Page 25: New Solid Waste Management System in Lahore (Technical Aspects)

Role of Citizens in New SWM System

Page 26: New Solid Waste Management System in Lahore (Technical Aspects)

Other Initiatives & Way Forward

Page 27: New Solid Waste Management System in Lahore (Technical Aspects)

Sale of Waste to Private Sector

Agreement of sale of waste to private

sector;

1. DG Khan Cement

2. PNO Waste Management

Expected Technologies include : Segregation, composting or energy from landfill Gas, anaerobic digestion or RDF

Page 28: New Solid Waste Management System in Lahore (Technical Aspects)

Development of Model Areas

Local Area Office for complaint redressal

Waste collection in commercial areas

Special arrangements after rains and storms

Page 29: New Solid Waste Management System in Lahore (Technical Aspects)

Integrated Landfill Facility

Page 30: New Solid Waste Management System in Lahore (Technical Aspects)

Removal of Waste from Open Plots

Page 31: New Solid Waste Management System in Lahore (Technical Aspects)

Establishment of waste transfer stations

at suitable locations

Establishment and outsourcing of

integrated waste disposal facility

Page 32: New Solid Waste Management System in Lahore (Technical Aspects)
Page 33: New Solid Waste Management System in Lahore (Technical Aspects)

Development of a proper legal framework for SWM

System

Integration of DHAs and Cantonments

Revenue generation through waste streams

Page 34: New Solid Waste Management System in Lahore (Technical Aspects)

DOCUMENTRY ON NEW SOLID WASTE

MANAGEMENT SYSTEM IN LAHORE