4 gmbRailways’ Development in Rajasthan (2014-Present)
Green: Ajmer DivisionOrange: Kota DivisionViolet: Jaipur DivisionRed: Bikaner DivisionBrown: Jodhpur Division
Blue: Agra Division
Capital investment increased by 327%, average ̀ 682 crore (2009-14) to 2,911 crore (2014-19) ̀
All metre gauge track sanctioned for gauge conversion
Accelerated electrification with 100% track sanctioned for electrification
518 unmanned level crossings (UMLC) & 207 manned level crossings eliminated
in 2014-18
Energy efficient LED fittings at all railway stations & service buildings provided
Major infrastructure Inputs in last 4 years
63 km of new lines completed
182 km doubling done
384 km electrification done
37% of western DFC passing through Rajasthan resulting in increase of industrial
development.
Wi-Fi provided at 16 stations
Works in progress
8 works of new lines: 696 km at the cost of 5,634 crore`
9 works of doubling: 859 km at the cost of 5,749 crore`
4 works of gauge conversion: 551 km at the cost of 2,943 crore`
23 works of electrification: 4,519 km at the cost of 3,998 crore`
4 gmbINPUTS BY RAILWAY IN BARMER PARLIAMENTARY CONSTITUENCY
BARMER PARLIAMENTARY CONSTITUENCY
A. ASSEMBLY SEGMENTS:
Jaisalmer, Sheo, Barmer, Baytoo, Pachpadra, Siwana, Gudamalani & Chohtan
B. WORKS COMPLETED IN LAST FOUR YEARS:
B1. INFRASTRUCTURAL DEVELOPMENTS
v Provision of coach care complex at Barmer station at the cost of ̀ 3 crore
v Provision of 25 road under bridges (RUBs) in lieu of various level crossing gates at the cost of
`36 crore
B2. PASSENGER AMENITIES
v Circulating area improvement and new second medium level platform at Baytu station
v Raising of platform work has been done at Baytu station
v New toilets at Jetha Chandan, Pokaran, Jaisalmer, Baniya Sanda Dhora, Rakhi, Balotra stations
and Divyang friendly toilet provided at Jaisalmer station
v Provision of 17 standard signages at Balotra station and 16 standard signages & LED station
name board at Jaisalmer station
v Improvement of platform surface at Baytu, Jaisalmer and Barmer stations at the cost of ̀ 2 crore
v Provision of water supply at Samdari station at the cost of ̀ 5 crore
v Coach guidance board and Wi-Fi facility provided at Jaisalmer station
v 26 CCTV cameras at Munabao and Jaisalmer stations
v Provision of waiting hall at Munabao station and platform shelters at Ajit, Rakhi, Jetha
Chandan, Baytu, Baniya Sanda Dhora, Utarlai, Gadra Road and Tilwara stations at the cost of
`1 crore
v Provision of 16 manual Passenger Address system at Bhachhbar, Kavas, Shribhadriya Lathi,
Jetha Chandan, Thaiyat Hamira, Bamsin, Rakhi, Mokalsar, Ajit, Parlu, Janiyana, Tilwara,
Gole, Bhimarlai, Baniya Sanda Dhora and Jasai stations
C. OTHERS:
v Stoppages of trains number 14805/14806 Barmer-Yasvantpur AC Express provided at Balotra,
Samdari, Jalore, Marwar Bhinmal stations and 15013/15014 Ranikhet Express provided at
Jodhpur, Mandore, Tivari, Osian, Phalodi, Ramdevra, Ashapura Gomat and Shribhadriya Lathi
stations
v Train number 12467/12468 Leelan Express from Jaipur to Bikaner extended up to Jaisalmer
station
v Provision of Self Propelled Accident Relief Train (SPART) at Barmer station
D. ON-GOING WORKS:
v Provision of new line from Thaiyat Hamira station to Sanu station (59 Km) at the cost of ̀ 237
crore
v Provision of platform shelters at 10 stations at the cost of ̀ 2 crore
v Provision of foot over bridges at 7 stations and second high level platforms at Ajit, Gole and
Utarlai stations
v Provision of 96 coach guidance system at Jaisalmer, Barmer and Baytu stations
v Provision of 1 road over bridge on Samdari-Barmer section and 30 road under bridges in lieu of
various level crossing gates at the cost of ̀ 65 crore
v Additional loop line at Rakhi station