Page 1: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

NCCS User Forum

June 15, 2010

Page 2: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Agenda

Current System StatusFred Reitz, HPC Operations

NCCS Compute CapabilitiesDan Duffy, Lead Architect

User Services UpdatesTyler Simon, User Services

Questions and CommentsLynn Parnell/Phil Webster

Welcome & IntroductionPhil Webster, CISTO Chief

Analysis Updates & 3D DemoTom Maxwell, Analysis Lead

Visualization Wall Demos &NCCS Facility Tours

Informal Breakout Sessions

NCCS User Forum, June 15, 2010 2

Page 3: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

NASA Center for Climate Simulation

• New name for a Goddard Space Flight Center organization that has provided supercomputing resources to NASA scientists and engineers for more than 25 years.

• With climate and weather modeling representing the bulk of NCCS computing, the new name reflects emphasis on supporting NASA Earth science.

• Data-centric science: create datasets and make them available for science researchers around the world.

• The NCCS is continuing to expand its services to meet NASA's growing climate data needs in creation, utilization, and exploitation of Earth science model data.

NCCS User Forum, June 15, 2010 3

Page 4: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

• Large scale HPC computing

• Comprehensive toolsets for job scheduling and monitoring

• Large capacity storage

• Tools to manage and protect data

• Data migration support

•Help Desk

•Account/Allocation support

•Computational science support

•User teleconferences

•Training & tutorials

• Interactive analysis environment

• Software tools for image display

• Easy access to data archive

• Specialized visualization support

• Internal high speed interconnects for HPC components

• High-bandwidth to NCCS for GSFC users

• Multi-gigabit network supports on-demand data transfers

HPC Computing Data Archival and Stewardship

• Code repository for collaboration

• Environment for code development and test

• Code porting and optimization support

• Web based tools

Code Development*

Analysis & Visualization*User Services*

• Capability to share data & results

• Supports community-based development

• Data distribution and publishing

Data Sharing and Publication

Data Transfer

DATAStorage &

Management

Global file system enables data access for full range of modeling and analysis activities

* Joint effort with SIVO

NCCS Data Centric Climate Simulation Environment

NCCS User Forum, June 15, 2010 4

Page 5: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

NCCS Compute Capacity Evolution2007-2010

NCCS User Forum, June 15, 2010 5

Page 6: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Highlights of the New NCCS

• Discover SCU7 hardware, Fall 2010– Approximately doubles Discover capacity, to 300+

peak TFLOPS

• Visualization Wall in the Data Exploration Theater

– Present highly detailed depictions of scientific results

• Data Management via Integrated Rule-Oriented Data System (iRODS)

– MODIS and IPCC pilot projects

• Earth System Grid and other Data Portal data sharing and publishing services

• Advances in Data Analysis software in close collaboration with scientists

NCCS User Forum, June 15, 2010 6

Page 7: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

NCCS Staff Additions

Maria Ealey, Computing Allocations

NCCS User Forum, June 15, 2010 7

Page 8: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Meeting Logistics Questions

• How many for Vis Wall Demo and NCCS Facility Tours?

• How many for the following Informal Breakouts:– Archive data flow– Discover workflow evaluation– 3D visualization– Discover nobackup plans discussion– Sysadmin confab

NCCS User Forum, June 15, 2010 8

Page 9: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Agenda

Current System StatusFred Reitz, HPC Operations

NCCS Compute CapabilitiesDan Duffy, Lead Architect

User Services UpdatesTyler Simon, User Services

Questions and CommentsLynn Parnell/Phil Webster

Welcome & IntroductionPhil Webster, CISTO Chief

Analysis Updates & 3D DemoTom Maxwell, Analysis Lead

Visualization Wall Demos &NCCS Facility Tours

Informal Breakout Sessions

NCCS User Forum, June 15, 2010 9

Page 10: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Key Accomplishments

General

• GLOPAC mission support

• Data Exploration Theater

Discover/Analysis Environment

• Returned SCU5 to normal queue structure

• Additional storage

Dataportal

• Upgraded GPFS

• Upgraded OS to SLES 11

• Established two new FTP sites – g5_cld, oceanwinds

DMF

• Upgraded OS to SLES 10 SP3

• Removed 64 processors from palm/dirac

NCCS User Forum, June 15, 2010 10

Page 11: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Discover Total CPU ConsumptionPast 12 Months (CPU Hours)

NCCS User Forum, June 15, 2010 11

Page 12: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Discover CPU Consumption by GroupPast 12 Months

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

3,500,000

4,000,000

Discover CPU Hour Usage by GroupJune 2009 - May 2010

Discretionary

SR&T

GISS

SIVO

GMAO

NCCS User Forum, June 15, 2010 12

Page 13: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Discover CPU Consumption by QueuePast 12 Months

0

1,000,000

2,000,000

3,000,000

4,000,000

5,000,000

6,000,000

Discover CPU Hours by Top QueuesJune 2009 -May 2010

general_small

high_priority

gmaodev

general_high

test

general

NCCS User Forum, June 15, 2010 13

Page 14: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Discover Job Analysis – May 2010

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

4 16 32 64 128 256 512 1024 2048 4096 8192

Discover Jobs by Job Size -May 2010

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

4 16 32 64 128 256 512 1024 2048 4096 8192

Discover CPU Hours by Job Size - May 2010

0

1

2

3

4

5

6

7

4 16 32 64 128 256 512 1024 2048 4096 8192

Discover Expansion Factors by Job Size -May 2010

NCCS User Forum, June 15, 2010 14

Page 15: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Discover Job Analysis – May 2010

010,00020,00030,00040,00050,00060,00070,00080,00090,000100,000

Discover Jobs by Queue - May 2010

0

1,000,000

2,000,000

3,000,000

4,000,000

5,000,000

6,000,000

Discover CPU Hours by Queue -May 2010

0

0.5

1

1.5

2

2.5

3

3.5

4

Discover Expansion Factors by Queue - May 2010

NCCS User Forum, June 15, 2010 15

Page 16: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Discover Availability – Past 12 Months

Scheduled Maintenance: March-May

22 April – 1 hour Network switch maintenance

12 May – 12.5 hoursInfiniBand, disk controller firmware

Unscheduled Outages: March-May

21 April – 1 hour 15 minutesGPFS hang

88%

90%

92%

94%

96%

98%

100%

DiscoverSystem Availability June 2009 -May 2010

NCCS User Forum, June 15, 2010 16

Page 17: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

NCCS Network AvailabilityPast 12 Months

99.75%

99.80%

99.85%

99.90%

99.95%

100.00%

NCCS-Managed Network AvailabilityJune 2009 - May 2010

NCCS User Forum, June 15, 2010 17

Page 18: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Future Enhancements

• Data Exploration Theater performance, functionality• Discover Cluster

– PBS v10– SLES11– GPUs

• Data Portal– iRODS– Additional storage– New database servers

• Mass Storage– Additional storage– Platform upgrade

NCCS User Forum, June 15, 2010 18

Page 19: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Agenda

Current System StatusFred Reitz, HPC Operations

NCCS Compute CapabilitiesDan Duffy, Lead Architect

User Services UpdatesTyler Simon, User Services

Questions and CommentsLynn Parnell/Phil Webster

Welcome & IntroductionPhil Webster, CISTO Chief

Analysis Updates & 3D DemoTom Maxwell, Analysis Lead

Visualization Wall Demos &NCCS Facility Tours

Informal Breakout Sessions

NCCS User Forum, June 15, 2010 19

Page 20: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

SCU7 Discover Cluster Augmentation

• SCU7 will augment Discover compute nodes with Intel Xeon Westmere processors within the existing SCU5 and SCU6 InfiniBand communication fabric.

– Dual-socket, hex-core processors.– 12 MB L3 cache, 50% larger than Nehalem’s.– 24 GB or RAM.– Quad-Data Rate (QDR) Infiniband

• Initial performance of the GEOS-5 Cubed-Sphere benchmark showed a slight improvement on Westmere processors compared to Nehalem.

– Test compared use of 4 cores per socket on both Nehalem and Westmere.

• Expecting equipment delivery July 2010

XeonProcessor

Speed Cores/Socke

t

L3 Cache Size

Nehalem 2.8 GHz 4 8 MB

Westmere 2.8 GHz 6 12 MB

NCCS User Forum, June 15, 2010 20

Intel Xeon 5600 processor series: “Westmere”

Discover’s SCU7 will augment the compute capacity available for high resolution GEOS-5 Cubed Sphere runs and for GISS and GMAO simulations in support of the IPCC 5 th Reassessment.

Page 21: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Extending the IB Fabric to Include SCU7

288-port DDRQlogic IB

Full Non-Blocking

288-port DDRQlogic IB

Full Non-Blocking

258 Compute Nodes

2,064 Cores

258 Compute Nodes

2,064 Cores

Top Level IB Switch288-port DDR

Qlogic IB (GFE)

Top Level IB Switch288-port DDR

Qlogic IB (GFE)

24 Uplinks

258 Compute Nodes

2,064 Cores

258 Compute Nodes

2,064 Cores

24 Uplinks

258 Compute Nodes

2,064 Cores

258 Compute Nodes

2,064 Cores

24 Uplinks

258 Compute Nodes

2,064 Cores

258 Compute Nodes

2,064 Cores

24 Uplinks

20 I/O Nodes20 I/O Nodes24 Service Nodes24 Service Nodes 2 Management Nodes

2 Management Nodes

2 Subnet Manager Nodes

2 Subnet Manager Nodes

240 Compute Nodes

2,880 Cores

240 Compute Nodes

2,880 Cores

QDR2-to-1

Blocking

QDR2-to-1

Blocking

288-port DDRQlogic IB

Full Non-Blocking

288-port DDRQlogic IB

Full Non-Blocking

288-port DDRQlogic IB

Full Non-Blocking

288-port DDRQlogic IB

Full Non-Blocking

288-port DDRQlogic IB

Full Non-Blocking

288-port DDRQlogic IB

Full Non-Blocking

24 Uplinks

SCU75 Additional Units

14,400 Cores161 TF Peak

NCCS User Forum, June 15, 2010 21

Page 22: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

NCCS Peak Computing (TF) Over Time

NCCS User Forum, June 15, 2010 22

Page 23: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

NCCS Visualization Capability

• The NCCS High Performance Visualization Capability was installed and made operational a very short time following the early March equipment delivery, and includes:

• High Performance 3x5 Hyperwall (6’ x 17’)• Dell servers with Nvidia FX1700 GPUs.• Samsung 46-inch, very small bezel

televisions, 720p.

• Two fixed and three mobile Scientific Analysis Workstations

• Dell workstations with Nvidia FX4800 GPUs.• High-definition 46-inch, 1080p Samsung

monitor attached to the Nvidia GPU, will be 3D capable.

• NCCS and SIVO’s Scientific Visualization Studio staff are providing tools and assistance to help scientists exploit the Hyperwall.

• Mobile workstations can be deployed for periodic use in scientists’ offices or meeting spaces.

NCCS User Forum, June 15, 2010 23

The NCCS High Performance Visualization Capability will expedite highly detailed depictions of scientific results to facilitate the development of new insights and discoveries.

Page 24: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Upgrades to the Archive (Dirac)

• Dirac is currently on a system that is 5 years old• Upgrades

– New DMF server to replace the Bx2– Parallel Data Movers for Tape– Two Login Nodes for interactive access to the archive data– Two NFS Nodes for improved NFS access to the archive data from Discover– All systems are commodity Xeon based– Upgrade to the primary disk cache to 600 TB RAW– Upgrade to the disk cache for the DMF databases for improved serviceability and access to

data

• What does this mean to the users?– A much higher performing archive– Outages for moving file systems and databases between systems (please be patient)

• Time Line– Upgrades to be complete by the end of August

NCCS User Forum, June 15, 2010 24

Page 25: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Agenda

Current System StatusFred Reitz, HPC Operations

NCCS Compute CapabilitiesDan Duffy, Lead Architect

User Services UpdatesTyler Simon, User Services

Questions and CommentsLynn Parnell/Phil Webster

Welcome & IntroductionPhil Webster, CISTO Chief

Analysis Updates & 3D DemoTom Maxwell, Analysis Lead

Visualization Wall Demos &NCCS Facility Tours

Informal Breakout Sessions

NCCS User Forum, June 15, 2010 25

Page 26: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Ticketing System Upgrade

NCCS Users will be able to login (via the web) and create new tickets, add a new description or add an attachment to an existing open ticket.

Users will be able to search the built-in knowledge base for solutions to common problems.

Follow current system issues in real time by subscribing to global tickets.

NCCS User Forum, June 15, 201026

Page 27: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Discover Hardware/Software Migrations

Deadline to migrate off of ScaliMPI nodes is July 6.

We will also be moving away from the Visual nodes and Queue at a later date TBD.

Testing new versions of Intel MPI 4.0 with debugging tools.

[email protected]

NCCS User Forum, June 15, 2010

27

Page 28: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

iRODS

NCCS User Forum, June 15, 2010

28

Page 29: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

iRODS

NCCS User Forum, June 15, 2010

29

Analyze the potential for iRODS to federate climate simulation data and observational data

Provide one-stop shopping to remote and local data while providing data management services).

Metadata is catalogued by iRODS and that existing user interfaces let users manage the data and metadata (e.g., add, search, extract, annotate).

Page 30: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

iRODS

NCCS User Forum, June 15, 2010

30

Page 31: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Agenda

Current System StatusFred Reitz, HPC Operations

NCCS Compute CapabilitiesDan Duffy, Lead Architect

User Services UpdatesTyler Simon, User Services

Questions and CommentsLynn Parnell/Phil Webster

Welcome & IntroductionPhil Webster, CISTO Chief

Analysis Updates & 3D DemoTom Maxwell, Analysis Lead

Visualization Wall Demos &NCCS Facility Tours

Informal Breakout Sessions

NCCS User Forum, June 15, 2010 31

Page 32: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Earth System Grid Data Node Update

• ESG Data Node software (2.4) received from PCMDI.– Installed and tested on the NCCS Dataportal.

– Successfully published to PCMDI ESG Gateway.

• Developing plans for publishing MERRA data .– Publishing virtual files not currently feasible.

– Will copy and publish monthly means.

• Will publish GISS & GMAO IPCC AR5 contributions.– Scheduled date for publication of initial data: August 2010

NCCS User Forum, June 15, 2010

32

Page 33: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

DV3D• Interactive 3D visualization of simulation data

– Tailored for climate scientists

– Interface to NCCS/ESG Analysis Products Server

• Python app built on MayaVi / VTK– Runs inside Grads

– Access all Grads variables

• Developed at NCCS– Hyper wall demo to follow

33

NCCS User Forum, June 15, 2010

Page 34: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Analysis Products Server (Under Development)

• Server-side Analysis Services executed on Dali • Python client for GrADS/DV3D

• DET: “Gateway to Dali”– Phase 1: Access saved simulation data

– Phase 2: Access running simulation.

• Service APIs:– Live Access Server (LAS) request protocol

– IRODS

• Planned Services– Subsetting, regridding/rescaling, reformatting, aggregation, etc.

– Differencing, averaging (e.g. zonal means)

– Data transforms ( wavelet, FFT, etc. )

NCCS User Forum, June 15, 2010

34

Page 35: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Live Access Server

• ESG Analysis module– ESG LAS not yet available

• Three Tiered architecture– Interface Server

• Installed on dp1

– Product server• Installed on dp1

– Back End Server (BES)• Installed on dp7 (future: dali)

• Current BES uses Ferret– Potential BE Services:

• Grads, CDAT, NCO, IRODS

NCCS User Forum, June 15, 2010

35

Page 36: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

IRODS

NCCS User Forum, June 15, 2010

36

• Integrated Rule Oriented Data System• Rule Engine applies user-defined Rules and Services• Nodes to be installed on Dali and Data Portal

Page 37: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Agenda

Current System StatusFred Reitz, HPC Operations

NCCS Compute CapabilitiesDan Duffy, Lead Architect

User Services UpdatesTyler Simon, User Services

Questions and CommentsLynn Parnell/Phil Webster

Welcome & IntroductionPhil Webster, CISTO Chief

Analysis Updates & 3D DemoTom Maxwell, Analysis Lead

Visualization Wall Demos &NCCS Facility Tours

Informal Breakout Sessions

NCCS User Forum, June 15, 2010 37

Page 38: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Important Contact Information

NCCS Support:

[email protected]

(301) 286-9120

NCCS User Forum, June 15, 2010

38

Page 39: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Agenda

Current System StatusFred Reitz, HPC Operations

NCCS Compute CapabilitiesDan Duffy, Lead Architect

User Services UpdatesTyler Simon, User Services

Questions and CommentsLynn Parnell/Phil Webster

Welcome & IntroductionPhil Webster, CISTO Chief

Analysis Updates & 3D DemoTom Maxwell, Analysis Lead

Visualization Wall Demos &NCCS Facility Tours

Informal Breakout Sessions

NCCS User Forum, June 15, 2010 39

Page 40: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Vis Wall Demo and NCCS Facility Tours

• No Food or Drink, please

• Vis Wall in S214/Data Exploration Theater

– Introduction (Phil Webster)

– 3D Demonstrations (Tom Maxwell)

• NCCS Facility Tours

– Begin at the bottom of front stairs

• Informal Breakouts to follow in E210, S216, and staff offices

NCCS User Forum, June 15, 2010 40

Page 41: NCCS User Forum June 15, 2010. Agenda Current System Status Fred Reitz, HPC Operations NCCS Compute Capabilities Dan Duffy, Lead Architect User Services

Agenda

Current System StatusFred Reitz, HPC Operations

NCCS Compute CapabilitiesDan Duffy, Lead Architect

User Services UpdatesTyler Simon, User Services

Questions and CommentsLynn Parnell/Phil Webster

Welcome & IntroductionPhil Webster, CISTO Chief

Analysis Updates & 3D DemoTom Maxwell, Analysis Lead

Visualization Wall Demos &NCCS Facility Tours

Informal Breakout Sessions

NCCS User Forum, June 15, 2010 41