national ris related activities germany. wieland haupt1.12.2013s2 national status report germany ...

15
National RIS related Activities Germany

Upload: carolina-burling

Post on 14-Dec-2015

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: National RIS related Activities Germany. Wieland Haupt1.12.2013S2 National Status Report Germany  AIS Landinfrastructure  Bridge „Vertical clearance

National RIS related ActivitiesGermany

Page 2: National RIS related Activities Germany. Wieland Haupt1.12.2013S2 National Status Report Germany  AIS Landinfrastructure  Bridge „Vertical clearance

Wieland Haupt1.12.2013 S2

National Status ReportGermany

AIS LandinfrastructureBridge „Vertical clearance indicator“ – visibility studyENC ProductionPaper navigational chart

Page 3: National RIS related Activities Germany. Wieland Haupt1.12.2013S2 National Status Report Germany  AIS Landinfrastructure  Bridge „Vertical clearance

Wieland Haupt1.12.2013 S3

AIS Landinfrastructur

Project area: Whole German Waterway Net, selected set of waterways

Financed by: national program for accelerating the infrastructural setup

In total 95 AIS Stations, 90% until End of 2014, 10% in 2015

In the German Danube area combined with lock management

Page 4: National RIS related Activities Germany. Wieland Haupt1.12.2013S2 National Status Report Germany  AIS Landinfrastructure  Bridge „Vertical clearance

Wieland Haupt1.12.2013 S4

AS Dorsten

AS Münster

AS Bad Essen

AS Köln

AS Duisburg

AS Neuss

AS Bevergern

AS Bolzum

AS Lohnde

AS Flaesheim

AS Lüdinghausen

AS Henrichenburg

AS Gelsenkirchen

AS Minden

AS Landesbergen

AR Nienburg

AS Schlüsselburg

AS Habbenhausen

AS Langwedel

AS DörverdenAS Drakenburg

AS Sülfeld

AS Velsdorf

AR Ketzin

AR Genthin

AR Charlottenburg

AS HammAS Wesel

AS Emmerich

AS Uelzen

AS Lüneburg

AS Wittingen

AS Achmer

Regionale AIS- Zentrale Duisburg

Regionale AIS- Zentrale Minden

AIS Landinfrastructure, Germany, North

AS Dorsten

AS Münster

AS Bad Essen

AS Köln

AS Duisburg

AS Neuss

AS Bevergern

AS Bolzum

AS Lohnde

AS Flaesheim

AS Lüdinghausen

AS Henrichenburg

AS Gelsenkirchen

AS Minden

AS Landesbergen

AR Nienburg

AS Schlüsselburg

AS Habbenhausen

AS Langwedel

AS DörverdenAS Drakenburg

AS Sülfeld

AS Velsdorf

AR Ketzin

AR Genthin

AR Charlottenburg

AS HammAS Wesel

AS Emmerich

AS Uelzen

AS Lüneburg

AS Wittingen

AS Achmer

Regionale AIS- Zentrale Duisburg

Regionale AIS- Zentrale Minden

AS – AIS Station - 86 AR – AIS Repeaterstation - 10 AS – AIS Station vorhanden - 7

Fachstelle der WSV für Verkehrstechniken, September 2013

Page 5: National RIS related Activities Germany. Wieland Haupt1.12.2013S2 National Status Report Germany  AIS Landinfrastructure  Bridge „Vertical clearance

Wieland Haupt1.12.2013 S5

Fachstelle der WSV für Verkehrstechniken , Januar 2013

Fachstelle der WSV für Verkehrstechniken Juni 2010

AS HarrbachAS ErlabrunnAS Randersacker

26 - AIS Stationen Main 16 - AIS Stationen Rhein13 - AIS Stationen Mosel 10 - AIS Stationen Main-Donau-Kanal 8 - AIS Stationen Westdeutsches Kanalnetz 7 - AIS Stationen Donau 6 - AIS Stationen Mittellandkanal 3 - AIS Stationen Elbe-Seitenkanal 3 - AIS Stationen Berliner Wasserstraßen 3 - AIS Stationen Saar95 - AIS Stationen Gesamt

Fachstelle der WSV für Verkehrstechniken, September 2013

AS Asterstein

AS Kostheim

AS Griesheim

AS Wallstadt

AS – AIS Station - 86 AR – AIS Repeaterstation - 10 AS – AIS Station vorhanden - 7

AS Brohl

AS Urbar

AS Elisenhöhe

AS Obernau

AS Krotzenburg

AS Lengfurt

AS RothenfelsAS

Eichel

AS Faulbach

AS RiedenburgAS

Kehlheim

AS Dietfurt

AS Berching

AS Hilpoltstein

AS Freudenberg

AS Klingenberg

AS Speyer

AS Gernsheim

AS Karlsruhe

AS Iffezheim

AS Lehmen

AS Trier

AS Müden

AS Fankel

AS Enkirch

AS Neumagen

AS Riol

AS Brodenbach

AS Cochem

AS Marktbreit

AS Kitzingen

AS Garstadt

AS Ottendorf

AS Viereth

AS Knetzgau

AS Bamberg

AR Kanzem

AR Mettlach

AR Serrig

AS St.Aldegund

AS Nürnberg

AS Leerstetten

AS HausenAS Erlangen

AS Volkach

AR Kaub

AR St. GoarAR

Oberwesel

AS Bad Abbach

AS Regensburg

AS Deggendorf

AS Straubing

AS Kachlet

AS Erlau

AS Vilshofen

AS WolfAS Zeltingen

AS Bullay

AS Eddersheim

AS Offenbach

AS Steinbach

AS Gemünden

AS Dettelbach

Regionale AIS- Zentrale Oberwesel

Regionale AIS- Zentrale Gösselthal-mühle

AIS Landinfrastructure, Germany, South

Page 6: National RIS related Activities Germany. Wieland Haupt1.12.2013S2 National Status Report Germany  AIS Landinfrastructure  Bridge „Vertical clearance

Wagner1.12.2013 S6

Bridge „Vertical clearance indicator“ – feasibility study

Page 7: National RIS related Activities Germany. Wieland Haupt1.12.2013S2 National Status Report Germany  AIS Landinfrastructure  Bridge „Vertical clearance

Wagner1.12.2013 S7

Aims:

Study finished 2014/2015

Test of possible solutions

Vessel based

Bridge based

Criteras to evaluate:

Costs

Accuracy

Reliability

Several preconditions and parameters

Working Group WSD Süd / FVT

Feasibility study

Bridge „Vertical clearance indicator“ – feasibility study

Page 8: National RIS related Activities Germany. Wieland Haupt1.12.2013S2 National Status Report Germany  AIS Landinfrastructure  Bridge „Vertical clearance

Seehars1.12.2013 S8

Vessel:

Moveable helmstand

Vessel‘s flotation depth

Vessel‘s floating dynamic

Cranes, buildups

Vessel‘s driving speed

→Stopping distance

→Warning distance

Bild: Peter Baumgartner

Bridge „Vertical clearance indicator“ – feasibility study

Page 9: National RIS related Activities Germany. Wieland Haupt1.12.2013S2 National Status Report Germany  AIS Landinfrastructure  Bridge „Vertical clearance

Seehars1.12.2013 S9

Cargo:

Height of cargo

www.common-container.com

Bridge „Vertical clearance indicator“ – feasibility study

Page 10: National RIS related Activities Germany. Wieland Haupt1.12.2013S2 National Status Report Germany  AIS Landinfrastructure  Bridge „Vertical clearance

Seehars1.12.2013 S10

Waterway:

Fairway

Current of water

Changing water levels, waves

Durchfahrts-

korridor

Bridge „Vertical clearance indicator“ – feasibility study

Page 11: National RIS related Activities Germany. Wieland Haupt1.12.2013S2 National Status Report Germany  AIS Landinfrastructure  Bridge „Vertical clearance

Seehars1.12.2013 S11

Bridge:

Shape of the bridge

Displaced bridge arcs

Crossing angle

Temporarily mounted constructions

www.betontest.de

www.de.123fr.com

Bridge „Vertical clearance indicator“ – feasibility study

Page 12: National RIS related Activities Germany. Wieland Haupt1.12.2013S2 National Status Report Germany  AIS Landinfrastructure  Bridge „Vertical clearance

Seehars1.12.2013 S12

Bild: Peter Baumgartner

Bridge „Vertical clearance indicator“ – feasibility study

Sensor system/communication:

Darkness

Weather conditions (fog, rain)

Shadowing/mirroring effects

Radio signals

GPS signals

Page 13: National RIS related Activities Germany. Wieland Haupt1.12.2013S2 National Status Report Germany  AIS Landinfrastructure  Bridge „Vertical clearance

Wieland Haupt1.12.2013 S13

IENC-Production

Main (km 0 – 380), October 2013, IES 2.1

Main Danube Canal, October 2013, IES 2.1

Danube, January 2010, November 2013, IES 2.1

Page 14: National RIS related Activities Germany. Wieland Haupt1.12.2013S2 National Status Report Germany  AIS Landinfrastructure  Bridge „Vertical clearance

Wieland Haupt1.12.2013 S14

Paper navigational chart

Main (km 0 – 180), November 2010, new edition planned for 2014

Main (km 180 – 380), Spring 2012

Main Danube Canal, October 2013

Danube, November 2013

Page 15: National RIS related Activities Germany. Wieland Haupt1.12.2013S2 National Status Report Germany  AIS Landinfrastructure  Bridge „Vertical clearance

Thanks!