National Report of China
---- PLiM and OLE Activities in China
DOU, YiKang
TWG-LMNNP Meeting
25-27February, 2015, Vienna, IAEA
-2-
Status of China nuclear power programme
PLiM activities in China
OLE Activities in China
Conclusions
Contents
-3-
Status of China nuclear power programme
• China initiated nuclear power operation in 1991 when Qinshan-1 connected to grid.
• At present, China has totally 23 units in operation with total capacity about 21,038 MWe, ~2.1% of total power generation, 25 units under construction with total capacity about 27,240 MWe …
• All NPP units, either in operation or under construction, are in sea coast, the most developed area and relatively remote from coal mine areas
-4-
Status of China nuclear power programme
NPPs Owner Type Pw(MWe)
Date of
FCD (1st
unit)
Date getting grid
(1st unit)
Qinshan-1 CNNC PWR 310 1985-03-20 1991-12-15
Daya Bay CGN PWR 2 X 984 1987-08-07 1993-08-31
Qinshan-2 CNNC PWR 4 x 650 1996-06-02 2002-02-06
Ling’Ao CGN PWR 4 x 990 1997-05-15 2002-02-26
Qinshan-3 CNNC CANDU 2 x 720 1998-06-08 2002-11-19
Tianwan CNNC WWER 2 x 1060 1999-10-20 2006-05-12
Ningde CGN PWR 2 x 1080 2008-02-18 2012-12-28
Hongyanhe CGN/CPI PWR 2 x 1080 2007-08-18 2013-02-17
Yangjiang CGN PWR 1080 2008-12-16 2013-12-31
Fuqing CNNC PWR 1080 2008-11-21 2014-08-20
Fangjiashan CNNC PWR 2 x 1080 2008-12-26 2014-11-04
Total 21038/23
Op
era
tio
nal N
PP
s i
n C
hin
a
The newest unit in operation is Fangjiashan-2, which
started commercial operation at Feb. 12, 2015
-5-
Status of China nuclear power programme
Op
era
tio
nal N
PP
s i
n C
hin
a NPPs Owners Type Pw(MWe) FCD date
Planned date of getting grid (1st unit)
Hongyanhe CGN/CPI CPR 1000 1080×2 2007-08 1st unit combined to the grid
on 2013-02-17
Ningde CGN CPR 1000 1080×2 2008-02 1st unit combined to the grid
on 2012-12-28
Fuqing CNNC CPR1000 1080×3 2008-11 1st unit combined to the grid
on 2014-08-02
Yangjiang CGN CPR1000 1080×5 2008-12 1st unit combined to the grid
on 2013-12-31
Sanmen CNNC AP1000 1250×2 2009-04 2013-10 Delayed
Haiyang CPI AP1000 1250×2 2009-09 2014-04 Delayed
Taishang CGN EPR 1750×2 2009-10 2013-12 Delayed
Fangchenggang CGN CPR1000 1080×2 2010-07 2015-01
Changjiang CNNC PWR 650×2 2010-04 2015-01
Shidaowan CHNG HTR-PM 200×1 2012-12 2017-12
Tianwan CNNC WWER 1060×2 2012-12 2018-02
Total 27240/25
NPPs under construction
-6-
Status of China nuclear power programme
PLiM Activities in China
OLE Activities in China
Conclusions
Contents
PLiM Activities in China
Nuclear safety regulatory system for PLiM in China
HAF 102 Safety of
NPP Design (2004)
HAF 103 Safety of
NPP Operation(2004)
HAD xx HAD xx HAD103/11
PSR (2006)
HAD103/12
AM (2012)
…
Requirements
Guidelines
HAF 601 / HAF 604
Nuclear safety regulatory system for PLiM in China – Full life cycle ageing management
Design Constr
uction operating
Operating within design life LTO
Decommis
sioning
PSAR FSAR PSR-1 PSR-2 PSR-n+ LR app.
。。。。 PSR-
n+1
PSR-
n+m +D
app
Nuclear
safety
regulatory
AMP(traditional understanding )
PLEX Plan Decommissioning
plan
AMP covering life cycle (understanding based on NS-G-2.12)
EQ program;
identifying
ageing deg.;
exp.
Feedback;
materials;
monitoring;
facilit. O&M;
Ageing issues
for FSAR
Data by vendors;
experience
feedback;
baseline data;
testing sampling;
hot spots
identification;
vibration
monitoring
Resource allocation: Screening; ageing
mechanisms; ageing detection; ageing
mitigation; ageing assessment; data
collection and record keeping; impact of
significant modification……
Maintaining availability of
SSCs for decommissioning
activities through AMP
PLiM Activities in China
Nuclear safety regulatory system for PLiM in China
Need to develop related nuclear safety requirements and guidelines:
Update HAF102 and HAF 103 based on IAEA SSR-2/1 and SSR-2/2, respectively
Development of safety regulatory system for operation license extension (OLE) (on the way of issuing)
Development safety regulatory system for decommissioning
Development of full life cycle ageing management safety regulatory system.
PLiM Activities in China
Organizations involving in PLiM
PLiM Activities in China
CNEA: China Nuclear Energy Association
NPPs Peer Review and Experience Feedback Committee
TWG-… TWG-… TWG-PLiM TWG-… …
NPPs Regulatory Designers R&Ds Universities Suppliers
CNNO DNMC JNPC NNPC FNPC HNPC YNPC SMPC SDPC ……
NNSA
NRSC
……
SNERDI
NPIC
CNPEC
(CNNC)
CNPEC
(CGN)
……
RINPO
SNPI
SPERI
SNPSC
IMR
CIAE
……
Tsinghua
NCEPU
……
PLiM Activities in China
Every year TWG-PLiM will:
have 1~2 technical seminars to share information on PLiM activities
have 1 TWG meeting to discuss working plan
support soft technology projects
China PLiM-1 Meeting
Wuhan, Nov. 2013 China PLiM-2 Meeting
Suzhou, Dec. 2014
PLiM Activities in China
NPP Name Owner Type Date of First Connection to the Grid
AMP PSR
Qinshan NPP
Unit1 CNNC PWR 1991-12-15 √ 2nd PSR is ongoing
Supported by SNERDI, CNPO
Daya Bay NPP
Unit1 CGN PWR
1993-08-31 √
2nd nearly completed
Unit2 1994-02-07
Qinshan Phase II
NPP
Unit1
CNNC PWR
2002-02-06
√
1st PSR nearly completed
Supported by CNPEC, NPIC, CNPO
Unit2 2004-03-11
Unit3 2010-08-01 √ Not yet started
Unit4 2011-12-29
LingAo NPP
Unit1
CGN
PWR
2002-02-26 √ 1st PSR nearly completed
Unit2 2002-09-14
Unit3 2010-07-15 √ Not yet started
Unit4 2011-05-03
Qinshan Phase
III NPP
Unit1 CNNC CANDU
2002-11-19 √
1st PSR nearly completed
Supported by SNERDI, CNPO Unit2 2003-06-12
Tianwan NPP
Unit1
CNNC WWER
2006-05-12
√
1st PSR is ongoing
Supported by SNERDI, CNPEC, SNPI, CNPO Unit2 2007-05-14
Ningde NPP and others
Unit1 CGN PWR 2012-12-28 Under
construction
Not yet started
PLiM Activities in China
Reactor Internals AMPs development for PWRs of Qinshan NPP
Qinshan-II 4 x 650
MWe PWR units Qinshan-I 1 x 320
MWe PWR unit
Entrusted by CNNO, SNERDI carried out AMP development for Qinshan-I
and Qinshan-II (2013~2015)
PLiM Activities in China
Reactor Internals AMPs development for PWRs of Qinshan NPP
Evaluation on RI ageing mechanisms
Fatigue Irradiation
embrittlement Wear Stress relaxation Stress corrosion
cracking (SCC) Irradiation-
assisted stress corrosion cracking (IASCC)
Void swelling Thermal ageing
embrittlement
PLiM Activities in China
Reactor Internals AMPs development for PWRs of Qinshan NPP
ANSYS 12.0.1
NODAL SOLUTION
STEP=1
SUB =1
TIME=1
SINT (AVG)
DMX =31.535
SMN =.628122
SMX =218.278
SMXB=356.155
1
.628122
24.811
48.995
73.178
97.361
121.545
145.728
169.911
194.095
218.278
ANSYS 12.0.1
NODAL SOLUTION
STEP=1
SUB =1
TIME=1
TEMP
SMN =288.8
SMX =390.664
1
MX
288.8
300.118
311.436
322.755
334.073
345.391
356.709
368.027
379.346
390.664
1
ELEMENTS
Path1 Path4
Path5
Path6
Path2
Path3
Path7
Path8
Path9
Stress map for RI (part) Temperature map for RI (part) Path of fatigue evaluation
Neutron fluence map for RI (part) Transient prediction for RI
PLiM Activities in China
PWR Primary Boundary Piping System AM Research for Qinshan NPP
-- Qinshan-I and Qinshan –II, carried out by SNERDI
Ageing Mechanism Analysis
Aging Condition
Assessment Guide Line
Structure of AM Data Base
Aging Condition Evaluation
and Remaining Life
Evaluation
Primary Boundary Piping
System AMP -- General
Primary Boundary Piping
System AMP – Unit Specific
Technical Guideline for
Primary Boundary Piping
System AM Evaluation
Main tasks:
PLiM Activities in China
PWR Primary Boundary Piping System AM Research for Qinshan NPP
• Examples of AM
Analysis
– Thermal Ageing
– PWSCC
PLiM Activities in China
PWR Primary Boundary Piping System AM Research for Qinshan NPP
• Examples of Ageing
Condition Analysis
– Thermal Stratification
– Crack Growth
– Fatigue
Analysis model
Stress analysis
Loading match
Fatigue Evaluation
PLiM Activities in China
Aging management information system development by CNPO
General ageing management system for LR scoping and screening
Critical SSCs ageing management database, including RPV,SG, PRZ, cable, Fuel channel, Penetration etc,
Fatigue monitoring system
PLiM Activities in China
Daya Bay NPP Ex-Vessel Neutron Dosimetry carried out by SNPSC
The Ex-Vessel Neutron Dosimetry
(EVND) was installed in one of units
of Daya Bay NPP in October 19th
2013
Data from EVND provide best
estimation of RPV neutron exposure
together with data from RPV
surveillance capsules and
calculated neutron fluence, which
can be used in following aspects:
Assess the neutron
embrittlement of RPV
monitor the change of
neutron fluence rate and
spectrum after modification of
core design and reactor
internals
Provide data for RPV aging
management and life extension
of NPP
Crew of EVND installation in Daya Bay NPP
PLiM Activities in China
Life management for conventional island carried out by SPERI
Equipment Supervision
Pfm.
tests
Monitoring on vib., stress and pfm.
Metal
supervision and
failure analysis
Life
mgm.
R&D
topical
projects
Sys. upgrading Eq. upgrading Maint. support
Overall Target:Digital plant, good economy, high reliability, good
safety performance and well under control
PLiM Activities in China
Involvement in IAEA CRP on FAC Benchmark by SNERDI
single
phasedouble
phase
single
phasedouble
phase
Heat balance diagram
Line modeling
Analysis results
SNERDI involves in IAEA CRP project on
FAC benchmark using 3 NPP datasets
provided by IAEA to carry out calculation
using software CHECWORKS focusing on
the following points:
Heat balance diagram (HBD)
Global data input
Line modeling
Analysis results
Conclusions
PLiM Activities in China
Involvement in IAEA CRP on FAC Benchmark by SNERDI
Loop Test
• Testing loop was
established to investigate
the FAC behaviors of SA
335-P11 under simulated
main steam of NPP. Inlet flow velocity
1) morphology of original surface 2) disk specimen 3) tubular specimen Morphology of specimen
after test
-24-
Contents
Status of China nuclear power programme
PLiM Activities in China
OLE Activities in China
Conclusions
-25-
OLE activities in China
Background
The design life for Qinshan-1 is 30
years. It has been in safe operation
for 24 years since Dec. 15,1991.
The preparation for life extension of
Daya Bay unit-1 is also underway,
though its design life is 40 years.
Although nuclear safety
requirements and guidelines for life
extension have not been
established, the preparation to
establish license system is ongoing.
In China, life extension is called
Operational License Extension (OLE)
Qinshan-1
Daya Bay NPP
-26-
OLE activities in China
Background
In 2014, a series meetings on OLE nuclear safety requirements were held by
NNSA, participated by CNNC, CGN, SNPTC, etc.. As outcomes, technical
policies on OLE will soon put forward.
At the same time, a feasibility study was carried out by CNNO under the
support by SNERDI, CNPO, etc. in 2014. CNNC approved the feasibility
study report and OLE activities for Qinshan-1 started. More technical
exchanges with IAEA and others were also carried out.
-27-
OLE activities in China – CNNO/Qinshan-1
Technical communications in 2014
• NPP license renewal workshop focusing on TLAA and March 24-28, 2014
• Intercommunication with AREVA and the United Stated NRC April 16, 2014
• Intercommunication with Westinghouse’s chief engineer on the processes of NPP OLE program.
• IAEA workshop on the metal fatigue TLAA and buried pipe during Oct, 14 to 17, 2014
Technical Communication with NNSA in 2014
• CNNO discussed with NNSA on OLE issues and NNSA encouraged CNNO to go ahead.
• NNSA 1st Meeting on OLE April 18, 2014
• NNSA 2nd Meeting on OLE Aug. 21, 2014
• NNSA 3rd Meeting on OLE, Oct. 16, 2014
• As outcomes of study under the support by SNERDI and CNPO, 5 technical reports were completed covering investigation of LR models (US, IAEA, EDF), comparison of models, environmental impact, supervision, and administrational permission, etc.
-28-
OLE activities in China - NNSA
The OLE application should be submitted 5 years before the expiry of the license.
Maximum 20 years extension of operation license.
Review of OLE application will based on the license basis when approved for operation plus supplemental safety requirements during operation.
Besides Chinese nuclear safety regulatory documents, some international guidance or practice may be applicable.
The application should be submitted along with the reports on
Integrated plant assessment (IPA) report with a series of supporting materials such as TLAA reports, safety assessment reports for SSCs refurbishment, etc..
Addendum of environmental impact assessment report.
Addendum and revised FSAR.
Main points of technical policies for OLE (under construction)
-29-
OLE activities in China – CNNO/ Qinshan-1
2013 2014 2015 2017 2020 2021 2016
R18(2018.4~2019.4) R19、R20
2021.12
获得延照运行执照
OLE
permission
制定技改总体计划 Integrated schedule
establishment
Main Schedule for Qinshan-1 OLE
-30-
OLE activities in China – CGN/ Daya Bay
To accomplish detailed LCM analysis of equipments and the initial overall planning of
conventional island
Life evaluation
of critical
equipments in
Nuclear Island
Condition and
life evaluation
of other critical
equipments
To establish life management technical guidelines and life management workflow and management order and to organize special training according to the related AP913&AP940 guidelines and
EXELON
Based on the specified systems/equipments, continue to implement life
management
2008-2012 2012-2013 2014 2015 year
Life/A
sset
Man
ag
em
en
t
Demonstration Technology
Study
Technology
Improvement Reinforcement Application
-31-
OLE activities in China – CGN/ Daya Bay
Daya Bay License Renewal Project LRA will be submitted in 2019. and expect to approved by NNSA in 2022.
LR approval
Phase of
analysis
and review License extend period
Original life End of First
LR term
Data acquisition
2004 2014 2024 2034 2044 2054
Implementation plan
Executive commitment
Integrated plant assessment
Time limited aging analyses
Feasibility analysis
Environmental evaluation
2022
The review question answering
UFSAR LRA Roadmap
-32-
Contents
Status of China nuclear power programme
PLiM Activities in China
OLE Activities in China
Conclusions
Conclusion:
China nuclear power programme is steadily promoted
based on principle of safety priority.
Activities of PLiM for Chinese NPPs are undertaken by
all related parties covering wide range of topics. Domestic
TWG on PLiM is established to provide platform of
technical exchange and knowledge sharing.
Activities of OLE for Chinese NPPs, especially for
Qinshan-1, is on the way, either on regulatory side and on
utilities side.