NANC Report
Number Oversight Working Group(NOWG)
January 22, 2003
Co-Chairs:
Karen Mulberry, WorldCom
Jim Castagna, Verizon
01/22/2003 NOWG NANC Report 2
Summary
• PAS Forecasting Work Around Recommendation
• PA Change Order Recommendations
• 2002 NANPA Performance Survey Status
• 2002 NANPA PIP Status
• Meeting Schedule
• Attachments - Tracking Documents - PAS Work Around Letter- PA Change Order Recommendations- Table of NANPA Complaints- NOWG Project Status Table
01/22/2003 NOWG NANC Report 3
PAS Forecasting Work Around Recommendation
• NANC 11-19-2002 Action Item:NOWG will consider feasibility of “work arounds” so that carriers can obtain number blocks if request exceeds PAS forecast.
– Considered the feasibility of “work-arounds” that would allow service providers (SPs) the ability to be assigned blocks by PAS even if the quantity of blocks requested exceeds the SP’s PAS forecast.
– Work-around focused on eliminating the need for an SP to provide the “on the spot” forecast currently required by PAS when the quantity of blocks requested exceeds the embedded PAS forecast.
– The NOWG was unable to identify a work-around that could be implemented by SPs. However, the NOWG did identify a solution that may be easily implemented by NeuStar in the short term.
• Recommendation:PAS should override and auto-update the SP’s embedded forecast for the current month based upon the actual number of blocks requested and should discontinue the present practice of informing the applicant “Resource Request Denied: Requesting more blocks than forecasted for OCN (XXXX).” PAS would continue to employ its existing logic for pool replenishment, which appears to be triggered by forecasts and not by block assignments.
01/22/2003 NOWG NANC Report 4
PA Change Order Recommendations
• Developed template format for change order analysis.
• Reviewed pending PA Change Orders and prepared recommendations for the FCC.
• Recommendations forwarded to the FCC and NANC Chair on December 6, 2002
• Eight Recommendations completed.
01/22/2003 NOWG NANC Report 5
2002 NANPA Performance Survey Status
• Survey response deadline extended to January 15th.
• Respondents tabulated to date:Industry and Other 146
Regulatory Agencies 27
• Timeline: 1-23 NANPA Operational Review - Washington
DC
1-28/30 NANPA Operational Review - Concord CA
2-24/28 Data analysis and report development
March Final Report to NANC
01/22/2003 NOWG NANC Report 6
2002 NANPA Performance Improvement Plan Status
PIP 1 - Code Administration System (CAS)
1. Analysis and recommendations gathered from CAS Users Survey - Suspended pending resolution of identified issues.
2. Program to increase CAS usage - Completed
3. Data discrepancies (LERG, CAS, NRUF) - Investigating solutions to correct differences.
4. Reconcile CAS capabilities with Lockheed proposal - Suspended by new requirements
PIP 2 - NANPA Web Site
Completed
PIP 3 - Code Administration
Completed
01/22/2003 NOWG NANC Report 7
Status NANPA 2001-2002Performance Improvement Plan
PIP 4 - Relief Planning
Completed
PIP 5 - NRUF
1. Revised exhaust projection posted to NANPA web site - Ongoing
2. Update NRUF Job Aide - Completed
3. NRUF data proactively provided to State Commissions - Ongoing
PIP 6 - Measurements
1. NRUF performance measurements added - Completed
PIP 7 - General1. Leadership on numbering issues - Ongoing
2. Distribute and explain FCC directives regarding number administration - Ongoing
01/22/2003 NOWG NANC Report 8
Upcoming Meeting Schedule
Dates Time Meeting Details January 21 2003
9am to 5pm NOWG Face-to-Face Meeting Washington DC
January 23 2003
9am to 5pm
NANPA Operational Review in Washington DC
January 24 2003
9am to 5pm NOWG Face-to-Face Meeting Washington DC
January 28-30 2003
9am to 5pm
NANPA Operational Review in Concord CA
February 24-28 2003
9am to 5pm
WG Face-to-Face meeting in Denver CO
March 10 & 14 2003
2 to 5 pm EST
NOWG Conference Calls
March 18 2003
9am to 5pm
NOWG Face-to-Face Meeting Washington DC
Contact either of the Co-Chairs for complete meeting or conference call details
WG meeting records and documents posted on the NANC Chair web site
01/22/2003 NOWG NANC Report 9
Attachments - Tracking Documents
• PAS Forecasting Work Around Recommendation Letter
• PA Change Order Recommendations (#6, #10, #11, #12, #13, #14, #15, #16)
• PA Change Order Tracking Summary
• Table of NANPA Complaints
• NOWG Project Table - tracking WG Activities/Timelines