m/s monnet ispat & energy limitedenvironmentclearance.nic.in/writereaddata/online/tor/0_0... ·...

23
M M / / S S M M O O N N N N E E T T I I S S P P A A T T & & E E N N E E R R G G Y Y L L I I M M I I T T E E D D FORM 1 FOR GAITRA LIMESTONE MINE VILLAGE: GAITRA, PAUSARI, BHARSELA & BHARSELI, TEHSIL BALODA BAZAAR, DISTRICT: BALODA BAZAAR, CHHATTISGARH (EXTENT: 278.144 Ha) AUGUST, 2015 Prepared by: MIN MEC CONSULTANCY PVT. LTD. A-121, Paryavaran Complex, IGNOU Road, New Delhi – 110 030 Ph : 29534777, 29532236, 29535891 ; Fax: +91-11-29532568 Email :[email protected]; Web site : http://www.minmec.co.in Estb. 1983 An ISO 9001:2008 approved company

Upload: others

Post on 21-Jul-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

MM//SS MMOONNNNEETT IISSPPAATT && EENNEERRGGYY LLIIMMIITTEEDD

FORM 1 FOR

GAITRA LIMESTONE MINE VILLAGE: GAITRA, PAUSARI, BHARSELA &

BHARSELI, TEHSIL BALODA BAZAAR, DISTRICT: BALODA BAZAAR, CHHATTISGARH

(EXTENT: 278.144 Ha)

AUGUST, 2015

Prepared by:

M I N M E C C O N S U L T AN C Y PV T . L TD . A - 1 21 , Pa r y av ar a n C om p l ex , I G NO U R o a d , N ew D e l h i – 11 0 0 30 Ph : 29534777, 29532236, 29535891 ; Fax : +91 -11-29532568 E m ai l : m i n _m ec @ v s n l . c om ; W eb s i t e : h t t p : / / w w w. m i nm ec . c o . i n

EEssttbb.. 11998833

An ISO 9001:2008 approved company

Page 2: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 1

APPENDIX I (See Paragraph – 6)

FORM 1

(I) Basic Information 1 Name of the Project/s Gaitra Limestone Mine of M/s Monnet Ispat

and Energy Limited 2 S. No. in the Schedule 1(a) 3 Proposed capacity/ area/ length/

tonnage to be handled/ command area/ lease area/ number of wells to be drilled

Proposed rate of Production: 1.3 MTPA Mine Lease area: 278.144 Ha

4 New/ Expansion/ Modernization New 5 Existing capacity/ area, etc Nil 6 Category of Project i.e. ‘A’ or ‘B’ A 7 Does it attract general condition? If

yes, please specify No

8 Does it attract specific condition? If

yes, please specify No

9 Location Refer Annexure I for Location Map Plot/ Survey/ Khasra no. Toposheet no 64 K/2.

Refer Annexure II for Khasra Map Village Gaitra, Pausari, Bharsela & Bharseli Tehsil Baloda Bazar District Baloda Bazar State Chattisgarh 10 Nearest railway station/ airport along

with distance in kms Nearest Railway station – Bhatapara RS, 16.5 km, WNW (aerial). Airport- Raipur Airport at 100 km (by road)

11 Nearest town, city, district head

quarters along with distance in kms Nearest town & district: Baloda Bazar, 4.4 km, SE

Page 3: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 2

12 Village Panchayats, Zilla Parishad,

Municipal Corporation, Local Body (complete postal addresses with telephone nos. to be given)

Village Panchayat : Gaitra District : Baloda Bazar State : Chhattisgarh

13 Name of the applicant M/s Monnet Ispat & Energy Ltd. 14 Registered Address Monnet Marg, Mandir Hasaud,

Raipur-492 101(Chhattisgarh) 15 Address for correspondence : Monnet Ispat & Energy Ltd.

Monnet House, 11 Masjid Moth Greater Kailash, Part-II New Delhi-110048

Name Shri Amitabh S.Mudgal President (Mktg. & Corpt. Affairs)

Designation (Owner/ Partner/ CEO) Address Monnet Ispat & Energy Ltd.

Monnet House, 11 Masjid Moth Greater Kailash, Part-II, New Delhi

Pin Code 110048 E mail: [email protected] Telephone no. 011-29218542- 546 Fax 011-29218541 16 Details if Alternative sites examined, if

any. Location of these sites should be shown in a toposheet

Not applicable It is a site specific Mining Project.

17 Interlinked Projects Cement Plant for which application to State

Government has been filed for land. 18 Whether separate application of

interlinked project has been submitted? No

19 If yes, date of submission Not Applicable 20 If no, reason Application will b e filed after getting green

signal for land from State Government. 21 Whether the proposal involves

approval/ clearance under : if yes, details of the same and their status to

Page 4: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 3

be gives: (a) The Forest (Conservation) Act,

1980? No

(b) The Wildlife (Protection) Act, 1972?

No

(c) The CRZ Notification, 1991? No 22 Whether there is any Government

Order/ Policy relevant/ relating to the site?

Nil

23 Forest land involved (hectares) Nil 24 Whether there is any litigation pending

against the project and/or land in which the project is proposed to be set up?

No

(a) Name of Court Not applicable (b) Case No. Not applicable (c) Orders/ directions of the Court, if

any and its relevance with the proposed project

Not applicable

* Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.)

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Sl. No.

Information/Checklist confirmation

Yes/ No

Details there of (with approximate quantities /rates, wherever possible) with source of

information data 1.1 Permanent or temporary

change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan)

Yes Total mine lease area is 278.144 Ha. Out of this, 267.975 Ha is private agricultural land and 10.169 is government barren land. The block is mostly a flat terrain having gentle slope towards the North. Land use will be disturbed by opencast excavation and ancillary activity of mining. The disturbed area will comprise of excavated land, area occupied by infrastructure, roads, waste dump etc.

1.2 Clearance of existing land, vegetation and buildings?

Yes Major part of the block, especially the Northern part, is an agriculture land which supports flourishing agriculture of Paddy and Wheat.

Page 5: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 4

Sl. No.

Information/Checklist confirmation

Yes/ No

Details there of (with approximate quantities /rates, wherever possible) with source of

information data The Southern part is a waste land with scanty vegetation comprising acacia tree and wild Berries. Removal of vegetation such as trees, natural grass, small shrubs and bushes will take place before mining.

1.3 Creation of new land uses? Yes Infrastructural facilities/ offices, excavated area, plantation, dumps, green belt, mineral storage, haul roads, transportation roads, etc. will be created.

1.4 Pre-construction investigations e.g. bore holes, soil testing?

Yes Detailed exploration in this area for cement grade limestone was carried out by the State Govt. (Directorate of Geology and Mining) with the help of drilling. 28 boreholes were drilled achieving 744.60 mt of drilling in the applied area for ML. Out of these 28 boreholes; the limestone was encountered in 21 boreholes. In other 7 boreholes, Shale has been encountered. A total of 503.66 meters of core of Limestone was obtained from the boreholes. The depth of the boreholes was generally restricted to 30 meters.

1.5 Construction works? Yes Mining office, rest shelter, stores/workshop, explosive magazine, ANFO mining shed, canteen, and communication etc. will be created.

1.6 Demolition works? No - 1.7 Temporary sites used for

construction works housing of construction workers?

No Mostly local workers will be deployed; hence no arrangement for their housing is envisaged.

1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations

Yes Office and other facilities will be constructed at the north eastern part of the lease area.

1.9 Underground works including mining or tunneling

No It is an open cast mine.

1.10 Reclamation works? Yes As per the post mining land use, the pit will be converted into a water pond suitable to collect rain water. This will recharge the ground water. Afforestation will be carried out in 3.0 Ha area which covers the safety zone of 7.5 m width all along the lease boundary in first five years. In the next plan period’s plantation on and around

Page 6: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 5

Sl. No.

Information/Checklist confirmation

Yes/ No

Details there of (with approximate quantities /rates, wherever possible) with source of

information data the dump slopes will be carried out to stabilize them. Yearly approximately 1250 saplings of the local species like Mahua, Babool, Mango, Guava, Jamun etc. will be planted in the proposed area. Afforestation will be 15.0 Ha till the end of the mine life.

1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and

manufacturing processes? Yes The production of limestone shall involve

excavation of the limestone i.e., drilling, blasting, sizing, loading & transportation.

1.14 Facilities for storage of goods or materials?

Yes Mine waste (subgrade ROM limestone/ chips) will be stacked in the northern eastern part of the lease area. To accommodate this waste material, an area is earmarked for the life of the mine. As the low grade Limestone will be blended with the high grade Limestone simultaneously, therefore, temporary stacked in the northern side of the lease area. A 10 ton capacity permanent magazine will be provided for the storage of explosive.

1.15 Facilities for treatment or disposal of solid waste or liquid effluents?

Yes Topsoil material will be dumped in south eastern part of the lease area and the OB will be dumped in the north western part of the lease area. There is no generation of effluents by mining or allied activities. Liquid effluents from the work shop will be treated in the oil/ grease separation plant and recirculated. Oil/ grease will be stored in impervious containers and sold to authorized vendors. The mine water and the runoff water from the dumpers will be collected in the surface water reservoir and utilized for the industrial activities. Any excess water will be released in to natural surface water drains after testing to meet the

Page 7: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 6

Sl. No.

Information/Checklist confirmation

Yes/ No

Details there of (with approximate quantities /rates, wherever possible) with source of

information data stipulated norms.

1.16 Facilities for long term housing of operational workers?

No Due to proximity of villages near the proposed project, adequate labour will be available for mining operation such as loading and other associated jobs, hence, no housing arrangement is proposed.

1.17 New road, rail or sea traffic during construction or operation?

Yes There will be an increase in road traffic due to transportation of limestone to cement plant at about 11 km from the mine and due to movement of man and material to and fro from the mine on existing roads.

1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc?

Yes Construction of new road will be internal roads i.e. roads inside the block. Also there will be construction of about 11 km long road to the cement plant.

1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements?

No

1.20 New or diverted transmission lines or pipelines?

Yes LT power lines are present in the north western part of the area.

1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers?

No Not Applicable

1.22 Stream crossings? Yes Natural valleys hosting the seasonal nalla drain the rainwater that flow mainly towards W to E. A branch of Mahanadi canal is passing through center of the lease area. The crossings will be required

1.23 Abstraction or transfers of water from ground or surface waters?

Yes The drinking water shall be drawn from ground water source. Water for industrial purpose will be pumped out from the mine.

1.24 Changes in water bodies or the land surface affecting drainage or run-off?

No No changes are proposed.

1.25 Transport of personnel or materials for construction,

Yes Transportation of manpower and excavated

Page 8: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 7

Sl. No.

Information/Checklist confirmation

Yes/ No

Details there of (with approximate quantities /rates, wherever possible) with source of

information data operation or decommissioning?

limestone will be by road/conveyor.

1.26 Long-term dismantling or decommissioning or restoration works?

Yes It is anticipated that ultimately the excavated area will be converted into water reservoir; remaining plantation area would be around covering the dump yard, backfilled area, the green belt developed around crusher and other infrastructure. Refer Annexure III for Conceptual Plan and Annexure IV for Conceptual section

1.27 Ongoing activity during decommissioning which could have an impact on the environment?

No

1.28 Influx of people to an area in either temporarily or permanently?

Yes 89 employees will get direct employment in the mine. Unskilled and semi skilled (after training) will be hired from in and around the mine while skilled, engineers, managerial staff and technical experts will be hired from outside.

1.29 Introduction of alien species?

No

1.30 Loss of native species or genetic diversity?

No

1.31 Any other actions? No

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply)

Sl. No.

Information/checklist confirmation

Yes/No

Details thereof (with approximate quantities /rates, wherever possible) with source of

information data

2.1 Land especially undeveloped or agricultural land (ha)

Yes The total area 278.144 Ha. The applied area is dominated by private owned lands. About 267.975 Ha of land comprises of agricultural land and 10.169 Ha land is barren land.

2.2 Water (expected source & competing users) unit: KLD

Yes Total water requirement of 132 cum/day is estimated (Approximately 117 cum/day for industrial purpose & 15 cum/day for drinking). Water demand will be met from the tube well for drinking and the water for the industrial use will

Page 9: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 8

Sl. No.

Information/checklist confirmation

Yes/No

Details thereof (with approximate quantities /rates, wherever possible) with source of

information data be available from the mine sump.

2.3 Minerals (MT) Yes Limestone, 1.3 MTPA

2.4 Construction material – stone, aggregates, sand / soil (expected source – MT)

Yes The expected source of the construction material such as stone and sand shall be bought from nearest quarries and authorized vendors.

2.5 Forests and timber (source – MT)

Yes Will be bought from nearby vendors for doors and windows construction.

2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW)

Yes Power requirement will be 2 MVA which will be sourced from Kukurdih substation of CSEB. This will be utilized for operating crusher and other machineries.

2.7 Any other natural resources (use appropriate standard units)

No

3. Use, storage, transport, handling or production of substances or materials,

which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Sl. No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with

source of information data

3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies)

No The hazardous materials are engine oil, transformer oil etc., which will be stored in leak proof drums. Hence, no contamination anticipated.

3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases)

No No water borne diseases anticipated since there is no disposal of waste water.

3.3 Affect the welfare of people e.g. by changing living conditions?

No The project will create direct employment for 89 employees, so there will be positive impact on the socio-economy of the local people. In addition to this, considerable indirect employment will be generated. Professional organizations will be engaged

Page 10: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 9

Sl. No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with

source of information data for certain professional services like quality control, environment monitoring and occupational health monitoring etc.

3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc.

Yes Mining and transportation activity will generate SPM in ambient air, which can affect health of vulnerable groups. However, there are no vulnerable groups within close proximity of the proposed activities. The environment will be maintained clean and within statutory norms by proper environmental management plan.

3.5 Any other causes No

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Sl. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with

source of information data 4.1 Soil, overburden or mine

wastes Yes The waste generated is mainly sub grade

and Lateritic topsoil/waste. The total waste generated during plan period will be about 603065.52 cum.

4.2 Municipal waste (domestic and/or commercial wastes)

Yes Small amount of waste will be produced from the manpower deployed on the site It will be segregated into biodegradable, recyclable and others. The biodegradable waste will be composted at site while the recyclable waste will be sold to recycling vendors. The balance waste will be disposed in designated pit/ area within the mine lease.

4.3 Hazardous wastes (as per Hazardous Waste Management Rules)

No Used oil/ spent oil under category 5.1, from transformers, DG sets, machinery, etc will be generated periodically and sold to authorized recycling agencies.

4.4 Other industrial process wastes Yes From the mine there shall be OB generation which will be backfilled in the mine itself.

4.5 Surplus product No - 4.6 Sewage sludge or other sludge

from effluent treatment Yes Septic tanks in the mine lease will be

desludged periodically and the sludge composted into manure for use in green

Page 11: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 10

Sl. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with

source of information data belt.

4.7 Construction or demolition wastes

Yes Wastes from construction work will be disposed of at designated dump area or used for landscaping/ road construction/ filling low lying areas etc.

4.8 Redundant machinery or equipment

No The remaining machinery, after the completion of life of the project, will be sold to the prospective buyers.

4.9 Contaminated soils or other materials

No

4.10 Agricultural wastes No 4.11 Other solid wastes No

5. Release of pollutants or any hazardous, toxic or noxious substances to air

(Kg/hr) Sl. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with

source of information data

5.1 Emissions from combustion of fossil fuels from stationary or mobile sources

Yes Fossil fuel (diesel) will be used in operation of machinery in the mine. The emissions from the mine will include SO2, NOx, SPM and CO.

5.2 Emissions from production processes

Yes The production process will involve drilling, blasting and loading/excavation which will generate dust.

5.3 Emissions from materials handling including storage or transport

Yes There will be a crusher as point source for dust generation and there will be fugitive emissions due to storage of subgrade limestone, soil/OB and transportation of limestone and waste materials, hence the action plan to control and monitor fugitive emissions as per CPCB guidelines shall be implemented.

5.4 Emissions from construction activities including plant and equipment

Yes Emissions from construction activities including plant and equipment will be temporary and marginal. The emissions will be kept under control by intensive water sprinkling and barricading the concerned sites.

5.5 Dust or odours from handling of materials including construction

Yes Dust emissions due to material handling will be controlled by water sprinkling. There will not be any Odour as sewage will be

Page 12: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 11

Sl. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with

source of information data materials, sewage and waste dealt with by septic tanks and there will not

be open flows for it.

5.6 Emissions from incineration of waste

No No incineration processes within the proposed ML.

5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris)

No Burning of waste in open air (e.g. slash materials, construction debris) will not be permitted.

5.8 Emissions from any other sources

No

6. Generation of Noise and Vibration, and Emissions of Light and Heat

Sl. No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source of information data with source

of information data

6.1 From operation of equipment e.g. engines, ventilation plant, crushers

Yes Noise will be generated due to operation of Heavy Earth Moving Machinery (HEMM), and other transportation vehicles. Vibrations will be caused due to operation of HEMM, crushers etc for which appropriate control measures like dampers will be envisaged. Lights will be used for illuminating the work place and in order to limit the spread of the light to surrounding areas, appropriate reflectors will be utilized.

6.2 From industrial or similar processes

No

6.3 From construction or demolition Yes Construction work will be marginal and temporary, hence, impact will be minimal and will be during the initial stage of one or 2 years but due care shall be taken that the construction sites are barricaded properly, roads are water sprinkled and vehicle are well maintained.

6.4 From blasting or piling Yes Noise and vibration will occur, the quantum of which will depend upon strata under blasting. Ground vibration studies will be done in the area for assessment to reach at optimum charge per delay after commissioning the mine.

Page 13: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 12

Sl. No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with source of information data with source

of information data

6.5 From construction or operational traffic

Yes The plying of trucks for transport of limestone will increase noise to about 60-75 dB (A) for that instant in ambient air. Natural attenuation will dampen the noise and no impact is anticipated.

6.6 From lighting or cooling systems

No

6.7 From any other sources No -

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea

Sl. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with

source of information data

7.1 From handling, storage, use or spillage of hazardous materials

No Waste oil from machineries and other equipment shall be generated periodically after few months and shall be sold to CPCB authorized recycling vendors.

7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge)

No Domestic sewage will be treated in septic tanks and soak pits and any overflow will be used for gardening purpose. Storm water from mine or dumps will be collected in a settling tank through garland drains and utilized for in house industrial needs. Excess runoff, if any, will be discharged to natural seasonal drain only after testing to meet the disposal standards.

7.3 By deposition of pollutants emitted to air into the land or into water

Yes Since dust suppression systems will be adopted in material handling, the airborne dust will be minimised and consequently, deposition minimised.

7.4 From any other sources No -

7.5 Is there a risk of long term build up of pollutants in the environment from these sources?

No Most of the dust generated will be suppressed and prevented from becoming airborne and any meager dust amount falling on land/ plants will easily be washed off during rains. Hence no risks of long term build up.

Page 14: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 13

8. Risk of accidents during construction or operation of the Project, which

could affect human health or the environment Sl. No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities/rates, wherever possible) with

source of information data 8.1 From explosions, spillages,

fires etc. from storage, handling, use or production of hazardous substances

No Explosive will be used for blasting, however proper safety measures shall be taken. Appropriate “On Site Emergency Plan” will be prepared and implemented.

8.2 From any other causes No 8.3 Could the project be affected

by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)?

No The project is under Seismic Zone - II. The project area is not prone to floods, landslides or cloudburst etc.

9. Factors which should be considered (such as consequential development)

which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Sl. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with

source of information data 9.1 Lead to development of

supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.:

Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.)

Yes The establishment of the project will lead to establishment of wide metalled roads to and around the mine. Power supply will be from Kukurdih Sub station of Chhattisgarh State Electricity Board. No waste treatment plant is envisaged.

housing development Yes A small township of area 1.25 ha is planned. extractive industries No - supply industries No - other No - 9.2 Lead to after-use of the site,

which could have an impact on the environment

No The post mining land use will be planned scientifically. Meagre OB/soil generated during the life of mine will be backfilled and small area will be rehabilitated and reclaimed at surface level. Most of the excavated area will remain in the form of a void because of

Page 15: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 14

Sl. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities/rates, wherever possible) with

source of information data dearth of backfill material. The excavated area cannot be brought to the pre-mining land use. This area will become water body which can be used for irrigation of surrounding areas and other domestic purposes of villagers.

9.3 Set a precedent for later developments

No

9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects

Yes The industries in 10 km radius are: Sl. No.

Name of Industry Distance from the

mine in km

Direction

1 Ambuja Cement Ltd 1.8 SW

2 South Asian Agro India Ltd.

8.1 NE

3 Sonadih Cement Plant (LAFARGE)

9.6 NE

4 Rawan L.S Mine (Ambuja Cement Ltd.)

0.8 SW

(III) Environmental Sensitivity

(Refer Annexure V for topography and features map of 15 Km radius around ML)

Sl. No.

Areas Name/ Identity Aerial distance (within 15 km.) Proposed project location

boundary 1. Areas protected under

international conventions, national or local legislation for their ecological, landscape, cultural or other related value

No Wild life Sanctuary, National park within 15 km. Nil within 15 km radius. Nearest is Barnawapara Wildlife Sanctuary (74 km, SE)

River/Nala/Drain/Canal Khorsi Nala 6.0 km, SE Risda Nala 4.1 km, S Jamuniya Nadi 5.5 km, N Banjari Nala 7.4 km, W

2. Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests

Seonath River 10.6 km, NE

Page 16: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 15

Sl. No.

Areas Name/ Identity Aerial distance (within 15 km.) Proposed project location

boundary Mallin Nala 11.5 km, ESE Kauwa Nala 8.7 km, SSE Tengna Nala 8.4 km, SSE Chituwar Nala 9.2 km, S Amera Minor 7.7 km, SSE Kukardih 3.2 km, SSW Muriadih Minor 9.3 km, ENE Kevlari Minor 1.1 km, N Lawanband Minor 10.7 km, SE Charothi Minor 6.0 km, E Magarchhawa Minor 8.9 km, SE Distributaries

Distributary no. 7 12.3, SSW Distributary no.8 10.6, S Distributary no.9 7.3, S Distributary no.12 5.3, SW Distributary no.13 3.3, SW Distributary no.15 Within Distributary no.16 2.3, E Distributary no.17 Within Canals

Mahanadi canal (Baloda branch)

Within

Ameri diversion canal 12.9, SW Kesla minor 12.2, SSE Palari canal 14.4, SSE Charothi minor 13.96, ENE Risda canal 4.1, S Amera minor 7.7, SSE Kevlari minor 1.1, N Magarchhawa minor 8.9, SE Water bodies

Kukardih Talab 3.2, SSW Near Sonpuri village 0.5, E Near Amera village 9.7, SSE Near Chherkapur 12.9, SE

Page 17: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 16

Sl. No.

Areas Name/ Identity Aerial distance (within 15 km.) Proposed project location

boundary village Near Binauri village 13.7, SSE Near Rasota village 13.6, SSE Near Datan village 14.8, S Near Khapradih village

12.4, SW

Near Karhi village 10.9, SW Near Khairwahi village

5.4, SSW

Near Bharsela village Adjoining, E Near Khairtal village 3.6, W Near Maldi village 5.4, WSW Near Arjuni village 3.4, W Near Khamariya village

6.7, WNW

Near Karmada village

1.2, N

Near Jaraund village 14.5, W Near Guma village 12.3, SSW Near Saiha village 11.4, SSW Near Achholi village 9.1, N Near Puran village 7.0, S Near Thelki village 7.6, S Near Khamariya village

9.1, S

Near Bharuwadih village

8.1, SSW

Near Semaradih village

8.2, SW

Near Mapar village 8.9, SW Forest Areas Latura R.F. 2.1 km, ENE Sonbursa R.F. 2.4 km, NE Mohtara R.F. 5.8 km, ENE Dhabadih R.F. 5.2 km, SSW

3. Areas used by protected, important or sensitive species of flora or fauna for breeding,

As listed in Point 1 & 2 above

Page 18: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 17

Sl. No.

Areas Name/ Identity Aerial distance (within 15 km.) Proposed project location

boundary nesting, foraging, resting, over wintering, migration

4. Inland, coastal, marine or underground waters

As in Point 2 above

5. State, National boundaries Nil in 15 Km radius (Nearest State Boundary is with Orissa at 115 km E)

Roads SH-10, Bhatapara to Baloda Bazar

0.6 km, SW

SH-9, Baloda Bazar to Raipur

5.0 km, SE

SH-14, Baloda Bazar to Kasdol

4.9 km, SE

MG Road, Baloda Bazar to Hathbandh

4.3 km, SSE

Railway Station Bhatapara R.S. (16.5 km, WNW)

Airport Raipur Airport (100.0 km, N)

6. Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas

7. Defense installations Nagpur AFS (324 km, WSW) and Nagpur (Kamptu) Cantonment (306 WSW)

8. Densely populated or built-up area

Baloda Bazar 4.4 km, SE

9. Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities)

Hospitals, Schools, Community facilities are present in the villages within 10 Km of study area (Refer Annexure VIII for List of amenities within 10 km radius).

10. Areas containing important, high quality or scarce resources (ground water resources,

Forests and water bodies are as listed in point 2 above

Page 19: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 18

Sl. No.

Areas Name/ Identity Aerial distance (within 15 km.) Proposed project location

boundary surface resources, forestry, agriculture, fisheries, tourism, minerals)

Critically Polluted area

11. Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded)

Nil in 15 km, radius. (Nearest is at Raipur 68 km, SW)

12. Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

The project is under Seismic Zone-II (Least Active).

(IV) Proposed Terms of Reference for EIA studies The terms of reference on the basis of which the EIA will be prepared are

given below: 1.0 SCOPE OF THE STUDY The EIA will be prepared on the basis of data generated by Min Mec

Consultancy Pvt. Ltd., New Delhi. The scope of study is as follows. 2.0 DATA GENERATION

Environmental monitoring will be done to obtain present environmental

status of the study area for the present project. The EIA will be prepared based on the environmental monitoring data being generated for the post monsoon season (period of 3 months) from October to December 2015. The proposed terms of reference on the basis of which the EIA will be prepared are given below:

TABLE 1 : DATA GENERATED

Sl. No.

Description No. of locations

Total No. of samples

1.0 AIR Ambient air monitoring (24 hourly samples), twice a week for 3 months for one season Parameters : PM 10, PM 2.5, SO2, NOx

8 (one in core

zone and 7 in buffer zone)

192

Page 20: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 19

Sl. No.

Description No. of locations

Total No. of samples

1.1

Meteorological parameters will be measured at hourly duration simultaneously at one air monitoring station for 3 months for Wind speed, direction, Relative humidity, Temperature, Cloudiness and Rainfall

1 90 days

2.0 WATER Water sample to be collected from various locations (surface and ground water) in core and buffer zone (10 km radius). Parameters tested for physical and chemical and biological parameters as per IS 10500 or Schedule VI of EPR

Upto 10 upto 10

3.0 SOIL 2 2 4.0 NOISE

Hourly readings taken for 24 hours (Leq)

8 8 sets

5.0 TRAFFIC DENSITY 1 1 sets 3.0 DATA COLLECTION The EIA study will be done for the mine lease area (core zone) and area

within 10.0 km radius (buffer zone), both of which comprise the ‘study area’. The following data, through field survey and other sources, are being collected by Min Mec Consultancy for preparing the EIA/EMP for the proposed mine with related facilities.

i Details of fauna (wild and domestic), flora within a distance of 10 km

from the project site (including forest details). ii Major habitat within 10 km radius. iii Major industries within 10 km radius. iv Sensitive places / historical monuments and sanctuaries within 10 km

radius. v Land use pattern within core zone and buffer zone (10 km radius

around the core zone) including the cropping pattern. vi Demography and Socio-economic based on last available Census

data for entire study area vii Relevant meteorological data, for previous decades from India

Meteorological Department (IMD) viii Study of present environmental protection and mitigation measures in

nearby operating similar projects, if any. ix Geo-hydrological aspects based on available data from various

secondary sources.

Page 21: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 20

x Identification of water bodies, hills, roads etc. within 10.0 km radius and collecting data regarding discharge of streams and flood levels etc. from existing records, if any river lies in study area.

4.0 PREPARATION OF EMP The EMP includes the following details a. Study of the reports like Geological report, FR for mine available with

the client regarding the project. b. Present Environmental Setting

The base line data being generated and collected as per para 2.0 and 3.0 will be used to establish the present environmental scenario.

c. Identification, prediction and evaluation of Anticipated

Environmental Impacts due to the Proposed Mine and related facilities.

The environmental impacts will be anticipated in core and buffer zone on:

- Topography - Climate - Water Quality (Surface/Ground) - Hydro-geological Regime - Air quality - Noise Levels - Flora and Fauna (terrestrial, aquatic) - Traffic density - Land-Use - Socio-Economic Conditions - Habitat - Health, culture, human environment including public health,

occupational health and safety - Sensitive Places/Historical Monuments - Aesthetics and Visual intrusion The impacts would be anticipated based on experience of similar projects. d. Proposed Environmental Safeguards and Monitoring Mechanism Relevant guidelines as per Environmental Impact Assessment (EIA)

Notification issued in January 1994 and subsequently in 2006 under the Environment (Protection) Act, 1986 will be kept in mind while spelling out mitigation measures. The experience of similar project(s) will be made use of for envisaging the pollution control measures by pronouncing the success in the past.

Page 22: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 21

The following aspects will be covered i. Reclamation of disturbed areas if feasible

ii. Measures to control the surface and ground water pollution due to various effluents to be discharged

iii. Measures to control air pollution due to proposed activities/ operation.

iv. Green belt development plan and identification of flora species which can be planted in and around the project

v. Measures to contain noise pollution and mitigate adverse impact on workers and habitat in core and buffer zone

vi. Pronounce the improvement in socio-economic conditions and benefits the people will get on implementation of the project

vii. Measures to control health hazard of workers and surrounding population.

viii. Total and specific cost of implementation of control measures

ix. Environmental monitoring, implementation organization and feedback mechanism to effect mid course corrections.

I hereby give undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.

(AMITABH S.MUDGAL) Date: 17-08-2015 President (Mktg. & Corpt. Affairs) Place: Delhi Monnet Ispat & Energy Ltd. Monnet House 11, Masjid Moth, Greater Kailash Part-II, New Delhi-110048

Submit document supporting claim of authorized signatory for the specific project. (Refer Annexure-VI)

Page 23: M/S MONNET ISPAT & ENERGY LIMITEDenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0... · 2015-08-18 · State : Chhattisgarh 13 Name of the applicant M/s Monnet Ispat & Energy

Form 1 for Gaitra Limestone Mine of M/s Monnet Ispat & Energy Ltd., Chhattisgarh 22

LIST OF ANNEXURES FOR FORM-1

Annexure No. Description

I Location map

II Khasra map

III Conceptual Plan

IV Conceptual Section

V 15 km study area

VI Authorized signatory

VII Feasibility report

VIII List of amenities within 10 km radius