Moving Ruston Forward Program Status April 13, 2017

Upload: hoangnga

Post on 24-Jun-2018

227 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

Moving Ruston Forward Program StatusApril 13, 2017

Page 2: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 2 of 38 04/13/2017

TABLE OF CONTENTSPROGRAM SUMMARYPROJECT SUMMARIES

STREETS & DRAINAGE- MRF 34 - MLK ExtensionSTREETS & DRAINAGE- MRF 125 - Shephard Creek DrainageSTREETS & DRAINAGE- MRF 201 - Kentucky 3 Lane 167 to GoodwinSTREETS & DRAINAGE- MRF 202 - Monroe Street South - California to KCSRSTREETS & DRAINAGE- MRF 201 - Kentucky Bridge/Engineering/PropertySTREETS & DRAINAGE- MRF 202 - Monroe Street South - Bryan/Jones (Line Intersection) to CaliforniaSTREETS & DRAINAGE- MRF 203 - Street Overlays 35 MilesSTREETS & DRAINAGE- MRF 204 - Corrugated Metal Pipe ReplacementSTREETS & DRAINAGE- MRF 205 - Reynolds Dr. 167-GoodwinSTREETS & DRAINAGE- MRF 212 - Street Overlay PrepSTREETS & DRAINAGE- MRF 216 - Monroe Street North KCSRR to Service Rd.

SEWER PROJECTS- MRF 211 - Hundred Oaks Lift Station ConversionSEWER PROJECTS- MRF 213 - South Plant Liftstation RehabSEWER PROJECTS- MRF 214 - Southside Sewer ImprovementsSEWER PROJECTS- MRF 215 - South Plant Force Main RehabWATER PROJECTS- MRF 206 - AMI MetersWATER PROJECTS- MRF 207 - Water Well RehabWATER PROJECTS- MRF 208 - MLK East - WaterWATER PROJECTS- MRF 209 - Arizona/Kirkland/Trenton Main RehabWATER PROJECTS- MRF 219 - Associated Water Projects (Gilman, Lesna Lane, West Hilly)SPORTS COMPLEX- MRF 220 - Sports Complex

OTHER- MRF 210 - ClarifiersOTHER- MRF 210 - RAS Pump Station & PH MonitoringOTHER- MRF 210 - Tertiary FiltersOTHER- MRF 218 - Bike Trails Alabama to Service Rd.OTHER- MRF 218 - Bike Trails California to AlabamaOTHER- MRF 218 - Bike Trails California to West TennesseeOTHER- MRF 218 - Bike Trails Kentucky to Service RdOTHER- MRF 218 - Kentucky to Cook ParkOTHER- MRF 221 - Animal Control FacilityOTHER- MRF 231 - PR/High Level Project OversightOTHER- MRF 234 - Heard Building

PHASE DESCRIPTIONS

PROGRAM STATUS REPORT - CITY OF RUSTON

Page 3: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 3 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

Obligated/Type Budget Encumbered Spent % Spent % Cpl. # Proj.

STREETS & DRAINAGE 42,650,000$ 5,574,206$ 951,050$ 2% 5% 11SEWER PROJECTS 6,000,000$ 881,800$ 102,305$ 2% 2% 4WATER PROJECTS 6,900,000$ 690,875$ 199,914$ 3% 2% 5SPORTS COMPLEX 30,000,000$ 514,249$ 445,649$ 1% 0% 1

OTHER (Animal Control, Bike Trails, Etc.) 7,150,000$ 617,964$ 101,281$ 1% 2% 1192,700,000$ 8,279,094$ 1,800,199$ 2% 3% 32

PROGRAM SUMMARY$42,650,000

$6,000,000 $6,900,000

$30,000,000

$7,150,000 $5,574,206

$881,800 $690,875 $514,249 $617,964 $951,050 $102,305 $199,914 $445,649 $101,281

$-

$5,000,000

$10,000,000

$15,000,000

$20,000,000

$25,000,000

$30,000,000

$35,000,000

$40,000,000

$45,000,000

STREETS & DRAINAGE SEWER PROJECTS WATER PROJECTS SPORTS COMPLEX OTHER (Animal Control,Bike Trails, Etc.)

Budget Obligated/Encumbered Spent

Page 4: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 4 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

STREETS & DRAINAGEMRF 34 - MLK Extension

Project Budget: 2,900,000$ Obligated/Encumbered: 2,195,685$

Spent: 259,797$ % Spent: 9%

% Overall Complete: 28%

Project Address:

Project Description:

Current Phase In Progress - Construction

PROGRESS PHOTOS

Increase accessibility to the area from Hwy 167. Provide heavy commercial traffic with alternate route around Ruston’s Core Districts to industrial area

$2,900,000

$2,195,685

$259,797

$-

$500,000

$1,000,000

$1,500,000

$2,000,000

$2,500,000

$3,000,000

$3,500,000

Budget Obl./Enc. Spent

Page 5: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 5 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

STREETS & DRAINAGEMRF 125 - Shephard Creek Drainage

Project Budget: 6,000,000$ Obligated/Encumbered: 105,000$

Spent: 18,052$ % Spent: 0%

% Overall Complete: 0%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

Increase flow capacity of the creek and road crossing. Rebuild all road crossings and water flow conduits. This will help the sewer system in the area by reducing water infiltration into the sewer system.

$6,000,000

$105,000 $18,052 $-

$1,000,000

$2,000,000

$3,000,000

$4,000,000

$5,000,000

$6,000,000

$7,000,000

Budget Obl./Enc. Spent

Page 6: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 6 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

STREETS & DRAINAGEMRF 201 - Kentucky 3 Lane 167 to Goodwin

Project Budget: 5,000,000$ Obligated/Encumbered: 319,875$

Spent: -$ % Spent: 0%

% Overall Complete: 0%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

Streets and Drainage ugrades, utility upgrades and sidewalks

$5,000,000

$319,875

$- $-

$1,000,000

$2,000,000

$3,000,000

$4,000,000

$5,000,000

$6,000,000

Budget Obl./Enc. Spent

Page 7: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 7 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

STREETS & DRAINAGEMRF 202 - Monroe Street South - California to KCSR

Project Budget: -$ Obligated/Encumbered: -$

Spent: -$ % Spent: 0%

% Overall Complete: 0%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

$- $- $- $-

$0

$0

$0

$0

$1

$1

$1

$1

$1

$1

Budget Obl./Enc. Spent

Page 8: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 8 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

STREETS & DRAINAGEMRF 201 - Kentucky Bridge/Engineering/Property

Project Budget: 5,000,000$ Obligated/Encumbered: 1,352,556$

Spent: 142,152$ % Spent: 3%

% Overall Complete: 13%

Project Address:

Project Description:

Current Phase In Progress - Construction

PROGRESS PHOTOS

Bridge replacement

$5,000,000

$1,352,556

$142,152

$-

$1,000,000

$2,000,000

$3,000,000

$4,000,000

$5,000,000

$6,000,000

Budget Obl./Enc. Spent

Page 9: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 9 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

STREETS & DRAINAGEMRF 202 - Monroe Street South - Bryan/Jones (Line Intersection) to California

Project Budget: 5,000,000$ Obligated/Encumbered: 527,351$

Spent: 108,109$ % Spent: 2%

% Overall Complete: 6%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

Streets and Drainage ugrades, utility upgrades and sidewalks

$5,000,000

$527,351

$108,109

$-

$1,000,000

$2,000,000

$3,000,000

$4,000,000

$5,000,000

$6,000,000

Budget Obl./Enc. Spent

Page 10: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 10 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

Page 11: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 11 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

STREETS & DRAINAGEMRF 203 - Street Overlays 35 Miles

Project Budget: 5,000,000$ Obligated/Encumbered: 317,085$

Spent: 188,405$ % Spent: 4%

% Overall Complete: 1%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

Currently working with engineering firm to develop plan, evaluate, and grade all road surfaces in the city. The information generated by the street survey will determine the scope and schedule of work per street block.

$5,000,000

$317,085 $188,405

$-

$1,000,000

$2,000,000

$3,000,000

$4,000,000

$5,000,000

$6,000,000

Budget Obl./Enc. Spent

Page 12: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 12 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

STREETS & DRAINAGEMRF 204 - Corrugated Metal Pipe Replacement

Project Budget: 750,000$ Obligated/Encumbered: -$

Spent: -$ % Spent: 0%

% Overall Complete: 0%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

Replace all existing Corrugated metal pipe culverts, drains and bridges system wide.Most of the corrugated pipe will be replaced with a smooth PVC pipe that has a much longer life span.Approximately 107 corrugated metal pipe culverts that cross roadways

$750,000

$- $- $-

$100,000

$200,000

$300,000

$400,000

$500,000

$600,000

$700,000

$800,000

Budget Obl./Enc. Spent

Page 13: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 13 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

STREETS & DRAINAGEMRF 205 - Reynolds Dr. 167-Goodwin

Project Budget: 2,000,000$ Obligated/Encumbered: 225,214$

Spent: 39,090$ % Spent: 2%

% Overall Complete: 4%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

Need to address multiple issues along the roadway;Establish sidewalks down the roadway. Address drainage issues along the right of way. Reevaluate any parking that backs into the street and speed limits along the right of way.Evaluate the road surface and determine if any improvements are necessary

$2,000,000

$225,214

$39,090

$-

$500,000

$1,000,000

$1,500,000

$2,000,000

$2,500,000

Budget Obl./Enc. Spent

Page 14: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 14 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

STREETS & DRAINAGEMRF 212 - Street Overlay Prep

Project Budget: 5,000,000$ Obligated/Encumbered: 5,940$

Spent: 5,940$ % Spent: 0%

% Overall Complete: 1%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

Project will be done in conjunction with the road overlay project. Any section of road surface that is chosen to be rebuilt will have the existing sewer line evaluated and replaced as needed. Will help decrease inflow and infiltration and decrease the amount of storm water relocated by lift stations and treated at the treatment plant. This initiative will further decrease any future cost if the sewer is replaced while the road is actively under construction

$5,000,000

$5,940 $5,940 $-

$1,000,000

$2,000,000

$3,000,000

$4,000,000

$5,000,000

$6,000,000

Budget Obl./Enc. Spent

Page 15: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 15 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

STREETS & DRAINAGEMRF 216 - Monroe Street North KCSRR to Service Rd.

Project Budget: 6,000,000$ Obligated/Encumbered: 525,500$

Spent: 189,505$ % Spent: 3%

% Overall Complete: 1%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

Streets and Drainage ugrades, utility upgrades and sidewalks

$6,000,000

$525,500 $189,505

$-

$1,000,000

$2,000,000

$3,000,000

$4,000,000

$5,000,000

$6,000,000

$7,000,000

Budget Obl./Enc. Spent

Page 16: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 16 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

SEWER PROJECTSMRF 211 - Hundred Oaks Lift Station Conversion

Project Budget: 1,000,000$ Obligated/Encumbered: -$

Spent: -$ % Spent: 0%

% Overall Complete: 0%

Project Address:

Project Description:

Current Phase Not Started

PROGRESS PHOTOS

Rebuild the Hundred Oaks Lift station. Rebuild portions of the gravity sewer line and reduce inflow and infiltration

$1,000,000

$- $- $-

$200,000

$400,000

$600,000

$800,000

$1,000,000

$1,200,000

Budget Obl./Enc. Spent

Page 17: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 17 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

SEWER PROJECTSMRF 213 - South Plant Liftstation Rehab

Project Budget: 1,000,000$ Obligated/Encumbered: 100,000$

Spent: 100,000$ % Spent: 10%

% Overall Complete: 1%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

Need to rehab the south plant lift station. Will improve the sewer main issues in the area

$1,000,000

$100,000 $100,000

$-

$200,000

$400,000

$600,000

$800,000

$1,000,000

$1,200,000

Budget Obl./Enc. Spent

Page 18: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 18 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

SEWER PROJECTSMRF 214 - Southside Sewer Improvements

Project Budget: 1,000,000$ Obligated/Encumbered: 681,300$

Spent: 2,305$ % Spent: 0%

% Overall Complete: 8%

Project Address:

Project Description:

Current Phase In Progress - Construction

PROGRESS PHOTOS

Rehabilitation of the collection system

$1,000,000

$681,300

$2,305 $-

$200,000

$400,000

$600,000

$800,000

$1,000,000

$1,200,000

Budget Obl./Enc. Spent

Page 19: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 19 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

SEWER PROJECTSMRF 215 - South Plant Force Main Rehab

Project Budget: 3,000,000$ Obligated/Encumbered: 100,500$

Spent: -$ % Spent: 0%

% Overall Complete: 0%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

Replace gravity sewer lines that feed the South Plant lift station. Replacement of lines will improve efficiency of South Plant lift station by reducing amount of storm water that enters into our waste water system. Approximate distance 16,430’

$3,000,000

$100,500 $-

$-

$500,000

$1,000,000

$1,500,000

$2,000,000

$2,500,000

$3,000,000

$3,500,000

Budget Obl./Enc. Spent

Page 20: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 20 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

WATER PROJECTSMRF 206 - AMI Meters

Project Budget: 2,100,000$ Obligated/Encumbered: 129,800$

Spent: -$ % Spent: 0%

% Overall Complete: 1%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

Will increase the city’s water meter reading and billing efficiency.Projected two year time line

$2,100,000

$129,800

$- $-

$500,000

$1,000,000

$1,500,000

$2,000,000

$2,500,000

Budget Obl./Enc. Spent

Page 21: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 21 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

WATER PROJECTSMRF 207 - Water Well Rehab

Project Budget: 3,000,000$ Obligated/Encumbered: 257,975$

Spent: 160,670$ % Spent: 5%

% Overall Complete: 1%

Project Address:

Project Description:

Current Phase In Progress - Construction

PROGRESS PHOTOS

Install new 12” main down Jonesboro St to MLK Dr.Abandon existing 2” line and install 8” line at the eastern end of MLK Dr., down Cornell Ave., and south along Dark St.Connect existing 6” lines on Vernon St. to 6” lines on MLK Dr.

$3,000,000

$257,975 $160,670

$-

$500,000

$1,000,000

$1,500,000

$2,000,000

$2,500,000

$3,000,000

$3,500,000

Budget Obl./Enc. Spent

Page 22: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 22 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

WATER PROJECTSMRF 208 - MLK East - Water

Project Budget: 400,000$ Obligated/Encumbered: 24,600$

Spent: -$ % Spent: 0%

% Overall Complete: 2%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

Replace 2" water mains and improve water quality

$400,000

$24,600

$- $-

$50,000

$100,000

$150,000

$200,000

$250,000

$300,000

$350,000

$400,000

$450,000

Budget Obl./Enc. Spent

Page 23: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 23 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

WATER PROJECTSMRF 209 - Arizona/Kirkland/Trenton Main Rehab

Project Budget: 900,000$ Obligated/Encumbered: 135,000$

Spent: 12,330$ % Spent: 1%

% Overall Complete: 7%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

Replace 1700’ of 4” water main with 6” water main. Tie into existing 6” water line on Dan Reneau Dr.Increase capacity of water lines. Increase fire protection.

$900,000

$135,000

$12,330

$-

$100,000

$200,000

$300,000

$400,000

$500,000

$600,000

$700,000

$800,000

$900,000

$1,000,000

Budget Obl./Enc. Spent

Page 24: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 24 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

WATER PROJECTSMRF 219 - Associated Water Projects (Gilman, Lesna Lane, West Hilly)

Project Budget: 500,000$ Obligated/Encumbered: 143,500$

Spent: 26,914$ % Spent: 5%

% Overall Complete: 8%

Project Address:

Project Description:

Current Phase In Progress - Construction

PROGRESS PHOTOS

Replace 4" water mains and improve water quality

$500,000

$143,500

$26,914

$-

$100,000

$200,000

$300,000

$400,000

$500,000

$600,000

Budget Obl./Enc. Spent

Page 25: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 25 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

SPORTS COMPLEXMRF 220 - Sports Complex

Project Budget: 30,000,000$ Obligated/Encumbered: 514,249$

Spent: 445,649$ % Spent: 1%

% Overall Complete: 0%

Project Address:

Project Description:

Current Phase In Progress - ROW Acquisition

PROGRESS PHOTOS

Adult softball fields, 8 youth baseball fields, 8 girls softball field, 3 t-ball fields, 1 buddy ball field, 6 soccer fields, 3 football fields and walking track

$30,000,000

$514,249 $445,649

$-

$5,000,000

$10,000,000

$15,000,000

$20,000,000

$25,000,000

$30,000,000

$35,000,000

Budget Obl./Enc. Spent

Page 26: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 26 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

OTHER (Animal Control, Bike Trails, Etc.)MRF 210 - Clarifiers

Project Budget: 1,000,000$ Obligated/Encumbered: -$

Spent: -$ % Spent: 0%

% Overall Complete: 0%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

Wastewater treatment plant updates and rehabilitation

$1,000,000

$- $- $-

$200,000

$400,000

$600,000

$800,000

$1,000,000

$1,200,000

Budget Obl./Enc. Spent

Page 27: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 27 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

OTHER (Animal Control, Bike Trails, Etc.)MRF 210 - RAS Pump Station & PH Monitoring

Project Budget: 1,000,000$ Obligated/Encumbered: -$

Spent: -$ % Spent: 0%

% Overall Complete: 0%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

RAS: Return Activated Sludge Pump Station update and rehabilitation

$1,000,000

$- $- $-

$200,000

$400,000

$600,000

$800,000

$1,000,000

$1,200,000

Budget Obl./Enc. Spent

Page 28: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 28 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

OTHER (Animal Control, Bike Trails, Etc.)MRF 210 - Tertiary Filters

Project Budget: 1,000,000$ Obligated/Encumbered: -$

Spent: -$ % Spent: 0%

% Overall Complete: 0%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

Update and rehabilitation

$1,000,000

$- $- $-

$200,000

$400,000

$600,000

$800,000

$1,000,000

$1,200,000

Budget Obl./Enc. Spent

Page 29: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 29 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

OTHER (Animal Control, Bike Trails, Etc.)MRF 218 - Bike Trails Alabama to Service Rd.

Project Budget: 200,000$ Obligated/Encumbered: -$

Spent: -$ % Spent: 0%

% Overall Complete: 0%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

Developing bike and running trails throughout the city

$200,000

$- $- $-

$50,000

$100,000

$150,000

$200,000

$250,000

Budget Obl./Enc. Spent

Page 30: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 30 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

OTHER (Animal Control, Bike Trails, Etc.)MRF 218 - Bike Trails California to Alabama

Project Budget: 200,000$ Obligated/Encumbered: -$

Spent: -$ % Spent: 0%

% Overall Complete: 0%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

Developing bike and running trails throughout the city

$200,000

$- $- $-

$50,000

$100,000

$150,000

$200,000

$250,000

Budget Obl./Enc. Spent

Page 31: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 31 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

OTHER (Animal Control, Bike Trails, Etc.)MRF 218 - Bike Trails California to West Tennessee

Project Budget: 200,000$ Obligated/Encumbered: 147,000$

Spent: -$ % Spent: 0%

% Overall Complete: 6%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

Developing bike and running trails throughout the city

$200,000

$147,000

$- $-

$50,000

$100,000

$150,000

$200,000

$250,000

Budget Obl./Enc. Spent

Page 32: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 32 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

OTHER (Animal Control, Bike Trails, Etc.)MRF 218 - Bike Trails Kentucky to Service Rd

Project Budget: 300,000$ Obligated/Encumbered: 152,500$

Spent: 76,959$ % Spent: 26%

% Overall Complete: 18%

Project Address:

Project Description:

Current Phase In Progress - Construction

PROGRESS PHOTOS

Developing bike and running trails throughout the city

$300,000

$152,500

$76,959

$-

$50,000

$100,000

$150,000

$200,000

$250,000

$300,000

$350,000

Budget Obl./Enc. Spent

Page 33: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 33 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

Page 34: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 34 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

OTHER (Animal Control, Bike Trails, Etc.)MRF 218 - Kentucky to Cook Park

Project Budget: 200,000$ Obligated/Encumbered: 75,648$

Spent: -$ % Spent: 0%

% Overall Complete: 6%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

Bike trails

$200,000

$75,648

$- $-

$50,000

$100,000

$150,000

$200,000

$250,000

Budget Obl./Enc. Spent

Page 35: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 35 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

OTHER (Animal Control, Bike Trails, Etc.)MRF 221 - Animal Control Facility

Project Budget: 1,500,000$ Obligated/Encumbered: 1,216$

Spent: 1,216$ % Spent: 0%

% Overall Complete: 5%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

New Kennel Facility, Office building, Exam/surgery/lab isolation rooms, Large animal facilities, fencing new location and dog park.

$1,500,000

$1,216 $1,216 $-

$200,000

$400,000

$600,000

$800,000

$1,000,000

$1,200,000

$1,400,000

$1,600,000

Budget Obl./Enc. Spent

Page 36: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 36 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

OTHER (Animal Control, Bike Trails, Etc.)MRF 231 - PR/High Level Project Oversight

Project Budget: 50,000$ Obligated/Encumbered: 50,000$

Spent: 23,106$ % Spent: 46%

% Overall Complete: 46%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

$50,000 $50,000

$23,106

$-

$10,000

$20,000

$30,000

$40,000

$50,000

$60,000

Budget Obl./Enc. Spent

Page 37: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 37 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

OTHER (Animal Control, Bike Trails, Etc.)MRF 234 - Heard Building

Project Budget: 1,500,000$ Obligated/Encumbered: 191,600$

Spent: -$ % Spent: 0%

% Overall Complete: 0%

Project Address:

Project Description:

Current Phase In Progress - Planning/Design

PROGRESS PHOTOS

$1,500,000

$191,600

$- $-

$200,000

$400,000

$600,000

$800,000

$1,000,000

$1,200,000

$1,400,000

$1,600,000

Budget Obl./Enc. Spent

Page 38: Moving Ruston Forward Program Status · 13/04/2017 · Moving Ruston Forward Program Status. April 13, ... Kentucky Bridge/Engineering/Property ... Project Status Report

City of Ruston Page 38 of 38 04/13/2017

PROGRAM STATUS REPORT - CITY OF RUSTON

PHASE DESCRIPTIONS

PLANNING: Project needs further definition, community input, or City Council approval.

DESIGN:

BID & AWARD:

CONSTRUCTION: Construction begins.

IMPLEMENTATION:

CONTRACT CLOSURE/ CITY OF RUSTON CLOSEOUT: Contractor establishes substantial project completion and facility or roadway is

available for use. Contractor and City continue to finalize final acceptance documentation. Final acceptance documentation is turned over to the City of Ruston.

The Design Consultant investigates the site and available information and prepares the scope of the project, outlines the design criteria and starts construction drawings. The design package is completed in preparation for the bid and procurement process.

Project is advertised for bids, which are received and evaluated. A Construction Contractor is selected and placed under contract.

All professional and/or construction services have been contracted and are working toward delivering the final product.