MMOVE Mobility Management oVer Europe
Steering Advisory Group 1Technical Working Group 1Brighton & Hove February 2009
MMOVE
ProgrammeTuesday 24 February
1200 Brighton & Hove presentations
1430 Steering Advisory Group/ Technical Working Group
1800 Close
1930 Dinner
MMOVEProgrammeWednesday 25 February
Separate meetings09:00-11:30 SAG1 TWG members on guided walking tour of Brighton and Hove
and Royal Pavilion
Lunch
12:30-14:45 TWG1 SAG members on guided walking tour of Brighton and Hove
and Royal Pavilion
14:45-15:15 Joint SAG TWG Next Steps
MMOVE- Overview: Success!Interreg IVC
European Regional Development Fund
Promotes interregional exchange to support regional policy
Innovation and Environment
Circa 500 applications35 applications approved
Interreg IVC aims
Improve the effectiveness of regional development policies
Contribute to economic modernisation and increased competitiveness of Europe
… by…
Enabling exchange of experiences and knowledge
Matching less experienced with more advanced regions
Ensuring transfer of identified good practice into mainstream programmes
MMOVE Overview
Interreg IVC 1st call
Budget: 1.9 million euro75/85% ERDF
November 2008-October 2011
11 partners
MMOVE
Mobility Management oVer Europe
Aims
To improve the effectiveness of sustainable mobility policies implemented by local authorities in small and medium sized cities in Europe and improve awareness amongst regional level policy makers of the importance of supporting these sustainable mobility policies within regional development frameworks.
MMOVE
Mobility Management oVer EuropeObjectives
• To identify and exchange good practices in sustainable mobility policies for small and medium sized towns.
• To assess the transferability of best practices in order to identify their critical success factors.
• To provide a common methodology for mobility management policies.• To improve awareness of innovative mobility management methods that
have low investment and large impact in terms of changing citizens’ mobility patterns.
• To provide European small and medium sized municipalities with a tool to advocate for their needs with regional governments (providing policy recommendations).
• To provide a tool that will support policy-makers in their mobility management planning across Europe.
MMOVE
11 Partners
• *Reggio Emilia (IT) – Lead Partner• Regione Marche (IT)• *Ulm (DE)• *Girona (ES)• *Varberg (SE)• *Molndal (SE)• *Kavala (GR) • Volos (GR)• *Brighton & Hove (UK) • Bydgoszcz (PL) • Razlog (BU)
MMOVE
Activities
• Identification of Best Practice
• Study Visits• Feasibility studies to
transfer BP• Network meetings• Policy recommendations• Regional Stakeholder
meetings• Online mobility toolbox
Priorities
• communication & awareness raising
• traffic management and control
• public & collective transport
MMOVEProducts
targeted specifically at medium sized cities
• Collection of good practices• Study visit reports• Feasibility studies on
transferability of policies • On-line Mobility Management
Toolbox• Toolbox Manual• Project website• Communication & dissemination
materials • Media coverage
MMOVE Team:
Lead Partner: Reggio Emilia
Reggio Nel Mondo:Serena ForacchiaNubia TagliaferroPatrizia Marani
Municipality:Cllr Paolo GandolfiAlessandro Meggiato
External Experts: Aurora
MMOVE Team
Component 3 Leader
Marche Region/ SVIMPaolo PasquiniGiovanni RomaniniErika FulgenziAnnalisa Paccapelo
MMOVE Workplan
2009 2010 2011 (Oct)
Best Practice Report
Study Visits x 5
Final Event
SAG X2 SAG x 2 Regional meetings x 11
TWG x2 TWG x 3 TWG x2
Kick off + BP network meetings
Study Visit Network meeting
SAG x 2
Study Visit x1
Feasibility Studies x 11
SC X 1
SC X 2 SC X 1
MMOVE Activities and Outputs
Best Practice Study (30 BPs)
Start: February 2009Complete report and presentation:
September 2009 Template for collectionFoundation for Study Visits and ToolboxBudget 24,000 eurosLed by Marche Region, in collaboration with
ICOOR
MMOVE Activities and Outputs
6 Study Visit and Reports• Partner cities and beyond• Each partner has 6500 euros to
participate• Start December 2009• Complete February 2010• Network meeting to exchange results (around April 2010)
MMOVE Activities and Outputs
Feasibility Studies• To transfer best practice• 1 per partner• Semester 5 (July- December 2010)• 40,000 euro per partner (EE or staff)• Network meeting to exchange results• Use results to influence policy
MMOVE
Management Structure
Joint Technical SecretariatLead Partner
Components 1-2-3Steering Advisory GroupTechnical Working Group
Steering CommitteeSecretariat
MMOVE
2009 WorkplanJanuary MMOVE Project Officer and Administration Monitoring Officer start in
RnMSerena goes on Maternity Leave (Aurora cover)
February SAG 1 and TWG 1 week of 23 February
March
April Kick off Meeting Reggio Emilia 31 March-2 April
May
June
July 1st Partner claims to RESerena back from maternity leave
August
September BP Network Meeting
October Claim for Semester 1 and 2 due to JTS
November SAG 2 and TWG 2
December 1st Study Visit
MMOVE Kick Off Meeting31 March – 2 April 2009 Reggio Emilia,
Italy Programme ideas
• DAY 1: 31 March 2009• Welcome• Icebreaker / Networking • MMOVE –Overview– introduction and discussion• Mobility tour of Reggio Emilia (on bicycles?)• Partner presentations (following a pre determined
template)• Reception and Networking Dinner
MMOVE Kick Off MeetingDAY 2: 1 April Partnership Agreement, Budget & Shared Cost MethodologyWorkplan for 2009 - presentation and discussionCommunications (including a workshop)Claims and Monitoring System – introductionClaims and monitoring 1:1 sessions for finance and monitoring officers
(20 minutes each)Mini Study VisitDinner
DAY 3: 2 AprilExpert presentation (eg EPOMM)Best Practice Study (including a session to reply to questions on the Best
Practice template)First discussion of exchange and feasibility study phasesConclusions and Next steps 2009
MMOVE SAG 1
Wednesday 25th February
Finance and ClaimsAudit
Shared cost methodologyPartnership Agreement
EvaluationCommunications
Policy
MMOVE SAG 1
Finance and Claims
Administration and Monitoring Officer Patrizia Marani to lead
Guidance will include IVC guidelines, report forms and timetable
KO meeting training and 1:1 sessionsClaims for preparation costs + Semesters 1 and 2(Italian LP – no IVC authority)Close monitoring – quarterly mechanism
Claims and monitoring system
InterregJTS
Lead PartnerReggio Emilia
Project Partner
6 Monthly Claims Jan-Jun & Jul-Dec
ERDF PaymentsIn arrears
15 February & 15 August after First Level Control
Claims and monitoring system
• Timely and accurate• JTS templates• Patrizia report forms
and timesheets (start now!)
• Actual, defrayed and eligible expenditure
• In euros using average monthly rate
• Audit
http://ec.europa.eu/ budget/inforeuro/
MMOVE ClaimsSemester Dates Claim to JTS Partner claims to
RE
12
November – December 08 1.10.09 15.08.09
January – June 09 1.10.09 15.08.09
3 July- December 09 1.4.10 15.02.10
4 January – June 10 1.10.10 15.08.10
5 July- December 10 1.4.11 15.02.11
6 January – June 11 1.10.11 15.08.11
7 July- October 11 1.2.12 15.12.11
MMOVE Finance
Partnership Agreement and Shared Cost Methodology
Shared costs in CP2Methodology options: Patrizia to lead on
agreementPartnership Agreement timetable- needs
partners to verify then sign (Nubia to lead)Training and guidance at KO
MMOVE Evaluation
Budget 27,000 euros in RE External Expertise
Aims to• Collate participant feedback• Give action oriented recommendations• Report in semesters 3, 5 and 6 to
coincide with Study Visit, Feasibility and Final stages
MMOVE Communications
Component 2 Communication and DisseminationLed by Reggio Emilia
Communications PlanWorkshop at Network meeting 2 Website and logoDVDPhotographyPrint materialsToolbox manualLocal and regional events
MMOVE Communications
Design of communications template & logo 12,000.00
Web site design / maintenance & translation of toolbox in html30,000.00
Production promotional material (brochures, pubb. print) 13,500.00
Project DVD 12,000.00
toolbox manual editing 2,000.00
local communication campaigns (local project brochures) 22,000.00
Translation costs 24,000.00
Final Event ( organization/ venue/ material ect) 35,000.00
Regional events ( venue/ organization) 18,000.00
Media campaign (PR support/Publicity space/press conf...) 60,000.00
MMOVECommunications
Key Outputs by semester and component
Key Outputs by semester and component 1 2 3 4 5 6 7
Communications Plan x
Press releases 33 11
11 11
Website (launch) x
Brochures 11 x
Dissemination Events 12 12
Leaflets 11 11
Stakeholder Events 11 x x x x x
DVD/webstream 1 x x
Final Event x
Toolbox manual 1 x
Policy Presentations 11 11
MMOVE Communications
The Communication plan is a document which will set the:
• objectives• audiences• messages and contents• instruments• tactics
which will allow an effective, efficient, shared, coordinated, planned and widely disseminated communication during the entire length of the project
MMOVE Communications
Objectives• to encourage the exchange of ideas and results• to coordinate the communication actions and
activities in a recognizable way, linked to the project and to the mobility policies of the different involved partners
• to encourage a change in local and regional mobility policies
• make citizens aware in everyday mobility choices
MMOVE Communications
Audiences
• project partners• local and regional stakeholders • mobility experts and planners• mobility local and regional authorities policy
makers• mobility networks• citizens
MMOVE Communications
Key messages and contents
To be defined and presented during the Kick Off meeting.
Tactics
• Appointment of a communication officer by the Lead Partner in RE who will coordinate all the activities
• Communication instruments immediately recognizable linked to the MMOVE project
• Identification of instruments which will ease the exchange of ideas and results
• Simplification of results for citizens
MMOVE Communications
Instruments
• shared communication plan • communication workshops• media coverage (Press releases, press conferences,
articles, etc.)• technological instruments (website, blogs, e-
bullettins, DVD, photos)• periodical local, regional (and 1 EU) events and final
event • brochures, leaflets, etc.• toolbox manual
MMOVE
SAG/TWG 1 Next steps
• General• Send out definitive final versions of AF and simplified budget plus explanation of
changes made during approval of conditions• Circulate all powerpoints from SAG/TWG• In future send a reminder of what papers have been sent and store on project website
• Partnership Agreement• Nubia to circulate the PA draft and ask each partner 1) to start checking the doc with
lawyers (if required) 2) who will be the signatory on the PA• Aim to get PA signed at KO- maybe too ambitious- need to get 11th partner confirmed
and Shared Cost methodology agreed as annex- if possible bring signed PA to KO- to start the collection.
• Nubia to give 14 day deadline to Bydgoszcz MMRC for reply- and get RE Mayor to write.• Volos to informally ask Lodz Uni contact at municipality
MMOVE
SAG/TWG 1 Next steps• KO Meeting• Agreed programme- start 1200 on 31 March end 1200 2 April• Day 2 technical issues will be SC- Finance, Claims, Communications, Website• Registrations will go out by 27 February• Ask partners if they wish to invite politicians- RE could organise special session on
Day3- deadline to respond• Consider holding a special network meeting for politicians towards the end of project• Give partners a checklist for preparation- who should attend, what they need to
prepare• Invite EPOMM/PIMMS Transfer representatives• Organise a TWG meeting at same time• Keep it motivational as well as training/management processes• Invite the JTS• Invite Gehl as expert speaker• Volunteers for chairing?
MMOVE
SAG/TWG 1 Next steps• Finance and Claims• Partners have some flexibility to transfer money between budget lines and components
BUT must ask RE first so they can control overall balance up to 10% flexibility rule• Patrizia to:• Circulate proposed shared cost methodology with a draft email to national FLC – to seek
approval within 4 weeks• Circulate link to Interreg IVC website with Country Specific Information and the IVC
Programme Manual• Seek agreement from non eurozone partners on the preferred euro exchange rate
method• Send each partner a very simple summary of their budget- what they can spend on which
activity• Clarify situation for PC1 – can it be combined with PC2?• Find out how long each partner FLC will take to certify claims – partners to check with
their FLC• Consider adjusting the claims timetable to get ‘first in the queue’ at FLCs- e.g end
reporting period 1 month earlier• Ask JTS to consider staggering the claims timetable (!)
MMOVE
SAG/TWG 1 Next steps• Evaluation
• Draft specification to be developed and circulated by Nubia to SAG for comment
• Partners can propose potential external contractors• Brief presentation and discussion in SC at KO• Evaluator to be appointed in Semester 3• Candidates should be interviewed and should attend SC/Network meetings• Nubia will monitor core outputs/ indicators. Evaluator should look at these
materials , also set up , collate and analyse participant feedback, give qualitative info on both mobility and management issues.
• Reports can be used as evidence for exit or forward funding
MMOVE
SAG/TWG 1 Next steps• Communications
• Key messages and plan to be developed for KO and discussed
• Website- draft spec to be presented and discussed at KO-• Audiences : 1) public 2) partners 3)mobility professionals 4) local and regional
government• Links to all partner sites• Contract to be by open procurement- Volos expressed interest• Needs to have technical capacity for webstream and online toolbox- either database or
interactive game• Needs an exit strategy – perhaps Eurotowns site
• Professional photography, press conference and first filming at KO• MMOVE to send a representative to 1) IE Bages project meeting, Spain May 2) EPOMM
conference, San Sebastian, May.
MMOVE
SAG/TWG 1 Next steps
• SV
• Partners can decide which SVs to attend and how many people to send.• There can be more than 6 SVs – they could be smaller and take other forms, eg staff
exchange, round table• Dates- consider extending the timetable for SV-
• TWG Methodology• Be clear about ambitions- 11 partners BP- not the perfect model for all cities• Often qualitative info- which practice requires a lot of investment or faces resistance-
which policies are more effective or used more in smaller cities- turn these into simple indicators
• Claudio to check data/indicators are compatible with standard EU measurements and Eurostat.
• Claudio to circulate TWG methodology discussion notes and additional indicators.