H.O. CORE TEAM
• 1. MR. AJAY CHAFALE – AE-MIS-HO
• 2. MR. SATISH NAWATHEY – AE-
DOMBIVLI DIVISION .
• 3. MR. T.G. DESHPANDE – JE –
KALYAN – R – DIVISION
• 4. MR. ABHAY RAUT – JE –
WASHI CIRCLE
H.O. CORE TEAM
• 5. MR. AJAY KHODKE – SA – HO – IT
• 6. MRS. KIRTI MODAK – AP – MIS –
CELL , HO , MUMBAI.
• 7. MR. BAGUL – AP – HO – IT
• 8. MR. TUSHAR BIND – AP – HO - IT
TARGET
• TO COMPLETE ALL THE ACTIVITIES OF FEMS AND GENERATE THE FEEDER WISE ENERGY AUDIT REPORTS FOR A SUB DIVISION
• ANALYSIE THE REPORTS AND THEN TAKE PROPER ACTIONS FOR REDUCING THE LOSSES BY USING FEMS AS A TOOL.
TARGET
• TO FORM A ZONAL / CIRCLE WISE TEAM TO RESOLVE THE PROBLEMS RELATED WITH FEMS AT THE SAME LEVEL ONLY.
• H.O. CORE TEAM WILL BE ALWAYS SUPPRTING TO ZONAL / CIRCLE TEAM FOR 24 Hrs. AND 365 DAYS
THREE DAYS WORKSHOP AT ZONAL / CIRCLE LEVEL
INCLUDES
• INSTALLATION OF SOFTWARE• COMPLETE FEEDING OF MASTER
DATA – ( 11 Activities )• VARIOUS TRANSACTIONS LIKE • DT FAILURE &COMMISSIONING• FEEDER INTERRUPTIONS
ACTIONS RELATED WITH ENERGY AUDIT
• SUB STATION , SUB DIVISION WISE AND FEEDER WISE CONSUMPTION AS AN IN PUT.
• ACCEPTING THE ( BILLED UNITS ) HT & LT BILL DATA COMING FROM “IT”
• GENERATING THE ENERGY AUDIT REPORTS – FEEDER WISE AND SUB DIVISON WISE ALSO.
OUT PUT OF HO CORE TEAM
• GENERATING THE FEEDER WISE LOSSES AT SUB DIVISION LEVEL THROUGH FEMS HAS STARTED.
• UPDATE INFORMATION IS AS FOLLOWS
• TOTAL NO OF FEEDERS FOR E.A.=
% LOSS > 50%
% LOSS between 25% & 50%
% LOSS between 5% & 25
% LOSS < 5%
CIRCLE WISE INFORMATION
CIRCLE S / DN LOCATION1) East – I 2) West
3) MIDC 4) East – II
5) Netivali 6) Kolshewadi
7) Kalyan – III 8) Kalyan – IV
1)Ulh - 1 2) Ulh - II
3) Ulh - III 4) Ulh - IV
5) Ulh - V 6) Ambernath
7) Badlapur 8) Shahapur
ZONAL / CIRCLE TEAM
i) Mr. Oze – JE
Approx. Participants – 25 Nos
i) Kalyan – I
ii) Kalyan – II
8 Nos
8 Nos
CIRCLE WISE INFORMATION
CIRCLE S / DN LOCATIONS PARTICIPANTS
ZONAL / CIRCLE TEAMi)Mr. Nakate – Dy.EE
ii)Mr. Wadodkar – Dy.EE
iii)Mrs. Ambadkar – J.E.
iv)Mrs. Asha Pawar - Sub. Eng
v)Mr. Jayant Limaye – Sub.Eng.
RASTA PETH
4 NOS i) Shivaji Nagar
ii) Aundh
iii) Ganesh Khind
iv) Nagar Road
Approx. 40 to 50 Participants
CIRCLE WISE INFORMATION
CIRCLE S / DN LOCATIONS PARTICIPANTS
ZONAL / CIRCLE TEAM
Mr. Chikate – S.A. – I.T. – Vasai .
VASAI 4 NOS i) Vasai - West
ii) Virar - East
iii) Virar - West
iv) Dahanu
Approx. 15 to 20 Participants
CIRCLE WISE INFORMATION
CIRCLE S /DN LOCATIONS PARTICIPANTS
ZONAL / CIRCLE TEAM
Being at Initial
Stage
i) Mr. Inamdar – JE
ii) Mr. Wadze - JE
i) NANDED
ii) BID
iii) LATUR
1 No NANDED URBAN S/DN
Approx. 30 to 40 Participants
CIRCLE WISE INFORMATION
CIRLE S/DN LOCATION PARTICIPANTS
ZONAL / CIRCLE TEAM
i) Mr. Kale – JE
ii) Mr. Vishwas sabnis – J.E.
i) Parbhani
ii) Jalna
3 Nos i) Hingoli
ii) Parbhani
iii) Jaln-R
Approx. 10 to 15 Participants
CIRCLE WISE INFORMATION
CIRCLE S / DN LOCATION PARTICIPANTS
ZONAL / CIRCLE TEAM
i) Mr. Kale – JE
ii) Mr. Vishwas Sabnis – J.E.
Aurangabad 8 Nos i) Chavani
ii) Cidco
iii) Shahaganj
iv) Kranti Chawk
v) Power House
vi) Sillod
vii) Kannad
viii) Vaijapur
Approx. 20 to 25 Participants
CIRCLE WISE INFORMATION
CIRCLE S / DN LOCATION PARTICIPANTS
ZONAL / CIRCLE TEAM
i) Mr. Kumthekar – AE
ii) Mr. Bhagwat - JE
i) Kolhapur 2 Nos i) Kolhapur North Zone
ii) Kolhapur East Zone
Approx. 30 to 40 Participants
CIRCLE WISE INFORMATION
CIRCLE S / DN LOCATION PARTICIPANTS
ZONAL / CIRCLE TEAM
i) Mr. Rajkumar Patil – JE
i) Sholapur 1 No Sholapur – A Zone
Approx. 5 to 7 Participants
CIRCLE WISE INFORMATION
CIRCLE S / DN LOCATION PARTICIPANTS
ZONAL / CIRCLE TEAM
i) Mr. Jagdale – JE
i) Sangli 2 Nos i) Sangli Central Zone
ii) Sangli North Zone
Approx. 10 to 15 Participants
CIRCLE WISE INFORMATION
CIRCLE S / DN LOCATION PARTICIPANTS
ZONAL / CIRCLE TEAM
i) Karad 2 Nos i) Kard – U
ii) Karad - II
Approx. 5 to 8 Participants
CIRCLE WISE INFORMATION
CIRCLE S / DN LOCATION PARTICIPANTS
ZONAL / CIRCLE TEAM
i) Mr. Abhay Raut – JE
i) Washi 2 Nos i) Panvel – U Bhingari
ii) Washi Railway
Approx. 15 to 20 Participants
CIRCLE WISE INFORMATION
CIRCLE S / DN LOCATION PARTICIPANTS
ZONAL / CIRCLE TEAM
i) Ms. Manisha Surwade – JE
i) Thane 3 Nos i) Neelam Nagar
ii) Kopri
iii) Lokmanya
Approx. 5 to 7 Participants
CIRCLE WISE INFORMATION
CIRCLE S / DN LOCATION PARTICIPANTS
ZONAL / CIRCLE TEAM
Mr. Amrutkar from “IT” Nasik
i) Nasik 1 No Satpur MIDC
Approx. 5 to 7 Participants
CIRCLE WISE INFORMATION
CIRCLE S / DN LOCATION PARTICIPANTS
REMARK
Complete – one day training session for Morshi Dn. At Morshi
i) Amaravati 1 No Amaravati – U Approx. 25 To 40 Participants
CIRCLE WISE INFORMATION
CIRCLE S / DN LOCATION PARTICIPANTS
ZONAL / CIRCLE TEAM
i) Mr. Lonare – JE
i) Nagpur Rural
ii) Nagpur Urban
2 Nos i) Nagpur Rural S/Dn
ii) Shankar Nagar
Approx. 25 to 30 Participants
CIRCLE WISE INFORMATION
CIRCLE S / DN LOCATION PARTICIPANTS
ZONAL / CIRCLE TEAM
i) Mr. Amit Shivalkar – JE
ii) Mr. Shendre – JE
i) Chandrapur under Nagpur Rural Zone including Bhandara & Gondia Circle
1 No Ballarshah Approx. 25 to 30 Participants
CIRCLE WISE INFORMATION
CIRCLE S / DN LOCATION PARTICIPANTS ZONAL / CIRCLE TEAM
Mr. Harshad Apate – AP
Mr. Misal JE
Mr. Sinkar
JE
Ratnagiri Circle
2 Nos i) R – I
ii) CHIPLUN - Rural
Approx. 10 to 12 Participants
CIRCLE WISE INFORMATION
CIRCLE S / DN
LOCATION PARTICIPANTS ZONAL / CIRCLE TEAM
Sindhudurg 2 Nos i)KUDAL - U
ii)RAJAPUR
Approx. 5 to 7 Participants
STATISTICAL CIRCLE WISE TOTAL INFORMATION
TOTAL NO OF CIRCLES
TOTAL NO OF S / DNS
APPROX. TOTAL PARTICIPANTS
REMARKIN ADDITION TO THIS SAY AROUND
200 ENGINEERS
HAVE TAKEN TRAINING AT NASIK TRD TILL UP DATE .
25 NOS 57 NOS APPROX. 250 TO 300
OBSERVATIONS • EXISTING METERS AT ALL 33/22/11 KV
S/S NEEDS TO BE REPLACED BY STATIC OR ELECTRONIC WITH HIGH CLASS & ACCURACY ON TOP PRIORITY.
• ONLY INTRESTED ENGINEERS ARE FAMILIER WITH CMS AND FEMS ACTIVITIES AND HENCE ACTIVITIES OF S/DN ARE CONTINUED.
OBSERVATIONS
• MANY S/DNS ARE DEPENDENT ON OPERATOES ( OUT SOURCED )
• ACTIVITIES GETS STOPPED ,THE MOMENT ENGINEER GETS TEANSFERED OR OPERATOR LEAVE THE JOB.
• ALL SUB DIVISION WISE LOSSES VARIES FROM 8% TO 40 %
SOFT REQUIREMENT• 1. AS AND WHEN THERE IS A DESIRED OUT
PUT,CONCERNS SHOULD NOT BE TRANSFERRED IRRESPECTIVE OF NO OF YEARS.
• 2. PREFERABLY ONE INDEPENDENT ENGINEER SHOULD OPERATE ALL THESE ACTIVITIES AT SUB DIVISION LEVEL RELATED WITH CMS AND FEMS AND ALSO RECENTLY INTODUCED SPOT BILLING SYSTEM.
SOFT REQUIREMENT
• 3. IF THE REQUIREMENT NO -2 IS FULL
FILLED THEN THE ACTIVITIES WILL
CONTINUE FOR A LONGER PERIOD
• 4. AMC OF PROFIT CENTERS SHOULD
BE EITHER AT CIRCLE LEVEL OR
AT THE MOST AT ZONAL LEVEL.
SOFT REQUIREMENT• AN APPROPRIATE ACTION SHOULD BE TAKEN FROM MANAGEMENT SIDE TO BOOST THE MORAL OF THE ZONAL / CIRCLE TEAM
• MSEDCL SHOULD PROVIDE FACILITY TO AVAIL INTREST FREE LOAN TO PURCHASE DESKTOP PC OR LAPTOP TO WORK EVEN AT RESIDANCE.