MIDZAGHE PROJECT ENVIRONMENTAL IMPACT ASSESSMENT 25 AUGUST 2015 – COLD LAKE OPEN HOUSE ROUND #1 SUMMARY Submitted to: Imperial Oil Resources Calgary, Alberta Submitted by: Amec Foster Wheeler Environment & Infrastructure Calgary, Alberta October 2015 CE0436215.1900

Upload: truongthuy

Post on 29-Jul-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

MIDZAGHE PROJECT ENVIRONMENTAL IMPACT ASSESSMENT

25 AUGUST 2015 – COLD LAKE

OPEN HOUSE ROUND #1 SUMMARY

Submitted to:

Imperial Oil Resources Calgary, Alberta

Submitted by:

Amec Foster Wheeler Environment & Infrastructure Calgary, Alberta

October 2015

CE0436215.1900

Imperial Oil Resources Amec Foster Wheeler Midzaghe Project – Public Open House #1 Environment & Infrastructure Cold Lake, Alberta October 2015

\\Cal1-fs2\cal1-projects\Environment\Projects\CE04362 Grand Rapids SAGD EIA 2013\TechInfo\Public Engagement\15-08 Open House\Report\Midzaghe - Aug'15 Open

House #1 Summary Report - FINAL (15-11-12).docx Table of Contents

TABLE OF CONTENTS

PAGE

1.0  INTRODUCTION ............................................................................................................... 1 

2.0  OBJECTIVES ................................................................................................................... 1 

3.0  METHODOLOGY .............................................................................................................. 1 

3.1  Date and Location ................................................................................................. 1 

3.2  Notification ............................................................................................................. 1 

3.2.1  General Public ........................................................................................ 1 

3.2.2  Identified Stakeholders ........................................................................... 1 

3.2.3  Imperial Website ..................................................................................... 2 

3.3  Open House Format .............................................................................................. 2 

3.4  Project Team Attendance ...................................................................................... 3 

4.0  PUBLIC AND STAKEHOLDER PARTICIPATION ........................................................... 3 

5.0  FEEDBACK ...................................................................................................................... 4 

5.1  Process-Related Responses ................................................................................. 5 

5.2  Project Comments ................................................................................................. 5 

6.0  CONCLUSIONS FROM THE OPEN HOUSE ................................................................... 7 

7.0  NEXT STEPS .................................................................................................................... 7 

LIST OF APPENDICES

Appendix A Advertisements (newspaper and invitation) Appendix B Display Boards Appendix C Feedback Form

Amec Foster Wheeler Environment & Infrastructure is committed to achieving sustainability through balancing economic growth, social responsibility and environmental protection. Learn

more at: http://amecfw.com/aboutus/sustainability.htm.

Imperial Oil Resources Amec Foster Wheeler Midzaghe Project – Public Open House #1 Environment & Infrastructure Cold Lake, Alberta October 2015

\\Cal1-fs2\cal1-projects\Environment\Projects\CE04362 Grand Rapids SAGD EIA 2013\TechInfo\Public Engagement\15-08 Open House\Report\Midzaghe - Aug'15 Open

House #1 Summary Report - FINAL (15-11-12).docx Page 1

1.0 INTRODUCTION

Imperial is proposing to develop the Midzaghe SA-SAGD project (the Project), located within Imperial’s lease area approximately 23 kilometres northwest of Cold Lake, Alberta and within the Municipal District of Bonnyville.

Imperial is proposing a development that would produce up to 55,000 barrels of bitumen per day using an in-situ solvent-assisted, steam-assisted gravity drainage (SA-SAGD) process.

2.0 OBJECTIVES

This is the first open house for the Project, held to provide project information to the general public, and to hear any comments or concerns that people may have regarding the Project.

3.0 METHODOLOGY

3.1 Date and Location

The open house was held on Tuesday, 25 August 2015 at the Riverhurst Community Hall outside Cold Lake from 4:00 to 8:00 pm.

3.2 Notification

3.2.1 General Public

The open house was advertised in the following publications:

Bonnyville Nouvelle – 18 August 2015;

Lakeland Regional – 18 August 2015;

Cold Lake Sun – 18 August 2015; and

Lac La Biche Poste – 18 August 2015.

A “street sign” was also placed along Highway 55 outside of the Riverhurst Community Hall to advise passers-by of the upcoming open house.

A copy of the ad is provided in Appendix A.

3.2.2 Identified Stakeholders

Potential stakeholders were identified by the project team as part of the Public Engagement Plan and for the first open house, and included the following:

municipal/regional/federal government offices (4);

provincial government departments (6);

elected officials (local/provincial/federal) (9);

industry with leases within/adjacent to the Midzaghe Project (4);

Imperial Oil Resources Amec Foster Wheeler Midzaghe Project – Public Open House #1 Environment & Infrastructure Cold Lake, Alberta October 2015

\\Cal1-fs2\cal1-projects\Environment\Projects\CE04362 Grand Rapids SAGD EIA 2013\TechInfo\Public Engagement\15-08 Open House\Report\Midzaghe - Aug'15 Open

House #1 Summary Report - FINAL (15-11-12).docx Page 2

leaseholders within/adjacent to the Midzaghe Project (4);

landowners within/adjacent to the Midzaghe Project (65);

local organizations (10);

Registered Fur Management Area (RFMA) tenure holders (10);

Aboriginal groups (16); and

Imperial Cold Lake Operations employees and contractors.

An invitation to the open house (see Appendix A) was sent by e-mail or postal mail to the above-noted stakeholders on 11 August 2015.

3.2.3 Imperial Website

Details on the date, time and location of the open house were provided on the project website at www.imperialoil.ca/midzaghe.

3.3 Open House Format

The open house was informal with no presentation. A sign-in table was placed near the entry, and display boards were set out around the perimeter of the room. Tables and chairs were set up for people who wished to fill out their feedback forms or to sit and chat. Light snacks and refreshments were provided.

Attendees were greeted at the door, asked to sign in, informed of the open house format (i.e., walk around to look at the display boards, talk with project team members and fill out a feedback form).

The following documents were available to attendees, upon request:

Proposed Terms of Reference; and

Plain Language Summary.

Display boards (see Appendix B) were organized to provide information on Cold Lake operations, the Midzaghe Project, and information that pertained to existing operations and the proposed project. They contained the following information:

Welcome board

Information about Cold Lake operations:

o Cold Lake operations sites

o Map of existing operations and 2014 data

o Safety

o Emergency Response,

Information about the Midzaghe Project:

o General information and project schedule

Imperial Oil Resources Amec Foster Wheeler Midzaghe Project – Public Open House #1 Environment & Infrastructure Cold Lake, Alberta October 2015

\\Cal1-fs2\cal1-projects\Environment\Projects\CE04362 Grand Rapids SAGD EIA 2013\TechInfo\Public Engagement\15-08 Open House\Report\Midzaghe - Aug'15 Open

House #1 Summary Report - FINAL (15-11-12).docx Page 3

o Project location map

o What is SA-SAGD?

o Process overview

o Environmental Impact Assessment (EIA):

o EIA methodology

o Surface water – historic Cold Lake water levels, conserving water

o Groundwater

o Air monitoring

o Wildlife and wildlife camera sightings,

o Reclamation

Procurement process

Contractor services

Economic benefits

Aboriginal engagement

We’re listening

We’ll see you again

Project team members were available to answer questions at all of the display boards, with some team members roaming the room to answer questions as needed.

People were invited to provide comments through the following methods:

talking with a project team member;

noting what community they were from on a large “What Community Are You From?” wall map;

putting large post-its on the “What Are Your Thoughts on the Project?” wall with their comments so all attendees could see them; and

filling out a feedback form.

3.4 Project Team Attendance

The project team at the open house consisted of 17 representatives from Imperial (Cold Lake Operations and Major Projects) and 2 from Amec Foster Wheeler.

4.0 PUBLIC AND STAKEHOLDER PARTICIPATION

Approximately 150 people attended the open house, spread out over the four-hour period. About 100 people provided their information on the sign-in sheet, and 21 filled out feedback forms. Many people discussed the Project with the team members, and questions were about the existing Cold Lake operations as well as the Midzaghe Project.

Imperial Oil Resources Amec Foster Wheeler Midzaghe Project – Public Open House #1 Environment & Infrastructure Cold Lake, Alberta October 2015

\\Cal1-fs2\cal1-projects\Environment\Projects\CE04362 Grand Rapids SAGD EIA 2013\TechInfo\Public Engagement\15-08 Open House\Report\Midzaghe - Aug'15 Open

House #1 Summary Report - FINAL (15-11-12).docx Page 4

5.0 FEEDBACK

All attendees were invited to fill out a feedback form; the form was completed by 21 people. Information requested included the following (see Appendix C for the form):

how they heard about the open house;

if they found the open house and team members informative, and if their questions were satisfactorily addressed;

comments and/or concerns on potential project effects the project team should be aware of;

comments on the Project;

contact information (if they wished to be contacted); and

if they wished to be added to the project mailing list.

No “thoughts” were posted on the wall. About 30 people noted where they lived on the “What Community Are You From?” map. Many were from Cold Lake, and some were from Bonnyville and the area surrounding Bonnyville and Cold Lake.

As determined from the sign-in sheet, attendees came from the following communities:

Community No. of Attendees

Ardmore 5

Bonnyville and area 11

Calgary 6

Cherry Grove 1

Cold Lake 30

Edmonton 7

Ethel Lake 1

La Corey 1

Lloydminster 1

Wolf Lake 1

Did not specify 32

Imperial Oil Resources Amec Foster Wheeler Midzaghe Project – Public Open House #1 Environment & Infrastructure Cold Lake, Alberta October 2015

\\Cal1-fs2\cal1-projects\Environment\Projects\CE04362 Grand Rapids SAGD EIA 2013\TechInfo\Public Engagement\15-08 Open House\Report\Midzaghe - Aug'15 Open

House #1 Summary Report - FINAL (15-11-12).docx Page 5

5.1 Feedback Form – Process-Related Responses

From the feedback form, responses to the question “How did you hear about the Open House?” were as follows.

Advertising Method No. of Responses

Print newspaper ad 3

Online newspaper ad 0

Imperial website 1

Invitation letter 10

Word of mouth 4

Sign in front of hall 4

E-mail 2

Responses to other questions were as follows.

Yes Some-what

No Don’t

know/no opinion

Blank

Did you find the Open House Informative? 19 0 0 0 2

Were your questions addressed satisfactorily? 16 4 0 1 0

Were the project team members knowledgeable and thorough in responding to your questions?

18 2 0 1 0

5.2 Feedback Form – Project Comments

Attendees who raised questions or concerns with project team members were asked to record their comments on the feedback form so that all comments could be captured.

There were a number of common themes to the comments on the feedback forms received. Comments captured are noted below (no particular order).

Category Comment

Air, Noise and Light Pollution My concerns relate to noise, air quality and light pollution southwest (downwind) from the plant affecting Crane Lake. The existing development and continued development in the last 7-10 years, and particularly in the last 5, have significantly diminished quality of life in the three areas of concern noted above.

Maximum air/emission control mechanisms must be in place; directional shields installed on any site lighting; maximum noise suppression in place to minimize noise pollution that is already significant and increasing.

As a landowner at Marie Lake, can you tell me what the cumulative noise level will be once Midzaghe is in operation? The cumulative noise includes all the other plants in operation plus Midzaghe.

Vegetation CBC article says boreal forest is in danger. Are the trees being planted taking this into account?

Imperial Oil Resources Amec Foster Wheeler Midzaghe Project – Public Open House #1 Environment & Infrastructure Cold Lake, Alberta October 2015

\\Cal1-fs2\cal1-projects\Environment\Projects\CE04362 Grand Rapids SAGD EIA 2013\TechInfo\Public Engagement\15-08 Open House\Report\Midzaghe - Aug'15 Open

House #1 Summary Report - FINAL (15-11-12).docx Page 6

Category Comment

Water Resources Water quality of Cold Lake - concern with solvent.

Can you tell me how many wells will be drilled under Marie Lake?

How many line crossings will occur across Marie Creek?

Even though you're sitting back 350 m on top of the land, you're still going to be able to directionally drill under Marie Lake. There is no guarantee that this increased pressure/temperature will not affect the lake, or is there?

About how many wells will be drilled under Marie Lake? How is this any different than Osum? You're still drilling under Marie Lake, just like Osum wanted to do.

Always worry about surface water disappearing due to oil operations pumping it underground.

My concern is that surface/lake/river water will be depleted slowly over time to fill the cavities left by production.

Socio-Economic The project will be good for the local communities - employment, service industries, rental market.

The Chamber of Commerce is hearing from our business community that they would like to see the workers from the construction phase be housed within the community. We are well positioned to accommodate an influx of people in both accommodations (i.e. new construction of both hotels and multi-family housing) as well as services (i.e., restaurants, etc.).

Engagement This information could be presented and questions for schools, groups, seniors’ local group, Aboriginal friendship centres.

Ceremony with the local Dene Nation honoring the owl.

We would be interested in any updates as this project progresses.

I look forward to a project update meeting with our community where elders and citizens can raise their environmental, socio-economic and business/contract opportunities.

Project in General How many more plants to be built and life span? (40-50 years)

I am concerned with the choice of name. Being part of the community in Cold Lake for over a decade, it is my understanding that owls are thought of as death omens to the surrounding Aboriginal community. That and it is very hard to say as the pronunciation is quite guttural.

Proud of Imperial Oil for carrying on in light of current circumstances.

Procurement We hope to work together in the near future.

Open House Having never attended something like this I found it incredibly informative and helpful. Hopefully, commodity prices improve and the Midzaghe SA-SAGD facility is green-lighted.

Well done.

Very well presented. Breath of fresh air.

Thank you for a well organized and informative event! I will keep working on pronouncing "Midzaghe" correctly!

Good displays. Knowledgeable staff. Good dispensation of information to the community. Well done!

Imperial Oil Resources Amec Foster Wheeler Midzaghe Project – Public Open House #1 Environment & Infrastructure Cold Lake, Alberta October 2015

\\Cal1-fs2\cal1-projects\Environment\Projects\CE04362 Grand Rapids SAGD EIA 2013\TechInfo\Public Engagement\15-08 Open House\Report\Midzaghe - Aug'15 Open

House #1 Summary Report - FINAL (15-11-12).docx Page 7

6.0 CONCLUSIONS FROM THE OPEN HOUSE

The majority of people who filled out a feedback form found the session informative, and noted their questions were addressed and the project team was knowledgeable. Overall, project staff received positive feedback on the Project, although some concerns were raised. Responses to concerns raised will be provided in the Project Application.

7.0 NEXT STEPS

This report will be posted to the project website at www.imperialoil.ca/midzaghe. Notification of this posting will be provided to all on the project mailing list (potentially affected stakeholders identified by the project team as well as those who have provided e-mail addresses).

Members of the Midzaghe team will have information on the Project available at the Imperial Neighbour Night in November, and a second open house will be planned after the Project Application has been submitted.

Comments collected at the open houses have been provided to the project and environmental assessment team, and concerns will be addressed where required.

Imperial will continue to engage stakeholders through the life of the Project. Further information on the engagement process to date and planned for the future will be provided in the Project Application, and regular updates will be posted to the project website.

Appendix A

Advertisements (newspaper and invitation)

Midzaghe in-situ SA-SAGD project

Proposed Cold Lake operations expansion

Public open houseImperial Oil Resources extends an invitation to attend a public open house to learn more about a proposed expansion to its Cold Lake operation. The proposed Midzaghe project is located within Imperial’s lease area approximately 23 kilometres northwest of Cold Lake, Alberta and within the Municipal District of Bonnyville.

Imperial is proposing a development that would produce up to 55,000 barrels of bitumen per day using an in-situ solvent-assisted, steam-assisted gravity drainage (SA-SAGD) process.

Please join us to learn more about the Midzaghe project, and to provide us with your initial comments and feedback.

Refreshments and snacks will be provided.

For additional information regarding the open house, please contact:

Natasha Pyfrom 587.476.2057 [email protected]

Tuesday, August 25, 20154:00 to 8:00 p.m.Riverhurst Community Hall

Corner of Highway 55

and Range Road 32

West of Cold Lake, Alberta

Appendix B

Display Boards

Welcome to our

Midzaghe open house

Our objectives

• ProvideinformationontheproposedCold akee pansionproject idzaghe

• istentoandrecordyourfeedbackontheproposedproject

• ddressinitialuestionsorconcernsyoumayhave

Cold Lake operations

Leming• Startedproductionin1975

Maskwa• Maskwa,Creewordmeaning‘bear’• Startedproductionin1985

Mahihkan• Mahihkan(ma-hee-kan),Creewordmeaning‘wolf’• Startedproductionin1985

Amisk• Amisk,Creewordmeaning‘beaver’• Centraladministrationbuilding

Mahkeses• Mahkeses(mah-kee-sis),Creewordmeaning‘fox’• Startedproductionin2002

Nabiye• Nabiye,Denéwordmeaning‘otter’• Startedproductionin2015

DATE

CONTRACTOR NAME CONTRACTOR MAP NUMBER

SCALE IOR MAP NUMBER REV.DRAWN CHECK DESIGN APPR.

PROJECTION DATUM

Arc

GIS

MA

P N

O M

AN

UA

L C

HA

NG

ES

Arc

GIS

CNRL PRIMROSE

SOUTH

CNRL BURNT LAKE

MAHIHKAN

OSUMORION

CNRL PRIMROSE

MAHKESES

LEMING

MASKWA

HUSKYTUCKER

LAKE

NABIYE

LEASE 040

LEASE 041LEASE 042

LEASE 049

ETHELLAKE

MARIE LAKE

MOORELAKE

TUCKER LAKE

HILDA LAKE

MAY LAKE

SINCLAIRLAKE

EDWARD LAKE

HAROLD LAKE

COLD LAKE

McDOUGALL LAKE

LITTLE BEAR LAKE

LEMING LAKE

892

IOR

_A

-MA

P-P

Ve

rsio

n:

20

14

COLD LAKE ALL AREASCLO MAP - MIDZAGHE OPEN HOUSE AUGUST 2015

OVERVIEW MAP

073-0000-310-096 01

00527113CA

1

WORLEYPARSONS CANADA

IMPERIAL OIL RESOURCES LIMITED

VTV

UTM 12N NAD83

1:190,000NPVTV SD

2,000 0 2,0001,000

Metres

073-

000

0-3

10-

096

01

15 08 18

Legend

IORL Plants

Other Operator Plants

Roads

Oil Sand Lease Boundary

Waterbodies

ATS Section Grid

Notes:

TW

P 6

7T

WP

63

TW

P 6

4T

WP

65

TW

P 6

6

RNG 5 RNG 1RNG 2RNG 3RNG 4

DATE

CONTRACTOR NAME CONTRACTOR MAP NUMBER

SCALE IOR MAP NUMBER REV.DRAWN CHECK DESIGN APPR.

PROJECTION DATUM

Arc

GIS

MA

P N

O M

AN

UA

L C

HA

NG

ES

Arc

GIS

CNRL PRIMROSE

SOUTH

CNRL BURNT LAKE

MAHIHKAN

OSUMORION

CNRL PRIMROSE

MAHKESES

LEMING

MASKWA

HUSKYTUCKER

LAKE

NABIYE

LEASE 040

LEASE 041LEASE 042

LEASE 049

ETHELLAKE

MARIE LAKE

MOORELAKE

TUCKER LAKE

HILDA LAKE

MAY LAKE

SINCLAIRLAKE

EDWARD LAKE

HAROLD LAKE

COLD LAKE

McDOUGALL LAKE

LITTLE BEAR LAKE

LEMING LAKE

892

IOR

_A

-MA

P-P

Ve

rsio

n:

20

14

COLD LAKE ALL AREASCLO MAP - MIDZAGHE OPEN HOUSE AUGUST 2015

OVERVIEW MAP

073-0000-310-096 01

00527113CA

1

WORLEYPARSONS CANADA

IMPERIAL OIL RESOURCES LIMITED

VTV

UTM 12N NAD83

1:190,000NPVTV SD

2,000 0 2,0001,000

Metres

073-

000

0-3

10-

096

01

15 08 18

Legend

IORL Plants

Other Operator Plants

Roads

Oil Sand Lease Boundary

Waterbodies

ATS Section Grid

Notes:

TW

P 6

7T

WP

63

TW

P 6

4T

WP

65

TW

P 6

6

RNG 5 RNG 1RNG 2RNG 3RNG 4

2014 dataveragebitumenproduction barrelsperday onebarrel litres

umberofactive ells

easearea s uarekilometres

pproveddevelopmentarea s uarekilometres

ctivedevelopmentarea s uarekilometres

Existing operations

Safety

The high importance we place on safety, health and the environment is evident in our priorities for operating:

Priorities for operating

WP00167 14 08

1. Take care of yourself and all others

2. Take care of your workplace and your neighbourhood

3. Take care of business

Imperial is committed to safety and continues to strive for the ultimate goal of “nobody gets hurt”

Thereareanumberofsafetyfundamentalsthatareessentialinenablingustomeetthosehighstandards.

Theyinclude:

• Contractorselectionandmonitoringprocessassessmenttools

• Pre-jobplanningtools

• Hazardassessments

• Behavioralobservationprogram

• Stopandthinkcards

• Stopthejobprogram

• Safedrivingprogram

It is Imperial’s objective to respond in an effective and timely manner to emergencies

To accomplish this objective, Imperial will:

• trainworkers,conductsimulationsandrespondimmediatelytoanincident

• minimizeimpactsonthepublicandourenvironment

• continuetoworkwithindustryassociationsandgovernmentagenciestodevelopandmaintainemergencyresponseprograms

TrainingexerciseEmergencyresponsesimulationatH15pad

Emergency response

Midzaghe project

• Asolvent-assistedsteam-assistedgravitydrainage(SA-SAGD)processwillbeusedtorecoverbitumenfromoilsandsintheGrandRapidsFormation(approximately350metresbelowsurface)

• Operatinglifespanof25to30years

• Eventualannualproductionofupto55,000bbl/day,basedonthedevelopmentofasingleproductionphase

• Willincludeacentralprocessingfacility,wellpadsandrelatedinfrastructure

Potential project schedule 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

Applicationpreparation,submissionandregulatoryreview

Aboriginalandstakeholderconsultation

Aboriginalandpublicengagementthroughoutthelifeoftheproject

Construction

Production

Potential project schedulePendingregulatoryapproval,fullprojectfunding,andmarketconditions,itisanticipatedthatMidzaghecouldbeginconstructionasearlyas2019andproductionby2022.

Project locationProject location

idzagheislocated ithintheCold ake

operationslease appro imately

kilometresfromCold

ake lbertaand ithintheunicipal istrictofBonnyville

o.

IMPERIAL

DATE

CONTRACTOR NAME CONTRACTOR MAP NUMBER

SCALE IMPERIAL MAP NUMBER REV.DRAWN CHECK DESIGN APPR.

PROJECTION DATUM

Arc

GIS

MA

P N

O M

AN

UA

L C

HA

NG

ES

IMP

ER

IAL

_A

-MA

P-P

Ve

rsio

n:

2U

:\Ass

ets

\Ke

arl\

All\

Ma

ste

r\F

ac_

Pro

j\arc

gis

\ma

ps\

Gra

nd

Ra

pid

s\0

73

-50

01

-34

5-0

40

_0

2_R

EV

8.m

xd

Arc

GIS

073-

500

1-3

45-0

40

02

15 08 18 1:285,000 073-5001-345-040 02

Cold LakeProvincial

Park

Mar

ie C

reek

892

892

897

897

FortKent

HappyHollow

Midzaghe

BigMeadow

Beaver River

41

28

55

897

659

28

897

55

English BayProvincial

Recreation Area

Mar

ie C

reek

Reita

Cre

ek

Jack

fish

Creek

Jackfish Creek

Muriel Creek

Jackfish Creek

Muriel C

reek

Reita C

reek

Medley

Rive

r

Cold LakeProvincial Park

WillowLake

AfricanLake

FontaineLake

BarreyreLake

SinclairLake

MargueriteLake

TuckerLake

BourqueLake

HildaLakeMoore

Lake

EdwardLake

HaroldLake

MaloneyLake

MarieLake

May Lake

LittleBear Lake

ColdLake

ErnestinaLake

LizaLake

JessieLake

CharlotteLake

LemingLake

EthelLake

Beaver River

WolfLake

Mahihkan

Nabiye

MaskwaLeming

Mahkeses

La Corey

FRESNOY

Beaver Crossing

Cold Lake

Beaver River

BONNYVILLE

Ardmore

Lessard

R1W4MR2R3R4R5R6

T60

T61

T62

T63

T64

T65

T66

T67

Imperial Map No.: 073-5001-345-040 02

NOTES:- Cold Lake Lease Information compiled from IHS EnergyMarch 15, 2015.- Cities/Towns compiled from IHS Energy July 8, 2014.- Midzaghe Project Area is current to July 23, 2014.- Regional Roads are current to July 9, 2014.- Parks are current to August 7, 2014.

UTM 12N NAD83 -- --

KM SA KM NP 8

MIDZAGHE SAGDPLAIN LANGUAGE SUMMARY

OVERVIEW MAP

5 0 52.5

Kilometres

Proposed Midzaghe Plant

Existing Cold Lake Plant

Highway

Access Road

Midzaghe Project Area

Cold Lake Lease Boundary

City of Cold Lake

Provincial Park

Peace River #1

PeaceRiver #2

Athabasca

ColdLake

Fort McMurray

Edmonton

Calgary

200 0 200100

Kilometres

AlbertaOil Sands Zones

IMPERIAL

DATE

CONTRACTOR NAME CONTRACTOR MAP NUMBER

SCALE IMPERIAL MAP NUMBER REV.DRAWN CHECK DESIGN APPR.

PROJECTION DATUM

Arc

GIS

MA

P N

O M

AN

UA

L C

HA

NG

ES

IMP

ER

IAL

_A

-MA

P-P

Ve

rsio

n:

2U

:\Ass

ets

\Ke

arl\

All\

Ma

ste

r\F

ac_

Pro

j\arc

gis

\ma

ps\

Gra

nd

Ra

pid

s\0

73

-50

01

-34

5-0

40

_0

2_R

EV

8.m

xd

Arc

GIS

073-

500

1-3

45-0

40

02

15 08 18 1:285,000 073-5001-345-040 02

Cold LakeProvincial

Park

Mar

ie C

reek

892

892

897

897

FortKent

HappyHollow

Midzaghe

BigMeadow

Beaver River

41

28

55

897

659

28

897

55

English BayProvincial

Recreation Area

Mar

ie C

reek

Reita

Cre

ek

Jack

fish

Creek

Jackfish Creek

Muriel Creek

Jackfish Creek

Muriel C

reek

Reita C

reek

Medley

Rive

r

Cold LakeProvincial Park

WillowLake

AfricanLake

FontaineLake

BarreyreLake

SinclairLake

MargueriteLake

TuckerLake

BourqueLake

HildaLakeMoore

Lake

EdwardLake

HaroldLake

MaloneyLake

MarieLake

May Lake

LittleBear Lake

ColdLake

ErnestinaLake

LizaLake

JessieLake

CharlotteLake

LemingLake

EthelLake

Beaver River

WolfLake

Mahihkan

Nabiye

MaskwaLeming

Mahkeses

La Corey

FRESNOY

Beaver Crossing

Cold Lake

Beaver River

BONNYVILLE

Ardmore

Lessard

R1W4MR2R3R4R5R6

T60

T61

T62

T63

T64

T65

T66

T67

Imperial Map No.: 073-5001-345-040 02

NOTES:- Cold Lake Lease Information compiled from IHS EnergyMarch 15, 2015.- Cities/Towns compiled from IHS Energy July 8, 2014.- Midzaghe Project Area is current to July 23, 2014.- Regional Roads are current to July 9, 2014.- Parks are current to August 7, 2014.

UTM 12N NAD83 -- --

KM SA KM NP 8

MIDZAGHE SAGDPLAIN LANGUAGE SUMMARY

OVERVIEW MAP

5 0 52.5

Kilometres

Proposed Midzaghe Plant

Existing Cold Lake Plant

Highway

Access Road

Midzaghe Project Area

Cold Lake Lease Boundary

City of Cold Lake

Provincial Park

Peace River #1

PeaceRiver #2

Athabasca

ColdLake

Fort McMurray

Edmonton

Calgary

200 0 200100

Kilometres

AlbertaOil Sands Zones

What is SA-SAGD?

SA-SAGD stands for “Solvent-Assisted Steam-Assisted Gravity Drainage”• TheS -S processuseshorizontal ellpairstorecoverbitumenlocateddeepbelo thegroundsurface

•T o ells productionandinjection aredrilledintothereservoir oneaboutfivemetresabovetheother theproduction ellisdrilledlo ersoitsitsnearthebottomofthereservoir

•Steamandsolvent diluent areinjectedintotheupperelltoheatandthinthebitumenandallo gravitytoassist

drainageintothelo erproduction ell

•Pumpjacksassist ithtransportingtheheatedbitumenmi turetosurfacepipelines Glacial T

ill

Grand Rapids

Colorado

Shale

Production wellSteam and solvent (diluent) injection well

Clearwate

r

Steam and solvent (diluent)

Heated bitumen flows to well

Process overview

• idzaghe illinterconnect ithe istinginfrastructure ithinCold akeoperationsincludingpo er ater gas diluentanddilutedbitumen

Process overview – water

Midzaghe will need water for steam generation, domestic and utility use

Water sources for steam generation:• ProducedwaterfromtheMidzaghereservoir

• Ifneeded,surplusproducedandbrackishColdLakeoperations

Water source for domestic and utility water: • ColdLakeoperations

Water disposal:• MidzaghewastewaterandsurplusproducedwaterwillbesenttotheexistingdisposalsystematColdLakeoperations–anexpansiontothedisposalsystemmayberequiredtohandleexcesswatervolumes

Environmental impact assessment (EIA)

Thepurposeoftheenvironmentalimpactassessment(EIA)istoidentify,evaluateandreportthepotentialenvironmentalandsocioeconomiceffectsoftheMidzagheproject.TheEIAisintendedtoprovidesufficientinformationforreviewerstounderstandthe:

• Natureoftheproject

• Environmentalsettinginwhichtheprojectwouldoccur

• Effectsthattheprojectisexpectedtohaveonthatenvironmentalsetting

• Mitigationmeasuresthatwillbeusedtoreduceoreliminatepotentialadverseeffectsortoenhancepotentialpositiveeffects

• Managementandmonitoringplansproposedtomanageresidualeffectsandforon-goingadaptivemanagement

ThescopeoftheEIAwillbesetoutintheTermsofReference(issuedbytheAlbertaEnergyRegulator)andtheGuidetoPreparingEnvironmentalImpactAssessmentReportsinAlberta(AlbertaESRD2013).

Step 1: Baseline studiese illlookate isting

conditionsfor:

• ir uality• oise• Surfaceandground ater

ualityand uantity• isheriesanda uaticresources

• Soils terrainandsurficialgeology

• egetationand etlands• ildlife• Biodiversity• andandresourceuse traditionalandnon-traditional

• Historicalresources• Healthrisks• ocalandregionalsocialandeconomicinformation

Step 2: Identification and assessment of potential project effects• ookatpossibleeffectsontheenvironmentandpeople

• etermine hat illbeaffected suchaspeople a uaticresources ildlife vegetation soil

andthesignificanceofthoseeffects

• Publicandregulatoryinputissolicitedduringthisstep

Step 3: Mitigation and monitoring• dentifymeasuresthatcanbeincludedearlyintheprojectdesign

• ecommendappropriatemonitoringprogramsforair ater vegetation soilsand ildlife

• onitorchangesovertimeandadjustasre uired

EIA methodology

Baseline conditions Project effects Mitigation and

monitoring

Water

Cold Lake water level 1996 to 2015 YTD

534.0

534.2

534.4

534.6

534.8

535.0

535.2

535.4

535.6

535.8

536.0

96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15

Year

Metres above sea level

Maximum daily withdrawal rate 9,800m3 when below 534.62 masllShut-off 534.55 maslWeekly level

DatausedforchartfromEnvironmentCanada

Water

Conserving fresh water• ecentoperationalimprovements

illreducenon-saline ater

consumptionby percent.

• ateruseforsteamgeneration

atsitesdesignedforcommercial

productionforCold akeoperations

aremanaged giventhecapabilities

oftheprocessinge uipment

accordingtothefollo inghierarchy:

reuseon-siteproduced ater

transferinproduced aterfromanothersite hensurplus aterisavailable

usebrackish aterasmake-up ater and

usenon-saline aterasmake-up ater

For the proposed Midzaghe development, Imperial plans to:

• useS -S hich illreduce ateruseoverthelifeoftheprojectascomparedtoS

• note ceedthee istingCold akeoperationsater ithdra allicences

• continuetomaintainametresetbackfromthe

high- atermarkofBour ueake arie ake ay ake ackfishCreek and arieCreek

0.00

1.00

2.00

3.00

4.00

5.00

6.00

0

10000

20000

30000

40000

50000

60000

70000

80000

90000

100000

1975

1980

1985

1990

1995

2000

2005

2010

Fres

h w

ater

to b

itum

en ra

tio

Fresh Brackish Recycled Fresh water per bitumen ratio

Water volume (m3/d)

Historical water use

Groundwater

• mperialcontinuestoinvestigateande pandmonitoringofground aterchemistry-asground atermovesveryslo lyandre uiresalongtimetomoveevenshortdistances theground aterfieldstudiesillcontinueformanyyears

• Cold akeoperationshasane tensiveground atermonitoringprogramforbothshallo anddeepground ater

Cold akeoperationsground atermonitoringprogramillbee panded

toincorporatethe idzaghedevelopment

Air monitoring

Cold akeoperationshasbeenapartner iththe akeland ndustryandCommunity ssociation C forover years.

C isacommunitybasedpartnershipactivelysupportingahealthyandsustainableenvironment.Toaccomplishthis C gathers sharesandactsoninformationregardingdevelopmentinourregion.

orkingcollaboratively ithotherindustrypartners ithin C allo sustobemoreproactiveandefficientithourairshedmonitoring.

C operatesapremiumair ualitymonitoringnet orkconsistingoffourcontinuousmonitoringstations passivemonitoringstations

t ovolatileorganiccompoundandpolycyclicaromatichydrocarbonsamplersandt osoilacidificationmonitoringplots.Continuousmonitoringstationsprovideup-to-the-minutemeasurementsofambientconcentrationsforseveralman-madeandnaturalemissions hilepassivemonitoringstationsprovidedataforuseinunderstandingregionalpatternsinair ualityandforlongtermtrendanalyses.

LICA airshed zone

Beaver Riverwatershed alliance

LICA boundary

• Preliminaryair ualitymodellingindicatesthattheproposedidzaghedevelopment

alone illnote ceedthelberta mbient ir ualitybjectivesforemissionrates.

• idzaghe illuseS -S hichise pectedtoreduceH intensityoverthe

lifeofthedevelopment ascomparedtoS ..

Wildlife

Wildlife Habitat Council• pplicationforrecertification

assubmittedin ay .

• The ildlifeHabitatCouncilHC isanonprofit non-

lobbyinggroupofconservationorganizations individualsandcorporationsdedicatedtorestoringandenhancingildlifehabitat.

• mperial sparentcompany on obilhasbeenamember

ofthe HCsince astandingthatdemonstratesitscommitmenttoimprovingildlifehabitatonthe

company sprojectareas.

• Communityoutreachandeducationisoneaspectofourildlifeat orkcertification.

Wildlife observation card program• Commontypesof ildlifesightings

on mperial sCold akeoperationsleasebasedonobservationsfromthe ildlife bservationCardprogramaredeer blackbear birds fo coyoteandmoose.

• ver ildlifeobservationsreportedsincetheprogramsimplementationin .

. ildlifehc.org

ortheproposed idzaghedevelopment mperialplansto:

• follo the bove roundPipeline ildlifeCrossingesignStandardsforall

ne pipelines

• meetthere uirementsofthe oodlandCaribouPolicyof lbertaandthe ederal ecoveryStrategyforBorealoodlandCaribou

• developandimplementacaribouprotectionplanforconstruction ithinthecaribourange

Wildlife camera sightings

ColdLakeoperationshaswildlifecamerassetupatvariouslocationsonourlease.Herearesomeofourmoreinterestingphotos!

Reclamation

Our goal is to restore disturbed areas back to an “equivalent land capability” upon decommissioning, remediation and reclamation.2014 – Cold Lake operations mineral surface lease = 14,222 ha

Year Total area disturbed (ha)

% Undergoing temporaryreclamation, remediation and reclamation

% Reclaimed Total % undergoingreclamationactivity

2012 3,455 43% 14% 57%

2013 3,482 47% 14% 61%

2014 3,482 47% 15% 62%

76%

9%

10%1% 4%

76% undisturbed

9% disturbed for operations

10% temporary reclaimed

1% undergoing remediation and reclamation

4% reclaimed

(Surface water, lands and forest)

(Area cleared and disturbed for operations)

(Areas that are reclaimed and have the potential to be re-disturbed in the future)

(Remediation, recontouring, soils placed, revegetation or wetland reclamation trial)

(Areas reforested, natural reclamation, created habitat and reclaimed wetlands)

• eclamationfortheproposed idzaghedevelopmentillfollo e istingCold akeoperationpractices

• isturbedlands illbeprogressivelyreclaimedtoane uivalentlandcapability

• Sitespecificplanningisdoneonafacilitybasispriortoconstruction

Reclamation

In2014,aColdLakevegetationcooperativewasinitiatedfortheColdLake3.1SeedZone(COLK).TheinitiativecollectsnativeplantseedfromtheColdLakeareatobeusedinupcomingreclamationandrestorationprojects.

OtherindustrypartnersintheColdLakeareaincludeSuncor(10percent)andCanadianNaturalResourcesLimited(60percent).

Since1999,Imperial’sColdLakeoperationhasplantedover1.6milliontreeandshrubseedlings

2015

39,540shrubseedlings

193,340treeseedlings

Procurement process

Step 1 Describerequirements(scopeofwork)

Step 2 Developcontractplan

Step 3 Requestforinformation

Step 4 Homeofficeassessment

Step 5 Preparebidlistandrequestforquotationdocuments

Step 6 Evaluatebids

Step 7 Awardwork

Step 8 Contractadministration

Typical bid process

Prequalification process

Prequalification processStep 3 Request for information

1. Capability

• SafetyProgram• AlcoholandDrugProgram• QualityAssuranceProgram• Keypersonnelandequipment• Workproceduresandsystems• Experiencewithworkinsimilarsizeandscope

2. Capacity• Personnel• Equipmentandfacilities• Financialstability• Insurance

3. Performance measures• Safetyperformance• Managementsystems• Workerscompensation• Environmentalmanagementsystem• Aboriginalworkforcecontactand/orpartnerships

Step 4 Home office assessmentToevaluatepotentialvendors’safetymanagementsystem

Contractor services

Civil works• Road/leaseconstructionandmaintenance

• Earth,foundationandconcreteworks

• Constructionsurveyanddetaileddesign

• Drillingsumptreatment

Mechanical construction services• Instrumentation/electricalinstallation

• Pipelineandpumpjackinstallation

• Off-sitefabrication(piping,modules,etc.)

• Materialsmanagement

• Constructionsurveys

• Satelliteandfacilityinstallation

Mechanical services• Pressurepipe,pumpjackmaintenance

• Vessel,tank,pipelinemaintenance

• Scaffolding

• Painting/coating/sandblasting

Types of services (direct and subcontract)Fluid hauling• Tank,pressure,vacuum,steamertruckservices

• Fluidtransferservices

• Tankandvesselcleaning

• Oilspillremediation

Building services• Janitorialandcustodialservices

• Buildingrenovations

• HVAC,firealarm,sprinklersystem,potablewatermaintenance

• Lawnandgrounds,pestcontrol

Economic benefits

Imperialgenerateseconomicbenefitsforthelocalcommunitythroughmultiplesourcesincluding:

Taxes and royalties• Taxesandroyaltiesprovidebenefittothemunicipal,provincialandfederalgovernment

Employment – direct and through contractorsOuremployeesandcontractoremployeesliveinthecommunitiesinandaroundColdLakeandBonnyvilleandcontributetothelocaleconomy.• 2014employees~400• 2014contractors~1,200

Local businessColdLakeoperationsworkstoprovideopportunitiesandbenefitsforlocalbusinessesbothdirectlyandthroughourcontractors.

Community investmentActivemembershipinlocalorganizations,In-kinddonations,supportforevents,VolunteerInvolvementProgram(VIP)

2014LocalCommunityInvestment$530,700

2014LakelandUnitedWay$202,400

2014FirstNationsitevisit

Aboriginal engagement

ManyofImperial’soperationsanddevelopmentopportunitiesarelocatedwithinAboriginalcommunitiesorontheirtraditionallands.Imperialsupportscommunitiesinareaswhereitexplores,developsandoperates,andstrivestoestablishlastingrelationshipsbuiltonmutualtrustandrespect.

ConsultationImperialengagesAboriginalcommunitiesandtheirrepresentativesinopenandforthrightconsultation.WeseektounderstandAboriginalperspectivesonissuesofmutualinterestandtodealconstructivelywithdifferingviews.

Cold Lake operations (CLO) is located in Treaty 6 Traditional Territory and in close proximity to four Métis settlements

Community relations and investment ImperialcreateslastingrelationshipswithAboriginalcommunitiesbysupportinginitiativesthataddresscommunityneedsandareconsistentwiththeImperialOilFoundation’sphilanthropicobjectives.

Aboriginal scholarships and programs: • AboriginalAwardofMerit/Grade9students

• AboriginalEducationAwardsProgram/Post-Secondary

• SponsoroftheIndigenousWomeninCommunityLeadershipProgram/CoadyInternationalInstitute

• PartnerofIndspireBursariesandScholarshipAwards(www.indspire.ca)

2014Discover-ESciencecamp

2014awardofmeritrecipient

2014KehewinPowWow

RichardDesjarlais(retired)oneofthefoundersofNativeInternshipProgram,withdaughtersKellyandMichelle,bothgraduatesoftheNIP

Aboriginal engagement

INNmembermentoringandNIPMillwright

ImperialandPimeeWellServicingrecentlycelebrated25yearsworkingtogether

Forover10years,SevenLakesOilfieldServiceshaveprovidedavarietyofservicesforthesite

Workforce developmentImperialsupportsrecruitmentanddevelopmentprogramsthatenableAboriginalpeopletomeetthecompany’semploymentrequirementsandbusinessneeds.

Imperial Native Network (INN)

INNwasformedin1991andseekstoguideImperialCLOinrecruitment,mentorshipandretentionofqualifiedAboriginalworkforceandengagethesurroundingAboriginalcommunitiesthrougheducationandtraining.CLOAboriginalemployeeworkforcehasmorethandoubledsincethenetworkwasformed.

Native Internship Program (NIP)

Foundedin1998,CLONIPprovidespaidon-the-jobtrainingforlocalAboriginalpeopleforuptotwoyears.

Business developmentImperialfostersthedevelopmentofAboriginalbusinessesinwaysthatprovidebenefitstothecompanyandtoAboriginalcommunities.

IntheColdLakearea,ImperialhassuccessfullyworkedwithlocalAboriginalbusinesses.WecontinuetoidentifydirectandthirdpartyopportunitiesforlocalAboriginalbusinesses.

We’re listening

Imperialbelievesopencommunicationandtrustingrelationshipsmustbeestablishedandmaintainedbetweenourcompanyandthecommunitieswhereourfacilitiesarelocated.Communityconsultation—particularlywithregardtoenvironment,healthandsafetyconcerns—isanintegralpartofourbusiness.

WewillsolicitfeedbackontheproposedMidzaghedevelopmentfromAboriginalcommunities,thepublic,industryandgovernments.Thisfeedbackwillcontinuetoguideusaswemoveforwardwiththisdevelopment.

Communityquestions,concernsandfeedbackarewelcomeatanytime,andcanbedirectedto:

DetailsregardingtheproposedMidzagheprojectareavailableonImperial’swebsiteatimperialoil.ca/midzaghe

ForquestionsoncurrentColdLakeoperationspleasecontact:

Natasha Pyfrom [email protected]

Jordan Nail [email protected]

Pius Rolheiser [email protected]

Susan Scott [email protected]

We’ll see you again

Cold Lake operations neighbour nightPleasejoinusagainforfurtherprojectinformationattheCold akeneighbournightin ovember.eaveyourcontactinformationtobeaddedtoourmailinglistforaninvitationandadditionalprojectinformationasitbecomesavailable.

Feedbackourfeedbackisimportanttous Pleasetaketheopportunitytofilloutafeedbackformandleaveit ithoneofourrepresentatives.

Thank you

Thank you for attending and please contact us at any time should you have any comments, concerns or questions.

Appendix C

Feedback Form

August 2015

Proposed Midzaghe Development – Open House Riverhurst Hall, Cold Lake, Alberta

August 25, 2015, 4:00-8:00 pm

Please give us your feedback on today’s open house

Your comments will be included in the open house report (will be posted on the project website at www.imperialoil.ca/midzaghe) and summarized in the engagement section of the

Environmental Impact Assessment application. How did you hear about the Open House?

Print newspaper ad Online newspaper ad Imperial website

Invitation Letter Word of mouth Sign outside hall

Other: ________________________ Yes Somewhat No

Don’t know / no opinion

Did you find the Open House informative? Were your questions addressed satisfactorily? Were the project team members knowledgeable and thorough in responding to your questions?

Do you have any comments and/or concerns about potential project effects that the project team should be aware of?

August 2015

Do you have any other comments about the proposed Midzaghe SA-SAGD Project you wish to share with us?

Please contact me about my concerns noted above (provide contact information below)

Please add me to the project mailing list (provide contact information below)

Name:

Organization represented (if one):

Address:

Phone: E-mail:

How/when is the best time to contact you (about concerns)?

Personal information is protected under authority of the Freedom of Information and Protection of Privacy Act, and is used solely for the purpose of evaluating and improving the Project assessment. Individuals will not be identified in any public documents or names used for any purpose other than this project.

Also feel free to write, phone or email us:

Natasha Pyfrom Phone: 587-476-2057 Imperial Oil Resources Email: [email protected] 237 Fourth Avenue SW Calgary, AB T2P 3M9