micro hydrro electricc projects

49
INTRODUCTION MICRO HYDRO ELECTRIC PROJECT REURAL ELECTRIFICATION SLIDES BY ABHISHEK RAJ MECHANICAL RIT KOTTAAYM

Upload: abhishek-raj

Post on 13-Apr-2017

167 views

Category:

Engineering


3 download

TRANSCRIPT

Page 1: Micro Hydrro electricc projects

INTRODUCTION

MICRO HYDRO ELECTRIC PROJECT REURAL ELECTRIFICATION

SLIDES BY ABHISHEK RAJ MECHANICAL

RIT KOTTAAYM

Page 2: Micro Hydrro electricc projects

OVERAL FUEL CONSUMTION

MINISTRY OF RENEWABLE ENERGY

Page 3: Micro Hydrro electricc projects

POWER CONSUMPTION INDIA

MINISTRY OF RENEWABLE ENERGY

Page 4: Micro Hydrro electricc projects

WORLD

MINISTRY OF RENEWABLE ENERGY

Page 5: Micro Hydrro electricc projects

MAKE IN INDIA

• AS WE ARE A LARGE IMPORTER OF CRUDE OIL,OUR REURAL AREAS ARE STILL UNDER DARKNESS

Page 6: Micro Hydrro electricc projects

Today we are here on micro hydro

• What is micro hydro?????• Why???? • Is it possible???

Page 7: Micro Hydrro electricc projects

Of course it’s possible

• Minimum environmental impact• Small in scale• seasonal• Consistent: Produces continuously, 24/7

Page 8: Micro Hydrro electricc projects

Is it true???

• We don’t need a DAM, but some flowing water

Page 9: Micro Hydrro electricc projects

Hydro, Driven by Solar Power

Page 10: Micro Hydrro electricc projects

Micro hydro

Page 11: Micro Hydrro electricc projects

Power estimation??

– Power (watts) = Density*g*Head (m) * Flow Rate(m^3/s)

Power output is proportional to the combination of head and flow

Page 12: Micro Hydrro electricc projects

Does we have the resourceplace Head available

Adianpara 17.62

Aruvikkal Anchuruli Idukki 21.31

Nellikkappara Pathanamthitta 32.54

Aruvikkuzhi kottayam 30

Chengara Pathanamthitta 50

Thekkum thoni Idukki 49.06

Gandhismarakapadi Idukki 42

This is some of a few numbers there are more than 30 numbers

From kerala govt official records

Page 13: Micro Hydrro electricc projects

RURAL INDIA AND ENERGY

• large rural population of (70% of the total population) living in villages and being poor,

• 26% villages (56.5% households) had no access to electricity; as per 2004

• Rajiv Gandhi Grameen Vidyuteekaran Yojana (RGGVY) targets to achieve 100% village electrification by 2012 (originally by 2010).

Ministry of energy india

Page 14: Micro Hydrro electricc projects

Current scenario

• Currently only 210MW are installed across 267 projects, predominating in the north.

• The investment costs for small rural and remote hydro power projects in India vary between Rs. 124,310–Rs 233,335 per kW.

• Seasonal variation in water flow and under utilization of the produced electricity can threaten the viability of hydro plants.

Page 15: Micro Hydrro electricc projects

UTILISATION OF RENEWABLE ENERGYIN RURAL AREAS

• In many rural areas of developing countries, connections to central electric grids are economically prohibitive and may take decades to materialise, if at all.

• Grid connectivity does not address the need for access to sustainable heating and cooking options

• Renewable energy can be used for LOCAL POWER GRIDS

Ministry of energy india

Page 16: Micro Hydrro electricc projects

HYDRO POWER PLANTSTYPES ELECTRICITY GENEREATION

Big Hydro > 100 MW (grid connected)

Small Hydro 1 MW – 100 MW Mini-hydro 100 kW – 1000 kW Micro-hiydro 5 kW – 100 kW Pico-hydro < 5k W

Ministry of energy india

Page 17: Micro Hydrro electricc projects

CASE STUDY-MALASYA

SIRIM

Page 18: Micro Hydrro electricc projects

WHAT IS SIRIM??

• http://www.sirim.my/

• SIRIM Berhad, formerly known as the Standards and Industrial Research Institute of Malaysia, is a corporate organisation owned wholly by the Malaysian Government, under the Minister of Finance Incorporated.

Page 19: Micro Hydrro electricc projects

BENEFITS OF MHP(based on study conduced by MALAYSIA)

Type of energy Energy payback ratio

Land requirement (km2/TWh)

Gas emission (KT.eq.CO2/TWh)

Hydropower (run-of-river)

267 0.1 1

Hydro (reservoir) 205 152 15

Wind power 39 72 9

Photovoltaic 9 45 13

Nuclear 16 0.5

Conventional thermal

5-11 4 974

Page 20: Micro Hydrro electricc projects
Page 21: Micro Hydrro electricc projects

PROJECT FEASIBILITY STUDY

Page 22: Micro Hydrro electricc projects

FEASIBILITY-HYDROLOGY

• Catchment Area- to ensure continuous supply of water.

• Flood Discharge- to determine suitable location for civil structure from flood prone area.

• Potential Power-To determine suitable design of civil structure for optimum micro hydro power.

• Dependable Discharge- to determine the type of turbine and civil structure.

Page 23: Micro Hydrro electricc projects

DESIGN STUDY

Page 24: Micro Hydrro electricc projects

MICRO HYDRO COMPONENTS

• Civil & Structure: i.Intake weir and settling basin ii.Water Channel iii.Forebay tank

iv.Penstock v.Power House

• Electro-mechanical: i.Turbine ii.Generator

Page 25: Micro Hydrro electricc projects

• Electrical & Transmission • i.Control Unit • ii.Poles • iii.Transmission Cables

Page 26: Micro Hydrro electricc projects

TURBINES CONVERTS THE FLOW AND PRESSURE ENERGY INTO MECHANICAL ENERGY. TURBINES ARE BASICALLY OF TWO TYPES I.E. REACTION & IMPULSE AND DEPENDING UPON THE HEAD OF THE AVAILABLE WATER FURTHER DIVIDE IN THREE CATEGORIES I.E. HIGH, MEDIUM & LOW HEAD.

TURBINE

Page 27: Micro Hydrro electricc projects

TURBINES

IMPULSE• Pelton, • Turgo Wheel• Cross Flow

REACTION• Francis• Axial Flow Propeller, Semi Kaplan, Kaplan

Page 28: Micro Hydrro electricc projects

PELTON WHEEL• Nozzles direct forceful streams of

water against a series of spoon-shaped buckets mounted around the edge of a wheel.

• Each bucket reverses the flow of water and this impulse spins the turbine

• Suited for high head, low flow sites.• The largest units can be up to 200

MW.• Can operate with heads as small as

15 meters and as high as 1,800 meters.

Page 29: Micro Hydrro electricc projects

Cross Flow Turbines• drum-shaped • elongated, rectangular-section nozzle

directed against curved vanes on a cylindrically shaped runner

• “squirrel cage” blower• water flows through the blades twice First pass : water flows from the

outside of the blades to the inside Second pass : from the inside back out Larger water flows and lower heads

than the Pelton.

Page 30: Micro Hydrro electricc projects

Kaplan Turbine• The inlet is a scroll-shaped

tube that wraps around the turbine's wicket gate.

• Water is directed tangentially, through the wicket gate, and spirals on to a propeller shaped runner, causing it to spin.

• The outlet is a specially shaped draft tube that helps decelerate the water and recover kinetic energy.

Page 31: Micro Hydrro electricc projects

Francis Turbines• The inlet is spiral shaped.• Guide vanes direct the water tangentially

to the runner.• This radial flow acts on the runner vanes,

causing the runner to spin.• The guide vanes (or wicket gate) may be

adjustable to allow efficient turbine operation for a range of water flow conditions.

• Best suited for sites with high flows and low to medium head.

• Efficiency of 90%.• expensive to design, manufacture and

install, but operate for decades.

Page 32: Micro Hydrro electricc projects

SELECTION OF TURBINESTURBINE TYPE FLOW HEADPelton wheel LOW HIGH >75FEET

Turgo MEDIUM MEDIUM 25-75 FEET

Cross flow HIGH LOW <25 FEET

Theoretical Power P = 9.81 × ρ × Q × H

Where : ρ = Density of water, kg/m3 Q = Flow Rate, m3/sH = Head, meters

Page 33: Micro Hydrro electricc projects

GENERATORS

The standard generators used in micro hydro power projects are the synchronous generator and the induction motor used as a generator. Induction generator :- Induction generator usually an induction motor. Which rotates 1-5% faster then synchronous speed so that it can achieve negative slip, to run in generating mode.

Page 34: Micro Hydrro electricc projects

ELECTRONIC LOAD CONTROLLER• Water turbines vary in speed as load is

applied. This speed variation will seriously affect both frequency and voltage output from a generator.

• To over come this problem ,electronic load controller is used in micro-hydro power plant

• The ELC prevents speed variations by continuously adding or subtracting an artificial load, so that the generator is working permanently under full load.

• A further benefit is that the ELC has no moving parts, it is very reliable and maintenance free.

Page 35: Micro Hydrro electricc projects

MALAYSIASIRIM PROJECT IMPLEMENTAION

Page 36: Micro Hydrro electricc projects

• Kampung Sri Stamang 2, Lubok Antu, Sarawak

• Rumah panjang’ + Klinik Desa (~ 240 orang)

• Location: Sungai Ubo • Power Generation: 18.3 kW • Type of Turbine: Crossflow • Construction: Okt 2010 – July 2011 • Commissioning Date: 29 February 2012

Page 37: Micro Hydrro electricc projects
Page 38: Micro Hydrro electricc projects

COST ANALYSISmicro-hydro; power plant; Hink river;

Engineering Department, University of Papua, Jl.Gunung Salju Amban, Manokwari, 98314,

Indonesia

Page 39: Micro Hydrro electricc projects

MEATHOD

• Economic analysis of a micro-hydro power plant is important to evaluate the eligibility of the plant.

• It includes cost, benefit and benefit cost ratio, and payback period to build the plant.

COST Cost in developing a micro-hydro power plant will be

investment and operational cost

Page 40: Micro Hydrro electricc projects

• Daily benefit of micro-hydro power plant operation will be the product of power production and fixed price ofthe power.

• By multiplying daily benefit within 30 days, it will give monthly benefit value. Annual benefit is 12times higher than monthly benefit

• Payback period is the time period for paying back all of the cost. The payback period is calculated by counting the number of years taken to recover the cash invested in a project. The investment is feasible if the payback period is lower than investment period

Page 41: Micro Hydrro electricc projects

Potency of Hink River• A survey had been done to investigate hydrolic potency of the Hink

River in earth coordinate of 1o 14’ 08.9” S and 133o 57’ 14.2” E.• Measured by a GPS, the height of the head was about 10 m.

Therefore, the hidrolyc potency of theriver with flow rate 0.3m3/s

• POWER (TH)=(1000 )(9.8 )(0.3 )(10 ) =29.4KW

• overall efficiency will be 50-70%, and• then the generated power is in between 14.70-20.58 kW.

Therefore, the turbine and generator should be chosen• higher than 20.58 kW.

Page 42: Micro Hydrro electricc projects

COST OF POWER PLANT SETTING• Civil Equipment• Waterworks of the planning micro-hydro power plant include weir, intake,

forebay and tailrace. Flood gate and• trash screen are the complement equipments that are placed in intake

and forebay. Flood gate is used to maintain thepower plant, and trashrack is used to separate trash from water before it comes to the turbine.

• Dimension planning of power house was 3x3 m and it will be semi pemanent building with set forth of gaveL stone in bottom side and thick board in upper side. Slove and machine foundation will be reinforced concrete with

• iron cast type K-225 and the house will be roofed by corrugated iron.

Page 43: Micro Hydrro electricc projects

Energy Production and Distribution• Efficiency of turbine, generator and penstock are known

about 76%, 92% and 98 % respectivelly while effective• head after instalation the equipments is approximatly 8.6 m.

Therefore, overall efficiency and generated power are calculated as

• EFFICIANCY=0.98*.92*.76*100=68.52%• POWER=1000*9.8*.3m3/s*8.6m*68.52%=17.32KW

Page 44: Micro Hydrro electricc projects

Economic Analysis

• Investment of the micro-hydro power plant is approximately Rp. 778224202.02, including direct cost and indirect

• cost. Contingencies cost is predicted about 5% of direct cost and engineering cost is about 7% of direct cost for

• survey, supervision cost, detail design and planning

Page 45: Micro Hydrro electricc projects

Items INDONASIA RUPIAH

Direct cost

1. CIVIL WORKS 382388690.18

2.ELECTRICAL 198000000.00

3.DISTRIBUTION 57500000.00

4.TAXES-10% 63788869.02

TOTAL 701677559.20

INDIRECT COST

Contingencies cost (5%) 31894434.51

Engineering cost (7%) 44652208.31

TOTAL 778224202.02(RS3657653.749)

Page 46: Micro Hydrro electricc projects

• Annual generator output is about 149644.8 kWh; therefore annual benefit is about Rp. 92543126.40 at powerprice Rp. 720.00/kWh and monthly load benefit is chosen about Rp. 32000.00 per month kWh or in this case about

• Rp. 5468160.00 per month. Cost which includes deviation of civil building (30 years), deviation of electrical and mechanical (25 years), deviation of distribution lines (30 years), operation and maintenance cost, and 3% of bank interest as in table

• Profit of annual operation is the benefit minus cost and it will cost Rp. 44933537.85. Benefit factor build by the

• micro-hydro power plant in Hink district is about 1.94 and payback periode will be 17.32 years or about 17 years and 4 month. Electrical and mechanical equipment can reach 25 years and the building can life until 30 years.

• According to the criterion of benefit cost ratio and payback period, the development of micro-hydro power plant inHink district is feasible.

• 1Rp=Rs0.0047

Page 47: Micro Hydrro electricc projects

Conclusion• The result of water supply measurement in Hink River shows

that maximum flow rate is 0.4 m3/s. With head about 10m, the hydraulic potency is equal to 29.5 kW

• We have many spots in kerala where this project can be adopted

• It can solve the power solution in remote areas • Many government policies support the development of the

micro hydro projects

Page 48: Micro Hydrro electricc projects

TARGET AREAS

• MINIMISING HEAD REQUIREMENTS • (ASTONISHING FACT THAT IT CAN BE DONE AS

SMALL AS 0.5 M)• REVERSE PUMP MECHANISM FOR POWER

PRODUCTION

Page 49: Micro Hydrro electricc projects

THANK YOU

BY

ABHISHEK RAJ RIT KOTTAYAM