MICRO HYDRO PROJECTS under Programme for Economic Advancement and Community Empowerment (PEACE)

Upload: smart-villages

Post on 15-Apr-2017

104 views

Category:

Government & Nonprofit


3 download

TRANSCRIPT

Page 1: Islamabad | Oct-15 | Micro Hydro Projects - Programme for Economic Advancement and Community Empowerment (PEACE)

MICRO HYDRO PROJECTS under

Programme for Economic Advancement and Community Empowerment (PEACE)

Page 2: Islamabad | Oct-15 | Micro Hydro Projects - Programme for Economic Advancement and Community Empowerment (PEACE)

• Establishment of Community Institution in the form of CO/VO/LSO.

• Capacity building of Community Institution in Management and Leadership skills through CMST/LMST

• Exposing the Community to the area where already such practices are successfully run by the community itself as: Seeing is believing

• Need identification and prioritize it

• Community put forward demand in the form of resolution with the approval of 2/3 majority.

• SRSP staff visit the area and conduct feasibility.

• If the site is feasible, detail cost estimate is prepared and forwarded for the approval.

Community Mobilization & MHP (Before MHP)

Page 3: Islamabad | Oct-15 | Micro Hydro Projects - Programme for Economic Advancement and Community Empowerment (PEACE)

• After Approval, third dialogue held to formally initiate the MHP and the committee’s formed namely; Project Committee, Audit Committee and O&M Committee by the community itself.

• A joint account opened with signatories ; President, General Secretary of the CI and the DPM of the Project.

• Community contributed in the form of provision of land (free of cost), carriage of equipment, erecting poles and transmission lines.

• Community also provide a place as ware house for the material.

• During implementation, the Project Committee took responsibility of quality work and supervision.

• Project staff also visit the site to ensure the quality and the work as per design.

Community Mobilization & MHP (During MHP)

Page 4: Islamabad | Oct-15 | Micro Hydro Projects - Programme for Economic Advancement and Community Empowerment (PEACE)

Glimpses of MHPs Third dialogue Pictures

Excavation for poles and transmission lines Pictures

Page 5: Islamabad | Oct-15 | Micro Hydro Projects - Programme for Economic Advancement and Community Empowerment (PEACE)

• After successfully testing the MHP, the community provide an operator for O&M purpose.

• Capacity building of the operator through technical training.

• Proper handing/taking over of the MHP with the community.

• Rs. 2000/connection was collected from the community and deposited in the joint account with the purpose to use it for Operational & Maintenance and sustainability of the project.

• Collection of monthly bills and deposit in the joint account by the operator.

• Maintaining the complete record of the MHP, financial as well as physical.

• For maintenance purpose, the community put forward the request in the form of resolution which will verify by the project staff, estimate prepared and then the amount released for repair or maintenance.

Community Mobilization & MHP (After MHP)

Page 6: Islamabad | Oct-15 | Micro Hydro Projects - Programme for Economic Advancement and Community Empowerment (PEACE)

Glimpses of MHPsMalam MHP Testing of Malam MHP

Testing of Beha MHP Jukhtai MHP

Page 7: Islamabad | Oct-15 | Micro Hydro Projects - Programme for Economic Advancement and Community Empowerment (PEACE)

Benefits• Proper training of Operators and management committees

• Reduction in using the biogas (dung, wood, kerosene oil)

• Less pressure on forest.

• Time saved to use it for other productive activities especially for women

• Children have enough time to study.

• Kalam MHP is running as social enterprise benefitting 637 domestic consumers as well as 43 commercial consumers like hotels, schools, telephone exchange and health providers.

Micro Hydro Projects

Page 8: Islamabad | Oct-15 | Micro Hydro Projects - Programme for Economic Advancement and Community Empowerment (PEACE)

Issues and Challenges

• Difficulty in bill collection

• In winter low production of electricity

• Migration of the people in winter to lower part of the countries.

• Due to poverty people feel difficulty in getting connections.

Micro Hydro Projects

Page 9: Islamabad | Oct-15 | Micro Hydro Projects - Programme for Economic Advancement and Community Empowerment (PEACE)

Thank You

Micro Hydro Projects