      PT PERUSAHAAN GAS NEGARA (Persero) 

    Tbk 

    CONTRACT NO. :

    DOC. NO. :

      PT. PRATIWI PUTRI SULUNG

    CONTRACT PACKAGE NO. 11A :

    PENGADAAN PAKET PEKERJAAN

    UPGRADING TANGSI OFFTAKE STATION

    PROJECT (CP-11A)

    SCOPE OF WORK 

    A02/12/20

    14ISSUED FOR BID

    REV. DATE PAGED E S C R I P T I O

    N

    PREPRD CHKDAPP

    D

    CHK

    DAPPD

    CONTRACTOR P!C PGN

    PT. PETROTECHNINDO

  • 8/18/2019 Mgmt - Scope of Work_cp11

    2/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    SCOPE OF WORK 

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    TABLE OF CONTENTS

    DAFTAR ISI

    1. GENERAL..............................................................................................................4

    2. DEFINITIONS........................................................................................................ 6

    3. TERMINOLOGY AND ABBREVIATIONS.................................................................10

    4. SOPE OF !OR"................................................................................................11

    4.1 GENERAL..................................................................................................... 11

    4.2 INTENDED P#RPOSES OF T$E PRO%ET.......................................................13

    4.3 ALITY.......................................................................................................13

    4.4 RIS"............................................................................................................. 13

    '. ESSENTIAL OPERATION REIREMENTS............................................................13

    6. PERMANENT !OR"S..........................................................................................14

    . TEMPORARY !OR"S.......................................................................................... 1

    . PT. PRATI!I P#TRI S#L#NG !OR" ATIVITIES...................................................1

    .1 GENERAL..................................................................................................... 1

    .2 T*e SITE...................................................................................................... 1

    .3 S+r,e- / So I/,eso/......................................................................15

    .4 Dee E//eer/................................................................................... 21

    .4.1 O/s*ore Dsr+o/ P7e/e................................................................23

    .4.2 T/s O89e So/s :2 (TS:2)..........................................................26.4.3 Ne; Fre < Gs S-se=> Ao/ Fre E?/+s*er / Ne; !er

    S-se= E//eer/ @.........................................................................................31

    8.4.4   TV S-se= E//eer/.....................................................................31

    .4.' Po;er Dsr+o/ S-se= E//eer/................................................31

    .4.6 Eer S-se= E//eer/ (Gro+//> L*// Proeo/ /

    L*/)@........................................................................................................... 32

    PT. Pratiwi Putri Sulung Scope of WorkPage 2 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    3/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    .4. Dese E//e Ge/eror S-se= E//eer/.......................................33

    .4. #PS S-se= E//eer/@......................................................................33

    .4.5 I/sr+=e/o/ S-se= (e /sr+=e/s> Co; o=7+er> =eer/

    so/ o=7+er> =rs*/ r9)> SADA / Tee7*o/- E//eer/.........34

    .4.10 , E//eer/................................................................................... 34

    .4.11 Ar*e+r Des/ E//eer/..........................................................36

    .4.12 B+/ #es E//eer/................................................................36

    .4.13 I/sr+=e/ Ar S-se= E//eer/.......................................................3

    .4.14 #- !er S-se= E//eer/@ Moo/....................................3

    5. INDEPENDENT DESIGN VERIFIATION................................................................3

    10. PRO#REMENT............................................................................................... 3

    10.1 GENERAL..................................................................................................... 310.2 FREE ISS#ED MATERIALS.............................................................................41

    10.3 OFFTA"E STATION........................................................................................ 42

    11. ONSTR#TION !OR"...................................................................................46

    11.1 GENERAL..................................................................................................... 46

    11.2 !OR" SPAE AISITION..........................................................................45

    11.3 PERMIT> LIENSES> RETRIB#TION AND LEVIES............................................'0

    11.4 PIPELINE ONSTR#TION............................................................................'1

    11.' PIPE BRIDGES ONSTR#TION....................................................................'3

    11.6 PIPELINE ROSSINGS...................................................................................'4

    11. REINSTATEMENT.......................................................................................... '4

    11. TANGSI OFFTA"E STATIONS.........................................................................''

    12. INSPETION AND TESTING..............................................................................60

    12.1. ONS$ORE DISTRIB#TION PIPELINE...........................................................60

    12.2. OFFTA"E STATION.....................................................................................62

    13. ALIBRATION.................................................................................................. 6613.1 I/sr+=e/o/...........................................................................................66

    13.2 Meer/ < Re+/ S-se=....................................................................66

    14. $EALT$> SAFETY AND ENVIRONMENT ($SE)...................................................66

    1'. MIGAS ERTIFIATIONS...................................................................................65

    1. OMMISSIONING.............................................................................................0

    1. TRIAL OPERATION...........................................................................................1

    PT. Pratiwi Putri Sulung Scope of WorkPage 3 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    4/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    15. !ARRANTY AND MAINTENANE......................................................................2

    20. SPARE PARTS AND ONS#MABLES..................................................................3

    21. TRAINING........................................................................................................3

    22. DO#MENTATION............................................................................................4

    22.1 Ge/er........................................................................................................ 4

    22.2 De,eres or Des/............................................................................... '

    22.3 De,eres or o/sr+o/......................................................................'

    22.4 De,eres or Tes....................................................................................

    22.' De,eres or As B+..............................................................................

    23. TEMPORARY FAILITIES...................................................................................

    23.2 Ao==oo/ or EMPLOYERs Perso//e.................................................0

    23.3 o==+/o/ S-se= or EMPLOYERs Perso//e.....................................1

    23.4 Ancillary Facilities............................................................................................3

    23.5 Power  ............................................................................................................ 3

    23.6 Transport........................................................................................................ 4

    24. ADMINISTRATION............................................................................................ 6

    2'. PROGRAMMING AND PLANNING......................................................................6

    26. INTERFAE !IT$ OT$ERSBATTERY LIMIT.......................................................

    2. EMPLOYERS #NDERTA"INGS..........................................................................

    2. S$ED#LE FO !OR"......................................................................................

    25. ATTA$MENTS................................................................................................

    1. GENERAL

    1.0 This document descries PT. Pratiwi Putri Sulung  !cope o" #or$ includin% ut not

    limited to sur&ey and soil in&esti%ation' ()istin% "acilities assessment' detailed en%ineerin%'

     procurement' construction' inspection and testin%' caliration' certi"ication' trainin%' pre*

    commissionin%' commissionin%' trial operation' and war ranty o" +p%radin% Tan%si !tation

    Pro,ect -P*11A/.

    2.0 PT. PAT# P+T !++ is reuired to pro&ide andor do whate&er is

    PT. Pratiwi Putri Sulung Scope of WorkPage 4 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    5/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    inherently or indispensaly necessary to achie&e the desi%n' e)ecution and completion o" 

    the #7! and the remedyin% o" all de"ects therein' in "ull accordance with the

    reuirements o" PT. Pratiwi Putri !ulun%. This e)tends' ut is not limited' to arran%in%

    manu"acturin%' "arication and such li$e acti&ities' and "or all procurement' shippin% and

    other transportation acti&ities' all o" which are deemed to e encompassed in the term

    9constructioninstallation wor$ 9 as used hereina"ter .

    3.0 ()ce pt where otherwise e)pressly stated' all o" the reuirements e)pressed in or to  e

    reasonaly implied "rom the 7TAT are to e met y PT. PAT# P+T !++.

    This is so re%ardless o" whether such reuirements are e)pressed in the acti&e &oice as

    somethin% PT. PAT# P+T !++ must do' e.%. 9...  PT. Pratiwi Putri Sulung shall 

    ...9or in the  passi&e &oice as somethin% which must e done y PT. PAT# P+T!++. e.%. 9... the Works shall be designed to allow ...9 or in the imperati&e mood as a

    direct instruction' e.%. "  Provide the following ...9

    4.0 #here items o" #7 or topics are listed in the 7TAT as e)amples o" what is to  e

    done or addressed' such a list does not limit the wor$ to  e done solely to those items

    listed. !uch lists are to illustrate the type o" wor$ to e done or the topic to e addressed. not

    the "ull ran%e o" what is to e done or addressed.

    5.0 ()cept where otherwise e)pressly stated' the cost o" meetin% all o" the reuirements and

    oli%ations e)pressed or reasonaly implied in the 7TAT are a%reed to e included in

    the Accepted ontract Amount. This includes' in addition to the desi%n' e)ecution and

    completion o" the #7! and the mana%ement and administrati&e wor$ associated

    therewith. such thin%s as the cost o" all licence and  permits' utilities detection'  protection and

    relocation. demolition o" structures' tra""ic mana%ement and di&ersions' temporary relocation

    and reinstatement o" e)istin% "acilities. en&ironmental protection. and implementation o" 

    health and sa"ety measures.

    6.0 The (:P7;( reuires that the desi%n and e)ecution o" the #7! ta$e into account the

    nature o" the en&ironment within which the #7! will  e constructed. t is there"ore

    essential that PT. PAT# P+T !++ liaises e""ecti&ely with all o""icially

    appointed (n&ironmental

  • 8/18/2019 Mgmt - Scope of Work_cp11

    6/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    i&er and anal Authority' ndustrial Area and others ha&in%  ,urisdiction andor utilities o&er 

    the areas in which the #or$s are located.

    =.0 n addition'  plannin% and e)ecution o" the #7! shall ta$e into account the

    reuirements o" ocal:unicipal Authorities to reduce the disruption to the normal

    acti&ities o" areas ad,acent to the #or$ Areas caused y the e)ecution o" the #7! to a

    le&el acceptale to such Authorities.

    8.0 #here PT. PAT# P+T !++ is reuired to 9de"ine9 somethin% -"or e)ample' an

    in&esti%ation or sur&ey/ then such de"inition must include e&erythin% necessary to ensure that

    the in&esti%ation  or sur&ey %enerates the in"ormation necessary to enale PT. PAT#

    P+T !++ to meet the reuirements o" the (:P7;(.

    >.0 PT. PAT# P+T !++ shall adhere strictly to the reuirements is respect o" health'

    sa"ety and en&iromental aspects %i&en in the 7TAT includin% the custody and care o" the

    e)istin% "acilities alon%side the wor$in% areas under 7TAT PAA( 7. 11A. " the

    e)istin% "acilities are dama%ed due to the responsiility o" the 7TAT7' such dama%e shall

     e recti"ied upon PT. PAT# P+T !++ receipt o" the employer?s acceptance to PT.

    PAT# P+T !++ proposed correcti&e action plan and in accordance with the

    conditions o" contract.

    10.0 All in"ormation re%ardin% tie*in' rid%e crossin% and road crossin% locations in these road

    descriptions are appro)imate' and such thin%s are to e precisely determined y PT. PAT#

    P+T !++ durin% the detail desi%n and e)ecution o" the wor$s.

    2. DEFINITIONS

    For the de"inition o" terms appearin% within the documents "ormin% the  Dokumen Teknis

    that are not speci"ically %i&en herein' re"erence should e made to the onditions o" 

    ontract.

    n addition to the de"initions %i&en within the onditions o" ontract' the "ollowin%

    de"initions !@A apply

    P7B(T +p%radin% 7""ta$e Tan%si !tation Pipeline Pro,ect -P*11A/

    Tan%si 7""ta$e !tation C 1 The e)istin% 7""ta$e !tation o" Tan%si C i$aran%' #est Ba&a

    PT. Pratiwi Putri Sulung Scope of WorkPage 6 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    7/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    -T!*1/

    Tan%si 7""ta$e !tation C 2

    -T!*2/

    The ew 7""ta$e !tation o" Tan%si located ne)t to the e)istin%

    T!*1 as part o" the de&elopment o" Tan%si 7""ta$e !tation

    Tan%si 7""ta$e !tation

    -T7!/

    The "inal de&elopment o" T!*2 and all its "acilities which uilt

    in the e)istin% area o" T!*1

    i$aran% istrindo 1 -*

    1/

    ()istin% :! !tation "or elctricity power plant o" P?s

    customer o" i$aran% istrindo 1

    (:P7;(P PT Perusahaan as e%ara -persero/ T$.

    P: PT. Petrochindo +tama -PT+/ selected y the (:P7;( to

    carry out the duties assi%ned to him as Pro,ect :ana%ement

    onsultant "or the P7B(T

    PT. PAT# P+T

    !++

    A company selected y the (:P7;( as PT. PAT#

    P+T !++ to per"orm (n%ineerin%' Procurement and

    onstruction "or the completion o" the P7B(T.

    !+

  • 8/18/2019 Mgmt - Scope of Work_cp11

    8/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    ET:(T Eirectorate o" :etrolo%y o" ndonesia

    TA 7P(AT7 Acti&ities that shall e per"ormed y PT. PAT# P+T

    !++ to &eri"y that the "acilities can e operated under 

    stale conditions "or the period o" 14 -"ourteen/ days calculated

    "rom the date o" the accesptance o" commissionin% which

    include' ut not limited to the operation' maintenance' troule

    shootin% and recti"ication o" the pipeline' :!' "ire water 

    system and Eiesel (n%ine enerator !et.

    TA 7D(

    (TFAT( -T7/

    Ta$in% 7&er erti"icate -T7/ issued y (:P7;( in

    accordance with the pro&ision in the contract !u*louse 8

    -Serah Terima/ and !u*lause >.3 -

  • 8/18/2019 Mgmt - Scope of Work_cp11

    9/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    :(@AA

    7:P(T7

    ompletion o" pre*commissionin% acti&ity in which all

    elements o" the P7B(T are to e mechanically completed

    and ready "or commissionin%.

    P(:A(T #7! The permanent wor$s to e e)ecuted y PT. PAT# P+T

    !++ under the contract.

    T(:P7A; #7! All temporary wor$s o" e&ery $inds -other than PT. Pratiwi

    Putri !ulun% euipment/ reuired on !T( "or the e)ecution and

    the completion o" the P(:A(T #7! and remedyin%

    o" any de"ects.

    #7! The P(:A(T #7! and T(:P7A; #7!' or  

    either o" them as appropriate includin% the responsiility "or 

    underta$in% wor$s outside o" the !T( i" any as indicated in the

    !P(FAT7.

    !T( The places where the P(:A(T #7! to e e)ecuted

    and to which the Plant and :aterials are to e deli&ered' and

    any other places as may e speci"ied in the 7TAT as

    "ormin% part o" the !T(.

    The ao&e de"initions shall apply "or e&ery de"ined word when it is written with all

    capital letters andor when it is written with only the "irst letter is capital.

    " there is any discrepancy re%ardin% the de"initions o" the ao&e words  etween this

    !cope o" #or$ and other documents under  Bab  X.  Dokumen Teknis then the pre&ailin%

    de"initions shall e as mentioned in the onditions o" ontract and in this !cope o" #or$ .

    ". TER!INOLOG# AND ABBREVIATIONSThe are&iations in this document !@A ha&e the meanin% as "ollows

    AT! Automatic Trans"er !witch

    TD losed ircuit Tele&ision

    P athodic Protection

    E( Eiesel (n%ine enerator 

    PT. Pratiwi Putri Sulung Scope of WorkPage 9 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    10/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    FAT Factory Acceptance Test

    F Fire and as

    P@A Process @aGard Analysis

    7 nput  7utputA ocal Area etwor$ 

    :E< :ain Power Eistriution

  • 8/18/2019 Mgmt - Scope of Work_cp11

    11/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    +nder such e)istin% conditions' PT. PAT# P+T !++ shall per"orm the #7! as

    "ollow -!ee PFE Eoc. P*11A*PT+*32=5*P!*E*002/

    a. Ee&elopment o" Tan%si 7""ta$e !tation -T!*2/

    • Ee&elopment new tan%si o""ta$e station*2 as up%radain% o" e)istin%

    Tan%si 7""ta$e !tation

     . Pipeline !ystem nstallation

    • !ection*1

    20 inch upstream pipeline systems -Appro)imately 200 meters/

    includin% tie*in wor$s y usin% hot tappin% method to the e)istin% 24

    inch awa :a,u C arawan% main line.

    • !ection *2

    20 inch Tan%si 7""ta$e !tation*2 -T!*2/ downstream pipeline system

    -Appro)imately 2 $m/ to connect with the 16 inch e)istin% *1

     pipeline y usin% hot tappin% method includin% "uture connection "or 

    i$aran% istrindo*2 -Future/ and ((*@yundai arae -Future/.

    • !ection*

    Bumper line connection the e)istin% 16H "uture connection at

    downstream Tan%si 7""ta$e !tation*1 to e)istin% 12H distriution

     pipeline Te%al ede C Eistriusi

  • 8/18/2019 Mgmt - Scope of Work_cp11

    12/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    e)istin% T!*1 y demolishin% the e)istin% re%ional o""ice o" Tan%si 7""ta$e !tation and

    e)istin% Tan%si warehouse uildin%. +p%radin% Tan%si 7""ta$e !tation !hall e

    includin% modi"ication some e)istin% "acilities.

     . onnection' inter"ace and inte%ration o" the new "acilities and euipment o" T!*2 with

    the e)istin% T!*1 "acilities.c. 7nshore pipeline distriution system 20 inch diameter' 16 inch diameter and 12 inch

    diameter as descries ao&e' includin% installation o" &al&e o)' tappin% connection'

    connection to "uture connections' "uture connection' rid%es installation' cathodic

     protection systems' etc.

    4." $UALIT#  

    PT. PAT# P+T !++ oli%ation is to ensure that the uality o" desi%n' materials and

    wor$manship is "it "or purpose and that heshe estailshes' implements' maintains and impro&es

    a ualtity mana%ement system that will ensures and can &eri"y and documents that the #7!

    are' in all respoects' desi%ned' e)ecuted' and completed in accordance withh the 7TAT.

    4.4 RISK  

    PT. Pratiwi Putri !ulun% oli%ation is to ensure that PT. PAT# P+T !++

    estalishes implements' maintains and impro&es a ris$ mana%emen%t system that will ensure

    that the #7! are desi%ned' e)ecuted and completed in such a manner that ris$ is

    competently identi"ied and mana%ed.

    %. ESSENTIAL OPERATION RE$UIRE!ENTS

    The pipeline system to e pro&ided as part o" the #7! shall e capale o" operatin% non*

    stop -24 hours per day/ "rom the date o" Ta$in% 7&er and such will pro&ide

    a. on*interruption o" the %as distriution pipeline system operation' and

     . !a"e operatin% condition throu%hout the entire %as distriution pipeline system and its

    en&ironment.

    &. PER!ANENT WORKS

    The permanent #7! under this contract that reuired to e desi%ned' e)ecuted and

    completed y the PT. PAT# P+T !++' includin%' as the minimum' the "ollowin%

    PT. Pratiwi Putri Sulung Scope of WorkPage 12 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    13/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    1. Eemolishin% e)istin% Tan%si re%ional o""ice and warehouse' modi"ication' addition'

    reparation o" e)istin% "acilities and de&elop Tan%si 7""ta$e !tation and its "acilities as

     part o" the #7!' include' as minimum -!ee ayout Erawin% Tan%si 7""ta$e !tation

    Eoc. o. P11A*PT+*32=5*A*E*001/

    2. The demolished euipment such as e)istin% air conditioned units' e)istin% pump units'

    e)istin% e)haust "an units and the li$e shall e hand o&ered and retruned to

    (:P7;(?s desi%nated area' PT. Pratiwi Putri !ulun% shall coordinat with

    PP: "or the demolishion wor$ to e e)ecuted

    3. Eemolish wor$ and dispose remo&al materials.

    4. A "ully operational 7""ta$e !tation and its "acilities which located within Tan%si Area.

    -!ee ayout Erawin% Tan%si 7""ta$e !tation Eoc. o. P11A*PT+*32=5*A*E*

    001/

    5. A "ully operational onshore %as distriution pipeline to e installed "or pro,ect'

    includin% pipeline o" downstream and upstream T!*2' pipeline etween upstream *1

    and e)istin%

  • 8/18/2019 Mgmt - Scope of Work_cp11

    14/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    Eetail Erawin%

  • 8/18/2019 Mgmt - Scope of Work_cp11

    15/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    operation o" the #7!' includin% addition' replacement and modi"ication "or Tan%si

    7""ta$e !tation' as reuired to complete the #7!

    26. All uildin%s and "acilities reuired' whether new uildin% or modi"ication uildin% "or 

    operation and maintenance' as reuired in the (:P7;(?s data and drawin%s.

    2=. All testin% reuirements "or all material and system euipped in the P7B(T.28. All pre*commissionin% and commissionin% reuirements to complete the P7B(T.

    To ensure that the (:P7;( will e ale to ma$e "ull use o" the "acilities pro&ided within the

    Permanent #or$s upon ta$in% o&er and that those Permanent #or$s "ul"ill all their "unctions'

    PT. PAT# P+T !++ shall e responsile "or nte%ratin%' Pre*commissionin%'

    Testin%' ommissionin%' Trial 7peration and !ta"" Trainin% o" the (:P7;(?s operational

     personnel.

    n respect o" the distriution pipeline system installed under the ontract Pac$a%e o. 11A' PT.

    PAT# P+T !++ shall coordinate with and support the (:P7;(?s

    operationmaintenance di&ision and other PT. Pratiwi Putri !ulun%s -i" any/ to e appointed y

    the (:P7;(' in the ao&e acti&ities.

    ertain o" PT. Pratiwi Putri !ulun% personnel shall remain on*site "or a period o" 3 months a"ter 

    Tal$in%*7&er in order to ad&ise the operational sta"" on all operatin% maintenance aspects in

    respect o" ontract Pac$a%e o. 11A and such as will allow them to achie&e the intended %as

    supply a&ailaility reuirements.

    '. TE!PORAR# WORKS

    The Temporary #or$s may depend on choices made y PT. PAT# P+T !++'

    includin%

    • Temporary uildin%s' includin% o""ices' wor$shops' warehouses' medical and toilet

    "acilities' canteens' etc'

    • Temporary roads -includin% access roads/ and associated temporary structures'• Temporary di&ersion o" tra""ic includin% si%nallin% and direction %uidance

    reuirements'

    • @ealth and sa"ety euipment and related "acilities'

    • Temporary utilities includin% electric power supply'

    • !anitary and drin$in% water supplies' waste and soil water plumin% and draina%e' etc'

    • Temporary wor$ areas' includin% that "or additional construction space' material

    stora%e' par$in% areas' "ences' etc'

    PT. Pratiwi Putri Sulung Scope of WorkPage 15 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    16/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    • Temporary relocation andor supports "or e)istin% utilities

    • Temporary communication lin$ alon% the pipeline route and etween the satellite

    o""ices and main o""ices'

    • !upports and stailiGation measures to "acilitate e)ca&ation wor$'

    •o""er dams' draina%e and dewaterin% "or earthwor$s'

    • Temporary sca""oldin% and "alse wor$ "or construction purposes'

    • Fire' smo$e detection and "ire e)tin%usher "acilities.

    (. PT. PRATIWI PUTRI SULUNG WORK ACTIVITIES

    (.1 GENERAL

    PT. PAT# P+T !++ is reuired to pro&ide andor do whate&er is inherently or 

    indispensaly necessary to achie&e the desi%n' e)ecution and completion o" the #7! and

    the remedyin% o" all de"ects therein' in "ull accordance with the reuirements o" the ontract.

    This e)tends' ut is not limited' to arran%in% detail sur&ey' detail en%ineerin% desi%n'

    construction' installation' manu"acturin%' "arication and such li$e acti&ities' all o" which are

    deemed to e encompassed in the term Jconstructioninstallation wor$H as used hereina"ter.

    The desi%n and constructioninstallation wor$ shall "ollow a desi%n reuirements as detailed in

    this !cope o" #or$s.

    PT. PAT# P+T !++ shall ensure that where necessary

    • Full coordination is estalished with the authorities o" e)istin% and planned construction

    o" utility ser&ices'

    • Pulic in"ormation ser&ices' with ad&ice issued in su""icient time' are pro&ided where

    disruptions to e)istin% utility ser&ices are una&oidale'

    • :onitorin% the en&ironmental and social impacts o" the carryin% out o" the #7!'

    • Eealin% with antiuities and liaison with rele&ant authorities'

    • The pro&ision o" power in whate&er "rom necessary "or the e)ecution and completion o" 

    the #7! includin% power "or Tests on ompletion and Tests a"ter ompletion -i" 

    any/'• The pro&ision o" water necessary "or the e)ecution and completion o" the #7!

    includin% adeuate water treatment "acilities "or disposed water and its permits'

    • !ettin% up and runnin% a system to ensure compliance with re%ulation and permittin%

    reuirements %o&ernin% the desi%n' e)ecution and completion o" the #7!.

    PT. Pratiwi Putri Sulung Scope of WorkPage 16 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    17/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    (.2 T)* SITE

    1/ Access to and possession' to the de%ree reuired' o" #or$ Area shall e Jas isH' which

    includes e)istin% structures and &e%etation. +nless otherwise speci"ied' the remo&al o" 

    structures and &e%etation and the preparation o" the !T( "or wor$in%' includin% anyroad di&ersions and the li$e' shall e responsiility o" PT. PAT# P+T !++.

     o e)istin% access may e closed without an alternati&e access ein% pro&ided.

    2/ one o" the #or$ Areas shall e used "or purposes other than "or the e)ecution o" the

    #7!.

    3/ The (:P7;( will not pro&ide any wor$in% space to PT. PAT# P+T

    !++ eyond that comprised within the Pipeline oute identi"ied on the llstrati&e

    Erawin%s. PT. PAT# P+T !++ should prepare additional wor$in% space "or 

    his own use i" necessary' then all such additional wor$in% space shall e sourced and

    otained y him' entirely at his own cost.

    4/ PT. PAT# P+T !++ shall' at his own e)pense' source any uarries or 

     orrow pits that may e reuired' includin% arran%in% "or and otainin% all necessary

     permits where such are still not a&ailale. ()cept where stated otherwise' PT. PAT#

    P+T !++ shall at his own e)pense arran%e adeuate o""*!T( disposal o" all

    surplus e)ca&ated materials and disposal and remo&al o" demolished wor$ -e)istin%

    o""ice' e)istin% security %uard hause' e)istin% warehause' e)istin% E( !helter' etc'

    includin% arran%in% "or and otainin% all necessary permits where such are still not

    a&ailale.5/ The !T( -includin% #or$ Areas/ shall e returned to the ori%inal neat and tidy

    condition on completion o" the #7!. All holes shall e properly ac$"illed to the

    ori%inal line and le&els' all dama%es shall e properly repaired snd all e&idences o" 

    construction acti&ities shall e remo&ed.

    6/ The sur"ace o" earth slopes shall e shaped to ensure e""ecti&e draina%e.

    (." S+,-* S3 I-*563763

    1/ !ur&eyin% all e)istin% "acilities and de"inin% the oprational reuirements "or inter"acin%

    the new "acilities to e pro&ided under the ontract with those e)istin% "acilities.

    2/ PT. PAT# P+T !++ may use (:P7;(?s ()istin% data sur&ey report

    which is attached' howe&er PT. PAT# P+T !++ shall e totally responsile

    "or identi"yin% and per"ormin% any and all other additional sur&ey and soil in&esti%ation

    acti&ities necessary to complete the desi%n. " additional sur&ey and soil in&esti%ation

    PT. Pratiwi Putri Sulung Scope of WorkPage 17 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    18/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    are reuired' PT. PAT# P+T !++ shall conduct sur&ey prior desi%n wor$ 

    and &eri"y data sur&ey pro&ided y P' which co&ers' ut not limited to the "ollowin%

    items

    • Topo%rahic sur&ey'

    • !oil test' -sondir' shallow orin% deep orin%/'• Test pit and utilities sur&ey'

    • Tra""ic sur&ey'

    • !oil resisti&ity sur&ey'

  • 8/18/2019 Mgmt - Scope of Work_cp11

    19/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    "acilities' notin% the type o" construction' the e)istin% condition o" the structural

    elements' "acades' interior "inishes and pa&ement' and any e)istin% dama%e. The

    condition o" the e)istin% structures and "acilities shall e documented in a written

    report' includin% s$etches and phot%raphs. :easurements shall e made o" the location'

    len%th and width o" any crac$s' &oids' di""erential settlement' lateral de"lection' spillin%'

    lea$s or other oser&ed dama%e.

    12/ PT. PAT# P+T !++ shall re&iew and re"ine the alli%nment sheet e)istin%

    data and sur&ey report pro&ided y the (:P7;( "or the route o" the pipeline to a

    width su""icient encompass in"luences o" the topo%raphic on the desi%n or construction

    o" the pipeline and associated structures.

    13/ PT. PAT# P+T !++ is reuired to chec$' con"irm and supplement "or 

    necessary e)istin% cadastral sur&eys o" all properties within 25 m o" the oundary o" the

    !T(.14/ PT. PAT# P+T !++ shall e responsile "or de"inin%' implementin% and

    updatin% as reuired a sur&ey to ideti"y all permits that need to e otained to allow the

    #7! to e desi%ned' e)ecuted and completed.

    15/ PT. PAT# P+T !++ shall e responsile "or de&elopin% the e)istin%

    utilities' ta$in% into account all e)istin% utilities that may e a""ected y the carryin% out

    o" the #7!.

    16/ The sur&ey shall e re%ularly updated and include interro%ation o" the responsile

    authorities' the study o" a&ailale drawin%s' interpretation o" $nown !T( conditions'

    the use o" utility location euipment and the di%%in% o" test pits and trenches. t must

    culminate in trial trenches to e e)ca&ated at each open cut e)ca&ation i" needed. The

    intended purpose o" this in&esti%ation is to ensure that all utilities that need to e

    supported' protected or relocated y reason o" the #7! are identi"ied in su""icient

    time to allow the #7! to pro%ress as planned.

    (.4 D*63* E73**,37

    1/ ertain PT. Pratiwi Putri !ulun% Eocuments as speci"ied in the ontract as ein%

    reuired y the (mployer to re&iew. The sumission o" such documents and the

    suseuent re&iew thereo" shall e carried out under the pro&isions o" the onditions o" 

    ontract JEesain ontra$torH.

    2/ PT. Pratiwi Putri !ulun% oli%ation with respect to the desi%n include the production o" 

    a Eesi%n :anual' Plans "or the mana%ement o" the desi%n process and the de&elopment

    o" the detail desi%n and drawin%s into the detailed desi%n' all such as will enale the

    #7! to e desi%ned' procured' manu"actured' constructed' installed' tested and

    PT. Pratiwi Putri Sulung Scope of WorkPage 19 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    20/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    commissioned in accordance with the ontract and to meet the reuirements o" the

    (:P7;( in the !cope o" #or$.

    3/ The ancillary wor$ associated with those oli%ations includes plannin%' pro%rammin%'

    re"inement' detailin%' speci"yin%' re&isin%' uality control and &eri"ication and

    documentation o" the desi%n and the administrati&e procedures associated therewith

    throu%h to and includin% production o" As*uilt Erawin%s.

    4/ The desi%n o" #7!' as contained in the detailed drawin%s' speci"ications and

     procedures and all other documents to e prepared y PT. PAT# P+T !++'

    shall ensure that the #7! are "ir "or their intended purposes. nherent in the

    intended purpose o" the #7! -and all component parts thereo"/ is that what is

    desi%ned and constructed is intrinsically sa"e' roust' reliale' durale and cost*e""ecti&e

    in operation.

    5/ The reuirements with respect to the desi%n %i&en herein or elsewhere in the !cope o" #or$ are minimum reuirements. Achie&ement thereo" does not relie&e PT. PAT#

    P+T !++ o" his oli%ation to comply with the "itness "or purpose reuirements

    o" the ontract.

    6/ The Plant and :aterials within the completed Pipeline !ystem shall allow optimum

    operation at the %i&en desi%n condition speci"ied in the (:P7;(?s reuirements.

    =/ Adeuate control measeures shall e installed to minimiGe the ris$s and haGards to

    health' sa"ety and the en&ironment as "ar as is practicale.

    8/ The de"inition drawin%s are to e read as part o" !peci"ication and such drawin%s are

    not intended to e used "or construction purposes ut to show speci"ic !peci"ication in pictoral "orm andor in a lar%e siGed taular "orm. !uch drawin%s show the minimum

    reuirements o" the #7! to e de&eloped and carried out y PT. PAT# P+T

    !++ "or (:P7;(?s appro&al.

    >/ The illustrati&e drawin%s do not de"ine the !peci"ication' they ser&e to indicate desi%n

    solutions that could e acceptale to the (mployer and which PT. PAT# P+T

    !++ is "ree to adopt i" he so chooses and adapt to suit the particular 

    circumstances.

    10/ t shall e the responsiility o" PT. PAT# P+T !++ to determine i" other 

    wor$ eyond that shown on the de"inition drawin%s pro&ided y (:P7;( are

    reuired to "ul"ill the ntended purpose o" ontract Pac$a%e o. 11 +p%radin% Tan%si

    7""ta$e !tation and *2 Pipeline Pro,ect and to desi%n' procure' "aricate' construct

    and modi"icate all such additional "acilities as may e ruired' all o" which shall e

    deemed to ha&e een included in the ontract Proce stated in Surat Penun!ukan

     Pelaksana Peker!aan.

    11/ The chainna%es %i&en in the Ali%nment !heet pro&ided y (:P7;( are indicati&e

    PT. Pratiwi Putri Sulung Scope of WorkPage 20 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    21/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    only' and PT. PAT# P+T !++ shall determine the e)act position o" all

    reuired pipeline system components "rom his own sur&eys prior to commencin% desi%n

    wor$.

    12/ The suitaility o" the desi%n to satis"y the ontract and e "it "or purpose shall e

    deemed to rest entirely with the PT. PAT# P+T !++' notwithstandin%

    issuance o" any appro&al notice.

    (.4.1 O5),* D356,3b+63 P38*3*

    1/ Eetailed (n%ineerin% o" the P7B(T shall e in accordance with the (n%ineerin%

    desi%n per"ormed y PT. PAT# P+T !++ and shall include' ut not limited

    to the "ollowin%s

    e&iewin% and &eri"yin% preliminary en%ineerin% speci"ied in the

  • 8/18/2019 Mgmt - Scope of Work_cp11

    22/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    • Dal&e oatin% !peci"ication -"or &al&e o) application/.

    • Paintin% !ystem !peci"ication -"or ao&e %round pipin% and structural steel/.

    • Topo%raphy !ur&ey !peci"ication.

    • !ur&ey and !oil n&esti%ation !peci"ication.

    • i&il and !tructural !peci"ication.

    • !teel Pipe asin%' asin% !pacer and (nd !eal Eata !heet.

    • Permanent athodic Protection !ystem !peci"ication.

    • !peci"ication "or @ydrostatic Test.

    • 7ther technical speci"ications or data sheets reuired to complete the detailed

    desi%n.

    3/ Eesi%n alculations

    • oad rossin%@i%hway rossin% alculation.

    • @ydrolic Analysis.

    • @oriGontal Eirectional Erillin% alculation' i" any.

    • Free !pan Analysis' i" reuired.

    • Pipe !tress and Fle)iility Analysis.

    • Pipe #all Thic$ness alculation.

  • 8/18/2019 Mgmt - Scope of Work_cp11

    23/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    • @ot Tappin% Procedure -includin% #P!/.

    • @ydrostatic Test' Eewaterin% and Ery Procedure.

    • Pre*ommissionin% ommissionin% Procedure.

    • Trial 7peration Procedure.

    • 7ther procedures reuired to complete the #or$s.

    5/ Luality Assurance and Luality ontrol

    • Pro,ect Luality Plan

    • nspection and Test Plan

    • #P!PL and weler certi"icate "or pipeline and structure

    •  on Eesctructi&e ()amination Procedure

    • LAL eneral euirement

    • LAL :anual

    • Procedure "or ad Eisposition Plan

    • :aterial ecei&in%' nspection and !tora%e Procedure

    • Procedure "or :aterial ontrol and Taceaility• Permits and eport "orm "or construction wor$ 

    • 7ther uality assurance and uality control documents reuired to complete the

    #or$s.

    6/ Eesi%n Erawin%s' which shall detail and descrie re%ardin% to this su,ects

    • Topo%raphy and Ali%nment !heet -A3 siGe Topo%raphy scale 1500 and

    ele&ation 1100/

    • rossin%s "or all ma,or crossin% location -road crossin%s' ri&er crossin%s' pipe

     rd%es' e)istin% "acilities' etc A3 siGe/

    • sometric Erawin%s -A3 siGe/

    • Permit Erawin%s

    • 7stacle denti"ication

    • Places where installation position will e chan%ed e)tremely

    • +nder%round &al&es and o)es

    • Pipin% and nstrumentation Eia%ram

    • @ydrostatic Test Eia%rams

    • (lectrical !in%le ine Eia%rams

    • athodic Protection

    • Topo%raphical data' control monuments and crossin% location

    • Ad,acent property owners' i" reuired• P test locations

    • :ar$in% post and warnin% si%n locations

  • 8/18/2019 Mgmt - Scope of Work_cp11

    24/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    T!*2 and its "acilities in accordance with the Pro,ect !peci"ications' and shall include'

     ut not limited to the "ollowin%s

    • e&iewin% and &eri"yin% preliminary en%ineerin% speci"ied in the Pro,ect

    !peci"ications' Eata !heet' Erawin%s' uidelines and another data ha&e een

     pro&ided y (:P7;(.

    • e&iewin% and &eri"yin% reuirements o" pipes and materials e)cludin% "ree

    issue materials supplied y (:P7;(.

    • Per"ormin% detailed en%ineerin% reuired to complete the desi%n includin%

    calculations' speci"ications' data sheets' drawin%s

    • Per"ormin% the Process @aGard Analysis -P@A/ study

    • Preparin% desi%n drawin%s

    • Preparin% detail euipment layout and station layout

    • on"irmin% uantities o" pipes' "ittin%s and "lan%es as :aterial Ta$e 7"" -:T7/.

    • Preparin% construction and installtion procedure

    • Preparin% test procedure

    • Preparin% 7perations and :aintenances Procedure

    • Preparin% Pre*ommissionin% Procedure

    • Preparin% ommissionin% Procedure

    • Preparin% Trial 7peration Procedure

    • ompletin% JAs*

  • 8/18/2019 Mgmt - Scope of Work_cp11

    25/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    i&il and !tructural

    !hutdown Dal&e

    7ri"ice :eter Eata !heet -!enior 7ri"ice Fittin%/

    Flow omputer 

    :eterin% !tation omputer' nstrumenation and (uipment

    Eesi%n ontrol o%ic and !AF( hart

    Pressure ontrol Dal&e

    oacl !AEA -T+ include networ$/

    7ther technical speci"ications or data sheets reuired to complete

    the detailed desi%n.

    2. Eesi%n alculations

    Pipe !tress Analysis -includin% :! station/

    Pipe wall thic$ness calculation

    ine siGin%

    (uipment !iGin% -Filters' Pumps' ompressor' etc./

    !iGin% and stren%th calculation' "ilter element calculation

    !tructure and "oundation calculation

    ontrol &al&e siGin% and noise calculation

    :eter !iGin%

    +tility euirement

    Thermowell calculation

    :aterial Ta$e 7"" 

    +ncertainty calculation

    pe support "oundation calculation.. pipe

     oise calculation on surroundin% location -outside 7""ta$e and

    :! !helter' outside panel wall' "ence' etc./ 7ther technical calculation reuired to complete the detailed

    desi%n.

    3. Procedures' which shall consist o" "ollowin% su,ect as minimum

    :aterial handlin%' transportation and stora%e procedure

    !T( clearin% procedures

    :echanical euipment installation procedures

    i&il !tructure installation procedures

    eneral (lectrical installation procedures' includin% testin%

     procedures eneral nstrumentation installation procedures' includin%

    testin% procedures

    Pipe haulin% procedures

    Pipe cuttin%' e&elin% -with remo&in% &arnish -i" any// and

    weldin% procedures

    #eldin% Procedures -#P!/' certi"ied y :A!

     ET procedures

    PT. Pratiwi Putri Sulung Scope of WorkPage 25 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    26/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    Paintin% procedures

    Pipeline crossin% with e)istin% utility procedures

    einstatement procedures

    @ot tappin% procedure -includin% #P! C i" any/

    @ydrostatic test procedures

    Pre*ommissionin% commissionin% Procedure

    7ther procedures reuired to complete the #or$s.

    4. Luality Assurance and Luality ontrol

    Pro,ect Luality Plan

    nspection and Test Plan

    #P!PL and welder certi"icat "or pipin% and structure'

    certi"ied y :A!

     on Eestructi&e ()amination Procedure

    LAL eneral euirement

    LAL :anual

    Procedure "or and Eisposition Plan

    :aterial recei&in%' inspection and stora%e procedure

    Procedure "or material control and traceaility

    Permits and reports "orm "or construction wor$ 

    7ther uality assurance and uality control documents reuired

    to complete the #or$s.

    5. Eesi%n Erawin%s' which shall detail and descrie re%ardin% to this

    su,ects' as minimum

    7""ta$e !tation and :! %eneral arran%ement and layout -A3/

    7""ta$e !tation and :! !$id -permanent and temporary :!/

    and pipe support drawin% -A3/

    sometric drawin% -A3/

    Process Flow Eia%ram -PFE/ and @eat and :aterial

  • 8/18/2019 Mgmt - Scope of Work_cp11

    27/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    nstrument oop Eia%ram Termination Eia%ram

    And other drawin%s reuired to complete the detailed desi%n

    (.4." N*= F3,* > G5 S56*?@ A363 F3,* E637+5)*,

    N*= W6*, S56*? E73**,37

    PT. PAT# P+T !++ shall per"orm detailed en%ineerin% and desi%n "or the

    Fire and as !ystem' consistin% o" the "ollowin%

    Fire and as Eesi%n !peci"ication

    Fire and as Eesi%n alculation

    as lean A%ent -F:200/ alculation

    as lean A%en -F:200/ ayout Erawin%

    !in%le ine Eia%ram

    Eetector ayour and o&era%e drawin%

    (uipment Eata !heet Portale ()tin%uisher Eata !heet

    Portale ()tin%uisher layout drawin%

    Pro&ision "or !AEA connections

    #ater pond reuirement calculation

    Fire hydrant layout' that consist o" water pond' "ire pumps' hydrant' "ire

     pipin% system' siamese connection and accessories

    Fire as schematic drawin%

    #irin% dia%ram

    (uipment !iGin%

    7ther en%ineerin% documentsdrawin%s reuired to complete the desi%n

    8.4.4 CCTV S56*? E73**,37

    PT. PAT# P+T !++ shall per"orm detailed en%ineerin% and desi%n "or the

    TD !ystem' consistin% o" the "ollowin%

    TD Eesi%n !peci"ication

    TD ayout Erawin%

    TD !in%le ine Eia%ram

    (uipment Eata !heet

    7ther en%ineerin% documentdrawin%s reuired to complete the desi%n

    (.4.% P=*, D356,3b+63 S56*? E73**,37.

    PT. PAT# P+T !++ shall per"orm detailed en%ineerin% and desi%n "or the

    Power Eistriution !ystem' consistin% o" the "ollowin%

    Power Eistriution !ystem !peci"ication

    (lectrical Power !ystem !tudy

    o oad Flow

    PT. Pratiwi Putri Sulung Scope of WorkPage 27 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    28/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    o !hort ircuit

    o :otor !tartin%

    o @armonic Analysis

    o (uipment and ale !iGin%

    !in%le ine Eia%ram Erawin%

    ayout drawin% Eesi%n "or :ain Eistriution

  • 8/18/2019 Mgmt - Scope of Work_cp11

    29/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    industrial type +P! system and pro&ided y &endor with pro&en satis"actory supply and

    ser&ices that "eeds the &ital loads.

    The load o" +P! system shall consist o" &ital euipment related to !AEA' T and

    Telecom system' :eterin% e%ulation% instrument system. The unit shall e desi%ned

    to include 25M minimum mar%in applicale "or "uture load %rowth.

    PT. PAT# P+T !++ shall calculate the power reuirement' attery and

    recti"ier siGin%.

    The desi%n li"e o" ndustrial type +P! unit and the atteries shall e minimum 20

    -twenty/ years.

    +P! system shall e desi%ned as ac$*up power supply "or 4 -"our/ hours o" "ull load

    operation.

    PT. PAT# P+T !++ shall pro&ide the "ollowin% desi%n documents durin%

    detail desi%n

    +P! Eesi%n !peci"ication

    +P! Eata !heet

    alculation otes "or the +P! unit includin% attery' recti"ier and

    in&erter 

    !in%le ine Eia%ram o" the +P! unit includin% the distriution unit

    nterconnectionwirin% dia%ram the +! unit and Eistriution +nit

    7ther en%ineerin% documentsdrawin%s reuired to complete the desi%n

    Eetail reuirement o" the +P! system shall re"er to (uipment !peci"ication o" +P!

    !ystem.

    PT. PAT# P+T !++ shall de&elop (uipment Eata !heet o" +P! and

    drawin% "or +P! !in%le ine Eia%ram ased on e)istin% data re"erence. PT. PAT#

    P+T !++ shall per"orm sur&ey to %et the e)istin% data on his own cost.

    (.4. I56,+?*663 S56*? ;* 356,+?*65@ =

    ?8+6*,@ ?*6*,37 5663 ?8+6*,@ ?,5)37 ,k

  • 8/18/2019 Mgmt - Scope of Work_cp11

    30/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    !ystem Architecture Erawin%

    @oo$*up drawin%

    #irin% dia%ram

    nstrument #irin% onnection ist

    Panel Arran%ement

    oop drawin%

    ale and (uipment ayout drawin%

    (uipment !iGin%

    ocal !AEA connection

    ocal T+ pro%rammin%

    Acoustic !ur&ey

    Telephony system

    7ther en%ineerin% documentsdrawin%s reuired to complete the desi%n

    (.4.10 C3-3 E73**,37.PT. PAT# P+T !++ shall per"orm detailed en%ineerin% and desi%n "or the

    nstrumentation !ystem' consistin% o" the "ollowin%

    #ater pond "or "ire water system calculation

    Foundation calculation

    :o&ale antry rane calculation

    !tructure calculation

    7""ta$e and :! !helter and E( shelter desi%n drawin% and

    calculation. n desi%nin% the 7""ta$e station and :! shelter' PT.

    PAT# P+T !++ shall consider the applicale re%ulation on

    noise to surroundin% en&ironment -such as Eecree o" (n&ironmental

    :inistry/.

    ayout drawin% -include muster point and e&acuation route/

    :odi"ication drawin% o" e)istin% "acility' that consist o"

    o #ater chamer ponds repair a"ter re*calculation

    o Eraina%e system

    o :ain ate and "ence

    o :odi"ication o" ontrol

  • 8/18/2019 Mgmt - Scope of Work_cp11

    31/80

  • 8/18/2019 Mgmt - Scope of Work_cp11

    32/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

     uildin% utility' consistin% o" the "ollowin%

    !anitation desi%n and plumin% system -sewa%e' sanitary' clean water 

    system/

    @DA

  • 8/18/2019 Mgmt - Scope of Work_cp11

    33/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    $ey en%ineerin% drawin%s -process "low dia%rams' pipin% instrument dia%rams'

    ali%nment sheets' layout drawin%s' crossin%sectional drawin%s and other rele&ant

    details/' simulation proceduresresults' materials speci"icationsdata sheets'

    construction and transportation methodolo%ies and their calculations' inspection and

    testin% plansprocedures and the li$eN

     / !tate that the desi%n has een &eri"ied conceptually' analytically and arithmetically

    c/ (ither state that the desi%n complies with the rele&ant data pro&ides y (:P7;( 

    and ndonesian re%ulations and rules.

    " the ED( -andor ED( or%aniGation/ was nominated at the id sta%e' then such nomination

    shall e deemed to e acceptale to the (:P7;(. #here that was not the case' the name o" 

    the proposed person and or%aniGation shall e sumitted y PT. PAT# P+T !++ in

    such time as to ensure that any ad&erse response thereto does not a""ect the Pro%ramme. " the

    (:P7;( is not satis"ied with the proposed ED(' (:P7;( shall %i&e notice to that

    e""ect to PT. PAT# P+T !++ within 28 days o" PT. PAT# P+T !++

    sumission statin% the reasons. !hould the (:P7;( not %i&e notice o" dissatis"action within

    14 days' then (:P7;( shall e deemed to e satis"ied with PT. PAT# P+T

    !++ nomination.

    10. PROCURE!ENT

    10.1 GENERAL

    PT. PAT# P+T !++ !@A e responsile "or procurement o" all materials and

    euipments and "or sucontract ser&ices includin% pac$in%' shippin%' transportation and

    insurance to the site location-s/' e)cept "ree issued material supplied y (:P7;( in Tale*

    1.

    e%ardin% to these responsiilities' PT. PAT# P+T !++ shall per"orm' ut not

    limited to' the "ollowin% procurement acti&ities

    Prepare and issue inuiry pac$a%es to

    !+

  • 8/18/2019 Mgmt - Scope of Work_cp11

    34/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    Proposal on oth technical and commercial &iewpoint.

    Per"orm technical e&aluation and recommendation o"  

    !+

  • 8/18/2019 Mgmt - Scope of Work_cp11

    35/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    construction and shall ma$e such records a&ailale to the (:P7;( 

    immediately on reuest.

    Purchase o" materials and euipments with or without the allowance to

     proceed "rom the (:P7;( will not relie&e PT. PAT# P+T

    !++ responsiility o" liaility "rom oli%ations under this

    7TAT.

    Pro&ide materials and euipments with rand new and completed with

    manu"acturer certi"icate "or each and shall e produced not later than 6

    month prior 7TAT.

    Pro&ide all euipments which sahll ha&e local support "or maintenance

    and other ser&ices in ndonesia.

    (!P7!

  • 8/18/2019 Mgmt - Scope of Work_cp11

    36/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    applicale/'

    o a copy o" Factory Acceptance Test -FAT/ erti"icate -in an

    appro&ed "ormat/ and the :ill erti"icate -i" any/'

    o a copy o" Pemeritahuan lmpor

  • 8/18/2019 Mgmt - Scope of Work_cp11

    37/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    o" uantity made. Any discrepancies oser&ed durin% such ,oint inspection shall e noted on an

    7&er' !hort and Eama%e -7!E/ eport. 7nce PT. PAT# P+T !++ accept and

    deli&er the Free ssue :aterials to his stoc$yard' i" any dama%es "ound in the e&e coatin%'

    etc.' they !@A e repaired y the PT. PAT# P+T !++.

    PT. PAT# P+T !++ !@A e "ully responsile "or loadin%' transportin%'

     protectin%' temporary storin%' installin%' inspectin% and testin%' and insurin% all o" the

    (:P7;(O! Free*ssue :aterials a"ter receipt o" those :aterials at such stoc$pile yards "rom

    the (:P7;(.

    TABLE-1: FREE ISSE! "ATERIAL

    NO ITE" TOTALE"PLO#ER$%

    St&'()il* L&'ati&n%

    1

  • 8/18/2019 Mgmt - Scope of Work_cp11

    38/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    (uipment "or meterin% shall e listed in JEAFTA AAT ++ :;A 

    EA A! >0 "or lean #ater !tandard.

    The +tility #ater !ystem shall include ut not limited to deep wall pumps'

    deep well' trans"er pumps' "ilters' water meterin% euipment water tan$s' pipes'

    PT. Pratiwi Putri Sulung Scope of WorkPage 38 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    39/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    "ittin%s' &al&es and all the reuired constraction materials and tools

    5. TD ameraN Addition

    PT. PAT# P+T !++ shall supply and install TD !ystem "or T!*

    2 -as additional system reuirement/.

    PT. Pratiwi Putri !ulun% shall pro&ide new TD system and inte%rate with

    the e)istin% TD cameras.

    6. ocal !AEA

    PT. PAT# P+T !++ shall supply new ocal !AEA "or Tan%si

    7""ta$e !tation*2

    =. Power Eistriution !ystem

    PT. PAT# P+T !++ shall pro&ide new Power Eistriution !ystem

    "or Tan%si 7""ta$e !tation*2. This shall include ut not limited to main

    connection to P' main PE. (lectrical !ystem

    PT. PAT# P+T !++ shall supply new (lectrical !ystem "or the

    Tan%si 2 7""ta$e !tation' include ut not limited to

    • roundin% system "or electrical system' instrument system and

    telephony system completed with %roundin% rods' %roundin% cales'

    spar$ %ap -T( C Transient (arth lamp/' %roundin% "ittin%s'

    %roundin% us ars' anti sur%e protection and accessoriesN

    • i%htnin% protection system completed with air terminals' down

    conductors' li%htnin% protection poles' and accessoriesN

    • i%htin% system completed with "lood li%ht' indoor and outdoor 

    li%htin%' classie"ied area li%htin%' emer%ency li%htin%' panels' li%htin%

     poles' li%htin% switches and accessoriesN

    • athodic Protection !ystem

    10. Eiesel (n%ine enerator !ystem

    PT. PAT# P+T !++ shall supply new Eiesel (n%ine enerator 

    !ystem "or the ac$up power source o" Tan%si 7""ta$e !tation "or e)istin%

    PT. Pratiwi Putri Sulung Scope of WorkPage 39 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    40/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    E( replacement. This shall include ut not limited to Eiesel (n%ine

    enerator pac$a%es' remote attery char%ers' "uel tan$' calin% and

    accessories. PT. PAT# P+T !++ shall &eri"y durin% detail sur&ey.

    11. nstrumentation !ystem

    PT. PAT# P+T !++ shall supply new nstrumentation !ystem "or 

    Tan%si 7""ta$e !tation*2 and *2. This shall include ut not limited to "low

    computers' meterin% station computers' alarm printers' marshallin% rac$' "low

    computers cainets' ,unction o)es' instrument wirin%' instrument ta%%in%'

    cale supportin% system' "ittin% tuin% and &al&es' cale ties' cale lu%s and

    accessories' transmitters' indicators and %au%es.

    12. PA

  • 8/18/2019 Mgmt - Scope of Work_cp11

    41/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    canopy' draina%e system' plumin% system includin% toiletries' pipin%'

    &entilation and air conditionin% system and accessories. PT. PAT# P+T

    !++ shall per"orm ,oint sur&ey to de"ine whether this scope will e

    modi"ied or shall e new desi%ned one.

    11. CONSTRUCTION WORK 

    11.1 GENERAL

    1. The construction wor$ !@A e  planned and e)ecuted so as to ensure that the

    disruption to e)istin% utility ser&ices is not such as to cause undue incon&enience

    or to compromise sa"ety. PT. PAT# P+T !++ shall ensure that where

    necessary

    a/ "ull coordination is estalished with the Toll oad operators and authorities o" 

    e)istin% and planned construction o" utility ser&ices' and

     / pulic in"ormation ser&ices' with ad&ice issued in su""icient time' are pro&ided

    where disruptions to e)istin% utility ser&ices are una&oidale.

    2. PT. PAT# P+T !++ is reuired to plan the desi%n' e)ecution

    and completion o" the #7! in such a manner that the #7! pro%ress in an

    orderly "ashion' with due e)pedition and without delay. The plannin% and

    associated coordination is to include the identi"ication o" all e)ternal inter"aces

    within the desi%n' e)ecution and completion process. These include such di&erse

    aspects as complyin% with plannin% and uildin% re%ulations' otainin% permits or 

    consents "or operations on or under land or water' tra""ic di&ersion' utility

     protection and relocation. and coordination o" desi%n and construction with other 

    7TAT7 .

    3. The ontract is an (P contract. The  primary moti&ation o" such a contract is

    9sole9 source responsiility "or desi%n. construction and commissionin%' and the

     principal practical ad&anta%e thereo" lies in the pro%rammin%'  plannin% and

    coordination aspects o" the desi%n' e)ecution and completion o" the #7!. PT.

    PAT# P+T !++ plannin% and coordination oli%ations are imposed to

    PT. Pratiwi Putri Sulung Scope of WorkPage 41 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    42/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    ensure that this ad&anta%e is realiGed.

    4. PT. PAT# P+T !++ oli%ation with respect to construction include a

    reuirement to

    a/ identi"y'  prospect' sur&ey' secure' e)tract'  pay royalties "or and transport

    as the case may reuire' all natural materials needed to e rou%ht to !ite and

    to ensure that they comply with the reuirements o" the 7TAT' and

     / ensure that any area on or in which PT. PAT# P+T !++ has

    wor$ed upon or acuired "or the e)traction o" materials is reinstated and

    rehailitated' unless arran%ements ha&e een made "or the "urther use o" 

    such land.

    5. #ithin the constraints %i&en in the (mployer Os euirements and any

    constraints that may e imposed y le%islation or national or municipal

    re%ulations' and y the incorporation in the 7TAT o" speci"ic proposals

    made y PT. PAT# P+T !++ in his id -i" any/' PT. PAT# P+T

    !++ is "ree to use whate&er methods he considers to e appropriate to

    construct the #7!.

    6. +nless otherwise stated in the (mployerOs euirements' installation and

    application procedures "or each product are reuired to e in accordance with the

    appropriate manu"acturerOs recommendations. PT. PAT# P+T !++

    !@A' when so reuested' "urnish the (:P7;( with printed copies o" 

    such recommendations prior to installation or application.

    =. PT. PAT# P+T !++ !@A remedy any dama%e or de"ect -which

    was attriutale to PT. PAT# P+T !++ improper operation and

    maintenance "or construction related wor$manship/ within a reasonale time at the

    ris$ and cost o" the PT. PAT# P+T !++.

    8. The PT. PAT# P+T !++ shall e solely responsile "or any

    accident or incident occurred attriutale to PT. PAT# P+T !++

    construction wor$manship. n such case' PT. PAT# P+T !++ !@A

    co*operate with the rele&ant landowner or property*owner in accordance with the

    PT. Pratiwi Putri Sulung Scope of WorkPage 42 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    43/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    a%reed emer%ency response plan and procedures.

    >. PT. PAT# P+T !++ !@A e (!P7!

  • 8/18/2019 Mgmt - Scope of Work_cp11

    44/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    • Pro&ide security and sa"ety arran%ements "or the protection o" humans and properties durin%

    construction period.

    • arry out the  proper disposal o" liuid and solid wastes %enerated as a result o" the construction

    operations.

    • All recruitments stated in all onstruction !peci"ication document

    11.2 WORK SPACE AC$UISITION

    PT. PAT# P+T !++ !@A pro&ide all temporary wor$ space not

    speci"ically pro&ided y the (:P7;( as reuired' to sur&ey' install and commission

    the "acilities as descried in this document.

    PT. PAT# P+T !++ !@A pro&ide proo" o" temporary wor$ space

    a%reements with land owners to the (:P7;( prior to commencin% wor$.

    11." PER!IT@ LICENSES@ RETRIBUTION AND LEVIES

    PT. PAT# P+T !++ shall "ully comply with and e totally responsile "or 

    satis"yin% the reuirements o" ndonesian laws and re%ulations with re%ard to the

    implementation o" the #7!' includin% otainin% permits' licenses and certi"icates

    issued y rele&ant authorities. Further' inso"ar as it is within PT. PAT# P+T

    !++ aility to do so' it is PT. PAT# P+T !++ responsiility to render 

    all assistance to the (:P7;( to otain operational permits' licenses and appro&als

    "rom all rele&ant authorities.

    PT. PAT# P+T !++ shall e responsile to otain all reuired permit

    to accomplish the P7B(T' includin% ut not limited to sur&eyin%' liaisin% with

     permittin% a%encies' site &isits' photo%raphy' drawin% preparation' methodolo%y

    description procedures' wor$ instructions' hot wor$ permit' co&er letters' wor$s

     pro%ress schedules and reports' sa"ety and en&ironmental miti%ation measures'

    emer%ency response procedures and control procedures.

    PT. PAT# P+T !++ !@A e "ully (!P7!

  • 8/18/2019 Mgmt - Scope of Work_cp11

    45/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    transportin% o" euipment and materials' permits and &isas "or PT. PAT# P+T

    !++ Personnel' import and e)port o" oods' handlin% radioacti&e material'

    treatment and disposal o" liuids and water used "or hydrostatic tests' and mo&in% o" its

    euipment' personnel and POs operation.

    !peci"ically' PT. PAT# P+T !++ !@A e deemed to e "ully aware that

    compliance with all the reuirements o" :A! is "undamental to the success"ul

    completion o" oth the #7! and the P7B(T as a whole.

    The (:P7;( will appoint a third party inspection company certi"ied y :A! to

    re&iew. inspect and &eri"y whether or not the wor$ underta$en y PT. PAT#

    P+T !++ complies with :A! re%ulations and standards. PT. PAT#

    P+T !++ shall e (!P7!

  • 8/18/2019 Mgmt - Scope of Work_cp11

    46/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    11.4 PIPELINE CONSTRUCTION

    PT. PAT# P+T !++ shall do the wor$s reuired to complete the o&erall

     pipeline system. The wor$ shall include ut not limited to

    • esponsile to otain all permits' le&ies' retriution and licenses "rom

    re%ulatory authorities to per"orm construction wor$.

    • !ur&ey and sta$e the ranch*line distriution ali%nment and !T( oundaries'

    includin% soil in&esti%ation and soil resisti&ity test.

    • Per"orm test pit trenchin% to con"irm e)istin% utilities..

    • lear the pipeline route "rom trees' ille%al uildin%' i" necessary.

    • Transport and store all materials and euipment as reuired.

    • onstruct temporary "ences and warnin% mar$er durin% construction.

    • uttin% pa&ement' trenchin%' e)ca&ation up to the ottom o" trench.

    • nstall !oil (rosion control to control tra""ic durin% construction• Prepare proper person to control tra""ic durin% construction.

    • Eitch protection shall e installed to pre&ent the soil "ailure durin%

    construction.

    • 7penin% dicth shall co&ered y temporary anner with en&ironment picture and

    P lo%o to a&oid dri&er %aGe on construction acti&ity when dri&e the &ehicle

    which ma$es possiility o" accident.

    • " reuired' the arran%ement o" ditch protection shall "ollow typcal Eitch Eetail

    Erawin% -P11A*PT+*32=5*D*E*002/.

    •Apply sand eddin% and paddin% "or strin%in% pipe' as reuired.

    • onstruct sheetin% with temporary support durin% trenchin% acti&ity.

    • Pre"rom uali"ication o" weldin% procedures and welders.

    • emo&in% pipe coatin% -strippin%/ "or ao&e %round pipe installation -i.eN pipe

     rid%e crossin%' pipin% on stations' etc/.

    • Apply paintin% "or ao&e %round pipepipin% installation.

    • uttin% and e&elin% -with remo&in% &arnish/ pipe prior to weldin%.

    • @aulin%' strin%in%' ali%nment and weldin% the pipe.

    •  ET "or weldin% ,oint y radio%raphic test' &isual test and liuid penetrant

    testma%netic particle inspection "or "illet weld and +T "or olden Boint.

    • Apply coatin% with heat shrin$ slee&e to weldin% ,oint and "ittin%.• Per"orm holiday inspection o" completed coatin%.

    • Apply e)ternal and internal coatin% "or "ittin%s.

    • Apply e)ternal and internal coatin% "or are spool in the &al&es o)es.

    • owerin% pipe into ditch.

    • epair dama%ed coatin%.

    • Per"orm traceaility inspection.

    • nstall dicth plu%s as reuired

    PT. Pratiwi Putri Sulung Scope of WorkPage 46 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    47/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    • nstall temporary cathodic protection.

    • nstall permanent cathodic protection.

    • nstall %roundin% cell around A -Alternatin% urrent/ in"luence area.

    • nstall permanent re"erence cell at the palce where it is di""icult to put the

    temporary re"erence electrode.•

  • 8/18/2019 Mgmt - Scope of Work_cp11

    48/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    • einstatement o" all dama%ed within rid%e construction area.

    11.& PIPELINE CROSSINGS

    PT. PAT# P+T !++ shall do the wor$s reuired to complete the crossin%

    construction. The wor$ shall include ut not limited to

    • Eetermine the appropriate orin% method "or crossin%' which shall use au%er 

     orin%' or etter method with enou%h euipment capacity "or pipe and depth

    co&er o" pipe esed on appro&ed calculation. For au%er orin% method' PT.

    PAT# P+T !++ shall protect the e)ternal pipe coatin% y usin%

    doule wrapped Poly (thylene coatin% or methode materials appro&ed y

    (:P7;(. PT. PAT# P+T !++ shall in&esti%ate the !T( and

    soil condition prior to orin%' and prepare the pit orin% with adeuate depth

    and euipped with temporary shore structure to pre&ent soil erosion and land

    slidin%.

    • PT. PAT# P+T !++ shall install sacri"icial cathodic protection

    system at pipe casin% with desi%n li"etime 50 years.

    • PT. PAT# P+T !++ shall protect weldin% ,oint usin% special

    shrin$ slee&e -e) Eyra) or eui&alent/ "or construction

    PT. PAT# P+T !++ shall conduct a close coordination with permitauthorities durin% construction.

    • PT. PAT# P+T !++ shall prepare orin% procedures' launchin% pit

    and e)it pit protection' euipment and "acilities' and shall otain the prior 

    consent "rom (:P7;( e"ore start o" the crossin% wor$.

    11.' REINSTATE!ENT

    PT. PAT# P+T !++ shall e responsile "or reinstatement wor$ within or 

    ad,acent to the wor$ areas used y the PT. PAT# P+T !++.

    The reinstatement reuirements' includin% uality o" material and wor$manship shall

     e su,ect to acceptance o" Toll road operator' the (:P7;(' andowner' authorities

    and other property owners.

    Particularly "or ri%id pa&ement reinstatement' PT. PAT# P+T !++ shall

    PT. Pratiwi Putri Sulung Scope of WorkPage 48 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    49/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    replace entire se%ment o" ri%id pa&ement within or ad,acent to the pipeline construction

    area used y the PT. PAT# P+T !++. The reinstatement reuirements "or 

    such replacement includin% uality o" materials' wor$manship and warranty shall e

    su,ect to the acceptance o" the local %o&ernment authoriy or property owner.

    PT. PAT# P+T !++ !@A pro&ide "ield*en%ineerin% ser&ices' includin%

    manu"acturerOs representati&es to ensure con"ormance with contract documents.

    All o" the ao&e reuirements are as detailed in onstruction !peci"ication "or 

    i&il !tructural -Eoc. o. P11A*PT+*32=4*D*!*001/.

    PT. PAT# P+T !++ shall carry out reinstatement o" all dama%ed within

    crossin% wor$ area.

    PT. PAT# P+T !++ shall %ardenin% and plantin% the area with the proper 

     plants or crops. PT. PAT# P+T !++ !hall propose to (:P7;( "or the

    $ind o" plants or crops "or appro&al.

    11.( TANGSI OFFTAKE STATIONS

    PT. PAT# P+T !++ shall do the wor$s reuired to complete #7! "or 

    the up%radin% tan%si o""ta$e station . The wor$ shall e ut not limited to

    1/ Permanent :eterin% e%ulatin% !ystem

    • Faricate the 7""ta$e station and s$id structure

    • nstall all the mechanical and instruments euipments o" 7""ta$e

    station as per appro&ed PE

    • nstall  pipe support and steel structure "or access and maintenance

    • nstall the complete set o" 7""ta$e station to the rele&ant sites

    2/ Fire #ater !ystem

    • nstall Fire #ater !ystem

    • nstall #ater Pond and Eeep #ell Pump

    • nstall Fire @ydrant and accessories

    • (tc.

    3/ nstall +tility #ater !ystem

    • nstall Plumin% !ystem

    • nstall water tan$ 

    • (tc.

    4/ Fire as and Fire ()tin%usher !ystem

    • nstall conduit and calin% system

    PT. Pratiwi Putri Sulung Scope of WorkPage 49 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    50/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    • nstall the euipments -detectors' panels' manual push uttons' stroes'

    horns/ as per appro&ed drawin%s includin% necessary support

    • nstall manual portale e)tin%uishers.

    • onnect to ocal !AEA system.

    •(tc.

    5/ nstrument Air !ystem

    • nstall air compressor pa$a%e complate with air inta$e "ilter' air cooled

    a""ter cooler' a liuid separator' and accessories

    • nstall air instrument &essel

    • nstallation o" euipment' pipin% and au)illaries includin% pro&ide air 

    instrument header "or e)istin% T!*1

    • nstallation ocal ontrol Panel

    • onnect and inte%rate to local !AEA !ystem

    • (tc

    6/ TD !ystems• nstall new TD !ystem "or 7""ta$e !tation as per appro&ed drawin%s.

    • nte%rate e)istin% TD cameras with new TD !ystem

    • (tc.

    =/ ocal !AEA and Telephony !ystem

    • nstall conduit' calin% system' euipment support and other necessary

    euipments.

    • nstall the euipments as per appro&ed drawin%s.

    • (tc.

    8/ Power Eistriution !ystem

    • onnection to e)istin% electricity power' i" reuired per"orms new

    connection to P.

    •  ew PE

  • 8/18/2019 Mgmt - Scope of Work_cp11

    51/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    conductors' accessories and connect to e)istin% li%htnin% pole.

    • nstall li%htin% system "or new "acillities completed with conduits' trays'

    trenchin%' "lood li%ht' indoor and outdoor li%htin%' classi"ied area

    li%htin%' emer%ency li%htin%' panels' li%htin% poles' li%htin% switches'

    euipment support and accessories.

    • onnect and inter"ace with e)istin% electrical systems.

    • (tc.

    10/ Eiesel (n%ine enerator !ystem

    • nstall the new Eiesel (n%ine enerator sets as per appro&ed documents.

    • nstall calin% to PE< system.

    • nstall control cale "rom %enerator local control panel to marshallin%

    rac$.

    • nstall control cale "rom remote attery char%er to %enerator au)iliary

    terminal.

    • onnect to ocal !AEA systems

    • (tc.

    11/ +P! !ystem

    • nstall the new +P! +nit included with the attery and distriution unit in

    accordance with the appro&ed construction drawin% includin% the

    necessary support and rac$ system.

    • nstall power calin% to PE< unit' i" reuired

    • nstall control cale to the marshallin% ainet

    • onnect to ocal !AEA system.

    12/ nstrumentation !ystem

    • nstall and connect instrument cale "rom "ield instruments to ,unction

     o)es andor "rom ,unction o)es to marshallin% rac$ and "rom

    marshallin% rac$ to "low computers cainets ocal !AEA.

    • nstall "ield instruments' ,unction o)es and supports.

    • nstall hoo$ up tuin% and "ittin%s "or related "ield instruments.

    • nstall A cale to accommodate communication "rom "low computers

    to station computers

    • nstall trenchin%' tray or conduit "or calin% system

    • nstall cale ta%%in%• nterconnection etween "low computers with local !AEA @: display.

    • nstall "low computers !AEA cainet' marshallin% cainet.

    • nstall "low computers !AE' station computers @: display

    includin% the reuired so"tware to operate the system

    • nstall printers

    • Pro%rammin% "or the !AEA system.

    • nstall power cale' data cale' %roundin% instrument cale.

    PT. Pratiwi Putri Sulung Scope of WorkPage 51 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    52/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    • (tc.

    13/ i&il #or$s

    • PT. PAT# P+T !++ !@A construct all ci&il wor$s at

    station. The ci&il wor$s comprises o" ut not limited to demolishin% o" 

    e)istin% o""ice o" Tan%si station' :odi"ication o" e)istin% ontrol

  • 8/18/2019 Mgmt - Scope of Work_cp11

    53/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    15/

  • 8/18/2019 Mgmt - Scope of Work_cp11

    54/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    • nspection and Test Plan -TP/ to (:P7;( "or re&iew and

    appro&al.PT. PAT# P+T !++ shall re"er to LAL !peci"ication

    "or the detailed reuirements.

    • nspection and Test Plan -TP/ to (:P7;( in "ull compliance to

    :A! reuirement

    (:P7;( reser&es the ri%ht to carry out o" inspections at any time durin% the

     procurementconstruction o" PT. PAT# P+T !++ wor$.

    PT. PAT# P+T !++ shall pro&ide (:P7;( with a complete set o" 

    detailed drawin%s and procedures' which will e used y (:P7;( as %uidance

    durin% manu"acturin%' "arication and testin% o" euipment. PT. PAT# P+T

    !++ shall re"er to LAL !peci"ication "or the detailed reuirements.

    PT. Pratiwi Putri Sulung Scope of WorkPage 54 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    55/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    PT. PAT# P+T !++ !@A carry out the inspection' testin% and

     pre commissionin% o" the pipeline "acilities as "ollows

    • Preparation o" inspection' testin% and pre*commissionin% procedures o" all

     pipeline distriution "acilities and sumit to (:P7;( "or re&iew and

    appro&al.

    • Per"orm ET y usin% I* ray "or each weld ,oint'

    • Per"orm ET 100M "or %olden ,oint -I*ray' +ltrasonic Test' and :TPT/

    • Per"orm holiday test'

    • PT. PAT# P+T !++ !@A minimiGe the numer o" %olden ,oint.

    • Per"orm hydrostatic tests o" completed sections o" the pipeline

    distriution includin% the supply o" test waterN locate and repair lea$sN

    dewaterin%' swain%' dryin% and pur%in%. The wor$ !@A e in accordance

    with the !peci"ication @ydrostatic Testin% C 7nshore Pipeline' !pool and :!

    -P11A*PT+*32=5*:*!*001/.

    • au%in% pi% inspection shall e done "or each pipeline section to detect any

    de"ect in the pipeline sections.

    • aliper pi% inspection shall only e per"ormed "or 20 inch "or the "ollowin%

     pipeline !ection*2

    • Per"orm commissionin% o" cathodic protection system. And P!

    • aliration o" instruments to e used in the system"acilities pre*

    commissionin% and testin%.• !tand*y super&isors and laors to cope with dama%es and une)pected troules.

    • eportin% "or testin% and pre*commissionin% to (:P7;( "or otainin%

    appro&al and acceptance.

    • !upportin% (:P7;( to prepare report "or any and all ser&ices

    necessary "or otainin% :A! appro&al and certi"icate.

    12.2. OFFTAKE STATION

    PT. PAT# P+T !++ shall e responsile "or the complete all system up to

    "ull and "inal acceptance o" the installed and tested system. The testin% !@A

    include ut not e limited to hydrostatic test' ET-y usin% I*ray/' loop test' continuity

    test' "unction test' FAT' and !AT.

    PT. PAT# P+T !++ shall sumit nspection and Test Plan -TP/ to

    (:P7;( "or re&iew and appro&al.

    PT. Pratiwi Putri Sulung Scope of WorkPage 55 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    56/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    (:P7;( reser&es the ri%ht to carry out o" inspections at any time durin% the

     procuremen construction o" PT. PAT# P+T !++ Os wor$.

    #hen ready' and unless a pro&ision to the contrary is e)plicitly stated herein' e&ery

    system shall underta$e a stand*alone Factory Acceptance Test in order to demonstrate

    its aility to "ul"ill its "unctionalities as per speci"ications.

    PT. PAT# P+T !++ shall pro&ide all caliration' test and simulation

    euipments that are reuired to demonstrate the correct operation o" the system.

    erti"icates o" the test euipment shall e traceale to ational and nternational

    !tandards and shall e pro&ided and included as part o" the o""icial test eport.

    PT. PAT# P+T !++ shall otain "rom the :anu"acturer records o" all tests

     per"ormed as part o" the :anu"acturers standard "actory testin% and uality control

     procedures. PT. PAT# P+T !++ shall pro&ide Product erti"ication o" 

    de&ice and euipment' supplied y :anu"acturers.

    PT. PAT# P+T !++ shall sumit copies o" the :anu"acturers test records

    and Product erti"ication durin% FAT. They shall e part o" the Factory Acceptance Test

    eport.

    PT. PAT# P+T !++ shall pro&ide (:P7;( with a complete set o" 

    detailed drawin%s and procedures' which will e used y (:P7;( as %uidance

    durin% manu"acturin%' "arication and testin% o" euipment.

    PT. PAT# P+T !++ shall demonstrate durin% FAT the standard and

    speci"ic' hardware and so"tware "unctionalities and per"ormance as de"ined in the

    appro&ed detailed "unctional desi%n o" the indi&idual system.

    PT. PAT# P+T !++ shall sumit to (:P7;( a complete test schedule

    and FAT Procedures "or the Factory Acceptance Test -FAT/' at least thirty -30/ days

     prior to the test ein% per"ormed' "or (:P7;( re&iew and appro&al.

    The ori%inal si%ned copy o" the Factory Acceptance Test eport shall e sumitted

    o""icially to (:P7;( no later than se&en -=/ days a"ter completion o" the test'

    with two complete copies o" the eport with attachments.

    PT. Pratiwi Putri Sulung Scope of WorkPage 56 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    57/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    "' "or any reason' the (:P7;( wai&es any part o" the inspection' the wai&er does

    not relie&e PT. PAT# P+T !++ "rom the responsiility to repairs at his

    own e)pense to any de"ects "ound later on site within the site commissionin% andor 

    warranty period.

    FAT shall e per"ormed per system and held in PT. PAT# P+T !++

    !+

  • 8/18/2019 Mgmt - Scope of Work_cp11

    58/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    • Per"orm test "or ocal !AEA connection

    • !upportin% (:P7;( to report to related parties "or testin%.

    • Per"orm load test "or antry rane

    • 7ther test speci"ied re"er to onstruction !peci"ication

    The "ollowin% tests are reuired to e witnessed y (:P7;( 

    N& !*%'ri)ti&n

    1 inepipe FAT

    2 F !ystem FAT

    10 nstrument Air Pac$a%e FAT

    11 (lectrical Eistriution Panel FAT

    12 !AT 1' 2' 3' 4

    PT. PAT# P+T !++ shall responsile on :A! and ET:(T attendance

    to witnessin% the meterin% system FAT' !AT and commissionin%.

    1". CALIBRATION

    1".1 I56,+?*663

    All "ield instrumentation !@A e calirated y Eirectorate o" :etrolo%y or any

     party appointed y Eirectorate o" :etrolo%y. PT. PAT# P+T !++ !@A

     pro&ide the caliration procedures and !@A e sumitted to (:P7;( "or 

    re&iew and appro&al.

    PT. Pratiwi Putri Sulung Scope of WorkPage 58 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    59/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    1".2 !*6*,37 > R*7+637 S56*?

    PT. PAT# P+T !++ shall calirate the :eterin% and e%ulatin% !ystem.

    The system !@A include ut not limited to ori"ice meters' transmitters' %au%es' "low

    computers' "low recorders.

    aliration !@A e conducted with the presence o" and shall e certi"ied and

    &alidated y Eirectorate o" :etrolo%y and with :A!.

    PT. PAT# P+T !++ shall pro&ide the caliration procedures and shall e

    sumitted to (:P7;( "or re&iew and appro&al.

    14. HEALTH@ SAFET# AND ENVIRON!ENT ;HSE<

    (:P7;( is "ully committed to maintainin% hi%h le&els o" sa"ety' occupational

    health and en&ironmental protection throu%hout the #7!. PT. PAT# P+T

    !++ shall comply strictly with these reuirements PT. PAT# P+T

    !++ shall ensure that all pro&isions o" his site sa"ety procedures are ein%

     properly met or e)ceeded with no unacceptale harm to the en&ironment.

    PT. PAT# P+T !++ shall pro&ide and "unish the employees with the

     proper and necessary Personel Protecti&e (uipment -PP(/. The PP( standard

    reuirement should e in accordance with A!! and or an eual' and should e

    appro&ed y (:P7;(P: representati&e prior to commencement.

     e&ertheless' PT. PAT# P+T !++ shall also consider @!( aspects within

    his desi%n consideration o" the permanent plant and "acilities o" the P 11A +p%radin%

    Tan%si 7""ta$e !tation Pro,ect.

    PT. PAT# P+T !++ shall adhere strictly to the reuirements o" the

    (:P7;( in respect o" health and sa"ety matters as are particularly e)pressed in the

    (:P7;(Os 9POs uideline on !a"ety' 7ccupational @ealth and (n&ironmental

    :ana%ement !ystem - Pedoman !istem eselamatan dan esehatan er,a !erta

    Pen%elolaan in%$un%an/ o. P*0010.189.

    Eurin% P7B(T implementation PT. PAT# P+T !++ !@A

    PT. Pratiwi Putri Sulung Scope of WorkPage 59 of 80

     

  • 8/18/2019 Mgmt - Scope of Work_cp11

    60/80

    UPGRADING TANGSI OFFTAKE STATION PROJECT (CP-11A)

    also re"er to (:P7;(Os 7peratin% Procedures as "ollow

    a. !7P (:P7;( o. 0*0030.38 * lin #er!a -Permit To #or$/N

     . !7P (:P7;( o. 0*0040.38 C  Pengelolaan dan Pemantauan

     Lingkungan $ (n&ironmental :ana%ement and :onitorin%/Nc. !7P (:P7;( o. 0*0050.38 C  Pengelolaan B% dan Limbah B%

    -@aGardous and poisonous #aste :ana%ement/N

    d. !7P (:P7;( o. 0*0060.38 C Pre !tart*+p and !a"ety e&iewN

    e. !7P (:P7;( o. 0*00=0.38 C  &nalisa Baha'a Proses -Process

    @aGard Analysis/N

    ". !7P (:P7;( o. 0*0080.38 C  &nalisa #eselamatan #er!a -Bo

    !a"ety Analysis/N

    %. !7P (:P7;( o. 0*0100.38 C oc$ 7ut Ta% 7utN

    h. !7P (:P7;( o. 0*0120.38 C is$ ontainment Audit -A/N

    i. !7P (:P7;( o. 0*0020.38 C Tanggap (awat Darurat 

    -(mer%ency esponse Plan/N

     ,. !7P (:P7;( o. 0*0140.38 C nvestigasi nsiden dan Pelaporan

    -ncident n&esti%ation and eportin%/N

    $. !7P (:P7;( o. 0*01>0.18 C Pelaksanaan Peker!aan)

    l. !7P (:P7;( o. 0*0200.38 C *valuasi #iner!a #+,T-T+-)

    m. !7P (:P7;( o. 0*0210.38 C  Laporan n!uk #er!a -!@(

    Per"ormance eport/N

    n. #or$ nstruction (:P7;( o. *0020.38 C !in #er!a Panas)

    o. #or$ nstruction (:P7;( o. *0030.38 C !in #er!a Dingin)

     p. #or$ nstruction (:P7;( o. *0040.38 C  !in #er!a /emasuki

     -uang Terbatas)

    . #or$ nstruction (:P7;( o. *0050.38 C !in #er!a -adiografi)

    r. #or$ nstruction (:P7;( o. *0060.38 C !in #er!a Listrik)

    s. #or$ nstruction (:P7;( o. *00=0.38 C  !in #er!a

     Penggalian)

    t. #or$ nstruction (:P7;( o. *0100.38 C  #omunikasi0

     #onsultasi dan Partisipasi #eselamatan0 #esehatan #er!a dan

     Pengelolaan Lingkungan serta *nergi)

    u. #or$ nstruction (:P7;( o. *0110.38 C  dentifikasi Baha'a0

     Penilaian -esiko dan Bentuk Pengendaliann'a)&. #or$ nstruction (:P7;( o. *0120.38 C  Penanganan

    Tumpahan /aterial B%.

    w.