OUTCOME BUDGET 2013-2014 Government of India Ministry of External Affairs New Delhi

Upload: vutram

Post on 02-Jan-2017

228 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MEA Outcome Budget 2013-14

OUTCOME BUDGET2013-2014

Government of IndiaMinistry of External Affairs

New Delhi

Page 2: MEA Outcome Budget 2013-14

OUTCOME BUDGET2013-14

Government of IndiaMinistry of External Affairs

New Delhi

Page 3: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

2

Page 4: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

3

Contents

Executive Summary 5

Chapter I - Introduction 7

Chapter II - Outlays and Outcomes 14

Chapter III - Reforms and Policy Initiatives 83

Chapter IV - Review of Past Performance 86

Chapter V - Financial Review 207

Chapter VI - Autonomous Bodies 211

Page 5: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

4

Page 6: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

5

EXECUTIVE SUMMARY

Ministry of External Affairs is mandated to frame and conduct theforeign policy of India with the aim to secure the country’sfundamental security and strategic objectives under the dynamiccircumstances and challenges of global politics and internationalrelations. India’s bilateral and multilateral relations with foreigncountries are guided by the vision of furthering India’s intereststhrough a framework of international peace and cooperation. Themultifarious spheres of these relations include political, economic,trade, cultural and consular matters. In conduct of the country’sforeign policy, the MEA Headquarters is assisted by its variousMissions/Posts abroad, Branch Secretariats and Passport Officesin India and the Autonomous Bodies funded by it.

India has traditionally been at the forefront of developing countriesproviding aid and assistance through technical and economiccooperation to other developing countries. Over the years, theIndian economy itself has become one of the major drivers of globalgrowth and India is increasingly recognised as one of the majorcountries in the world involved in providing technical and economicassistance to other countries. With the increasing recognition andstrength of India in this important sphere of aid and assistance atglobal level, the Ministry’s activities in undertaking developmental

projects in other countries and training programmes for buildinghuman resources capacity of recipient countries has beenincreasing. The global reach of India’s technical and economiccooperation has also extended geographically and touches uponits immediate and extended neighbourhood and the countries inSouth East Asia, Central Asia, Africa, the Pacific Islands and LatinAmerica.

The quantum of MEA’s budget devoted to its technical andeconomic cooperation programme has also been increasing overthe years. The proposed Plan Budget of the Ministry constitutesaround 25.5% of the total proposed budget of `11,719 crore forthe financial year 2013-14. The proposed budget for the technicaland economic cooperation programmes on the Non Plan sideconstitutes 46.9% of Ministry’s budget. The Outcome Budget ofthe Ministry spells out the outlays made on the country’s technicalcooperation programmes with various countries. It also focuseson the Ministry’s efforts towards purchase and construction ofproperties abroad in order to reduce the rental liabilities, and stepstowards improvement in providing passport, visa and consularservices. The Outcome Budget, however, does not cover routineexpenditure on establishment matters, such as, Salaries, Office

Page 7: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

6

Expenses, regular and mandatory contributions made to regionaland international organizations of which India is a member,etc.

The Outcome Budget document shows the outlays that havebeen earmarked for specific projects and the outcomes desiredagainst them. It is a useful tool to measure the performance ofthe Ministry in terms of the goals and objectives it has laid outfor itself in implementing the foreign policy of India. It also helpsin evaluating the correlation between the sums budgeted andthe results expected.

Chapter I: Introduction

This Chapter highlights the functions of the Ministry, its goals,objectives and policy framework. It mentions about theorganizational structure of the Ministry and the salient featuresof the budget proposed for the Financial Year 2013-14.

Chapter II: Outlays and Outcome

This Chapter elaborates the outlays and outcomes that theMinistry has proposed to make on the technical cooperationprogrammes with various countries during the Financial Year2013-14. It also mentions the steps that the Ministry plans totake towards property management both in India and abroad.The efforts of the Ministry towards public diplomacy, externalpublicity and improvement of consular, passport and visa relatedwork have been enunciated in this chapter.

Chapter III: Reforms and Policy Initiatives

This Chapter brings out the approach of the Ministry towardsfurther streamlining the modalities, terms and conditions of the

developmental aid provided by India to the partner countriesunder technical cooperation.

Chapter IV: Review of Past Performance in 2011-12 and2012-13

The performance of the Ministry in terms of the Outlays made in2011-12 and up to 31st December, 2012 has been brought outin this Chapter. It needs to be factored in that the technicalcooperation programmes of the Ministry are executed in othercountries. Measuring the output in quantifiable terms might bedifficult at times because these outlays are made with theobjective of creating goodwill for India in the recipient countryand towards consolidating India’s ties with these countries.Review of the factors leading to cost escalation and delay incompletion of projects in the Outcome Budget has helped inbetter monitoring of the progress of projects.

Chapter V: Financial Review

This Chapter focuses on the financial position of the Ministry,particularly, with reference to the revenues generated by it. Thevarious steps taken in the Ministry towards improving the internalfinancial procedures have also been elaborated.

Chapter VI: Autonomous Bodies

The outcome budget pertaining to the activities of the IndianCouncil for Cultural Relations (ICCR), Indian Council for WorldAffairs (ICWA) and the Research and Information System forDeveloping Countries (RIS) have been outlined in thisChapter.

Page 8: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

7

CHAPTER I - INTRODUCTION

Functions

The functions of the Ministry of External Affairs have been laiddown in the Government of India Allocation of Business Rules,1961, as amended from time to time. The Ministry is entrustedwith the task of formulating, implementing and managing theforeign policy of India. The dynamics of the foreign policy isdetermined primarily by fundamental security and strategicinterests of the country and its developmental priorities. Underthese parameters, the Ministry has been building andconsolidating India’s political, economic, trade, commercial,cultural and consular relations with other countries. Theseobjectives are shaped into action through bilateral, regional andinternational consultations both at Headquarters and abroad.The Ministry has 179 Missions/Posts abroad which constantlyengage with the host governments as well as regional andmultilateral bodies to pursue the objectives of India’s foreignpolicy. The Ministry has also set up specialized offices acrossthe world, and regional passport and branch offices in India. TheMinistry is also responsible for the work of the Indian Council ofCultural Relations and the Indian Council of World Affairs.

Goals, Objectives and Policy Framework

India’s foreign policy goal is to ensure a peaceful and secureneighbourhood, cordial and balanced relations in all fields with

major powers and mutually beneficial partnerships withdeveloping countries. The multilateral dimension of India’sforeign policy has a global recognition and has acquired addedsignificance with hosting of the BRICS Summit, the ASEAN-India commemorative Summit and the IOR-ARC Ministerialmeeting in 2012. Significant challenges of global dimensionsexist in front of the country today, which require global efforts tocombat them. Issues such as threat to peace and securityincluding international terrorism, disarmament, environment,human rights, natural disasters, trade, technological self-reliance,reform of the international financial architecture and internationalorganisations, food and energy security etc. are some of theissues which require multilateral cooperation to tackle them.

The Ministry has the prime responsibility of executing the foreignpolicy of India by constantly monitoring the prevailing andemerging situation in the world. It has to dynamically adapt itselfto changes in the international environment while carrying outthis task. The Ministry has to ensure that the foreign policy of thecountry is attuned to its core national values.

The factors that shape the foreign policy of India are related toits national priorities as well as the evolving regional and globalsituations. The most important national priority is to secure anenabling environment to facilitate India’s growth anddevelopment as a major advanced economy capable of meeting

Page 9: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

8

the developmental aspirations of its billion-strong population.The country is striving to build a global order in which India’sinterests are secured, its strategic autonomy safeguarded andis conducive for achieving the overriding goal of rapid, sustainedand inclusive socio-economic development of the country. Toachieve these goals, it is imperative that there is peace andstability in the country’s immediate and extended neighbourhoodand an enabling environment that provides a sustained andpredictable basis for India’s engagement with the internationalcommunity for trade, acess to natural resources, capital, andenergy flows and technology.

The Ministry undertakes a proactive but balanced engagementat multiple levels – bilateral, regional as well as global with allthe major powers. At the domestic level, the Ministry holdsconsultations with the other arms of the government, particularlythe security and defence apparatus, the economic ministries,and also those dealing with human development and overseasIndians.

One of the essential and key elements of India’s foreign policyhas been technical and economic cooperation with othercountries. India has never been a donor in the traditional senseon the international economic stage. However, India has alwaysshared its technical expertise in building human resourcescapacity in other developing countries, training foreign personnelin India for educational and skill enhancements, undertakingdevelopment projects in partnership with recipient countries andin full consultation with them and extending aid in times of naturaldisasters. Such assistance has been extended through bilateralas well as regional and multilateral mechanisms. This role ofIndia has been much appreciated by the recipient countries aswell as regional and international organizations.

Development cooperation with other countries is conductedunder the Technical and Economic Cooperation programmeencompassing virtually the entire developing community ofnations. Nearly 47% of Ministry’s budget is devoted to Technicaland Economic Cooperation with other countries. With eachpassing year, the quantum of projects dealt under this programmeand their geographical spread has been growing. The immediateneighbourhood is accorded priority in any country’s foreignpolicy. India’s assistance to the neighbouring countries has beenthe most significant. In its extended neighbourhood, India hasembarked upon supporting infrastructure and developmentprojects in Africa as prioritized by the African countriesthemselves.

The Ministry has been rendering passport, consular and otherservices to Indian nationals residing inside India and outsidethrough its various passport offices located in India and Missions/Posts abroad. The Ministry renders visa services to nationals ofother countries visiting India. The Ministry has also launchedthe Passport Seva Project to bring about a quantum improvementin the quality of passport services rendered to Indian nationals.

The Foreign Service Institute (FSI) has been established by theMinistry primarily to cater to the professional training needs ofits officers. FSI conducts the basic professional training for allthe new entrants to the Indian Foreign Service as well as holdsmid-career training programmes and refresher courses forserving officers and other officials of the Ministry. The FSI alsoconducts Professional Courses for Foreign Diplomats (PCFD)which enjoys great popularity and in which large number ofdiplomats from foreign countries participate regularly. SpecialPCFD was organized for diplomats from ASEAN countries asthe year 2012 marked the 20th anniversary of the ASEAN-India

Page 10: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

9

dialogue partnership and the 10th anniversary of ASEAN-IndiaSummit-level partnership. The Institute has successfullyestablished institutional linkages with counterpart institutions inother countries.

The Indian Council of Cultural Relations (ICCR) is an importantarm of the Ministry for fostering India’s external cultural relations,developing mutual understanding between India and othercountries and promoting cultural exchanges with other peoples.The Indian Council of World Affairs (ICWA) has evolved as thethink-tank of the Ministry devoted exclusively to the study ofinternational relations and foreign affairs. The Research andInformation System for Developing Countries (RIS) is also athink-tank mandated to function as an advisory body of theMinistry.

The Ministry undertakes the task of purchase of properties inIndia and abroad for the government. These properties are alsomanaged by the Ministry and have helped in bringing down therental liability. Construction projects of chanceries andresidences for officials posted abroad have also been taken upin many stations abroad.

Organizational set-up

The Ministry of External Affairs is headed by the External AffairsMinister. He is assisted in the discharge of his functions by twoMinisters of State for External Affairs. The Foreign Secretaryoversees the functioning of the Ministry at the official level.

Countries of the world have been divided in several regionalgroups which are assigned to various Territorial Divisions in theMinistry. These Territorial Divisions are responsible for the affairspertaining to management of the bilateral and political relationsof India with all countries. There are also several function-specificDivisions in the Ministry. Functional Divisions look afterAdministration, Policy Planning, Development Partnership,Technical and Economic Cooperation, Investment, Trade andTechnology Promotion, Energy Security, Multilateral EconomicRelations, International Organizations, Regional Groupings,Press and Media Affairs, Public Diplomacy, Legal Issues,Protocol, Passport, Consular and Visa matters under theMinistry’s jurisdiction. In addition, the Ministry oversees the workof the Foreign Service Institute, the Central PassportOrganisation, as well as grants-in-aid institutions such as theICCR, ICWA and RIS.

The Embassies, High Commissions, Consulates and PermanentMissions to the United Nations and other multilateralorganizations represent India abroad and work towards furtheringthe country’s foreign policy goals.

Budget - Sectoral Allocation

The BE 2013-14 of the Ministry is ̀ . 11,719 Crore. It is ̀ 2057.03Crore more than BE 2012-13 of ` 9661.97crore. It is ` 1657.00Crore more than the RE 2012-13 of ̀ 10062.00 Crore. The sectoralallocation of funds in the Ministry’s BE 2013-14 (proposed)compared to that of RE 2012-13 is detailed below:

Page 11: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

10

Sectoral Allocation of MEA’s Budget

Allocation (in ` Crores)

Sectors RE 2012-13 BE 2013-14(Proposed)

MEA Secretariat 241.93 270.67

Embassies & Missions 1589.83 1683.23

Passport & Emigration 560.93 453.48

Special Diplomatic Expenditure 1185.00 1320.00

Contributions to International 271.61 376.23Organisations

Grant to Institutions 199.44 209.12

Technical & Economic Cooperation 3633.93 5498.50

Capital Outlay 300.00 300.00

Loans to Foreign Governments 1838.00 1468.50

Others 241.33 139.27

Total Budget 10062.00 11719.00

Non Plan Allocation 8442.00 8719.00

Plan Allocation 1620.00 3000.00

Total Budget 10062.00 11719.00

Revenue Section 7924.00 9950.50

Capital Section 2138.00 1768.50

Total Budget 10062.00 11719.00

Page 12: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

11

Page 13: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

12

The budget of the Ministry for financial Year 2013-14 comprisesof the following broad groups:

i. Approximately 20.54% pertains to establishment costs i.e.expenditure on MEA Secretariat and Missions/Posts abroadas well as the expenditure on the overall establishment of theCentral Passport Organisation;

ii. Nearly 16.26% pertains to obligatory expenditure; such asexpenditure on SDE, mandatory contributions to internationalorganizations of which India is a member, Grants-in-aid toinstitutions;

iii. Nearly 46.92% pertains to technical and economiccooperation with other countries;

iv. Approximately 2.56% on the Capital Outlay of the Ministry;

v. Loans to foreign Governments comprise 12.58%; and

vi. Other expenditure approximately 1.19%

A large chunk of the budget of the Ministry is invested into technicalassistance programmes in neighbouring countries and otherdeveloping countries. The principal beneficiaries of theseprogrammes in 2012-13 (RE) and 2013-14 (proposed BE) aregiven below:

(` In Crore)

Aid and Loan to Countries RE 2012-13 BE 2013-14(proposed)

Bhutan 3409.06 3614.00

Afghanistan 491.16 648.24

Nepal 270.00 380.00

African Countries 237.50 300.00

Mongolia 1.00 2.50

Sri Lanka 290.00 500.00

Myanmar 125.00 450.00

Eurasian Countries 30.00 40.00

Bangladesh 280.00 580.00

Maldives 30.00 30.00

Latin American Countries 27.61 30.00

Others 280.60 392.26

Total 5471.93 6967.00

Page 14: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

13

Page 15: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

14

CHAPTER - II - OUTLAYS AND OUTCOMES

growth at home has given the requisite encouragement topromote greater economic cooperation with other countries. Ithas also enabled Indian enterprises to move into the markets ofother countries and introduce their products and technologiesin these markets. A higher budgetary allocation for technical andeconomic cooperation has been made in the Financial Year2013-14.

The Ministry’s outlay on technical cooperation is made forprojects to be undertaken in other countries. Smooth executionof such projects is always dependent upon the internal political,security and economic developments in the beneficiary State.The conception and implementation of these projects is a longdrawn out process. It begins with consultations with thebeneficiary state to identify the project, the terms of the technicalassistance, its financing and thereafter concluding a bilateralMOU/Agreement for its execution. The Ministry initiates steps toobtain the requisite approvals of the Competent Authority in Indiafollowing prescribed financial rules. Work is awarded to thequalified bidder for executing the project. The Ministry also triesto build the capacity of the beneficiary nation so that they couldmaintain and sustain the projects set-up with India’s technicalassistance after the completion of the project.

The growth rate of the Indian economy slowed to 6.2 per centand 5.0 per cent in FY 2011-12 and FY 2012-13 respectively.Nevertheless, despite this slowdown, the compound annualgrowth rate (CAGR) for gross domestic product (GDP) at factorcost, over the decade ending 2012-13 is 7.9 per cent.

India is one of the major economies of the world and is expectedto play a more important role in the management of global polityand economy. India will play its due and commensurate role ininternational bodies. The Ministry would play its appropriate rolein the current situation by responding to the challenges andopportunities available. India hosted ASEAN-IndiaCommemorative Summit in New Delhi in December 2012 tocommemorate twenty years of ASEAN-India relations. At theSummit, the leaders unanimously endorsed elevating ASEAN-India partnership to Strategic level. India also hosted the BRICSSummit for the first time in New Delhi in March 2012 with extensivediscussion among top five emerging economies to boost mutualcooperation and take steps to jointly respond to commonchallenges.

The Ministry would continue to focus on promoting technicalcooperation with other developing countries. The economic

Page 16: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

15

Plan Outlays

A small component of the Ministry’s outlay is from Plan funds.These are some identified projects in Bhutan, Afghanistan,Myanmar and in India. These projects are appraised by theExpenditure Finance Committee and approval of the CompetentAuthority is obtained thereafter. These mega projects have along implementation schedule and monitoring mechanisms.

Bhutan: India has invested heavily in the construction of hydro-electric power plants in Bhutan which have created newinfrastructure in Bhutan in the power sector and has provided asource of power to India through purchase. It has enhancedBhutan’s capacity to raise revenue and thus reduce itsdependence on the financial assistance from India. Constructionof Punatsangchu- I Hydroelectric Project (1200 MW),Punatsangchu II Hydroelectric Project (990 MW) andMangdechu Hydroelectric Projects (720 MW) is in full swing.Proposal for building five new hydroelectric projects in Bhutanhas been made in the Annual Plan of 2013-14. The constructionof the Dungsum Cement Plan in Bhutan is on the verge ofcompletion.

Afghanistan: The construction of the 220 KV Transmission Line(202 Km) from Pul-e-Khumri to Kabul and a 220/110 KVsubstation at Kabul in Afghanistan had been completed beforetime in February 2009 and the project was commissioned in May2009. At the request of Government of Afghanistan, India hasundertaken to build 2 additional 220/110 KV sub stations at Doshiand Charikar as a part of this project. The total project cost hasbeen estimated at `187 crore. At both the sites leveling work iscomplete and construction of boundary hall has started. Supplyof equipment is likely to commence from April 2013. An amountof Rs. 100 crore has been allocated for the project in BE 2013-

14. The project is expected to be completed by December 2013as per the agreed schedule.

Myanmar: The construction of the Kaladan Multimodal Transitand Transport Project in Myanmar has commenced in 2010 withthe award of the work. The project involves development ofapproximately 268 km of multimodal route from between Indiaand Myanmar along the River Kaladan to provide an alternateroute for transport of goods to the North East States of India. Itenvisages connectivity between Kolkata to Sittwe Port inMyanmar, between Sittwe and Palletwa in Myanmar using inlandwaterways through the Kaladan River, and from Palettwa to theMizoram border by road. While the work on the port componentof the project is in full swing, the draft detailed project report forthe road component is under evaluation. Actual work of the roadcomponent is expected to commence in 2013-14. An allocationof ` 250 Crore has been made for the project in the BE 2013-14.

Nalanda: The establishment of the Nalanda International Universityin Bihar is also being funded from the Plan allocation of the Ministry.A total of 446 acres of land has been made available by the BiharGovernment in Nalanda district for the project. Construction ofcompound wall to secure the allocated land is underway. Thecontract for the construction of buildings is expected to be awardedin the second half of 2013. An Outlay of ` 125 Crore has beenmade for the Project in BE 2013-14.

Non-Plan outlay on Technical Cooperation

A major portion of the Non-Plan Outlay of the Ministry will bemade for the implementation of projects in the neighbouringcountries. India’s assistance to Bhutan for its development,progress and prosperity will be continued. India’s assistance to

Page 17: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

16

Afghanistan would be towards building the country’s vital civilinfrastructure, development of human resources and capacity inthe areas of education, health, agriculture and rural development.The Ministry would undertake the implementation of SmallDevelopment Projects in Nepal with greater involvement of thelocal communities. The outlay on India’s assistance to Sri Lankawill have a major portion of it devoted to the mega project ofbuilding 50,000 houses for Internally Displaced Persons (IDPs)in Sri Lanka as part of helping in the rehabilitation andreconstruction of Northern and Eastern parts of the country afterthe cessation of the conflict.

The engagement between India and Africa received a newimpetus during the First India-Africa Summit held in New Delhiin April 2008. The Second India-Africa Summit took placed inAddis Ababa in May 2011 resulting in India’s commitment tosubstantially enhance its aid and assistance to Africa. Theoutlays for 2013-14 will be for the implementation of thestructured programmes finalized during the Second Summitfocusing on capacity building and human resource development.Areas of cooperation include human resources, capacity building,agriculture, SME sector, science and technology, informationtechnology, etc. This also includes the Pan-Africa e-networkProjects (Tele-education and Tele-medicine components).Projects identified during the First India-Africa Summit whichare yet to be completed will continue to be implemented till theircompletion.

India’s annual assistance to the Pacific Island Forum countrieshas been increased to US$ 125,000 to each country for theireconomic development. It would be based on the prioritiesidentified by these countries. The outlays proposed would

include supplies of equipment and materials for social andeconomic programmes and for sustainable developmentinitiatives in these countries. In South East Asia, cultural linkswith India have been reinvigorated through implementation oftemple/ archaeological site restoration projects along with otherprojects promoting trade and economic cooperation.

Technical cooperation between India and the countries of LatinAmerica would be sustained in the coming years. Countries ofthis region are beneficiaries under the ITEC Programmefacilitating exchange of experts between India and the countriesin the region. India has been setting up IT Centres in thesecountries. In September 2012, India extended cash assistanceto the tune of US$ 5 million for construction of houses in Haiti inthe aftermath of devastating earthquake of 2010.

India has taken the initiative and come forward to respond to thehumanitarian challenges faced by many countries from naturaldisasters. India has taken the lead in providing cash assistanceand in dispatching urgently needed aid for disaster relief andextended rehabilitation support to the countries affected by naturaldisasters, as and when requested. Cash grant of US$ 0.5 millionwas provided to Republic of Congo to help people affected in amassive fire. Relief supply and medicines have been suppliedto war-affected Libya and Syria and cyclone affected areas ofPhilippines, Bangladesh and Fiji. India has also extended foodassistance to Yemen in the form of 2,500 metric tonnes of ricevalued at around $ 2 million and is in the process of supplyinganother tranche of wheat to the war-torn country.

A tabular depiction of the outcomes and outlays for 2013-14follows.

Page 18: MEA Outcome Budget 2013-14

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

Press and Advertising & Total arrangements to 5.86 Arrangements for the visit of Such familiarization visits ContinuousMedia Publicity/Press facilitate media related foreign journalists/ will ensure a better process

Relations activities on behalf of delegations to India. understanding throughProgramme the Ministry Proposed familiarisation first hand exposure to

trips of Journalists from India’s politics, foreignEast Europe, Arab countries, policy priorities, economy,China, Pakistan, Afghanistan, culture, science andSri Lanka, Nepal and Bhutan. technology.Visit of India Brazil SouthAfrica (IBSA) Editors forConference/Summit

Policy and To keep monitoring 0.24 Subscription to and payment Final payment to IANS for Continuousplanning the Publicity Budget for India Africa Connect maintenance of processprogramme/ of Missions/Posts website maintained by website.www.indiaafricacmonitoring and abroad and M/s IANS, monthly onnect.in in April.compilation of preparation of the subscription charges of the Preparations of Annualpublicity budget action plan of XP IANS News Service. Action Plan of XP Divisionfor Missions Division Preparation of Annual Action and compilation ofabroad Plan of XP Division and Mission’s Annual

compilation of Missions’ Action Plan.Annual Action Plans.

Office of the Dissemination of 1.40 Dissemination of Press ContinuousSpokesperson/ press information/ Releases, Media Advisories, processAdministrative media briefings on Speeches & Joint Statementsexpenses behalf of the Ministry to media; Arrangements of

regular press briefings andJoint Press Interactions in

* Column 4 (iii) relating to “Complementary Extra-Budgetary Resources” has been omitted as there is no such item in the Ministry’s Budget.

17

(` in Crore)

Outcome Budget 2013-14

Page 19: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

18

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Hyderabad House duringincoming visits of Heads ofStates and Government toIndia; Transcription of PressBriefings. Live streaming ofMEA Media briefing ondedicated MEA Youtube;maintenance and updationof MEA’s social mediachannel;Updation of MEA’sofficial website;Integration ofIndia’s Missions/Posts’website;development ofapplication software formobile devices ;Arrangementfor PTI News Scan Service ;Alerting Media regularlythrough SMS Alert Serviceabout various Media relatedevents; Arrangement fortranslation and hosting ofselect MEA related documentin Arabic and Urdu.

TOTAL 7.50

Page 20: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

19

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Public Public Audio- Effective projection of 7.68 Commissioning of ContinuousDiplomacy Visual material. India abroad through documentaries on various process

audio-visual publicity subjects; Supportingdocumentary film festivals;Translation of documentaryfilms into various foreignlanguages;Procurement ofrights for TV serials/ films foruse by missions/ posts;dispatch of 35 MM prints ;procurement of customisedaudio CD sets forMissions/Posts.

PMS Section Promotion of India’s 3.52 Printing/Purchase of various Projection of India’s Continuous(Public image in various coffee table books in English image through books processDiplomacy aspects including and foreign languages. and publicationsMaterial & through print media. Purchase of general booksSupply) and regional language books

as approved by the BookPurchase committee.Financial support for bookfestivals, undertakingtranslations of books intoforeign languages.

India Monthly publication of 7.68 To spread awareness about Increased awareness of Monthly Monthly issues ofPerspectives the magazine for India and its activities India and its activities Issue India PerspectivesMagazine publicity and through reaching out to the through the magazine in is available in 14

promotion of India’s widest cross-section of India and abroad. different languagesimage abroad. readers abroad through the including major

Page 21: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

20

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

magazine and by making it foreign languagesaccessible online throughvarious websites.

Public Projection of India/ 3.84 Division will be handling a Division has been able to All outreachDiplomacy Indian foreign Policy number of delegations from achieve the desired activities areOutreach (POR) through Distinguished abroad. Division will also be objectives of outreach time boundSection Lecture Series, rendering financial activities. There will be by nature

interaction with media assistance to think-tanks/ sizable increase in the and allthink-tanks, Institutions institutions/organizations. number of visits as deadlinesand Universities both It will be the endeavour to compared to previous would bewithin India and organize at least two lectures years. met.abroad. per month under lecture

series

Digital To reach out to the 0.64 To engage the younger To reach audiences in ContinuousDiplomacy younger generation in generation through digital India and abroad and process

india & abroad. new media such as face harness India soft powerbook, twitter, youtube as wellas interactive website

Other 0.64administrativeexpenses

Total 24.00

Page 22: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

21

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

CPV Central 1. To grant passport 453.48 1. The network of 37 1. Successfully ContinuousPassport service to more than passport offices has been completed the process.Organization 8 million people expanded considerably implementation of theand passport through Passport under the Passport Seva Passport Seva Project,visa and Offices and Missions Project. Under this one of the Mission Modeconsular related abroad. transformative e-Governance Project under theactivities in 2. Implementation of initiative 77 Passport Seva National e-GovernanceMission/Posts passport Seva Kendras have been Plan. As part of theabroad. Project(i) Data Centre established all over India. project, 77 Passport Seva

(ii) Disaster Recovery It is proposed to set up Kendras (PSKs) haveCentre(iii) Project Passport Seva Laghu been set up under PublicManagement Unit ; Kenedras in remote areas. Private Partnership mode3. Improvement in 2. IT networking of passport 2. National Institute ofinfrastructure of offices is a continuous Smart Governance (NISG)Passport Offices.; process. 3. In view of ever is technical consultant4. Upgradation of increasing demand for travel and providing continueshardware, scanning document large number of support; 3. M/s. Tataof Passport files; travel document are Consultancy Services5. Provision of anticipated to be procured (TCS) is the servicemachine readable from India Security Press, provider in Passportprinters Nasik. The project for Sewa Project; 4. E-

issuance of E-Passport is Passport Project is to beunder active consideration implemented to devise aand as a pilot project Passport which would beDiplomatic and Official tamper proof and couldpassport are now being not be forged;issued. 4. Holding of 5. Passport Adalats willPassport Adalats every facilitate in clearingmonth all over India; 5. In pending casesorder to obviate the problems

Page 23: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

22

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

of smudging of photographsand data and to improver thequality, functionality andsecurity of Indian Passportsthrough various measures

TOTAL 453.48

Page 24: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

23

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Aid to Grant (i)Payment of US$ 100 550.00 For development projects to To further improve TwoBangla- assistance to million to Government be idenitified by the recipient bilateral relations with a instalmentsdesh Bangladesh of Bangladesh as 2nd country friendly neighbouring in FY

& 3rd instalment of country 2013-14grant assistance outof committedassistance totallingUS$ 200 million.

Akhaura - To commence ground 15.00 Land acquisition To establish rail linkAgartala Rail work , between BangladeshLine . and Agartala in India

Inland River Detailed Project 10.00 DPR to be completed. To promote trade SubstantialPort at Ashuganj Report to be prepared. linkages between India enhancement at

and Bangladesh. RE stage will berequired toundertake variousother projects inthe pipeline.

Other projects 5.00

TOTAL 580.00

Page 25: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

24

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Aid to Punatsangchhu-I India will receive 735.00 Will generate peak-load The installed capacity 2016 The project wasBhutan Hydroelectric surplus power from energy of 1200 MW, of which was revised from initial approved by

Project this project. This surplus will be supplied to 1095 MW to 1200 MW. Cabinet at a cost ofwould be a clean and India. Construction of Headrace `.3514.81 crorereliable source of Tunnel (HRT) is ongoing. with 60% as loanpower which will help Powerhouse complex and 40% as grant.bridge the existing also stands completed.energy demand-supply gap in India.

Punatsang- India will receive 900.00 Will generate peak-load Civil works, already 2017 The project waschhu-II surplus power from energy of 990 MW, of which under way and is approved byHydroelectric this project. This surplus will be supplied to expected to progress as Cabinet at a cost ofProject would be a clean and India. per schedule. Diversion `. 3777.80 crores

reliable source of and Highway tunnels with 70% loan andpower which will help were completed. The 30% grant.bridge the existing project will include 2 yrsenergy demand- of infrastructuresupply gap in India. development with an

expected completion bythe end of 2017.

Mangdechhu India will receive 885.00 Will generate peak-load Main access tunnel has 2016 The project wasHydroelectric surplus power from energy of 720 MW, of which been completed. approved byProject this project. This surplus will be supplied to Construction of Access Cabinet at a cost of

would be a clean and India. Roads and Permanent `.2896.30 croresreliable source of structures for Dam has with 70% as loanpower which will help started. Contracts for and 30% as grant.bridge the existing further hydromechanicalenergy demand- and electromechanicalsupply gap in India. works are being awarded.

Page 26: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

25

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Underground powerhouse works areprogressing.

New 5.00 Augmentation of Bhutan’s Token Outlay of ` one Sankosh, Bunakha,Hydroelectric surplus power generation Crore each has been Chamkharchu,power projects capacity provided for five new Khologchu and

HEPs. Cabinet approval Wangchuwill be sought for these Hydro-Electricnew projects. Projects.

Development Development 140.00 Maintaining friendly It is an annual Annual Approved bySubsidy partnership with relations with Bhutan development assistance Cabinet as part of

Bhutan to assist its to Bhutan, released India’s assistanceeconomic quarterly. to Bhutan’s 10thdevelopment Five-Year Plan.

Chukha To subsidise 100.00 Ongoing The subsidy will besubsidy purchase of power by programme phased out

Power Trading gradually.Corporation Ltd. fromChukha hydroelectricproject in Bhutan forsupply to the States ofWest Bengal, Sikkim,Bihar and Orissa.

Supply of To prevent cross- 50.00 Maintaining friendly relations Ongoing The subsidy is thekerosene oil border smuggling of with Bhutan programme difference in theand LPG to SKO/LPG across an international parityBhutan at open border under a price at which

Page 27: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

26

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

subsidised free trade regime LPG/ SKO isprices imported and the

supply price toBhutan which isbased on the pricesof SKO/LPG in ourdomestic market.

Excise duty To promote Indian 150.00 Maintaining friendly relations Excise duty for the years on annual The amountrefund exports to Bhutan and with Bhutan 2009-10 and 2010-11 will basis depends on the

compensate Bhutan be refunded in 2013-14. actual tradefor the loss of revenue between India andunder the free trade Bhutan and isregime calculated on the

basis of exports toBhutan.

Project-Tied Development 600.00 Maintaining friendly relations ` 2000 Crore, Ongoing The PTA coversAssistance partnership with with Bhutan allocated for these programme projects in wide(PTA) Bhutan to assist its socio-economic ranging fields

economic developmental projects comprising roads,development as Indian assistance for agriculture,

Bhutan’s 10th Five Year education, ruralPlan from 2008-13, will development,be utilised in full. health etc.

Small Development 44.00 Maintaining friendly relations ` 700 Crore, allocated Ongoing The SDPs areDevelopment partnership with with Bhutan and building for these small-scale programme conceived at villageProjects (SDPs) Bhutan to assist its goodwill for India at the grassroot-level socio- level and as per the

economic grassroots level in Bhutan economic development perceived needs ofdevelopment projects as Indian local communities.

Page 28: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

27

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

assistance to Bhutan’s10th Five Year Plan(2008-13) will be utilisedin full.

Miscellaneous Various initiatives, 5.00 Maintaining friendly relations Ongoing Total Solutionsprojects visits, training with Bhutan programmes Project, Bhutan

assistance etc. Institute of Medicalunder ongoing Sciences etc.bilateral cooperation

Total 1089.00 2525.00

Page 29: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

28

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Aid to Integrated Create necessary 11.89 Construction of ICP Birgunj to Completion of (a) April Statutory clearancesNepal CheckPost infrastructure to complete; award of work for construction and 2013 from the

(ICP) facilitate trade and ICP Biratnagar and commissioning of ICP (b)Tendering Government ofcommerce between commencement of works at Birgunj (Nepal). for ICP Nepal; security ofIndia and Nepal in subject to approval of Biratnagar site and personnel.modern and scientific competent authority. expected toway. be

completed.

Rail Link at Create rail link 25.36 Earthwork, finalisation of Facilitate trade and Statutory clearancesJogbani- between Jogbani- location of Bardibas railway commerce and people- from , GovernmentBiratnagar & Biratnagar and Gauge station, initiation of to-people contacts. of Nepal; securityJayanagar- Conversion of construction work expected of site andBijalpura Jayanagar- Bijalpura- to be completed subject to personnel.Bardibas. Bardibas section and availability of encumbrance

construction of railway free land.station at Bardibas.

Terai Road Up-gradation of 605 118.87 Significiant portion of Better road connectivity to (a)Signifi- Political and socialProject km consisting of 19 project is expected to be result in increase trade cant portion stability in Nepal;

roads is underway. completed by end of FY and commerce and of project is Security of site and2013-14 subject to people-to-people expected to personnel;availability of encumbrance contacts. be encumbrance freefree land completed land.

by FY 2013-14 subject toavailability ofencum-brance freeland.

Page 30: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

29

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Emergency and 200-bed Emergency 8.72 Expected to be Support trauma facilities Expected to StatutoryTrauma Centre, and Trauma Centre to commissioned subject to in Nepal. be functional clearances andKathmandu provide medical allocation of additional funds by end of FY taking over of the

services to the people from competent authority. 2013-14 Centre byof Nepal Government of

Nepal; Responsefrom bidders formedical equipment.

Establishment Construction of 1.19 Preparation of working Establishment of a Floating of Land acquisition forof Nepal-Bharat Polytechnic building, drawings, floating of tenders well-equipped, modern tenders by PolytechnicMaitri institutional block, for construction of building, polytechnic at Hetauda, consultant Building, tenderPolytechnic at administrative block, approximately 30% Makwanpur in Nepal to after response andHetauda residential blocks, construction work for the produce required basic preparation approval subject to

Hostels, etc. in Polytechnic building and medium level of drawings, reasonability ofapprox 32 acres land trained, technical Award of cost, statutory

manpower in critical work in 90 approvals fromareas days from Government of

floating of Nepaltenders

Supply of Fire Supply of 17 numbers 3.96 Completion and handing Enhanced Fire safety in Tender Statutory approvalsEngines to of Fire Engines over of 17 Fire densely populated evaluation of Government ofNepal (water/foam/chemical Engines to different areas of different and award Nepal

types) to municipalities municipalities of Nepal. municipalities of Nepal of work forof Nepal Training and handholding supply of

Operation sessions in Fire Enginesmunicipalities by April

2013.Supply,handing

Page 31: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

30

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

over of FireEngines byJuly 2013.

Construction of Construction of a 1.58 Construction of a Sabha Infrastructure Agreement Land acquisition,Nepal-Bharat Sabha Griha, Griha, Convention Hall in development in Birgunj, with Statutory approvalsMaitri Convention Hall with Birgunj having seating Nepal for promotion of Consultant of Government ofConvention a seating capacity of capacity of 1000 persons in culture and arts and floating Nepal requiredHall (Sabha 1000 persons in 1.17 hectares of land, of tendersGriha) in Birgunj signing of Agreement with by AprilBirgunj consultant, floating of tenders 2013, Award

and award of work, approx of work and30% construction of work 30%

constructionwork

Construction of Construction of a 1.58 Construction of a Infrastructure Prequalifi- Land acquisition,Nepal-Bharat Dharmashala Dharmashala building and development in cation of Statutory approvalsMaitri Building in Tilganga, allied development works in Pashupati Trust Area, contractors of Government ofDharmashala, Pashupati Trust Area Tilganga, floating of tenders Improved amenities to and floating Nepal, finalizationTilanga, in 5500 sq mtr area and award of work to pilgrims and tourists from of tenders by of tenders forKathmandu along with allied site eligible contractors, approx India and Nepal April 2013, construction work

development work 30% construction of award ofDharmashala building work by

June 2013,approx 30%Constructionwork ofDharma-shalabuilding

Page 32: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

31

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Strengthening To augment the 11.89 Commissioning of 12 km After completion of the Tender for Statutory approvalsof India-Nepal quantum of power long 132 kV Kataiya – Project, additional 125 execution of of Government ofPower supply to Nepal Kusaha transmission line, MW power can be work are to Nepal, finalizationTransmission Reconductoring of Indian supplied. be called by of tenders forInterconnections portion (about 3 km) of the April 2013 physical work

existing 132kV Kataiya – and workKusaha transmission line, completionCommissioning of Raxaul – by MarchParwanipur 132kV Tower line, 2014Installation of 220/132kV

Payment to Supply of electricity to 23.77 Supply of electricity to Nepal. Supply of electricity to AnnualNational Hydro Nepal under bilateral (Regular payment). Nepal under bilateral commit-Power commitment. commitment. mentCorporation(NHPC)

Embankment Construction of 83.21 Embankments on Lalbakaya, Embankments on Ongoing.construction on embankments on Bagmati, Kamla and Khando Lalbakaya, Bagmati, No specificLalbakaya, rivers in Nepal for rivers (on an ongoing basis). Kamla and Khando rivers timeframeBagmati, Kamla flood prevention on (on an ongoing basis). assigned.and Khando Indian side. Torivers. mitigate the problems

of floods both in Indiaand Nepal .

Scholarship to Support for human 22.19 Scholarships to Nepali Support for human On anNepalese resources students for MBBS, B.Tech, resources development annualstudents development in and other courses .various in Nepal. basis.(Payment to Nepal. educational scholarships/ICCR and other Approximately 1800 slots provided to Nepali

Page 33: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

32

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

schemes). scholarship a year students under variousfor Nepalese students schemes of GOI. These arestudying in Nepal aimed at building a pool ofand India. skilled manpower in Nepal.

Police training, Ongoing assistance to 10.30 Capacity building for the On-going traininghuman capacity enforcement agencies police force in Nepal. programmebuilding and of Government ofmodernization Nepal & capacityprogrammes; building for NepalNepal Police security agencies.Academy.

Small SDPs executed under 51.51 Over 400 projects such as Continued execution of OngoingDevelopment GOI assistance in schools, hospitals and other SDP’s, that contributes to programme.Projects (SDP). Nepal for the benefit social infrastructure elements socio-economic

of the people of Nepal. being implemented and development of the localhanded over to local people as these focus onauthorities. community infrastructure

is fields such aseducation and health.

Other 3.96 Ongoing Construction ofmisc. programme Bharat-Maitriprojects . Vidyalaya,

Construction ofBharat-Nepal MaitriAuditorium inLumbini & manyother projects arein the pipeline

Total 380.00

Page 34: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

33

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Aid to Reconstruction Reconstruction/repair 433.31 Reconstruction and repair of To provide assistance to The projectSri Lanka and Repair of of houses in Sri Lanka 49,000 houses IDPs in Northern and is scheduled

houses for for internally displaced Eastern Provinces of Sri to beInternally persons and Indian Lanka to reconstruct or completedDisplaced Origin Tamils repair their houses. in 2014-15Persons (IDPs)

Setting up of 150-bed hospital at 53.73 Completion of civil work, Assist in meeting the Expected to Statutoryhospital at Dickoya to provide installation of service need for advanced be functional clearances fromDickoya medical services to equipment and supply of healthcare in the northern by the end Government of Sri

the people of northern medical equipment part of Sri Lanka of FY Lanka; responsepeninsula of Sri 2013-14 from bidders forLanka supply of medical

equipment.

Kankesanthurai To rehabilitate the 11.27 Dredging work and final To facilitate movement of Dredging to Statutory(KKS) Harbour KKS harbour in Jaffna hydrographic survey expected vessels, promote trade be clearances from

province of Sri lanka to be completed. and commerce and completed Government of Sriand make it capable develop port facility of in 3 months Lanka; weatherto handle medium Sri Lanka from award conditions.size vessels of work for

dredging.

Establishment To set up an Indian 0.60 Inauguration of Indian Gallery To display the centrality Tenders Statutoryof Indian Gallery at International by November 2013 of India in the Buddhist would be clearances fromGallery at the Buddhist Art Museum, universe and the fact that called by Government of SriInternational Dalida Maligawa, Buddhism travelled out of April 2013 Lanka; weatherBuddhist Kandy Sri Lanka to India to Sri Lanka, South- and the conditions.Museum in display association East Asia , East Asia and Gallery willKandy, Sri of India to Buddhism elsewhere while be set up byLanka retaining its focal point November

in India. 2013.

Page 35: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

34

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Restoration of Restoration of 0.45 Construction of Restoration work to (a) Decem- StatutoryThirukethees- Thiruketheeswaram Mahamandapa by December continue ber clearances fromwaram Temple Temple, a 1500 years 2013. 2015 Government of Sriin Mannar, old temple in Mannar, Lanka; weatherSri Lanka Sri Lanka conditions.

Jaffna Cultural To provide assistance 0.65 Completion of pre- Pre-construction activities (a) Septem- StatutoryCentre in construction of construction activities and shall be completed and ber 2015. clearances from

Jaffna Cultural Centre award of work to Contractors construction work shall Government of Sriat Jaffna, Sri Lanka for construction start. Lanka; response

from bidders fortender to be calledfor execution of thework; availability ofinputs.

TOTAL 500.00

Page 36: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

35

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Aid to Police Academy Setting up of the 15.00 Construction of the Academy Foster institutional 3 years Statutory approvalsMaldives in Maldives National Police linkages with Maldives of Government of

Academy in Maldives Maldives,finalization oftenders for physicalwork

Renovation of Renovating the IGMH 15.00 Renovation of the hospital Foster institutional Tendering Statutory approvalsIndira Gandhi established by GOI in building in Male linkages with Maldives under of Government ofMemorial the 1990s. progress/2 Maldives,Hospital (IGMH), years finalization ofMale tenders for physical

work

Total 30.00

Page 37: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

36

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Aid to Kaladan Provide a trade route 250.00 Waterways component along Completion of waterways Waterways Limited workingMyanmar Multimodal to Myanmar and with six barges is expected component. component season (5 months),

Transit and dependable mode of to be completed by (a) April remote location ofTransport transport to North- December 2013; 2013 project, naturalProject. East region of India Mobilisation for road work (b) Decem- hazard prone area,

expected to start subject to ber 2013 statutoryapproval of competent – Road clearances fromauthority. component Government of

(a) Three Myanmar.years fromdate ofaward ofwork.

Trilateral Provide road link with 98.04 Appointment of consultant for Facilitate people to The DPR to Limited workingHighway Project Thailand which may preparation of DPR for people contact, promote indicate the season (5 months),

be extended to ASEAN Kalewa-Yagyi section, DPR trade and commerce. timeline for remote location ofand Ganga-Mekong preparation, completion of the project the project,basin countries work on last stretch of 7 km statutory

of Tamu-Kalewa road. Start clearances fromof construction of 71 bridges, Govt. of Myanmar.subject to approval ofcompetent authority.

Rhi-Tiddim To create road link 13.07 Modalities for preparation of Enhance cross border DPR is Limited workingRoad between Rhi in DPR and execution of project, connectivity; encourage expected to season (5 months),

Mizoram and Tiddim under consideration trade and commerce and be ready remote location ofin Myanmar people-to-people the project,

contacts statutoryclearances fromGovernment ofMyanmar.

Page 38: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

37

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Tamu-Kalewa- Part of Trilateral 13.07 The stretch between Kyigone- Promote trade and Project The last stretch ofKalemyo (TKK) Highway and connects Kalewa (28 km) where extra commerce and expected to road repeatedlyRoad Moreh in Manipur with correction work was required participate people-to- be ready. affected by natural

Kalewa and Kalemyo is expected to be completed. people contact. hazards.in Myanmar

Establishment Establishment of 32.68 Appointment of mentor/ Cooperation in the IT Appointment Land acquisition,of Myanmar Myanmar Institute of partner institute/ PMC for sector, imparting IT of mentor Statutory approvalsInstitute of Information Technology establishment of MIIT, education to Myanmarese institute and from GovernmentInformation (MIIT) in Mandalay for desiging courses, finalization students for better signing of of Myanmar,Technology IT education of of architectural designs of opportunities and job Agreement availability of(MIIT) Myanmarese students MIIT buildings, Procurement creation, development of with mentor physical

of equipment and setting up IT industry, social and institute by infrastructure inof laboratories economic growth and April 2013, Mandalay

poverty alleviation setting uplaboratoriesandrecruitingfaculty byOctober2013

Upgradation of Upgradation of Yangon 19.61 Procurement of medical Cooperation in the Health Award of Statutory approvalsYangon Children Hospital and equipment, CT scan, MRI, Sector, improved health contract and of Government ofChildren Sittwe General Medical Gas Manifold system, care facilities in Yangon placement Myanmar,Hospital and Hospital; Installation Oxygen Concentrator by the and Sittwe for of purchase finalization ofSittwe General of Medical Gas Consultant M/s HSCC Myanmarese patients, order for tenders ofHospital manifold system and training of para-medicos, medical procurement of

Oxygen concentrator, nurses, doctors, etc. equipment, medical equipmentMRI, CT Scan, etc. CT scan,

MRI,

Page 39: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

38

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Medical gasmanifoldSystem, etcby April 2013,Supply,installationandcommissio-ning ofequipmentby June2013

Setting up of Setting up of a Rice 6.54 Signing of Agreement with MS Cooperation and Signing of Land acquisition,Rice Bio-Park Bio-Park in Myanmar Swaminthan Research strengthening the Agreement Statutory approvalsin Myanmar consisting plants of Foundation for construction Agriculture sector, with from Government

Stabilized Bran, Cattle of Rice Bio-Park building and improving food security consultant of Myanmar,and Poultry feed using supply of equipment, training, as well as income by February availability ofspecialized formula- etc., Floating of tenders and security for small and 2013, physicaltions, Improved award of work for marginal farmers Procurement infrastructure inlivestock feed with procurement of equipment, of equipment Nay Pyi Taw,enhanced protein, imparting training to by August MyanmarOyster Mushroom Myanmarese trainees, 2013,using paddy straw, construction of plants of training toRice Mill, etc. Rice Bio-Park Myanmarese

trainees byOctober2013

Page 40: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

39

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Setting up of Setting up of ACARE 13.07 Signing of Agreement with Development, Adoption Signing of Land acquisition,Agricultural Divisions viz New Department of Agriculture and dissemination of Agreement Statutory approvalsResearch and Genetics, Post Research and Education suitable technology for with DARE from GovernmentEducational Harvest Technology, (DARE) for appointment of enhancement of by April2013, of Myanmar,Centre (ACARE) Participatory Indian Agricultural Research agricultural production, Floating of finalization ofin Myanmar Knowledge Institute (IARI) as Project employment, income, tenders and tenders for

Management and Manager cum Consultant nutritional and rural award of procurement ofCapacity Building (PMC), setting up of Project livelihood security of contract for equipment

Monitoring Unit (PMU), Myanmar Procurementprocurement of equipment of equipment

bySeptember2013,training toMyanmaresetrainees byOctober2013

Setting up of To set up English and 1.31 Installation and Foster institutional The project Statutory approvalsLanguage Foreign Language commissioning of Language linkages with Myanmar. is expected from GovernmentLaboratories Laboratories in Laboratories. Training of to be of Myanmar,and e-Resource Yangon and Nay Pyi faculty. completed finalization ofCentre in Taw and e-resource by the end tenders forMyanmar centre in Nay Pyi Taw. of August implementation of

2013 the Project.

Page 41: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

40

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Upgradation of To upgrade existing 2.61 Existing centre shall be Foster institutional Project is Land acquisition,India-Myanmar centre into C-DAC upgraded. linkages with Myanmar. expected to Statutory approvalsCentre for Authorized Training be from GovernmentEnhancement Centre completed of Myanmar,of IT Skills by December finalization of(IMCEITS) 2013. tenders for

execution of theProject.

Total 200.00 250.00

Page 42: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

41

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Aid to Cash 53.00 PM’s commitmentother assistance to of cash assistancedeveloping Palestine of US $ 10 millionCountries to Palestine

Annual financial 0.05 Financial assistance to the A committed expenditure Indian tourists areassistance to Indian Hospice in Jerusalem to generates goodwill accommodated atthe Indian for upkeep and maintenance. the Indian HospiceHospice inJerusalem

Construction of To provide education 2.00 Strengthen bilateral relations India has pledgedtwo Schools in to the residents of with Palestine an amount of US $Palestine. Palestine by 1.8 mn towards

constructing and setting up of twoequipping High schools inSchools at Abu Dees Palestine

Construction/ 0.28 Strengthen bilateral relations The project wasupgradation of with South Sudan delayed on accounta Hospital in of political deadlockSouth Sudan to post secession offulfill India’s South Sudan.commitmentpledged duringthe OsloDonorsConference in2005 (US $5 million).

Page 43: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

42

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Construction/ 0.28 Strengthen bilateral relationsupgradation of with Sudana hospitalproject in Sudan(US $ 5 million)

Feasibility 0.63 Phosphate raw material and Draft Feasibilitystudy of finished products imports Report has beenphosphate from Syria submitted to themining activities Syrian authorities,proposed to be GECOPHAM.carried out in Comments of theSyria. Total cost Syrian sideis expected at comments on theUSD 1.5 million. DFR has been

conveyed to Ministryof Chemicals andFertilizers.

Projects for the To engage with the 0.21 Generation of goodwillPuntland State new Government ofof Somalia: Somalia in view ofI. Fish our interests inprocessing unit fighting piracy off thewith Coast of Somaliaaccessories;II. Developmentof jetties forPuntlandMaritime Force;III. Assistance

Page 44: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

43

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

in Education;IV. Proposalfor setting upof an IT Schoolat a cost ofUS $ 3,00,000in Mogadishu.

Supply of 0.68 Assistance in view of ourequipments for interest in fighting piracy offPuntland the Coast of SomaliaMaritime PoliceForce (PMPF)through Ministryof Defence(MOD) toSomalia(USD 1.5million)

Setting up of Offering Indian 0.10 MoU to be signed. New Projecttwo Vocational experience inTraining vocational training.Centres in theRepublic ofYemen

Setting up of Offering Indian 0.16 MoU to be signed. New Projectthree ICT experience in IT.centres in theRepublic ofYemen

Page 45: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

44

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Supply of Offering Indian 2.00 New Projectcomputer- experience in IT.relatedequipments forgirls college inAden, Yemenand supply ofscientific andLab equipmentto schools inYemen

Setting up of To further boost the 0.80 Execution of remaining part It is expected that the March 2011India-Maldives bilateral relations with of the project work by NBCC, project will be completed to March/Friendship Maldives to assist a public sector company as in 2013-14. April 2013Faculty of them in setting up of project managementHospitality & this speciality institute. consultant (PMC).TourismStudies at Male

Conservation & Conservation of 0.41 Conservation of various It is envisaged that workRestoration of certain portions of the sections of temples and its plan as conceived byTa Prohm world heritage surroundings to be Archaeological Survey ofTemple in monument. implemented . India (ASI) would beCambodia adhered to

Conservation of To strengthen 0.05 Archaeological Survey of India ASI will continue the 2009-2010Wat Phou bilateral and cultural would implement the project conservation in Wat to2016-2017Temple, Lao relation between the They would conserve and Phou TemplePDR two countries by restore the damage of Wat

implementing the Phou temple complex and

Page 46: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

45

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

project. Conservation address other relatedand restoration of problems like waterUNESCO World drainage etc.Heritage Wat PhouTemple complexin Lao PDR

Conservation Conservation of 0.03 ASI’s project proposal for the New ProjectProject at My monuments of World conservation of ChamSon, Vietnam heritage at My Son, monuments is under

Vietnam examination/process in theMinistry.

Govt. of 0.14 Supply of Medicines and New ProjectCommonwealth Medical Equipmentsof Dominica worth US $ 1 million(CD)-Supply of approved by EAM.Medicines andMedicalEquipments.

Language 0.03 New ProjectLaboratoriesand ResourceCentre inMayanmar.

Capacity To strengthen India’s 0.54 To set up the IT/ICT centers, IT centers in Grenada, Running/ IT/ ICT centres inbuilding relations with foreign supplying of computers, Dominican Republic will New various developingprojects in countries training material and other be completed in 2013-14 Projects countries, includingvarious equipment. and rest for others MOU, Ecuador, Costadeveloping after finalisation of new Rica, Benin,

Page 47: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

46

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

countries template, action will be Burundi, Centralinitiated. African Republic,

Cape Verde,DemocraticRepublic of Congo,Peru, Grenada,Timore Leste,DominicanRepublic, Lao PDR;Construction of aJoint School inMongolia & India-US OpenGovernmentProcurementInitiative inRawanda & Ghana

Total 61.38

Page 48: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

47

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Investment Investment & Disbursing 0.15 Printing of ITP Division’s Will prove valuable in AnnualPromotion Technology information on Annual Publication and its highlighting business Publicationand Promotion: opportunities in India dispatch to Missions opportunities in various Brought OutPublicity Printing of to interested sectors of the Indian by ITP

Publication businesses/ economy for promotion Divisionindividuals and of foreign investmentsapex chambers into Indiaabroad

Maintenance Providing information 0.20 To help promote FDI and Updating is An exclusiveof website on business trade by educating the target a continuous website for

opportunities in India user about India’s FDI activity which dissemination ofto general public. Policies and information on is carried all up-to-date

India’s Economy. out as and information on thewhen Indian economy.required.

Misc Organization of 0.75 Misc Promotional Activities Organization ofPromotional conferences with conferences to helpActivities Chambers of promote India as an

Commerce for investment destinationpromotion of FDI and and facilitate exchangeother investment of informationpromotion activities

Interest 24.24 IES to EXIM Bank for Bi-annual,Equalization LoCs extended to onSupport (IES) to Bangladesh and Nepal submissionEXIM Bank for of demandLine of Credit by EXIMextended to Bank ofBangladesh India

Page 49: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

48

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Conducting 0.10 To conduct ten feasibility Such studies will enable As laidfeasibility studies GoI to assess viability down in thestudies for and sustainability of LoCLOC projects projects to be funded guidelines

under LoCs

Conference on 0.50 To organize one conference To sensitize recipientLines of Credit governments about LoCfor African and procedures andother countries guidelines

Total 25.94

Page 50: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

49

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Energy Hiring of To obtain technical 0.65 To engage consultants forSecurity institutional supports to undertake technical advisory on energy

consultant certain projects like security matters.publications, reportsetc.

Subscription of To obtain technical 0.24 To continue subscription ofJournals, supports, to technical journals; to bringCommissioning undertake the global out technical reports/papersof paper, energy market on Energy security; to holdRound-table technologies and IWG meetings with seniorseminars/ resources to elicit level officers in PSUs andworkshops and information and private sector.publicity on analysis fromenergy security specialists, tomatters. organise meetings

with academia/industry and to bearthe cost of energysecurity publications.

Total 0.89

Page 51: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

50

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

ITEC Indian 140.00 About 9750 civilian and Capacity building and The ITEC/ ITEC/SCAAP andTechnical and defence participants have human resource SCAAP TCS of ColomboEconomic been offered courses development translates academic Plan TrainingCooperation conducted by institutes/ into empowerment for calender Programmes are(ITEC) organizations of repute in developing world. India year is from longstandingProgramme India thus transferring gains in terms of the April to programmes ofinvolves training knowledge and expertise. In goodwill earned. March and India’s Technicalof foreign turn, participants will use the Enhancing India’s courses are Cooperationnationals in knowledge gained in India position and standing organized extended in thevarious civil and resulting in multiplier effect internationally.The within that South-Southdefence training in capacity building and international training period. Cooperationprogrammes human resource programme also makes framework restingfrom 142 development in the for networking on partnershipdeveloping developing world. 27 ITEC opportunities, bonds of based on solidaritycountries in 47 experts are presently friendship and and mutualcivilian and 83 deployed overseas. camaraderie being respect,voluntarydefence establish and wider cooperation freeinstitutions knowledge and from anyincluding understanding of India. conditionalities,National national ownershipDefence and alligned withCollege priorities of partner

countries, demand-driven andresponse-oriented.The growingpopularity of ITECprogramme showsthat partner

Page 52: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

51

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

countries considerthe trainingprogrammes asvalued instrumentfor vocationaltraining,upgradation ofskills, capacitybuildings andempowerment. Theprogramme figuresin the GenderBudget Statement ofUnion Budget2013-14.

Total 140.00

Page 53: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

52

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

SCAAP Special (a) Strengthen 25.00 About 9750 civilian and Capacity building and The ITEC/ It is one of theCommonwealth bilateral ties; defence participants have human resource SCAAP longstandingAssistance for (b) Share India’s been offered courses development translates academic programmes ofAfrica developmental conducted by institutes/ into empowerment for calender programmes ofProgramme experience and organizations of repute in developing world. India year is from India’s Technical(SCAAP) expertise with India thus transferring gains in terms of the April to Cooperationinvolves developing countries knowledge and expertise. goodwill earned. March and extended in thetraining for In turn, participants will use Enhancing India’s courses are South-Southforeign the knowledge gained in position and standing organized Cooperationnationals from India resulting in multiplier internationally.The within that framework resting19 countries in effect in capacity building international training period. on partnershipAfrica in 47 and human resource programme also makes based on solidaritycivilian training development in the for networking and mutualinstitutes. developing world. 27 ITEC opportunities, bonds of respect,voluntary

experts are presently friendship and cooperation freedeployed overseas. camaraderie being from any

establish and wider conditionalities,knowledge and national ownershipunderstanding of India. and alligned with

priorities of partnercountries, demand-driven andresponse-oriented.The growingpopularity of ITECprogramme showsthat partnercountries considerthe training

Page 54: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

53

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

programmes asvalued instrumentfor vocationaltraining,upgradation ofskills, capacitybuildings andempowerment. Theprogramme figuresin the Genderudget Statement ofUnion Budget2013-14.

Total 25.00

Page 55: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

54

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

TCS TCS of (a) Strengthen 4.60 Some 500 civilian and Capacity building and The ITEC/ ITEC/SCAAP andColombo Colombo Plan bilateral ties; defence participants have human resource SCAAP TCS of ColomboPlan training (b) Share India’s been offered courses development translates academic Plan Training

imparted to the developmental conducted by institutes/ into empowerment for calender Programmes areNationals of experience and organizations of repute in developing world. India year is from longstanding18 countries expertise with India thus transferring gains in terms of the April to programmes ofin 40 Institutes. developing countries knowledge and expertise. goodwill earned. March and India’s Technical

In turn participants will use Enhancing India’s courses are Cooperationthe knowledge gained in position and standing organized extended in theIndia resulting in multiplier internationally.The within that South-Southeffect in capacity building international training period. Cooperationand human resource programme also makes framework restingdevelopment in the for networking on partnershipdeveloping world. opportunities, bonds of based on solidarity

friendship and and mutualcamaraderie being respect,voluntaryestablish and wider cooperation freeknowledge and from anyunderstanding of India. conditionalities,

national ownershipand alligned withpriorities of partnercountries, demand-driven andresponse-oriented.The growingpopularity of ITECprogramme showsthat partner

Page 56: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

55

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

countries considerthe trainingprogrammes asvalued instrumentfor vocationaltraining,upgradation ofskills, capacitybuildings andempowerment. Theprogramme figuresin the GenderBudget Statement ofUnion Budget2013-14.

Total 4.60

Page 57: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

56

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

SAARC India To promote and fund 10.00Pro- Endowment for environment friendlygramme climate change initiatives undertaken

in SAARC Countries

Other SAARC 5.00 Programmes have been Capacity building in the SAARC Tele-Programmes planned to boost regional region, cooperation in medicine project,

capacity building, people-to- diverse fields such as SAARC Tele-people contact and general textiles & handicrafts, education project,cooperation. health, etc. are expected SAARC Museum of

to grow. Support being Textiles andextended for SAARC Handicrafts in Newfestivals on folklore, Delhi, variousliterary, arts, bands, trainingscholarship, etc. programmes and

SAARC Culturalfestivels.

Total 15.00

Page 58: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

57

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

South Contribution to Strengthening of 43.00 Construction process to Establishment of a South Enhanced funds toAsian South Asian cooperation among begin in 2013. NOC from Asian University with be sought at the REUniversity University (SAU) SAARC Countries Delhi Development Authority world class facilities and stage/

in respect of 83.1 acres of professional faculty and supplementaryland at Maidan Garhi, New students and researchers grants stage asDelhi has been obtained. from SAARC countries, allocation fallsSAU is in the process of for forging a sense of short to supportobtaining approvals of the ‘South Asian constructioncompetent authorities in consciousness’ by activitiesGOI for its Master Layout bringing together thePlan. Presently, SAU is future generations offunctioning from temporary South Asian in a commonpremises in Akbar Bhawan, pursuit of qualityChanakya Puri, New Delhi. education

Total 43.00

Page 59: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

58

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Aid to Hybrid Setting up of a Hybrid 0.80 Project is being To introduce people in Total cost of theAfrica Planetarium Planetarium and implemented by National Mauritius to world of project:

and extension extension of existing Council of Science Museums Astronomy,celestial `. 10.46 Cr.of existing Science Centre (NSCM), Kolkata phenomenon, offeringScience Centre building at Rajiv non-formal educationBuilding in Gandhi Science and providing supportingMauritius Centre (RGSC), tool for the teaching of

Mauritius student population

India-Africa Setting up of the 15.24 The project is being Fulfilment of Total cost of theInstitute of India-Africa Institute of implemented by Indian commitments at IAFS-I project:Foreign Trade Foreign Trade (IAIFT) Institute of Foreign Trade `. 60.00 Cr.(IAIFT) in Africa in Uganda by Indian (IIFT). IIFT team visitedunder IAFS-I Institute of Foreign Uganda in Jan 2011 and is

Trade (IIFT)] preparing the DPR.Confirmation from Ugandanside on provision of land,building etc. awaited.

India-Africa Setting up of India- 4.06 The project is being Implementations of Total cost of theDiamond Africa Diamond implemented by Indian decisions under IAFS-I project:Institute in Institute in Botswana Diamond Institute (IDI), `. 16.00 Cr.Africa under by Indian Diamond Surat. IDI team visitedIAFS-I Institute (IDI), Surat Botswana in March 2011

and has submitted the DPR.Project is underimplementation.

India-Africa Setting up of the India- 30.48 NUEPA has visited Burundi, Fulfilment of Total cost of theInstitute of Africa Institute of consulted officials of AU & is commitments at IAFS-I project:Educational Educational Planning in process of preparaing the `. 120.00 Cr.

Page 60: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

59

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Planning and and Administration DPR. Burundi has identifiedAdministration (IAIEPA) in Burundi land & building and is(IAIEPA) in by National University currently revamping/Africa under of Educational renovating the identifiedIAFS-I Planning and building. Project is under

Administration implementation.(NUEPA)]

Vocational Setting up of 15.24 10 VTCs in Burkina Faso, Fulfilment of Total cost of theTraining Vocational Training Burundi, Egypt, Ethiopia, commitments at IAFS-I project:Centres in Centre in 10 African Mozambique, Gabon, `. 50.00 Cr.African countries viz. Burkina Gambia, Libya, Rwanda &countries Faso, Burundi, Egypt, Zimbabwe are being set upunder IAFS-I Ethiopia, Mozambique, by National Small Industries

Gabon, Gambia, Corporation (NSIC).Rwanda,Libya &Zimbabwe by NationalSmall IndustriesCorporation (NSIC)

Scholarship for Scholarship to African 7.62 Scholarships for Masters & Fulfilment of Total cost of theMasters & students admitted in doctoral degree to African commitments at IAFS-I project:Doctoral various Agricultural students admitted in various `. 26.80Cr. forDegrees in Universities/colleges Agricultural Universities in 5 Years.Agriculture for & deemed Universities India were provided.African students in India The scheme is spread overunder IAFS-I five years(2008)

Entrepreneur- Setting up of 05 7.16 Expert team from Project aims to enhanceship Entrpreneurship Entrepreneurship the capacity of

Page 61: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

60

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Development Development Centres Development Institute of India, entrepreneurs of African Total cost of theCentres (EDCs) (EDCs) in African Gandhinagar is visiting countries. project:in African countries (Namibia, Senegal, Rwanda, Zambia `. 24.10 Cr.countries Gabon, Zambia, and Namibia to conductunder IAFS-II Senegal & Benin). Feasibility Study for project

The project is being implementation shortly.implemented byEntrepreneurshipDevelopmentInstitute of India,Gandhinagar.

Centres for Setting up of 05 7.62 Two experts from EFLU, Project aims to provide Total cost of theEnglish Centres for English Hyderabad are visiting a permanent venue for project:Language Language Training Sudan, Togo, Mauritania, teaching in English, `. 15.00 Cr.Training (CELT) in African Djibouti and Central African impart training in the use(CELT) in countries (Djibouti, Republic to conduct the of English, train & updateAfrican Sudan, Mauritania, Feasibility Study for project English languagecountries under Togo & Central African implementation. teachers & prepareIAFS-II Republic). The project students for competitive

is being implemented exams.by “The English andForeign LanguagesUniversity (EFLU),Hyderabad”.

Food Testing (I) Setting up of 05 26.57 Ministry of Food Processing The project aims to Total cost of theLaboratories FTLs in Republic of Industries delegations visited support capacities for project:(FTLs) & Food Congo, Rwanda, Nigeria, Gambia, Zimbabwe, food testing, enhance `. 57.30 Cr.Processing Zimbabwe, Gambia Rwanda, Cameroon & skill in food processingIncubation & Nigeria (II) and 05 Republic of Congo in and fulfil the basic needs

Page 62: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

61

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Centres FPBICs in Uganda, connection with project of a food processing(FPBICs) in Cameroon, Ghana, implementation. business in Africa.African Mali & Angola ICRISAT, Hyderabad hascountries been appointed asunder IAFS-II implementing agency.

India-Africa Setting up of India- 25.40 Project is under The project aims at Total cost of theInstitute of Africa Institute of implementation capacity building in the project:Agriculture and Agriculture and Rural areas of agriculture and `. 92.00 Cr.Rural Development in Africa rural development inDevelopment Africain Africaunder IAFS-II

Other Capacity 87.34 ITEC training courses forbuilding African nationalsprogrammes (additional 900 ITECfor Africa slots per year for a period

of three years from 2011-14); Africa ScholarshipScheme under IAFS-II(3600 Scholarships forfour years from 2011-12;Setting up computertraining centre called“Project Arrow” in Ghana;Setting up of BiomassGasifier Systems in5 African countries viz.Burundi, Zambia, Malawi,Lesotho & Mauritius;

Page 63: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

62

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Setting up of 5 VocationalTraining Centres (VTC)in Africa; Setting up ofanother 5 VTCS in Africain collaboration withBarefoot College, Tilonia;Setting up 8 SolarCharging Stations inAfrica; India-Africa RuralTechnology Parks inAfrican countries; SolarElectrification of 11,000houses in 22 Africancountries; Establishmentof India-Africa Centre forMedium Range WeatherForecasting in Africancountries; Pilot project ontomato productionresearch in Ghana;Medical assistanceproject to Gambia; Eastand South Africa bilateralgrant; etc.

Academic India-Africa Academic 1.02 ICWA is organizing The project aims to bring Total cost of theConferences Conferences/ conferences/ Seminars in together African & Indian project: `. 5.05 Cr.for 03 years Seminars/hosting Africa and India. Academics & opinionfrom 2011-2014 African Research makers to discussunder IAFS-II interns by Indian themes of mutual interest.

Council of WorldAffairs (ICWA)

Page 64: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

63

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Visiting Proposal being 0.25 Visiting Fellowship The project aims to Total cost of theFellowship implemented by Programme, India Africa enhance African project: `. 0.98 Cr.Programme/ Institute for Defence Strategic Dialogue are being capacities on researchNewsletter on Studies & Analyses organized by IDSA on strategic issues,Africa/ India (IDSA) monitor Africa’s strategicAfrica Strategic development.Dialogue underIAFS-II

Awareness Two Awareness 0.05 AIMA had organized “ India- The programmes aim to Total cost of theProgrammes Programmes on Africa Partnership Inititaive apprise African students project:on Enterprise Enterprise ” Awareness progarmme in on Enterprise `. 30 Lakh.Development Development for Chandigarh in March 2012. Developmentfor African African students instudents in India by All IndiaIndia under ManagementIAFS-II (2 Association (AIMA)programmeseach year for03 years from2011-2014)

Page 65: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

64

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Training/ Projects implemented 1.50 Project is being implemented The project aims to have Total cost of theworkshops in by Self Employed by SEWA. an integrated approach project: `. 8.56 Cr.the field of Women’s Association to strengthening African(a) Micro- (SEWA) under AIFS-II people’s organizationsFinance (a) Micro-Finance and NGOs, by utilizing the(b) Micro- (b) Micro-enterprise & strength of Indian NGOs.enterprise & Livelihood PromotionLivelihood (c) Micro-insurancePromotion (d) Health & Childcare(c) Micro- (e) Capacity Buildinginsurance for leadership(d) Health & managementChildcare(e) CapacityBuilding forleadershipmanagementunder IAFS-II[Kenya, SouthAfrica,Namibia]

INDIAFRICA- INDIAFRICA- A Shared 2.03 Various events under the The objective of the Total cost of theA Shared Future Future by Ideaworks programmes are being project is to extend the project:Programme for Design & Strategy organized under the project. India Future of Change `. 11.84 Cr.Africa under Pvt.Ltd. (being Theme to Africa andIAFS-II implemented by PD create awareness of

Division) opportunities in sectorslike healthcare, food &agriculture, environment,

Page 66: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

65

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

energy, education,entertainment, cultureetc. in Africa

Familiarization Familiarization visit of 0.51 Media related initiatives Total cost of thevisit of African African journalists to are being undertaken to project:journalists to India, Training develop, enhance `. 12.00 Cr.India, Training Programmes for awareness about AfricaProgrammes African journalists, in India & vice-versa,for African Media Partnerships specially about economicjournalists, symposium etc. & business opportunities.MediaPartnershipssymposium etc.under IAFS-II

Training Training programmes 5.08 Capacity building inCourses for for Africans in the field various fields in AfricaAfrican national of journalism, IT,under IAFS-II Power, New &

Renewbale Energy,Water Resources,Highways, Posts,Desertification &Climate change,Advance machiningTechnology, FoodProcessing,Biodiversity,Investment Promotion,basketry

Page 67: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

66

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

PAN-African To strengthen 22.43 Project commissioned in 47 (a) July 2014 Total project cost ise-network relations with African countries (currently under (b) July 2014 `. 542 crore for aProgramme countries implementation in 48th period of 6 1/2 year

country - South Sudan)

Emergency To strengthen 2.54 To supply medicines, relief- in case of disasters funds keptAssistance to relations with African material or cash assistance forWest African countries in case of disasters emergencycountries assistance

Aid to Liberia To strengthen relations 3.05 Supply of additional 25 buses To create goodwill(supply of 25 with African countries to Liberia under aid to Westbuses) African countries

Aid to Liberia To strengthen relations 4.57 To create goodwill(Health and with African countriesEducationSector)

Aid to Ghana Providing support to 0.29 Developing IT Skills in Africa To strengthen relations MOU signed. Total project cost is(Providing two- India-Ghana Kofi with African countries `. 385.30 lakhs.year support to Annan Centre for The Centre wasIndia-Ghana K Excellence set up with Indianofi Annan assistanceCentre forExcellence inIT)

Aid to Liberia To strengthen 2.54 To supply CT scan to Liberia To strengthen relations(CT scan) relations with African with African countries

countries

Page 68: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

67

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Aid to Ghana Setting up IAIIT at 23.06 Setting up IAIIT at Ghana To create goodwill Feasibility Project likely to(Setting up Ghana study start in FY 2013-14.India-Africa undertakenInstitute ofInformationTechnology(IAIIT) at Ghana)

Technical Development of cotton 3.56 To strengthen relations 2014 Project standsAssistance for sector through with African countries approved bydevelopment of capacity building and Cabinet at a totalcotton sector in transfer of technology cost of7 African `. 21 crorescountries

Total 300.00

Page 69: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

68

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Aid to Central Asia the E-networking 9.35 Appointment of Consultant; StatutoryEurasia e-network project involves linking calling of tenders by the clearances;

project for Tele- the five Central Asian Consultant response of NIT toEducation and countries viz. be issued for hiringTele-Medicince Kazakhstan, of Consultant;

Kyrgyzstan,Turkmenistan,Tajikistan andUzbekistan with Indiathrough a E-networkto deliver Tele-medicine and tele-education.

Entrepreneur- Setting up of an 1.57 To improve the quality of Goodwill for India 18 monthsship Entrepreneurship entrepreneurship training in through creatingDevelopment Development Centre the country employment inCentre in Tashkent, Uzbekistan

Uzbekistan

IT Centre in Setting up of Centre 3.73 Training of master trainers Goodwill for India and 9 monthsKazakhstan of Excellence in IT in and supply of IT infrastructure opportunities for Indian

Astana companies in Kazakhstan

IT Centre in Upgradation of IT 1.97 Training of master trainers Goodwill for India and 9 monthsUzbekistan Centre in Tashkent and supply of IT infrastructure opportunities for Indian

companies in Uzbekistan

Projects in Setting up various 23.38 Provide infrastructure Goodwill for India and 12 monthsTajikistan development projects improvement and opportunities for Indian

in Tajikistan on grant employment generation companies in Tajikistanbasis in Tajikistan

Total 40.00

Page 70: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

69

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Aid to Supply of small Grant of electrical 3.75Latin equipment to equipments likeAmerican small island electronic fingerCountries nations in the printing system,

Latin American CCTV cameras,Countries (LAC) breath analyzers,region electronic radar guns,

coastguard patrollingvehicles, ultra highpower phone jammer,wireless radios.

5 Solar 4.50ElectrificationProjects(DominicanRepublic,Bahamas,Guyana,Uruguay,Paraguay,Colombia)

2 Micro- 2.25hydroelectricityprojects inCaribbean andCentralAmericanCountries

Page 71: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

70

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Solar Street Installation of traffic 3.00lights and lights and street lightsTraffic light with solar energysignals inCaribbean andCentralAmericanCountries

Construction of 0.75the Indiansection of theZoo in Jamaica

Small Irrigation Construction of small 3.00Projects water supply and

irrigation schemes inBolivia, Surinameand Haiti

School building/ 5.25communitycenters(Guatemala,Honduras,Nicaragua,Costa Rica,Paraguay,Bolivia, Belize,Suriname,Jamaica,

Page 72: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

71

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Guyana andTrinidad &Tobago)

To provide Auto-rickshaws/mini- 4.50public vans/ ambulancestransport/utility vehiclesin the LACregion oncase-by-case basis

Biogas/ 2.25Biomass plantsin LAC countries

Miscellaneous Assistance for 0.75projects synthetic Hockey

Turf to Cuba

TOTAL 30.00

Page 73: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

72

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Aid to Construction of Project is supplying 100.00 Transmission line completed Supply of power to Kabul The Land acquisition,Afghanis- 220 kV power to Kabul from in February 2009 and and northern provinces construction Security,tan Transmission generating stations of commissioned in May 2009. of Afghanistan through a of Doshi and Transportation,

Line from Pul- its neighbouring Construction of Doshi and transmission line from Charikar Landlocked,e-Khumri to country, Uzbekistan Charikar substation to be Tirmiz via Pul-e-Khumri would be Infrastructure.Kabul including through a transmission completed. to Kabul. completed220/110 kV line from Tirmiz via bysub-station at Pul-e-Khumri to DecemberKabul, including Kabul 2013.construction oftwo additionalsub-stations atDoshi andCharikar.

Supply of 1 Food assistance of 3.55 Completion of 5th tranche in Scheme is meant to To be Offtake by themillion MT of 1 million MT of wheat 2013-14. enhance enrollment of completed implementingwheat in the in the form of high school going children in 2013-14. agency and itsform of high protein biscuits for and improve child health distribution.protein biscuits School Feeding by providing nutritiousfor School Programme. food.FeedingProgramme,suppliedthrough WorldFoodProgramme(WFP).

Page 74: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

73

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Reconstruction Assistance to 142.17 Work is in progress. 75% Supply of power and The project Security, remoteand completion Government of work is expected to be irrigation facilities in is expected location of dam siteof Salma Dam Afghanistan for power complete in 2013-14. western Afghanistan to be and poorPower Project infrastructure and Construction of spillway completed connectivity of road(42 MW) in irrigation. along with erection of hydro- by January between Herat andHerat Province mechanical equipments, 10, 2015. Chiste(site) andby M/s Water ferrul erection inside the rising cost of inputsand Power tunnel and power house.ConsultancyServices(India)Limited(WAPCOS).

ICCR Ongoing scheme 28.43 Ongoing scheme. ICCR Capacity building of (a) 2020-21. —Scholarship contribute to capacity slots increased from 675 to Afghan students;Scheme for building of Afghan 1000 from Financial Year contribute to the humanAfghan students students and 2012-13 as per GOI resource development infor University economy of commitment. Approved slots Afghanistan.education in Afghanistan utilization is above 95%.India.

Afghanistan Construction of 106.63 Civil and electro-mechanical Contribution to (a) Decem- Approvals of theParliament Afghanistan’s works will be completed in Afghanistan’s democracy ber 2011 relevant authorities,building. Parliament building 2013-14. and its people. Symbolic (b) Decem- security and cost

by CPWD representation of Indo- ber 2013 escalation of inputs.Afghan cooperation.

Phase I, II & III Implementation of 21.33 Completion of phase I & II. Development in the fields (a) 2015-16 Implementation byof Small small projects in the Implementation of phase III of health & sanitation, the Government ofDevelopment fields of health, projects. agriculture, education, Afghanistan. Total

Page 75: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

74

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Projects. education, sanitation, rural development, cost of the projectrural development etc. vocational training and is US $ 100 million.For benefit of local environmentalcommunities. The conservation.projects areimplemented by localauthorities andmonitored by therelevant Afghan andIndian agencies.

Supply of Supply of 1.5 Lakh MT 28.43 Donation of 1.5 lakh MT of Improving food security of The Transportation,foodgrains to of wheat to wheat to be completed by Afghan people. donation of logistics andAfghanistan. Afghanistan. July 2013. 1.5 lakh MT landlocked.

of wheat isexpected tobecompletedby July 2013.

Restoration of Restoration of Stor 3.55 Project design, construction Restoration of cultural (a) July 2015.Statutory approvalsStor Palace. Palace. drawing and tendering heritage; Structural and handing over

process. improvement in the of site.Ministry of Foreign Affairsof Afghanistan.

Fellowship for 614 agricultural 10.66 In 2013-14, 553 slots will be Capacity building of 2012-13 toIndian Council scholarships to offered. Afghan students in the 2016-17.for Agricultural Afghan nationals field of Agriculture.Research through DARE/ICAR.(ICAR)Scholarships.

Page 76: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

75

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Setting up an Setting up an Mining 1.42 Training of 180 officials of Quality education in the — Identification ofMining Institute. Institute. Afghanistan in 2013-14. field of Mining. candidates.

Finalization of modality forpreparation of DPR andapproval of competentauthority

Indian Medical 0.71 More than 3,50,000 patients Contribution in the field 2009-2012. Security andMissions in are treated annually. of health sector. transportation.Afghanistan

Setting up an Setting up an 1.42 DARE/ICAR to provide Quality education in the — Identification ofAgricultural Agricultural University. training to 25 faculty field of Agriculture. candidates.University. members from Afghanistan.

Supply of To provide diagnostic 10.66 Delivery of equipment for Completion of the project Medical Finalization ofMedical facilities in the hospital Diagnostic Centre; take up shall strengthen the equipment tenders andEquipment for and to construct a 40- the work of construction of infrastructure and for transportation ofDiagnostic bed Maternity ward maternity ward. diagnostic facilities in Diagnostic medical equipmentCentre and accompanied by 60- the hospital. Centre shall to AfghanistanConstruction of bed neo-natal ward be deliveredMaternity and at the hospital. by Marchneo-natal ward 2014.at Indira GandhiInstitute ofChild Health,Kabul

Other 189.27 Donation of 1000misllaneous Buses and 500projects/ Tractors; Solarprogrammes Electrification ofin Afghanistan 100 villages;

Revival of

Page 77: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

76

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Afghanistan’scultural andarchaeologicalheritage; Supply ofAgricultural seeds;Medical Package toAfghan patients;Vocational TrainingProject by CII;Donation ofComputer andTraining aids toCommand andStaff College,Kabul; Training ofAfghan NationalArmy (ANA)Personnel inMedical/Para-Medical Courses inIndia; MedicalTreatment of ANAPersonnel;Trainingof Afghan CivilServants/CivilSociety Groups forskills upgradation;Donations of books,computers; etc.

TOTAL 548.24 100.00

Page 78: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

77

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Public Abuja, Nigeria Construction of 13.67 Chancery building and Chancery building and Construction Project expected toWorks Chancery Residences Residences Underway be completed inand September 2013Housing

Bahrain Construction of 10.12 Building for Chancery, Building for Chancery, At tenderChancery, Embassy Embassy Residence and Embassy Residence StageResidence and other other residences and other residencesresidences

Bangkok Extension and 3.37 Repair and maintenance of Repair and maintenancerenovation of GOI buildings of GOI buildingsChancery

Beijing, China Construction of 1.35 Buildings for Chancery and Buildings for Chancery Project Final payments toChancery and residences and residences completed be settledresidences on

22.11.2011

Berlin Construction of 1.35 Building for Residences Building for Residences At designResidences Stage

Birmingham Purchase of residence 10.12 CG’s residence CG’s residence Expected to(CGI) for Counsel General be materia-

(CG) lised in F.Y.2013-14

Brasilia, Brazil Construction of 20.25 Buildings for Chancery, Buildings for Chancery, ConstructionChancery, Embassy Embassy Residence and Embassy Residence UnderwayResidence and other other residences and other residences Date ofresidences completion

(DOC) is12.06.2013

Page 79: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

78

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Dar-Es-Salaam Construction of 3.37 Building for Chancery Building for Chancery ConstructionChancery expected to

commence in2013-14

Dhaka Construction of 20.25 Buildings for Chancery, Buildings for Chancery, ConstructionChancery, Embassy Embassy Residence and Embassy Residence Underway.Residence and other other residences and other residences Revisedresidences DOC

30.06.2013

Dubai Renovation of 6.75 Repair and maintenance of Repair and maintenance To beChancery GOI buildings of GOI buildings completed

by June2013

Dublin New Chancery Block 0.88 Additional Chancery Block Additional ChanceryProject Block

Islamabad Construction of 33.74 Buildings for Chancery, Buildings for Chancery, ConstructionChancery, Embassy Embassy Residence and Embassy Residence is underwayResidence and other other residences and other residencesresidences

Kabul Purchase of Chancery 26.99 Chancery Chancery Expected to(Additional) materialise

in F.Y.2013-14

Kathmandu Construction of 16.87 Buildings for Chancery and Buildings for Chancery Construction Project expected toChancery and residences and residences Underway be completed byresidences June 2013

Page 80: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

79

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Kuala Lumpur Construction/ 9.79 Repair and maintenance of Repair and maintenance ProjectRenovation Work and GOI buildings of GOI buildings expected toSpace Augmentation beof Chancery commenced

in June 2013

Medan Repair and 1.35 Repair and maintenance of Repair and maintenanceMaintenance of CG’s GOI buildings of GOI buildingsResidence, Chanceryand other ResidentialBuilding

Port Moresby Purchase of Chancery 13.50 Chancery and residences Chancery and residences Expected toand residences materialise

in F.Y.2013-14

Sydney Fit out work of 3.37 Repair and maintenance of Repair and maintenanceChancery GOI buildings of GOI buildings

Toronto (CGI) Purchase of CG’s 9.45 CG’s residence CG’s residence Expected toresidence materialise

in F.Y.2013-14

Tashkent, Construction of 13.50 Buildings for Chancery, Buildings for Chancery, At designUzbekistan Chancery, Embassy Embassy Residence and Embassy Residence Stage

Residence and other other residences and other residencesresidences

Warsaw, Poland Construction of 24.29 Buildings for Chancery and Buildings for Chancery ConstructionChancery and residences and residences is inresidences progress

Page 81: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

80

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Washington Purchase of property 26.99 ICC ICC Expected tofor an Indian Cultural materialiseCentre (ICC) in F.Y.

2013-14

Zagreb Purchase of existing 8.44 Chancery Chancery Expected toChancery materialise

in F.Y.2013-14

Misc. Repair Repair & Maintenance 6.75 Repair and maintenance of Repair and maintenanceand Renovation of Govt. owned office GOI buildings of GOI buildingsProjects(i) Accra buildings(ii) Berlin(iii) Cairo(iv) Canebra(v) Tokyo,(vi) Tunis

Various Construction of 13.50 Buildings for Chancery or Buildings for Chancery orConstruction Buildings for Residences/Embassy Residences/EmbassyProjects Chancery or Residence or Both or Residence or Both or(i) Addis Ababa- Residences/EmbassyChancery and Residence or Both orResidences(ii) Bahrain-Chancery cumResidences(iii) Bangkok-ResidentialComplex

Page 82: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

81

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

(iv) Berlin-Residences(v) Brunei(Darusallam)(vi) Doha-Chancery andER(vii) Gabarone-Chancery andResidences;(viii) Harare;(ix) Khartoum-Chancery cumResidences;(x) Kyiv-Chancery cumResidence;(xi) Nicosia-Residences;(xii) Oslo;(xiii) Port-Louis-Chancery;(xiv) PortLouise-WorldHindiSecretariat(xv) Santiago-RedevelopmentProject;

Page 83: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

82

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14

Object Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Head Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

(xvi) Singapore-Chancery;(xvii) Shanghai-Chancery;(xviii) Tashkent-Chancery andResidences

Total 300.00

Nalanda Establishment To set up the university 125.00 (i)Refurbishment of existing (i) The work will be Throughof Nalanda at Rajgir . structure for temporary office completed. (ii) Master laid downUniversity at Rajgir; (ii)Finalization of Plan is expected to be processRajgir . Master Plan for the campus- finalized.

preparation of detailed (iii) Construction isdesigns and drawings for expected to be startedvarious buildings ; (iv) Recruitment will start;(iii) Start of construction of (v) Recruitment will start.various buildings; (iv) Startrecruitment of faculty;(v) Recruiting administrative/supporting staff

TOTAL 125.00

Page 84: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

83

CHAPTER III - REFORMS AND POLICY INITIATIVES

With a view to discharge its function in an efficient and effectivemanner, the Ministry undertakes constant review of existingpractices to improve them. Several new policy initiatives havebeen taken in the last year and follow-up action has been takenon promised initiatives. Significant progress has been achievedin this sphere. The Ministry is conscious of the fact that reformsand policy initiatives must be undertaken to make it responsiveto the dynamics of India’s foreign policy goals, which areultimately aimed towards serving the national objectives andaspiration of people of India. Some of the major initiatives andreforms that have fructified and/or initiated are as follows:

Development Partnership Administration (DPA)

An overarching structure called the Development PartnershipAdministration was created in the Ministry in January 2012 forensuring speedy and efficient implementation of Government ofIndia’s external economic assistance programmes as well asfor smooth coordination with other Departments and Ministriesof GOI for this purpose. The Division has been mandated toestablish procedures for efficient handling of developmentprojects and streamline and upgrade capacity buildingprogrammes under various schemes. In 2012-13, the transfer ofprojects to DPA from various Territorial Divisions in the Ministry

progressed in tandem with DPA developing the technicalexpertise required to handle multiple projects in diverse sectorsand regions through various stages of project appraisal,implementation monitoring and evaluation. It is expected thatDPA with its in-house expertise in diverse sectors will be ableto cut down on delays to a great extent which are ofteninescapable whenever multiple divisions/departments oragencies are involved in formulating a project.

E-publishing of Tender Inquiries on Central PublicProcurement Portal

The Ministry has complied with the Government guidelines topublish all tender enquiries on the Central Public ProcurementPortal (CPPP) developed by the Public Procurement Cell,Ministry of Finance. In this regard, it has been made mandatoryto publish all tender inquiries, corrigenda thereon and details ofbid awards on the Portal by all Divisions of the Ministry, BranchSecretariats, Passport Offices and Autonomous Bodies of theMinistry w.e.f. January 1, 2012. Missions and Posts abroad havealso been brought under this purview w.e.f. 1 March 2012. It aimsat greater transparency and facilitation of easy access to biddersin public tendering by making available all tender enquiries ofthe Ministry at a centralized website.

Page 85: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

84

Integrity Pact

A provision has been made from January 1, 2013 for signing Pre-contract Integrity Pact for all procurements / projects of the valueof ` 50 crore and above between Ministry and the prospectivebidders / sellers. Integrity Pact is a tool for preventing corruptionin public procurement / contracting under which the governmentagency offering a contract and the companies/agencies biddingfor it give undertaking that they would abstain from bribery, collusionand other corrupt practices for the extent of the contract. Itestablishes mutual contractual rights and obligations to reducethe high cost and distortionary effects of corruption in publiccontracting / procurement. The Ministry is in the process ofappointing independent external Monitors as stipulated in thePact.

Passport Seva Project (PSP)

PSP is one of the principal projects undertaken by the Ministryto bring about qualitative and quantitative improvement inrendering passport services to the citizens of India as part ofNational e-Governance Plan. By June 2012, all the planned 77Passport Seva Kendras (PSK) were set up and operationalisedin the country. More than 69 lakh passport applications havebeen processed under the new system till January, 2013. TheProject is being run with over 3,000 persons deployed by M/s TataConsultancy Services (TCS), the contractor and nearly 2,400officials of the Ministry and the Central Passport Organization.The implementation of PSP has led to increased access ofpassport outlets to the public, more counters and increased publicdealing hours, connectivity of the system to the district police

headquarters to ensure faster police verification and statusupdates to the citizens through SMS and e-mail. This has led tobetter governance, transparency and accountabilitywhile accessing passport services and has considerably reducedthe delay and difficulties in submission of passportapplications.

Social media in Public Diplomacy

Realizing the importance and power of the Internet in engagingwith foreign and Indian audiences for an informed foreign policydiscourse, the MEA’s Official Spokesperson is available on allprominent social media platforms like Facebook, Twitter, Youtube,Flicker in order to disseminate Government’s viewpointsuccessfully to a larger population. Ministry’s Public DiplomacyDivision is actively engaged across social media digital platformsincluding Facebook, Twitter and Youtube by regular generationand updation of interesting and informative content on variousfacets of India. By the end of 2012, nearly 80 Missions and Postshave created their Facebook pages and several are now activeon Twitter. These sites along with other India-branding initiativeshave led to considerable viewership and outreach globally,especially in the neighboring countries. In addition, the Facebookpage ‘Indiandiplomacy’ has gathered more than 96,000 viewersand its You Tube page has received about a million hits. Ministry’ssocial media platforms have been very effective in reaching out tothe youth in India and overseas.

Social and Gender Empowerment

While the requirements of the recipient Government arerecognized and given precedence in executing projects abroad,

Page 86: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

85

the Ministry is consciously trying to support projects that focuson empowerment of women and the socially weaker sections ofsociety. Under Technical and Economic Cooperationprogramme, India has launched a number of programmes inneighbouring countries and Africa such as setting up ofvocational training centres, building girls’ hostels, maternitycentres etc which benefit and empower women.

There are several other programmes in which women constitutea significant number of beneficiaries such as the housing projectfor Internally Displaced Persons (IDPs) in Northern and Easternprovinces of Sri Lanka, distribution of Trishaws to war-affectedwidows in Jaffna, Sri Lanka, training of African womencandidates in vocational training centres, etc. A large number ofwomen candidates from various developing countries areprovided training in various courses under Ministry’s IndianTechnical and Economic Cooperation (ITEC) and other trainingprogrammes.

Ministry has submitted its first ever Gender Budget Statementfor inclusion in the Union Budget 2013-14 and has now joinedthe club of Ministries / Departments of GOI reporting on GenderBudget. Ministry has also regularly participated in the Gender

Budget workshops conducted by Ministry of Women and ChildDevelopment (MWCD) which focuses on raising awareness ofgender budgeting issues.

Asset acquisition abroad

In pursuance of the previous recommendation of the Parliament’sStanding Committee on External Affairs, the Ministry hasconsistently endeavoured to purchase properties at variousstations and initiated action on construction of properties abroadfor chanceries and residences with a view to reduce the rentalliability of the Government. In 2012-13, India acquired propertiesfor Chanceries in Atlanta and Yerevan and a plot of land forconstruction of residential complex in Bangkok. Proposal foracquisition of property for Chancery/Cultural Centre in Kabuland plot of land for Chancery in Canberra are at advanced stageand are expected to be completed in the current financial year.Construction work is at advance stages in Abuja, Dhaka, Brasilia,Islamabad and Kathmandu while construction has started onthe Chancery-cum-residence project in Warsaw. Proposals foracquisition of properties for residences and chanceries at manyother stations abroad are actively being pursued.

Page 87: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

86

CHAPTER IV - REVIEW OF PAST PERFORMANCE

The performance of the Ministry during 2011-12 and up to 31st

December, 2012 in terms of the outlays made in various projectshas been elaborated in a tabular form. This evaluation has beencarried out in terms of the targets fixed in the Outcome Budget2011-12 and 2012-13. Each scheme has been analyzed andthe results evaluated in terms of the targets and objectives laiddown.

In the domain of Public Diplomacy, India’s foreign policy wasprojected in various states of India through Distinguished LectureSeries (DLS), interaction with media, think-tanks, institutions anduniversities both within India and abroad, and through conferencesand seminars. An annual Conference bringing together the expertsfrom academia and diplomacy on International Relations wasorganized by the Division for the second year in succession.Commissioning of documentary films and books, publication ofmonthly magazine India Perspectives in print and digital formats,were also undertaken to equip our Missions and Posts in projectinga positive image of India abroad.

As for Digital Diplomacy, the Ministry became the first CentralGovernment Organisation to proactively use social media sitessuch as Twitter, Facebook and Youtube to engage the youngergeneration in India and abroad to create awareness about various

dimensions of India’s international cooperation and diplomacy.The webfeeds have been followed eagerly and has facilitatedinteractive dialogue among the users of these social websiteson India’s foreign policy and other issues. Public DiplomacyDivision’s the “India is…..” video competition on Youtubeattracted a large number of entries from youth across the globe.

India has pledged grant assistance to the tune of US$ 200 millionto Bangladesh for its economic development. Payment of thefirst installment of US$ 50 million has been made in 2012-13.The project of Akhaura-Agartala Rail Link has been planned tocreate a rail link between Agartala and Akhaura to provide betterconnectivity between the two countries. MoU for the project wassigned between the two sides in February 2013. Feasibility studyof Ashuganj Inland Port is in under process.

In Bhutan, the construction of three Hydro-electric Projects(HEPs) with India’s assistance is in full swing. MangdechuHydroelectric Project (HEP), for which the pre-constructionactivities have been completed and the contracts for the maincivil works were awarded in March 2012, is scheduled to becompleted by 2017. This plant will have a peak load of 720 MW.India will receive surplus power from the project. This will be aclean and reliable source of power which would help bridge our

Page 88: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

87

existing energy demand-supply gap in Bhutan. The pre-construction activities of Punatsangchhu-II HEP have since beencompleted. The contracts for the main civil works have beenawarded, and their execution has begun. The Punatsangchhu-II HEP will generate peak-load energy of 990 MW, of whichsurplus will be supplied to India. The construction of thePunatsangchu I HEP (1200 MW) is progressing as per schedule.

In Nepal, India has assisted in the project of Bharat-Nepal Maitri Emergency & Trauma Centre in Kathmandu, the first of its kindsuper specialty hospital for trauma patients in that country. Supplyof medical equipment is underway. The 200-bed Trauma Centreis expected to be handed over to the Nepalese side in 2013-14.Another project- the Jogbani-Biratnagar Rail link Project includinggauge conversion in Jayanagar-Bardibas sector is underway inNepal. Earthwork, construction of bridge and station is underway.The project is intended for better connectivity which would lead toincreased trade and commerce between the two countries. Thefirst phase of ‘Terai Roads’ construction projects stretching to 605kms for better connectivity and increased trade and commercebetween the two countries is also in full swing. Construction ofroads in all the six packages of the first phase is going on. Workis also underway for the creation of Integrated Check Posts (ICP)Birgunj at the Indo-Nepal international boundary for better tradefacilitation and to check smuggling. Work on the link roadconnecting the ICP Birgunj with main road is underway.

In Sri Lanka, the Ministry has taken up the project of constructionof 50,000 houses for Internally Displaced Persons (IDPs) inNorthern and Eastern provinces. The Pilot project for 1000houses under agency-driven model has been completed. Award

of work for the 49,000 houses (43,000 under owner-driven modeland 6,000 under agency-driven model) is ongoing. Constructionof all the dwelling units will take around three years. Constructionof a 150-bed hospital is in full swing in Dickoya, Sri Lanka.

In all cases of project assistance, steps have been taken towardscapacity building of the people of the country in which a projectis being implemented. This is being implemented through aprocess involving the local authorities, relevant agencies andnon-governmental organisations in the implementation ofprojects, wherever possible. Training has been given its duesignificance. The Ministry has also made efforts to see that thereis no involvement of the Government of India required once theproject has been implemented. It is ensured that the local bodiesand the concerned Governments take over the responsibilitiesof the future maintenance and sustenance of these projects.

In Myanmar, the project of supplying tractors and agriculturalimplements for agricultural development has been completed.India is also constructing a transport corridor, namely, the KaladanMulti Modal Transit Transport System involving both water andland transportation. This corridor will provide an alternativeaccess route to the North East India from Kolkata via the Bay ofBengal. Work on the port component is on full swing at the Sittweport site in Myanmar.

In Afghanistan, the construction of 220 KV transmission line fromPul-e-Khumri to Kabul including one 220/110 KV substation hasbeen completed. Work on the construction of two moresubstations at Doshi and Charikar are underway. The project isenvisaged to supply power to Kabul and Northern provinces of

Page 89: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

88

Afghanistan from the generating stations in Uzbekistan througha transmission line from Tirmiz via Pul-e-Khumri to Kabul. Indiahad pledged a food assistance of one million Metric Tonnes ofwheat to be supplied through World Food Programme.Approximately 450,000 MT of wheat has already been releasedunder the scheme. Supply of fifth tranche of wheat is going on.India is also assisting the Government of Afghanistan in thedevelopment of power infrastructure, irrigation and townshipthrough the Salma Dam project. The project envisagesreconstruction and completion of Salma Dam Power Project (42MW) in the Herat Province. Construction of the dam is going on.However, due to escalation in the cost of various componentsand security reasons cited by sub/local contractor, the projecthas suffered delay and now expected to be completed in 2015.In another milestone of India-Afghan friendship, India isconstructing Afghanistan’s Parliament building at a cost of ̀ 710Crore. The construction work is progressing satisfactorily and isexpected to be completed by June 2013.

In Africa, the Ministry has handed over Dornier Aircraft toGovernment of Seychelles at a total cost of ` 118.19 crore inJanuary 2013. Ministry has also supplied medical equipment toMalawi worth ` 4.73 crore during 2012-13. Many other projectsand training programmes as decided in the India Africa ForumSummit I and II are under implementation.

The Indian Technical and Economic Cooperation (ITEC)Programme involves training for foreign nationals in various civiland defence training programmes from 142 developing countriesin 47 civilian and 83 defence institutions including NationalDefence College (NDC) and Defence Services Staff College

(DSSC). This programme is aimed at (a) strengthening India’sbilateral ties with these countries, and (b) sharing of India’sdevelopmental experience and expertise with developingcountries. Under the programme, the Ministry has trained 5700civilian and defence participants in various Indian institutes inthe year 2012-13 (up to 31st December 2012).

Under the framework of the South Asian Association of RegionalCooperation (SAARC), the South Asian University (SAU), aworld class University with state of the art facilities andprofessional faculty for students and researchers from SAARCMember States, has been planned to be established in asprawling campus in Maidangarhi, New Delhi. The Universityhas started functioning from its temporary premises at the AkbarBhavan in Chanakya Puri, New Delhi. 2012-13 is SAU’s thirdacademic year. The University has 323 students and 64 facultymembers.

In every case of development assistance, the Ministry has takensteps for the implementation of identified project as per themodalities laid down in the MoU/ Agreement signed with thebeneficiary countries. Consultations are held with otherMinistries and Departments in the Government of India for theiradvice and opinion on the implementation of the project. Theconstruction of power projects in Bhutan is discussed with theMinistry of Power, Ministry of Finance and the PlanningCommission.

In all projects, financial norms and regulations are scrupulouslyfollowed while awarding the work for their execution. Themechanism of monitoring, reviewing and evaluation has been

Page 90: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

89

built into the project implementation plan. Such overseeing isbeing done at the level of the Ministry and/or the concernedMission/Post to ensure that the projects remain on track. Theimplementation is monitored regularly and adequate safeguardshave been put in place to protect the interests of the Government.Stipulations such as imposition of liquidated damages andobtaining of adequate bank and performance guarantees /indemnity bonds have been incorporated into the contractssigned.

The Ministry has completed construction of its headquarters andhas shifted its Divisions located in the Akbar Bhavan premisesin Chanakya Puri to its newly constructed building, the JawaharLal Nehru Bhawan, at Janpath, New Delhi, thereby reducing itsrental liability. The building is an energy efficient, modern, greenand eco-friendly complex in complete harmony with thearchitectural and aesthetic features of the Central Vista.

Page 91: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

PressandMedia

Media relatedactivities

Totalarrangements tofacilitate mediarelated activitieson behalf of theMinistry

4.25 5.47 Arrangements for the visit offoreign journalists/delegationsto India

Continuousprocess

i) Incomingjournalists on XPhospitality from 10African countries,neighbouring Asiancountries, LatinAmericancountries, SelectASEANcountries,WestAsia (Israel,Jordan, Palestine),Kuwait, BRICScountries,Tanzania, Urdumedia fromPakistan. (ii)Training ofjournalists fromselective countries(iii) Press coverageof incoming VVIPvisits (iv) Presscoverage of visitsabroad by Indiandignitaries.

Press and Mediabriefings

Disseminationof pressinformation/media briefingson behalf of theMinistry

0.81 1.05 Supply of newspapers/periodicals to Officers andSections of XP Division;Dissemination of PressReleases, Media Advisories,Speeches & Joint Statements to

Continuousprocess

Hosting andupdation of Arabicand Urdu Sectionof MEA website.

91

Outcome Budget 2013-14

Page 92: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

92

Outcome Budget 2013-14

media; Arrangements ofregular press briefings byOfficial Spokesperson includingthose by Foreign Secretary ,Secretaries in MEA from time totime; Arrangements for JointPress Interactions in theHyderabad House duringincoming visits of Heads ofStates and Governments toIndia; Transcription of PressBriefings; Updation of MEAofficial websitehttp://mea.gov.inregularly; Project ofdevelopment of web portal ofMEA official website;Arrangements for coverage ofmeetings of MOSs for ExternalAffairs meeting with foreigndignitaries/ delegations etc;Arrangements for PTI newsscan service to MOS for ExternalAffairs, Foreign Secretary,Secretary(West), Secretary(East); Alerting media regularlythrough SMS alert service aboutvarious media related eventsand uploading of pressreleases, joint statements etc.

Page 93: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

93

Outcome Budget 2013-14

To monitorPublicity Budgetof Missions/Posts abroadand preparationof the ActionPlan of XPDivision

Otheradministrativeworks

0.44 0.46 Subscription of India AfricaConnect website maintainedbyM/s IANS, customized weeklyTRP ratings report of IndianNews channels by M/s TAMMedia and monthly subscriptioncharges of the IANS NewsService. Preparations of AnnualAction Plan of XPDivision andcompilation of Mission’sAnnualAction Plans.

Continuousprocess

5.50 6.99Total

Page 94: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

94

Outcome Budget 2013-14

Film Committeechaired by SpecialSecretary PDapprovedcommissioning ofdocumentaries onwide range ofsubjects to projectIndia’s culturalheritage in the field ofscience andtechnologies with anemphasis onshowcasing films onPublic Diplomacy.Dispatch of 35 MMprints of mainstreamIndian Cinema and aselection of 17 Hindifilms in DVD formatfor which duecopyrights have beenobtained forMissions/Postsabroad for screeningin various filmfestivalsetc.Commissioning ofcustomised packs ofpopular film musicand instrumentalmusic CDs for

PublicDiplomacy

PAV Section(Public AudioVisual Activities)

Effectiveprojection ofIndia’s imageabroad throughaudio-visualpublicity

7.09 9.34 TV channels in Georgetown(Guyana), Cape Town (SouthAfrica) and Brasilia and Beijingscreened some of thedocumentaries produced by theDivision. Total 25 documentaryfilms have so far beencommissioned (till end-January2011) and all theses films arecompleted and Master Copiesreceived by the Division.Missions in Algeria, Brazil,Mexico, Argentina and Ghanaorganised film festivals forwhich the Section sent 35 mmfilm prints with region specificlanguage subtitles. TheDivision also commissioned aninstrumental music 4-CDcustomized pack (ClassicalMusic of India) in collaborationwith M/s Sa Re Ga Ma Ltd. Acustomized packcommemorating the 150thanniversary of RabindranathTagore has beencommissioned.

Continuousprocess

Page 95: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

95

Outcome Budget 2013-14

disseminationthrough our Mission/ Posts abroad.

PMSSection(PublicDiplomacyMaterial & Supply)

Promotion ofIndia’s image invarious aspectsincludingthrough printmedia.

4.72 6.35 Printing/purchase ofvarious coffee tablebooks selected in26th & 27th BookCommittee vis.Tagore book-(i)Something OldSomething New(3600copies)(ii)India-Timeless Splendourin English & 5 otherforeign languages,(15000 copies)(iii)India for a BillionReasons (1500copies for Davos-World EconomicForum )(iV) TwoBillion Dreams-IndiaAfrica Relations forIndia Africa ForumSummit II (5000copies) (v)TheIndiaIdea (2000copies) (vi) India-TheSpirit of Enterpriseand (v) Great Indian

Meeting of the 27th BookPurchase Committee was heldin May 2011 for presentation toforeign dignitaries anddistribution to Missions /postsabroad for publicity purpose.

(i) May 2011(ii)May-June2011(iii)Sent directlyto Davos(Switzerland inJan 2011)(iv) May 2011(v)October2011The timeline for deliveryof the coffeetable bookswasmaintained.

Page 96: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

96

Outcome Budget 2013-14

Yoga Masters inEnglish/otherlanguages (7000copies) and purchaseof general books forpresentation toforeign dignitaries byour Missions/Postsabroad

To spreadawarenessaboutIndia and itsactivities throughreaching out to thewidestcross-sectionof readers abroadthrough themagazine andbymaking it accessibleonline throughvarious websites.

IndiaPerspectivesMagazine

Monthlypublication ofthe magazine forpublicity andpromotion ofIndia’s imageabroad.

4.72 5.70 To spread awareness aboutIndia and its activities throughreaching out to the widestcross-section of readersabroad through the magazineand by making it accessibleonline through variouswebsites; printing a specialaddition of RabindranathTagore book on his 150th birthanniversary.

Monthly Issue Monthly issues ofIndiaPerspectivesmagazines in 17different languagesincluding majorforeign languages

PORSection(PublicDiplomacyOutreach)

Projection ofIndia/Indianforeign PolicythroughDistinguishedLectureSeries,interactionwith mediathink-tanks.Institutions and

2.76 3.94 Processed 22 casesof financialassistance toInstitutions/Organisations.Handled 10incoming visits,mostly ParliamentaryDelegations

Division has been able toachieve the desired objectives ofoutreach activities. Theincrease in the number of visitsis a key indicator. PD Division’sconference on “PublicDiplomacy in the InformationAge” is one of the highlyacclaimed event.

All outreachactivities are

None

Page 97: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

97

Outcome Budget 2013-14

(Important ones beingPILDAT delegationfrom Pakistan,Nepalese womenConstituent Assemblydelegation, young CAdelegation fromNepal, AfricanParliamentarians etc).Sponsored the visit of2 think tanks/academicians toattend seminar/Conference abroadOrganised 12Distinguishedlectures in differentuniversities

Digital Diplomacy 0.20 0.24 To engage theyounger generationthrough digital newmedia such asFacebook, Twitter,Youtube as well asinteractive website

PD Divisions Twitter page has23 thousand followers while itsFacebook page has 24thousand followers fromseveral locations .Its Youtubepage has been visited by over1.8 lakh people

Everyday

Universitiesboth within Indiaand abroad.

time bound bynature and alldeadlines havebeen met.

Administrativeexpenses

Submission of Datato Finance andkeeping a Tag on theexpenditure incurredby this Division.

Misc. expenditure related withadministration. MaintainingCongruency and cohesion onfinance matters in the runningof the PD Division

0.51 0.67

To reach out tothe youngergeneration inIndia andabroad

ContinuousProcess

Page 98: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

98

Outcome Budget 2013-14

Keeping abreast withthe accounts sectionon streamlining ofpayments andstaffing of the entiredivision.

20.00 26.24TOTAL

Page 99: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

99

Outcome Budget 2013-14

CPV Central PassportOrganization andpassport, visaand consularrelated activitiesin Missions/Postsabroad

Networking ofPassportOffices,Upgradation ofhardware,Scanning ofPassport files,Provisions ofmachinereadableprinters,implementationof PassportSeva Project (i)Data Centre (ii)DisasterRecovery Centre(iii) ProjectManagementUnit

402.60 405.25 Networking wouldenable updation ofcentral database(PISON) at least ondaily basis. Largenumbers of passportapplication files areanticipated to bescanned. An equalnumber of records isanticipated to beadded to the centraldatabase. ITinfrastructure underPassport SevaProject.

1. All passport Offices havebeen computerized and theynow issue machine-readablepassports as per the guidelinelaid down by the internationalCivil Aviation Organization. 2.Rendered a total of 73.65 lakhpassport services by allpassport issuing authorities. 3.Online submission of passportapplication has beenintroduced. 4. Passport Adalatsare now being held once amonth all over India as a part ofpendency clearance drive,54,418 Public Grievancesdisposed off through PublicGrievances RedressalMechanism of the CentralPassport Organization. 5. Underthe PSP, a new online portalpassportindia.gov.in has beencreated to offer passportservices. 6. 726 E-Official and843 E-diplomatic passportswere issued by the Ministry till01.01.2011 7. Under thePassport Seva Project, total of50 Passport Seva Kendras havebeen set up all over India till 4thFebruary, 2012. Over 12.3 lakhpassport applications have

The PassportSeva Project hasgenerated apositive response.

Page 100: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

100

Outcome Budget 2013-14

been processed under the newsystem as on 31st December2011.

402.60 405.25TOTAL

Aid toBangla-desh

Variousdevelopmentprojects

3.00 8.80

3.00 8.80TOTAL

Akhaura-AgartalaRail Link,Scholarships toBangladeshistudents, TrainingProgrammes etc.

Ongoing Project

Page 101: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

101

Outcome Budget 2013-14

Aid toBhutan

Dungsum CementProject

This project has helped instrengthening bilateraleconomic linkages andsupported Bhutan’sdevelopment efforts. It hasprovided local employment. Itwould exploit Bhutan’s onlyviable mineral resource in thearea, limestone, and provide asource for cement for East andNorth-east region of India.

A one million tonnecapacity cementplant for supplyingthe needs of Bhutanas well as North-east Region ofIndia.

10.00 0.00

India will receivesurplus powerfrom this project.This would be aclean andreliable sourceof power whichwill help bridgethe existingenergy demand-supply gap inIndia.

Punatsangchhu-IHydroelectricProject

350.00 561.60 Will generate peak-load energy of 1200MW, of which surpluswill be supplied toIndia.

Pre-construction activities wereunder way during 2010-11.These have now beencompleted. Contracts for thecivil, electromechanical andhydromechanical works havebeen awarded. The civil work isin full swing.

Punatsangchhu-IIHydroelectricProject

India will receivesurplus powerfrom thisproject. Thiswould be aclean andreliable source

200.00 303.13 Will generate peak-load energy of 990MW, of which surpluswill be supplied toIndia.

Pre-construction activities wereunder way during 2010-11.These have been completed.The contracts for the main civilworks have been awarded, andtheir execution has begun.

There were nodisbursements forthe project duringFY 2011-12 as nodemands werereceived for theproject.

The project wasunder way, withJuly 2012 as theexpectedcompletiondate.

Page 102: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

102

Outcome Budget 2013-14

of power whichwill help bridgethe existingenergy demand-supply gap inIndia.

MangdechhuHydroelectricProject

India will receivesurplus powerfrom this project.This would be aclean andreliable sourceof power whichwill help bridgethe existingenergy demand-supply gap inIndia.

130.00 165.27 Will generate peak-load energy of 720MW, of which surpluswill be supplied toIndia.

Pre-construction activities wereunder way during 2010-11.These have now beencompleted and the contracts forthe main civil works will beawarded in March 2012.

DevelopmentSubsidy

Developmentpartnership withBhutan to assistits economicdevelopment

To subsidisepower bought byM/s PTC Ltd.from Chukhahydroelectricproject, Bhutanfor supply to

78.98 135.73 Maintaining friendlyrelations with Bhutan.

Chukha subsidy 90.00 73.40

Page 103: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

103

Outcome Budget 2013-14

West Bengal,Sikkim, Biharand Odisha.

Supply ofKerosene oil andLPG to Bhutan atsubsidised prices

To preventcross-bordersmuggling ofSKO/LPGacross an openborder under afree traderegime

50.00 39.84 Maintaining friendlyrelations with Bhutan.

Excise duty refund To promoteIndian exports toBhutan andcompensateBhutan for theloss of revenueunder the freetrade regime.

140.00 122.29 Maintaining friendlyrelations with Bhutan.

Project-TiedAssistance (PTA)

Developmentpartnership withBhutan to assistits economicdevelopment

400.00 526.17 Maintaining friendlyrelations with Bhutanand building goodwillfor India at thegrassroot level inBhutan.

Implementation of theapproximately 70 projectsprogressed as per schedule.

SmallDevelopmentProjects (SDPs)

Developmentpartnership withBhutan to assistits economicdevelopment

200.40 75.81 Maintaining friendlyrelations with Bhutanand building goodwillfor India at thegrassroot level inBhutan.

Implementation of first phase of440 projects and second phaseof 819 projects commenced.

Page 104: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

104

Outcome Budget 2013-14

Total SolutionsProject

Indianassistance toBhutan’s effortstowardsbecoming aknowledgesociety

29.05 15.44 Maintaining friendlyrelations with Bhutanand building goodwillfor India at grassrootlevel in Bhutan.

Deliverables such as computerhardware and printedcourseware etc. have beendisbursed as per the agreedschedule.

Bhutan Institute ofMedical Sciences

Developmentpartnership withBhutan to assistits economicdevelopment

10.56 0.00 Maintaining friendlyrelations with Bhutan.

Work on first two phases of therenovation has begun.

India’scommitment toprovide anassistance of ` 25crore for theproject.

Miscellaneous Variousinitiatives, visits,training assis-tance etc. underongoing bilateralcooperation.

1.00 2.68 Maintaining friendlyrelations with Bhutan.

Total 1690.00 2021.36

Page 105: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

105

Outcome Budget 2013-14

Aid toNepal

Createnecessaryinfrastructure tofacilitate tradeand commercebetween Indiaand Nepal inmodern andscientific way.

IntegratedCheck Posts(ICP) atJogbani-Biratnager,Raxual-Birgunj,Sunauli-Bhairahawa andNepalganj-NepalganjRoad.

3.00 5.05 Award of work Work commenced at BirgunjICP.

14 months foreach ICP fromdate of award ofcontract

Due to delay inhanding over ofsite, extension oftime, resulting inincrease inconsultancy cost.

Rail Link atJogbani-Biratnagar &and Jayanagar-Bijalpura-Bardibas.

Create rail linkbetweenJogbani-Biratnagar andGaugeConversion ofJayanagar-Bijalpura-Bardibas andconstruction ofrailway stationat Bardibas.

20.00 34.00 Better connectivity,increased trade andcommerce andpeople-to-peoplecontacts.

DPR complete for Jogbani -Biratnagar. Final location surveywork on gauge conversion forthe last 10 kms underway. WorkonIndian side underway

Facilitate tradeand commerceand people-to-people contacts.

Delay in removalof encumbrances,delay in handingover of land anddelay in statutoryclearances maylead to increase inthe project cost.

Terai RoadProject

Upgradation of605 kmconsisting of 19roads underway.

92.00 31.84 Award of work for sixpackages

Better connectivity would lead toincreased trade and commerceand people-to-people contacts.

30 months fromthe date of theaward of workfor eachpackage.

Delay in removal ofencumbrancesand delay instatutoryclearances couldresult in increasein project cost.

Page 106: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

106

Outcome Budget 2013-14

Bharat-NepalMaitri Emergencyand TraumaCentre,Kathmandu

200-bedEmergency andTrauma Centreto providemedicalservices to thepeople ofNepal.

1.20 1.66 200-bed Emergencyand Trauma Centre(work ongoing).

200 bed Emergency andTrauma Centre (work ongoing)-civil work for the centreis complete. Tendering formedical equipment underway.

Delay in taking overof the centre byGovernment ofNepal could resultin increase cost ofproject

Establishment ofNepal-BharatMaitri Polytechnicat Hetauda

Construction ofPolytechnicbuilding,institutionalblock,administrativeblock,residentialblocks, Hostels,etc in approx 32acres land.

0.60 0.00 Identification ofconsultant for theproject by invitingExpression ofInterest.

Bilateral MoU signed betweenGovernment of India andGovernment of Nepal,Consultant appointed,Agreement with Consultantsigned

No cost overrun,drawings andestimation areunder preparation

Construction ofNepal-BharatMaitriDharmashala,Tilanga,Kathmandu

Construction ofa DharmashalaBuilding inTilganga,Pashupati TrustArea in 5500 sqmtr area alongwith allied sitedevelopmentwork.

0.10 0.00 Identification ofconsultant,Prequalification ofcontractors

Consultant for the Projectappointed

No cost overrun,prequalificationapplications invitedfrom eligiblecontractors

Page 107: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

107

Outcome Budget 2013-14

Payment toNational Hydro-electric PowerCorporation(NHPC)

Embankmentconstruction onLalbakaya,Bagmati, Kamlaand Khandorivers.

Supply ofelectricity toNepal underbilateralcommitment.

Construction ofembankmentson rivers inNepal for floodprevention onIndian side. Tomitigate theproblems offloods both inIndia and Nepal.

Support forhumanresourcesdevelopment inNepal.Approximately1800scholarship ayear forNepalesestudentsstudying inNepal and India.

3.00 0.00

Flood mitigation

Supply of electricity to Nepal.(Regular payment).

Supply ofelectricity toNepal underbilateralcommitment.

Ongoing project

Annual payment.

9.68 3.20 Embankments on Lalbakaya,Bagmati, Kamla and Khandorivers (on an ongoing basis).

Scholarship toNepalesestudents (Paymentto ICCR and otherschemes).

1.80 9.00 Scholarship toNepalese studentsfor MBBS, B.Techand other courses.Various educationalscholarships/slotsprovided toNepalese studentsunder variousschemes of GOI.These are aimed atbuilding a pool ofskilled manpower inNepal.

Support for human resourcesdevelopment in Nepal.

Ongoingproject.

Page 108: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

108

Outcome Budget 2013-14

ManmohanAdhikariPolytechnic (MAP).

GoI support toMAP forengineeringdiplomas.

1.01 0.74

Rehabilitation of theproject.

Projectcompleted

Mahendra Nagar-Tanakpur Project.

Creation of thelink road is acommitmentunder MahakaliTreaty.

0.60 0.00

MAP is functional. Indian facultyat the polytechnic.

Devighat Hydro-electric Project .

Rehabilitationof the projectwhich wasimplementedunder GOIassistance.

Capacitybuilding for thepolice force inNepal.

SDPs executedunder GOIassistance inNepal for thebenefit of thepeople ofNepal. Projectsat the grassrootlevel, which

1.20 1.90

MoU underconsideration

Nepal PoliceAcademy.

0.00 0.00 Capacity building forthe police force inNepal.

DPR is under submission toMinistry of Transport and Roadfor approval

SmallDevelopmentProjects (SDPs)

DPR is under submission toMinistry of Transport and Roadfor approval

Projectcompleted

5.90 58.20 Over 400 projectssuch as schools,hospitals and othersocial infrastructureelements beingimplemented andhanded over to localauthorities.

Continued execution of SDPsthat contributes to socio-economic development of thelocal people as these focus oncommunity infrastructure infields such as education andhealth.

Ongoing project.

Page 109: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

109

Outcome Budget 2013-14

directly benefitscommon peopleand helpscreate a positiveimage of India.

Police training,human capacitybuilding andmodernizationprogrammes.

1.80 3.70Ongoingassistance toenforcementagencies ofGovernment ofNepal. Capacitybuilding ofsecurity force.

Capacity building forthe police force inNepal.

Ongoing training programme.

Construction ofCollege Block &Indian facultysupport for BPKoirala Institute ofHealth Science,Dharan, Nepal(BPKHIS)

Additionalinfrastructure forBPKIHS and toprovide facultysupport underbilateralcommitment.

1.20 4.10 A new college block &Indian faculty atBPKIHS.

Under bilateral commitment toprovide faculty support toBPKIHS over the next two years.

2013

Intermediatedevelopmentworks executedunder GOIassistance inNepal.

3.00 0.00 Social infrastructureprojects benefitingthe common peopledirectly and add toIndia’s image.

Continued execution of theintermediate projects. Eachlikely to be completed in 3 yearstime.

IntermediateDevelopmentProjects - BirgunjSabha Griha,1000 shallowtube wells,upgradation ofroad, BaktawariEye Hospital etc.

Ongoing project

Page 110: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

110

Outcome Budget 2013-14

Science LearningCentre.

GOIcooperation inEducationsector benefitscommon manand projectsscientificcapabilities ofIndia.

1.20 0.00 Science LearningCentre nearKathmandu.

MoU signed inJan 2010.

Preliminary work ongoing forthe project. Selection ofConsultant is under processfor the project.

Repair of East-West Highway.

GoI commitmentto provideassistance forrepairs to theHighway whichwas affected byKosi floods.

0.60 0.00 Feasibility report forthe repairs has beenprepared.

Preliminary work ongoing.Feasibility report for the repairshas been prepared.

As perfeasibilityreport, 1 yearfor detailedinvestigationsand 18 monthsfor constructionwork would beneeded.

Other Misc.projectsincluding visits

2.11 37.76

TOTAL 150.00 191.15

Page 111: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

111

Outcome Budget 2013-14

Aid to SriLanka

Setting up ofhospital atDickoya

150-bedhospital atDickoya toprovide medicalservices to thepeople of SriLanka

To rehabilitatethe KKS harbourin Jaffnaprovince of SriLanka and makeit capable tohandle mediumsize vessels

To strengthenbilateralrelations withSri Lanka

5.00 4.18 Setting up of 150-bed hospital

Work under consultancy ofHSCC

Delay in handingover of projectsite byGovernment of SriLanka

(a) June 2013

Kankesanthurai(KKS) Harbour

40.00 74.24 To rehabilitate theKKS harbourdamaged during theconflict.

Wreck removal completed inJanuary 2012

(a) April 2013

Other Projects/Programs

245.00 103.52 Setting up ofVocational TrainingCentres,Construction of 1000houses under PilotProject for InternallyDisplaced Persons,Establishment ofIndia Gallery atInternationalBhudhist Museum inKandy, ScholarshipProject for studentpursuing highereducation,

Page 112: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

112

Outcome Budget 2013-14

Empowering womenthrough SelfEmployed WomenAssociation (SEWA)in Batticaloa.

290.00 181.94TOTAL

Aid toMaldives

Renovation ofIndira GandhiMemorialHospital(IGMH),Male

Renovation of theIGMH hospitalestablished byGOI in the 1990s.

2.00 0.00 Renovation of thehospital building inMale

(a) 2 years (b) 4years

Training of officialsin defence andcivil courses,InformationTechnology, Cashassistance toMaldives forholding SAARCSummit etc.

Other Projects 8.00 37.38

To strengthen relations withMaldives

TOTAL 10.00 37.38

To strengthen relations withMaldives

Page 113: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

113

Outcome Budget 2013-14

Aid toMyanmar

Provide a traderoute toMyanmar and adependablemode oftransport toNorth Easternpart of India.

KaladanMultimodalTransit TransportProject

Terminal at Sittweport, inland waterwaysystem betweenSittwe and Paletwaand DPR for PaletwaKaletwa RoadSection

60.00 28.31 Construction work started.Delay in handing over of siteby Government of Myanmar

Limited workingseason (5 months),remote location ofthe project,statutoryclearances fromGovt. of Myanmar.

TrilateralHighway Project

Provide road linkwith Thailandwhich may beextended toASEAN andGanga-Mekongbasin countries

5.00 2.80 Preparation of DPR DPR will serve as the basicdocument for award of contractto the implementing agency

Enhancecross-borderconnectivity

Limited workingseason (5months), remotelocation of theproject, statutoryclearances fromGovernment ofMyanmar.

Rhi-Tiddim Road To create roadlink between Rhiin Mizoram andTiddim inMyanmar

5.00 0.00 DPR prepared byBorder RoadsOrganisation needsupdating forimplementation ofthe project

Tender Document under vettingby Ministry of Road Transportand Highways

Supply of tractorsand agriculturalequipments

33.00 12.60

Other projects

TOTAL

87.00 23.69

190.00 67.40

Page 114: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

114

Outcome Budget 2013-14

Aid toOtherDevelo-pingCountries

Construction ofPalestineEmbassy cumResidentialComplex in NewDelhi

Strengthenbilateralrelations withPalestine

It was a fixed ratecontract andhence no costescalation

(a) June 2009(b) March 2011

The construction workcompleted in March 2011

9.41 0.13

FinancialAssistance toIndian Hospicein Jerusalem

To strengthenbilateralrelations andimproveperception ofIndia.

0.20 0.30 Annual commitment is beingbudgeted from 2010-11

It is an annualcontribution ofUSD 20,000/-and amount inINR varies onlydue to officialrate of exchange.Indian touristsareaccommodatedin the Hospice

India-MaldivesFriendshipFaculty ofHospitality &Tourism Studiesat Male

To further boostbilateralrelations withMaldives and toassist them insetting up of thisspecialityinstitute cumhotel

5.00 4.45 To assist Maldives in itscapacity building in hospitalityand tourism studies

(a)December2008 (b)March2013

Initial cost:`. 50.73 crore;Revisedcost(approved)`. 69.65 crore.The contract wasoriginally awardedto a privatecompany in 2007.Due to non-performance thecontract wasterminated and re-

Page 115: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

115

Outcome Budget 2013-14

awarded toNBCC in 2010.The escalation incost is due toincrease in thecost of materialduring the gap ofthree years.

Conservation &Restoration of TaProhm Temple inCambodia.

Conservationof certainportions of theworld heritagemonument asapproved bythe UNESCO’SICC and theCambodianGovernment.

3.45 3.78 Conservation ofvarious sections oftemple and itssurroundings to beimplemented.

It is envisaged that work planas conceived by theArchaeological Survey of India(ASI) and approved by ICC andCambodian Government wouldbe adhered to.

(a) April 2011(b) April 2013

Originallyapproved for`. 19.57 crore andnow approved for`. 34.16 crore dueto (a) additionalnine criticallocationsidentified forrestoration (b)Increase in thescope of work inthe ‘ Hall ofDancers’. (c)Increase in thescope of work forWAPCOS (d)Increased scopeof work for ForestResearch Institute

Page 116: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

116

Outcome Budget 2013-14

computer labsand capacitybuildinginstitutes.

India and training tobe given in Vietnam.

Conservation ofWat Phou Temple,Lao PDR

To furtherstrengthenbilateral andcultural relationbetween the twocountries byimplementingthe project.

1.55 1.65 Conserve and restorethe damage of WatPhou TempleComplex andaddress other relatedproblems like waterdrainage etc.

Archaeological Survey of India(ASI) will continue theconservation in Wat PhouTemple

May 2017

IT Centre in Syria Offer Indianexperience in ITservices.

2.78 2.77 To Train studentsfrom Syria in differentmodules of ITcourses.

2nd year training hascommenced.

May 2012

Development ofSMEs inZimbabwe

To assistZimbabwe bysetting up ofVocationalTrainingCentres in thefield of SME.

1.17 0.83 Training programmefor 400 students in ayear.

Last phase of on-the-jobtraining commenced.

(a) June 2008(b) June 2012

To assistVietnam in thefield of IT bysetting up of anumber of

Setting up of anAdvancedResource Centreat Hanoi,Vietnam

5.52 6.62 Project consists ofsetting up of anumber of computerlabs, training ofVietnamese faculty in

The project was inaugurated inSeptember 2011.

June 2012

Page 117: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

117

Outcome Budget 2013-14

IT Centre,Ecuador

Offer Indianexperience in ITservices.

1.00 0.00 To Set up the ITTraining Centre,supplying ofcomputers, trainingmaterial and otherequipment.

Not yet started

Work has started.IT Centre,DominicanRepublic

Offer Indianexperience in ITservices.

1.44 1.44 To Set up the ITTraining Centre,supplying ofcomputers, trainingmaterial and otherequipment.

May 2013

Assistance toBahamas in thefield of solarenergy

Assistance inthe field of solarenergy toBahamas.

0.02 0.02 Supply of several utilityequipments using solar energytechnology and to imparttraining to the technicians inBahamas in October 2012.

IT Centre inGrenada

Offer Indianexperience in ITservices.

1.20 1.20 To Set up the ITTraining Centre,supplying ofcomputers, trainingmaterial and otherequipment.

Project was officiallyinaugurated in April, 2011.

October 2012

VocationalTraining Centre,Aceh, Indonesia

To set up aVocationalTraining Centrein Aceh,Indonesia

1.22 1.34 To set up workshopin different fields ofconstruction sectorand impart trainingto students in Aceh.

Project was inaugurated inJuly, 2011.

March 2012

Page 118: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

118

Outcome Budget 2013-14

Setting up of ITCentre started in2008. Two yearstraining completed inMarch 2010. On therequest ofGovernment of ElSalvador andNicaragua anextension of one yearwas granted.

1.EL SalvadorProjectcompleted in May2011,2.NicaraguaProjectcompleted inJune 2011 and3.JamaicaProjectcompleted inFebruary 2011.

Setting up of ITTraining Centre atEl Salvador,Nicaragua,Jamaica

Offering Indianexperience in ITServices.

1.04 0.94 Projects completed

TOTAL 35.00 25.47

Page 119: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

119

Outcome Budget 2013-14

InvestmentPromotionandPublicity

Investment &TechnologyPromotion:Printing ofPublication(Books and CDROMs & Airfreight, packing &forwarding

Information contained in thepublication was disseminatedto over 170 Indian Missions/Posts abroad. Proved valuablein highlighting businessopportunities in varioussectors of the Indian economy,trade figures, EXIM policiesand measures for promotingforeign investment into India.

Disbursinginformation onopportunities inIndia tointerestedbusinesses/individuals andapex chambersabroad

0.20 0.31 Printing of ITPDivision’s AnnualPublication

Maintenance ofwebsite

Providinginformation onbusinessopportunities inIndia to thegeneral public

0.18 0.28 An exclusive websitefor dissemination ofall up to dateinformation on theIndian economy

To promote FDI and trade byeducating the target usersabout India’s FDI policies andinformation on India’seconomy

Misc PromotionalActivities

Organization ofconferenceswith Chambersof Commercefor promotion ofFDI and otherinvestmentpromotionactivities

0.73 0.51 Misc PromotionalActivities

Contributed to familiarizing thetargeted constituents regardingIndia’s trade and investmentrelated policies. Facilitatedexchange of Information andIndia Brand Promotion

Page 120: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

120

Outcome Budget 2013-14

Consultancy Fund To ensureeffectiveutilization ofLOCs byreceipientcountries

3.00 0.89

Total 4.11 1.98

EnergySecurity

MiscellaneousExpenditure

Subscription ofjournals,publicationsrelated toEnergy Security.

0.89 0.06Total

Page 121: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

121

Outcome Budget 2013-14

ITEC Indian Technicaland EconomicCooperation(ITEC)Programmeinvolves trainingfor foreignnationals invarious civil anddefence trainingprogrammes from142 developingcountries in 47civilian and 83defenceinstitutionsincluding NationalDefence Collegeand DefenceServices StaffCollege.

Total

(a) Strengthenbilateral ties;(b) ShareIndia’sdevelopmentalexperience andexpertise withdevelopingcountries;

120.00 103.77 Training of 6886civilian and defenceparticipants invarious IndianInstitutes.

Training of 6300 civilian anddefence participants in variousIndian Institutes.

120.00 103.77

Page 122: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

122

Outcome Budget 2013-14

SCAAP SpecialCommonwealthAssistance forAfrica Programme(SCAAP) involvestraining for foreignnationals from 19countries in Africa

(a) Strengthenbilateral ties;(b) ShareIndia’sdevelopmentalexperience andexpertise withdevelopingcountries;

15.00 23.74 Training of civilianand defenceparticipants invarious IndianInstitutes.

Cost escalationdue to highinflation rate,increase intransportationcost, facultycharges etc.

(a) & (b) all thetrainingprogrammescommencedfrom April,2011till March, 2012.All the trainingprogrammeshave fixedschedules.

Total 15.00 23.74

TCSColomboPlan

TCS of ColomboPlan trainingimparted to theNationals of 18countries in 40Institutes.

(a) Strengthenbilateral ties;(b) ShareIndia’sdevelopmentalexperience andexpertise withdevelopingcountries;

Training of 316 civilianparticipants in variousInstitutes.

8.00 3.77 Training of 500 civilianparticipants in varioustraining Institutes inIndia.

(a) & (b) all thetrainingprogrammescommencedfrom April,2011till March, 2012.All the trainingprogrammeshave fixedschedules.

Cost escalationdue to highinflation rate,increase intransportationcost, facultycharges etc.

Total 8.00 3.77

Page 123: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

123

Outcome Budget 2013-14

SAARCPro-gramme

SAARCProgramme

Strengthening ofcooperationamong SAARCCountries

10.00 8.02 Programmes were organized toboost regional capacitybuilding, people-to-peoplecontact and generalcooperation in diverse fieldssuch as textiles & handicrafts,support for SAARC festivals onfolklore, literary, arts, bands,scholarship etc.

Total 10.00 8.02

SouthAsianUniversity(SAU)

Contribution toSouth AsianUniversity (SAU)

Strengthening ofcooperationamong SAARCCountries

25.00 23.35 As part of India’s commitment toestablish a South AsianUniversity, out of 100 acres landallocated for the project, DelhiDevelopment Authority (DDA)handed over a total of 93.68acres. In its second academicyear, the University had 156students and 30 faculty.

Total 25.00 23.35

2014

Page 124: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

124

Outcome Budget 2013-14

CoastalSurveillanceRadar System(CSRS) forGovernment ofMauritius

Aid toAfrica

Supply ofCoastalSurveillanceRadar System(CSRS) toGovernment ofMauritius

1.10 0.00 Installation &Commissioning ofCSRS in Mauritiuswas completed.

Total Cost : Euro2,465,726.00(Approx. `.16.80Cr.)

Surveillance capability atMauritius Coastline enhanced.

SolarPhotovoltaicequipment inRawanda

Supply &installation ofSolarPhotovolticequipment in35 schools inrural areas inRwanda

0.44 0.00 Total cost : `.4.12Cr

Establishment ofFaculties ofEngineering &InformationTechnology inNamibia

Establishmentof Faculties ofEngineering &InformationTechnology atUniversity ofNamibia, UNAMin Windhoek

Supply of CTScan machineto Black LionHospital ofEthiopia

4.39 0.00 Capacity building in the field ofIT in Lesotho

Estimated cost ofthe project: `.59.40Cr.

CT Scan machinefor Ethiopia

1.32 0.00 Project curtailed. Estimated cost ofthe project: `. 6.05Cr.

Page 125: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

125

Outcome Budget 2013-14

Medicalequipment toBotswana

Supply ofmedicalequipment toBotswana

0.88 0.00 Medical equipmenthave been suppliedto Botswana

Hospitals in Botswana havebeen equipped for betterservices

Estimated cost`.5.00 Cr.

Medicalequipment toSeychelles

Supply ofmedicalequipment toVictoria Hospitalin Seychelles

0.66 1.68 Out of 13 medicalequipment to besupplied to VictoriaHospital, 03 havebeen supplied, 07are in their finalstage ofimplementation; 03are beingprocessed.

Facilities in Victoria hospitalhave been improved.

Estimated cost of`. 5.15 Cr.

Centre ofAdvancedEducation inInformationTechnology (CAE-IT) in Lesotho

Setting up ofCentre ofAdvancedEducation inInformationTechnology(CAE-IT) atLerotholiPolytechnic inMaseru(Lesotho) byCentre forDevelopmentof AdvancedComputing (C-DAC)

1.10 3.70 Installation &Commissioning ofILCAE-IT in Maseru,Lesotho completed.

Government of Lesotho hasbeen assisted in the field ofInformation Technology.

Estimated Cost of`. 8.70 Cr.

Page 126: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

126

Outcome Budget 2013-14

Hole-in-the WallProject inZimbabwe

Setting up of 03Hole-in-the WallLearningStations inZimbabwe

0.49 0.00 03 Hole-in-the-WallLearning Stationshave been installedand commissionedin Zimbabwe byHole-in-the-WallEducation Ltd.(HiWEL). Projectcompleted.

Elementary level ComputerAided Education for Childrenin rural areas of Zimbabwehave been put in place.

Total cost of 0.47Cr.

CoastalSurveillanceRadar System toGovt. ofSeychelles

Supply ofCoastalSurveillanceRadar Systemto Govt. ofSeychelles byBharatElectronicsLimited (BEL),Bangalore

0.33 0.00 Procurement andshipment of theequipment is beingdone. Delivery of theCSRS equipment inSeychelles expected(Feb-Mar 2013)

Improved surveillancecapability of Seychelles wouldbe of strategic importance toIndia.

Total Cost : US$9,478,820.00

Offshore PatrolVessel (OPV) forMauritius

Supply of oneOPV toMauritius

3.29 40.31 Projectimplementation isunder process.

Supply of OPV would assistMauritius to guard its coastline.

Estimated Exp.of`. 3.82 Cr. in 03years

Deputation ofDirecting Staff inUganda

Deputation ofDirecting Staffto Uganda’sSenior &CommandCollege,Kimaka(Uganda)

1.10 0.00 Defence Team is inplace in Uganda

Training of Defence personnelin Uganda

Page 127: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

127

Outcome Budget 2013-14

Deputation ofexperts toSeychelles &Mauritius

Deputation ofexperts toSeychelles &Mauritius

0.66 0.00

Assistance toMalawi

Supply ofLaboratoryequipment,Digital Printingmachine,tractors,medicalequipment toMalawi

3.29 2.37 Science Laboratoryequipment to Malawihave been suppliedto Malawi.Procurement ofDigital PrintingMachine is underprocess.

School Laboratories in variousschools of Malawi have beenequipped.

Dornier Aircraft forSeychelles

Supply ofDornier Aircraftto Seychelles

10.97 0.00 Air Surveillance capability ofSeychelles improved.

Projectcomplete

SolarElectrification inrural areas ofAfrican countries

SolarElectrification in5 countries ofAfrica byBarefootCollege, Tilonia

0.88 0.00

Strategy Paper onWater Resourcesin Africa

Preparation ofStrategy Paperon WaterResources byWAPCOS

2.19 4.72 Preparation ofStrategy Paper onWater Resources forSave RiverBasin,ZimbabweSankuru River Basin,Congo & Lake Chad

Expertise and technicalknowledge in the field of WaterResources for irrigation &power purposes have beenshared with the Africancountries

Page 128: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

128

Outcome Budget 2013-14

Basin is underprocess.

Sharing ofexperience onpolicy andregulatoryframeworks onfinancial sectorincludingmicrofinancesector

Capacitybuilding in thefield of micro-finance sector

2.19 0.00 05 projects on (a)Micro-finance, (b)Micro-enterprise andlivelihood promotion,(c) Micro-insurance,(d) Health andChildcare and (e)Capacity building forleadership,management arebeing implementedby Self EmployedWomen’s Association(SEWA).

Decisions being implementedunder India Africa ForumSummit (IAFS).

Training coursesin power sector

2.19 0.46 03 training coursesfor African studentshave beenconducted byNationalHydroelectric PowerCorporation Ltd.(NHPC), Faridabad.

Decisions being implementedunder India Africa ForumSummit.

HumanSettlementCentres in Africa

Establishment ofHumanSettlementCentres in Africa

4.39 0.00 Commitments made at IndiaAfrica Forum Summit II

Page 129: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

129

Outcome Budget 2013-14

Apex TrainingOrganization inCoal Sector inAfrica

Establishmentof ApexTrainingOrganization inCoal Sector

7.68 0.00 Commitments made at IndiaAfrica Forum Summit II

Apex PlanningOrganization inCoal Sector

Establishmentof ApexPlanningOrganization inCoal Sector inAfrica

8.78 0.00 Commitments made at IndiaAfrica Forum Summit II.

India AfricaInstitute ofInformationTechnology (AIIT)

Establishmentof India AfricaInstitute ofInformationTechnology(AIIT) in Ghana

7.68 0.00 Commitments made at IndiaAfrica Forum Summit II.

India AfricaInstitute ofEducationalPlanning andAdministration

Establishmentof India AfricaInstitute ofEducationalPlanning andAdministrationby NationalUniversity ofEducationalPlanning andAdministration(NUEPA)

3.84 0.62 Commitments made at IndiaAfrica Forum Summit.

Page 130: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

130

Outcome Budget 2013-14

VocationalTraining Centres(VTC) in Africa

Setting up 10VTCs in Africancountries

Setting up of 10VTCs in BurkinaFaso, Burundi, Egypt,Ethiopia,Mozambique, Gabon,Gambia, Libya,Rwanda &Zimbabwe is underprocess.

4.39 6.53 Fulfilment of commitments atIndia Africa Forum Summit.

India-AfricaAgricultureScholarships

Scholarships toAfrican studentsin the field ofAgriculture

1.54 5.16 Scholarships forMasters & doctoraldegree to Africanstudents admitted invarious AgriculturalUniversities in Indiaare being provided.

Fulfilment of commitments atIndia Africa Forum Summit.

The scheme isspread overfive years

Food Fairs inAfrica

Participation ofIndia inInternationalFood Fairs inAfrica underIAFS

0.27 2.50 India participated in03 InternationalFood Fairs in Africaduring 2011-12 (I)Africa’s Big Seven inJohannesburg,South Africa; (ii)Lagos InternationalFair in Nigeria 7 (iii)Addis AbabaInternational TradeFair in Ethiopia

Bilateral trade in the field ofFood Processing Sector.

Page 131: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

131

Outcome Budget 2013-14

TrainingProgrammes

Capacitybuilding in thefield of Climatechange,transport,journalism &maritimesecurity in Africa

3.29 3.31 Trainingprogrammes wereconducted in thefield of Climatechange, transport &journalism forAfrican students

Fulfilment of commitments atIndia Africa Forum Summit.

PAN-African e-networkProgramme

To strengthenrelations withAfricancountries

64.11 32.49 Projectcommissioned in 47countries

To strengthen relations withAfrican countries.

Total project costis `. 542 crore fora period of 6 1/2year. Started in2008

EmergencyAssistance toWest Africancountries

To strengthenrelations withAfricancountries

5.48 0.00 To supplymedicines, relief-material or cashassistance in caseof disasters

USD 1 million provided toSenegal as flood relief. Euro86,452/- sanctioned to Nigeron 31.03.2011 for purchase oftwo television cameras.

Aid to CapeVerde (supply ofcomputers)

To strengthenrelations withAfricancountries

1.10 0.00 To supply computersand accessories

In process

TechnicalAssistanceProgramme(TAP) for thecotton sector inselect Africancountries

Development ofcotton sectorthrough capacitybuilding andtransfer oftechnology

0.00 10.40 To supplytechnological know-how on cotton sector

Under implementation 2014

150.00 114.26TOTAL

Page 132: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

132

Outcome Budget 2013-14

Aid toEurasia

Varzob-I HydroPower Plant

Renovation,modernizationand uprating ofVerzob-I HydroPower Plant,Tajikistan

10.00 17.47 Development of theVerzob region byproviding more powerto the city (9.5 MW)

Machinery supplied by BHEL.Civil work by NHPC. Progressof work at Varzob monitored byPMC.

(a) June, 2011

PotatoProcessing Plant

Setting up ofPotatoProcessingPlant in KyrgyzRepublic.

0.00 0.90 Development of theregion and providegainful employment

Supplies completed. Plant isready for commissioning.

(a) June, 2011 No cost escalation.

IT Centre,Yerevan

IT Centre inYerevan,Armenia

5.00 2.12 Provide gainfulemployment and ITtraining. Goodwill forIndia.

Centre commissioned andinaugurated.

(a) July, 2011(b)November,2011

No cost escalation.

Training Centrein Tajikistan

Tool Roomand TrainingCentre inTajikistan

3.00 0.50 Provide gainfulemployment in ToolRoom training.

Centre has been set up. (a) July, 2011(b)November,2011

No cost escalation.

IT Centre, Minsk IT Centre inMinsk, Belarus

3.00 1.50 Provide IT trainingto Belarusnationals

Centre set up andinaugurated.

(a) July, 2011(b)November,2011

No cost escalation.

Page 133: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

133

Outcome Budget 2013-14

IT Centre,Ashgabat

IT Centre atAshgabat,Turkmenistan

6.00 6.97 Provide IT training toTurkmenistannationals

Centre inaugurated. (a) Dec, 2011(b) Oct, 2011

No cost escalation.

Medicalequipment

Supply ofmedicalequipment forhospitals inUzbekistan

3.00 0.00 Improve the conditionof the hospitals inUzbekistan.

Supplies completed. (a) June, 2011(b) June, 2011

No cost escalation.

TOTAL 30.00 29.46

Aid toLatinAmericanCountries

Financialassistance to theCentre for LatinAmerican Studiesof Goa Universityin connectionwith organisationof 3- dayInternationalConference titled:India-BrazilDialogue held inGoa from 28-30Oct. 2011.

To enhanceawarenessabout India -Brazil relations.

4.00 0.02

4.00 0.02TOTAL

Page 134: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

134

Outcome Budget 2013-14

Aid toAfganistan

Construction of220 KVTransmission Linefrom Pul-e-Khumrito Kabul including220/110 kv sub-stations at Kabulcompleted by M/sPowergrid Corpnof India Ltd.(PGCIL) inFebruary 2009.Approved cost:592.30 crores.

Project issupplying powerto Kabul fromgeneratingstations of itsneighboringcountry,Uzbekistanthrough atransmissionline from Tirmizvia Pul-e-Khumrito Kabul

40.00 50.91 The original projecthas been completedin February 2009and commissionedin May 2009.

Supply of power toAfghanistan.

(a) The originalproject wascompleted inFebruary 2009andcommissionedin May 2009. (b)Sub-stationsDoshi andCharikar to becompleted inDecember2013.

No costescalation.Handing over ofsites for the substations wasdelayed by theGovernment ofAfghanistan.

Supply of 1 millionMT of wheat in theform of highprotein biscuitsfor SchoolFeedingProgramme,supplied throughWorld FoodProgramme(WFP)

Food assistanceof 1 MT of wheatto Afghanistan. S

0.00 0.00 Supply of fifth tranchein progress.

Scheme is meant to enhanceenrollment of school goingchildren and improve childhealth by providing nutritiousfood.

(a) 2009-10 (b)2013-14

No costescalation. Offtake by theimplementingagency.

Reconstructionand completion ofSalma DamPower Project (42MW) in HeratProvince by M/s

Assistance toGovernment ofAfghanistan forpowerinfrastructureand irrigation.

68.88 75.38 Work is in progress. Supply of power and irrigationfacilities in westernAfghanistan.

(a) December2012 (b)January 10,2015.

Security, remotelocation of damsite, poor roadconnectivitybetween Heratand Chiste(site)

Page 135: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

135

Outcome Budget 2013-14

Water and PowerConsultancyServices (India)Limited(WAPCOS)

and rising cost ofinputs.

Supply ofMedicalequipment toIGICH, Kabuland constructionof Neo-Natalward.

Supply of Medicalequipment toIndira GandhiInstitute of ChildHealth (IGICH),Kabul andConstruction ofNeo-Natal Wardfor IGICH, Kabul.

11.96 13.22 Medical equipment tobe supplied.

Improve and upgrade medicalfacilities of IGICH.

(a) 2015-16ICCRScholarshipScheme forAfghan studentsfor Universityeducation inIndia.

Ongoingschemecontributing tocapacity buildingof Afghanstudents andeconomy ofAfghanistan

34.67 38.35 From 500, slotsincreased to 675from FY 2009-10.Utilisation ofapproved slots isabove 95%.

Capacity building of Afghanstudents; contribute to theeconomy of Afghanistan

Delay in handingover of site;change inalignment ofParliamentbuilding; changein specifications ofexternal cladding

AfghanistanParliamentbuilding

Construction ofAfghanistan’sParliamentbuilding byCPWD

47.83 52.90 Contribution to Afghanistan’sdemocracy; Symbolicrepresentation of Indo-Afghancooperation

(a) 2011 (b)2013

Page 136: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

136

Outcome Budget 2013-14

material; delay inapproval ofinterior designspecifications;security; fewbidders forvarious packagesof work couldresult in costescalation.

Phase III of SmallDevelopmentProjects (SDP): Allprojects havebeen sanctionedfor phase I & II

In the fields ofhealth,education,sanitation, ruraldevelopmentetc. For benefitof localcommunities.

Funds are beingreleased in aphased manner forthe execution ofvarious projectsunder Phase-I & II ofSDP.

17.93 19.84 Development in the fields ofhealth & sanitation,agriculture, education, ruraldevelopment, vocationaltraining.

(a) 2010 No costescalation; Theprojects areimplemented bylocal authoritiesand monitored bythe relevant Afghanand Indianagencies..

UNDP – CapacityAdvisoryProgramme/NationalInstitutionBuilding Project(NIBP) undertripartite MOUbetween India,UNDP andAfghanistan

Financialassistance toUNDP undertripartiteagreement

5.98 6.61 2013-14 No cost escalation;As per commitmentof GOI, US$ 1.08million remittedevery year underthis project toUNDP.

Provide technical assistance todifferent Ministries ofGovernment of Afghanistan.

Page 137: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

137

Outcome Budget 2013-14

Supply of Sportsequipment toAfghan NationalArmy

0.60 0.66 Providing sportsequipments toAfghan NationalArmy.

MedicalTreatment ofAfghan NationalArmy personnel

MedicalTreatment ofAfghan NationalArmy personnel

0.60 0.66 Provide medicaltreatment to ANApersonnel.

Supply offoodgrains toAfghanistan

Provide foodassistance toGovernment ofAfghanistan andimprove foodsecurity

44.24 48.93 Supply of 1 lakh MTof wheat toAfghanistan.

Supply of 2.5 LakhMT of wheat toAfghanistan. 1lakh MT of wheathas beensupplied in FY2011-12.

(a) 2011-12

Restoration ofStor Palace

Restoration ofStor Palace.

5.98 6.61 Project underfinalisation

Restoration of culturalheritage; structuralimprovement in the Ministry ofForeign Affairs of Afghanistan

-

Fellowship forIndian Councilfor AgriculturalResearch (ICAR)scholarships.

614 agriculturalscholarships toAfghan nationalsthroughDepartment ofAgriculturalResearch &Education(DARE)/ICAR

4.78 5.29 Capacity building inthe field ofAgriculture.

Capacity building of Afghanstudents in the field ofagriculture.

(a) 2015-16

Page 138: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

138

Outcome Budget 2013-14

Other misc.projects/programmes inAfghanistan

To strengthenbilateralrelations withAfghanistan

Capacity BuildingProgrammesincluding Donationof Computer andTraining aids toCommand andStaff College,Kabul; Training ofANA Personnel inMedical/Para-Medical Courses inIndia; MedicalTreatment of ANAPersonnel; MedicalTreatment of ANPPersonnel;Training of AfghanCivil Servants/CGOs/Civil SocietyGroups for skillsupgradation under250 discretionaryITEC slots allotted;Donation of books,computers,teaching-aids etc.;Exposures visits/Parliamentaryexchanges/CulturalCooperation etc

6.55 7.25

TOTAL 290.00 326.61

Page 139: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

139

Outcome Budget 2013-14

PublicWorksandHousing

Abuja, Nigeria Construction ofChancery andResidences

14.07 10.42 Chancery buildingand residences

Chancery building andresidences

(a) 03.01.2013

Atlanta (CGI) Purchase ofConsul General(CG)’sResidence

15.86 17.42 Building for CG’sresidence

Building for CG’s residence Purchased in2011-12

Beijing, China Construction ofChancery andresidences

14.07 12.08 Buildings forChancery andresidences

Buildings for Chancery andresidences

(a) 19.03.2009(b)22.11.2011Actual Date ofcompletion(DOC)

Brasilia, Brazil Construction ofChancery,EmbassyResidenceand otherresidences

14.07 19.05 Buildings forChancery, EmbassyResidence andother residences

Buildings for Chancery,Embassy Residence andother residences

(a) 12.06.2013

Brunei Purchase ofLand

4.54 4.99 Land Land Purchased in2011-12

Final payments tobe settled

Budapest Construction ofChanceryAnnexe

0.94 0.21 Building of Annexe toChancery

Building of Annexe toChancery

Project alreadycompleted inOctober 2010

Final payments tobe settled

Page 140: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

140

Outcome Budget 2013-14

Damascus Conversion ofChancery intoResidences

3.69 4.05 Repair andMaintenance of GoIBuilding

Repair and Maintenance of GoIBuilding

15.11.2012

Dar-es-Salaam Construction ofChancery

4.69 0.23 Construction ofChancery

Construction of Chancery DesignRevised due tolocal norms

Dhaka Construction ofChancery,EmbassyResidence andotherresidences

9.38 14.57 Buildings forChancery, EmbassyResidence andother residences

Buildings for Chancery,Embassy Residence andother residences

(a)23.02.2012(b)30.06.2013

Houston Purchase ofChancery

15.82 17.38 Building for Chancery Building for Chancery Purchased in2011-12

Helsinki Renovation ofOld ChanceryBuilding intoEmbassyResidence(ER)

3.40 3.74 EmbassyResidence

Embassy Residence 17.07.2012

Hongkong Renovation ofChanceryBuilding

2.81 3.09 Repair andMaintenance of GoIBuilding

Repair and Maintenance ofGoI Building

07.05.2012

Islamabad Construction ofER and otherResidences

13.20 17.32 Building of ER andResidences

Building of ER and Residences (a) 27.03.2012(b)December2013

Page 141: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

141

Outcome Budget 2013-14

Jawahar LalNehru BhawanNew Delhi

Construction ofofficeHeadquarters ofMinistry ofExternal Affairs

28.14 27.30 Building of officeHeadquarters ofMinistry of ExternalAffairs

Building of office Headquartersof Ministry of External Affairs

(a) 22.04.2010(b) 31.03.2013

Kabul Construction ofChancery andresidences

70.34 77.20 Buildings forChancery andresidences

Buildings for Chancery andresidences

Kathmandu Construction ofChancery andresidences

14.07 15.65 Buildings forChancery andresidences

Buildings for Chancery andresidences

(a) 12.04.2010(b) 12.10.2014

London Construction ofResidences

2.34 2.42 Building forResidences

Building for Residences

New York Replacement ofChiller units andAC Plnt

2.25 2.47 Repair andMaintenance of GoIBuilding

Repair and Maintenance ofGoI Building

15.11.2012

Perth Purchase ofChancery

16.75 18.40 Building forChancery

Building for Chancery Purchased in2011-12

Perth Purchase ofCG Residence

11.32 12.44 Building for CG’sresidence

Building for CG’s residence Purchased in2011-12

Perth Purchase ofConsul’sResidence

6.41 7.05 Building for Consul’sResidence

Building for Consul’sResidence

Purchased in2011-12

Port of Spain Purchase ofResidences

8.78 9.64 Residences Residences Purchased in2011-12

Page 142: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

142

Outcome Budget 2013-14

Tashkent Construction ofChancery &Residences

0.47 0.20 Building forChancery andResidences

Building for Chancery andResidences

PreQualificationStage

Warsaw Construction ofChancery cumResidences

0.94 0.35 Building for Chanceryand Residences

Building for Chancery andResidences

(a) 20.06.2014

Yeravan Purchase ofEmbassyResidence

9.01 9.90 Building for EmbassyResidence

Building for EmbassyResidence

Purchased in2011-12

VariousConstructionProjects(i) Addis Ababa-Chancery andResidences(ii) Bahrain-Chancery cumResidences(iii) Bangkok-ResidentialComplex(iv) Berlin-Residences(v) Doha-Chancery and ER(vi) Gabarone-Chancery andResidences(vii) Khartoum-

Construction ofBuildings forChancery orResidences/EmbassyResidence orBoth or

1.69 1.30 Buildings forChancery orResidences/EmbassyResidence or Both

Buildings for Chancery orResidences/EmbassyResidence or Both

Projects are inPreliminary orDesign Stage

NA

Page 143: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

143

Outcome Budget 2013-14

Chancery cumResidences(viii) Kyiv-Chancery cumResidence(ix) Nicosia-Residences(x) Port Louis-Chancery(xi) Port Louis-World HindiSecretariat(xii) Port of Spain-Cultural Centre(xiii) Santiago-RedevelopmentProject(xiv) Singapore-Chancery(xv) Shanaghai-Chancery(xvi) Tashkent-Chancery andResidences

RegionalPassport Officesat Mumbai,Srinagar,Jalandhar, Suratand Bhopal

Construction ofbuilding forPassport Office

23.45 24.21 Building for PassportOffice

Building for Passport Office 2011-12

Page 144: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

144

Outcome Budget 2013-14

Purchases atParis, Geneva,Rome,Washington andMisc

Misc.purchases ofproperties etc.

18.76 9.63 Purchases at Paris,Geneva, Rome,Washington andMisc

Purchases at Paris 2011-12

Misc. Repair &Maintenance andSmall Projects(i) Athenes(ii) Brussels(iii) Colombo(iv) Dubai(v) Frankfurt(vi) Gabarone(vii) Madrid(viii) Paramaribo(ix) Santiago(x) Singapore(xi) Vienna(xii) Washington

Total

Misc. R&M andSmall Projects

Misc. R&M andSmall Projects

Misc. R&M and Small Projects18.76 16.22

350.00 358.93

Page 145: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

145

Outcome Budget 2013-14

Nalanda Establishment ofNalandaUniversity atRajgir.

To set up theUniversity atRajgir.

10.00 7.17 Acquiring land forCampus; Preparationof DPR; Developmentand launch ofwebsite of theUniversity;Development of logo;Erection of boundarywall.

Got land for construction ofUniversity at Rajgir; DPRfinalized; Website launched;Logo developed and launched;Boundary wall underconstruction.

10.00 7.17Total

Page 146: MEA Outcome Budget 2013-14

Press Advertising and Total 4.45 3.52 i) Incoming visits of nearly 189and Publicity/ Press arrangements to journalists from around 51Media Relations facilitate media countries, 13 journalists from

Programme related activities select ASEAN countries on XPon behalf of the hospitality. (ii) Training ofMinistry journalists from selective

countries (iii) Press coverage ofincoming VVIP visits (iv) Presscoverage of visits abroad byIndian dignitaries.

Policy and Monitoring the 0.27 0.18 Subscription to and payment forPlanning Publicity Budget India Africa Connect websiteprogramme/ of Missions/ maintained by M/s IANS andmonitoring & Posts abroad monthly subscription chargescompilation of and preparation of the IANS News Service.publicity budget of the Action Plan Payment made to ANI for 3for Missions/Posts of XP Division. months for the period March - 11abroad to May 11 for subscription to five

feature article per month.Preparations of Annual ActionPlan of XP Division andcompilation of Missions/Posts’Annual Action Plans.

1.78 1.71 Disseminated PressReleases, Media Advisories,Speeches & Joint Statements tomedia by way of email andwebsite; Arrangements ofregular press briefings byJS(XP) by Foreign Secretary,Secretaries in MEA ;Arrangements for Joint Press

Office of Spokes-person/Administrativeworks

Disseminationof pressinformation/mediabriefings onbehalf ofthe Ministry;Other adminis-trative functions

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

147

Outcome Budget 2013-14

Page 147: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

148

Outcome Budget 2013-14

Interactions in HyderabadHouse during incoming visits ofHeads of States andGovernments to India ,Transcription of PressBriefings, Live streaming ofMedia briefings ; DedicatedMEA Facebook page, Flickr,Google+ updated on real-timebasis and disseminatedassorted information; Updationof MEA official website http://mea.gov.in ; Integration of thewebsites of Indian Missions &Posts. Some of the websitesintegrated; PTI news scanservice to MOS for ExternalAffairs, Foreign Secretary,Secretary(West) and Secretary(East) were provided; AlertedIndian and foreign mediaregularly through SMS alertservice and e-mails aboutvarious media related eventsand uploading of pressreleases, joint statements etc.;Coordinated/ facilitated pre-travel arrangements for mediadelegations accompanyingVVIPs visits abroad.

TOTAL 6.50 5.41

Page 148: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

149

Outcome Budget 2013-14

Public Public Diplomacy Effective 6.00 5.92 Commissioned Projection of India’s image All projectsDiplomacy Audio Visual (PAV) projection of documentaries on through audio-visual material completed as

Section India’s image various subject which per scheduledabroad through would substantively timelinesaudio-visual project India’s culturalpublicity heritage and

development in thefield of science andtechnologies, dispatchof 35MM prints basedon Indian cinema,procurement of 4DVDs pack of VEDASfor disseminationthrough our Missions/Posts

PMS Section(Public Promotion of 4.00 3.20 Printing/Purchase of Projection of India’s image All projectsDiplomacy Material India’s image various coffee table through books and publication completed as& Supply) through print books in English and per scheduled

media. Creation foreign languages. timelinesof a new Public Coffee Table Book-Diplomacy ”India for a Billionwebsite, reasons” (15000maintenance of copies inclusive ofwebsite and language versions)content and purchase ofgeneration. general books & gifts

sets approved by 27thBook PurchaseCommittee. Printing/purchase of coffee

Page 149: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

150

Outcome Budget 2013-14

table book “India forA Billion Reasons”(5000 copies ) andvarious general booksand gift setsrecommended by28th book committee.500 sets of document“ India PakistanRelations 1947-2007”

India Perspectives Publicity related 8.00 6.32 To spread awareness To spread awareness about Monthly Issue Monthly issues ofMagazine activity for about India and its India and its activities though India Perspectives

promoting activities through monthly India Perspectives magazine in 17India’s image reaching out to the magazine with in India and different languagesabroad widest cross-section Missions /Posts abroad. including major

of readers abroad Division has also started foreign languagesthrough the magazine E- Version of India Perspectivesand by making it magazine called Digitalaccessible online Diplomacy Publication.through variouswebsites.

POR Section Projection of 3.00 1.99 Processed 19 cases Division has been able to All outreach(Public Diplomacy India/Indian of financial assistance achieve the desired objectives activities areOutreach) foreign Policy to Institutions/ of outreach activities. time bound by

through Organisations; The increase in the number of nature and allDistinguished Handled 4 incoming visits is a key indicator. PD deadlines haveLecture Series visits mostly Division’s Conference on been met.interaction with Parliamentary “International Relations(IR)media think- Delegations Experts” is one of the highlytanks,Institutions (Important ones being acclaimed event.

Page 150: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

151

Outcome Budget 2013-14

and Universities PILDAT delegationboth within India from Pakistan,and abroad. delegation from

Egyptian Council ofForeign Affairs College,100 delegates fromUS, delegates fromPakistan forNeemrana initiativetalks); Handled 2outgoing visitsincluding IDSA-sponsored seminaron Indo-Saudirelations in Riyadhand delegates toNeemrana initativetalks in Pakistan;Sponsored visit of 2think tanks/academicsto attend seminar/Conference etc;Organised 16Distinguished lecturesin differentuniversities.

Digital Diplomacy To reach out to 0.30 0.07 To engage the Increased following on both Continuousthe younger younger generation Facebook and Twitter pages Processgeneration in through digital newIndia and abroad media such as

Facebook, Twitter,

Page 151: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

152

Outcome Budget 2013-14

Youtube as wellas interactivewebsites

Office 0.70 0.48Administration

Total 22.00 17.98

Page 152: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

153

Outcome Budget 2013-14

CPV Central Passport 1. To grant 583.73 223.18 1. The network of 37 1 & 3. Successfully completed Project Already The Passport SevaOrganization and passport service passport offices has the implementation of the Completed Project haspassport, visa and to more than 8 been expanded Passport Seva Project (PSP), generated a positiveconsular related million people considerably under one of the Mission Mode response.activities in through Passport the Passport Seva Projects under the NationalMission/Posts Offices Project. Under this e-Governance Plan. As part ofabroad. (including PSKs) transformative e- the project, 77 Passport Seva

and Missions/ Governance initiative, Kendras (PSKs) have beenPosts abroad. 77 Passport Seva set up under Public Private2. Implemen- Kendras have been Partnership mode to delivertation of successfully passport related services topassport Seva established all over our fellow citizens in a timely,Project(i) Data India. In view of ever convenient and transparentCentre & increasing demand manner. The Passport feesDisaster for travel documents, has been revised to meet theRecovery more than 40 lakh increasing costs involved inCentre(ii) Project travel documents have passport issuance. TheManagement unit been procured from enhanced revenue will be used3. Improvement India Security Press, for further expanding Passportin infrastructure Nasik. The project for Service network, upgradingof Passport issuance of E- technical infrastructure andOffices. Passport is a pilot improving public service delivery.4. Upgradation project. Diplomatic Till December 2012, a total ofof hardware, and official passports 73.89 lakh passport servicesscanning of are now being issued. were rendered by all passportPassport files; issuing authorities. Under the5. Provision of PSP, a new online portalmachine passportindia.gov.in has beenreadable created to offer passportprinters services. A national call centre

has been set up, operating in

Page 153: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

154

Outcome Budget 2013-14

17 Indian Languages to cater tothe dissemination of informationabout various services,grievances handling, andcitizen feedback which atpresent works on a centralsystem platform.

2. IT networking of all Also a help desk has beenpassport offices is a set up which can be accessedcontinuous project by citizen through theand has enabled passportindia.gov.in portal andupdation of central where suggestion anddatabase on a daily grievances can be sent andbasis. Large number tracked online. The PSP callof passport application centre and helpdesk cater tofiles have been various services informationscanned and stored dissemination, grievanceselectronically. An equal handling, and citizen feedback.number of records The Call Centre operates onhave been added to 24X7 basis. The call centrethe central database. commenced operations from3. Construction of 23rd May 2010 and has receivedPassport office over 1.5 million calls tillbuilding and 22 staff December 2011. It presentlyresidences at Surat handles 6000 calls per day.has been completed. The E- passport project is a4. Holding of passport pilot project and Diplomatic &every month all over Passports are being issued.all India. Construction of Passport office

Page 154: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

155

Outcome Budget 2013-14

5. 35 Machine building and 22 staff residencesReadable Passport at Surat has been completedPrinters were provided 2. The project has beento a number of completed.Passport Offices. 4. A number of Passport Adalats

were held during the year.5. Provision for MRPs weremade for 35 MRPs were madefor various Passport Offices.

Total 583.73 223.18

Page 155: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

156

Outcome Budget 2013-14

Aid to Various Grant 30.00 3.03 For development Visit of BangladeshiBangla- Development assisstance to a projects to be Muktijodhas;desh Projects friendly idenitfied by the Training for police

neighbouring recipient country personnel at policecountry for its training centre andeconomic computer labdevelopment Rajshahi; Supply of

equipment toRangpur School;Supply of computersto Model Schools;Other smalldevelopmentprojects; Feasibilityof Ashuganj InlandPort in Bangladesh;Goodwill visits;Legal assistanceetc.

Cash assistance 0.00 0.00 For assistance for Under process a) Original date While there was noof US$ 50 million various development was September initial provision forto Bangladesh projects in 2012 this purpose in BE

Bangladesh b) Anticipated 2012-13, it wasdate is March decided with the2013 approval of Cabinet

to convert US$ 200million out of theUS$ 1 billion Line ofCredit toBangladesh into

Page 156: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

157

Outcome Budget 2013-14

cash grant. Ministrywas directed torelease the firstinstallment of US$50 million out of itsbudget. Withidentification ofsavings, provisionwas made for therelease of funds.US$ 50 millionreleased inFebruary 2013.

Total 30.00 3.04

Page 157: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

158

Outcome Budget 2013-14

Aid to Punatsangchhu-I India to receive 500.00 500.00 Generate peak-load Contracts for civil, electro-Bhutan Hydroelectric surplus power energy of 1200 MW, of mechanical and hydro-

Project from this project. which surplus to be mechanical works have beenThis would be a supplied to India. awarded. The civil work is in fullclean and swing. The project is expectedreliable source to be completed by Septemberof power which 2016.will help bridgethe existingenergy demand-supply gap inIndia.

Punatsangchhu-II India to receive 478.00 478.00 Generate peak-load Pre-construction activities haveHydroelectric surplus power energy of 990 MW, of been completed. The contractsProject from this project. which surplus to be for the main civil and hydro-

This would be a supplied to India. mechanical works have beenclean and awarded, and their executionreliable source has begun. The project isof power which scheduled to be completed bywill help bridge 2017.the existingenergy demand-supply gap inIndia.

Mangdechhu India to receive 160.00 160.00 Generate peak-load Pre-construction activities haveHydroelectric surplus power energy of 720 MW, of been completed. The contractsProject from this project. which surplus to be for main civil works have been

This would be a supplied to India. awarded in March 2012. Theclean and project is scheduled to bereliable source completed by 2017.

Page 158: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

159

Outcome Budget 2013-14

of power whichwill help bridgethe existingenergy demand-supply gap inIndia.

Development Development 140.00 105.00 Maintaining friendlySubsidy partnership with relations with Bhutan.

Bhutan to assistits economicdevelopment

Chukha Subsidy To subsidise 85.00 62.16 The subsidy will bepower bought by phased out gradually.M/s PTC Ltd.from Chukhahydroelectricproject, Bhutanfor supply toWest Bengal,Sikkim, Biharand Odisha.

Supply of To prevent cross- 40.00 41.41 Maintaining friendlyKerosene oil and border relations with BhutanLPG to Bhutan at smuggling ofsubsidised prices SKO/LPG across

an open borderunder a freetrade regime

Page 159: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

160

Outcome Budget 2013-14

Excise duty refund To promote 200.00 0.00 Maintaining friendlyIndian exports to relations with BhutanBhutan andcompensateBhutan for theloss of revenueunder the freetrade regime.

Project-Tied Development 574.00 319.05 Maintaining friendly Implementation of approximatelyAssistance (PTA) partnership with relations with Bhutan 70 projects is progressing as

Bhutan to assist and building goodwill per schedule.its economic for India at thedevelopment grassroot level in

Bhutan

Small Development 100.00 305.40 Maintaining friendly Implementation of first phase ofDevelopment partnership with relations with Bhutan 440 projects and second phaseProjects (SDPs) Bhutan to assist and building goodwill of 819 projects is progressing.

its economic for India at the The third phase of 640 projectsdevelopment grassroot level in has commenced.

Bhutan

Total Solutions Indian 41.40 36.00 Maintaining friendly Deliverables such as computerProject assistance to relations with Bhutan hardware and printed

Bhutan’s efforts and building goodwill courseware etc. have beentowards for India at the disbursed as per the agreedbecoming a grassroot level in schedule.knowledge Bhutansociety

Page 160: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

161

Outcome Budget 2013-14

Bhutan Institute Development 11.00 0.00 Maintaining friendly Work on first two phases of theof Medical partnership with relations with Bhutan renovation has begun.Sciences Bhutan to assist

its economicdevelopment

Miscellaneous Various 8.60 2.30 Maintaining friendly Regular visits and exchangesinitiatives, visits, relations with Bhutan took place at the highesttraining political level as well as atassistance etc. technical cooperation andunder ongoing capacity-building levels.bilateralcooperation.

Total 2338.00 2009.32

Page 161: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

162

Outcome Budget 2013-14

Aid to Building four Create 20.00 4.18 28% physical Work commenced on Birgunj (a) 26 September Due to delay inNepal Integrated Check necessary progress at ICP ICP. Tendering for ICP 2012(b) 5 April handing over of site,

Posts (Jogbani- infrastructure to Birgunj; work on Biratnagar to commence once 2013 extension of time,Biratnager, Raxual- facilitate trade various buildings of Government of Nepal confirms resulting in increaseBirgunj, Sunauli- and commerce ICP Birgunj at various land for access road in the cost ofBhairahawa and between India stages, work on the consultancy work.Nepalganj- and Nepal in link road connectingNepalganj Road) modern and ICP with main road

scientific way; started.To checksmuggling andunauthorisedtrade.

Rail Link at Create rail link 75.00 89.08 Earth work, Facilitate trade and commerce Delay in removal ofJogbani-Biratnagar between construction of bridge and people-to-people contacts. encumbrances,and Jayanagar- Jogbani- and station is delay in statutoryBijalpura Bardibas. Biratnagar and underway. clearances could

Gauge result in increase inConversion of project cost due toJayanagar- increase in cost ofBijalpura- inputs.Bardibas andRailway stationat Bardibas.

Terai Road Project aims to 40.00 4.46 Mobilisation in all Better connectivity would lead to (a)Was expectedProject up grade the packages; list of increased trade and commerce to be completed(Upgradation of existing road encumbrances and people-to-people contacts. by FY 2013-14.605 km consisting linkage between handed over to Delay due to lateof 19 roads) the Terai region Government of Nepal handing over of

of Nepal with the project site and

Page 162: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

163

Outcome Budget 2013-14

adjoining areas removal of Delay in removal ofof India encumbrances, encumbrances,

delay in delay in statutoryobtaining clearances couldstatutory result in increase inclearances from project cost due toGovernment of increase in cost ofNepal. inputs and

extension ofconsultancyservices.

Bharat-Nepal 200 bed, 2.00 0.85 Gas manifold system Negotiation underway with Completion Delay in taking overMaitri Emergency Emergency and installed and supply Government of Nepal for early anticipated by of the centre byand Trauma Trauma Centre of furniture completed. hand-over to the Nepalese side. FY 2013 -14 Government ofCentre, to provide Tenders for Nepal hasKathmandu medical services procurement of increased cost of

to the people of medical equipment the project. DetailsNepal underway. to be worked out.

Payment to NHPC. Supply of 25.00 28.79 Supply of electricity to Nepal. Annual Supply of electricityelectricity to (Regular payment). commitment. to Nepal underNepal under bilateralbilateral commitment.commitment.

Embankment Construction of 15.00 6.86 Embankments on Lalbakaya, Ongoing.construction on embankments Bagmati, Kamla and Khando No specificLalbakaya, on rivers in rivers (on an ongoing basis). timeframeBagmati, Kamla Nepal for flood assigned.and Khando rivers. prevention on

Indian side. To

Page 163: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

164

Outcome Budget 2013-14

mitigate theproblems offloods both inIndia andNepal .

Scholarship to Support for 13.00 4.91 Scholarships to Support for human resources Ongoing project.Nepalese students human Nepali students for development in Nepal.(Payment to ICCR resources MBBS, B.Tech, andand other development in other courses. Variousschemes). Nepal. educational

Approximately scholarships/slots1800 scholarship provided to Nepalia year for students underNepalese various schemes ofstudents GOI. These arestudying in aimed at building aNepal and India. pool of skilled

manpower in Nepal.

Small SDPs executed 55.00 38.79 Over 400 projects Continued execution of SDPs, Ongoing project.Development under GOI such as schools, that contributes to socio-Project (SDP) assistance in hospitals and other economic development of the

Nepal for the social infrastructure local people as these focus onbenefit of the elements being community infrastructure inpeople of Nepal. implemented and fields such as education andProjects at the handed over to local health.grassroot level, authorities.which directlybenefitscommon peopleand helps

Page 164: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

165

Outcome Budget 2013-14

create a positiveimage of India.

Police training, Ongoing 15.00 10.46 Capacity building for Ongoing training programme. Ongoing project.human capacity assistance to the police forces inbuilding and enforcement Nepal.modernization agencies ofprogrammes. Government of

Nepal. Capacitybuilding ofsecurity forces.

Construction of Additional 5.00 8.08 A new college block & 2013College Block & infrastructure for Indian faculty atIndian faculty BPKIHS and to BPKIHS.support for BP provide facultyKoirala Institute of support UnderHealth Science bilateral(BPKIHS), Dharan, commitment.Nepal .

Others Projects - Intermediate 5.00 4.88 Social infrastructure Continued execution of theBirgunj Sabha development projects benefiting the intermediate projects.Griha, 1000 works executed common people Each likely to be completedshallow tube under GOI directly and add to in 3 years time.wells, upgradation assistance in India’s image.of road, Baktawari Nepal. DirectlyEye Hospital etc. benefits

common manand enhanceIndia-Nepalfriendship.

Total 270.00 201.34

Page 165: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

166

Outcome Budget 2013-14

Aid to Reconstruction Reconstruction/ 280.00 35.77 Reconstruction and To provide assistance to IDPs in The project isSri Lanka and Repair of repair of houses repair of 49,000 Northern and Eastern Provinces scheduled to be

houses for in Sri Lanka for houses of Sri Lanka to reconstruct or completed inInternally internally repair their houses. 2014-15Displaced displacedPersons (IDPs) persons and

Indian OriginTamils

Setting up of 150-bed hospital 6.20 Foundation stone for Assist in meeting the need for (a) 21 December Delay in handinghospital at Dickoya at Dickoya to work laid in July 2011. advanced healthcare in the 2012(b) June over of the site by

provide medical Superstructure of northern part of Sri Lanka. 2013 the Govt. ofservices to the building ready, plaster Sri Lankapeople of Sri work completed.Lanka Tender document for

procurement ofmedical equipmentunderway.

Kankesanthurai To rehabilitate 19.67 DPR finalised by To facilitate movement of April 2013(KKS) Harbour the KKS harbour RITES, Wreck removal vessels, promote trade and

in Jaffna completed. commerce and developprovince of Bathymetric survey port facility of Sri LankaSri lanka and completed. Dredgingmake it capable work underto handle finalisation.medium sizevessels

Restoration of Restoration of 10.00 1.96 Selection of Tripartite Agreement between January 2015 Statutory clearancesThirukethee- Thirukethees- Implementing Agency; MEA, ASI and College of from Government ofswaram Temple in waram Temple, signing of Agreement Architecture and Sculpture, Sri Lanka; weatherMannar, Sri Lanka a 1500 years old between GOI and Mamalaapuram was signed. conditions.

Page 166: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

167

Outcome Budget 2013-14

temple in Board of Trustees of Restoration work strated.Mannar, Temple; signing ofSri Lanka. tripartite Agreement

between Ministry ofExternal Affairs (MEA),Archaeological Surveyof India (ASI) andCollege of Architecture& Sculpture,Mamallapuram;beginning ofrestoration work

Other Projects/ To strengthen 63.93 Setting up of VocationalPrograms bilateral relations Training Centres,

with Sri Lanka Establishment of IndiaGallery at InternationalBhudhist Museum inKandy, ScholarshipProject for studentpursuing highereducation,Empowering womenthrough Self EmployedWomen Association(SEWA) in Batticaloa,Assistance to SmallBusinesses inKilinochhi andMullaithivu, AtchuvelyIndustrial Zone, Jaffna.

Total 290.00 127.53

Page 167: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

168

Outcome Budget 2013-14

Aid to Police Academy in Setting up of the 17.00 0.00 Issue of tender and MoU between GoI and 3 years from No cost overrun,Maldives Maldives National Police award of work Government of Maldives signed date of award of Agreement to be

Academy in followed by in September 2012. work signed withMaldives commencement of Consultant.

construction

Renovation of Renovation of the 10.00 0.00 Award of work and Tenders called by NBCC for 2 years from the No cost overrun.Indira Gandhi IGMH hospital commencement of execution of renovation works date of award of ImplementingMemorial Hospital established by renovation works of for third time due to very high work Agency is to be(IGMH), Male GOI in the 1990s. the hospital building quotes received in first two selected.

in Male tenders.

Other Projects/ To strengthen 9.00 8.56 Defence & CivilPrograms bilateral relations training courses,

with Maldives Scholarshipprogramme, Supplyof equipment etc.

Total 36.00 8.56

Page 168: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

169

Outcome Budget 2013-14

Aid to Kaladan Provide a trade 220.00 35.23 40% work for Port Completion of Terminal at (a) April 2013. Increase in theMyanmar Multimodal Transit route to Myanmar and Inland Waterways Sittwe port, inland waterway (b) December project cost due to

Transport Project and dependable Terminal (IWT) system between Sittwe and 2013 – road requirement ofmode of complete. DPR for Paletwa and DPR for Paletwa component Environment Impacttransport to Paletwa-Zorinpuri Kaletwa Road Section (c)Completion Assessment/SocialNorth Eastern road section under of road to take Impact Assessment;part of India vetting by Ministry of 3 years from inclusion of

Road Transport and date of award additional facilitiesHighways. of work. additional facilities

requested byGovernment ofMyanmar; sitespecific conditions.

Trilateral Highway Provide road 5.00 1.06 Preliminary study of Preparation of DPR; approval Timeline for Limited workingProject link with Kalewa-Yagyi section of competent authority. completion of season (5 months),

Thailand and completed. Request the project to be remote location ofmay be extended for Proposal to decided based the project, statutoryto ASEAN and appointment on DPR and clearances fromGanga-Mekong consultant to prepare subject to Govt. of Myanmar.basin countries DPR for Kalewa-Yagyi approval of

section in final stages. competentauthority.

Rhi-Tiddim Road To create road 21.36 0.00 DPR prepared by Enhance cross border Limited workinglink between Rhi Border Roads connectivity; encourage trade season (5 months),in Mizoram and Organisation needs and commerce and people-to- remote location ofTiddim in updating for people contacts the project, statutoryMyanmar implementation of the clearances from

project Government ofMyanmar.

Page 169: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

170

Outcome Budget 2013-14

Tamu-Kalewa- Part of Trilateral 3.00 0.00 The stretch between Promote trade and commerce & Expected to be Road damaged dueKalemyo (TKK) Highway and Kyigone-Kalewa facilitate people-to-people completed by to floods; increaseRoad connects Moreh (28 km) where extra contact. March 2013 in scope of repair

in Manipur with correction work is and strengtheningKalewa and required due to of bridges resultingKalemyo in damage and soil in increase of costMyanmar erosion resulting from by `. 21.91 crore.

floods; Out of 28 km,21 km completed andwork on the remainingportion is underway.

Other projects 52.85 29.19 Projects underimplementationincludeEstablishment ofRice Bio-park,Assistance inproduction of largecardimom in Nagaareas, gifting ofBudha Replica,Setting up ofIndustrial TrainingInstitute at Myingyan,Upgradation of IndiaMyanmar Centre forenhancement of ITSkills etc.

Total 302.21 65.48

Page 170: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

171

Outcome Budget 2013-14

Aid to Annual financial 0.50 0.17 Financial assistance A committed expenditure to a) Annual financialOther assistance to the to the Indian Hospice generates goodwill assistance of USDDevelo- Indian Hospice in in Jerusalem for 20000/- to Indianping Jerusalem upkeep and Hospice inCountries maintenance. Jerusalem.

b) One-time grant ofUSD 25000/- forsetting up of BabaFareed HeritageCentre at IndianHospice

Construction of To provide 0.00 0.00 Strengthen bilateral relations India has pledgedtwo Schools in education to the with Palestine an amount of US $Palestine. residents of 1.8 mn towards

Palestine by setting up of twoconstructing and schools inequipping High PalestineSchools at AbuDees

Feasibility study of 3.00 0.00 Phosphate raw Draft Feasibility Report has Clearance of the Total cost isphosphate mining material and finished been submitted to the Syrian DFR by Syrian expected at USDactivities in Syria. products imports from authorities. Comments of the side expected in 1.5 million.

Syria Syrian side comments on the 2013DFR has been conveyed toMinistry of Chemicals andFertilizers.

India-Maldives To further boost 26.00 9.87 To set-up the Faculty To assist Maldives in its (a)December Initial cost:Friendship Faculty the bilateral of Hospitality & capacity building in hospitality 2008 ` 50.73 crore;of Hospitality & relations with Tourism Studies at and tourism studies (b)March 2013 Revised costTourism Studies Maldives and to Male (approved) `

Page 171: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

172

Outcome Budget 2013-14

at Male assist them in 69.65 crore. Thesetting up of this contract wasspeciality originally awardedinstitute cum to a private companyhotel in 2007. Due to non-

performance, thecontract wasterminated and re-awarded to NBCC in2010. Theescalation in cost isdue to increase inthe cost of materialduring the gap ofthree years.

Conservation and Conservation of 3.50 6.62 Conservation of It is envisaged that work plan (a) April 2011 Originally approvedRestoration of Ta certain portions various sections of as conceived by ASI and (b) April 2013 cost is `. 19.57Prohm Temple in of the world temples and its approved by ICC and crore and revisedCambodia. heritage surroundings to be Cambodian Government would approved cost is `.

monument as implemented. be adhered to. 34.16 crore due toapproved by the (a) additional nineUNESCO’S ICC critical locationsand the identified forCambodian restorationGovernment. (b) Increase in the

scope of work in the‘Hall of Dancers’.(c) Increase in thescope of work forWAPCOS.

Page 172: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

173

Outcome Budget 2013-14

(d) Increased scopeof work for ForestResearch Institute.

Setting up of an To assist 1.65 0.00 Project consists of The project was inaugurated in June 2012.Advanced Vietnam in the setting up of a number September 2011. ProjectResource Centre field of IT by of computer labs, completed.at Hanoi, Vietnam setting up of a training of Vietnamese

number of art faculty in India andcomputer labs training to be given inand capacity Vietnambuilding

Conservation of To further 2.00 1.50 Conserve and restore ASI will continue the May 2017Wat Phou Temple, strengthen the damage of Wat conservation in Wat PhouLao PDR bilateral and Phou Temple Temple

cultural relation Complex and solvebetween the two other relatedcountries by problems like waterimplementing drainage etc.the project.Conservationand restorationof UNESCOWorld HeritageWat PhouTemple complexin Lao PDR.

Page 173: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

174

Outcome Budget 2013-14

Capacity building To strengthen 0.35 0.00 To set up the IT/ICT Confirmation of courses and Running/New IT/ ICT centres inprojects in various India’s relations centers, supplying of availability of facilities for IT Projects various developingdeveloping with foreign computers, training Centre from various countries countries, includingcountries countries material and other awaited Ecuador, Costa

equipment. Rica, Benin,Burundi, CentralAfrican Republic,Cape Verde,DemocraticRepublic of Congo,Syria, Grenada,Timore Leste,Domnican Republic,Lao PDR;Construction of aJoint School inMongolia,ConservationProject at My Son,Vietnam, India-USOpen GovernmentInitiative inRawanda andGhana

Total 37.00 18.16

Page 174: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

175

Outcome Budget 2013-14

Investment Investment & Disbursing 0.74 0.00 Printing of ITP Proved valuable in highlighting Publication is Cost expected toPromotion Technology information on Division’s Annual business opportunities in not yet printed. escalate due toand Promotion: opportunities in Publication and its various sectors of the Indian It would be increase in size/Publicity Printing of India to dispatch to Missions economy for promotion of circulated to pages of

Publication interested foreign investments into India Missions / Posts publication.businesses/ afterwardsindividuals andapex chambersabroad

Maintenance of Providing 0.67 0.00 To help promote FDI Updating is a An exclusivewebsite information on and trade by continuous website for

business educating the target activity which is website foropportunities in user about India’s FDI carried out as dissemination of allIndia to general Policies and and when up-to-datepublic. information on India’s required. information on the

Economy. Indian economy.

Misc Promotional Organization of 2.70 0.44 Misc Promotional Contributed to familiarizing theActivities conferences with Activities targeted constituents regarding

Chambers of India’s trade and investmentCommerce for related policies. Facilitatedpromotion of FDI exchange of Information andand other India Brand Promotioninvestmentpromotionactivities

Page 175: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

176

Outcome Budget 2013-14

Interest To project India’s 0.00 0.00 Interest equalisation Payment of Interest Equalization The provision is If the repayment isEqualization strategic support to EXIM Bank Support to EXIM Bank of India in to be utilized defaulted by theSupport (IES) to economic is given by GOI in respect of Line of Credit of upto 31st March recipient country,EXIM Bank for interests abroad respect of lines of US$ 800 million to Bangladesh 2013 GOI to repay theLine of Credit and develop credit extended to under process. amount to EXIM

longstanding neighbouring Bank, as countereconomic countries for the guarantee has beenrelationship. growth of India’s given to EXIM BankThe scheme export, development for the line of credit.provides interest of economic Payment of `. 3.65equalization relationship with Cr. estimated whichsupport to EXIM these countries. was not budgetedBank for GoI earlier.supported Linesof Credit.

(i)Conducting (i)To evaluate 0.00 0.18 (i)To conduct three (i) One feasibility study for (i) One visitfeasibility studies feasibility of feasibility studies hospitals in Zimbabwe has conducted infor LOC projects projects funded (ii) Appraisal of 48 been conducted and the July 2012 and(ii)Appraisal of under LOCs projects process for the other two viz the other twoMEA projects by extended by GOI (iii) Appraisal of 16 new coach manufacturing unit expected byConsultancy (ii)&(iii) To projects at Saidpur, Bangladesh and, March 2013Development appraise LoC (iv) Five Visits, one Monorail project at Seychelles, (ii)AnticipatedCentre (CDC) projects each to Nepal, is underway. date for(iii)Renewal of (iv) Field level Myanmar,Sri Lanka, (ii) Appraisal of 44 project completingcontract with M/s evaluation/ Djibouti and Fiji proposals has been completed appraisal ofCDC for Jan-March Monitoring of (iii) Renewal of contract is projects is2013 LOC projects under process January 2013

(v)To build in- (iv) One visit to Myanmar (iii) anticipatedhouse capacity date of

completion is

Page 176: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

177

Outcome Budget 2013-14

March 2013(iv) Visits arescheduled totake place duringJan-March 2013

Total 4.11 0.62

Page 177: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

178

Outcome Budget 2013-14

Energy Hiring of To obtain 0.64 0.08 Preparation of Energy Out of these, Energy security 01.02.2012Security Institutional technical Security Handbook, Handbooks and six regional 15.03.2012

Consultant supports to 4 Regional Reports reports and research papersundertake and two Research have already been printed;certain projects Papers. Matrix work awarded to IIFTlike matrix, for commissioning of researchpublications, paper for preparation ofreports and country-wise matrix on 09.01.events. 2013; Process of evaluation of

technical and financial bids forproposal for commissioning of4 Research Papers on specifictopics is underway.

Commissioning To elicit 0.05 0.00 To bring out technical Due to delay in internal Work is nowof Papers information and reports/papers on approvals the work is delayed. being awarded

analysis from energy security and expected toenergy security matters. be completespecialists. in next six

months.

Roundtable To organise 0.12 0.00 As in the past, IWG meeting was organised to During the Completed but withSeminars & brainstorming informal group generate closer coordination entire FY NIL expenditure.Workshops sessions and meetings were with line-ministries, PSUs and

informal organised in August stakeholders on energy field.meetings with and December 2012 Inter-Ministerial committee onacademia and inviting the senior Energy Security matter wasindustry. level officers in PSUs held on 1.06.2012.

with a view togenerate closercoordination.

Page 178: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

179

Outcome Budget 2013-14

Publicity on energy To understand 0.08 0.02 Printing of reports and Energy security Handbooks and During the entiresecurity matters/ the global energy research papers; six regional reports and FYSubscription of markets, Subscribing various research papers have alreadyjournals technologies journals in the field of been printed; ES Division has

and resources. Energy Security. subscribed the followingjournals – 1. Petroleumeconomist 2. TERI journals3. Oil & Gas journals 4. Drillingand exploration.

Total 0.89 0.10

Page 179: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

180

Outcome Budget 2013-14

ITEC Indian Technical (a) Strengthen 120.00 95.09 Training of 7200 Training of 5700 civilian and (a) & (b) all theand Economic bilateral ties; civilian and defence defence participants in various trainingCooperation (b) Share India’s participants in various Indian Institutes. programmes(ITEC) Programme developmental Indian Institutes. commencedinvolves training experience and from April,2012for foreign expertise with till March, 2013.nationals in developing All the trainingvarious civil and countries; programmesdefence training have fixedprogrammes from schedules.142 developingcountries in 47civilian and 83defenceinstitutionsincluding NationalDefence Collegeand DefenceServices StaffCollege

Total 120.00 95.09

Page 180: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

181

Outcome Budget 2013-14

SCAAP Special (a) Strengthen 15.00 14.92 Training of 1700 Training of 1550 civilian (a) & (b) all theCommonwealth bilateral ties; civilian participants in participants in various Indian trainingAssistance for (b) Share India’s various Indian Institutes. programmesAfrica Programme developmental Institutes. commenced(SCAAP) involves experience and from April,2012training for foreign expertise with till March, 2013.nationals from 19 developing All the trainingcountries in countries; programmesAfrica in 47 civilian have fixedtraining institutes. schedules.

Total 15.00 14.92

TCS TCS of Colombo (a) Strengthen 4.00 3.84 Training of 500 civilian Training has been completed (a) & (b) all theColombo Plan training bilateral ties; participants in various for around 316 civilian trainingPlan imparted to the (b) Share India’s Institutes in India. participants in various Indian programmes

Nationals of 18 developmental Institutes. commencedcountries in experience and from April,201240 Institutes. expertise with till March, 2013.

developing All the trainingcountries; programmes

have fixedschedules.

Total 4.00 3.84

Page 181: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

182

Outcome Budget 2013-14

SAARC Other Projects Strengthening of 24.00 1.42 Programmes underProg- cooperation implementation are SAARCramme among SAARC Tele-Medicine project, SAARC

Countries Tele-Education Project, capacitybuilding, people-to-peoplecontact and general cooperationin diverse fields such as textiles& handicrafts, support forSAARC festivals on folklore,literature, arts, bands,scholarship, etc.

Total 24.00 1.42

South Contribution to Strengthening of 20.00 26.08 Delhi Development Authority 2014 Monthly rental ofAsian South Asian cooperation issued NOC for 83.10 acres of Akbar Bhawan,University University (SAU) among SAARC land and informed about the SAU’s current

Countries High Court’s stay order on the premises wasrest of 10.58 acres. SAU in the continued to be paidprocess of obtaining necessary to avoid penalty.approval from the civil bodies to Funds have beenthe Master Layout Plan of the augmented at REcampus. In its third academic stage to provide foryear, the SAU has 323 students the deficit.and 64 faculty.

Total 20.00 26.08

Page 182: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

183

Outcome Budget 2013-14

Aid to Establishment of 0.00 0.00 Total cost of theAfrica Faculties of project:

Engineering & `. 55.86 Cr.InformationTechnology atUniversity ofNamibia inWindhoek

Supply of CT Scan 0.00 0.00 Project could not bemachine to Black implementedLion Hospital ofEthiopia

Setting up of a 2.00 2.23 Project is being To introduce people in Mauritius Total cost of thePlanetarium at implemented by to world of Astronomy,celestial project:Rajiv Gandhi National Council of phenomenon, offering non- `.10.96 Cr.Science Centre in Science Museums formal education and providingMauritius (NSCM), Kolkata supporting tool for the teaching

of student population

Deputation of 0.00 0.00 Defence team is in In three years Total cost of theDirecting Staff to place in Uganda project: ` 3.82 Cr.Uganda’s Senior &CommandCollege, Kimaka(Uganda)

Deputation of 0.00 0.00 In three years Total cost of theexperts to project: ` 6.00 Cr.Seychelles &Mauritius

Page 183: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

184

Outcome Budget 2013-14

Hole-in-the-Wall 0.00 0.00 03 Hole-in-the -Wall Elementary level Computer Total cost of theProject in Learning Stations Aided Education for Children in project: ` 0.47 Cr.Zimbabwe have been installed & rural areas of Zimbabwe have

commissioned in been put in place.Zimbabwe by HiWEL

Africa Scholarship 0.00 0.00 Africa Scholarship Fulfilment of India-Africa Forum There is offer ofScheme scheme is being Summit-II (IAFS-II) commitments 3600 scholarships

implemented by ICCR. to African studentsUnder AIFS-II, over a period of 04

years.

Preparation of 1.00 0.64 WAPCOS has Expertise and technical Total cost of theStrategy Paper on submitted final report knowledge in the field of Water project: `5.00 Cr.Water Resources for Save River Basin, Resources for irrigation &by WAPCOS Zimbabwe. power purposes have been

Preparation of Strategy shared with the African countriesPaper on WaterResources forSankuru River Basin,Congo & Lake ChadBasin is underprocess.

Supply of Relief 0.00 0.00 Total cost of theMaterial to Malawi project: ` 4.50 Cr.

Supply of Medical 5.00 4.73 Medical equipment Fulfilment of high level Total cost of theequipment and have been supplied to commitment project: ` 7.50 Cr.assorted items to MalawiGovt. of Malawi.

Page 184: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

185

Outcome Budget 2013-14

Supply of Farm 0.00 0.00 Total cost of theTractors & project: ` 4.00 Cr.accessories toMalawi.

Supply of Heavy 0.00 0.00 Total cost of theDuty Digital project: ` 6.00 Cr.Printing Machineand accessoriesto the Govt. ofMalawi.

Supply of Dornier 0.00 118.19 Dornier Aircraft was Seychelles assisted to increaseAircraft to handed over to its air surveillnace capabilitySeychelles Govt. of Seychelles on

Jan 31, 2013

Supply of Offshore 0.00 0.00 Project Supply of OPV would assist Total cost of US$Patrol Vessel implementation is Mauritius to guard its coastline. 58.50 million [ Grant(OPV) to Mauritius. under process. of US$ 10.00 million

and LOC element ofUS$ 48.50 million]

Establishment of 0.00 0.00 Total cost of thean Incubator in project: ` 5.00 Cr.Malawi

Supply of 742 0.00 0.00 742 Computers; 742 In fulfilment of a high levelDesktops, 742 Printers and 742 UPS commitment, Govt. of BotswanaPrinters & 742 have been supplied to has been assisted in the fieldUPS to the Govt. Botswana of Educationof Botswana

Page 185: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

186

Outcome Budget 2013-14

Setting up of India 0.00 0.00 The project is being Implementations of decisionsAfrica Diamond implemented by Indian under IAFS-IInstitute, Botswana Diamond Institute

(IDI), Surat. IDI teamvisited Botswana inMarch 2011 and hassubmitted the DPR.Project is underimplementation.

Setting up of an 0.00 0.00 Ministry of Coal has Implementations of decisions Total cost of theApex Training engaged Coal India under IAFS-I project: ` 5.00 Cr.Organization in Limited to implementCoal Sector the project. MOU is

under discussionbetween Govt. ofMozambique andCoal India Limited

Setting up of an 0.00 0.00 Ministry of Coal has Implementations of decisions Total cost of theApex Planning engaged Coal India under IAFS-I project: ` 10.00 Cr.Organization in Limited to implementCoal Sector the project. MOU is

under discussonbetween Govt. ofMozambique andCoal India Limited

Setting up of India 0.00 0.00 The project is being Fulfilment of commitments Total cost of theAfrica Institute of implemented by at IAFS-I project:Information Educational ` 10.00 Cr.Technology (IAIIT) Consultants India Ltd.in Ghana (EdCIL). EdCIL team

Page 186: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

187

Outcome Budget 2013-14

has prepared the DPRwhich is being vettedby Ministry of HumanResourceDevelopment

Setting up of the 0.00 0.00 NUEPA has visited Fulfilment of commitmentsIndia-Africa Burundi, consulted at IAFS-IInstitute of officials of AfricanEducational Union (AU) & is inPlanning and process of preparingAdministration the DPR. Burundi has(IAIEPA) in identified land &Burundi by building and isNational University currently revamping/of Educational renovating thePlanning and identified building.Administration Project is under(NUEPA) under implementation.IAFS-2008

Setting up of 0.00 0.00 10 VTCs in Burkina Fulfilment of commitmentsVocational Training Faso, Burundi, Egypt, at IAFS-ICentres’ (VTC’s) Ethiopia, Mozambique,in Burkina Faso, Gabon, Gambia, Libya,Burundi, Egypt, Rwanda & ZimbabweGabon, Gambia, are being set up byEthiopia, Libya, National SmallMozambique, Industries CorporationRwanda & (NSIC).Zimbabweunder IAFS-2008

Page 187: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

188

Outcome Budget 2013-14

Leaders of Future 0.00 0.00 PD Division had Higher engagement of Estimated costorganized the visit of Parliamentarians from African ` 0.60 Cr.Parliamentarians from countriesthe African countries(April 2011) as part ofLeaders for the FutureProgramme. Projectis underimplementation.

Scholarships for 4.00 4.61 Scholarships for Fulfilment of commitmentsAfrican students Masters & doctoral at IAFS-Ifor PG & Ph.D degree to Africancourses at various students admitted inAgricultural various AgriculturalUniversities / Universities in IndiaColleges in India were provided. The(2011-12) scheme is spread

over five years

Setting up of the 0.00 0.00 The project is being Fulfilment of commitments“ India-Africa implemented by at IAFS-IInstitute of Foreign Indian Institute ofTrade (IAIFT) in Foreign Trade (IIFT).Uganda under IIFT team visitedIAFS-2008 Uganda in Jan 2011

and is preparing theDPR. Confirmationfrom Ugandan sideon provision of land,building etc. awaited.

Page 188: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

189

Outcome Budget 2013-14

Implementation of 0.10 0.09 Scholarships have Fulfilment of commitments Expenditurethe Africa been provided to at IAFS-I incurred inScholarship African nationals FY 2011-12Scheme by ICCR under “Africaon behalf of MEA Scholarship Scheme”during the year under IAFS2009-10

Setting up of 21 0.00 0.00 Fulfilment of commitments Projects includeinstitutions , at IAFS-I setting up ofconducting 51 Vocational Trainingtraining Centres; India-Africaprogrammes, Institutes of Foreignorganizing 5 Trade; Apexconferences/ Planningworkshops on Organisation & Apexvarious issues in Trainingthe CFY 2011-12 Organisation for

Coal industry inMozambique; 05Human SettlementInstitute in Kenya,Togo, Mauritania,Zambia &DemocraticRepublic of Congo;Various TrainingProgrammes andConferences

Page 189: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

190

Outcome Budget 2013-14

Various Projects 153.40 0.00 Fulfilment of commitmentsto be implemented at IAFS-Iunder IAFS-II forhuman resourcedevelopment andinstitutionalcapacity building

Allocation to TC 13.00 0.00Division, MEA forITEC Scholarships

Allocation to ICCR 23.10 0.00 African Scholarshipfor 900 Scheme for AfricanScholarships nationals is beingunder IAFS-II implemented by ICCR

on behalf of MEA.

Funds for Short 8.49 0.00 Training in the field ofTerm Training journalism, IT, power,Courses New & Renewable

Energy, Waterresources, Highways,posts, Desertification& Climate change,advance machine/welding technology,food-processing,bio-diversity,bio-medical sciences,domestic savings,crafts & skill

Page 190: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

191

Outcome Budget 2013-14

development, sports, Fulfilment of commitmentsrural electrification, at IAFS-Itrade & sustainabledevelopment issues,agriculture etc. wereconducted for Africanstudents.Capacitybuilding workshopfor African Investmentpromotion Agencies &workshop on “ DesignInterventions for theBasketry Craft” werealso conducted.

Scholarships for 5.00 4.61 Scholarships for Fulfilment of commitments The scheme isAfrican students Masters & doctoral at IAFS-I spread over fiveadmitted to various degree to African yearsAgricultural students admitted inUniversities in various AgriculturalIndia Universities in India

were provided.

Supply of 13 0.00 0.00 Out of 13 medical Facilities in Victoria hospital Total Cost isMedical equipment equipment to be have been improved. ` 6.5 Cr.to Victoria Hospital, supplied to VictoriaSeychelles Hospital, 03 have

been supplied, 07are in their final stageof implementation;03 are beingprocessed.

Page 191: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

192

Outcome Budget 2013-14

Supply of IT related 0.00 0.00 Project is under Assistance to Namibia in the Total Cost isequipment & implementation field of Health Sector `10.00 Cr.items to HealthSector, Namibia

Supply of 0.00 1.71 Medical equipment Hospitals in Botswana have Total Cost isEntomology have been supplied been equipped for better ` 3.00 Cr.Laboratory to Botswana servicesequipment/Hospitalequipment toBotswana

PAN-African e- To strengthen 23.00 17.68 Implementation of the To strengthen relations with It is on-going Total project cost isnetwork relations with project African countries project ` 542 crore for aProgramme African countries period of 6 1/2 year

Emergency To strengthen 2.86 0.00 To supply medicines, To strengthen relations with on need basisassistance to relations with relief-material or African countriesWest African African countries cash-assistance incountries case of disasters

Aid to Liberia Aid in the field of 0.00 0.00 To supply the material To strengthen relations with(Health and Health and in health and African countriesEducation Sector) Education education sector as

Sectors requested by theLiberian Govt.

Aid to Liberia To supply CT 0.00 0.00 To strengthen relations withScan machine to African countrieshelp Healthsector of Liberia

Page 192: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

193

Outcome Budget 2013-14

Aid to Sierra Leone Supply of 0.00 0.00 To supply medicines To strengthen relations withmedicines to as per the African countriesSierra Leone requirement of Sierra

Leone side

Aid to Gambia Supply of 1.18 0.00 To supply material as To strengthen relationsmedicines and per the request of with African countriesmedical Gambian Govt.equipment toGambia

Aid to Ghana Providing 2.00 2.14 To set up the Training To strengthen relations with MOU signed. Total project costsupport to India- Centre in Ghana to African countries is ` 385.30 lakhs.Ghana Kofi showcase Indian IT The Centre was setAnnan Centre Industry up with Indianfor Excellence assistancein Ghana

Aid to Ghana Setting up of a 2.39 0.00 To set up the Training To strengthen relationsTechnical Centre in Ghana as with African countriesVocational requested by GhanaTraining Centrein Ghana

Implementation of To strengthen 0.29 0.00 To set up Learning To strengthen relations withHole in the Wall relations with stations for under- African countriesProject in West West African priviledged childrenAfrican countries countries

To supply To strengthen 1.86 1.81 As requested by To strengthen relations with Already suppliedcomputers to relations with Governments of African countries Supply ofCape Verde and West African Cape Verde, Niger computers toNiger; Supply of countries and Liberia Cape Verde,

Page 193: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

194

Outcome Budget 2013-14

buses to Liberia Supply of busesto Liberia,supply of 100computers toNiger

Misc. To strengthen 0.17 1.72 To strengthen relations with 8th CII India -Expenditure relations with African countries Africa Conclave

West African was organised incountries March, 2012

Technical Development of 1.18 0.00 2014Assistance for cotton sectordevelopment of through capacitycotton sector in building and7 African countries transfer of

technology

Total 250.00 160.15

Page 194: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

195

Outcome Budget 2013-14

Aid to Varzob-I Hydro Renovation, 21.17 18.51 Development of the Goodwill for India and provide 34 months Due to time over -Eurasia Power Plant modernization Varzob region by opportunities for Indian run, there is likely to

and uprating of providing more power companies in the region be cost escalation.Varzob-I Hydro to the city (9.5 MW)Power Plant,Tajikistan

Computers in 72 Setting up of 5.65 2.98 Provide computer Generation of goodwill for Indiaschools in Tavush Computer Labs education in schoolsregion, Armenia in 72 schools in in Tavush region,

Tavush region, ArmeniaArmenia

Financial Support Holding of 3.18 1.26 Provide contacts with Opportunity for Indian andfor seminars, international academics and foreign academics for interactionstudies and visits seminars and scholars for

studies on understanding aboutrelevant topics the region

TOTAL 30.00 22.75

Aid to Cash assistance To assist in the 15.00 27.61 Cash assistance ofLatin of US$ 5 million to Rehabilitation US $ 5 million wasAmerican Haiti for process. To provided to Haiti byCountries construction of generate re-appropriation to

500 low cost goodwill for India augment the fundshousing units for and Promote/ under this Head.the victims of StrengthenJanuary 2010 bilateralearthquake. relations.

TOTAL 15.00 27.61

Page 195: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

196

Outcome Budget 2013-14

Aid to Construction of Project is 127.00 0.00 The original project Supply power to Kabul and (a)December Land acquisition,Afganistan 220 kV supplying power has been completed northern provinces of 2013 Security,

Transmission to Kabul from in February 2009 and Afghanistan from generating Transportation,Line from Pul-e- generating commissioned in May stations of its neighboring Landlocked,Khumri to Kabul stations of its 2009. Two more country, Uzbekistan through Infrastructure.including 220/110 neighboring substations are being a transmission line fromkV sub-station at country, constructed at Doshi Tirmiz via Pul-e-Khumri toKabul and Uzbekistan and Charikar. Kabul.including through aconstruction of two transmissionadditional sub- line from Tirmizstations at Doshi via Pul-e-Khumriand Charikar. to Kabul

Supply of 1 million Food Assistance 31.51 15.13 Supply of fifth tranche Scheme is meant to enhance (a) 2009-10 Offtake by theMT of wheat in the of 1 million MT in progress. Approx. enrollment of school going (b) 2013-14 implementingform of high of wheat in the 4,43,321 MT of wheat children and improve child agency and itsprotein biscuits for form of high has been released health by providing nutritious distribution.School Feeding protein biscuits under the scheme. food.Programme, for Schoolsupplied through FeedingWorld Food Programme.Programme (WFP).

Reconstruction 118.17 45.63 60% of the work is Supply of power and irrigation (a)December Security, remoteand completion of complete. facilities in western Afghanistan. 2012 (b) January location of dam site,Salma Dam Power 10, 2015. poor roadProject (42 MW) in connectivity betweenHerat Province by Herat and ChisteM/s Water and (site) and risingPower Consultancy cost of inputs.Services (India)

Page 196: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

197

Outcome Budget 2013-14

Limited (WAPCOS).Assistance toGovernment ofAfghanistan forpowerinfrastructureand irrigation.

Supply of Medical Supply of Medical 7.88 0.00 Medical equipment to Improve and upgrade (a) 2012-13equipment to equipment to be supplied. medical facilities of IGICH. (b) 2013-14.Indira Gandhi IGICH, KabulInstitute of Child and ConstructionHealth (IGICH), of Neo-NatalKabul and Ward.Construction ofNeo-Natal Wardfor IGICH, Kabul.

ICCR Scholarship Ongoing scheme 31.51 18.11 Ongoing scheme. Capacity building of Afghan (a) 2015-16 forScheme for Afghan contribute to ICCR slots are to be students; contribute to the 675 slotsstudents for capacity building increased from 675 to human resource development (b) 2012-21 forUniversity of Afghan 1000 from Financial in Afghanistan. 1000 slots.education in India. students and Year 2012-13 as per

economy of GOI commitment.Afghanistan

Afghanistan Construction of 70.90 47.44 Civil works have Contribution to Afghanistan’s (a) December Delay in handingParliament Afghanistan’s progressed democracy and its people. 2011 over of site; changebuilding Parliament Symbolic representation of (b) December in alignment of

building by Indo-Afghan cooperation. 2013. Parliament building;CPWD change in

specifications of

Page 197: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

198

Outcome Budget 2013-14

external claddingmaterial; delay inapproval of interiordesignspecifications;security; fewbidders for variouspackages of workcould result in costescalation.

Phase III of Small Implementation 7.88 9.96 Funds are being Development in the fields of (a) Most of the No cost escalation.Development of small projects released in a phased health & sanitation, agriculture, projects areProjects(SDP): in the fields of manner for execution education, rural development, complete.All projects have health, education, of various projects vocational training. (a) Phase III tobeen sanctioned sanitation, rural under Phase-I & II , be completed byfor phase I & II development etc. where most of the 2015-16

For benefit of projects are complete.localcommunities.The projects areimplemented bylocal authoritiesand monitoredby the relevantAfghan andIndian agencies.

Computer Setting up of a 1.97 0.00 Setting up of a Computer literacy. More than (b) 2013-14laboratory at computer computer laboratory. 100 students will be benefited.Habibia School. laboratory at a

secondaryschool in Kabul

Page 198: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

199

Outcome Budget 2013-14

UNDP – Capacity Financial 3.94 6.78 As per commitment Provide technical assistance to (a) 2013-14 Ongoing project.Advisory assistance to of GOI, US$ 1.08 different Ministries ofProgramme(CAP)/ UNDP – under million is remitted Government of Afghanistan.National Institution tripartite every year under thisBuilding Project agreement. project to UNDP. Till(NIBP) under date approximatelytripartite MOU 35 Civil Servants havebetween India, provided technicalUNDP and assistance to variousAfghanistan Afghanistan Ministries.

To support Afghan Supply of Sports 8.27 1.21 Providing sports Expenditure on training of ANA Requirements ofNational Army equipment to equipments to Afghan personnel not covered under Government of(ANA) through Afghan National National Army. ITEC Budget, Election Basket Afghanistan arevarious Army (ANA); Fund, Special Training of awaited.programmes Medical Afghan Diplomats at FSI,

treatment of ANA medical treatment, training inPersonnel and IIPA, C-DAC, AIIMS, LBNOPEUtraining of ANA and other miscellaneousPersonnel projects from time to time.in variouscourses

Supply of Supply of 2.5 159.13 82.39 Provision made to Improving food security (a) Supply of Transportation,foodgrains to Lakh MT of supply 1.5 lakhs MT 1 lakh MT of logistics andAfghanistan wheat to of wheat in FY wheat landlocked terrain

Afghanistan 2012-13 completed in2011-12.(b) Supply of 1.5lakh MT isunderway.

Page 199: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

200

Outcome Budget 2013-14

Restoration of 7.88 6.64 Renovation of Restoration of cultural heritage; July 2015.Stor Palace historical building structural improvement in the

located in Ministry of Ministry of Foreign Affairs ofForeign Affairs of AfghanistanAfghanistan

Fellowship for 614 agricultural 7.88 1.21 Capacity building in Capacity building to Afghan 2015-16. Ongoing project.Indian Council for scholarships to the field of Agriculture. faculty members & students inAgricultural Afghan nationals the field of agriculture.Research (ICAR) throughScholarships. Department of

AgriculturalResearch andEducation(DARE)/ICAR

Other misc. 123.08 0.00 Capacity buildingprojects/ programme,programmes in Donation ofAfghanistan Computer and

Training aids toCommand and StaffCollege, Kabul;Training of AfghanNational Army (ANA)Personnel inMedical/Para-Medical Courses inIndia; MedicalTreatment of ANAPersonnel; Training

Page 200: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

201

Outcome Budget 2013-14

of Afghan CivilServants/CivilSociety Groups forskills upgradation;Donations of books,computers; etc.;Exposure visits;Parliamentaryexchanges; CulturalCooperation etc.

TOTAL 707.00 234.50

Page 201: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

202

Outcome Budget 2013-14

Public Abuja, Nigeria Construction of 23.54 19.23 Chancery building Chancery building and (a) 03.01.2013Works Chancery and Residences ResidencesandHousing

Addis Ababa Construction of 4.69 0.01 Chancery building Chancery building and Design StageChancery and and Residences Residencesresidences

Atlanta (CGI) Purchase of 21.59 23.77 Building for Chancery Building for Chancery Purchased inChancery 2012-13

Bahrain Construction of 4.69 0.05 Building for Chancery, Building for Chancery, Embassy Tendering Unexpected delay inChancery, Embassy Residence Residence and other Stage tendering due toEmbassy and other residences residences design modificationResidence and required at lastother residences stage for obtaining

local approvals

Bangkok Purchase of plot 12.20 13.44 Plot of Land Plot of land Purchased inof land 2012-13

Beijing, China Construction of 9.39 1.24 Buildings for Buildings for Chancery and (a) 19.03.2009 Final paymentsChancery and Chancery and residences (b) 22.11.2011 to be settledresidences residences (actual DOC)

Brasilia, Brazil Construction of 46.93 25.46 Buildings for Buildings for Chancery, (a) 12.06.2013Chancery, Chancery, Embassy Embassy ResidenceEmbassy Residence and other and other residencesResidence and residencesother residences

Page 202: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

203

Outcome Budget 2013-14

Canberra Purchase of plot 13.61 0.00 Plot of Land Plot of land Expected toof land adjacent materialise into existing 2012-13Chancery

Dar-Es-Salaam Construction of 9.39 0.00 Buildings for Buildings for Chancery and NA DesignChancery and Chancery and residences modificationsresidences residences required to meet

new guidelines/conditions imposedby local governmnet

Dhaka Construction of 46.93 11.23 Buildings for Buildings for Chancery, (a) 23.02.2012Chancery, Chancery, Embassy Embassy Residence and other (b) 30.06.2013Embassy Residence and other residencesResidence and residencesother residences

Hanoi Purchase of built 4.69 0.00 Chancery and Chancery and Residence Expected toup properties for Residence materialise inChancery and 2012-13Residences

Islamabad Construction of 46.93 11.48 Buildings for Buildings for Chancery, (a) 27.03.2012Chancery, Chancery, Embassy Embassy Residence and other (b) DecemberEmbassy Residence and other residences 2013Residence and residencesother residences

Jawahar Lal Nehru Construction of 9.39 5.25 Building of office Building of office HeadquartersBhawan, New office Headquarters of of Ministry of External AffairsDelhi Headquarters of Ministry of External

Ministry of AffairsExternal Affairs

Page 203: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

204

Outcome Budget 2013-14

Kabul, Afghanistan Construction of 23.46 52.64 Buildings for Buildings for Chancery and (a) 22.04.2010Chancery and Chancery and residences (b) 31.03.2013residences residences

Kathmandu Construction of 28.16 12.78 Buildings for Buildings for Chancery and (a) 12.04.2010Chancery and Chancery and residences (b) 12.10.2014residences residences

Moscow Replacement of 1.30 1.44 Repair and Repair and maintenance of GOI 2012-13Heating System maintenance of GOI buildingsat DCM buildingsResidence andother R&MWorks atChancery

Port of Spain Construction of 1.88 0.87 Building for Building for International Design StageInternational International Cultural Cultural CentreCultural Centre Centre

Tashkent, Construction of 4.69 0.19 Buildings for Buildings for Chancery, PQ StageUzbekistan Chancery, Chancery, Embassy Embassy Residence and

Embassy Residence and other other residencesResidence and residencesother residences

Warsaw, Poland Construction of 6.57 4.62 Buildings for Buildings for Chancery and (a) 20.06.2014Chancery and Chancery and residencesresidences residences

Wellington Construction of 0.00 2.90 Buildings for Buildings for Chancery and Tendering StageChancery and Chancery and residencesresidences residences

Page 204: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

205

Outcome Budget 2013-14

Various Construction of 3.43 0.40 Buildings for Buildings for Chancery or Projects are inConstruction Buildings for Chancery or Residences/Embassy Preliminary orProjects Chancery or Residences/Embassy Residence or Both or Design Stage(i) Bangkok- Residences/ Residence or Both orResidential EmbassyComplex Residence or(ii) Berlin- Both orResidences(iii) Doha-Chancery andER(iv) Gabarone-Chancery andResidences(v) Khartoum-Chancery cumResidences(vi) Kyiv-Chancerycum Residence(vii) Nicosia-Residences(viii) Port Louis-Chancery(ix) Port Louis-World HindiSecretariat (WHS)(x) Santiago-RedevelopmentProject(xi) Shanghai-Chancery(xii) Kolkata-ICCR

Page 205: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

206

Outcome Budget 2013-14

Yerevan Purchase of 7.80 8.59 Property for Chancery Property for Chancery Purchased inproperty for Dec, 2012Chancery

Miscellaneous Repair & 4.69 2.47 Repair and Repair and maintenance of 2012-13projects Maintenance of maintenance of GOI GOI buildings(i) Budapest Govt. owned buildings(ii) Damascus office buildings(iii) Frankfurt(iv) Kuala Lumpur(v) London(vi) Nairobi(vii) Paris(ix) Stockholm(x) TripoliPassport Offices Construction of 14.08 15.24 Building for Passport Building for Passport Office 2012-13

building for OfficePassport Office

Total 350.00 213.31Nalanda Establishment of Setting up the 15.00 11.51 Refurbishing of Construction of Boundary Wall All the items of Through laid down

Nalanda University University at existing structure for nearly completed; Draft report work are processat Rajgir. Rajgir. temporary office at of topographical survey and expected to be

Rajgir; Construction soil investigation received completed by theof Boundary Wall; end ofTopographical survey 2012-2013.of the land; Soilinvestigation of theland; Launch ofArchitectural DesignCompetition of theUniversity.

TOTAL 15.00 11.51

Page 206: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

207

CHAPTER V - FINANCIAL REVIEW

The budget of the Ministry has both Plan and Non-Plan componentsthough the share of the Plan funds is comparatively small. ThePlan Budget of the Ministry is being allocated following a Cabinetdecision taken in 1996. A noteworthy feature of the total budget

has been its growth over the years, which is a reflection of thegrowing importance of India in global affairs and the increasingfunctions of the Ministry. Both Plan and Non Plan components haveseen an upward trend as can be seen from the table below:

(` in Crore)

BE 2012-13

RE 2012-13

BE 2013-14

Plan Non Plan Plan Non Plan Plan Non Plan

Revenue 362 7261.97 482 7442 1531.5 8419

Capital 1138 900 1138 1000 1468.5 300

Total 1500 8161.97 1620 8442 3000 8719

Grand Total 9661.97 10062 11719

With high-level commitments made by India towards thedevelopment of the hydropower sector in Bhutan, construction ofKaladan Multimodal Transit Transport Project in Myanmar andNalanda University Project in Bihar, it has become imperative thata greater provision of Plan funds be allocated to the Ministry. A

higher allocation of funds at the BE stage itself would also helpthe Ministry in financial planning in advance. The request of theMinistry for Supplementary Grants at the RE stage have generallybeen accepted and to some extent, additional funds provided.

Page 207: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

208

An important feature has been the higher utilization of the grant bythe Ministry both on the Revenue and Capital Accounts. This hasbeen the result of regular monitoring of projects and expenditure

by various Divisions of the Ministry. The table below shows theutilization pattern of the Budget on the basis of the funds allocatedat the Revised Estimates stage:

2010-11 2011-12 2012-13

Budget (RE)

Percent Utilised

Budget (RE)

Percent Utilised

Budget (RE)

Percent Utilised*

Revenue 6248 100.12 6445 100.46 7924 70.19

Capital 872 103.09 1391 100.52 2138 78.14

Total 7120 100.49 7836 100.47 10062 71.88

* Expenditure up to January, 2013

Trend of Allocation vis-a-vis Utilization The revenues earned by the Ministry have also been increasingsteadily. As part of Government’s efforts to enhance Non-Taxrevenue, the Ministry has revised passport fee w.e.f. October 1,2012 which has also helped in enhanced revenue generation. Thetrend of growing revenues of Ministry is clearly visible from thetable given below:

(` in Crore)

Fees 2009-10 2010-11 2011-12 2012-13**

PASSPORT 878.33 659.61 1018.72 1006.52

VISA 1222.01 927.93 1373.44 1514.14

OTHERS 128.52 144.67 341.18 308.21

TOTAL 2228.86 1732.20 2733.34 2828.87

**Revenues up to January 2013

Page 208: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

209

Several Missions/Posts abroad are able to generate substantialrevenue accruing from Consular services. These Missions do notrequire any foreign exchange remittances from India for meetingtheir approved budgeted expenses.

The Ministry has made efforts to reduce the cash holding byMissions/Posts abroad by undertaking monthly review of their cashbalances and determining the amount to be remitted accordingly.The Missions/Posts are required to send their Cash BalanceReports regularly to the Ministry for monitoring their cash holdings.Missions are strictly instructed not to hold cash reserves of morethan what is required for meeting their expected expenditure forsix weeks.

One of the important measures taken by the Ministry towardsfinancial management has been the implementation of theIntegrated Mission Accounting System (I-MAS) in its Missions/Posts abroad for accounting purposes. I-MAS has beenoperationalised in all the Missions and Posts. This software hasbrought all Missions/Posts on a common accounting platform andenabled timely incorporation of the monthly cash accounts of theMissions/Posts abroad into the monthly accounts of the Ministry.The Ministry aims to further improve the I-MAS software as perusers’ feedback received from time-to-time.

In order to fast-track the payments by the Ministry, electronicpayment system is being used. The Ministry is using ECS formaking all payments above ̀ . 5 lakh. Local payments of amountsless than ̀ . 5 lakh are being made through cheque while outstationpayments for this amount are being made by demand draft.

The Ministry has 1278 subscribers to the New Pension System(NPS) which has been made applicable to the entrants to theGovernment Service from January 2004. While there were teethingdifficulties in implementation of the NPS, the same has beenaddressed by the Office of the Principal Chief Controller ofAccounts through regular workshops to train the Drawing andDisbursing Officers (DDOs) and to address problems faced bythem in the implementation of NPS. As a result, the incidences ofnon-matching and booking of subscribers’ contribution in their NPSaccount have been significantly reduced. The monitoring of theworking of the NPS in the Ministry is being done at the level of theFinancial Advisor.

Trend of Receipts

Page 209: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

210

The Ministry has been laying emphasis on the prompt settlementof its audit paras. A Standing Audit Committee (SAC) has beenset up to function as a nodal agency of the Ministry to monitor andreview the submission of Action Taken Notes (ATN) on Comptrollerand Auditor General’s (CAG) Audit Paras and Action TakenReports (ATR) on Public Accounts Committee’s (PAC)

recommendations and take appropriate measures. The SAC hasheld regular meetings and has been able to expedite the processof submission of pending ATNs to the Competent Authority. As of31 December 2012, the Ministry has 23 CAG paras pendingagainst it whereas no PAC para is pending.

Page 210: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

211

CHAPTER VI - AUTONOMOUS BODIES

The Ministry of External Affairs has the following autonomous

bodies under its administrative control: (i) the Indian Council for

Cultural Relations (ICCR), (ii) the Indian Council of World Affairs

(ICWA); and (iii) the Research and Information System for

Developing Countries (RIS).

Indian Council for Cultural Relations (ICCR)

The ICCR was founded in 1950. It is funded by the Ministry. Its

main function is to strengthen cultural relations between India and

other countries. In this regard it participates in the formulation and

implementation of policies and programmes relating to India’s

cultural diplomacy. The ICCR is engaged in the promotion of cultural

exchanges between India and other countries and works towards

strengthening people-to-people contact. It also establishes and

develops relations with national and international organizations in

the field of culture.

The ICCR has its main office in New Delhi and 20 regional offices

functioning in major Indian cities. In order to promote awareness

of India’s composite cultural heritage abroad, the Council has 35

Indian Cultural Centres in different parts of the world. The Cultural

Centres function under the administrative control of the ICCR and

the respective Indian Missions abroad.

The major activities of ICCR include the following:

• Administration of scholarship schemes for overseas students

on behalf of the Government of India and other agencies;

• Grant of scholarships to foreign students to learn Indian dance

and music;

• Exchange of exhibitions;

• Organization and participation in international seminars and

symposia;

• Participation in major cultural festivals abroad;

• Organization of “Festival of India” in foreign countries;

• Exchange of groups of performing artists;

• Organization of lecture-demonstration by performing artists

abroad;

• Distinguished Visitors Programme (DVP) under which

eminent personalities from abroad are invited to visit India;

and

Page 211: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

212

• Outgoing Visitors Programme in which experts are sent

abroad for delivering lectures.

The proposed allocation of ICCR in BE 2013-14 is `. 160 crore

with a marginal hike from RE 2012-13 of ` 157.30 crore.

The Outcome Budget of ICCR for 2013-14 and the review of its

past performance during 2011-12 and 2012-13 (up to December

2012) are annexed in a tabular form.

Indian Council of World Affairs (ICWA)

The Indian Council of World Affairs was established in 1943 by a

group of Indian intellectuals as a think tank. It was registered as a

non-official, non-political and non-profit organisation under the

Registration of Societies Act, 1860. By an Act of Parliament in

2001, the Council has been declared an institution of national

importance. The Vice President of India is the ex-officio President

of ICWA. The Ministry administers the ICWA as per the provisions

of the Indian Council of World Affairs Act, 2001, which has also

laid down the objectives of the Council.

The ICWA promotes the study of Indian and International Affairs in

order to develop a body of informed opinion on international

matters. It promotes India’s relations with other countries through

study, research, discussions, lectures, exchange of ideas and

information with other organizations within and outside India

engaged in similar activities. The ICWA organizes conferences

and seminars to discuss and study India’s policy towards

international politics. It undertakes research activities and

publishes books, periodicals, journals and other literature on

subjects dealt by the Council.

The allocation for ICWA during BE 2012-13 was `. 8.81 crore

which remained unchanged at RE 2012-13 stage. Allocation for

ICWA in BE 2013-14 is `. 10.81 crore which includes `. 2 Crore

for renovation, purchase of equipment, furniture etc for the ICWA

Library.

The Outcome Budget of the ICWA for the Financial Year 2013-14

and the review of past performance during 2011-12 and 2012-13

(up to December 2012) are annexed in a tabular form.

Research and Information System for Developing Countries

(RIS)

The RIS is an autonomous body of the Ministry of External Affairs

and the Ministry extends financial support to it. RIS is a think tank

specializing in international economic relations and development

cooperation. Its mandate is to function as an advisory body to the

Government of India on matters pertaining to multilateral economic

and social issues, including regional and sub-regional cooperation

arrangements, as may be referred to it from time-to-time. The RIS

has been envisioned as a forum for fostering effective policy

dialogue among think tanks of developing countries on international

economic issues.

Page 212: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

213

The RIS conducts research studies to assist the policy formulation

and preparation for major summit meetings and other negotiations.

It organizes policy dialogues, conferences and symposia to fulfill

its mandate of fostering intellectual dialogue among developing

countries. RIS publishes books and reports, policy briefs and

discussion papers on various subjects.

The RIS has been extended a budgetary support of ̀ . 5.35 crore

in RE 2012-13. The proposed BE 2013-14 of the institute has

been retained at the same level.

The outcome budget of RIS for financial year 2013-14 and the

review of past performance during 2011-12 and 2012-13 (up to

December 2012) are annexed.

Others

In addition, the Ministry also provides grants-in-aid to various other

institutions, namely, the Indian Society of International Law (`. 0.05

Crore in BE 2013-14), Indian Council for Research on International

Economic Relations (`. 0.1 Crore in BE 2013-14), Support to

Institutes of Chinese Studies (`. 1.23 Crore in BE 2013-14), Institute

of Foreign Policy Studies, Calcutta University (`. 2 Crore in BE

2013-14), Centre for Research in Rural and Industrial Develo-

pment, Chandigarh (`. 1.75 Crore in BE 2013-14).

Page 213: MEA Outcome Budget 2013-14

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14 (AUTONOMOUS BODIES)

(` in Crore)

SL.No. Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

ICCR Other Cultural Diplomacy 80.00 Promotion of IndianExpenditure through exchange of culture abroad and also(I) Grant in Aid cultural delegations, providing a platform toto Indian participation in other countries forCouncil for international showcasing their culture.Cultural exhibitions, Facilitating dialogue andRelations conferences & interaction between

seminars, scholars and institutionspublications, offering in India and abroad.scholarships,organization ofFestivals of Indiaabroad etc.

5.10 Sponsoring 154 culturaltroops abroad.70 Outgoingand 15 Incoming Academicvisitors are proposed

4.25 7 Cultural festival of Indiaabroad

0.99 To host 90 overseas Dance& Music group Performances.Financial support to 70agencies/organisations /NGOs is proposed forpromotion of Indian Culture

0.35 198 Indian classical danceand music programmes with

215

Outcome Budget 2013-14

Page 214: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

216

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14 (AUTONOMOUS BODIES)

SL.No. Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

indian artists. Fellowshipsetc.

34.43 Opening of 11 New CulturalCentres abroad.Expenditures on existingcentres.

1.70 26 Outgoing exhibitions areproposed; 5 incoming and60 local exhibitions areproposed

5.10 20 more Long/Short TermChairs are proposed to beset up . Expenditure onexisting Centres.

1.42 15 International Seminars/Conferences on Indology/Buddhism etc.Celebrationof 150th Birth Anniversary ofVivekanand by holdingconferences in India andabroad

0.42 Distribution of presentsthrough Missions/Postsworth 150 lakhs is planned

0.51 15 incoming Visitors underDistinguished Visitor

Page 215: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

217

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14 (AUTONOMOUS BODIES)

SL.No. Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Programme and 12Distinguished Indians tobe sent abroad.

13.59 3000 scholarships areplanned

12.14 Admn & Estt expenditure ofICCR Headquarters andRegional Offices . 6 Journalsin five different languageswere brought out.Libraryexpenses and other smallactivities, including CapitalExpenditure.

Total 160.00

Page 216: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

218

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14 (AUTONOMOUS BODIES)

SL.No. Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

ICWA Grant-in-Aid to Funding the ICWA to 10.81 a) To promote the study of To promote India’sIndian Council meet various Indian and international relation with otherof World Affairs objectives affairs so as to develop a countries and academic

body of informed opinion on research on Internationalinternational matters; (b) to Affairs.promote India’s relationswith other countries throughstudy, research, discussion,lectures, exchange of ideasand information with otherorganizations within andoutside India engaged insimilar activities; (c) to serveas a clearing house ofinformation and knowledgeregarding world affairs; (d) topublish books, periodicals,journals, reviews, papers,pamphlets and otherliterature on subjects coveredunder clauses (a) and (b) ;(e) to establish contacts withorganization promotingobjects mentioned in thissection; (f) To arrangeconferences and seminarsto discuss and study theIndian policy towardsinternational affairs; and

Page 217: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

219

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14 (AUTONOMOUS BODIES)

SL.No. Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

(g) to undertake such otheractivities for the promotion ofideas and attainment of theabove-mentioned objects.

Total 10.81

Page 218: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

220

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14 (AUTONOMOUS BODIES)

SL.No. Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

RIS The activities of RIS is a New Delhi 5.35 The main research 1. Policy Advisory Services 01.04.2013Research and based autonomous programme of RIS includes 2. Fostering toInformation think-tank under the the following broad areas: Policy Dialogue: 31.03.2014System for Ministry of External Conferences, SymposiaDeveloping Affairs. It is an and Workshops;Countries (RIS), organization that 3.Capacity Building andamong others, specializes in policy Training Programmes;include: research on 4. Publications : Reports,a) Policy international Policy Briefs, DiscussionResearch; economic issues and Papers, and Journals.b) Policy developmentAdvisory cooperation. RIS isServices; envisioned as a forumc) Fostering for fostering effectivePolicy policy dialogue andDialogues: capacity buildingConferences, among developingSymposia and countries onWorkshops; internationald) Capacity economic issues.Building andTrainingProgrammes;d) CapacityBuilding andTrainingProgrammes;e) Outreach,GlobalPresence and

Page 219: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

221

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14 (AUTONOMOUS BODIES)

SL.No. Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

Networking;f) Publications;g) Data andInformationCentre.

A. Global Economic Governance

• Climate Change, BorderMeasures and their Impacton India

• Technology Transfer underthe Clean DevelopmentMechanism: A Multi-Country Analysis

• Development CooperationPolicies of EmergingEconomies: Implicationsfor India

B. Regional/BilateralEconomic Integration

• Deepening India-MaldivesEconomic Cooperation

• Strategic Partnership forPolicy Development andAction to Foster RegionalCooperation in South Asia

Page 220: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

222

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14 (AUTONOMOUS BODIES)

SL.No. Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

• Trade in TraditionalMedicines: Prospects forCooperation in SAARC

• Pruning India’s “SensitiveList” for Least DevelopedCountries under the SouthAsian Free Trade Agreement:A Possible Approach

• Broader RegionalEconomic Integration in Asia:The Agenda for East AsiaSummit

• Trade in Services in SAARC:Creating an InstitutionalMechanism for Data andInformation Management

• Trade Prospects of theIOR-ARC in the NewMillennium: New EconomicFrontiers of the Region

• India-ASEAN Connectivity:The Emerging Architecture

• Production Networks inASEAN: What is Missing inSouth Asia?

Page 221: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

223

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14 (AUTONOMOUS BODIES)

SL.No. Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

• India-Japan CEPA andImplications for East AsianEconomic Integration

• Policy and ImplementationMeasures to Enhance India-Myanmar Border Trade

• India’s Trade in Audio-Visual Services under theGATS

• Analysing the Effect ofPotential FTA between Indiaand the EU on FDI: AnEmpirical Analysis

• Biotechnology andDevelopment

• India-China TradeRelations: The EmergingScenario

• Financial Cooperationbetween ASEAN+3:Implications for India

C. South-South Cooperation,New Technologies AndDevelopment

• South-South Collaborationin Genomics Innovations

Page 222: MEA Outcome Budget 2013-14

Outcome Budget 2013-14

224

STATEMENT OF OUTLAYS AND OUTCOMES/TARGETS FOR 2013-14 (AUTONOMOUS BODIES)

SL.No. Name of Objective/ Outcome Outlay 2013-14 Quantifiable Projected Processes/ Remarks/Scheme/ Deliverables/ Outcomes Timelines Risk Factors

Programme Physical Outputs

1 2 3 4 5 6 7 8

4(i) 4(ii)

Non- PlanPlan Budget

Budget

(` in Crore)

• Innovation System inPharmaceuticals in India

• DAC Terms of Referenceand Development PartnershipPolicies

• Managing the GlobalFinancial Sector: Imperativesfor the BRICS

D. Strategic Responses toGlobalization

• Poverty and Investment:Channels to EconomicDevelopment

• Global Ethics in Scienceand Technology (GEST)

• Trends, Structure andComposition of IndianSeed Industry

• India’s FDI Inflows andOutflows: Monitoring andAnalysis

• India 2050: Long TermProspects, Implications andChallenges

Total 5.35

Page 223: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12 (AUTONOMOUS BODIES)

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

ICCR Other Expenditure Cultural 121.00 68.19 Promotion of Indian culture(I) Grant in Aid to Diplomacy abroad and also providing aIndian Council for through platform to other countries forCultural Relations exchange of showcasing their culture.

cultural Facilitating dialogue anddelegations, interaction between scholarsparticipation in and institutions in India andinternational abroadexhibitions,conferences &seminars,publications,offeringscholarships,organization ofFestivals ofIndia abroadetc.

5.20 90 Incoming culturaldelegation receivedand performancesheld.11 incomingvisitors underDistinguished visitorProgramme werereceived

5.00 140 Outgoing troopswere sponsored/sentto various countries.The councilsponsored 72

225

Outcome Budget 2013-14

Page 224: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12 (AUTONOMOUS BODIES)

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

226

Outcome Budget 2013-14

outgoing visitors andreceived 10 Academicvisitors.

3.15 6 major Culturalfestival of Indiaabroad. 10International Festivalsin India.

1.19 14 Statue/Busts weresent.

0.00 24 Exhibitions havebeen sponsoredabroad.

0.00 4 Incoming and 47Local exhibitions havebeen organised. .

3.54 ICCR maintains 91Long/Short termChairs in UniversitiesAbroad.

1.13 Council organised 12international seminaron Buddhism/Indology/MaulanaAzad & also assisted8 Universities/Institutes to holdInternationalConferences/

Page 225: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12 (AUTONOMOUS BODIES)

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

227

Outcome Budget 2013-14

Seminars in India.150th TagoreAnniversarycelebration.

24.86 Expenses on IndianCultural centresabroad. One NewCultural Centre atDar-e-Salam wasopened .

12.55 Admn & Esttexpenditure of 6Journals in fivedifferent languages.Library expenses andother small activities.Including CapitalExpenditure.

11.06 2404 scholarshipswere administered forforeign students.

0.49 Financial support to258 agencies/organisations /NGOswere given forpromotion of IndianCulture. Fellowshipsawarded underFellowshipprogrammes

Total 121.00 136.37

Page 226: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12 (AUTONOMOUS BODIES)

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

228

Outcome Budget 2013-14

ICWA Grant-in-aid to Funding the 12.00 11.23 a) To promote study ofIndian Council of ICWA to meet Indian andWorld Affairs various international affairs so

objectives as to develop a bodyof informed opinionon internationalmatters; (b) topromote India’ srelations with othercountries throughstudy, research,discussion, lectures,exchange of ideasand information withother organisationswithin and outsideIndia engaged insimilar activities;(c) to serve as aclearing house ofinformation andknowledge regardingworld affairs; (d) topublish books,periodicals, journals,reviews, papers,pamphlets and otherliterature; (e) toestablish contactswith organisationspromoting objectsmentioned in this

Page 227: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12 (AUTONOMOUS BODIES)

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

229

Outcome Budget 2013-14

section; (f) to arrangeconferences andseminars to discussand study the Indianpolicy towardsinternational affairs

Total 12.00 11.23

Page 228: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12 (AUTONOMOUS BODIES)

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

230

Outcome Budget 2013-14

RIS The activities of RIS is a New 5.35 5.35 The main research As in previous years, RISResearch and Delhi based programme of RIS continues to respond to theInformation autonomous includes the policy needs of the GovernmentSystem for think-tank under following broad areas: of India on different issues ofDeveloping the Ministry of Global Economic international economicCountries (RIS), External Affairs. Governance,Regional/ cooperation. RIS in the past year,among others, It is an Bilateral Economic among others, provided inputsinclude: a) Policy organization that Integration; South- to the Government of India onResearch; specializes in South Cooperation, the following:b) Policy Advisory policy research New TechnologiesServices; on international And Development;c) Fostering Policy economic Strategic Reponses toDialogues: issues and GlobalizationConferences, developmentSymposia and cooperation. RISWorkshops; is envisioned asd) Capacity a forum forBuilding and fosteing effectiveTraining policy dialogueProgrammes; and capacityd) Capacity building amongBuilding and developingTraining countries onProgrammes; internationale) Outreach, economicGlobal Presence issues.and Networking;f) Publications;g) Data andInformation Centre.

Page 229: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2011-12 (AUTONOMOUS BODIES)

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2011- diture deliverables Outcome during and Anticipated analysis of cost

Programme 12 2011- 2011-12 2011-12 (b) dates of escalation, impact12 Completion of cost overrun

and viability ofproject etc.

1 2 3 4 5 6 7 8 9

231

Outcome Budget 2013-14

WTO; BRICS ; India-ASEAN;G-20; Global Financial Crisisand Canada Joint Study Group

Fostering Policy Dialogue:Conferences, Symposia andWorkshops:9 conferences were organisedincluding on South Asia, Indiaand East Asia, India-Baltic SeaRegion, India-Indonsia,International Trade and ClimateChange etc.

Capacity Building and TrainingProgrammes:6 Capacity building and trainingprogrammes were ogranisedincluding for ITEC/SCAAPcandidates, Afghanistandiplomats, ASEAN diplomats etc.

Publications: A host of PolicyBriefs and Discussion Paperswere brought out including in thefield of South- SouthCooperation, Food Security inSouth Asia, EconomicCooperation among BRIC,Food-Feed-Fuel Triangle etc.

Total 5.35 5.35

Page 230: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13 (AUTONOMOUS BODIES)

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

233

Outcome Budget 2013-14

ICCR Other Expenditure Cultural 150.00 116.50 Promotion of Indian culture(I) Grant in Aid to Diplomacy abroad and also provide aIndian Council for through platform to other countries forCultural Relations exchange of showcasing their culture.

cultural Facilitating dialogue anddelegations, interaction between scholarsparticipation in and institutions in India andinternational abroadexhibitions,conferences &seminars,publications,offeringscholarships,organization ofFestivals of Indiaabroad etc.

4.51 90 Incoming CulturalDelegationperformancesundertaken. 133Indian classical danceand musicprogrammes withindian artists held.

7.36 128 cultural groupshave been sponsoredto perform abroad.Sponsored 55outgoing visitors and

Page 231: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13(AUTONOMOUS BODIES)

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

234

Outcome Budget 2013-14

received 9 Academicvisitors

2.62 8 InternationalFestivals in India .

24 Exhibitions weresponsored for showsabroad.

9 busts statutes sentabroad.

20 Outgoing As per demandexhibitions organizedabroad.

2.04 4 Incoming and 47 As per demandLocal exhibitionsorganised.

5.32 ICCR proposed 20Long/Short TermChairs in Universitiesabroad. Expenditureon existing

3.70 Council organised 5international seminaron Budhism/Indology/Maulana Azad andalso assisted threeUniversities/Institutesto hold International

Page 232: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13 (AUTONOMOUS BODIES)

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

235

Outcome Budget 2013-14

Conferences/Seminars in India.Rabinrath Tagoreanniversarycelebrations.

45.73 One New CulturalCentres was opened.Expenditure onexisting centres.Salaries, RRT andactivites

16.06 1850 newscholarships weregiven. Making totalstudents to 4700.

28.03 Admn & Esttexpenditure of ICCRHead Quarters &Regional Offices.6 Journals in fivedifferent languageswere brought out.Library expenses andother small activities.Capital Expenditure.

1.13 Financial support to85 NGOs in India

Page 233: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13(AUTONOMOUS BODIES)

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

236

Outcome Budget 2013-14

TOTAL 150.00 233.00 The expenditureexceeded thebudgetary allocationand was temporarilya financed byICCR’s agencywork.

Page 234: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13 (AUTONOMOUS BODIES)

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

237

Outcome Budget 2013-14

ICWA Grant-in-Aid to Funding the 8.81 4.06 a) to promote study ofIndian Council of ICWA to meeting Indian andWorld Affairs the various international affairs

objectives so as to develop abody of informedopinion oninternational matters;(b) to promote India’ srelations with othercountries throughstudy, research,discussion, lectures,exchange of ideasand information withother organisationswithin and outsideIndia engaged insimilar activities;(c) to serve as aclearing house ofinformation andknowledge regardingworld affairs; (d) topublish books,periodicals, journals,reviews, papers,pamphlets and otherliterature on subjectscovered under clauses(a) and (b); (e) toestablish contacts

Page 235: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13(AUTONOMOUS BODIES)

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

238

Outcome Budget 2013-14

with organisationspromoting objectsmentioned in thissection; (f) to arrangeconferences andseminars to discussand study the Indianpolicy towardsinternational affairs;and (g) to undertakesuch other activitiesfor the promotion ofideas and attainmentof the above-mentioned objects.

TOTAL 8.81 4.06

Page 236: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13 (AUTONOMOUS BODIES)

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

239

Outcome Budget 2013-14

RIS The activities of RIS is a New 5.35 4.01 The main research RIS provided inputs to the a) 31.12.2012;Research and Delhi based programme of RIS Ministry of External Affairs (MEA) b) 31.03.2013Information autonomous includes the following on: (a) The views of the BRICSSystem for think-tank under broad areas: Global countries on the “PreparatoryDeveloping the Ministry of Economic Governance, Process of the UN ConferenceCountries (RIS), External Affairs. Regional/Bilateral on Sustainable Development”among others, It is an Economic Integration; (Rio+20 Conference) (b) Globalinclude: a) Policy organization that South-South Peace and Security: Role of theResearch; specializes in Cooperation, New BRICS and (c) Access tob) Policy Advisory policy research Technologies And Affordable Medicines:Services; on international Development; Opportunities for Co-operationc) Fostering economic issues Strategic Reponses to among the BRICS.Policy Dialogues: and development GlobalizationConferences, cooperation. RISSymposia and is envisioned asWorkshops; a forum ford) Capacity fosteing effectiveBuilding and policy dialogueTraining and capacityProgrammes; building amongd) Capacity developingBuilding and countries onTraining internationalProgrammes; economic issues.e) Outreach,Global Presenceand Networking;f) Publications;g) Data andInformation Centre.

Page 237: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13(AUTONOMOUS BODIES)

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

240

Outcome Budget 2013-14

Indian Ocean Region Associationfor Regional Cooperation(IORARC): RIS provided inputsto the MEA on “TowardsCooperative Regionalism inIORARC”.

Conference of Parties: RISprovided inputs to the Ministryof Environment and Forests onthe agenda items of the 10thMeeting of the Conference ofParties, held in Hyderabad inOctober 2012.

Policy Dialogues, Conferences,Workshops, Capacity BuildingProgrammes: 11 conferences/seminars/round tables wereorganized on themes such asIndia-Mayanmar Trade &Connectivity; India-ASEAN;Bio-safety Protocol;Biotechnology and DevelopmentGlobal Financial Crisis etc.

Capacity Building Programmes:A. Workshop on Trade andEconomic Cooperation: Globaland Regional Perspectives;RIS, jointly with Foreign ServiceInstitute (FSI), Ministry of

Page 238: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13 (AUTONOMOUS BODIES)

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

241

Outcome Budget 2013-14

External Affairs, organizeda one-day workshop on Tradeand Economic Cooperation:Global and RegionalPerspectives for ForeignDiplomats under the 54thProfessional Course for ForeignDiplomats (PCFD) in New Delhion 3 April 2012

B. Workshop on Trade andEconomic Cooperation: Globaland Regional Perspectives:RIS, jointly with FSI organized aone-day Workshop for ForeignDiplomats on Trade andEconomic Cooperation: Globaland Regional Perspectivesunder the 2nd Special Coursefor IOR–ARC, in New Delhi on8 May 2012;

C. Workshop on Trade andEconomic Cooperation: Globaland Regional Perspectives:RIS, jointly with FSI organized aWorkshop on Trade andEconomic Cooperation: Globaland Regional Perspectives forforeign diplomats under the55th professional course inNew Delhi on 4th September2012.

Page 239: MEA Outcome Budget 2013-14

REVIEW OF PAST PERFORMANCE IN TERMS OF TARGETS FIXED IN OUTCOME BUDGET 2012-13(AUTONOMOUS BODIES)

(` in Crore)

Object Name of Objective / Outlay Expen- Quantifiable Physical Output/ Original (a) Factor-wiseHead Scheme / Outcome 2012- diture deliverables Outcome during and Anticipated analysis of cost

Programme 13 2012- 2012-13 2012-13 (b) dates of escalation, impact13 (upto December 2012) Completion of cost overrun

(Upto and viability ofDec. project etc.

2012)

1 2 3 4 5 6 7 8 9

242

Outcome Budget 2013-14

D. Capacity-BuildingProgramme on RegionalPerspectives and WTONegotiations on Trade andEconomic Cooperation: RIS,on behalf of FSI, organised theCapacity Building Programmeon Regional Perspectives andWTO Negotiations on Trade andEconomic Cooperation underthe 7th Special Course forASEAN Diplomats in New Delhion 11 December 2012.

RIS PublicationsReportsASEAN-India ConnectivityReport: India Country Study

Expansion of North East India’sTrade and Investment withBangladesh and Myanmar:An Assessment of theOpportunities and Constraints

Trade and Investment Prospectsof the IOR-ARC in the NewMillennium: New EconomicFrontiers of the Region

8 Policy briefs, 6 DiscussionPapers and many other articlesin various journals were published.

Total 5.35 4.01