mba weekly bulletin vol.57 issue#12
DESCRIPTION
MBA Weekly Bulletin vol.57 issue#12TRANSCRIPT
Calendar Events
Seminars and Trainings Benefits and Services
April 25, Thursday Dine & Donate Jason’s Restaurant
15% donation from Jason’s to our Scholarship Program Lunch and dinner
May 17, Friday Bocce Ball Tournament 9:30AM – 3:30PM May 23, Thursday CPR/First Aid 8:30AM May 23, Thursday Forklift Training 12:30PM June 12, Wednesday 5:00PM – 7:00PM
Scholarship Awards Reception Jason’s Restaurant
Our Insurance Benefits Representative is at the MBA Office
Tuesdays 10AM – 12 Noon Thursdays 1:30PM – 3:30PM
Appointments are advisable but drop-ins are accepted Please call Mike Carlson at Craford Benefit Consultants
415-871-4820
WEEKLY BULLETIN
www.marinba.org ◆ [email protected] April 9 , 2013 Vol. 57, Issue #12
Marin Builders Association ◆ Weekly BulletIn ◆ Page 2
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ Weekly BulletIn ◆ Page 3
www.marinba.org ◆ [email protected]
Please join us at our FUNdraiser
300 Drakes Landing
Greenbrae
Thursday, April 25 Lunch and Dinner
15% of all proceeds of the day
(including alcoholic beverages) will be donated to the
Marin Builders Association Scholarship Fund
A great opportunity to enjoy a
special meal and support the community!
Marin Builders Association ◆ Weekly BulletIn ◆ Page 4
www.marinba.org ◆ [email protected]
□ CPR – FIRST AID CLASS
Thursday ~ May 23, 2013 8:30 a.m. ~ 12:30 p.m.
$90.00 Members ~ $150.00 Non-members
Attendees receive CPR and First Aid Certifications
This course encompasses the new CPR (hands-only) and traditional CPR for adult/child/infant. Also includes activation of EMS System, heart healthy behavior/nutrition and foreign body airway obstruction management. The First Aid portion includes management of medical emergencies in the crucial first few minutes while help is on the way.
--------------------------------------------------------------------
□ FORKLIFT CERTIFICATE TRAINING
Thursday ~ May 23, 2013 12:30 P.M. – 4:30 P.M.
660 Las Gallinas Avenue, San Rafael
$110 Members ~ $165 Non-members
All attendees will receive a three year certificate as a forklift driver A forklift donated by CAL-WEST RENTALS will be on site for training
For reservations call MBA at 415-462-1220
or complete and return this form by fax to 415-462-1225 or go to our website www.marinba.org and pay online
PLEASE CHECK THE BOX NEXT TO YOUR COURSE PREFERENCE
Company: ________________________________________________________ Phone: ________________________ Person(s) attending: ______________________________________________________________________________ MC/Visa Account #______________________________________________Expiration Date ______________ Credit Card Billing Address ____________________________________3 Digit Security Code_______ City, State, Zip _____________________________________________________________________________________ Approved signature _____________________________________________________ Date __________________
(Cancellations made after May 20th and no-shows will be billed.)
Marin Builders Association ◆ Weekly BulletIn ◆ Page 5
www.marinba.org ◆ [email protected]
Marin Builders Association Bocce Tournament & Picnic
Benefitting the MBA Scholarship Fund
FRIDAY, May 17, 2013 9:00AM – 3:30PM 9:00AM – Check in & Continental Breakfast
10:00AM – Play begins Marin Bocce Federation Courts
550 “B” Street San Rafael
Event Sponsorship with prominent banner signage
$200
Team Sponsorship $240 (a team consists of 4-6 players) Team Photo
Team name on scoreboard Team picnic table reserved
$50.00 per person as an individual player to be placed on a team $25.00 donation per person lunch only Player 1_____________________________ Player 2_____________________________ Player 3 _____________________________ Player 4 ____________________________ Player 5 _____________________________ Player 6 ________________________
Team Name: ___________________________________
Please register no later than May 9, 2013 ADVANCE PAYMENT REQUIRED
For reservations please complete and return this form with
check made payable to Marin Builders Association Scholarship Fund. Pay with Visa or Mastercard or
Pay online at our website www.marinba.org. For questions please call Barbara at 415-462-1220.
NO REFUNDS AFTER MAY 1!
Marin Builders Association ◆ Weekly BulletIn ◆ Page 6
SOnOMARIn, IS SeekIng QuAlIfIed dVBe/SBe/lBe
SuBcOntRActORS fOR:
CHINese ImmersIoN at wIllIam deavIlaFor the san Francisco Unified school district
Bid Due Date: 04.23.2013 at 3:00 p.m.
Boiler replacement
Project Number: 11082
Plans and specs at: arC Northern California- Bid services, 945 Bryant street, san Francisco, Ca
p 415.537.2235, f 415.348.0684,[email protected]
Contact: George merrill, sonomarin Phone 707.566.9447 Fax 707.566.9448
cOMMunIty PlAygROundSIS SeekIng ceRtIfIed dVBe
SuBcOntRActORS fOR:
daNIel weBster elemeNtary sCHool465 missouri street, san Francisco Ca 94107
Bid Due Date: 04.18.2013 at 2:00 p.m.
rubbertiles / trucking
Project Number: 11636
Contact: david Brown, estimatorCommunity Playgrounds
200 Commercial st., vallejo, Ca 94589Phone 415.892.8100
ReQueSt fOR BIdS
www.marinba.org ◆ [email protected]
SOnOMARIn, IS SeekIng QuAlIfIed dVBe/SBe/lBe
SuBcOntRActORS fOR:
martIN lUtHer KING mIddle sCHoolFor the san Francisco Unified school district
Bid Due Date: 04.25.2013 at 3:00 p.m.
Boiler replacement
Project Number: 11080
Plans and specs at: arC Northern California- Bid services, 945 Bryant street, san Francisco, Ca
p 415.537.2235, f 415.348.0684,[email protected]
Contact: George merrill, sonomarin Phone 707.566.9447 Fax 707.566.9448
SOnOMARIn, IS SeekIng QuAlIfIed dVBe/SBe/lBe
SuBcOntRActORS fOR:
GleN ParK elemeNtary sCHoolFor the san Francisco Unified school district
Bid Due Date: 04.25.2013 at 3:00 p.m.
Boiler replacement
Project Number: 11086
Plans and specs at: arC Northern California- Bid services, 945 Bryant street, san Francisco, Ca
p 415.537.2235, f 415.348.0684,[email protected]
Contact: George merrill, sonomarin Phone 707.566.9447 Fax 707.566.9448
Marin Builders Association ◆ Weekly BulletIn ◆ Page 7
PROJECT OF THE WEEKSealed proposals for MBA Project #199
SIR FRANCIS DRAKE BL & RED HILL AVE
PIPELINE REPLACEMENT PROJECT
will be received at the Office of the Manager of Engineering, Marin Municipal Water District,
220 Nellen Avenue, Corte Madera, CA 94925, until
Thursday April 24, 2013 @ 10:00 AM
This contract is for furnishing labor and equipment for the in-stallation of approximately 3,660 feet of 12-inch welded steel pipe and appurtenances in the Town of San Anselmo. A Class “A” or C34 California Contractor’s license is required.
Specifications may be obtained at either the Engineering Re-cords Department, MMWD, 220 Nellen Avenue, Corte Made-ra, CA 94925; by mail at the noted location; or by phone at (415) 945-1530, upon receipt of a $25 non-refundable deposit (cash, check, Master/Visa Card).
Plans and specifications for MBA Project #199 may be viewed in the MBA Plan Room or on line by subscribers to the On Line Plan Service. Bidders who have questions regarding the project should contact Kevin McDonnell at (415) 945-1576.
in this issue
Calendar of Events ........................1
Business Expo & Job Fair ....................2
Dine & Donate at Jason’s ...............3
Classes & Seminars:
First Aid , Forklift Training ...............4
MBA BOCCE 2013 ...........................5
Request for Bids .............................6
Project of the Week ........................7
ROP Interns Available .....................8
Capitol Connection (FKA Kalb’s) ....10
Phil Vermeulen ...............................11
Safety: Eye Injuries .........................13
Permits .........................................15
Project Bid List ..............................20
Bid Results .......................................31
Classifieds ..........................................32
Share Your History ..........................34
contact MBa660 Las Gallinas Avenue
San Rafael, CA 94903 ◆
Office: 415-462-1220Fax: 415-462-1225
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ Weekly BulletIn ◆ Page 8
www.marinba.org ◆ [email protected]
Marin Builders Association ◆ Weekly BulletIn ◆ Page 9
www.marinba.org ◆ [email protected]
2013 MBa Directors & officers
PresidentJeff Mertel - Mertel carpets, inc.
Vice Presidentjim schalich - schalich Bros.
construction
chief financial officer tyler Doherty - cal-West rentals, inc.
secretarYtom Barr - Ghilotti Bros., inc.
Past Presidentaimi Dutra - the Dutra Group
executive DirectorKLif KnoLes
Dave Trahan - Patriot MechanicalHerb Moran - MOC Insurance Services
John Busick - Bob Kunst PaintingOliver Dibble - Dibble & Company
Mark Silvia - Marin Mechanical, Inc.Clayton Fraser - West Bay BuildersRob Scerri - Golden State Lumber
Keith Dotto - Dotto Glass, Inc.Dick Ghilotti - Ghilotti Construction CompanyDave Garbarino - Marin Sanitary Service, IncDiane Henderson - DMH Land Use Planning
Jeff Grady - Grady Consulting, Inc.
STAFFPaula Krause - Office Manager
Barbara Jones - Membership ManagerDiane Van Renselaar - Plan Room Technician
Kellie Buono - Administrative Assistant/Reception
COnSULTAnTSCasey Mazzoni - Legislative Analyst
The weekly bulletin is owned by MBA and is available at www.marinba.org
660 Las Gallinas Avenue, San Rafael, CA 94903Publisher: Klif Knoles
Marin Home & GardenExpo
JUNE 1&2Book Your Space Today!www.marinhomegarden.comor Call (415) 507-1537
MBA MEMBER
Marin Builders Association ◆ Weekly BulletIn ◆ Page 10
www.marinba.org ◆ [email protected]
The Capitol Connection Q&A for Contractors By Shauna Krause, Capitol Services, Inc.
Answers to your problems are ‘on the house’ here, so we’ll start on top with a roofing contractor that changed hands recently. When a licensed partnership breaks apart, who can put the pieces back together again before it’s too late to save? Failing to act is a decision itself, and a former contractor finds his ‘judg-ment’ then may have cost him more now than he ever real-ized…
Q: Our company recently purchased a roofing business, which is a corporation, and we would like to continue doing business under the well-established business name on their license, however we don’t want two sets of books. Because our corporation purchased the assets of the roofing company, can we keep the roofing license number and company name the same while operating under our existing corporation?
A: In the scenario you described, your existing business and the roofing corporation are two separate entities. In order to operate under your existing corporation, you would need to apply for a new license number under your current corporate name along with a “doing business as” (dba) name that would reflect the name of the roofing business you purchased. Even though you would ultimately have two separate license numbers, the “dba” entity would still be part of the existing corporation and therefore you would not need to do separate bookkeeping.
Q: Our Qualifying Partner on our Partnership license unexpectedly disassociated resulting in the automatic cancellation of our license. Can we request an extension? How do we do this and who is re-quired to make the request?
A: According to B&P Code 7076(c) a Partnership can request a continuance of the license to complete projects contracted for or in progress prior to the date of a Qualifying Partner’s disassociation. The General Partner must make this request in writing within 90 days after the disassociation.
I wish we could turn back the clock to help you, but I looked up
your Partnership license and only the Limited Partner remains on this license. You do not have a General Partner listed and that means that, unfortunately, you will not be able to request a continu-ance. Limited Partners cannot make this request because the CSLB has determined that a Limited Partner’s only involvement in the business is financial, and they do not hold signing authority for the license. You will need to apply for a new license and I recommend listing the General Partner on the application so that you don’t run in to this problem again in the future. Wish we could have helped at the start.
Q: I used to have a contractor’s license for my corporation. There was a judgment on the license that I never did anything about and my license is now expired and is still showing the unsatisfied judg-ment on there. Can I just start from scratch and apply for a new license? The thing is, I’m now in a position where I can pay the judgment but I have tried and tried to contact the former customer via phone, mail, and even Facebook and I have had no luck contact-ing him. What now?
A: In most cases if your name is associated with an unsatisfied judgment the CSLB will require that you address it in some way (proof of payment, bankruptcy filing documents, etc) before you will be able apply for a new license.
That being said, showing proof of payment will be difficult if you are unable to contact the judgment creditor. In some cases you can speak with the staff of the Small Claims Court where the judgment was filed to determine what steps to take, but either way, in this case you should consult with an attorney.
While knowledge is power, knowing where to go for the answers is half the battle. Get expert assistance immediately when you call 866-443-0657, email [email protected], or write us at Capitol Services, Inc., 1225 8th St. Ste. 580, Sacramento,
CA 95814. Research past columns at www.cutredtape.com.
Marin Builders Association ◆ Weekly BulletIn ◆ Page 11
Also In This Update• DIR Posts Updated Guidebook for Injured Workers
Should Every Excavator Be Certified To Use a Shovel?The California State Legislature returned from their Spring Break this week “ready” to solve all of mankind’s problems (and many “problems” that you didn’t know that needed fixing in the first place!). As promised, I will start writing about some of these bills starting this week. First up is AB 811, Lowenthal (note that this is the same number you dial to reach your regional One Call Dig Alert Office), which would require ALL excavators (anyone who uses a shovel!) to be “certified.”
To refresh your memory, this bill started out last year as AB 1514 and would have created substantial penalties for anyone caught not calling DIG Alert to have their location marked for subsurface installations before they excavated. It would have increased fines from $10,000 up to $100,000. AB 1514 was in response to the Federal PHMSA (US Department of Transportation Pipeline and Hazardous Materials Safety Administration) who has threatened to mandate federal safety standards on states that don’t update their own excavation standards. This, in-turn, is in response to excavators who are not complying with the current requirements to call and have subsurface utilities located before excavating which is causing damage and deaths nationwide.
Fortunately AB 1514 died, but back to fill its void this year is AB 811. Following is the official fact sheet on the purpose of the bill:
SUMMARY
AB 811 states that a contractor or an employee of a contractor shall not engage in any excavation activity unless they have participated in an approved excavation training program.
This bill authorizes a registered apprenticeship programs that teaches excavation, by either a state or federal apprenticeship program to qualify as an excavation training program. In addition, employees
who do not operate mechanical, power or air driven equipment and only use hand tools during the course of their work day, are not required to participate in the excavation training program. However, a “Competent Person,” as defined in CalOSHA Title 8 regulations, who has participated in an excavation training program, must be present when hand tool excavation is being performed.
BACKGROUND
Existing law requires all operators of subsurface facilities located in public rights-of-way to be members of the Underground Service Alert (USA) call-center providing coverage in the area where the facilities are located. The law is intended to prevent damage to subsurface gas, electric and communication infrastructure.
It also requires all persons digging in public rights-of-way to notify the USA and provide details at least two business days prior to the start of excavation. After receiving notice from the excavator, USA notifies owners or operators of subsurface facilities to enable them to locate and mark their facilities, or otherwise inform the excavator of the presence or absence of their facilities near the excavation location.
While the USA process is fairly straightforward, violations of existing law are very common. Many excavators fail to notify the call centers of their intent to perform excavation activity. In addition, many fail to properly excavate near the properly marked subsurface facilities. The most significant violation is beginning excavation prior to receiving a response (markings, verbal, etc.) detailing any subsurface facilities. These violations cause millions of dollars in damages and service outages. In some cases, serious injuries and fatalities have occurred.
Requiring excavation education training for those who excavate will ensure that excavations are done in the safest and most efficient manner possible, protecting both underground infrastructure and public safety.
www.marinba.org ◆ [email protected] ◆ [email protected]
Should Every Excavator Be Certified To Use a Shovel?by Phil Vermeulen, Governmental Relations
Marin Builders Association ◆ Weekly BulletIn ◆ Page 12
www.marinba.org ◆ [email protected]
SUPPORT
• Underground Service Alert of northern California and nevada (USA north) Co-Sponsor
• Underground Service Alert of Southern California (USA South) Co-Sponsor
The bill is set in the Assembly Judiciary Committee next week. I am deeply troubled by the latest amended language (bill is attached), because it is in essence the plans to build a watch when all you are asking for is the time! Cal OSHA already has a 10 hour excavation training program in existence. Plus, I’m not so sure that a simple tailgate safety session that all contractors are required to provide to their employees regularly anyway, wouldn’t suffice to resolve concerns? These tailgate sessions are required to be documented so if there ever were a question about training in the future, it would be simple to check. Plus, contractors and employees would have much more flexibility this way.
Of course, most contractors would say that they have always complied with the existing laws and as such should not be required to go through all of this in the first place? To this I would agree and state that as long as you have proof that your employees have received training either through an apprenticeship program or through other substantiation or certification (help me to define what this is), then you’re good to go!
By the way, I believe the bill also needs to address prompt resolution/payment to excavators for improperly marked subsurface installations by utilities?
This bill has only begun to “scratch the surface” (so to speak!). I would welcome any and all feedback that any of you might have on ways to address this issue. Please email me at [email protected] Help me to help you (or don’t bitch!). DIR Posts Updated Guidebook for Injured Workers The Department of Industrial Relations is pleased to announce the recent release of “Workers’ Compensation in California: A Guidebook for Injured Workers.” “This fourth edition of the injured workers’ guidebook helps workers and others understand the sometimes complicated process of workers’ compensation,” said DIR Director Christine Baker. “The guidebook has been updated to reflect the latest changes to California’s workers’ compensation system.”
The guidebook gives an overview of the California workers’ compensation system. It is meant to help workers with job injuries understand their basic legal rights, the steps to take to request workers’ compensation benefits, and where to seek further information and help if necessary. Also included are references to important laws and regulations and a glossary. The fourth edition includes important changes since 2006 in the following areas:• Pre-designation of one’s treating physician or a medical group• Treatment under the medical treatment utilization schedule
(MTUS) adopted by the Division of Workers’ Compensation (DWC)
• Independent medical review (IMR) to resolve disputes over denial of treatment
• Extension of time limits on receiving temporary disability (TD) benefits
• Return-to-work procedures• Permanent disability (PD) benefits• Supplemental job displacement benefits (SJDB) The guidebook is available online in English, with a Spanish translation available soon. Because the workers’ compensation system is undergoing many changes with the implementation of Senate Bill 863, workers using the guidebook are urged to check updates posted at the DIR’s Division of Workers’ Compensation (DWC) website. Injured workers may also obtain a printed copy at a local DWC district office. The California Department of Industrial Relations enforces the state’s labor laws to improve the workplaces of over 18 million wage earners and their employers. Its mission is to improve working conditions for California’s wage earners, and to advance opportunities for profitable employment in California. DIR administers and enforces laws governing wages, hours and breaks, overtime, retaliation, workplace safety and health, medical care and other benefits for injured workers, and apprenticeship training programs. Employees with work-related questions or concerns can obtain recorded information in English and Spanish on a variety of topics toll free at 1-866-924-9757.
Marin Builders Association ◆ Weekly BulletIn ◆ Page 13
Protect Your Vision!
Always wearing safety goggles or glasses may seem like a pain, but the alternative could be much worse. There are so many eye hazards on a construction site that leaving your eyes unprotected even for a short time is extremely risky.
This flyer is for informational purposes only and is not intended as medical or legal advice.
Content © 2010 Zywave, Inc. All rights reserved.
Eye Injuries Are a Serious Threat Protect your eyes on the job
There are countless eye hazards on a construction site, including particles (wood chips, dust, cement chips, metal shavings, etc.) that have been ejected from a tool or blown by the wind. Chemical splashes and swinging objects can also be eye hazards on a worksite. However, most eye injuries are preventable if you follow simple safety precautions, and always wear your safety goggles! Use Protective Eyewear It’s a proven fact that the best thing you can do to protect your vision on the job is to wear safety glasses or goggles. Even if you do have your safety glasses on, keep in mind that there are a variety of ways you can get debris in your eyes. Some accidents happen by simply taking off your safety glasses or goggles and wiping your face; particles can easily fall out of eyebrows or hair and into your eyes. Safety glasses should rest firmly on top of the nose and close to – but not against – the face. If they are uncomfortable, foggy or sight-restrictive, then find a different pair. Don’t let excuses get in the way of protecting your eyes. They may not always be convenient to wear, but the right eyewear will ensure your eyes and vision are safe while doing your job. Find a Good Fit You can find many ways to make safety glasses or goggles work for you, such as:
• If you find safety glasses uncomfortable, experiment with different sizes or styles.
• Make sure glasses are fit well while you are also wearing your hard hat and other protective equipment.
• Wear glasses or goggles that are properly ventilated for the work you are performing. Unless you are working near splash hazards, use goggles that have plenty of side ventilation.
• If you wear prescription glasses, wear goggles designed to fit over your glasses or safety glasses made with your prescription.
• If your goggles fog up, try a model with more ventilation or coat them with an anti-fog liquid.
• Wear a sweatband or handkerchief around your head to keep sweat off your goggles.
• Always keep your safety glasses clean. Scratched and dirty glasses or goggles can reduce vision, cause glare and may contribute to accidents.
Safety First It takes only one accident to cause partial or complete blindness. Even tasks that you don’t consider dangerous may present a risk for eye injury. Take a moment to think about possible eye hazards around each job site, and then take the necessary precautions to help prevent potential accidents and injuries.
Be safe and healthy on the job at with these helpful tips provided by California Builders Insurance Program.
California Builders Insurance Program
For more information, call: (866) 216-5255 or visit our website: http://www.cbeins.com
Marin Builders Association ◆ Weekly BulletIn ◆ Page 14
¡Proteja su visión!
Usar siempre anteojos o gafas de seguridad parece ser molesto, pero la alternativa puede ser mucho peor. Existen tantos riesgos para los ojos en un lugar de construcción que dejar sus ojos desprotegidos incluso por un tiempo corto es extremadamente riesgoso.
Este folleto tiene fines informativos exclusivamente y no debe considerarse como una recomendación médica o
legal. Contenidos © 2010 Zywave, Inc. Todos los derechos
reservados.
Las lesiones oculares son una amenaza grave Proteja sus ojos en el trabajo
Existen incontables riesgos para los ojos en un lugar de construcción, inclusive las partículas (trozos de madera, polvo, trozos de cemento, virutas de metal, etc.) que han sido expulsadas de una herramienta o volaron con el viento. Las salpicaduras químicas y los objetos giratorios también pueden ser un riesgo para los ojos en el lugar de trabajo. Sin embargo, la mayoría de las lesiones oculares se pueden prevenir si respeta las sencillas precauciones de seguridad y siempre usa sus gafas de seguridad. Use gafas de protección Es un hecho probado que lo mejor que puede hacer para proteger su vista en el trabajo es usar gafas o anteojos de seguridad. Incluso si tiene puestos sus anteojos de seguridad, recuerde que existe una variedad de maneras en las que pueden introducirse desechos en sus ojos. Algunos accidentes ocurren simplemente al quitarse los anteojos de seguridad y limpiarse la cara; las partículas pueden caer fácilmente de las cejas o del pelo en los ojos. Los anteojos de seguridad deben posarse firmemente sobre la parte superior de la nariz y cerca de la cara, pero no contra ella. Si son incómodos, nebulosos o limitan la vista, busque otro par. No deje que las excusas se interpongan en el camino para proteger sus ojos. Quizás no siempre sean prácticos para usar, pero las gafas de protección adecuadas mantendrán seguros sus ojos y su vista mientras realiza su trabajo. Encuentre un buen calce Puede encontrar muchas maneras para que los anteojos o gafas de seguridad funcionen para usted, como estas:
• Si los anteojos de seguridad le resultan incómodos, pruebe con diferentes tamaños o estilos.
• Asegúrese de que los anteojos calcen bien a la vez que usa el casco y demás equipo de protección.
• Use anteojos o gafas que estén adecuadamente ventilados para el trabajo que esté realizando. A menos que esté trabajando cerca de riesgos de salpicaduras, use anteojos que tengan mucha ventilación a los costados.
• Si usa anteojos recetados, use gafas diseñadas para calzar sobre sus anteojos o anteojos de seguridad hechos con su receta.
• Si sus gafas se empañan, pruebe otro modelo con más ventilación o cúbralas con un líquido antiniebla.
• Use una bandana o pañuelo alrededor de la cabeza para que la transpiración no llegue a las gafas.
• Mantenga siempre limpios los anteojos de seguridad. Las gafas o los anteojos de seguridad rayados o sucios pueden reducir la visión, causar reflejos y pueden contribuir a los accidentes.
La seguridad primero Un solo accidente puede provocar ceguera parcial o completa. Incluso las tareas que no considera riesgosas pueden presentar un riesgo para sufrir una lesión ocular. Tómese un momento para pensar sobre los posibles riesgos oculares en cada lugar de trabajo y luego tome las medidas necesarias para ayudar a prevenir los posibles accidentes y las lesiones.
Esté seguro y saludable en el trabajo en con estos consejos útiles provistos por California Builders Insurance Program
California Builders Insurance Program
For more information, call: (866) 216-5255 or visit our website: http://www.cbeins.com
Marin Builders Association ◆ Weekly BulletIn ◆ Page 15
PeRMItS Permit lists subject to change,please check with Association.
Owner Contractor Address Parcel # Construction ValueGiorgi Frank P Revoc Trus RODI COnSTRUCTIOn InC 137 Goodhill Rd Kentfield 074-261-01 (23) Ma Ba Rmdl $50,000 Barry Kevin T & Tina Re REDICAn HOMES 90 Green Valley Ct San Anselmo 177-011-09 (23,50,58) Rmdl K $290,000 Mochizuki Ron JACOB A BOnDS QUALITY BUI 50 Beach Dr San Rafael 186-142-32 (54) Siding Repai $25,000 Patterson Ann E /Tr/ Etal VEREnGO SOLAR 59 Viento Way Point Reyes Stat 119-181-14 (60) Pv System $27,000 Fortmann Richard REC SOLAR InC 167 Del Oro Lagoon novato 157-550-17 (60) Rf Mtd P V S $35,000 Chasanoff Lisa A /Tr/ REC SOLAR InC 26 Redwood Dr Kentfield 074-063-05 (60) Rf Mtd P V S $35,000 Holroyde Edward J MCGUIRE & SOnS 1204 El Cide Ct Mill Valley 048-201-23 (13) Remove And R $30,000 Muniz Jaime R WEDGE ROOFInG InC. 199 Evergreen Ave Mill Valley 047-224-01 (53) Re-Roof $10,410 Fisher Robert J Tr REDHORSE COnSTRUCTORS, In 3 Sky Oaks Rd Fairfax 197-060-01 (23,51,52) Rmdl K $57,000 Romberg Roberta V /Tr/ DAILEY COnSTRUCTIOn 133 California Ave Mill Valley 051-045-03 (23) Rmdl Kit $51,668 Gryler Jommer A /Tr/ COnTRERAS ROOFInG 65 Morning Sun Ave Mill Valley 048-212-16 (53) Reroof $13,437 Revoir Katherine Q /Tr/ JOHn PARLE 212 Laverne Ave Mill Valley 047-222-11 (58) Window Repla $14,714 Chiesa Anita /Tr/ SECOnD GEnERATIOn ROOFInG 67 Caribe Isle novato 157-530-05 (53) Reroof $11,200 Hargreaves David C & CAMELLO InC 110 Wisteria Way Mill Valley 051-092-04 (21--0/2) (58) Se $400,000 Suhayda Joseph n & Etal A FRAME COnSTRUCTIOn 425 Oceana Dr Dillon Beach 100-342-02 (12) Cover Existi $10,000 Ducey William Constance OWnER 141 Sacramento Ave San Anselmo 177-181-09 (23) Rmdl Kit Exp $35,826 Wertheimer Steven C /Tr/ CLOUGH, JAMES S EnTERPRIS 9 Poplar Dr Kentfield 071-081-36 (13) Repair Decks $52,000 Garner Patricia SUnGATE EnERGY SOLUTIOnS 68 Montego Key novato 157-212-09 (60) Rf Mtd P V S $18,000 Tommei Albert D OWnER/BUILDER 35 Meadow Dr Mill Valley 033-082-02 (12,21--0/0) Rem $48,000 Shultz Keith EDGE ROOFInG InC. 144 Corte Anita Greenbrae 070-092-02 (53) Reroof $11,110 Meldorf Matthew G & MILL VALLEY BUILDERS InC 443 Wellesley Ave Mill Valley 050-043-60 (12)(13)(50)(51)( $65,000 Lin Ting-Kun M /Tr/ Eta D C COnSTRUCTIOn 890 Chamberlain Ct Mill Valley 049-063-25 (23)(57) Remodel $27,000 Wells Jeffrey J /Tr/ & YOUnG, DAn COnSTRUCTIOn I 15 Crane Dr San Anselmo 176-101-12 (21)(59) Addition $40,000 Pigott Shannon R JETTOn COnST. 215 Woodland Rd Kentfield 075-031-04 (21,23,51,57,58) $103,000 Burkhard Brian E & REnEWAL BY AnDERSEn 646 Miller Creek Rd San Rafael 164-092-08 (58) Replace 5 Wi $32,979 Marin County Of B SIDE InC 315 Montford Ave Mill Valley 047-161-05 (31,32,13)Additio $890,000 Bilmont John ARMSTROnG InSTALLATIOn SE 137 Richardson Dr A Mill Valle 043-071-29 (53) Reroof $17,500 Mee Jonathan K L & PEnnY, DAVID COnST. SVCS 42 Park Ave Dillon Beach 100-132-19 (13)(54) Replace $12,000 De Jean Bradley S /Tr/ & MUELLER nICHOLS 148 Great Circle Dr Mill Valle 043-123-09 (22)(54) Remodel $141,150
COUNTY OF MARIN PERMITS ISSUED
www.marinba.org ◆ [email protected]
COUNTY OF MARIN PERMITS RECEIVEDAddress Owner Work Value550 Wilson Ave novato Stevenson nicole M /Tr/ (21)(23)(50)(58) Addition And $29,55222 Von Ct Fairfax Lake Katherine J (23) Rmdl Kit $27,0000 Taylor Park Rd Lagunitas John Smithyman (Rep For Homeowners) (11) Retaining Wall Before 2 P $40,0005549 Pt Reyes-Petaluma Rd Petaluma Michael Venera (93) Ag Exempt Barn $250,0005549 Pt Reyes-Petaluma Rd Petaluma Michael Venera (20-0/1)(12) new Sfd, Covered $150,00055 Martling Rd San Anselmo Miller Peter M & Janet A (11,13) Pool Decl Rmdl And Rep $50,000367 Los Cerros Dr Greenbrae Gaudin Suzanne F (24)(12) Covert Garage To Play $40,00016 Ivy Ln Woodacre Scott Richard C & (13) new Deck $10,000990 Idylberry Rd San Rafael Hothan Alec & (21) (23) Remodel And Addition $290,000175 Grandview Ave novato La Badie Charlene Declaration Of Trust (13) Repl Deck $15,5002 Friars Ln Mill Valley Hirschler Marcelo M & (12)(58)(50) Install Sunroom E $25,0003 Drake Way Inverness Balanda - Reitter Trust (10) Pool $49,841133 California Ave Mill Valley Romberg Roberta V /Tr/ (22) Structural Seismic Streng $17,340990 Butterfield Rd San Anselmo Scales Stephen & Cynthia G Family Tr E (21--0/3) Add To 1st Fl, Add 2 $200,000141 Sacramento Ave San Anselmo Ducey William & Constance (23) Rmdl Kit Express Pmt $35,82668 Montego Key novato Garner Patricia (60) Rf Mtd P V Sys 2.804 K W. $18,000
Marin Builders Association ◆ Weekly BulletIn ◆ Page 16
PeRMItS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
CITY & TOWN PERMITS ISSUED
City/Town Issue Date Owner Contractor Site Address Type Valuation Corte Madera 3/25 Sandra Steele Syntrol Plumbing
Heating & Air18 Diamond Head Psge
Solar $15,000
Corte Madera 3/27 Steve Russell Noble Quail Corporation
41 Hickory Ave Kitch Remodel $28,325
Corte Madera 3/28 Leslie Villarreal 28 Echo Ave Kitch & Bath Remodel $12,000 San Anselmo 3/5 Michael Roberts Max Ballines 15 Kemp Ave Demo $20,000 San Anselmo 3/5 Craig Allison 130 Scenic Ave Legalize Bed & Bath $50,000 San Anselmo 3/7 Marco & Natash
InnocentiCrescent Builders 145 Crescent
RoadBathroom Remodel $16,000
San Anselmo 3/12 Steve & Karen Grant Owner - Builder 117 Ridge Road Windows & Glass Door $10,000 San Anselmo 3/13 Mike Brown Brownco C & D 285 Crescent Rd Replace foundation $15,000 San Anselmo 3/14 Sue Ream & Craig
SharrowRTM Landscape 124 Woodside Dr Replace back yard
deck $18,500
San Anselmo 3/14 Anthony Orchan Acustruct 28 Woodside Dr Foundation improvement
$25,000
San Anselmo 3/14 Sunvest Int’l Group Owner - Builder 30 Florence Ave Replace foundation $25,000 San Anselmo 3/14 John Paletta 25A Oakwood
CourtLegalization of second unit
$60,000
San Anselmo 3/18 Priya Mathur Julio Guitierrez 44 Woodside Ave Reroof $10,985 San Anselmo 3/18 Westmore Properties Owner - Builder 18 Woodside Dr Kitch & 2 Bath
Remodel $45,000
San Anselmo 3/19 Peter Breen Owner - Builder 85 Woodside Dr Replace furnace $10,175 San Anselmo 3/20 Chris & Angela
EddlemanSkyvara Construction
36 Bolinas Ave Remodel $80,000
San Anselmo 3/21 United Markets Evoluelectric 100 Red Hill Ave Electric Vehicle Charging Station
$10,000
San Anselmo 3/21 Kelvin Zwiefelhofer Dan Young 212 Oak Springs Dr
Kitch Remodel $90,000
San Anselmo 3/27 Andrea Tsingos Eco-Valley Const 36 Mariposa Ave #2
Replace Kitch counters & cabs
$37,500
San Anselmo 3/28 Spencer & Roberta Michels
Jay Wood 149 Calumet Ave Remodel Kitch & Addition
$100,000
San Rafael 3/26 Alex Morin Dan Holleran 933 Las Pavadas Ave
Alter-Sfd $28,000
San Rafael 3/26 Andrew Nortz Andrew Nortz 1064 Los Gamos Rd D
Alter-Sfd $34,000
San Rafael 3/26 Shannon Bennett Rick Cerrutti 90 Bay Way Alter-Sfd $58,000 San Rafael 3/27 1033 Third Street Llc 1033 Third Street
Llc1033 3Rd St Alter-Commercial $63,000
San Rafael 3/28 Liss Ronald & Barbara
Liss Ronald & Barbara
110 Lochinvar Rd Alter-Sfd $10,000
San Rafael 3/28 Reznich Leonid /Tr/ & John Lockwood 9 Greenside Way Alter-Sfd $10,000
Marin Builders Association ◆ Weekly BulletIn ◆ Page 17
PeRMItS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
City/Town Issue Date Owner Contractor Site Address Type Valuation San Rafael 3/28 Cassettari Mario & Crown Ridge
Roofing112 Robinhood Dr Alter-Sfd $11,751
San Rafael 3/28 Jaureguito Pierre & Je
Northern Pacific Roofing
24 Wallace Way Alter-Sfd $14,000
San Rafael 3/28 Middleridge 2008 Trus
15 Marin St Alter-Sfd $18,000
San Rafael 3/28 Demetrulias Gregory Demetrulias Gregory
15 Greenside Way
Alter-Sfd $31,000
San Rafael 3/28 Lookinland Pia Family
Lookinland Custom Building
12 Bayo Vista Way
Alter-Sfd $45,000
San Rafael 3/28 Northgate Mall Asso 5800 Northgate Dr 134
Alter-Commercial $138,250
San Rafael 3/28 Viglienzone Randal L /
Mcdevitt & Mcdevitt
475 Francisco Blvd E
Alter-Commercial $200,000
San Rafael 3/29 Shuster Joseph C & 8 Alderwood Way Alter-Sfd $10,000 San Rafael 3/29 Bowman Stephen
M TrPro General Roofing I
831 B St Alter-Commercial $25,000
San Rafael 3/29 Dominican College Of
Twm Architects 90 Acacia Ave Alter-Commercial $900,000
San Rafael 4/2 P G & E Mother Lode Concrete Const
1220 Andersen Dr Alter-Commercial $10,000
San Rafael 4/2 Mc Robbie Ronald P 20
Michael Mclennan 115 Golden Hinde Blvd
Alter-Sfd $12,000
San Rafael 4/2 Camelot Assoc Camelot Assoc 21 Novato St Alter-Apartments $14,000 San Rafael 4/2 Nalducci Robert L
& SHoffman Construction Inc
92 Elena Cir Alter-Sfd $20,000
San Rafael 4/2 Nalducci Robert L & S
Hoffman Construction Inc
92 Elena Cir Alter-Sfd $20,000
San Rafael 4/2 Blackburn Robert & White Arch Studio 730 Las Colindas Rd
Alter-Sfd $25,000
San Rafael 4/2 Geary-Market Invsmn
Rossi Builders Inc 1000 4Th St Alter-Commercial $250,000
San Rafael 4/3 Moore Jerry T /Tr & Renewal By Andersen
4 Vineyard Dr Alter-Sfd $10,618
San Rafael 4/3 Hellar W Grant Iii & Ev
Titan Roofing & Construction
352 G St Alter-Sfd $12,000
San Rafael 4/3 Muhlhauser Hans-Joa
Renewal By Andersen
41 Dorian Way Alter-Sfd $15,329
San Rafael 4/3 Weber Phyllis G Living
Renewal By Andersen
340 Santa Margarita Dr
Alter-Sfd $28,288
San Rafael 4/3 Meyers Michelle & 16 Wallace Way Alter-Sfd $58,150 San Rafael 4/3 Terry Noyer Tim Grogan
Builders Inc19 Mountain View Ave
New Sfd $1,120,000
San Rafael 4/4 Stoughton Lillian Rev Calier Roofing 30 Forbes Ave Alter-Duplex $11,200
Marin Builders Association ◆ Weekly BulletIn ◆ Page 18
PeRMItS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
City/Town Issue Date Owner Contractor Site Address Type Valuation San Rafael 4/4 Maloney Douglas J
TrDemello Roofing 204 Forbes Ave Alter-Sfd $12,780
San Rafael 4/4 Dang Lori B Tr 45 Sandalwood Ct Alter-Sfd $15,000 San Rafael 4/4 Hamstra Susan /Tr/ Lamperti
Contracting & Desig
65 Bryn Mawr Dr Alter-Sfd $21,500
San Rafael 4/4 Sr Corp Ctr Phase 1 Ll
Rossi Builders Inc 750 Lindaro St Alter-Commercial $105,000
San Rafael 4/4 Northgate Mall Asso 5800 Northgate Dr 134
Alter-Commercial $138,250
Sausalito 3/1 Jones Fault-Line Builders 516 Olive Remodel & $61,500 Sausalito 3/4 412 Johnson HOA Forster Pump & 412 Johnson Repair $11,000 Sausalito 3/4 Lappert All food Service 817 Bridgeway Repair $15,000 Sausalito 3/5 Rulon-Miller 512 Main Repair/Replace $17,900 Sausalito 3/5 Sacco Steven Wheeler
Const.105 Santa Rosa Repair $30,000
Sausalito 3/6 Yeazell RK Roofing and 21 Miller Reroof $14,000 Sausalito 3/8 Caltrans STC Netcom Inc 99 Hecht alt/elec $95,933 Sausalito 3/11 Bishop 35 Harrison Repair $137,550 Sausalito 3/12 Snyder Elkington Building
Co.519 Bonita Repair $15,000
Sausalito 3/12 Roberts Neville Building 30 Bulkley Remodel $21,000 Sausalito 3/13 Dodder Miranda’s Roofing 240 Glen Reroof $19,500 Sausalito 3/14 Sausalito Foot of El Portal Remodel/alt $15,000 Sausalito 3/14 Rose Habekoss 60 Currey Replace $15,300 Sausalito 3/19 Randall Owner - Builder 501-503 Bonita Repair $10,000 Sausalito 3/20 Niederer/Fulton Jonathon Rauh 147 Harrison Remodel & $10,000 Sausalito 3/21 Rosenthal Owner - Builder 26 A Atwood Replace $15,000 Sausalito 3/22 Hamilton American Canvas 1200 Bridgeway Remodel & $62,000 Sausalito 3/22 Seaver Rempe 204 Bulkley Repair $671,526 Sausalito 3/25 Graves Northpoint Builders 222 Cazneau Remodel & $48,080 Tiburon 3/25 Hillary Bennett Able Roofing
Company270 Karen Way Reroof $10,300
Tiburon 3/27 Essex Property Trust Monterey Construction Company
45 Red Hill Circle #G
Kitch & Bath Remodel $29,990
Tiburon 3/27 Essex Property Trust Monterey Construction Company
45 Red Hill Circle #E
Kitch & Bath Remodel $29,990
Tiburon 3/28 Dymotrust Red Horse Construction, Inc.
295 Diviso Street Line chimney & Demo firebox
$10,000
Tiburon 3/28 Ridge Road Properties LLC
Oasis Pool & Spa Construction
440 Ridge Road Install Pool & Spa $60,000
Marin Builders Association ◆ Weekly BulletIn ◆ Page 19
PeRMItS Permit lists subject to change,please check with Association.
www.marinba.org ◆ [email protected]
City/Town Issue Date Owner Contractor Site Address Type Valuation Tiburon 4/1 David Andrews Marshall Vincent
Company115 Paradise Drive
Closet Remodel $10,000
Tiburon 4/1 Frances Gray Hendrickson Pool, Inc.
7 Linda Vista Ave Foundation for spa $20,000
Tiburon 4/1 Jim & Alexandra Freeman
Stephen F Kern Construction
1902 Mar West Street
Kitch Remodel $70,000
Tiburon 4/3 Emale Mobarekeh 3D Remodeling 90 Lyfor Drive #4 Kitch Remodel $19,000 Tiburon 4/3 Sandra Wolf Camello Inc. 117 Paradise
DriveBathroom Remodel $19,000
Tiburon 4/4 Jeffrey Slavitz Owner - Builder 45 Upper North Terrace
Replace wall $10,000
Tiburon 4/4 Mary & Andy Harris Paul S Blow General Contractor
8 Via Capistrano Replace beams $10,000
Tiburon 4/4 Vergie Suhr Sears Home Improvement Products
24 Marsh Road Bath Remodel $27,080
Tiburon 4/4 Cove Shopping Center, Inc.
Midstate Construction Corporation
1 Blackfield Drive #K
Addition $1,975,000
Marin Builders Association ◆ Weekly BulletIn ◆ Page 20
PROJECT BID SCHEDULE
Bid List Subject to Change Prior To Bid Date, Please Check With Association
Thursday, April 04, 2013
WOODSIDE
2:00 PM 4/4/2013Bid Date:
Prebid Conf: MAND 3/20/13AT 10:30AM
CLASS"B" LICENSE REQUIRED.Plan#: 139-CD
GUIDANCE OFFICES MODERNIZATION PROJECT AND MILTIPURPOSE MODERNIZATION PROJECT
13-00139
Addenda: 0Project Type: SCHOOL
Contact: SEQUOIA UNION HIGH SCHOOL DISTRICT 650-517-1895
CONFIRMED BIDDERS:Name Phone FaxLATHROP CONSTRUCTION ASSOCIATES
707-746-8000 707-746-8080
Rodan Builders Inc 650-508-1700 650-508-1705
ALAMEDA COUNTY2:00 PM 4/4/2013
Ref #: 6550BBid Date:
Prebid Conf: MAND 3/26/2013 10:00 AM
Plan#: 150-PA/OL
UPPER CANYON HEIGHTS PIPELINE REPLACEMENT PROJECT; AC
13-00150
Addenda: 1 4/1/2013Project Type: PIPELINE
Contact: ALAMEDA COUNTY WATER DISTRICT 510-668-4499
CONFIRMED BIDDERS:Name Phone FaxGHILOTTI CONSTRUCTION CO
707-585-1221 707-585-1601
Ghilotti Construction Co Inc 707-585-1221 707-585-1601
BERKELEY
2:00 PM 4/4/2013Ref #: 13-10713-C
Bid Date:
SIDEWALK AND ROADWAY IMPROVEMENTS IN FOUR DIFFERENT LOCATIONS. CLASS "A" LICENSE REQUIRED .
Plan#: 163-PA/OL SAFE ROUTES TO SCHOOL
13-00163
Addenda: 0Project Type: STREET IMPVS
Contact: BERKELEY, CITY OF, DPW, ENGINEERING 510-981-6444
Monday, April 08, 2013
ALAMEDA
2:00 PM 4/8/2013Ref #: NO. P.W. 03-13-
05
Bid Date:
PAINT ALL EXTERIOR SURFACES TO MATCH ORIGINAL COLOR HUES. WORK INCLUDES STUCCO WALLS, PAINTED METAL WINDOW FRAMES, DOORS, JAMS, THRESHOLDS AND ENTRY WAYS, METAL CHANNELS, GUTTERS, FACIAL TRIM, VENTS, DOWNSPOUTS AND METAL ROOFING
Plan#: 174-PA/OL
EXTERIOR BUILDING PAINTING OF FIRE STATION NO. 4
NEW13-00174
Addenda: 0Project Type: PAINTING
Contact: ALAMEDA, CITY OF, DEPT. OF PUBLIC WORKS 510-749-5840
Tuesday, April 09, 2013
LIVERMORE
2:30 PM 4/9/2013Bid Date:
Prebid Conf: 3/26/13 AT 2:30PM
THE WORK CONSISTS OF THE FOLLOWING ITEMS: INSTALL DEEP WELL ANODE ALONG EDGE OF SOUTH VASCO ROAD; REPLACE IMPRESSED CURRENT CATHODIC PROTECTION SYSTEMS IN TWO ABOVE-GROUND-STEEL WATER TANKS; REPAIR CENTER COLUMN, ROOF RAFTERS, CORRODED STEEL, AND DAMAGED
Plan#: 123-PA/OL WATER SYSTEM CORROSION PROTECTION
13-00123
Addenda: 0Project Type: TANK RE-LINING
Contact: LIVERMORE, CITY OF, WATER DEPT. 925-960-8129
MENLO PARK
2:00 PM 4/9/2013Ref #: 20-054
Bid Date:
PERFORM ALL CLEARING AND GRUBBING, PERFORMING, TRENCHING AND BACKFILLING, INSTALLING AND FURNISHING AGGREGATE BASE AND ASPHALT PAVEMENT, INSTALLING A COMPLETE AUTOMATIC IRRIGATION SYSTEM, FURNISHING AND INSTALLING LANDSCAPE SOIL PREPARATION, FURNISH AND I
Plan#: 137-PA/OL SANTA CRUZ AVENUE IRRIGATION REPLACEMENT
13-00137
Addenda: 1 3/22/2013Project Type: LANDSCAPING
Contact: MENLO PARK, CITY OF 650-330-6740
ALAMEDA COUNTY
2:00 PM 4/9/2013Ref #: 1,280,000.00
Bid Date:
REPLACEMENT HIGHWAY PLANTING. IN ALAMEDA COUNTY IN HAYWARD ON ROUTE 92 FROM 0.2 MILE WEST OF ROUTE 92/880 SEPARATION TO SANTA CLARA STREET AND ON ROUTE 880 FROM 0.1 MILE SOUTH OF TENNYSON ROAD OVERCROSSING TO 0.2 MILE NORTH OF ROUTE 92/880 SEPARATION. T
Plan#: 99-DOT DOT 04-2G3614 REPLACEMENT HIGHWAY PLANTING
13-00099
to $1280000Addenda: 0Project Type: CALTRANS
Contact: CALTRANS 510-286-5209
Wednesday, April 10, 2013
SONOMA COUNTY
2:00 PM 4/10/2013Ref #: M12004
Bid Date:
PLACEMENT OF A BONDED WEARING COURSE ON VARIOUS COUNTY ROADS
Plan#: 121-PA/OL 2013 PAVEMENT PRESERVATION PROGRAM
13-00121
Addenda: 0Project Type: ROAD WORK
Contact: SONOMA COUNTY TRANS & PW 707-565-2231
CONFIRMED BIDDERS:Name Phone FaxGHILOTTI CONSTRUCTION CO
707-585-1221 707-585-1601
Ghilotti Construction Co Inc 707-585-1221 707-585-1601
www.marinba.org ◆ [email protected]
PROject BId Schedule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Marin Builders Association ◆ Weekly BulletIn ◆ Page 21
SAN FRANCISCO
2:30 PM 4/10/2013Ref #: 2049J
Bid Date:
Prebid Conf: 3/19/13 AT 2:00pm
CLASS A LICENSE REQUIRED. THE WORK IS PAVEMENT RENOVATION, SEWER REPLACEMENT, WATERMAIN INSTALLATION FOR FRANKLIN STREET AND DIVISADERO STREET IN SF AND INCLUDES TRAFFIC ROUTING, TRAFFIC SIGNAL MODIFICATIONS, CLUB RAMP CONSTRUCTION AND ALL RELATED AND IN
Plan#: 126-CD
PAVEMENT RENOVATION AND WATERMAIN INSTALLATION-FRANKLIN STREET AND DIVISADERO STREET
13-00126
to $6700000Addenda: 3 4/4/2013Project Type: PUBLIC WORKS
Contact: SAN FRANCISCO, CITY AND COUNTY 415-554-8280
SAN FRANCISCO
2:30 PM 4/10/2013Ref #: 1910J
Bid Date:
Prebid Conf: 3/27/13 AT 1:30PM
CLASS "A" LICENSE REQUIRED. THE WORK TO BE DONE UNDER THIS CONTRACT IS LOCATED ON KIRKHAM STREET FROM 7TH TO 46TH AVENUES AND CONSISTS OF ASPHALT AND CONCRETE REMOVAL; GRADING AND DRAINAGE;ASPHALT PAVING WITH CONCRETE BASE; CONCRETE-CRUB RAMPS, CRUB WIT
Plan#: 142-CD
KIRKHAM STREET PAVEMENT RENOVATION SEWER REPLACEMENT
13-00142
to $3600000Addenda: 0Project Type: PUBLIC WORKS
Contact: SAN FRANCISCO DPW 415-554-8280
CONFIRMED BIDDERS:Name Phone FaxGhilotti Brothers Inc 415-454-7011 415-454-8376
CONTRA COSTA COUNTY
2:00 PM 4/10/2013Ref #: 04-CC-4-
R16.8/R20.3
Bid Date:
CLASS "A" LICENSE REQUIRED. PCCP REPLACEMENT IN CONTRA COSTA COUNTY IN PITTSBURG FROM 0.3 MILE WEST OF WILLOW PASS ROAD UNDERCROSSING TO 0.2 MILE EAST OF BAILEY ROAD UNDERCROSSING.
Plan#: 143-DOT DOT 04-3E2004 PCCP REPLACEMENT
13-00143
to $450000Addenda: 0Project Type: CALTRANS
Contact: CALTRANS 510-286-5209
CONFIRMED BIDDERS:Name Phone FaxGhilotti Brothers Inc 415-454-7011 415-454-8376
SANTA ROSA2:00 PM 4/10/2013
Ref #: C01758
Bid Date:
Prebid Conf: MAND 3/27/2013 10:00 AM
Plan#: 148-PA/OL FINLEY CENTER SENIOR WING PHASE 3
13-00148
Est. Cost: $1710000to $1890000
Addenda: 0
Project Type: TENANT IMPROVEMENTS
Contact: SANTA ROSA, CITY OF, ENGINEERING DIVISION, TPWD 707-543-4521
CONFIRMED BIDDERS:Name Phone FaxA.E. Nelson Construction 707-636-1750 707-636-1755BOBO CONSTRUCTION, INC. 916-685-2285 916-714-4850CONCRETE NORTH 209-745-7400 209-745-7477GCCI Inc 707-545-2134 707-545-2156Helmer & Sons, Inc. 707-965-2425 707-965-2982Murray Building 707-939-9001 707-939-9048RE West Builders 707-576-1224 707-541-0117ROMKON INC. 415-525-4432 415-529-2073
SANTA ROSA
2:00 PM 4/10/2013Ref #: CO1579
Bid Date:
Prebid Conf: 4/3/2013 10:00 AM
TRAFFIC CONTROL, SITE WORK, ASPHALT CONCRETE BASE, SIGNS, SIDEWALK, CURB AND GUTTER, THERMOPLASTIC CROSSWALK AND PAVEMENT MARKING, PEDESTRIAN FLASHERS, PAVEMENT MARKINGS, BICYCLE RACK AND OTHER RELATED WORK
Plan#: 152-PA/OL
SAFE ROUTES TO SCHOOL-COLLEGE AVE AND GLENN ST, WEST AVE AND DELPORT AVE, AND KAWANA SPRINGS RD AND MEADOW WAY
13-00152
Est. Cost: $247377Addenda: 0Project Type: PUBLIC IMPVS
Contact: SANTA ROSA , CITY OF, TRANSPORTATION AND PUBLIC WORKS DIVISION 707-543-3847
CONFIRMED BIDDERS:Name Phone FaxArgonaut Constructors 707-542-4862 707-542-3210
STRAWBERRY
10:00 AM 4/10/2013Ref #: 1710
Bid Date:CLASS "A" OR C-34 LICENSE REQUIREDPlan#: 167-PA/OL
RICHARDSON DRIVE PIPELINE REPLACEMENT PROJECT
13-00167
Addenda: 0Project Type: PIPELINE
Contact: MARIN MUNICIPAL WATER DISTRICT 415-945-1580
PROject BId Schedule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Marin Builders Association ◆ Weekly BulletIn ◆ Page 22
Thursday, April 11, 2013
NAPA
3:30 PM 4/11/2013Bid Date:
Prebid Conf: MAND 3/7/13 & 3/12/12AT 10:00AM
THE PROJECT WILL TAKE PLACE 4,500 FEET SOUTH OF HIGHWAY 128 AND CONTINUE SOUTH FOR APPROX. 3,000 FEET. CONSTRUCTION WILL INCLUDE BUT IS NOT LIMITED TO EARTHWORK IN AND NEAR THE NAPA RIVER CHANNEL, INSTALLATION OF IRRIGATION, CONSTRUCTION, AND INSTALLATIO
Plan#: 100-CD RUTHERFORD DUST REACH 8 B/C, PW 13-29
13-00100
to $3460171Addenda: 1 3/21/2013Project Type: PUBLIC WORKS
Contact: NAPA COUNTY DEPARTMENT OF PUBLIC WORKS 707-253-4351
CONFIRMED BIDDERS:Name Phone FaxArgonaut Constructors 707-542-4862 707-542-3210Suulutaaq, Inc. Unit 2 707-427-3209 707-419-4851
NAPA
3:30 PM 4/11/2013Ref #: PW 11-31
Bid Date:
Prebid Conf: MAND 3/28/13 AT 10:00AM
THE WORK INVOLVES DEMOLITION AND REPLACEMENT OF EXISTING AIR HANDLING UNIT SMOKE DAMPERS HEAT EXCHANGES, CONTROL SYSTEM, INSTALLATION OF ELECTRICAL CONTROL CONDIT, INSTALLATION OF PLUMBING AND OTHER MISCELLANEOUS WORK.
Plan#: 101-CD NAPA COUNTY HALL OF JUSTICE HVAC REPAIRS
13-00101
Addenda: 0Project Type: PUBLIC WORKS
Contact: NAPA COUNTY PUBLIC WORKS 707-253-4351
CONFIRMED BIDDERS:Name Phone FaxA.E. Nelson Construction 707-636-1750 707-636-1755Bell Products, Inc. 707-255-1811 707-255-1908D C Electric 707-992-0141 888-525-8419
SAN FRANCISCO
2:00 PM 4/11/2013Ref #: WW-567
Bid Date:
Prebid Conf: 3/22/13 AT 10:00AM
CLASS A LICENSES REQUIRED. THE OBJECTIVE OF THE PROJECT IS TO PROVIDE CONTINGENCY-BASED AS NEEDED SEWER REPAIR ON SHORT NOTICE AT LOCATION TO BE DETERMINED WITHIN THE CITY AND COUNTY OF SF.
Plan#: 107-CD AS-NEEDED SPOT SEWER REPAIR
13-00107
to $8000000Addenda: 0Project Type: PUBLIC WORKS
Contact: CITY & COUNTY OF S.F. 415-558-4080
SONOMA
2:00 PM 4/11/2013
Ref #: PPP-420
Bid Date:
Prebid Conf: 3/21/2013 8:00 AM
CONTRUCTION OF APPROXIMATELY 1.8 MILES OF TRAIL USING PRIMARILY HAND CREWS, HAND TOOLS AND EQUIPMENT AT A REMOTE AND ENVIRONMENTALLY SENSITIVE SITE. THE PROJECT INVOLVES THE EXCAVATION AND HAULING OF ROCK FOR RETAINING WALLS, ARMORED CROSSING AND STEPS A
Plan#: 129-PA/OL MONTINI OPEN SPACE PRESERVE TRAIL PROJECT
13-00129
Addenda: 0
Project Type: TRAIL CONSTRUCTION
Contact: SONOMA COUNTY AGRICULTURAL PRESERVATION & OPEN SPACE DISTRICT 707-565-3349
MARIN COUNTY
1:30 PM 4/11/2013Ref #: 2012-14
Bid Date:
WORK INCLUDES DIG-OUTS, GRINDING, ASPHALT PULVERIZATION, GUARDRAIL, RESURFACING, INSTALLATION OF ADA CURB RAMPS, REPLACING CURB, GUTTER AND SIDEWALK, TRAFFIC STRIPING, REPAIRING STORM WATER DRAINAGE FACILITIES, CLEARING AND GRUBBING, TREE REMOVAL AND RELA
Plan#: 130-PA/OL
2013 ROAD RESURFACING PROJECT CENTRAL REGION
13-00130
Est. Cost: $3100000Addenda: 1 4/1/2013Project Type: ROAD WORK
Contact: MARIN COUNTY D.P.W. 415-499-7877
CONFIRMED BIDDERS:Name Phone FaxArgonaut Constructors 707-542-4862 707-542-3210Ghilotti Brothers Inc 415-454-7011 415-454-8376GHILOTTI CONSTRUCTION CO
707-585-1221 707-585-1601
Ghilotti Construction Co Inc 707-585-1221 707-585-1601MCK Services, Inc. 925-957-9200 925-957-9292
SAN FRANCISCO
2:00 PM 4/11/2013Ref #: WW-545
Bid Date:
Prebid Conf: 3/27/2010 10:00 AM
REPLACE THE EXISTING SEWER AND RENOVATE THE EXISTING STREET PAVEMENT
Plan#: 136-CD
16TH/21ST/24TH/25TH AVENUES AND CABRILLO/CALIFORNIA STREETS SEWER REPLACEMENT AND PAVEMENT RENOVATION
13-00136
Est. Cost: $3500000Addenda: 0Project Type: STREET IMPVS
Contact: SAN FRANCISCO PUBLIC UTILITIES COMMISSION 415-551-4603
SONOMA COUNTY
2:00 PM 4/11/2013Ref #: C02166
Bid Date:
REPLACEMENT OF AN ALL-WAY SIGNED INTERSECTION WITH A SINGLE LANE ROUNDABOUT, SIDEWALKS, LANDSCAPE AND HARDSCAPE AT THE INTERSECTION OF ROADS 5603 AND 6601. CLASS "A" LICENSE WITH A HAZARDOUS SUBSTANCE REMOVAL CERTIFICATION REQUIRED.
Plan#: 149-PA/OL
ARNOLD DRIVE AT AGUA CALIENTE ROAD ROUNDABOUT
13-00149
Addenda: 0Project Type: ROAD WORK
CONFIRMED BIDDERS:Name Phone FaxArgonaut Constructors 707-542-4862 707-542-3210Ghilotti Construction Co Inc 707-585-1221 707-585-1601
PROject BId Schedule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Marin Builders Association ◆ Weekly BulletIn ◆ Page 23
www.marinba.org ◆ [email protected]
PROject BId Schedule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
SANTA ROSA2:00 PM 4/11/2013
Ref #: C00232Bid Date:
Prebid Conf: 4/2013 10:00 AM
Plan#: 151-PA/OL
SLATER STREET SEWER & WATER IMPROVEMENTS-COLLEGE TO BENTON
13-00151
Est. Cost: $380000to $460000
Addenda: 0Project Type: SEWER/SANITATION
Contact: SANTA ROSA PUBLIC WORKS, ENGINEERING 707-543-4528
CONFIRMED BIDDERS:Name Phone FaxArgonaut Constructors 707-542-4862 707-542-3210Ghilotti Construction Co Inc 707-585-1221 707-585-1601
NAPA
3:00 PM 4/11/2013Ref #: ST13PW01
Bid Date:CLASS "A", C12 OR C32 LICENSE REQUIREDPlan#: 156-PA/OL 2012 CRACK SEAL PROJECT
13-00156
Addenda: 0Project Type: STREET IMPVS
Contact: NAPA, CITY OF, P.W.D. 707-257-9305
SAN RAFAEL
2:00 PM 4/11/2013Bid Date:
Prebid Conf: MAND 4/2/2013 3:00 PM
Plan#: 183-PAPER
MARIN COMMUNITY SCHOOL RELOCATIONNEW13-00183
Addenda: 0Project Type: SCHOOL
Contact: GREYSTONE WEST COMPANY 707-933-0624
Friday, April 12, 2013
SONOMA COUNTY
1:00 PM 4/12/2013Ref #: C11008
Bid Date:
OVERLAYS OF VARIOUS COUNTY ROADS AND OTHER RELATED WORK.
Plan#: 114-PA/OL 2012 ASPHALT OVERLAY PROGRAM
13-00114
Addenda: 5 4/4/2013Project Type: ROAD WORK
Contact: SONOMA, COUNTY DEPT. OF TRANSP. AND PUBLIC WORKS
CONFIRMED BIDDERS:Name Phone FaxArgonaut Constructors 707-542-4862 707-542-3210Ghilotti Brothers Inc 415-454-7011 415-454-8376Ghilotti Construction Co Inc 707-585-1221 707-585-1601MCK Services, Inc. 925-957-9200 925-957-9292
NAPA
3:00 PM 4/12/2013Ref #: MS07PW01
Bid Date:CLASS "A" LICENSE REQUIREDPlan#: 157-PA/OL NAPA RIVER DEBRIS REMOVAL
13-00157
Addenda: 0Project Type: DEBRIS REMOVAL
Contact: NAPA, CITY OF, PWD 707-257-9423
SAN RAFAEL
5:00 PM 4/12/2013Bid Date:
GENERAL CONTRACTOR BIDS ONLY: INTERIOR AND EXTERIOR REMODEL/RENOVATION INCLUDING ADA BATH; SITE VISIT UPON REQUEST.
Plan#: 166-PA/OL 599 LOGANBERRY DRIVE
13-00166
Addenda: 0Project Type: REMODEL
Contact: CAREMAX 415-225-6868
SAUSALITO
5:00 PM 4/12/2013Bid Date:SUB BIDS ONLY FOR FRAMINGPlan#: 187-PA/OL 38 LOWER CRESCENT
NEW13-00187
Addenda: 0Project Type: NEW CONSTRUCTION
Contact: Phil Kline 415-215-8097
Tuesday, April 16, 2013
CONTRA COSTA COUNTY
2:00 PM 4/16/2013Ref #: 04-CC-680-
R12.7/R17.5
Bid Date:
CLASS"A" LICENSE REQUIRED. COLD PLANE EXISTING ASPHALT CONCRETE PAVEMENT AND PLACE HMA-O IN CONTRA COSTA COUNTY IN WALNUT CREEK AND PLEASANT HILL FROM RUDGEAR ROAD UNDERCROSSING TO 0.2 MILE SOUTH OF MONUMENT BLVD. UNDERCROSSING.
Plan#: 147-DOT
DOT 04-3E4304 COLD PLANE EXISTING ASPHALT CONCRETE PAVEMENT AND PLACE HMA-O
13-00147
to $3200000Addenda: 0Project Type: CALTRANS
Contact: CALTRANS 510-286-5209
CONFIRMED BIDDERS:Name Phone FaxArgonaut Constructors 707-542-4862 707-542-3210Ghilotti Brothers Inc 415-454-7011 415-454-8376Ghilotti Construction Co Inc 707-585-1221 707-585-1601GRANITE CONSTRUCTION 408-327-7000 408-327-7090MCK Services, Inc. 925-957-9200 925-957-9292OC Jones and Sons 510-526-3424 510-526-0990
BAY AREA
2:00 PM 4/16/2013Ref #: 15QH-140
Bid Date:
Prebid Conf: 4/4/2013 10:00 AM
REFURBISH PARKING LOT, ROADWAYS AND PLAZA AREAS AT VARIOUS STATIONS
Plan#: 159-PA/OL
SITE IMPROVEMENTS AT VARIOUS STATIONS-PHASE III
13-00159
Est. Cost: $800000to $1000000
Addenda: 0Project Type: SITE IMPROVEMENTS
Contact: BART 510-464-6543
CONFIRMED BIDDERS:Name Phone FaxCF CONTRACTING 415-721-7160 415-296-6437PARC Services, Inc. 925-371-4610 925-606-8704
Marin Builders Association ◆ Weekly BulletIn ◆ Page 24
BERKELEY
2:00 PM 4/16/2013Ref #: 13-10728-C
Bid Date:CLASS "A", C-34 OR C-42 LICENSE REQUIREDPlan#: 168-PA/OL
SANITARY SEWER REHABI;ITATION-HILLCREST ROAD, DOMINGO AVENUE, PLAZA DRIVE, THE UPLANDS AND PARKSIDE DRIVE
13-00168
Addenda: 0Project Type: SEWER/SANITATION
HAYWARD
2:00 PM 4/16/2013Ref #: 6815
Bid Date:
Prebid Conf: 4/3/2013 2:30 PM
1-STORY BUILDING, PEDESTRIAN BRIDGE, PARKING LOT, TRASH ENCLOSURE, SITE LIGHTING, IRRIGATION WORK , LANDSCAPING AND OTHER RELATED WORK
Plan#: 169-PA/OL
HAYWARD EXECUTIVE AIRPORT ADMINISTRATION BUILDING
13-00169
Est. Cost: $193000to $2121000
Addenda: 0Project Type: NEW CONSTRUCTION
Contact: HAYWARD DPW, ENGINEERING 510-583-4769
CONFIRMED BIDDERS:Name Phone FaxAlten Construction Inc 510-234-4200 510-234-4474D.L. Falk Construction, Inc. 510-887-6500 510-887-6501Mission City Rebar, Inc 925-449-6999 925-447-8797Rodan Builders Inc 650-508-1700 650-508-1705WEST BAY BUILDERS, INC 415-456-8972 415-459-0665Zovich Construction 510-784-1273 510-784-0173
ROHNERT PARK
2:00 PM 4/16/2013Ref #: 201`2-01
Bid Date:
PAVEMENT REHABILITATION INCLUDING CRACK SEALING, DIG-OUT AND PLUG AREAS AND INSTALLATION OF A FLASHING PEDESTRIAN CROSS-WALK SYSTEM
Plan#: 173-PA/OL
2013 VARIOUS STREETS PREVENTATIVE MAINTENANCE
NEW13-00173
Est. Cost: $1000000Addenda: 0Project Type: STREET IMPVS
Contact: ROHNERT PARK, CITY OF 707-588-2232
CONFIRMED BIDDERS:Name Phone FaxMCK Services, Inc. 925-957-9200 925-957-9292
HAYWARD AND SAN LEANDRO
2:00 PM 4/16/2013Ref #: 2232
Bid Date:
Prebid Conf: MAND 4/2/2013 10:00 AM
CLASS "A" OR C-12 LICENSE REQUIRED
Plan#: 185-PAPER
THE RESURFACING OF PORTIONS OF VARIOUS ROADWAYS IN THE UNINCORPORATED AREA OF HAYWARD AND SAN LEANDRO ALAMEDA COUNTY, CALIFORNIA
NEW13-00185
Addenda: 0Project Type: ROAD WORK
Contact: ALAMEDA COUNTY PUBLIC WORKS AGENCY 510-670-5450
ANTIOCH
2:00 PM 4/16/2013Ref #: P.W. NO. 205-G
Bid Date:
PROVIDE LABOR, EQUIPMENT AND TOOLS, PURCHASE AND DELIVER ON SITE ALL PLAYGROUND MATERIALS NECESSARY FOR THE RECONSTRUCTION AND ASSEMBLING OF THE TOT LOT PLAYGROUND EQUIPMENT INCLUDING NEW CONCRETE FOUNDATION, POST FOOTINGS, REMOVAL AND DISPOSAL OF THE EXI
Plan#: 191-PAPER
TOT LOT REPLACEMENT PROJECTNEW13-00191
Est. Cost: $175000Addenda: 0Project Type: PLAYGROUND
Contact: ANTIOCH, CITY OF, OFFICE OF CAPITAL IMPROVEMENTS 925-779-7050
Wednesday, April 17, 2013
SAN FRANCISCO
2:30 PM 4/17/2013Ref #: 2108J
Bid Date:
Prebid Conf: 3/14/13 AT 1:30PM
TRAFFIC SIGNAL MODIFICATIONS, CURB RAMPS, TRAFFIC ROUTING AND ALL RELATED AND INCIDENTIAL WORK AT VARIOUS INTERSECTION LOCATIONS.CLASS A LICENSE REQUIRED
Plan#: 106-CD CONTRACT 33 TRAFFIC SIGNAL MODIFICATIONS
13-00106
to $1000000Addenda: 2 4/1/2013Project Type: PUBLIC WORKS
Contact: SAN FRANCISCO, CITY AND COUNTY 415-558-5226
CONFIRMED BIDDERS:Name Phone FaxCF CONTRACTING 415-721-7160 415-296-6437CF CONTRACTING 415-721-7160 415-296-6437W BRADLEY ELECTRIC 415-898-1400 415-898-5991
SAN FRANCISCO
2:30 PM 4/17/2013Ref #: 1060J
Bid Date:
Prebid Conf: 3/29/13 AT 1:30PM
CLASS A LICENSE REQUIRED. THE WORK TO BE DONE UNDER THIS CONTRACT CONSISTS OF DOING TRAFFIC ROUTING, SEWER WORK, PAVING WORK, SIDEWALK PAVING, LANDSCAPE PLANTING AND ELECTRICAL WORK ALONG BALBOA STREET FROM 34TH to 39TH STREETS IN SF.
Plan#: 125-CD BALBOA STREETSCAPE IMPROVEMENTS
13-00125
to $2160000Addenda: 0Project Type: PUBLIC WORKS
Contact: SAN FRANCISCO, CITY OF 415-558-4541
OAKLAND
1:30 PM 4/17/2013Ref #: 2055
Bid Date:
Prebid Conf: 3/28/2013 10:00 AM
REMOVE AND DISPOSE OF HEEL WATER, REPLACE TAR AND GRAVEL ROOFING, REHABILITATE THE EXISTING VALVE PIT AND PIPING, INSTALLING SECURITY AND SITE IMPROVEMENTS, REMOVE SEDIMENT AND OTHER RELATED WORK
Plan#: 131-PA/OL SUMMIT SOUTH RESERVOIR REHABILITATION
13-00131
Est. Cost: $500000to $700000
Addenda: 0Project Type: RESERVOIR
Contact: EBMUD, PURCHASING DIVISION 510-287-0454Contact: EBMUD, PURCHASING DIVISION 510-287-1040
CONFIRMED BIDDERS:Name Phone FaxAztec Constructors 925-837-1050 925-837-1652Rodan Builders Inc 650-508-1700 650-508-1705
PROject BId Schedule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Marin Builders Association ◆ Weekly BulletIn ◆ Page 25
SONOMA COUNTY
2:00 PM 4/17/2013Ref #: 04-SON-121-
0.0/7.3
Bid Date:
CLASS "A" LICENSE REQUIRED. COLD PLANE ASPHALT CONCRETE PAVEMENT AND PLACE HOT MIX ASPHALT(A).IN SONOMA COUNTY NEAR SCHEVILLE FROM ROUTE 37 TO SONOMA CREEK BRIDGE.
Plan#: 145-DOT
DOT 04-3E3204 COLD PLANE ASPHALT CONCRETE PAVEMENT AND PLACE HOT MIX ASPHALT(A).
13-00145
to $470000Addenda: 0Project Type: CALTRANS
Contact: CALTRANS 510-286-5209
CONFIRMED BIDDERS:Name Phone FaxArgonaut Constructors 707-542-4862 707-542-3210Ghilotti Brothers Inc 415-454-7011 415-454-8376Ghilotti Construction Co Inc 707-585-1221 707-585-1601
NAPA
3:00 PM 4/17/2013
Ref #: WD13PW01WE-57601(53105-54501)
Bid Date:
Prebid Conf: MAND 4/10/2013 9:00 AM
INSTALLATION OF THREE NEW WATER MAIN FREEWAY CROSSINGS INCLUDING CASINGS, CARRIER PIPE VIA THE HORIZONTAL DIRECTION DRILLING METHOD AND ASSOCIATED WATER FACILITIES AND CATHODIC PROTECTION
Plan#: 158-PA/OL 2013 WATER MAIN FREEWAY CROSSINGS
13-00158
Est. Cost: $3100000Addenda: 0
Project Type: PIPELINE INSTALLATION
Contact: NAPA, CITY OF P.W.D: C.D. 707-257-9341
CONFIRMED BIDDERS:Name Phone FaxArgonaut Constructors 707-542-4862 707-542-3210ROBERTS & BRUNE CO 707-542-4100 707-542-4120
ANGEL ISLAND STATE PARK
2:00 PM 4/17/2013Bid Date:
Prebid Conf: MAND 4/10/2013 10:00 AM
CLASS "A" OR C-12 LICENSE REQUIRED
Plan#: 165-PA/OL
PAVING POINT BLUNT & NORTH GARRISON ANGEL ISLAND STATE PARK
13-00165
Est. Cost: $32000Addenda: 0Project Type: PAVING
Contact: CALIFORNIA, STATE OF DEPT. OF PARKS & REC. 707-769-5652
REDWOOD CITY
2:00 PM 4/17/2013Bid Date:
TURF REPLACEMENT PROJECT AT SEQUOIA HIGH SCHOOL AND WOODSIDE HIGH SCHOOL; CARLMONT HIGH SCHOOL MENLO-ATHERTON HIGH SCHOOL-JUMP PITS. PRE-QUALIFIED BIDDERS ONLY.
Plan#: 190-CD
SEQUOIA UNION HIGH SCHOOL DISTRICT TURF REPLACEMENT-PHASE 2
NEW13-00190
Addenda: 0Project Type: REPLACEMENT
Contact: SEQUOIA UNION HIGH SCHOOL DISTRICT 650-517-1895
SAN BRUNO
2:30 PM 4/17/2013Ref #: 7318A
Bid Date:
Prebid Visit: 3/19/2013 9:00 AMPrebid Conf: 3/12/2013 1:30 PM
CLASS "B" LICENSE REQUIRED. Plan#: 91-CD
SAN FRANCISCO COUNTY JAIL #3 REPLACEMENT PHASE 2 DEPUTY STATION
13-00091
Est. Cost: $2000000Addenda: 1 3/26/2013Project Type: REPLACEMENT
Contact: SAN FRANCISCO, CITY AND COUNTY 415-557-4688
CONFIRMED BIDDERS:Name Phone FaxCF CONTRACTING 415-721-7160 415-296-6437CF CONTRACTING 415-721-7160 415-296-6437KCK Builders 415-559-9312 415-453-9250Mission City Rebar, Inc 925-449-6999 925-447-8797ROMKON INC. 415-525-4432 415-529-2073Wickman Development & Construction
415-215-3473 415-341-0155
Thursday, April 18, 2013
SONOMA COUNTY
3:00 PM 4/18/2013Ref #: WO 7074
Bid Date:
Prebid Conf: 3/28/2013 10:00 AM
DEMOLITION OF A BUILDING WITH SOME ASBESTOS, UTILITY WORK, GRADING, DRAINAGE, CONCRETE WORK, ASPHALT AND RIGID PAVING SLURRY SEAL COATING, MASONRY STONE WORK, LANDSCAPING, IRRIGATION, TRAFFIC SIGNAL INSTALLATION, LIGHTING, PAVEMENT MARKING, SPECIALTY COLO
Plan#: 134-PA/OL COTATI INTERMODAL FACILITY PHASE I
13-00134
Addenda: 0Project Type: SITE IMPROVEMENTS
Contact: SONOMA COUNTY TRANS & PW 707-565-2231
CONFIRMED BIDDERS:Name Phone FaxArgonaut Constructors 707-542-4862 707-542-3210Ghilotti Brothers Inc 415-454-7011 415-454-8376GHILOTTI CONSTRUCTION CO
707-585-1221 707-585-1601
Ghilotti Construction Co Inc 707-585-1221 707-585-1601ROMKON INC. 415-525-4432 415-529-2073W BRADLEY ELECTRIC 415-898-1400 415-898-5991WEST BAY BUILDERS, INC 415-456-8972 415-459-0665
PROject BId Schedule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Marin Builders Association ◆ Weekly BulletIn ◆ Page 26
SAUSALITO
2:00 PM 4/18/2013Bid Date:
Prebid Conf: MAND 4/9/2013 10:00 AM
WORK INCLUDES BUT IS NOT LIMITED TO THE REPLACEMENT OF TWO 250 HP PUMPS, ELECTRICAL UPGRADES, REPAIR AND STRUCTURAL REINFORCEMENT OF THE WET WELL, REHABILITATION OF THE ROCK CATCHER STRUCTURE, INSTALLATION OF A SUBMERSIBLE PUMP AND INSTALLATION OF ASSOCIA
Plan#: 140-PA/OL
MAIN STREET PUMP STATION REHABILITATION PROJECT
13-00140
Addenda: 0Project Type: PUMP STATION
Contact: SAUSALITO-MARIN CITY SANI. DISTRICT #1 415-331-4714
CONFIRMED BIDDERS:Name Phone FaxCF CONTRACTING 415-721-7160 415-296-6437FORT BRAGG ELECTRIC 707-964-9118 707-964-1404ROBERTS & BRUNE CO 707-542-4100 707-542-4120WEST BAY BUILDERS, INC 415-456-8972 415-459-0665
SAN FRANCISCO
2:00 PM 4/18/2013Ref #: WW-548
Bid Date:
Prebid Conf: 4/3/13 AT 9:00AM
CLASS A LICENSE REQUIRED. THE OBJECTIVE OF THE PROJECT IS TO RENOVATE THE EXISTING SEWER ON THE SUBJECT STREETS.
Plan#: 161-CD
AVILA, BAY/ BEACH/ CHESTNUT/FRANCISCO/ SCOTT STREETS AND CAPRA WAY SEWER REPLACEMENT
13-00161
to $2600000Addenda: 0Project Type: PUBLIC WORKS
Contact: SAN FRANCISCO, CITY AND COUNTY 415-554-3106
CONFIRMED BIDDERS:Name Phone FaxCF CONTRACTING 415-721-7160 415-296-6437CF CONTRACTING 415-721-7160 415-296-6437
ATHERTON
2:00 PM 4/18/2013Ref #: 12172
Bid Date:
Prebid Conf: 4/8/13 AT 1:00PM
THE WORK CONSISTS OF THE SELECTIVE MODERNIZATION AT MENLO ATHERTON HIGH SCHOOL. CONCERSION OF EXISTING STORAGE AREA BETWEEN TO CLASSROOMS TO CERAMICS KILN ROOM. ASSOCIATED MECHANICAL AND ELECTRICAL.
Plan#: 170-CD CERAMICS KILN ROOM
13-00170
to $20000Addenda: 0Project Type: SCHOOL
Contact: SEQUOIA UNION HIGH SCHOOL 650-369-1411 EXT 2358
NAPA
3:00 PM 4/18/2013Ref #: FC12PRO2
Bid Date:
Prebid Conf: 4/9/2013 3:00 PM
THE WORK GENERALLY CONSISITS OF SURFACE PREPARATION AND PAINTING EXTERIOR AND INTERIOR WALLS, CEILINGS, PILLARS, STAIRWELLS, RAILINGS, PIPING, DOORS AND CANOPIES ON TWO (2) CONCRETE MULTI-STORY PARKING GARAGE BUILDINGS. THE WORK ALSO INVOLVES PAINTING SI
Plan#: 179-PAPER
PARKING GARAGE PAINTING PROJECT-CLAY STREET AND PEARL STREET GARAGES
NEW13-00179
Est. Cost: $102000Addenda: 0Project Type: PAINTING
Contact: NAPA CITY OF, DPW, ENGINEERING 707-257-9645
VALLEJO
2:00 PM 4/18/2013Ref #: FY 12/13
Bid Date:
Prebid Conf: 4/11/2013 2:00 PM590
TRAFFIC CONTROL, COLD MILLING REMOVAL OF ASPHALT CONCRETE, OVER-EXCAVATION, AGGREGATE BASE ROCK INSTALLATION, HOT-MIX ASPHALT PAVING, SPREADING AND COMPACTING, HOT-MIX ASPHALT, ADJUSTING EXISTING UTILITY FRAMES AND COVER TO NEW GRADE, INSTALLING TRAFFIC S
Plan#: 193-PAPER
ADMIRAL CALLAGHAN LN. PAVEMENT REHABILITATION PROJECT MEASURE 'B'-FY 12/13 (FROM TURNER PKWY. TO COLUMBUS PKWY.)
NEW13-00193
Addenda: 0Project Type: STREET IMPVS
Contact: VALLEJO, CITY OF, D.P.W. 707-648-4315
Tuesday, April 23, 2013
YOUNTVILLE
11:00 AM 4/23/2013
Ref #: CP-2013 AND CP-3013
Bid Date:
REMOVE PAVEMENT, CURB, GUTTER, SIDEWALK AND PAVERS, INSTALL PEDESTRIAN RAMPS, STRIPING, SIGNING, DRAINAGE FACILITIES, STREET TREES AND GRATES, RELOCATE IRRIGATION FACILITIES AND OTHER RELATED WORK. CLASS "A" LICENSE REQUIRED
Plan#: 117-PA/OL
ACCESSIBILITY IMPROVEMENTS AND SIDEWALK REPLACEMENT PROJECT
13-00117
Addenda: 1 4/2/2013
Project Type: ACCESSIBILITY IMPVMTS.
Contact: YOUNTVILLE, TOWN OF 707-571-8005
CONFIRMED BIDDERS:Name Phone FaxGHILOTTI CONSTRUCTION CO
707-585-1221 707-585-1601
Ghilotti Construction Co Inc 707-585-1221 707-585-1601
PETALUMA
2:00 PM 4/23/2013Ref #: 140707
Bid Date:
Prebid Conf: 4/16/2013 9:00 AM
CLEARING AND GRUBBING. DEBRIS REMOVAL AND POND SPILLWAY REHABILITATION. INSTALLATION OF 10 VEGETATED RESTORATION NODES, SOLAR POWERED DRIP IRRIGATION SYSTEM AND LIVESTOCK EXCLUSIONARY FENCING; ONE YEAR OF MAINTENANCE FOR NEW PLANTS AND THE IRRIGATION SYS
Plan#: 155-PA/OL CARDOZA CREEK RESTORATION PROJECT
13-00155
Est. Cost: $192000Addenda: 3 4/2/2013Project Type: RESTORATION
Contact: SONOMA COUNTY REGIONAL PARKS DEPARTMENT 707-565-2041Contact: SONOMA COUNTY REGIONAL PARKS 707-565-2041
PROject BId Schedule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Marin Builders Association ◆ Weekly BulletIn ◆ Page 27
PROject BId Schedule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
CUPERTINO
2:00 PM 4/23/2013Ref #: 2010-9134
Bid Date:
Prebid Conf: 4/9/13 AT 2:00PM
CLASS A LICENSE REQUIRED. Plan#: 172-CD
STEVENS CREEK CORRIDOR PARK & RESTORATION PHASE 2
13-00172
Addenda: 0Project Type: PUBLIC WORKS
Contact: SAN JOSE, CITY OF D.P.W. 408-777-3354
CONFIRMED BIDDERS:Name Phone FaxMcNabb Construction (DK Environ)
925-935-4200 925-952-4600
Mission City Rebar, Inc 925-449-6999 925-447-8797
CASTRO VALLEY
2:00 PM 4/23/2013Ref #: SRTSL-
5933(107)
Bid Date:
Prebid Conf: MAND 4/9/2013 10:00 AM
CLASS "A" LICENSE REQUIRED
Plan#: 181-PAPER
IMPROVEMENTS ON MARSHALL STREET AND MOEGA AVENUE IN THE VICINITY OF MARSHALL ELEMENTARY SCHOOL
NEW13-00181
Addenda: 0Project Type: STREET IMPVS
Contact: ALAMEDA COUNTY PUBLIC WORKS AGENCY 510-670-5450
OAKLAND
2:00 PM 4/23/2013Ref #: 15QH-130
Bid Date:
Prebid Conf: 3/29/2013 10:00 AM
REFURBISH PARKING LOT, ROADWAYS AND PLAZA AREAS AT VARIOUS BART STATIONS
Plan#: 182-PAPER
SITE IMPROVEMENTS AT VARIOUS STATIONS-PHASE II
NEW13-00182
Est. Cost: $850000Addenda: 0Project Type: SITE IMPROVEMENTS
Contact: BART 510-464-6383
LIVERMORE
2:00 PM 4/23/2013Ref #: 2013-07
Bid Date:CLASS "A" OR C-8 LICENSE REQUIRED
Plan#: 186-PAPER
ADA ACCESS RAMPS 2013NEW13-00186
Addenda: 0Project Type: ADA IMPROVEMENTS
Contact: LIVERMORE, CITY OF DPW 925-960-4554
CONFIRMED BIDDERS:Name Phone FaxHarris Builders, Inc. 209-664-9486 209-667-0738
KENTFIELD
2:00 PM 4/23/2013
Ref #: 303B
Bid Date:
Prebid Conf: MAND 4/11/2013 10:00 AM
CLASS C21 LICENSE REQUIRED; PRE-QUALIFIED BIDDERS ONLY: THE WORK INCLUDES BUT IS NOT LIMITED TO THE SITE PREPARATION AND DEMOLITION OF FIVE EXISTING BUILDINGS
Plan#: 189-PAPER
ACADEMIC CENTER DEMOLITION (303B)NEW13-00189
Est. Cost: $850000Addenda: 0
Project Type: DEMOLITION/SITE WORK
Contact: MARIN COM. COLL. DISTRICT 415-884-3162
CONFIRMED BIDDERS:Name Phone FaxSILVERADO CONTRACTORS, INC.
510-658-9960 510-658-9961
HAYWARD
2:00 PM 4/23/2013Ref #: FC 3A-111
Bid Date:
Prebid Conf: MAND 4/12/2013 10:00 AM
CLASS "A" OR C-34 LICENSE REQUIRED
Plan#: 192-PAPER
LINE A-5 OFFLINE DETENTION BASIN AT 28000 CALAROGA AVENUE, IN HAYWARD, ALAMEDA COUNTY, CALIFORNIA PHASE I BYPASS PIPELINE ZONE NO. 3A PROJECT
NEW13-00192
Addenda: 0Project Type: WATER-POWER
Contact: ALAMEDA COUNTY FLOOD CONTROL & WATER CONSERVATION 510-670-5450
Wednesday, April 24, 2013
SONOMA
2:00 PM 4/24/2013Bid Date:
Prebid Conf: MAND 4/10/2012 2:00 PM
PREPARE AND PAINT THE EXTERIOR OF THE FIRE STATION AND MEDIC GARAGE. PREPARE AND PAINT MOST OF THE INTERIOR AREAS. REMOVE AND REPLACE IN DAY ROOM, DINING ROOM, KITCHEN AND STAIRWELL, INCLUDING BASEBOARD AND CORNER PROTECTION. REMOVE ONE SLIDING DOOR AN
Plan#: 135-CD
CITY OF SONOMA FIRE STATION PAINTING AND REPAIR PROJECT
13-00135
Est. Cost: $95000Addenda: 1 3/22/2013Project Type: FIRE STATION
Contact: SONOMA, CITY OF 707-938-3681
CONFIRMED BIDDERS:Name Phone FaxA.E. Nelson Construction 707-636-1750 707-636-1755BAY WEST CONSTRUCTION 707-579-4078 707-579-4115REM CONSTRUCTION 530-876-1363 530-876-1169S W ALLEN CONSTRUCTION 916-344-2098 916-344-0307
Marin Builders Association ◆ Weekly BulletIn ◆ Page 28
PROject BId Schedule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Thursday, April 25, 2013
SANTA ROSA2:00 PM 4/25/2013
Ref #: AIP-44 & -45Bid Date:Plan#: 116-CD
CHARLES M SCHULZ-SONOMA COUNTY AIRPORT RUNWAY SAFETY AREA IMPROVEMENTS
13-00116
Addenda: 1 4/4/2013Project Type: AIRPORT
Contact: MEAD & HUNT, INC. 707-526-5010
CONFIRMED BIDDERS:Name Phone FaxGhilotti Brothers Inc 415-454-7011 415-454-8376Ghilotti Construction Co Inc 707-585-1221 707-585-1601Seward L. Schreder Construction, Inc.
530-229-0001 530-229-0070
CONCORD
2:00 PM 4/25/2013Ref #: WH659B
Bid Date:
Prebid Visit: 4/9/2013 10:00 AM: MANDATORYPrebid Conf: 3/28/2013 2:00 PM
THE WORK INCLUDES LEAD PAINT ABATEMENT AND PAINTING THE EXTERIOR OF CERTAIN EXISTING HANGER ROWS AND OTHER STRUCTURES AT AN ACTIVE AIRPORT. CLASS B OR CLASS C-33 LICENSE REQUIRED. ALL RESPONSIVE BIDDERS MUST ATTEND A MANDATORY SITE VISIT ON APRIL 9, 2
Plan#: 153-PA/OL
PAINTING HANGAR ROWS AT BUCHANAN FIELD AIRPORT
13-00153
Est. Cost: $140000Addenda: 0Project Type: PAINTING
Contact: CONTRA COSTA COUNTY, PW AND CPMD 925-313-2200
PETALUMA
2:00 PM 4/25/2013Bid Date:
Prebid Conf: MAND 4/11, 2013 1:00 PM
CLASS "B" LICENSE REQUIRED. QUESTIONS MUST BE SUBMITTED IN WRITING TO COUNTERPOINT CONSTRUCTION SERVICES INC ATTN; JUSTIN WALLING; EMAIL [email protected] OR VIA FACSIMILE AT 707-824-0254.
Plan#: 154-PA/OL
CASA GRANDE HIGH SCHOOL BUILDINGS E & H SIDING PROJECT
13-00154
Est. Cost: $320000Addenda: 0Project Type: SCHOOL
Contact: PETALUMA CITY SCHOOLS 707-576-0295Contact: PETALUMA CITY SCHOOLS 707-576-0829Contact: PETALUMA CITY SCHOOLS 707-778-4795
CONFIRMED BIDDERS:Name Phone FaxA.E. Nelson Construction 707-636-1750 707-636-1755BAY WEST CONSTRUCTION 707-579-4078 707-579-4115CF CONTRACTING 415-721-7160 415-296-6437CF CONTRACTING 415-721-7160 415-296-6437
SAN FRANCISCO
2:00 PM 4/25/2013Ref #: WD-2710
Bid Date:
Prebid Conf: 4/10/13 AT 10:00AM
CLASS A LICENSE REQUIRED. THE OBJECTIVE OF THE PROJECT IS TO PROVIDE AS NEEDED PAVEMENT RESTORATION FOR EXCAVATIONS IN STREETS AND SIDEWALKS DONE BY OTHERS AND REPLACEMENT OF EXISTING PAVEMENT ADJACENT TO THE ABOVE EXCAVATION PER DPW.
Plan#: 160-CD SAN FRANCISCO LOCAL WATER AS-NEEDED PAVING
13-00160
to $12000000Addenda: 0Project Type: PUBLIC WORKS
Contact: SAN FRANCISCO, CITY AND COUNTY 415-554-3106
YOUNTVILLE
11:00 AM 4/25/2013Ref #: ST-3013
Bid Date:
FULL DEPTH ASPHALT REPAIRS, PAVEMENT PREPARATION, CRACK FILLING, SLURRY SEAL, MICROSURFACING, PASS QB REJUVENATOR, STRIPING, PAVEMENT MARKINGS AND OTHER RELATED WORK
Plan#: 162-PA/OL SLURRY SEAL AND MICROSURFACING PROJECT
13-00162
Est. Cost: $204000Addenda: 0Project Type: ROAD WORK
Contact: YOUNTVILLE, TOWN OF, PUBLIC WORKS 707-944-8851
Tuesday, April 30, 2013
OAKLAND
2:00 PM 4/30/2013Ref #: 20HE-120
Bid Date:
Prebid Conf: MAND 3/28/2013 9:00 AM
REPLACE EXISTING HVAC EQUIPMENT, ASSOCIATED ACCESSORIES, ELECTRICAL COMPONENTS AND SPECIFIED CONTROL SYSTEMS AT FOUR TRAIN CONTROL HUTS AND ONE TRAIN CONTROL ROOM AND TO CONSTRUCT A NEW OFFICE IN THE TRAIN CONTROL ROOM
Plan#: 132-PA/OL
HVAC UPGRADES FOR THE TRAIN CONTROL ROOMS AT L14, L18, A58, C20 AND C76
13-00132
Est. Cost: $430000to $500000
Addenda: 0Project Type: SCHOOL
CONFIRMED BIDDERS:Name Phone FaxCF CONTRACTING 415-721-7160 415-296-6437CF CONTRACTING 415-721-7160 415-296-6437
CLAYTON
10:00 AM 4/30/2013Ref #: 308009 AND
311007
Bid Date:
Prebid Conf: 4/2/2013 10:00 AM
INSTALLING A PRESSURE REDUCING STATION, WATER PIPELINE, CALCIUM HYPOCHLORITE DISINFECTANT BOOSTER STATION, ASSOCIATED PIPING, ELECTRICAL AND OTHER RELATED WORK
Plan#: 164-PA/OL
CLAYTON REGENCY MOBILE HOME PARK EMERGENCY PIPELINE EXTENSION AND DISINFECTANT BOOSTER STATION
13-00164
Addenda: 0Project Type: WATER-POWER
Contact: CONTRA COSTA WATER DISTRICT 925-688-8350
CONFIRMED BIDDERS:Name Phone FaxGHILOTTI CONSTRUCTION CO
707-585-1221 707-585-1601
Ghilotti Construction Co Inc 707-585-1221 707-585-1601
SAUSALITO
2:00 PM 4/30/2013Bid Date:
Prebid Conf: 4/9/2013 11:00 AM
CLASS "A" LICENSE REQUIREDPlan#: 184-PA/OL URGENT SEWER REPLACEMENT PROJECT
NEW13-00184
Addenda: 0Project Type: SEWER/SANITATION
Contact: SAUSALITO, CITY OF, ENGINEERING 415-289-4180
Marin Builders Association ◆ Weekly BulletIn ◆ Page 29
www.marinba.org ◆ [email protected]
PROject BId Schedule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
FREMONT
2:00 PM 4/30/2013Ref #: FC 5-M-111
Bid Date:
Prebid Conf: MAND 4/16/2013 10:00 AM
CLASS "A" OR CLASS C-12 OR CLASS "C-34" OR C-36 LICENSE REQUIRED
Plan#: 195-PAPER
DESILTING OF LINE M-7 UNDERGROUND 48" AND 54" PIPES ALONG MISSION BLVD. IN FREMONT, ALAMEDA COUNTY, CALIFORNIA ZONE NO. 5 PROJECT
NEW13-00195
Addenda: 0Project Type: FLOOD CONTROL
Contact: ALAMEDA COUNTY PUBLIC WORKS AGENCY 510-670-5450
Wednesday, May 01, 2013
LAFAYETTE
1:30 PM 5/1/2013Ref #: 2061
Bid Date:
Prebid Conf: 4/9/2013 1O:OO AM
REPLACE CLEARWELL WITH A BOLTED STEEL TANK; DEMOLISH AN EXISTING TANK; FURNISH AND INSTALL A BOLTED STEEL TANK INCLUDING CONCRETE FOUNDATION, DOME ROOF, INLET AND OUTLET PIPOE CONNECTIONS AND OTHER RELATED WORK
Plan#: 178-PAPER
LAFAYETTE WATER TREATMENT PLANT CLEARWELL AND WASHWATER PIPELINE IMPROVEMENTS
NEW13-00178
Est. Cost: $1300000to $1600000
Addenda: 0Project Type: IMPROVEMENTS
Contact: EBMUD, PURCHASING DIVISION 510-287-0454Contact: EBMUD, PURCHASING DIVISION 510-287-1040
CONFIRMED BIDDERS:Name Phone FaxAztec Constructors 925-837-1050 925-837-1652PARC Services, Inc. 925-371-4610 925-606-8704
Thursday, May 02, 2013
SAN FRANCISCO
2:00 PM 5/2/2013Ref #: WD-2620
Bid Date:
Prebid Conf: 4/16/13 AT 10:30AM
CLASS A LICENSE REQUIRED. THE OJECTIVE of the PROJECT IS TO INSTALL 4,6,8 AND 12-INCH DUCTILE IRON WATER MAIN AND RENOVATE PAVEMENT ON BRYANT STREET, 9TH ST AND OTHER STREETS.
Plan#: 171-CD
8-INCH AND 12-INCH DUCTILE IRON WATER MAIN REPLACEMENT AND PAVEMENT RENOVATION ON BRYANT STREET, 9TH ST AND OTHER STREETS
13-00171
to $3700000Addenda: 0Project Type: PUBLIC WORKS
Contact: SAN FRANCISCO P.U.C. 415-551-4603
MARIN COUNTY
1:30 PM 5/2/2013Ref #: 2013-03
Bid Date:
WORK INCLUDES RESURFACING, MINOR CONCRETE, GUARDRAIL, ROAD PULVERIZATION AND MONOR DRAINAGE IMPROVEMENTS
Plan#: 176-PA/OL
2013 ROAD RESURFACING PROJECT SOUTHERN REGION
NEW13-00176
Est. Cost: $2400000Addenda: 0Project Type: ROAD WORK
Contact: MARIN COUNTY DEPT. OF PUB WORKS 415-499-7877
CONFIRMED BIDDERS:Name Phone FaxArgonaut Constructors 707-542-4862 707-542-3210Ghilotti Brothers Inc 415-454-7011 415-454-8376MCK Services, Inc. 925-957-9200 925-957-9292
SAN FRANCISCO
2:00 PM 5/2/2013
Ref #: WW-549
Bid Date:
Prebid Conf: 4/11/2013 10:00 AM
RENOVATE EXISTING SEWERS ON THE DESIGNATED STREETSPlan#: 196
BUCHANAN/DIVISADERO/FILLMORE/GREEN/PIERCE AND SCOTT STREET REPLACEMENT
NEW13-00196
Est. Cost: $1800000Addenda: 0
Project Type: WASTEWATER ENTERPRISE
Contact: SAN FRANCISCO WATER DEPARTMENT 415-551-4603
Tuesday, May 07, 2013
PLEASANTON
2:00 PM 5/7/2013Ref #: 15QJ-140
Bid Date:
Prebid Conf: 4/16/2013 10:00 AM
REMOVE EXISTING ROOF AND REPLACE IT WITH A COLD PROCESS, 3-PLY MODIFIED BITUMEN ROOFING MRMBRANE SYSTEM
Plan#: 188-PAPER
REROOF DUBLIN/PLEASANTON STATION SUPERVISOR'S BUILDING
NEW13-00188
Est. Cost: $85000to $100000
Addenda: 0Project Type: REROOFING
Contact: BART
Wednesday, May 08, 2013
SAN FRANCISCO
2:30 PM 5/8/2013Ref #: 2061J
Bid Date:
Prebid Conf: 4/9/13 AT 1:30PM
CLASS A LICENSE REQUIRED. THE WORK IS PAVEMENT RENOVATION AND SEWER REPLACEMENT ALONG 20TH AVENUE AND LINCOLN WAY AND INCLUDES TRAFFIC ROUTING, CRUB RAMP CONSTRUCTION AND ALL OTHER RELATD AND INCIDENTAL WORK.
Plan#: 180-CD
PAVEMENT RENOVATION AND SEWER REPLACEMENT-20TH AVENUE AND LINCOLN WAY
NEW13-00180
to $2600000Addenda: 2 4/4/2013Project Type: PUBLIC WORKS
Contact: SAN FRANCISCO, CITY AND COUNTY 415-554-8280
CONFIRMED BIDDERS:Name Phone FaxCF CONTRACTING 415-721-7160 415-296-6437CF CONTRACTING 415-721-7160 415-296-6437
Marin Builders Association ◆ Weekly BulletIn ◆ Page 30
Thursday, May 23, 2013
SAN RAFAEL
2:30 PM 5/23/2013Ref #: 2011-15
Bid Date:
CLASS A LICENSE REQUIRED. CAST-IN-DRILLED-HOLES(CIDH) RETAINING WALL ON MUIR WOODS ROAD AT MP 0.49.
Plan#: 124-PA/OL MUIR WOODS ROAD SLIDE REPAIR
13-00124
to $400000Addenda: 1 3/28/2013Project Type: RETAINING WALL
Contact: SAN RAFAEL PUBLiC WORKS 415-473-7877
CONFIRMED BIDDERS:Name Phone FaxGHILOTTI CONSTRUCTION CO
707-585-1221 707-585-1601
SACRAMENTO DRILLING, INC.
916-638-1766 916-638-3725
WEST BAY BUILDERS, INC 415-456-8972 415-459-0665
Thursday, May 30, 2013
HERCULES
2:00 PM 5/30/2013
Ref #: 63001A
Bid Date:
Prebid Conf: MAND 4/17/2013 9:00 AM
CONSTRUCT A CLASS 1 TRAIL, APPROXIMATELY 0.63 MILES BY 10-FEET WIDE (PAVED) SOIL NAIL RETAINING WALL, INSTALLATION OF A STORM DRAIN CULVERT UNDER THE UPRR TRACKS VIA PIPE RAMMING, INCLUDING GRADING, PAVING, DRAINAGE, SEWER RELOCATION, FENCING, PLANTING A
Plan#: 197
CITY OF HERCULES INTERMODAL TRANSIT CENTER SAN FRANCISCO BAY TRAIL
NEW13-00197
Addenda: 0
Project Type: TRAIL CONSTRUCTION
Friday, May 31, 2013
ORINDA
2:00 PM 5/31/2013Bid Date:
Prebid Conf: MAND 1/1013 2:00 PM
SITEWORK AND UTILITIES FOR THE INSTALLATION OF A TEMPORARY MODULAR FACILITY AND FOR CONSTRUCTION OF A NEW FIRE STATION BUILDING AND RELATED SITE IMPROVEMENTS INCLUDING DEMOLITION
Plan#: 05-PA/OL MORAGA-ORINDA FIRE STATION 43
13-00005
Addenda: 4 3/15/2013Project Type: NEW CONSTRUCTION
Contact: KSD GROUP INC. 925-827-0841Contact: MORAGA-ORINDA FIRE DISTRICT 925-286-4644
CONFIRMED BIDDERS:Name Phone FaxArntz Builders, Inc. 415-382-1188 415-883-7529Aztec Constructors 925-837-1050 925-837-1652B.M.N Fire Systems 209-207-7451 209-832-9555CALSTATE CONSTRUCTION 510-657-1800 510-657-1810CF CONTRACTING 415-721-7160 415-296-6437D.L. Falk Construction, Inc. 510-887-6500 510-887-6501Diede Construction 209-369-8255 209-368-0600GCCI Inc 707-545-2134 707-545-2156Gehvac Co. 209-204-0100 209-566-9995KCK Builders 415-559-9312 415-453-9250LATHROP CONSTRUCTION ASSOCIATES
707-746-8000 707-746-8080
McFadden Construction, Inc. 209-478-7407 209-478-1516Menghetti Construction 209-524-2465 209-524-2495Mission City Rebar, Inc 925-449-6999 925-447-8797Monterey Structural Steel 831-768-1277 831-768-1352National Electric, Inc. 510-475-9400 510-475-9411Northbay Roofing & Gutter Co 707-591-9288 707-591-9289Pacific-Mountain Contractors of California, Inc.
925-603-2652 925-687-8430
PARC Services, Inc. 925-371-4610 925-606-8704ROMKON INC. 415-525-4432 415-529-2073S W ALLEN CONSTRUCTION 916-344-2098 916-344-0307SOUTHWEST CONSTRUCTION 650-877-0717 650-877-0747US Matrix Co Inc 925-473-1043 925-432-7103Zovich Construction 510-784-1273 510-784-0173
PROject BId Schedule
www.marinba.org ◆ [email protected]
Bid list subject to change prior to bid date,please check with Association.
Marin Builders Association ◆ Weekly BulletIn ◆ Page 31
PROject BId ReSultS
www.marinba.org ◆ [email protected]
PROJECT BID RESULTS 3.25.13 - 3.27.13
Date Job Name Location3/25/2013 GRANT LINE ROAD WIDEN-
ING & IMPROVEMENT TRACY
TEICHERT CONST. 12,125,370.003/25/2013 INFRASTRUCTURE IM-
PROVEMENTS PHASE 2: NATURAL GAS MAIN UPGRADE HAGER DRIVE 9066
SANTA CRUZ
ANDERSON PACIFIC ENG. CONST, INC
281,500.00
LEWIS & TIBBITTS 294,924.00EARTHWORKS PAVING CONTRACTORS
330,730.00
3/26/2013 RUSSIAN RIVER COUNTY SANITATION DISTRICT TREATMENT PLANT BILOL-GICAL NUTRIENT REMOVAL SONOMA CO.WEST BAY BUILDERS 2,349,000.00
3/26/2013 PASSATEMPO PARK DUBLINGOODLAND LANDSCAPE CONST.
1,554,800.00
AGBAYANI CONST. 1,622,780.00ENVIRONMENTAL LAND-SCAPE SOLUTIONS
1,639,000.00
3/26/2013 PAVEMENT REHABILITA-TION VRF FY14(DISTRICT 6,10,15,19,20)
HAYWARD
GRAHAM CONTRACTORS 571,723.203/26/2013 MARSH CREEK ROAD
SHOULDER WIDENINGANTIOCH
STEVENS CREEK QUARRY, INC
847,998.50
O.C. JONES & SONS 948,764.00GRADETECH, INC 866,329.50
3/26/2013 MARE ISLAND PUMP STATION(MIPS) & BIO TOWER IMPROVEMENTS 131806
VALLEJO
ASHRON CONST. 545,100.003/26/2013 HYPOCHLORITE TANK RE-
PLACEMENT VALLEJO
GSE CONST. 123,400.00
Date Job Name Location3/27/2013 CORNELL PARK LIGHTING
UPGRADESDISCOVERY BAY
WINGARD ENG. 24,950.00DAN ELECTRIC 38,980.00COLUMBIA ELECTRIC 44,100.00
3/26/2013 RICHARDSON STREET SAUSALITO PIPELINE RE-PLACEMENT
SAUSALITO
TRINET CONST. 84,120.00D & D PIPELINES 108,120.00PIAZZA CONST. 112,505.00
3/27/2013 I-680 AT SABERCAT ROAD SANITARY SEWER RELO-CATION
FREMONT
BAY PACIFIC PIPELINE 1,585,490.00STEVE RADAS INC. 1,800,240.00RANER PIPELINES 1,804,245.00
3/27/2013 WILFRED AVENUE IM-PROVEMENTS
ROHNERT PARK
DESILVA GATES CONST. 11,757,757.00GHILOTTI BROS. 12,552,787.00GHILOTTI CONST. CO 15,060,195.00
3/27/2013 DWIGHT MURRAY PLAZA TRASH ENCLOSURE
NAPA
HM CONST. 63,340.00A.E. NELSON 81,840.00
3/27/2013 MANZANITA ROOM HVAC REPLACEMENT MARIN CENTER EXHIBIT HALL
SAN RAFAEL
MATRIX CONST. 236,184.00RE CORP. 239,887.00
3/27/2013 CIVIC CENTER BOILER EMISSIONS MODIFICA-TIONS, PHASE 2
SAN RAFAEL
ONE SOURCE ENG. 74,669.00
Marin Builders Association ◆ Weekly BulletIn ◆ Page 32
CAL-WEST RENTALSMechanic / Technician
Cal-West Rentals is in search of a technician to work within our service department at our yard in Petaluma. They will be responsi-ble for repairing and maintaining all types of equipment including small engines, heavy construction equipment, and delivery trucks.
The work is mostly in the shop, but also includes field service calls and deliveries of equipment. It is a full-time position, M-F, with full benefits. This person will be reporting to our service manager. Must possess knowledge and experience in the mechanical and construction field.
Please apply to [email protected] or call 707.763.5665.
www.marinba.org ◆ [email protected] ◆ [email protected]
clASSIfIed AdSClassified ads are provided free to MBA members & staff.
Please advise if position is filled or commodity is [email protected]
Seeking administrative assistant/customer service rep part time, 20-25hrs. per week.
Excellent phone skills, proficient in MS-Word, Excel, QuickBooks. Social media is a must.
Duties include, but not limited to answering phones, scheduling the plumbers, checking email, invoicing, mailing and other general of-fice tasks.
Please email [email protected] or fax 415-479-5434 resume. no phone calls please!
Gates Cooperative Construction Manager (Sausalito)
The Gates Cooperative is a 38 member organization of houseboat owners that are seeking permanent legal berths. These berths are to be located in the County approved expansion of the adjacent Waldo Point Harbor. In order to occupy the new berths, each houseboat must be brought to code standards established by the County. The Gates Cooperative, along with its institutional part-ners, the County of Marin, Marin Housing Authority, and EAH Inc. (Project Team) is seeking a Construction Manager to oversee the rehabilitation or replacement of the member-owned boats. Under the direction and supervision of Marin Housing Authority, the Construction Manager will:
1. Meet regularly with the Project Team, the Gates Co-op mem-bership and the Waldo Point Harbor Construction Manager
2. Review the relevant existing documents and history of the project
3. Consult regularly with the Project Financial Manager on the overall project budget
4. Develop construction budgets for individual Co-op house-holds in coordination with the Project Financial Manager and each owner
5. Seek collective purchasing agreements, identify potential construction donations and other cost savings mechanisms
6. Prepare written recommendations that will enhance the design, constructability, and cost and time efficiency of the individual houseboat plans, in coordination with the Co-op Project Architect and owner
7. Review the plans for compliance with codes as determined by the County Building Inspector and plan check comments
8. Identify the contractor pool and manage the bidding process 9. Develop a construction schedule with the Project Architect
and in coordination with Waldo Point Harbor’s construction manager
10. Monitor construction process; verify work completed for purposes of contractor applications for payment
11. Review requests for change orders and submit to Project Financial Consultant for approval
QUALIFICATIOnS: 1. Minimum 10 years’ experience in project estimating and con-struction2. Experience with houseboat construction preferred3. Proven budget management skills4. Good communication skills, both verbal and written5. Experience with computers, particularly Excel
This is a part time, contract job, with an expected duration of 3 years. • Location: Sausalito• Compensation: Depending on experience
Marin Builders Association ◆ Weekly BulletIn ◆ Page 33
CALLING ALL HISTORICAL COMPANY PHOTOS & EPHEMERA!~ SHARE YOUR PIECE OF HISTORY! ~
To celebrate our members and construction in Marin, we are preparing a display at the MBA of “days gone by”. We encourage all members to participate and would appreciate company ephemera and copies of photos
that show your company and exemplify the rich history of building in Marin.
Please send digital copies to our membership manager, Barbara Jones, at [email protected]. If you have originals you would like to share you can mail them or let us know where to pick them up!
Call 415.462.1220
Marin Builders Association ◆ Weekly BulletIn ◆ Page 34Marin Builders Association ◆ Weekly Bulletin ◆ Page 34
Publication rules for submission of articles to the MBA Weekly Bulletin
Members cornerLimited to 600 words and edited for length, grammar, spelling, clarity, style, libel and civility. We do not publish form
letters, petitions or consumer complaints. Please include writers name, address and phone number. All submissions become the property of Marin Builders Association and cannot be returned.
note: We would like a photo (jpeg) head shot and can offer ¼ page ad space to *fill out page for ½ the price.
*Ad space only available to fill out page if necessary.
www.marinba.org ◆ [email protected]
Page 34
Marin Builders Associationcirca 1962