may 15, 2019 data solutions report and project site map are … · 2019. 8. 23. · hazmat...

22
21 Griffin Road North Windsor Connecticut 06095 • Phone. 860.298.9692 • Fax. 860.298.6399 May 15, 2019 Mr. Adam Fox, P.E. Principal Engineer Environmental Compliance Section Bureau of Engineering and Construction State of Connecticut Department of Transportation 2800 Berlin Turnpike, P.O. Box 317546 Newington, CT 06131-7546 Attention: Jason Coite, P.E. / Stephen Clout Subject: On-Call Asbestos, Lead, Air Quality & Demolition Compliance Agreement No.: 8.07-01 (18) HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford, CT ConnDOT Assignment No. 519-5929 ConnDOT Project No. 63-712 TRC Project No. 289951.5929.0710 Dear Mr. Fox: TRC performed a limited survey for hazardous building materials associated with the rehabilitation of Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River in Hartford, Connecticut. Results of the survey identified lead paint to be present on the structural steel/metal bridge components of Bridge No. 00980B. Results obtained from TCLP waste stream sampling and analysis for leachable lead from the paint on the structural steel/metal bridge components characterized the paint waste stream at Bridge No. 00980B as CTDEEP/RCRA hazardous waste. Grey/white barrier seam caulk, black curb seam caulk, red pipe seam caulk and black road tar were sampled and found to be non-detect for asbestos. Bloodborne pathogens (BBP) concerns (homeless activity, human feces, etc.) were identified at Bridge No. 00980B. No bird/pigeon guano accumulations or other hazardous/regulated items were identified. Associated laboratory data, TRC Mobile Data Solutions report and project site map are attached. If you have any questions, please call TRC at (860) 298-9692. Very Truly Yours, TRC Stephen R. Arienti, CHMM Senior Project Scientist – Program Manager Erik R. Plimpton, P.E., CHMM, CMC Vice President – Engineer in Charge

Upload: others

Post on 01-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,

21 Griffin Road North Windsor Connecticut 06095 • Phone. 860.298.9692 • Fax. 860.298.6399

May 15, 2019

Mr. Adam Fox, P.E.Principal EngineerEnvironmental Compliance SectionBureau of Engineering and ConstructionState of Connecticut Department of Transportation2800 Berlin Turnpike, P.O. Box 317546Newington, CT 06131-7546

Attention: Jason Coite, P.E. / Stephen Clout

Subject: On-Call Asbestos, Lead, Air Quality & Demolition ComplianceAgreement No.: 8.07-01 (18)HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford, CTConnDOT Assignment No. 519-5929ConnDOT Project No. 63-712TRC Project No. 289951.5929.0710

Dear Mr. Fox:

TRC performed a limited survey for hazardous building materials associated with the rehabilitation of Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River in Hartford, Connecticut. Results of the survey identified lead paint to be present on the structural steel/metal bridge components of Bridge No. 00980B. Results obtained from TCLP waste stream sampling and analysis for leachable lead from the paint on the structural steel/metal bridge components characterized the paint waste stream at Bridge No. 00980B as CTDEEP/RCRA hazardous waste. Grey/white barrier seam caulk, black curb seam caulk, red pipe seam caulk and black road tar were sampled and found to be non-detect for asbestos. Bloodborne pathogens (BBP) concerns (homeless activity, human feces, etc.) were identified at Bridge No. 00980B. No bird/pigeon guano accumulations or other hazardous/regulated items were identified. Associated laboratory data, TRC Mobile Data Solutions report and project site map are attached.

If you have any questions, please call TRC at (860) 298-9692.

Very Truly Yours,

TRC

Stephen R. Arienti, CHMMSenior Project Scientist – Program Manager

Erik R. Plimpton, P.E., CHMM, CMCVice President – Engineer in Charge

Page 2: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,
Page 3: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,
Page 4: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,
Page 5: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,
Page 6: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,
Page 7: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,
Page 8: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,
Page 9: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,
Page 10: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,
Page 11: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,
Page 12: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,

Created 2019-04-19 09:34:09 EDT by Brendan McClure

Updated 2019-05-14 14:15:46 EDT by Stephen Arienti

Location 41.7699922481941, -72.6695650164715

Status Survey Complete

Site Name Bridge 00980B

Address Exit 51 BridgeHartford, CT 06120

TRC Project Number 289951.5929.0710

Project Manager Stephen Arienti

Inspector(s) Brendan McClure, Carmen Jacko, Hilton Hernandez

Client ConnDOT

Type of Asbestos Survey Reno/Demo

Additional Analysis for NOB Materials (Calc) TEM NY NOB 198.4

PLM Turnaround Time (TAT) 48-hour

TEM Turnaround Time (TAT) 48-hour

Date 2019-04-19

Overview Photo

ConnDOT, Bridge 00980B, Hartford, , Hartford, 06120, CT, US, Exit 51 Bridge,ConnDOT, Bridge 00980B, Hartford, , Hartford, 06120, CT, US, Exit 51 Bridge,

Job InformationJob Information

Page: 1 of 10

Page 13: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,

Page: 2 of 10

Page 14: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,

Page: 3 of 10

Page 15: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,

Surveys Performed Asbestos, XRF, Hazardous Materials Inventory, TCLP Sampling

Asbestos SectionAsbestos Section

( 2 ), C, 1, Grey/white barrier seam caulk , 2( 2 ), C, 1, Grey/white barrier seam caulk , 2

Page: 4 of 10

Page 16: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,

Representative Photos

Sample Location East barrier seam caulk

Analyze by Layer No

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date 2019-04-19

Time 10:28

Sample Location West barrier seam caulk

Analyze by Layer No

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date 2019-04-19

Time 10:30

Sampled or Assumed? Sampled

Material Acronym C, 1

Material Description Grey/white barrier seam caulk

Is Material a Non-Friable Organically Bound (NOB) Yes

Total Approximate Quantity 20LF

Total Count ( 2 )

East barrier seam caulkEast barrier seam caulk

West barrier seam caulkWest barrier seam caulk

Material InformationMaterial Information

Page: 5 of 10

Page 17: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,

Total Count (number only) 2

Representative Photos

Sample Location East curb

Analyze by Layer No

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date 2019-04-19

Time 10:34

Sample Location West curb

Analyze by Layer No

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date 2019-04-19

Time 10:34

Sampled or Assumed? Sampled

Material Acronym C, 2

Material Description Black curb seam caulk

Is Material a Non-Friable Organically Bound (NOB) Yes

( 2 ), C, 2, Black curb seam caulk , 2( 2 ), C, 2, Black curb seam caulk , 2

East curbEast curb

West curbWest curb

Material InformationMaterial Information

Page: 6 of 10

Page 18: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,

Total Approximate Quantity Length of bridge. Both sides

Total Count ( 2 )

Total Count (number only) 2

Representative Photos

Sample Location East side

Analyze by Layer No

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date 2019-04-19

Time 10:35

Sample Location West side

Analyze by Layer No

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date 2019-04-19

Time 10:35

Sampled or Assumed? Sampled

Material Acronym RT1

( 2 ), RT1, Black road tar, 2( 2 ), RT1, Black road tar, 2

East sideEast side

West sideWest side

Material InformationMaterial Information

Page: 7 of 10

Page 19: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,

Material Description Black road tar

Is Material a Non-Friable Organically Bound (NOB) Yes

Total Approximate Quantity 25’x2’x3

Total Count ( 2 )

Total Count (number only) 2

Representative Photos

Sample Location Drain pipe under bridge

Analyze by Layer No

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date 2019-04-19

Time 11:06

Sample Location Drain pipe under bridge

Analyze by Layer No

Asbestos Bulk Analysis PLM EPA 600/R93/116

Grab or Composite Grab

Date 2019-04-19

Time 11:07

( 2 ), C, 3, Red pipe seam caulk , 2( 2 ), C, 3, Red pipe seam caulk , 2

Drain pipe under bridgeDrain pipe under bridge

Drain pipe under bridgeDrain pipe under bridge

Material InformationMaterial InformationPage: 8 of 10

Page 20: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,

Sampled or Assumed? Sampled

Material Acronym C, 3

Material Description Red pipe seam caulk

Is Material a Non-Friable Organically Bound (NOB) Yes

Total Count ( 2 )

Total Count (number only) 2

Niton XRF Model No. 25555

XRF Survey Completed Yes

XRF Data Downloaded Yes

XRF Shots >1.0 on non-metallic building materials No

Date Data Downloaded 2019-04-19

Inventory Area Description Under Bridge in Alley

HAZMAT Item Description Human Feces

TCLP/SPLP/Total Lead Sample Description Grey paint on metal railings

Type of Analysis TCLP Lead

Sample Number 1

Grab or Composite Grab

Date 2019-04-19

Time 09:30

XRF SectionXRF Section

HAZMAT Inventory SectionHAZMAT Inventory Section

Under Bridge in AlleyUnder Bridge in Alley

Human FecesHuman Feces

TCLP/SPLP/Total Lead SectionTCLP/SPLP/Total Lead Section

Grey paint on metal railingsGrey paint on metal railings

Page: 9 of 10

Page 21: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,

TCLP/SPLP/Total Lead Photos

Asbestos Samples Submitted to TRC Lab No

Date Submitted to Lab 2019-04-19

TCLP/SPLP Samples Submitted to Lab No

TCLP/SPLP Samples Submitted To: CET

App Name WinBSI HBM Survey 1.0

Select one or more documents below to be generated. Once completed in the cloud, they will be sent to the listed email address. Pleasereport any difficulties or errors to Justin Coleman.

What documents should be generated? PCB chain-of-custody

Where should the document(s) be sent? [email protected]

Generate Documents N/A

General InformationGeneral Information

Generate Report DocumentationGenerate Report Documentation

Page: 10 of 10

Page 22: May 15, 2019 Data Solutions report and project site map are … · 2019. 8. 23. · HazMat Inspection - Bridge No. 00980B, I-84 TR -826 WB at Exit 51 over Connecticut River, Hartford,