materials info consultancy private limited
TRANSCRIPT
Materials Info : Your partners for Materials&Processes
Raghvendra Gopal
Your Pain Areas1. Receipt stage:Material not to specProcess related issuesSurface protectionOther issues
Raghvendra Gopal
Our solutions :Working with your suppliers to reduce rejections in the incoming stage for materials/processes followed by rejections at supplier factory , Thus increasing your response time for new developments and reducing development and supply costs.
Raghvendra Gopal
2. Critical Field failure i.e IPTV and design validation failures
Our solutions:Working closely on your field failure/IPTV Data and carry out root cause analysis with problem solving tools alongwith internal teams to bring
down IPTV, thus improving reliability of the product and improving brand image in case of
IPTV and reducing the overall development time
Raghvendra Gopal
3. In process rejections:Our solutions :1.Working through your complete process flow2.Finding out the specific root cause to bring down the rejections , thus resulting in improved productivity, reduction in cost associated with the rejections.
Raghvendra Gopal
4. Low Process yield :Our solutions :1.Study of the complete manufacturing process at all stages2.Optimizing the process to improve yield.
Raghvendra Gopal
5. High development time for new products:Our solutions :1.Study of the complete process for new project introduction.2.Working on all stages of new product development3.Finding out the bottleneck areas4.Plugging the same to reduce the Development time and thus increasing response for new developments
Raghvendra Gopal
6. High DMC ( Direct material cost) :Our solutions :
1. Study of the complete design stages2. Study the application of the part and
associated load/working stresses/environment.3. Suggest optimization of part and alternate
grade /type materials to reduce cost.
Raghvendra Gopal
7. High cost of Imported Raw material/steel/components:
Our solutions: 1. Study the application in detail
2. Work with the steel mills/raw material source/component manufacturer
Raghvendra Gopal
8. Delay in response/developing export applications:Our solutions:1.Study of the raw material , standards and equivalent2.Study of the whole manufacturing process spec and sequence
Raghvendra Gopal
9. Delay in taking up projects intensive to new materials/processes/surface protection adding
value to end customer :Our solutions:
1.Benchmarking for various materials and processes
2.Trend analysis for new developments in materials and processes
3. Start pilot study /trials for the same4. Project introduction
Raghvendra Gopal
10.Lack of Early Vendor involvement:Our solutions:
1. Involving your vendors in early stage of development.
2. Working with them continuously to bring down manufacturing process and material
costs during development
Raghvendra Gopal
11.Weight above benchmark with low fuel efficiency:
Our solutions:1.Study of benchmark vehicle
2.Alternate materials, constructions and design to bring down the weight including design with
Aluminium, hybrid and plastic.3.Working with internal teams for ride/handling
and durability aspect of proposed design till implementation.
Raghvendra Gopal
Other Support Areas:1.Working with internal project teams in the
area of QFD, DFMEA, Design for six sigma ,reliability, Lean process .
2.Awareness trainings for Quality systems, DFMEA, manufacturing process, materials technology, other Quaity tools including
problem solving both for the organisation and the critical suppliers i.e development partners.3.Design validation right from data acquisition support, understanding usage requirement, QFD, co ordination with external test labs for
design validation, materials and process validation, dimensional and other tests.
Raghvendra Gopal