1 Session 1 | © 2020 | www.moresteam.com | 614.602.8190 Master Series: Everyday Uses of Process Modeling

Upload: others

Post on 20-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Master Series - MoreSteam · The Need for Process Design For every product or service process that is designed, there are dozens or ... Week 1 Week 2 Week 3 S • Introduction to

1Session 1 | © 2020 | www.moresteam.com | 614.602.8190

Master Series: Everyday Uses of Process Modeling

Page 2: Master Series - MoreSteam · The Need for Process Design For every product or service process that is designed, there are dozens or ... Week 1 Week 2 Week 3 S • Introduction to

2

About Your InstructorLars Maaseidvaag, PhDVice President of Product Development

© 2020 MoreSteam.com

• Leads MoreSteam’s product development teams dedicated to data analytics and project management software, eLearning, and training simulations

• Co-curriculum director for Master Black Belt certification program in partnership with The Ohio State University

• Illinois Institute of Technology - PhD in Operations Research

• University of Texas in Austin - Masters in Operations Research and Industrial Engineering; MBA

Page 3: Master Series - MoreSteam · The Need for Process Design For every product or service process that is designed, there are dozens or ... Week 1 Week 2 Week 3 S • Introduction to

3

The Need for Process Design

For every product or service process that is designed, there are dozens or hundreds of supporting processes.

How many of those are intentionally designed?

How many processes have a mechanism for feedback and continuous improvement?

Our goal is to introduce you to a technique for process modeling called discrete event simulation.

As product and process offerings becoming increasingly complex and segmented, having a tool to understand the dynamic interactions within a process is critical.

© 2020 MoreSteam.com

Page 4: Master Series - MoreSteam · The Need for Process Design For every product or service process that is designed, there are dozens or ... Week 1 Week 2 Week 3 S • Introduction to

4

Masters Series AgendaWeek 1 Week 2 Week 3

OBJ

ECTI

VES

• Introduction to simulation

• Understand the basic components of modeling

• The importance of understanding the impact of interactions in a dynamic process

• Push vs Pull models

• Data collection and model validation

• Techniques to model MTBF, MTTR, batching, blocking, assemblies, etc.

• Social distancing models

• Your challenges – email your process model challenges to [email protected]

HOM

EWO

RK eLearning course, Kathy’s Best Wurstscase study, build models from the webinar

Build the Drury Lane Muffin Company model from the webinar, complete the eLearning quiz

© 2020 MoreSteam.com

Page 5: Master Series - MoreSteam · The Need for Process Design For every product or service process that is designed, there are dozens or ... Week 1 Week 2 Week 3 S • Introduction to

5

Remember the old days…

https://corporate.ford.com/content/dam/corporate/en/company/history/1908_Ford_Model_T_Runabout.jpg

https://upload.wikimedia.org/wikipedia/commons/thumb/3/37/RAZR_V3i_opened.JPG/220px-RAZR_V3i_opened.JPG

https://ohiostatebuckeyes.com/amt-media/202235

Page 6: Master Series - MoreSteam · The Need for Process Design For every product or service process that is designed, there are dozens or ... Week 1 Week 2 Week 3 S • Introduction to

6

Model-T Order Form

Select Your Color:Select Your Model:

T

© 2020 MoreSteam.com

Page 7: Master Series - MoreSteam · The Need for Process Design For every product or service process that is designed, there are dozens or ... Week 1 Week 2 Week 3 S • Introduction to

7

Versus…

Page 8: Master Series - MoreSteam · The Need for Process Design For every product or service process that is designed, there are dozens or ... Week 1 Week 2 Week 3 S • Introduction to

8

How Many F150 Combinations?

https://blog.consumerguide.com/how-many-different-ways-are-there-to-build-an-f-150-would-you-believe-2-billion/

© 2020 MoreSteam.com

Page 9: Master Series - MoreSteam · The Need for Process Design For every product or service process that is designed, there are dozens or ... Week 1 Week 2 Week 3 S • Introduction to

9

Takt Time Analysis – Model T Style

1 2 43 5

Task Time: 50 48 60 58 58

Takt Time

60 seconds

Expected Lead Time

4.6 minutes

0

10

20

30

40

50

60

1 2 3 4 5

Task Takt

© 2020 MoreSteam.com

Page 10: Master Series - MoreSteam · The Need for Process Design For every product or service process that is designed, there are dozens or ... Week 1 Week 2 Week 3 S • Introduction to

10

Takt Time Analysis – With A Little Variation

Task min: 40 39 50 45 50

Task mode: 47 46 55 55 58

Task max: 62 59 75 75 66

Mean: 50 48 60 58 58

Std.Dev: 4.6 4.1 5.4 6.2 6.2

Takt Time

60 seconds(Exponentially

Distributed)

What about interactions?

Capability to meet customer needs?

Lead Time?0

10

20

30

40

50

60

70

80

1 2 3 4 5

Task 95% Tail Takt

1 2 43 5

Page 11: Master Series - MoreSteam · The Need for Process Design For every product or service process that is designed, there are dozens or ... Week 1 Week 2 Week 3 S • Introduction to

11

Takt Time Analysis – Complexity Creeps…

1 2

3 B

3 A

4Item A (60%)

Item B (40%)

At the mean this process looks like it should be okay, but is it?

Dynamic modeling can predict the performance of this process.

5

Item A 60% 100 Min Max Mode Mean Std Dev

40 47 62 50 4.6 39 46 59 48 4.1 75 100 125 100 10.2

- - - - - 45 55 75 58 6.2 50 58 66 58 3.3

Item B 40% 150 Min Max Mode Mean Std Dev

40 47 62 50 4.6 50 75 100 75 10.2

- - - - - 200 225 275 233 15.6

25 30 45 33 4.2 50 58 66 58 3.3

Takt Time =

Takt Time =

0.0

20.0

40.0

60.0

80.0

100.0

120.0

140.0

160.0

180.0

1 2 3a 3b 4 5

Task Mean 95% Tail Takt

© 2020 MoreSteam.com

Page 12: Master Series - MoreSteam · The Need for Process Design For every product or service process that is designed, there are dozens or ... Week 1 Week 2 Week 3 S • Introduction to

12

Discrete Event Simulation – Inputs and Outputs

1 2 43 5

DEFINE YOUR DEMAND:• Takt time = interarrival time• Distribution of arrivals• Changing distribution and parameters

over time• Changing mix of items

DEFINE YOUR PROCESS:• Task time distribution

• By item• Capacity• Flow• Resources, shifts, skills

OBSERVE YOUR:• Queue time and variation• Utilization• Cycle Time• Lead Time• Throughput• Blocking and bottlenecks

Processes are dynamic, and the events within those processes are all interconnected. Increasing complexity of service and product offerings demand dynamic tools to help us:

• Meet customer expectations by…• The proper application of resources

© 2020 MoreSteam.com

Page 13: Master Series - MoreSteam · The Need for Process Design For every product or service process that is designed, there are dozens or ... Week 1 Week 2 Week 3 S • Introduction to

13

Modeling with Process Playground

Time to build some models

© 2020 MoreSteam.com

Page 14: Master Series - MoreSteam · The Need for Process Design For every product or service process that is designed, there are dozens or ... Week 1 Week 2 Week 3 S • Introduction to

14

Homework and More

© 2020 MoreSteam.com

HOMEWORK:

• Follow the instructions in your enrollment email to access the “Introduction to Process Modeling” course.• Don’t see the email in your inbox? Check your spam

folder.

• Complete the lessons, including the “Kathy’s Best Wursts” case study.

• Answer the quiz questions based on the case study and the models built in Session 1.

COMING UP IN SESSION 2: Complex processes including staff planning, batching, and kitting.

Today’s slides & recording will be available at:https://www.moresteam.com/webcasts/process-modeling-master-series.cfm

Questions about course content or the Process Playground modeling tool?Contact [email protected]

For more information about MoreSteam’sproducts & services:Contact Kathy Miller at [email protected]