marine biology 30

17
Marine Biology 30 ROV Project

Upload: ayasha

Post on 31-Jan-2016

66 views

Category:

Documents


0 download

DESCRIPTION

Marine Biology 30. ROV Project. Hydrothermal VENTS. Types of Hydrothermal Vents. -Warm vents that emit water 5 to 23 degrees C. -Hot vents with maximum exit temperatures of 270 to 380 degrees C. -Snow-blower vents. Geology of Hydrothermal Vents. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Marine Biology 30

Marine Biology 30ROV Project

Page 2: Marine Biology 30

Hydrothermal VENTS

Page 3: Marine Biology 30

Types of Hydrothermal Vents

-Warm vents that emit water 5 to 23 degrees C.

-Hot vents with maximum exit temperatures of 270 to 380 degrees C.

-Snow-blower vents

Page 4: Marine Biology 30

Geology of Hydrothermal Vents

• Geothermal vents are hot springs that occur deep in the ocean.

• Located along the world’s mid‑ocean ridges.

• First discovered in 1977 near the Galapagos Islands.

Page 5: Marine Biology 30

Blue Smokers

Page 6: Marine Biology 30

Biology of Hydrothermal Vents

-Ecosystem for bacteria and animals.

-Microbes get their energy from their different chemicals.

-More than 400 new animal species have been found in these ecosystems.

Page 7: Marine Biology 30

Remote Operated Vehicle

Page 8: Marine Biology 30

Instruments for Exploration

• Cameras/Lenses• Arms• Claws • Sensors• Scoops• Nets• Lights• Containers

Page 9: Marine Biology 30
Page 10: Marine Biology 30

SENSOR

SCOOPCAM

ERAREM

OTE

PH.D, M.A., B.A., A.A.

Page 11: Marine Biology 30

MISSION

Page 12: Marine Biology 30

Strategic Initiative:

• Main Objective - Successfully collect two crabs and identify the temperature of a vent within the allotted time frame, on the bottom of the Hartnell pool by utilizing a remotely operated vehicle (ROV).

Page 13: Marine Biology 30

Staffing Management Plan

• Kathryn = Driver/Co-chair• Wendi = Driver/Secretary

• Jonathan = Chair/Communication

Page 14: Marine Biology 30

Tasks/Milestones

TASKS (Projected times/Dates) MILESTONES

ROV Prep. (less than 1 min.) Mission Scrubbed-due to pump failure (9/7)

ROV Deployment to Site (2 min.) ROV Training-completed by project date (9/19)

Mission 1 Execution (5 min.) ROV Mission Rehearsal (9/19) 1:40 PM

Mission 2 Execution (5 min.) ROV Mission (9/26) 1:40 PM

ROV Retrieval (1 min.)

Data (9/19)

Presentations (9/22)

Page 15: Marine Biology 30

Risk Management Plan

Problems Strategy

Pool breakdown Reschedule mission.

Rover breakdown Borrow ROV from another group.

Group member no show Implementation of mission can be accomplished with only two people.-Or-Beg forgiveness and try again at another time.

Mission failure Another member of group may try.

Page 16: Marine Biology 30

Mission Results4:04 to the vent7:09 to retrieve crab A9:56 to retrieve crab B

Total Time: 9:56Total Time: 9:56

Page 17: Marine Biology 30

Thank you for watching.

END