Maharashtra Industry Trade Investment Facilitation Cell S.N o Name of the Company Location Department Name of the Service Application date Issue description and chronology Decision taken in the investor meeting on 12.08.2016 Issue Status 1 Abhay Cotex Pvt. Ltd. Nardhana MIDC, Phase II, Sindkhed Taluka, Dhule MSEDCL Power Connection 22.06.2016 On 25.02.2014 due to heavy wind and rainfall some poles feeding supply to the Nardhana Substation had fallen and now since May 2016 there are a lot of power failure from the MSEB feeder, due to these the plant is suffering from heavy financial loss. 08.07.2016- MSEDCL update: MSEDCL has put up 7 poles to resolve the issue and the power supply is regular. MAITRI to check with investor and verify. 20.07.2016- Investor update: The investor has confirmed that the power failure issue has been resolved. The issue to be closed in the upcoming investor meeting. The issue was closed on 12.08.2016 Closed 2 Alfa Laval India Ltd. Plot No. 1,5,6,10 and 14, Tal. Khandala, Distt. Satara Maharashtra Fire Services Provisional fire NOC 19.05.2016 Investor initially applied for Provisional Fire NOC at Directorate Of Maharashtra Fire Services Office, Mumbai on 3.05.2016. However, due to unavailability of the required supporting documents, the application was cancelled. Investor re-submitted the application on 19.05.2016 and a meeting was held for scrutiny on 1.06.2016. The department has recommended the release of payment chalan to pay the requisite fees. However, investor has not yet received the payment chalan from the department. 02.08.2016- Department update: MAITRI has forwarded the application and reminder email to Fire services department. The file is currently under process with Director, Maharashtra Fire Services for signature. MAITRI to follow up with the department to expedite the case. Open 3 Balaji Formalin Pvt. Ltd Plot no N- 32/1, Addl Patalganga MIDC, Near Rasayani, Raigad Revenue Department NOC (to store Methanol) 29.02.2016 Investor visited Collector office, Raigad on 29.02.2016 to apply for permission to operate the Methanol tank at the factory premises. They have already obtained permission from District Explosives department. However, Collector officer informed the investor to obtain a NOC from Gram Panchayat first. When investor approached the Gram Panchayat, they informed that, no such NOC exists with Gram Panchayat and hence no such NOC will be given by them. Investor is asking for assistance. 29.03.2016-Investor update: Collector agreed to obtain MIDC NOC instead of gram panchayat NOC. MIDC has issued NOC and further, Collector has asked for NOC of SP and Tehsildar by writing to them 13.05.2016 - Department update: The site visit is completed by the officer from Tehsildar office , the report on the same will be forwarded to the Tehsildar by the end of this week. 03.06.2016- department update: NOC is pending with Tehsildar and SP /local police office. 05.07.2016- department update the NOC is pending for Tehsildar signature. 08.07.2016- IM Decision: Sicom to produce all files & the timeline taken by each officer with regards to this case. 26.07.2016- SP office update: The file is sent back to Rasayani police station for queries. The issue is pending at Tehsildar office and Police. 27.07.2016- MIDC update: MIDC has issued a letter to Dist. Collector that the said land parcel cannot be used for warehousing purpose. According to MIDC, Godown/warehouses are allowed at the said plot. Jt. CEO to look into matter and update MAITRI on the same. Open Minutes of MAITRI Investor meeting dated 12th August 2016 Page 1 of 35

Upload: truongdien

Post on 12-Mar-2018

223 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

1Abhay Cotex Pvt.Ltd.

NardhanaMIDC, PhaseII, SindkhedTaluka, Dhule

MSEDCLPower

Connection22.06.2016

On 25.02.2014 due to heavy wind and rainfall some poles feeding supply to the Nardhana Substation hadfallen and now since May 2016 there are a lot of power failure from the MSEB feeder, due to these the plantis suffering from heavy financial loss.08.07.2016- MSEDCL update: MSEDCL has put up 7 poles to resolve the issue and the power supply isregular. MAITRI to check with investor and verify.20.07.2016- Investor update: The investor has confirmed that the power failure issue has been resolved.The issue to be closed in the upcoming investor meeting.

The issue was closed on12.08.2016

Closed

2 Alfa Laval India Ltd.

Plot No.1,5,6,10 and14, Tal.Khandala,Distt. Satara

MaharashtraFire Services

Provisionalfire NOC

19.05.2016

Investor initially applied for Provisional Fire NOC at Directorate Of Maharashtra Fire Services Office, Mumbaion 3.05.2016. However, due to unavailability of the required supporting documents, the application wascancelled. Investor re-submitted the application on 19.05.2016 and a meeting was held for scrutiny on1.06.2016. The department has recommended the release of payment chalan to pay the requisite fees.However, investor has not yet received the payment chalan from the department.02.08.2016- Department update: MAITRI has forwarded the application and reminder email to Fire servicesdepartment. The file is currently under process with Director, Maharashtra Fire Services for signature.

MAITRI to follow up with thedepartment to expedite thecase.

Open

3Balaji Formalin Pvt.Ltd

Plot no N-32/1, AddlPatalgangaMIDC, NearRasayani,Raigad

RevenueDepartment

NOC (to storeMethanol)

29.02.2016

Investor visited Collector office, Raigad on 29.02.2016 to apply for permission to operate the Methanol tankat the factory premises. They have already obtained permission from District Explosives department.However, Collector officer informed the investor to obtain a NOC from Gram Panchayat first. When investorapproached the Gram Panchayat, they informed that, no such NOC exists with Gram Panchayat and hence nosuch NOC will be given by them. Investor is asking for assistance.29.03.2016-Investor update: Collector agreed to obtain MIDC NOC instead of gram panchayat NOC. MIDC hasissued NOC and further, Collector has asked for NOC of SP and Tehsildar by writing to them13.05.2016 - Department update: The site visit is completed by the officer from Tehsildar office , the reporton the same will be forwarded to the Tehsildar by the end of this week.03.06.2016- department update: NOC is pending with Tehsildar and SP /local police office.05.07.2016- department update the NOC is pending for Tehsildar signature.08.07.2016- IM Decision: Sicom to produce all files & the timeline taken by each officer with regards to thiscase.26.07.2016- SP office update: The file is sent back to Rasayani police station for queries. The issue ispending at Tehsildar office and Police.27.07.2016- MIDC update: MIDC has issued a letter to Dist. Collector that the said land parcel cannot be usedfor warehousing purpose.

According to MIDC,Godown/warehouses areallowed at the said plot. Jt.CEO to look into matter andupdate MAITRI on the same.

Open

Minutes of MAITRI Investor meeting dated 12th August 2016

Page 1 of 35

Page 2: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

4Balaji Formalin Pvt.Ltd.

RaigadEnvironmentDepartment

EnvironmentClearance

25.08.2015

Investor has subsequently applied for Environment Clearance on 25.08.2015. EIA report has also beensubmitted to the department however, Environment Clearance has not yet been granted.09.10.2015- Investor meeting update: The case to be taken in the next SEIAA meeting.14.01.2016- Department update-The proposal was recommended by SEAC-1 in its 115th meeting held on03.12.2015. The proposal will be considered in ensuing meeting of SEIAA on 15.03.2016.27.04.2016- Investor update: Compliance is requested from investor as per the minutes. Investor has madecompliance too on 30.04.201601.06.2016- Department update: The issue is discussed in 101th SEIAA meeting dated 10.05.2016. MOMare awaited.06.07.2016- Department update: Env Clearance is subject to compliance by the investor. The investor willmake compliance in some time.21.07.2016- Investor Update: since the investor had already complied, he has submitted a declaration to theSEIAA committee.

MAITRI to follow up with thedepartment to expedite thecase.

Open

5BhagyalaxmiRolling Mills

DaregaonMIDC,Tal.Jalna,Distt.Jalna

DirectorateOf Industries

EligibilityCertificate

02.11.2015

Due to delayed power supply received from MSEDCL - unit started production from 01.02.2008 (one monthafter inaugural function of 01.01.2008). Accordingly Directorate of Industries granted EC for period01.02.2008 - 31.01.2015.In July 2010, DI issued addenda to the original EC with change in effective period as 01.01.2008-31.12.2014. The investor has availed IPS claims from 01.08.2008 only and has submitted that they havestarted the production from 01.02.2008 only.Investor is seeking for approval of IPC period as 01.02.20108- 31.01.2015 as mentioned in original EC.20.05.2016- IM decision: According to the department, changes in the Eligibility Certificate will not beconsidered, hence the department to intimate the investor and after that, MAITRI to close the case.

MAITRI to follow up with thedepartment for the letterintimating that changes in theEligibility Certificate will not beconsidered.

Open

6

Cadbury IndiaLimited (MondelezIndia Foods PrivateLimited -MIFPL)(Expansion)

Survey no.532, 533,Talegaon,Induri village,Taluka Maval

MPCBConsent toBoiler fuel

change28.04.2016

The investor has made an online application for Consent to Boiler fuel change for the existing factory inDist.Pune. The application was filed through online at MPCB which is under process with the department(reference no. MPCB-CONSENT-0000003682)08.07.2016- MPCB update: The case will be taken up in CAC meeting15.07.2016- Department update: The issue was discussed in the CAC meeting held on 08.07.2016 and theconsent has been recommended, hence the issue to be closed in the next investor meting.

The issue was closed on12.08.2016

Closed

7

Cadbury IndiaLimited (MondelezIndia Foods PrivateLimited -MIFPL)(Expansion)

Survey no.532, 533,Talegaon,Induri village,Taluka Maval

MPCBConsent to

operate20.06.2016

The investor has made an online application for Consent to Operate for the expansion factory in Dist.Pune.The application was filed through online at MPCB which is under process with the department (reference no.MPCB-CONSENT-0000008758)28.07.2016- MPCB update: It will be taken up in next CAC meeting.

MAITRI to follow up with thedepartment to expedite thecase.

Open

Page 2 of 35

Page 3: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

8Classic GypsumIndustries Pvt. Ltd.

F-12,Kagal -Hatkangale 5Star MIDC,Dist.:Kolhapur

MPCBConsent toEstablish

14.07.2015

The investor has made an application for Consent to Establish which is still under process with yourdepartment.30.03.2016- MPCB update: Investor has submitted fresh DD in Jan 2016. Yet to be received at HO11.04.2016- RO, MPCB update: The file is forwarded along with DD at Head office.13.04.2016- IM decision: Once the file reaches HO, it will be taken up in meeting as per seniority level ofapplications. MAITRI to follow up the case after 8 days - 20.04.2016.28.06.2016- MPCB update: The issue will taken up in next cc meeting.08.07.2016- IM Decision: Sicom to produce all files & the timeline taken by each officer with regards to thiscase.

The case to be taken up in thenext CC meeting

Open

9 CumminsPhaltan,satara

MSEDCL/MIDC

Shifting of Substation

11.08.2011

A sub-station of MSEDCL is located at Plot no A-1 an A-2 of investor's land. The unit applied to MSEDCL forshifting the sub-station to MIDC layout in 2011with undertaking to bear the entire cost of shifting it.13.09.2012 - Joint meeting between MIDC, MSEDCL and unit update: MIDC and MSEDCL agreed to shift thesub-station. Joint visits held on 2.11.2013 and 12.11.2014. Further, MSEDCL accorded administrativeapproval by its letter dated 30.09.2014 for shifting of Sub-Station. The shifting cost will be borne by theinvestor.MSEDCL had requested MIDC to give land on free hold/ 999 years lease since the land of existing substationwas given on freehold. The investor has agreed to give free land (of equivalent area 10,000 Sq. mtr) to MIDCfor the said purpose vide letter dated 24.07.2015. Hence, the request to transfer cummin's land to MSEDCLand MSEDCL existing land in name of Cummins is pending. MIDC has informed MSEDCL on 9.12.2015 aboutpolicy of lease for 95 years only.11.12.2015-MIDC update: MIDC has informed MSEDCL that it will renew lease tenure for 95 years each timewithout any financial implications till 999 years. Issue pending with MSEDCL.10.03.2016- MSEDCL Update: MSEDCL has approved the proposal by MIDC for renewable 95 year lease17.03.2016- MSEDCL update: MSEDCL has issued instruction to SE Satara to carry out the shifting work, atcost of unit.01.04.2016- MSEDCL update: Cummins to give the land parcel for shifting of substation in coordination withMESDCL and MIDC.14.06.2016- MIDC update: Draft agreement with suggestions is forwarded to MSEDCL.08.07.2016- IM Decision: According to MSEDCL, the plot allotment letter is not given by MIDC.Cummins to earmark the land for substation and then MIDC can transfer the plot to MSEDCL. MAITRI toinform Cummins to finalise the land details.21.07.2016 - Department update: The draft agreement is under process with MSEDCL, Legal.(SE Civil ,baramati)

The file is under process withlegal of MSEDCL, after whichthe agreement will be signedbetween MSEDCL and MIDC.

Open

Page 3 of 35

Page 4: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

10 Digichem Industries

N-71,ANANDNAGAR,MIDC,AMBERNATH-EAST, DIST-THANE

RevenueDepartment/

MIDCRoyalty 13.01.2016

Tehsildar office has issued royalty notice to the unit. Investor replied to Tehsildar, Ambernath office on13.01.2016 that they have used soil for levelling purpose of the same plot and as per the GR no. GKN –10/0307/P. No 57/KH dated 07.01.2011, Royalty is not applicable in MIDC area if the same soil is utilized forlevelling purpose. Hence Investor has requested to cancel the said notice.09.03.2016: MIDC update: MIDC has written to Tehsildar about non applicability of royalty in this case.20.03.2016- Investor update: Investor met Tehsildar as instructed by DC sir but Tehsildar is asking toapproach HO, Ulhasnagar. Investor is requesting for resolution. DC Industry has written a letter to Collectorfor the issue02.05.2016- Investor update: Investor has appealed at SDO office.08.07.2016- IM Decision: The department to resolve the case within a month, if not the concerned officerwith whom the file is pending to attend the next investor meeting at MAITRI.

The department to resolve theissue at the earliest, if not,the concerned officer withwhom the file is pending willhave to attend the nextinvestor meeting at MAITRI.

Open

11Eco RecyclingLimited

Bhiwandi,Thane

RevenueDepartment

Infrastructure 27.11.2015

This project of e-waste recycling is financially and technologically supported by (NEDO) a department ofGovernment of Japan. The developer has left the project site without completing the basic infrastructure likeroad, electricity, water supply, drainage system at the complex undertaken by him. Hence the investor isseeking intervention from the department to complete the approach road and other basic infrastructure sothat the project can be started at the earliest.09.10.2015- Investor meeting update: MAITRI to share the DO letter in name of DC(I) along with the copy ofthe FIR to be sent to collector(Thane) and Commissioner Police Thane.07.11.2015 update from department- DC(I) has talked to collector thane about providing support.Department to look into the matter and update MAITRI on the same.20.01.2016- Investor update; Collector has written letter to Tehsildar to issue permission in favour ofinvestor to construct the internal road (by investor). Investor will make application to Tehsildar accordingly05.02.2016- Investor update: Collector has instructed office of land records on 30.11.2015 to demarcateinternal road layout as per plan approved at time of NA permission sanction and once the demarcation isdone, the land to be transferred to gram panchayat and investor to be permitted to carry out infrastructureworks / approach road development at his own cost. Once investor develops the road, it will be handed overto gram panchayat. Investor has made application for demarcation of land on 02.02.2016.07.03.2016- Investor update: The investor has obtained demand note for demarcation survey. He has madethe payment02.05.2016- Investor update: The demarcation survey is scheduled on 19.05.2016.31.05.2016- Investor update: Investor was asked to comply with building plan approval before carrying outdemarcation survey. He has submitted the same. Investor has complied with the same.13.06.2016- Department update: Collector office is asked a update on the issue by PS Revenue. Collectoroffice is awaiting report from Bhiwandi LR office.30.06.2016- SLR Update: Field visit is done. SLR has asked the investor to submit drawings showing theroad for demarcation.

MAITRI to share the issuedetails with DC (Industries)explaining the issue, afterwhich DC (Industries) to send aDO letter to Collector, Thaneto consider demarcation of theapproach road to the unit.

Open

Page 4 of 35

Page 5: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

12Fine FinishOrganics Pvt. Ltd.

E2, E3,Mahad MIDC

MIDCTransfer of

Plot11.11.2012

Investor has purchased the plot numbers bearing E2 & E3 in Mahad MIDC through auction process fromofficial liquidator, Bombay high court in February 2012.Earlier, MIDC sought pending dues of previous owner form Fine finish (INR 8 lakh), which investor has notagreed to pay. Later, MIDC received the claimed the amount from DRT and received the same. So old dueswere cleared. Till this time, the plot was not transferred in name of Fine finish.To obtain No dues certificate, investor has approached exe. Engg, MIDC. Investor is claiming that Exe. Engg isasking for service charge of INR 1.80 Lakh (for duration of 2012 till date for infrastructure service of MIDC-but in verbal). Investor is seeking interventions to resolve the case.18.05.2016- MIDC update- The file is under process with RO Panvel for his remarks20.05.2016- MIDC update: MIDC has waived off the old due amount and has resolved the actual possessionissue. With regards to service charges applicability, MIDC to look into the matter and update MAITRI.05.07.2016- MIDC update: MIDC has issued the transfer order on 10.06.2016.The investor represented that there is no clarity over service charge applicability in transfer order. Further,he has requested to waive off condition in transfer order -"to produce no dues certificate from Dy Engineer,MIDC" as the investor has a letter from EE, Mahad, MIDC that such certificate is not required.However, the issue of plot transfer is resolved and hence, MAITRI has closed the case.

The issue was closed on12.08.2016

Closed

13Finolex J PowerSystems Pvt. Ltd

Gat no 1142to 1149,Shirval, Tal.Khandala,Dist. Satara

RevenueDepartment

NOC (to storepetroleum)

27.11.2012

The investor made an application on 27th November 2012 to obtain NOC to store petroleum class B at Gat no1142 to 1149 to Hon'ble District Collector.Collector office has requested four departments namely- (1) Superintendent of Police, Satara (2) ZillaParishad, (3) District Rehabilitation officer and (4) Town Planning, Satara (5) Dy Director, DISH (6) DistrictHealth Department and (7) MSEDCL to submit a report on the same (vide DC/MAG/3/Explo/NOC/SR-16/12dated 30th November 2012.) However, no reply has been received by Collectorate from these department tilldate. NOC is yet to be received by the investor.The 3 NOC out of 7 are received - namely DISH, .District Health Department and MSEDCL.25.02.2016- Investor update: Investor has shared application written to remaining 4 departments03.03.2016- ZP update: Exe. Engg, ZP has requested for compliance from the investor. , which investor hassubmitted.23.03.2016- Investor update: Investor has received, till date, 6 NOC from above including SP NOC. Only NOCfrom ZP is pending.04.04.2016- Investor update: Investor has complied for ZP NOC. Further, Collector has requested forTehsildar, Khandala's NOC. Hence, 2 NOC are pending as on date - ZP and Tehsildar.16.05.2016- Investor update: ZP has asked the investor to submit the details of the unit in a particularformat obtained from the PWD office.30.05.2016- Investor update: Investor has received NOC from ZP; NOC from Tehsildar is pending.08.07.2016- IM Decision: The department to resolve the case within a month, if not the concerned officerwith whom the file is pending to attend the next investor meeting at MAITRI.22.07.2016 - Investor Update: Since all the NOC's are obtained by the Collector, the file is under processwith the Collector.04.08.2016- Investor update: Investor has submitted the compliance to collector office.

It has been recommended 2days back. MAITRI to confirmwith the investor after whichMAITRI to close the case.

Open

Page 5 of 35

Page 6: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

14Finolex J PowerSystems Pvt. Ltd.

Gat no 1142to 1149,Shirval, Tal.Khandala,Dist. Satara

RevenueDepartment

Royalty 01.03.2016

Investor was served a demand notice of 2.58 Crores by Tehsildar, Satara for excavating minor minerals forconstruction of boundary walls and internal roads at the factory premise. Since the minor minerals andexcavated soil was not transported out of the factory premise, investor is seeking exemption from the royaltycharges.13.04.2016- IM decision: MAITRI to share GR copy- which says no royalty required for this process- with theinvestor and Sicom to inform Tehsildar02.05.2016- Department update: The file is under process at Prant officer. MAITRI has shared the detailswith newly appointed Prant officer.19.06.2016- Department update: 2nd Hearing on this matter was given by SDO on 11.07.2016. MOMawaited08.07.2016- IM Decision: The department to resolve the case within a month, if not the concerned officerwith whom the file is pending to attend the next investor meeting at MAITRI.

The department to resolve theissue at the earliest, if not,the concerned officer withwhom the file is pending willhave to attend the nextinvestor meeting at MAITRI.

Open

15 Force Motors Ltd

Village -Nanekarwadi,adjourning toChakan MIDC

UDDBuilding plan

approval12.03.2007

11.03.2016- Investor update: The development plan by PMRDA has two roads passing through unit's plot,inside MIDC. For the said issue, Investor has requested to delete these two roads from the plan. MIDC hasprovided its comments to PMRDA that it does not have objection with deletion of the roads. PMRDA toproceed further.22.03.2016- PMRDA update: PMRDA has forwarded the proposal to UDD for next course of action anddecision.13.04.2016- IM Decision: Investor to meet Jt Secy on 13.04.2016 and PS UDD. Further, investor was askedto write a note to DC (I) and MAITRI, which is to be forwarded to PS UDD.09.05.2016- Department update: Assistant Town planner, Pune have forwarded the file with theircomments to Under secretary, UDD22.06.2016- Department update: The notification is issued to delete the said two roads from the plan - inpublic domain to invite suggestion/ opposition from public at large.08.08.2016- Department update: The file is under process at Town planning Office, Pune

MAITRI to follow up with thedepartment to expedite thecase.

Open

16Givaudan India Pvt.Ltd.

ShirpurDirectorate

Of Industries

PackageScheme ofIncentives

04.05.2015

Investor had made an application to avail state incentives under PSI (2007) for large units. But due toprolonged delay in getting land from MIDC, their investment period is almost passed. The investor hastherefore applied (on 4th May 2015) to consider incentives benefits as per PSI 2013 instead of 2007 on thebasis of merit of case.August 2015- Update from DI:The department is examining the case.27.10.2015- DI update: The said issue was discussed in the State Level Committee constituted under theChairmanship of PS(Inds) for PSI. The minutes of meeting is approved by Government. The case will bescrutinised by DI as per the reasons submitted by the unit for delay in the project and decision will be taken inthe case.19.05.2016- DI update: GR is issued. So the issue may be closed08.07.2016- IM Decision: The issue to be closed once GR is shared with MAITRI. MAITRI to close the casealong with referred GR09.08.2016- Investor update: Investor is asked by department to apply under PSI 2013. MAITRI has closedthe case

The issue was closed on12.08.2016

Closed

Page 6 of 35

Page 7: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

17Ghatge PatilIndustries Plant II

D-2 KagalHatkangaleStarInd. Area,Post Talande,Tal.Hatkangale,Dist.Kolhapur

MIDC BCC Extension 17.12.2015The issue was closed on12.08.2016

Closed

18

Godrej & BoyceMfg. Co. Ltd.(Phase I/ Southblock)

VillageVadval,Tambati, Ta.Khalapur

RevenueGovernment

Survey13.05.2015

The investor is requesting for Government Survey to be done for Survey No. 24, 28 & 39 of Village Vadval,Tal. Khalapur for the Mega Project. The fees of the government survey too was paid on 13.05.201601.07.2016- Investor update: The department has circulated another letter asking the concerned parties tobe present for government survey.25.07.2016 - Investor Update: Investor has confirmed that survey is completed and MAITRI to close the casein the next investor meeting.

The issue was closed on12.08.2016

Closed

The investor has requested MIDC for extension of time limit for BCC. The investor has made an application toMIDC for amount payable under Udhyog Sanjivani scheme. The scheme is ending on 31. 01.2016 and henceinvestor is seeking early response from MIDC.11.01.2016- MIDC update- Investor has applied for it. MIDC will check eligibility of the unit for the scheme14.01.2016- Investor meeting decision: MIDC to give an hearing to the investor and take the decision.29.01.2016- investor update: According to investor, Dy CEO MIDC has concluded to charge pre-paymentcharges from July 2013 to production date (May 2014) and will waive 50% under Udhyog Sanjivani. MIDC willinform the amount to be paid as per discussion soon. The file is under process with Jt CEO, MIDC22.02.2016- MIDC update: The file is under process with CEO, MIDC10.03.2016- MIDC update: the file is under process with RO, for issuance of demand note11.03.2016- Investor update: Demand note issued. Investor has shared the copy of the same with MAITRI.29.03.2016- Investor update: RO, MIDC is saying the amount given by MIDC is incorrect. Hence, Investor isrequesting Dy CEO to intervene.12.04.2016- MIDC update: MIDC is re-verifying the case.05.05.2016 - Investor Update: MIDC has issued a letter that Udyog Sanjivani has been expired and the lastdemand note issued stands good.12.05.2016 Investor update: Investor has made a representation on the last letter issued by MIDC and isawaiting a hearing from Jt. CEO, MIDC18.05.2016- MIDC update- MIDC has issued demand letter to investor to pay as per previous amnestyscheme.20.05.2016- IM decision: MIDC to look into the matter to resolve the case, simultaneously the case to bereferred to Addl. Director, Industries01.06.2016- Investor update: The file is under process at Dy CEO for final decision.05.07.2016- MIDC update: MIDC has decided to maintain their stand on earlier decision. MIDC to issue letterto investor in this regards, then after, MAITRI to close the case.10.08.2016- MIDC update: MIDC has issued the demand note for BCC extension, hence the issue to beclosed at the upcoming investor meeting

Page 7 of 35

Page 8: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

19

Godrej & BoyceMfg. Co. Ltd.(Phase II/ Northblock)

VillageVadval,Tambati, Ta.Khalapur

Revenuedepartment/

ForestDepartment

Tree CuttingPermission

03.09.2015

The investor has made an application on 3rd September 2015 and the investor is still awaiting the siteinspection.11.09.2015- Investor meeting update: MAITRI to share the application of the investor with forestdepartment (for scheduled trees) and with revenue department (for non-scheduled trees) and follow up toexpedite the process.09.10.2015- Update from department- The investor to comply with relevant documents.25.07.2016 - Investor Update: Investor does not want to perceive the case further, hence case to be closedin the next investor meting

The issue was closed on12.08.2016

Closed

20

Godrej & BoyceMfg. Co. Ltd.(Phase II/ Northblock)

VillageVadval,Tambati, Ta.Khalapur

UDD FSI 1.10.2015

With reference to meeting held on 06.08.2015 under chairmanship of Hon. Chief Minister the investor hasmade an application to PS(UDD) on the following points:1) Increase in FSI to 1.0 for Industrial Zone.2) No Height Restriction for industrial sheds and other buildings in industrial Zone.3) Reduce the mandatory open area to 15% in Raigad district for industrial Zones12.01.2015- Investor update- Investor has re-submitted the application copy to PS, UDD on 06.01.2016.14.01.2016- Investor meeting decision: The department to resolve the case on top priority and MAITRI tosend the report to DC(I) every week on the progress of the issue.21.01.2016- Investor update: Investor met ADTP, Pune to discuss their proposal. Pune TP office hasforwarded the letter for remarks of Alibaug and Konkan Office. Pune TP office has forwarded the letter forremarks of Alibaug and Konkan Office. The investor is meeting Jt Director, TP on 01.02.2016. UDD willshare FSI circular with the unit for further reference.01.02.2016- The investor also met Jt Director, TP. The file is under process at JT Secy, UDD. The investor tomeet him.10.03.2016- Investor update: The file is under process with PS UDD24.03.2016- Investor update: The file is under process with Hon'ble CM. (The file is sent to his desk withoutsignature of PS UDD - as updated via field visit)18.05.2016- Department update: The file is under process with Jt Secy UDD19.05.2016- Investor update: The approval is given by the department and the investor is awaiting thenotification to be issued13.06.2016- Department update: TP to go ahead with remarks given by ground level offices.25.07.2016 - Investor update: Investor has confirmed that the unit has obtained the FSI=1.0 and MAITRI toclose the case in the next investor meeting

The issue was closed on12.08.2016

Closed

Page 8 of 35

Page 9: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

21

Godrej & BoyceMfg. Co. Ltd.(Phase II/ Northblock)

VillageVadval,Tambati, Ta.Khalapur

WaterResources

Department

Water quotasanction

18.06.2015

Investor is seeking permission to take 0.4 MLD water from Patalganga River in Dhamni, Ta. Khalapur. He hassubmitted an application to Irrigation Department for grant of approval but awaiting the approval till date.The site inspection was done on 8th July 2015 and the file is under scrutiny with sub div office, Karjat.29.09.2015- Update from department: CE, Konkan region Mumbai is intimated the new proposal as per latterdated 21.9.2015.27.10.2015- WRD update: the file is under process at CE, Konkan region21.12.2015- Investor update- Investor has applied again to the department with necessary forms andaffidavit. The file is with CE, Konkan for process. The investor has revised the requirements to 0.8 MLDwater and complied accordingly12.01.2016- investor update- The investor has made compliance with the department. The Karjat Office hasrecommended the same to Kolad region office.29.02.2016- Field visit update: The file is under process with Executive Engineer, Irrigation Dept., Fort office,Mumbai11.03.2016- Department update: The case to be presented in the cabinet by the end of March 2016.07.04.2016- WRD update: The file is sent back to regional office for queries.23.05.2016- Investor update: Investor has made compliance at Karjat Office, the file is forwarded to Koladoffice on 04,06.2016. The file is under process with CE Office (WRD, Fort)06.08.2016- Department update: The file is forwarded to finance department after compliance is made by theinvestor.

The file is under process withACS for cabinet note.The case to be referred forCM's meeting highlighting theprocess of water sanction (aseach file is forwarded tocabinet individually)

Open

22Godrej & Boyce Mfg.Co Ltd (DhamniPump house)

VillageDhamni, Tal.Khalapur

RevenueDepartment /

MSRDC

NApermission;

buildingpermission

14.01.2016

The investor has submitted the proposal for NA and Building construction permission at the Collector Office ,Alibaug09.02.2016 - The file has been forwarded to Town Planning Office , PWD, Tehsildar, Zilla Parishad for theirNOC from Collector's Office .26.02.2016- Investor update: Investor has shared support documents & applications with MAITRI. DIC hasasked report/NOC from TP, PWD, Health dept. and Tehsildar. TP has asked for compliance on 04.02.2016.03.03.2016- Investor update: Collector has forwarded the file to TP, PWD, Tehsildar and ZP for their NOCMSRDC is notified as Special Planning Authority for the region and hence, this matter will lbe forwarded toMSRDC. However, in absence of ready infrastructure and policy in place for MSRDC, Investor is requesting tonominate MIDC as planning authority for industrial units. He is meeting PS industries for the issue.02.05.2016- Investor update: Investor is to submit proposal to MSRDC03.05.2016- Investor update: The investor has submitted two proposals for NA & Building ConstructionApproval on 31.03.201620.05.2016- IM Decision: The NA permission will come from the Collector; whereas, Building plan willapproved by MSRDC. As this plot is of 3 acre falling under recreational zone, MIDC to examine if they can bethe planning authority for such private land and MIDC act can be implemented on it or not. The investor toget in touch with the Special Planning Authority of MIDC.The collector has written a letter to various department - PWD, ZP, Forest department- for their NOC. Till05.07.2016, none of NOC is received by Collector.08.07.2016- IM Decision: For building plan approval, MSRDC is the only approving authority.

MAITRI to follow up with thedepartment to expedite thecase.

Open

Page 9 of 35

Page 10: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

23 Gopesh Enterprises

Vile BhagadMIDC, TalukaMangaon,DistrictRaigad

MIDCLand raterevision

17.03.2016

Investor initially applied for 1800 Sqm land in Vile Bhagad MIDC and the matter was taken up in LAC meetingheld on 26.11.2013. However, a plot of 600 Sqm was allotted to the investor. The cost of the land was INR400 / Sqm for which investor had paid money to MIDC. However, did not take possession of the plot becauseas per Development Control Rules, 600 Sqm land is not fit for Weigh bridge. Investor again requested MIDC toallot a bigger plot which will suit his needs. Accordingly the matter was discussed in LAC meeting held on15.09.2015 and a plot admeasuring 1200 Sqm was allotted to the investor. Also MIDC has priced that newlyallotted plot at INR 1050 / Sqm. But as per the MIDC circular no. A-80769, MIDC should charge the old rate asthe LAC done in the year of 2015.05.07.2016-MIDC update: Approval on the basis of old rates is sanctioned. RO, MIDC to issue letter in thisregards. MAITRI to close the case afterwards.02.08.2016- Investor update: Investor has received the said letter from RO on 22.07.2016. He hasrequested MAITRI to close the case.

The issue was closed on12.08.2016

Closed

24Goradia SpecialSteels Ltd

Village -Niphan, NearBhushanSteels,Savroli -KharpadaRoad, Khopoli410203

MSEDCL

Support forrehabilitationof sick MSMEundertaking

3.02.2014

The unit is declared sick by BIFR under SICA 1985 vide case reference number 274/1998. Also the unit hasreceived eligibility certificate from Directorate of Industries on 4 July 2008 vide reference numberDI/BIFR/VCL/516/2008/B-29198 for relief and concessions as per clause 12.2 of GOM Policy, 2006.Investor has submitted an application on 29 July 2008 to MSEDCL to seek relief and concession as per theabove mentioned policy but MSEDCL rejected to forgo any of its dues. Investor is seeking the issue to beresolved.11.09.2015- Update from department- CE(Comm) has conveyed the guideline regarding the special Amnestyscheme to Investor on 13.05.2014. The stand taken by MSEDCL for granting relief to sick industrial unitunder BIFR rehabilitation scheme is conveyed to GoM, which is as under."A) MSEDCL is unable to sacrifice any of its dues.B) GOM may grant any rehabilitation scheme already approved by it.C) The actual amount of sacrifice /subsidy worked out by MSEDCL as per scheme at (B) above in respect ofthe particular company will have to deposit by the GoM in advance with MSEDCL.D) The advance granted by GoM will be paid by the company to the MSEDCL as per the provisions of thescheme and when the company turn around the said amount will be paid to the GoM as and when recoveredfrom MSEDCL. "13.01.2016- Department update: As on today there is no change in MSEDCL Stand. The stand of MSEDCL issame and common for all BIFR cases and Any change in the stand of MSEDCL may increase financial burdenfor all such BIFR cases. The matter is under process for decision from competent authority01.04.2016- MSEDCL update: revised proposal is sent to higher authority and it is under process. Investorwill be intimated accordingly.20.05.2016- IM decision: MSEDCL to decide in the matter and inform the investor regarding their decision toclose the case.

MSEDCL stand is alreadyconveyed to the consumer andrespective GoM Dept. and theissue is resolved. MAITRI to getconfirmation from the investorand accordingly close the case.

Open

25 Haier Appliances

B-3 ,RanjangaonMIDC, Tal,Shirur, Dist.Pune,Maharashtra,412209

EnvironmentDepartment

EnvironmentClearance

18.11.2015

Investor has applied for Environment Clearance on 18.11.2015 which will be examined by MS, Env Dept. inthe SEIAA meeting. However, due to this, the construction work is stalled. Investor is requesting to issue aprovisional Environment Clearance so that they can continue the construction work.14.01.2016- Department update: The project was discussed in 117th meeting of SEAC-1 (held on30.12.2015) and ToR was issued to the project Proponent. Investor is required to submit EIA report24.02.2016- Investor update: The investor has submitted EIA report.30.04.2016- The matter was discussed in the 126th SEAC meeting held on 30.04.2016. MOM awaited.08.07.2016- IM Decision: The case to be taken up in next SEIAA meeting.

The Environment Clearance isnot applicable to the unit asper MoEF guidellines uploadedon its website. However, thedepartment is seekingclarifications from MOEF. Thecase to be taken up for the CMmeeting.

Open

Page 10 of 35

Page 11: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

26Hindustan Platinum(make in India)

Plot no. c-122, c-154,TTC IndustrialArea, MIDCPawane, NaviMumbai. Dist.Raigad

MPCBConsent toOperate-renewal

The Consent to Operate granted to the unit was expired on 30.06.2015 and the investor has already madean application for renewal 2 months back which is still pending for approval.14.01.2016- Investor meeting decision: MAITRI to follow up with the investor for the copy of the application,if applied and also follow up with the department for updates.15.01.2016- Field visit update- for the balance capacity Technical Secretary, MPCB advised investor to applyfor 2000 Tons/A respectively as it will be treated as an expansion04.04.2016- MAITRI has shared granted consent to operate renewal (amalgamated) for 2 years.But the investor want to pursue the case, since according to him, the consent in red category are to be issuedfor 5 years.13.04.2016- IM decision: The investor to represent the case with MPCB and share application copy withMAITRI for further process. meanwhile, the original issue is resolved hence MAITRI to close the case.08.07.2016- Investor update: Investor has applied for change in consent on 03.06.2016 -for a period of 5years instead of 2 years. MAITRI has shared the same with MPCB.

The case to be taken up in thenext CC meeting

Open

27Hindustan Platinum(make in India)

Plot no. c-122, c-154,TTC IndustrialArea, MIDCPawane, NaviMumbai. Dist.Raigad

MIDCamalgamationand approval

In May 2011 the investor was allotted 11 different plots for expansion, but due to ComprehensiveEnvironmental Pollution Index (CEPI) being high in Navi Mumbai, MPCB had put all expansion of newprojects on hold. After certain modifications in the current buildings the investor obtained the BCC in 2014.Since than the investor is following up with MIDC to amalgamate the remaining plots which is still pendingwith the department.12.04.2016- MIDC update: Investor to apply for BCC extension first. then MIDC will proceed further foramalgamation.17.05.2016 - MIDC update: The file is under process with Jt. CEO MIDC.14.06.2016- MIDC update- Amalgamation is approved and the time limit extension is approved for 60 days.Written communication to the investor is pending in this regards01.07.2016 - Investor Update: The investor has made the payment for time limit extension under protest.

The amalgamation and thetime limit extension isapproved by MIDC. Accordingto PS(Industries) MAITRI not topersue the case further withregards to the paymentdemanded, hence the issuewas closed in the investormeeting held on 12.08.2016

Closed

Page 11 of 35

Page 12: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

28Hindustan Platinum(make in India)

Plot no. c-122, c-154,TTC IndustrialArea, MIDCPawane, NaviMumbai. Dist.Raigad

NMMC LBT 21.05.2013

The investor is currently paying 1.5 to 2% LBT, which his competitors in other Indian states are not liable topay. The investor was already exempted from cess before LBT was introduced, hence the investor isrequesting exemption from LBT on line of cess exemption; to least at LBT @ 0.1% (as applicable to preciousmetals). The labour charges are below 2% of the value of metal and hence paying LBT on job work makesmanufacturing in Navi Mumbai a loss making proposition.14.01.2016- Investor meeting decision: MAITRI to follow up with the investor for the copy of the application,if applied and also follow up with the department for updates.11.02.2016- Field visit update: as per NMMC, the unit is liable to pay LBT being a manufacturing unit.Further, all units having exemption from CESS are also paying LBT and similar decision is application toHindustan platinum as well. However, when investor shares his documents with MAITRI, it will have adetailed discussion again.25.02.2016- Investor update: Investor has shared documents with MAITRI. Investor is awaitingCommissioner, NMMC's site visit to his unit.16.05.2016 - Department update: As the Commissioner is transferred. field visit is postponed05.07.2016- Department update: Newly appointed Commissioner is looking into matter. He may not visit thesite but will decide based on internal discussion.19.07.2016 - Field visit update: Hearing conducted by NMMC on 18.07.2016. Accordingly investor is submitthe representation & the documents to the department by 20.07.201622.07.2016- NMMC update: NMMC has issued minutes of hearing to the investor, according to which, hisrequest cannot be considered and the investor is to pay LBT as per rules. MAITRI to close the case.

The issue was closed on12.08.2016

Closed

29Hindustan Platinum(make in India)

Plot no. c-122, c-154,TTC IndustrialArea, MIDCPawane, NaviMumbai. Dist.Raigad

RevenueDepartment

stamp duty 04.10.2011

Currently on imports the investor is paying 0.1% stamp duty on assessable value plus custom dutycomponents on all imports. This 0.1% levy account for large amount of money given the value of preciousmetals and it impacts on the price competitiveness as the competitors from other Indian states are not liableto pay the same.14.01.2016- Investor meeting decision: MAITRI to follow up with the investor for the copy of the application,if applied and also follow up with the department for updates.08.07.2016- Investor has shared the applications and documents, which are forwarded to Revenuedepartment as well.

This issue was discussedduring the meeting. The issueis a policy matter and hence,out of the purview of theMAITRI. The issue was closedon 12.08.2016

Closed

Page 12 of 35

Page 13: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

30HoneywellAutomation IndiaLimited

PuneSales Tax

DepartmentVAT Refund 19.03.2014

The investor is requesting credit of Rs 2,14,94,222 taxes paid in excess of tax assessed/ determined inappeals for the Financial Year 2002-03, 2003-04 & 2004-05 either through refund or issue RefundAdjustment Orders20.05.2016- IM decision: Department to provide a list of compliance with the investor like original chalan,original RAO copies, etc. Investor to comply with the department and share a copy of the same with MAITRI.The issue to be resolved within 1 month.02.06.2016- Investor update: Investor has made compliance. however, he is again asked to make furthercompliance.27.06.2016- Investor update: He is meeting the officials at Sales tax office at Pune for compliance. He hassubmitted compliance too. However, The investor does not have acknowledgement of past submissions norOriginal RAO (refund adjustment order). Without these documents, Sales tax department cannot consider hisrequest.08.07.2016- IM Decision: Refund of 63 lakhs are pending due to want of original RAO. Rest of amount isbased on bank challans. The amount based on bank chalan can be refunded at earliest and with regards tothe remaining amount, the department has assured to check the matter and resolve the issue at theearliest.04.08.2016- Department update: The file is under process. it will take 2 months.

The file is under process withthe department, it will take 2months.The case to be reviewed inOctober 2016

On Hold

31Indus Ferro metal(ghatege patil)

Plot No D-3,D-3/1, D-3/2KagalHatkangaleFiveStar MIDC,Kolhapur.

MIDC BCC Extension 17.12.2015The issue was closed on12.08.2016

Closed

The investor has requested MIDC for extension of time limit for BCC. The investor has made an application toMIDC for amount payable under Udhyog Sanjivani scheme. The scheme is ending on 31. 01.2016 and henceinvestor is seeking early response from MIDC11.01.2016- MIDC update- Investor has applied for it. MIDC will check eligibility of the unit for the scheme14.01.2016- Investor meeting decision: MIDC to give an hearing to the investor and take the decision.29.01.2016- investor update: According to investor, Dy CEO MIDC has concluded to charge pre-paymentcharges from July 2013 to production date (May 2014) and will waive 50% under Udhyog Sanjivani. MIDC willinform the amount to be paid as per discussion soon. The file is under process with Jt CEO, MIDC22.02.2016- investor update: The file is under process with CEO, MIDC10.03.2016- MIDC update: the file is under process with RO, for issuance of demand note11.03.2016- Investor update: demand note is issued and investor shared the same with MAITRI on22.03.201629.03.2016- Investor update: RO, MIDC is saying the amount given by MIDC is incorrect. Hence, Investor isrequesting Dy CEO to intervene.12.04.2016- MIDC update: MIDC is re-verifying the case.05.05.2016 - Investor Update: MIDC has issued a letter that Udyog Sanjivani has been expired and the lastdemand note issued stands good.12.05.2016 Investor update: Investor has made a representation on the last letter issued by MIDC and isawaiting a hearing from Jt. CEO, MIDC20.05.2016- IM decision: MIDC to look into the matter to resolve the case, simultaneously the case to bereferred to Addl. Director, Industries01.06.2016- Investor update: The file is under process at Dy CEO for final decision.05.07.2016- MIDC update: MIDC has decided to maintain their stand on earlier decision. MIDC to issue letterto investor in this regards, then after, MAITRI to close the case.10.08.2016- MIDC update: MIDC has issued the demand note for BCC extension, hence the issue to beclosed at the upcoming investor meeting.

Page 13 of 35

Page 14: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

32Inventys researchPvt ltd

AdditionalMIDC,Amravati

MIDCRefund of

funds paid forland allotment

11.05.2016

For expansion purpose, the unit had applied for plot in Amravati MIDC and received an offer letter from MIDCfor allotment of land at Amravati vide letter ref- MIDC/RO(AMR)/NAM/LMS-435/4800 of 05th December2014 according to which, the investor has paid the amount in two instalments-First instalment- Rs. 1,00,00,000 to MIDC RO Amravati vide DD No 216863 drawn on SBI Amravati dated17.12.2014.Second instalment – Rs. 12,50,000 to MIDC RO Amravati vide DD No 001058 drawn on HDFC Bank dated30.03.2015.In the MAITRI meeting held on 10.07.2015, it was discussed and concluded that as the Amravati CETP is onlyfor textile units, the identified land could not be allotted to the chemical unit. Since the proposal was rejectedby MIDC, the EMD of Rs 1, 12, 50,000 should be refunded to the investor. However, it is yet to be refundedby MIDC.31.05.2016-MIDC update: The file is under process with Dy CEO 4.21.06.2016- Mids. update: The file is forwarded to Jt CEO.30.06.2016- MIDC update: The file is forwarded to CEO as the amount of refund is more than INR 1 Crore..08.07.2016- IM Decision: MIDC has assured to refund the amount within 8 working days (i.e.18th July2016)14.07.2016- Department update: The file is under process with Jt. CEO, MIDC26.07.2016- Investor Update: The file is under process with Dy. CEO, MIDC09.08.2016- Investor update: CEO MIDC has approved the file. Investor has confirmed the same andrequested MAITRI to close the case.

The issue was closed on12.08.2016

Closed

33Jyoti SteelIndustries

VillageHonad,Shilphata,Khopoli, Dist.Raigad

RevenueDepartment

Local issues 22.02.2016

Investor is facing extortion from local people for giving them contracts. Since investor is not fulfilling theirdemand, the local people are now demanding to close the unit stating the noise from unit is disturbing thenearby school.Although, the investor has supported the school by providing computer, clean drinking water and by repairingthe school building.Investor has requested Dist. Collector to resolve the issue. He has also proposed to run the unit during non-school hours as well as to install sound proof material and air conditioner in six classrooms of the school. Theinvestor has also shown willingness to find a different location and relocate the school.11.03.2016- IM decision: PS has written a letter to the collector in order to look into the matter to resolvethe case.MPCB too had visited the unit to check noise levels/pollution. The case to be presented in CM meeting. Theunit is currently working in non-school hours only. It was suggested to the unit that it may continue to workas per norms and if school is creating issues, he may approach MAITRI.

MAITRI to close the case.The case to be taken up for CMmeeting.

Open

Page 14 of 35

Page 15: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

34 KGN Pharma

F3/1 MIDCTarapur,Boisar, Dist.Palghar

MIDCBuilding Plan

Approval03.12.2015

The investor applied for building plan approval to deputy engineer, Tarapur, MIDC which is pending for grantof approval. An RTI activist has lodged a complaint against MIDC on 20.02.2012 stating the accounts are notclear between the first owner and the second owner of the said plot and Police Jurisdiction failed to intervenebeing a civil matter. The activist has now approached the Palghar court and registered a criminal case onMIDC, other government agencies, M/s Thane Esskay Rolling Mill, M/s Pharma Martis and the broker. Due tothis, investor's application for building plan (of the said plot) is pending.10.02.2016 - Department Update: The hearing of court is awaited in this case.22.02.2016- MIDC update: Legal division, MIDC has instructed Regional MIDC office, Palghar to issueBuilding plan approval.10.03.2016- Investor update: Investor has obtained conditional building plan approval that court order willbe binding to investor.11.03.2016- IM decision: MIDC to reconsider the conditional Building plan approval issued by thedepartment.29.03.2016- MIDC update: MIDC has sought opinion of GM, Legal, MIDC on decision of IM March 2016 toreconsider the conditional building plan approval.12.04.2016- MIDC update: Investor has received building layout plan approval. Legal division has forwardedthe file to Dy CEO, MIDC18.05.2016- MIDC update- Building plan is approved.MAITRI to close the case

The issue was closed on12.08.2016

Closed

35 Killick Paints

Plot no A-29/30/58/59,STICE,Musalgaon,Nashik

DirectorateOf Industries

/ WMDC

Change ofmanufacturing

activities31.10.2013

Investor has submitted an application to obtain permission for change in manufacturing activity for theirexisting four SME units. The application was submitted on 31 October 2013, which is still pending forapproval.August 2015- The unit was not operational since 2004, but the investor had still claimed the benefits fromthe department. Hence, Western Maharashtra Development Corporation (WMDC) has filed a court case on theinvestor to recover INR 1,23,18,355. WMDC has sent a letter to DI seeking their inputs in this matter. DI tolook into matter

The earlier incentives wereclaimed up to 31st March2003. Unit is now closed.According to the investor,earlier products were carbonpapers etc., which are nowobsolete due tocomputerization.Investor to meet Jt. Director(DI) on 12.08.2016 to resolvethe case.

Open

Page 15 of 35

Page 16: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

36KSPG AutomotiveIndia Pvt.Ltd

Plot A 1, SupaParnerIndustrialPark

MIDC water 19.05.2015

The investor is seeking guidance for piped water supply application to satisfy 165 CMD water demand. Asthere is no infrastructure provided in Supa Parner industrial park at present, water supply connection can notbe given to the plot holder at present.August 2015- update from MIDC: MIDC, Nashik Div has floated tenders to provide infrastructure in theindustrial park. Once the work of laying pipeline from existing Supa water supply scheme is completed, thewater connection can be given to the investor.24.08.2015- MIDC update: Tenders are floated11.12.2015- Department update- The tender works will be completed by February 2016. To be reviewed inMarch 2016 investor meeting.13.01.2016- Department update- the work is expected to be completed by first week of April 2016.12.04.2016- MIDC update: the work will be completed by end of April 2016.18.05.2016- MIDC update- MIDC has made temporary arrangement for investor. the works under tender willbe completed by end of May 201614.06.2016- MIDc update- it will be completed within a month29.07.2016- Investor update: The works are completed and the unit has received the water supply. MAITRIhas closed the case.

The issue was closed on12.08.2016

Closed

37 Laurel Wires Ltd.

D 62, MIDC,Avdhan,Dhule - 424006

MSEDCLFrequent

powerdisruption

15.07.2016Investor is facing frequent power disruption which is causing loss of production and loss of quality of product.The investor is requesting for uninterrupted power supply.

The interruptions are due toheavy rains in the said region.Department has carried themaintenance work to minimisethe interruptions. MAITRI toget confirmation from theinvestor and accordingly closethe case.

Open

38MaharashtraSeamless

Pipe Nagar,Village Sukeli,N.H. 17,B.K.G. Road,Tal. Roha,Dist. Raigad

NHAIHold on landacquisition

07.01.2016

NHAI is executing project of widening of Panvel-Indapur stretch on NH-17 as 4/6 laning (84 kms length). Forthis, NHAI is acquiring the land alongside the NH 17. The unit has received an acquisition notice for its 16000SQM land - for 4/6 laning and a truck lay bay area.The investor is requesting NHAI (1) not to demolish the structures on the said land parcel (which is notrequired for 4 laning of highway) (2) shift the location of truck lay bay to nearby land parcel. The investor hasproposed to provide an alternate land for truck lay bay.01.3.2016 - Investor Update: The investor has also approached the high court, on which the high court hasput a stay on NHAI activity till 13.04.2016 (next hearing)20.07.2016-Investor update: the issue is taken to the High court by the unit and hence, the matter is subjudice. MAITRI to close the case in the next investor meeting.

The issue was closed on12.08.2016

Closed

Page 16 of 35

Page 17: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

39Manner & SkillInternational Pvt.Ltd

Survey No.30/2, 31/3 &35-1/B,village KonasSawantwadi

UDDBuilding Plan

Approval22.07.2015

The department to look intothe matter and update MAITRIon the same.

Open

40Matsyodari Steel &Alloys Pvt Ltd.

D-32,AdditionalMIDC,IndustrialArea, Jalna

Industries &Mining

Department

InvestmentPeriod

Extension03.11.2015

Unit was issued mega offer letter dated 15th November 2011 with the condition to complete the investmentwithin 5 years. However due to delay in getting environment clearance for phase 2 (Application Date -February 2013) investor is requesting for extension of investment period by 2.5 years.09.12.2015- Department Update- the file is put up to PS Industries - to be referred to HPC afterwards22.07.2016 - Field visit report: The proposal has been accorded but awaiting for the letter issued by thedepartment13.07.2016- Department update: The extension is granted and investor has confirmed the same. MAITRI toclose the case.

The issue was closed on12.08.2016

Closed

Survey No. 30/2, 31/3 & 35-1/B at Village Konas Sawantwadi is the ancestral land of the investor, on whichhe want to set up mineral water plant. The said land is notified as other forest area by town planningdepartment without informing the investor. Forest department does not recognise this land parcel as otherforest area.The investor is facing issues in obtaining the NA permission, Building permission, etc. even with revisedlayout plans. His applications are pending at Tehsildar , Sawantwadi.02-11-2015- Department update: TP officer, Sindhudurg has submitted ground reality report to Jt. Director ,Konkan region on 01.11.2015. Issue is pending with Jt Director, Konkan region07.11.2015- investor meeting decision: As the plot is notified as "other forest zone", the investor will haveto apply for the Zone Conversion.23.11.2015- Field visit update: File is with Shri. Shende (Jt. Director Town Planning). Expected time toforward the file to Shri. Rajan Kop (Dir. Town Planning) is 1 week.10.12.2015- Investor update: They have obtained approval of CGWA with condition to invest certain amountof money within 6 months, which is ending in a month. The investor is requesting early resolution of UDDissue so that he can start his project without any problem further.The investor was asked to carry out a contour survey (30 degree) and ensure to have 12 mtr wide road nearhis plot19.01.2016- Investor update-Investor has hired architect for contour survey and applied to gram panchayatfor NOC for the road. Field visit update: UDD does not have empanelled list for carrying out the activities. thearchitect of the investor should attach his certificate with the report. Investor needs to apply for zoneconversion with Divisional commissioner, TP with reference to GR dated 6.5.2015 and 4.1.2016)01.02.2016- Department update: The proposal for conversion of said land (if slope=<30 degree) toAgriculture-no development land is forwarded to UDD Mantralaya. The report of contour survey form investorwill be referred in this. As per the department, the procedure of conversion of land and notification issuancewill take 6-8 months.18.02.2016- Meeting update: In a meeting of UDD with investor, The entire region is falling under KasturiRanjan committee. But being a green category project, he is allowed to put up the project in the region. Theground reality report is forwarded to Hon'ble Minister, UDD.28.04.2016- Field visit update: The file is moved to Hon'ble CM's desk21.07.2016- Department update: The compliance letter has been issued to the investor. The investor isawaiting notification of UDD for empanelment of survey agencies.

Page 17 of 35

Page 18: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

41Matsyodari Steel &Alloys Pvt Ltd.

D-32,AdditionalMIDC,IndustrialArea, Jalna

Industries &Mining

Department

Change inmega status

03.11.2015

Unit was issued mega offer letter dated 15th November 2011 on the basis of Investment amount 110 Croreand 550 employment generation.Now Investor requesting to change the status of Mega (Investment) to Mega (Employment)09.12.2015- Department Update- the file is put up to PS Industries - to be referred to HPC afterwards17.05.2016- department update- the proposal is to be discussed in HPC meeting of 26.05.201622.07.2016 - Field visit update: The file will be referred to the cabinet13.07.2016- Department update: DI has issued a letter recommending change in mega status andinvestment period extension by 2.5 years. The issue is closed.

The issue was closed on12.08.2016

Closed

42 Melting Centrefive starMIDC, Kagal

MIDCExtension ofInvestment

Period17.11.2015

In 2013, the unit was given mega project status on the basis of proposed employment. However, due to thedelay in obtaining land from MIDC and Name change procedure of the company by MIDC, the investor isunable to implement the project within stipulated time frame. Hence the investor is requesting for theextension in setting up the Mega Project.13.01.2016- department update- the name change process is completed by Industries dept. (for offer letter)and the case is being considered for HPC17.07.2016- Department update: The file is forwarded to MIDC for their inputs on the case due to delay inName change process.

The department to look intothe matter and update MAITRIon the same.

Open

43MITC Rolling MillsPvt. Ltd.

Plot no B1,Palkhed road,Dindori

WaterResources

Department/MIDC

Water quotasanction

17.10.2013

The investor applied for the approval of lifting of water from Palkhed Dam- to Irrigation Department. Theapproval is awaited.27.10.2015- WRD update- Investor has filled online application on 1.10.2015. It is under process3.11.2015- Investor update: after a joint meeting between MIDC, MITC, irrigation dept. on 3.11.2015,Irrigation dept. has written to investor for applying through MIDC Dindori. MIDC dindori is given reservedquota of 0.11 unit water, which is not sufficient for MITC's requirement of 0.242 units. unit is directed to usewater supply to nearby MIDC Talegaon, having reserve water quota from Palkhed dam of 2.51 unit. However,water supply will be available once MIDC Talegaon will make the payment.20.11.2015- Investor update: MIDC has written a letter to WRD mentioning that payment for MIDC Talegaonwater supply to WRD is under process and has requested WRD to grant approval to MITC to construct jackwell and structure in the dam.11.03.2016- IM decision: MIDC to make payment to Water Resources Department in order to expedite theissue.23.03.2016- MIDC update: MIDC has requested WRD to share break up of charges to be paid and to waive offthe interest charges.01.04.2016- field visit update: Exe. Engg Palkhed dam has reverted to MIDC with break up of cost and hasapproved the construction work to be done by the unit.12.04.2016- MIDC update: WRD is not sure about chargeability of "water commitment charges" to MIDC.Hence they are seeking clarity from WRD05.05.2016- Department update: The file related to commitment charges is sent to WRD, Mantralaya forclarifications and the investor has already started the Jack well construction.09.08.2016 - Field visit update: WRD Mantralaya has issued clarification on commitment charges, butMAITRI yet to receive the copy of the same.

WRD Mantralaya has issuedclarification on commitmentcharges to MIDC.The case to be referred for CMmeeting.

Open

Page 18 of 35

Page 19: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

44 Mungi engineering

Plot No:- B-12,ChakanIndustrialArea, Phase -II ,Tal-Khed,Dist.- Pune

MIDCNOC for laying

ElectricalPower cable

12.12.2011

The unit was granted conditional NOC by MIDC on 19.01.2012 to lay 22 KV HT cable from 400 KV substation(Plot No. P-10) Phase-III to "MVML supplier park" (the mail client of Mungi engineering). According to thisNOC, MIDC did not have possession of land (from point E to F) of approx. 350 mtr and thus, midcap did notgranted NOC for this stretch. All works of cable laying is done by the unit except for the said stretch. Investoris requesting for NOC of 350 mtr land now.28.03.2016- MIDC update: Dy CEO2 to be approach for resolution18.05.2016- MIDC update- DY CEO2 to make the field visit by 20.05.2016

MIDC to look into the matterand update MAITRI on thesame.

Open

45New Holland Fiat(India) Pvt. Ltd.

Chakan MIDC MIDC water 08.01.2014

The investor applied for 600KL/day water supply, which is pending with the department.August 2015- Update from the department:Infrastructure of water supply distribution is not yet provided near plot of the investor. The tenders forintermediate water supply scheme are invited. Once the work of distribution line is laid, the department willissue sanction letter.24.08.2015- update from MIDC- tenders are floated11.12.2015- MIDC update- The tender work will be completed in April 2016. hence the issue to be reviewedin May 201620.05.2016- MIDC update: The Pipeline work is completed the department to extend the connection to theunit by 05.06.2016The investor has not received the water supply as on 05.07.201605.07.2016- MIDC update: Demand notice for water connection charges has been issued dated 30.06.2016.Copy not yet shared with MAITRI. Outward number: C06384.18.07.2016- Investor update: The investor has made the payment for water connection.09.08.2016- Investor update: Investor has received the supply and requested MAITRI to close the case.

The issue was closed on12.08.2016

Closed

46Owens CorningIndia Pvt. Ltd

Survey no T-28, MIDCPhase II,Taloja, Raigad

MPCB/MIDCConsent toEstablish

17.06.2016Investor has applied for Consent to Establish at Taloja SRO. However, as per the circular no -MPCB/JD(WPC)/B-4082, no permission would be given to industrial units where CETP is not in compliance.The CETP of Taloja MIDC is non performing.

MPCB to consider the case inthe next CC meeting. If theissue is unresolvedthe investorto be called for the nextMAITRI Meeting

MIDC will confirm if CETPbypass can be arranged for theunit. MIDC also to include theCETP matter on the agenda ofnext board meeting

Open

Page 19 of 35

Page 20: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

47PDP Gas & ChemicalPvt Ltd.

LoteGhanekhunt,Tal - KhedDist.-Ratnagiri

RevenueDepartment

NOC (forstorage ofAnhydrousAmmonia)

01.03.2012

Investor had applied for NOC from District Collector office, on 1st March 2012. The investor was informed in2015 that he has to comply with NA permission for want of NOC. The NA permission is not given to theinvestor and hence, the issue is still pending.11.09.2015- Investor meeting decision: Once the issue of NA permission is resolved, revenue department tolook into the matter31.10.2015- Investor update: investor has submitted NA permission required for further process to obtainNOC15.12.2015- Department update: collector has raised some inquiries since the application is made is 2012,hence a site visit will be made from collector office. Post which, Collector will decide further to issue the NOC20.12.2015- Department update- SDO has completed the site visit and submitted the site visit report to Dy.Tehsildar.01.02.2016- Department update: Dy Tehsildar has received the report. The site visit will commence in thisweek and they will update MAITRI on the same.08.08.2016- Department update; The file is forwarded to Tehsil office for compliance.

The department to resolve theissue at the earliest, if not theconcerned officer with whomthe file is pending to attendthe next investor meeting atMAITRI.

Open

48Pearls SanaInfrastructuresDevelopers

MIDC ThaneIndustries &

MiningDepartment

IntegratedIndustrial Area

application24.01.2014

Investor applied to the CEO (MIDC) for the Integrated Industrial Area Declaration on 24th January, 2014. TheMIDC Steering committee has discuss the proposed IIA Project & have kept the application on hold untilacquisition of land by the investor.Update from the department:MIDC to take decision once the IIA is notified by Industries Department

IIA policy will be publishedshortly. In the meanwhile MIDC(IIA) committee will be visitingthe site for screening.

Open

49Penna CementIndustries Ltd

KangaonVillage,DaundTaluka, Pune

LandAcquisition

03.05.2016

Out of total 27 acres required for the proposed project investor has already acquired 22 acres. Remaining 5acres land is required for railway siding which is owned by multiple persons, after persuading with owners formore than 2 years, investor is finding it difficult to bring them to conclusion in spite of offering acompensation way above the market rate. Now, Investor claims that the owners of the above mentioned 5acres land are either ill-guided or have the fraudulent motives as their approach towards their proposal isalways inconsistent and ambiguous. Investor has already invested heavily in this project (based on thepromise given by owners), assuming complete land will become available. At this stage, it isimpossible for investor to move out from the proposed site, given that it will lead to irrevocable financial lossto the company.MAITRI has closed the case based on 20.05.2016 IM. MAITRI do not take up cases of land acquisition.

The issue was closed on12.08.2016

Closed

50PolygommaIndustries Pvt. Ltd

Plot no 59,Ajivali Khopoli-pen road,

DistrictCollector,

Raigad

BuildingcompletionCertificate

22.09.2015

Investor applied for Building completion Certificate to District Collector, Raigad. A letter was sent by thecollector to Tehsildar, Khalapur and Town planning department asking their comment on 26.10.2015.However, reply not yet received from these two departments.27.05.2016- department update: Town planning department has made field visit. the report is awaited.08.06.2016- Department update: A report from TP dept. is forwarded to Tehsildar office.21.07.2016- Department Update: The investor to comply with relevant documents02.08.2016- Investor Update: The investor has complied with relevant documents and ADTP to do a fieldvisit shortly (date yet to decide).

MAITRI to follow up with thedepartment to expedite thecase.

Open

Page 20 of 35

Page 21: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

51Posco ElectricalSteel India Pvt Ltd

Vile BhagadMIDC, TalukaMangaon,DistrictRaigad

MIDCLand

allotment03.12.2015

For the purpose of expansion, Investor has applied for 18000sqm land adjoining to their existing unit in VileBhagad MIDC on December 2015 at MIDC regional office Panvel. The application is still pending for the grantof approval.18.05.2016- MIDC update- The matter was discussed in minor modification committee. Now it will be takenup in next LACMAITRI cannot take up the cases pertaining to MIDC land allotment hence, issue was closed

The issue was closed on12.08.2016

Closed

52 Procat tech LLP

A-94, MIDCPhase 1,DombivaliEast, Thane

MPCBConsent toEstablish

16.04.2015

Application was submitted on 16.04.2015. Investor took over a part of the land and products from an existingcompany, which already had consent to operate. MPCB kept denying the CTE on various grounds even afterinvestor applied for ZLD; received legal opinion from MPCB legal cell that the party should be granted theconsent and; even after investor submitted a letter from MIDC stating that they have given permission forthe project.Investor is claiming that the process does not involve any hazardous chemicals, it only involves inorganicsalts and the effluent also contained easily separable inorganic salts of benign elements. Investor is proposingto manufacture catalysts which are very important for green processes, but not available to Indiancompanies because of its strategic importance.11.5.2016: department update: The Consent was issued under Green Category which is not serving thepurpose of the investor. MIDC has abolished the policy to issue NOC (as per TA's update).25.06.2016- MPCB update: MPCB has shared the court order to MIDC on 09.06.2016.05.07.2016- MIDC update: MIDC has written letter to Investor and MPCB that MIDC is not a competentauthority to give any such NOC nor have any authority to judge performance of treatment of effluentgenerated by units.08.07.2016- IM Decision: The supreme court has stashed high court order- Hence, MPCB's request to obtainMIDC NOC is not required anymore. NGTs decision is prevailing that unit with ZLD should be granted consentto establish. MPCB to resolve the issue at earliest. MIDC has no role to play. Investor to share all supportdocument with new nodal officer of MPCB.18.07.2016 - Department update: The issue was discussed in the CC meeting held on 18.07.2016 Minutesawaited. NGT's opinion (dated 29.07.2016) on the matter will also be considered by MPCB.

The file under process with thelegal wing, department to lookinto the matter and updateMAITRI on the same.The Case to be taken up forCM's Meeting.

Open

53Pune High Techinfra EngineeringPvt Ltd.

Industries &Mining

Department

IntegratedIndustrial Area

application17.01.2014

Investor has submitted application for developing Integrated Industrial Area (IIA) on 17 January 2014 toDirector of Town Planning Department Pune. The said application is still pending for approval.Update from the investor: Investor has made a fresh application to obtain IIA notification on 25th March2015 and have shared it with MAITRI.Update from the department:The formulation of IIA guidelines is under process.

IIA policy will be publishedshortly. In the meanwhile MIDC(IIA) committee will be visitingthe site for screening.

Open

Page 21 of 35

Page 22: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

54Ravi dyeware(Expansion)

G10, 11, 12,13/1, MIDCTaloja MIDC

EnvironmentDepartment

EnvironmentClearance

06.05.2011

The investor had made an application for Environment Clearance and received TOR on 20.01.2012 in 49thSEAC Meeting thereafter, the state committee was dissolved for some time and the issues were taken up byCentral Committee. Again the SEAC committee was formed in Maharashtra, the investor completed andsubmitted the EIA on 22.01.14.After minor clarification & compliance, the case was recommended in 105th SEAC-1 dtd 03.07.15. Theproject was considered in 89th SEIAA meeting and was deferred because of PIL filed in Mumbai High Court byNGT regarding the non performance of CETP in Taloja. Currently, the file is under process with the StateEnvironment Impact Assessment Authority.05.07.2016- Department update: Investor to write to SEIAA about CETP effluent discharge and details givenby CETP about its usage. MAITRI has communicated the same to investor. The investor will write to SEIAAaccordingly.

Its operational unit. The queryis for expansion of unit.According to unit, they aremeeting standards of effluentand also has the onlinemonitoring system. It wasadvised that since the unit isfacing the issues they shouldmake a presentation to NGT.

MIDC will confirm if CETPbypass can be arranged for theunit. MIDC also to include theCETP matter on the agenda ofnext board meeting

Open

55Ravi dyeware(Expansion)

G10, 11, 12,13/1, MIDCTaloja MIDC

MIDC BCC extension 27.03.2015

The investor is unable to complete the project in the time frame given by MIDC because of non issuance ofEnvironment clearance by Env Department (on basis of PIL filed by NGT). Hence, Investor applied to RO, MIDCfor grant of Time limit Extension for BCC which is still under consideration.05.07.2016 - MIDC update: File pending with Hon'ble Minister (Industries). The CEPT of Taloja is not workingas confirmed by MIDC, Env Dept.

MIDC will give free time limitextension as the delay is dueto environment Clearance.

MIDC to also take the case of"Free BCC extension for wantof Environment Clearance" inthe agenda of next boardmeeting.

Open

Page 22 of 35

Page 23: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

56Raymond UcoDenim Pvt. Ltd.

Plot No. C-4Lohara, MIDC,Tal. & Dist.-Yavatmal

Forest/MSETCL

power 06.04.2015

A 132 KV EHV substation has been sanctioned by the department but the implementation work forinstallation of this substation is progressing at a very slow pace13.08.2015- IM decision: A joint meeting to be organised by DI on 19th August 2015 with MSETCL andinvestor to resolve the issue. Minutes are awaited11.09.2015- Update from department: The supply line to this s/s is coming from Yavatmal s/s, whereMSETCL is facing a land ROW issue. MSETCL to resolve the matter in consultation with MIDC for survey ofthe area and unutilised power connections, which can be diverted to Raymond unit for time being.08.01.2016- Field visit update- the work is pending for two different sections - 1. some portion of land isfalling under forest land 2. some portion of land is encroached. MSETCL has written to Forest department andSDO, Revenue for action. According to Exe. Engineer, MSETCL the work will be completed by March 201605.02.2016- Department update: Forest department, Yavatmal has referred the issue to Dy PCCF Nagpur.The encroachment issue pertaining to SDO is yet to be resolved.24.02.2016- MSETCL update: a conditional NOC from SDO is received and work is under progress. The file inForest Dept. is forwarded to Jt Secy (Forest)11.03.2016- Forest Dept. update: For the NOC from Forest department the file is under process with PCCF.It would take 2-3 months to issue the NOC.08.07.2016- IM Decision: The file is under process with Additional PCCF (Central).04.08.2016- Department update: PCCF (State) to comply with relevant documents to PCCF (Central)

The department to look intothe matter and update MAITRIon the same.

Open

57Renaissance IndusInfra Ltd

MIDC ThaneIndustries &

MiningDepartment

JVDevelopmentof Industrial

park

06.01.2014

Investor submitted an application on 6 January 2014 for approval of joint venture development of IndustrialPark with MIDC under the policy for development of Integrated Industrial Areas with MIDC under the policy fordevelopment of Integrated Industrial Areas of the Maharashtra Industrial Policy 2013 and it is still pending.Update from the department:MIDC to take decision once the IIA is notified by Industries Department

IIA policy will be publishedshortly. In the meanwhile MIDC(IIA) committee will be visitingthe site for screening.

Open

Page 23 of 35

Page 24: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

58Renaissance IndusInfra Ltd

MIDC Thane UDDZone

conversion19.03.201130.07.2012

The investor applied for zone change of 258 acre land and has complied with required documents on21.04.2014. He is still awaiting the approval.14.08.2015-Update from the department: The file has recently been approved by the office of CM and thedepartment is in process of publication of notification.31.08.2015-Verbal update from department: UDD will publicise the matter within 2 days.16.08.2015- verbal update from UDD: UDD will issue letter to investor for payment of premium charges forzone conversion. upon payment, the zone conversion would take place.09.10.2015- Investor meeting update: The letter for premium payment has been issued to the investor. Theinvestor has represented to waive off the said premium charges on basis of zone conversion policy. UDD hasreferred the case for policy decision to the CM level. Investor has paid the necessary fees in January 2016.04.02.2016- Investor update: Investor have been issued the premium payment demand letter with namedM/s Renaissance Infrastructure instead of M/s Renaissance Indus Infra Ltd. Hence Investor has representedthe letter to UDD asking to rectify the same and issue a new demand letter.11.03.2016- Department update: new demand note is issued to the investor.16.05.2016 - Investor update: The file is under process with UDD, Mantralaya. Investor is yet to acquire 65acres (out of 258 acre), due to which, the department has not convert the land and raised the query toinvestor. Investor has submitted undertaking that he will purchase the balance land- 65 acre

MAITRI to follow up with thedepartment to expedite thecase.

Open

59Rex PolyextrusionPvt. Ltd.

E-12, ShiralaMIDC GrowthCentre,Sangli.

MIDCApproach

Road & BCCExtension

26.07.2012

The investor informed MIDC that his plot is not accessible without a proper approach road. Due to this, thedevelopment work is not possible. Investor has obtained conditional building plan approval on 01.10.2014that it will stand cancelled, if the construction work is not started within 12 months (i.e. 01.10.2015) fromthe date of issuance of this approval.Till date, approach road is not provided to the unit and hence, the investor could not start development work.He is requesting for an approach road and a free time limit extension for BCC.28.03.2016- MIDC update: The file is under process with CEO, MIDC12.04.2016- MIDC update: Tender work is under progress. The file for BCC extension is with Dy. CEO218.05.2016- MIDC update- The note is submitted to Jt CEO05.07.2016- MIDC update: A report is awaited from CE, Pune

MAITRI to follow up with thedepartment to expedite thecase.

Open

Page 24 of 35

Page 25: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

60Robo Silicon PrivateLimited

Khanav, Tal:Khalapur,Dist. Raigad.

Environmentdepartment

EnvironmentClearance

12.04.2013

SEAC Committee is seekingclarity from GSDA on NOC by15.08.2016 and the case to betaken up in the next SEACmeeting.

Open

61Samartha Opto-Electropolymer Pvt.Ltd.

Survey No.36/ I-B ,NearChinchotiGramPanchayat,Phansapurtarf UmateVillage,Alibaug

Grampanchayat

NOC (powerconnection &

start ofactivity)

10.04.2015

The investor has purchased the land and building through Auction process (from official liquidator High court,Alibaug) in 2012. As per investor, delayed documents from High court resulted in delayed registration - in2015.The investor has applied to Gram panchayat for its NOC to obtain power connection for the unit but till date,it has not been received by the unit. The investor has also sent reminder on 11.02.2016 to gram panchayatin this regards11.03.2016- IM decision: The case to be presented for the CM meeting. SICOM to visit the gram panchayatto expedite the issues.

MAITRI to follow up with thedepartment to expedite thecase.

Open

Investor initially submitted the application for Obtaining Environment Clearance on 12.04.2013 which wasdiscussed in 75th, 82nd, 83rd, 96th and 104th SEAC meetings. However, the EC was not accorded to theunit. Lastly proposal has been discussed in the 95th SEIAA meeting on 12.01.2016 in which committee hasrecommended for reconsideration in SEAC1 meeting10.03.2016- Environment dept. update: Will be considered in ensuing SEAC-1 meeting as directed by SEIAAin its 95th meeting.11.03.2016- IM Decision: If the case is not taken up in SEAC1 meeting, then the investor to be called for thenext Investor Meeting.29.03.2016 - Department has uploaded meeting agenda, which includes the case of this unit. Investor isinformed for the same. Minutes are awaited.10.04.2016- Department update- According to minutes, SEAC 1 committee has requested MSRDC to providethe NOC.16.05.2016- Investor update: MSRDC yet to write a letter to Bombay IIT for conducting the survey at theplant location and preparing the report.18.05.2016- Investor update: MSRDC has written letter to IIT Bombay for conducting the survey. Further,the NOC from GSDA will be issued to the investor shortly.31.05.2016- MSRDC update: MSRDC has again asked IIT Bombay to conduct another survey, IIT Bombay hasalready submitted survey report of first survey.23.06.2016- Investor update: MSRDC has given the report of IIT Bombay (first report)- and NOC to investor,for submission to SEAC meeting. Investor has submitted the same.08.07.2016- Department update: The case to be taken up in the next SEAC meeting.15.07.2016- Investor update: The case was discussed in the SEAC-I meeting and the field visit wasrecommended to the unit.22.07.2016- Investor Update: The field visit was completed on 22.07.2016. and the case has been referredto the SEAC meeting scheduled on 05.08.2016.05.08.2016- Investor update: Investor to comply with report-as discussed in SEAC meeting.

Page 25 of 35

Page 26: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

62Samsonite SouthAsia Pvt. Ltd.

IgatpuriRevenue/MSEDCL

Power 23.12.2006

The unit is connected with 33 KV line, but due to frequent power failures and fluctuations, the productivityof their existing unit is getting affected. The investor has requested to expedite the installation of analternative lines to ensure uninterrupted power supply.August 2015- Update from department:It is proposed to connect the unit on 220 KV Raymond substation through a new link line of 33 KV. To carryout this work, tender was floated on 1st June 2015 (which received no bids) and refloated on 27th June2015 (Last date for bid submission 11 July 2015).Meanwhile, a revised instruction have been received from Head Office to issue Infra - II tenders locally forNasik (R) Division which includes above work.08.10.2015- Update from department: Survey for the work has given to contractor. Tentative time - 2months. To be reviewed in January 201613.01.2016- MSEDCL update- The said work of substation is under progress. Meanwhile, the power supply isextended to Investor's premises from another feeder.13.04.2016- IM decision: the work is stuck due to right of way issue. MSEDCL to get in touch with Collectorto resolve the issue and execute the works.20.05.2016- MSEDCL update: Right of way issue has been resolved and work of erecting the poles for 33 KMHT line is completed. Work of conductor stringing and Cable laying will be completed within 10 days.24.06.2016- MSEDCL update: The issue of right of way is still hampering the work

For solving the Right of Wayissue, the route of feeder ischanged. MSEDCL is followingup with the agency for speedycompletion of workThe case to be referred forCM's meeting highlighting theRight of way issues.

Open

63Satara Mega FoodPark

1288/1,1288/2,1490/1 and1490/2Degaon, Tal.& Dist..Satara

WaterResources

Department

Water quotasanction

02.01.2015The investor is seeking permission to lift water from Urmodi river which is about 4 kms from the factory site.22.06.2016- WRD update: The file is forwarded to Chief Principal Secretary Finance08.07.2016- WRD update: It will be taken up in next cabinet

The file has been forwarded tothe cabinet on 19.07.2016The case to be referred forCM's meeting highlighting theprocess of water sanction (aseach file is forwarded tocabinet individually)

Open

64 Seehra Industries

W-100, MIDC,Anand Nagar,Addl.Ambernath, Dist.Thane

MIDC Land rates 10.03.2016

The investor had made an application for Building Plan Approval and BCC on 27th October 2015 and thedemand note was for the same was issued on 27th January 2016. Meanwhile since the MIDC land rates wererevised MIDC has demanded the charges according to the new rates.Investor had made an appeal to consider older rates which was denied by MIDC in May 2016.05.07.2016- MIDC update: Old rate will not be applied. SPA to share a letter to RO and RO will communicatethe same to the investor.03.08.2016- Investor update: Investor has received the demand note accordingly and he has made paymentunder protest.

As MIDC has taken a decisionand communicated with theinvestor, MAITRI not to pursuethe case further. The issue wasclosed on 12.08.2016

Closed

Page 26 of 35

Page 27: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

65

Shekhar Opto-Electronics &polymer Pvt. Ltd.(Old name: ShekharGlass Fiber Pvt.Ltd.)

C 35, MIDCMahad,Raigad

MSEDCL Power 19.01.2016

The investor has purchased MIDC property from Auction process (by recovery officer, DRT and Officialliquidator , Bombay High court) in January 2011. Investor has applied for power connection on 19.01.2016.MSEDCL has asked the investor to submit " no dues certificate" and " wiring completion-testing report". Theprevious unit has outstanding of INR 18 lakh with MSEDCL. The investor is seeking power connection withoutpayment of dues left by previous owner11.03.2016- IM decision: The case to be presented for the CM meeting. The department to look into thematter to expedite the case.20.05.2016- IM decision: As policy related mater, MD MSEDLC to take decision on the issue or else it will bereferred to CM. MAITRI to follow up with the department to resolve the case.24.06.2016- MSEDCL update: SE, Pen has shared a circular no 58 which states that new buyer has to paythe due amount of last 6 months. The investor is not ready to accept the same.08.07.2016- IM Decision: MSEDCL updated that the bill charged is only current bill exclusive of any arrears.It was suggested that investor should pay the 6 months bill under protest and start the production . MAITRIto pursue the case.

Investor has agreed to settlethe matter for Rs.1.33 Lakh(current bill for last 6 monthsexclusive of any arrears )without submission ofundertaking. MSEDCL to lookinto the matter and updateMAITRI on the same.

Open

66Shri Omtee SteelPvt. Ltd.

Tadali MIDC MPCBConsent toEstablish

17.03.2012

The unit had not obtained consent to establish before starting the construction work and therefore has beenissued show cause notice by MPCB seeking explanation. The unit wants to obtain Consent to Establish andOperate together and wants to know the solution to come out of this situation.Update from Regional Office, Nagpur:Till the time moratorium is not lifted, Industry cannot commence production.01.06.2016- Investor update: The moratorium is lifted and investor was asked to make fresh application.Investor has applied again.01.07.2016- Investor update: The file is submitted to Head office, MPCB after the filed visit made by MPCB.The investor has complied on 05.07.2016 as requested by MPCB08.08.2016- MPCB update: The file is under process at HO, MPCB

Consent will be issued aftersubmission of additional fees

Open

67 Sindhudurg Mining SindhudurgIndustries &

MiningDepartment

Extension ofMOU

30.07.2012

Application has been made for MOU extension for next five years in view of delay in obtaining Mining Lease.Investor has submitted application for renewal of MOU in 2012.August 2015- Update from the department:Application has been forwarded to State Government for approval.13.01.2016- Department update- the proposal will be referred to HPC17.05.2016- Department update- the proposal is being scrutinized

The department to look intothe matter and update MAITRIon the same.

Open

Page 27 of 35

Page 28: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

68Sky Enterprises PvtLtd

SURVEY NO.171(P),VILLAGEAAMGAON,MANORWADA ROAD,TALUKAWADA, DIST.PALGHAR -421303

Revenue Land dispute 23.03.2016

In 2012, investor has purchased a private land ad-measuring 0.70 Hector at Manor - Wada Road, Survey No.171 Part, Aamgaon, Palghar and got the same transferred to their company's name for carrying industrialactivity through Tehsildar office. After taking all the required approvals investor has built a factory of 24532Sq. feet carpet area with all robust infrastructure.Now, On 3rd June 2015, Tehsildar - Wada issued a notice under land restoration act (Maharashtra TribalLaw), 1974 section 35/74 and 14/75 to return the land.30.06.2016: Investor Update : - Investor has attended a hearing on 29th June 2016 at collector office andsubmitted all the required documents. Next hearing on the case to be held on 13th July 2016.08.07.2016- IM Decision: Many units in Wada district are affected due to this law. This unit has purchasedthe land from non tribal owner- a freehold land. However, being a policy matter, MAITRI cannot do much inthe case. To assist the investor, MAITRI to write a letter addressed to Collector Palghar requesting dueconsideration-and share the draft letter with PS (Industries). MAITRI to close the case.

The issue was closed on12.08.2016

Closed

69Solar IndustriesIndia Ltd.

Chakdoh,Katol

ForestDepartment

Diversion ofForest land

13.04.2013

File is submitted to HonourableMinister of Forest.Forest Dept. to also call PS(Industries) in the nextmeeting with HonourableMinister of Forest with regardsto this case.

Open

The investor submitted application for diversion of 87.97 Ha of forest land to comply with the safety zonerequirement to manufacture defence explosives. The proposed forest land is not a part of the wildlifesanctuary nor a wildlife corridor. Some NGO and Wildlife Warden has raised objections. Their file is pendingfor approval with PCCF Nagpur since 20 January 2015.August 2015- Update from the department: Proposal under Forest (Conservation) Act for diversion of forestland has been processed for approval of Govt of Maharashtra. After approval of Govt of Maharashtra, thesame will be forwarded to MoEF & CC.23.09.2015- Investor update: File is with Minister (Forest), who will take views of the Mr. Bagrodia, MLC (theopponent) in some time01.10.2015- Update from Department: Proposal under Forest (Conservation) Act for diversion of forest landhas been processed for approval of Govt of Maharashtra. After approval of Govt of Maharashtra, the same willbe forwarded to MoEF & CC.07.11.2015- department update: Minister had a meeting with opponent who has raised concerns aboutwildlife activities in 84 hectare area. A study of tiger activities in the said area is carried out with help ofcameras by DCF. The report from PCCF will be completed in next 15-20 days.16.12.2015- Department update- PCCF report is received however the local MLA (Mr Sunil Kedar) has raisedconcerns about tiger habitat with MoEF.14.01.2016- Department update-A meeting was held by Forest Minister on 16.12.2015 at Nagpur with Mr.Kedar, MLA. It was agreed that restudy (of 7 days) will be done by involving Mr. Kedar in the proposed areaby camera trap. Mr. Kedar wanted department to ascertain if company has done any encroachment on forestland and provide information about cattle kill in said area. All information’s have been provided on 5/1/2016.However, restudy is yet to be started.29.06.2016- Department update: The re-study is done. the file is submitted to chief secy. The file is sentback to Forest department for queries.08.07.2016- IM Decision: The file is re-submitted to Chief Secretary for further action.

Page 28 of 35

Page 29: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

70 Sudarshan Jeans

Loni DevkarMIDC, Tal.Indapur, Dist.-Pune

MSEDCL/MSETCL

PowerConnection

01.09.2015

The investor had made an application for HT connection with the total power requirement of 7MW againstwhich the department has sanctioned 3.5MW and the remaining supply can be released to the unit only aftercommissioning of the 220KV EHV substation at Loni which is under progress. Currently, since MSEDCL hasno additional capacity for this unit and the quality of power supplied from the current feeder is poor theinvestor is facing a major concern in production.08.07.2016- IM Decision: PS (Industries) is having a meeting with energy department on 12.07.2016.Investor to attend the same. MAITRI to coordinate for meeting and inform the investor.

Sub station is ready but Poleerection is stuck due to right ofway (37 kms line). Thedepartment to look into thematter and update MAITRI onthe same.The case to be referred forCM's meeting highlighting theRight of way issues.

Open

71Supreme IndustriesLtd.

Gadegaon,Tal. Jamner,Dist.. Jalgaon

RevenueDepartment /

DINA permission 20.04.2016

Investor is planning for an expansion of his existing project but no land is available in MIDC. The directors ofthe company own two plots adjoining to the existing unit and these plots require Industrial NA permission tostart the work for expansion. The plots are 242/1, 242/2, 244/2+3, 4, 5.Plot 242/1 and 242/2 already has commercial NA permission and needs to be changed to industrial. (Pendingwith Commissioner)Plot 244/2+3, 4, 5 is agricultural plot and investor already applied to Dist. Collector Jalgaon to change it toCommercial NA which is expected to be received within this week. Once the commercial NA is received fromCollector's office, the Municipal Commissioner, Jalgaon will have to authorise the transfer from CommercialNA to Industrial NA. (Pending with collector).

20.05.2016: Investor update: Investor met with Jalgaon Municipal commissioner and it has been informed tohim that since the said plot is marked as residential zone as per the proposed development plan released byUDD. So as per section 37, Maharashtra Regional & Town Planning Act 1966 - the permission from GOM isrequired. So investor has submitted an application to Development Commissioner on 20.05.2016.

Since BTAL is withdrawn,permission of DI /DC is notrequired and accordingly DI toreply to the application madeby the investor.

Open

72SupremePetrochem Ltd.

VillageAmdoshi,WagnaniWakan - RohaRoad, Taluka -Roha, Raigad,Maharashtra -402106

Industries &Mining

Department

Revision inscope of Mega

Projectinvestment

20.05.2012

The unit was accorded Mega Project status for its proposed investment of 1115 Croce on 9.08.2006.However, due to the unforeseen delay in acquiring land for a minor port to import hazardous raw material,the unit is unable to commit the full resources and requesting to change the Mega Project investmentamount to 520 Crore and a time extension up to December 2017.17.05.2016- Department update- The unit is asked for submission of compliance22.06.2016- Investor update: Unit has complied for the same

MAITRI to follow up with thedepartment to expedite thecase.

Open

73Sustainabletechnologies Pvt.Ltd.

Kh no 146,PH no 7,Mouja -pilkapaar,Tehsil -kalmeshwar

Revenuedepartment

Building planApproval

10.03.2016Investor applied to Tehsil office to get the factory construction plan approval for his proposed biomassbriquetting unit. However, no reply received from tehsil office till date.

The department to resolve theissue at the earliest, if not theconcerned officer with whomthe file is pending to attendthe next investor meeting atMAITRI.

Open

Page 29 of 35

Page 30: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

74 Swarovski Pvt. Ltd.

D-108,M I D CRanjangaonVillage,Koregaon,Shirur,Ranjangaon-412220

Grampanchayat

Tax 21.10.2015

The investor is requesting Gram panchayat Karegaon to issue revised bill for gram panchayat tax based onG.N. of Bombay High court dated 3.12.1999.07.11.2015- Investor meeting decision: SICOM to coordinate with RDD regarding same.December 2015- Investor update: the file is pending with CEO, ZP09.12.2015- ZP update- ZP, CEO has instructed Gram panchayat to hold the matters of gram panchayatlevied tax quoting a GR issued by the Principal Secretary.10.12.2015- Investor update-Investor is requesting MAITRI to approach RDD to direct CEO, ZP. Investor hasrequested MAITRI to take up his suggestion on draft MH panchayat taxes and fees (amendment) of7.11.2015.1.1.2016- MAITRI has forwarded unit's suggestions received on 28.12.2015 to the PS Industries , DC (I) andPSI for further process. and informed the investor that MAITRI cannot assist in this issue.07.04.2016- Field visit update: The issue was to be taken up in the ZP board meeting on 11.04.2016. Theyare awaiting another notification from Government.06.05.2016- Field visit update: The investor is citing rule-9 of payment and lump sum contribution byfactories lieu of taxes, Rules 1961- according to which- In the event of failure on the part of a Panchayat &the occupier to arrive at an agreement, the matter shall be referred either by the panchayat or the occupierto arrive at an agreement, to the State Government through Chief Executive Officer concerned, who shallsubmit the same after obtaining the views of the standing committee of the Zilla Parishad to the StateGovernment for decision through the Commissioner with all the necessary documents." However, the ZP isnot referring the case to RDD and keeping the file on hold20.05.2016- IM decision: The case is referred to RDD on 18.05.2016. Investor to be called for the nextMAITRI Meeting.01.08.2016- Investor update: Investor to comply with appeal of entire Ranjangaon units facing similar issue -to Divisional Commissioner, RDD.

The case to be referred for CMmeeting highlighting the Govt.resolution of gram panchayattaxes issued in 2015.

Open

75 Swarovski Pvt. Ltd.

D-85 and108,M I D CRanjangaonVillage,Koregaon,Shirur,Ranjangaon-412220

MIDC/ DI BCC Extension 18.11.2015

The investor applied BCC time limit extension for plot no. D-85 which is in production since 2004. He hasproduced all relevant documents to prove the production date, yet the RO MIDC is asking for additionaldocuments. According to the investor, if the penalty is levied for time limit extension than the project will notbe viable.07.11.2015- Investor meeting decision: Dy. CEO MIDC to give a hearing to the investor on Monday09.11.2015 at MIDC HO and take a decision on the same.17.11.2015- Investor update: Investor was asked to apply again at RO office, Pune. Investor has applied tothe same24.12.2015- Investor update- the investor has applied for BCC on 15.12.2015 and has shared the copy toMAITRI04.01.2016 - MIDC update- Investor is asked to comply with certain document02.05.2016 Investor update - The investor has already complied with the relevant documents18.05.2016- MIDC update- The file is with Dy CEO230.05.2016- Investor update: Investor has received demand note for BCC extension.08.07.2016- IM Decision: DI to certify the date of production on this plot and communicate the same toMIDC. Investor to provide necessary documentation.

MAITRI to follow up with thedepartment to expedite thecase.

Open

Page 30 of 35

Page 31: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

76 Swarovski Pvt. Ltd.

D-108,M I D CRanjangaonVillage,Koregaon,Shirur,Ranjangaon-412220

MIDC Infrastructure 17.11.2015

The Investor is constructing a storage Hall at Plot No. D-108 with necessary permission of MIDC. There is nodischarge from the Storage Hall, and want connection to Strom Water line of MIDC to discharge pure rainwater. But the permission was denied. Investor is requesting for Storm Water connection for his storage Hall.07.11.2015 - Investor Meeting Decision: Dy. CEO MIDC to give a hearing to the investor on Monday09.11.2015 at MIDC HO and take a decision on the same.09.11.2015 - Investor Update - Investor to make a fresh application to Dy. Engineer MIDC and then MIDC tolook into the matter.22.12.2015 - Update from the investor: The investor has made an application on 17.11.2015 to Dy. EngineerMIDC. MIDC to look into the matter and update MAITRI.20.01.2016- Investor update: MIDC rejected the application by saying that storm water can be directedthrough exclusive rainwater harvest pits and there is no need to give connection to rainwater drainage line ofMIDC. Investor to apply now at HO, Mids. to pursue the matter. Investor will apply for the same in sometime11.03.2016- IM decision: The investor to resubmit the application copy to MIDC, HO Mumbai25.03.2016- Investor update: Investor has resubmitted the application18.05.2016- MIDC update- Investor needs to comply08.07.2016- IM Decision: This issue is resolved on 4th July meeting between MIDC and Swarovski. Swarovskihas agreed to do rain water harvesting on adjoining D 85 plot.Investor to come back if issue still persists. MAITRI has closed the case after the investor confirmed that theissue is resolved.

The issue was closed on12.08.2016

Closed

77Tata FicosaAutomotiveSystems Pvt. Ltd.

Plot No. D236/4 ChakanIndustrialArea Phase II,MIDC Chakan,Pune.

MPCBConsent toEstablish

30.06.2016The investor has made an online application for consent to Establish under Green Category and the referencenumber for the same is 0000009375.08.08.2016- MPCB update: The consent is granted on 28.07.2016. The issue to be closed.

The issue was closed on12.08.2016

Closed

78Tata Toyo RadiatorLtd.

D 236/7ChakanIndustrialArea Phase II,MIDC Chakan,Pune.

MPCBConsent toEstablish

02.07.2016The investor has made an online application for consent to Establish and the reference number for the sameis 0000009514.08.08.2016- MPCB update: The consent is granted on 28.07.2016. The issue to be closed.

The issue was closed on12.08.2016

Closed

79Trinity AutoComponents Ltd

Gat no1419/2,Shikrapur,TalukaShirur, NagarRoad, Pune -412208

MSEDCLFrequent

powerdisruption

2.06.2014The unit is facing power disruption for 5-6 times daily. Since it is a forging unit, the heating machine takes upto 30 minutes to heat up after each power cut. It is causing heavy losses to the investor. The investor isrequesting uninterrupted power supply

The power failure is becausethe unit is obtaining powerfrom the rural feeder. MAITRIto inform the investor to applypower from express feeder.

Open

Page 31 of 35

Page 32: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

80True Pack ThermoProduct

Plot No. 297,KondhleVillage,KudusKondhleRoad, Tal.Wada, Dist. -Palghar

ForestDepartment

NA Permission 05.02.2014

Since it is a policy related issuethe department needs 3months to resolve the case.To be reviewed after 3 months(November 2016).

On Hold

The Investor has made an application for NA permission under section 44 A for land no. 295 & 507 which isstill pending for approval. The investor has also paid the penalty for starting production without NAPermission.11.12.2015- Investor meeting decision: The action taken by UDD to be reviewed within 15 days. All NApermission issue units to be called in next Investor meeting. All units facing issue of NA permission to becalled in January 2016 Investor meeting14.12.2015- Investor update- Investor has replied to the query raised by Collector office and requested toissue NA permission for said land at 295 and 507 (regularise)08.01.2016- Investor update- Investor has shared compliance - MSME registration. However he does nothave Forest NOC and Town planning NOC. As per DCF, the land is private forest since 1956 and as perinvestor, the same land is under jurisdiction of Dist. Collector.11.01.2016- Investor update: Investor has applied for Forest NOC based on this.28.01.2015- Forest Update: DCF jawhar has decline forest NOC on basis of Forest act 1956, which states theland in question as private forest.29.01.2016- Investor update: Investor attended Industries NA committee meeting at RDC office on27.01.2016 but according to him, due to no clarification received from Forest dept. in it, the matter is stillpending to be resolved. Forest dept. will revert after looking in to all facts and figures04.02.2016- Investor update: Investor was asked by forest dept. to apply for regularise his land. No NOC canbe granted on basis of court order from the case of Godrej & Boyce Ltd.10.02.2016- Investor update: Investor has received building plan approval and has submitted it to revenuedepartment (collector).22.02.2016- Investor update: The investor has written to Hon'ble Minister (Revenue & Forest) to look intohis matter for Forest NOC. The collector has referred the issue to PS (Forest)11.03.2016- IM Decision: The department to look into the matter to expedite the process. The forestdepartment is seeking opinion of Advocate General for implication of Godrej & Boyce case on this case.(1956-section 35(3)notification - it was unsurvey land earlier. Later given survey no. certain activities werebanned.) But since it is a policy related issue the case to be reviewed after 4 months (July 2016).

Page 32 of 35

Page 33: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

81 Uttam Galva Sawantwadi UDDZone

Conversion29.08.2013

Enhancement of Industrial area admeasuring 745 Hectares at villages Satarda & Satose Taluka - Sawantwadiin the Regional plan of Sindhudurg District. The investor was informed that 40 hectares of land was havingremarks from forest department hence, investor requested to delete 40 hectares and to issue remaining areaas industrial zone -to UDD.13.08.2015- Update from forest department: Forest has sent remarks to UDD on 18th June 2015. File isunder process with UDD.07.11.2015- Forest department update: Forest department do not have any objection for other area.23.11.2015 - UDD update: The file is forwarded to Forest Department for remarks.14.01.2016- Forest department has sent remarks to UDD on 13.01.201618.02.2016- Meeting update: In the meeting with UDD, Forest officials, Investor explained that although hisland is falling in region under Kasturi Ranjan committee area, he is starting the project based on approvalform MoEF as the unit has applied for it before Kasturi Ranjan committee report/ 2013. The investor wasasked to submit the said approval of MoEF, contour survey, Slope analysis of +/-1.5 Mtr.22.02.2016- Investor update- Investor has shared MoEF approval for 1.5 T plant (Env Clr), expansion projectapproval (Env Clr), MoEF EAC Committee approval.30.03.2016- The file is with UDD. it is yet to be forwarded to Forest dept.05.07.2016- Field visit report- The file is yet to be forwarded to Forest Department20.07.2016 - Field visit report: Forest Department has forwarded the file to UDD with their remarks.

MAITRI to follow up with thedepartment to expedite thecase.

Open

82Vaishvik Foods PvtLtd

Gat No 340/1& 308/A, A/PWing, Taluka -Khandala

RevenueDepartment

Amendment inNA Permission

& BuildingCompletionCertificate

03.01.2015

The department to resolve theissue at the earliest, if not theconcerned officer with whomthe file is pending to attendthe next investor meeting atMAITRI.

Open

Investor has submitted application for amendment in NA permission and Building Completion Certificate for(change of warehouse to industrial purpose) at SDO office, Wai. The same is pending.Although Investor made an application in January 2015, the issue was taken up by SDO, Wai (nowtransferred) in August 2015 for unknown reasons, wherein, his letter mentions date of application as August2015.The SDO had asked opinions from various departments like MPCB, Fire department, DISH and Dy Collector inAugust 2015, which, till date, are not received by the SDO office.27.11.2015- SDO update- SDO has written to all concerned department about status of the same. Thedepartment's comments are yet to respond on the same11.12.2015- Department update- Revenue has shared replies received in response to the written lettersfrom Dy Collector office. Reply of MPCB, Fire and DISH are still awaited14.01.2016- Investor meeting decision: MAITRI to follow up with the department to expedite the case.MAITRI to share the history of the issue with DC(I).21.01.2016- SDO update- the replies have been received from concerned department and now file is pendingwith SDO.27.01.2016- Department update: SDO has asked for Provisional Fire NOC from the investor. Investor haspaid the fees for Provisional fire NOC on 7th January 2016 and NOC is awaited from the fire dept. (30 daystime line-standard)30.01.2016- Investor update: Investor has received provisional fire NOC and has shared the same with SDO.the file is under process with SDO03.03.2016- Investor update: Investor has received demand note to pay differential amount. Upon payment,the issue is expected to be resolved. Investor has paid it too. (15.03.2016)13.05.2016-Department update: The file is under process with SDO, Wai for the signature.23.06.2016- Department update: The investor needs to collect the amended copy of NA permission.The investor is awaiting both BCC and NA permission amendments. The amendments in BCC- File issubmitted to SDO (Wai) for signature.

Page 33 of 35

Page 34: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

83VHM IndustriesLimited

plot no T 2,AdditionalMIDC,NandgaonPeth

DISHFactoryLicence

04.04.2015

The investor has made an application for factory license, which is still pending.July 2015- Update from the department:The factory license will be issued once the machinery is installed in the plant.Update from the investor:Installation of machinery will take another 6-8 months time.October update from the investor:Until the power issue is not resolved, Installation of machinery will not be possible. (active issue in MAITRI)17.07.2016 Investor update: The unit has obtained the factory licence and the investor has confirmedMAITRI to close the case in the next investor meeting

The issue was closed on12.08.2016

Closed

84VHM IndustriesLimited

plot no T 2,AdditionalMIDC,NandgaonPeth

MPCBConsent to

operate30.03.2015

Investor's unit has been given conditional Consent to Establish permission stating that the Consent toOperate approval will be granted only after CETP of MIDC will be commissioned. Investor is ready to installtheir own ETP and is expecting completion of over all construction work by year end. Investor is worried ifMIDC CETP is not commissioned by that time then they will have to face huge loss.October 2015 update from investor: Investor has requested to relax the limits of LSI and MSI units for CETPbeing built by MIDC in Amravati Ind area, since the effluent from his unit is having higher BOD and CODcontent then the standards allowed for CETP. In this way, he has to incur double cost of effluent treatment,which is economically not feasible. MIDC has expressed its agreement to relax the standard of MSI-LSI in theletter to MPCB written on 29.07.201527.10.2015- MPCB update- A joint meeting between MPCB, MIDC and end users of CETP will be held to takedecision.As per the letter issued by MIDC, construction work of CETP Amravati, 1 MLD capacity & HRTS was to becompleted by December 2015. But the contractor has not yet applied for Consent to Operate.08.02.2016- MIDC update- CETP has applied for Consent to operate on 29.01.2016.13.04.2016- MPCB update: as discussed in joint meeting with industry representatives, NEERI is hired toprepare verification report regarding HRTS developed by MIDC. Accordingly, a site visit is planned on12.04.201617.05.2016- MPCB update: The consent to operate is accorded to the investor with a condition -Industryshall start the manufacturing activity only after commissioning of proposed CETP. The investor wants tostart production. But due to this condition, he is not able to start27.06.2016- MPCB MOM update: The consent was denied on basis that CETP is not completed. MIDC to re-submit application after completing the works.29.07.2016- MIDC update: MIDC has complied and submitted the application again to MPCB. The issue will betaken up in next CC meeting

MAITRI to follow up with thedepartment to expedite thecase.

Open

85Vinati Organics Pvt.Ltd.

Plot A-20,MIDC LoteParshuram,415 722,TalukaKhed, dist.Ratnagiri,

EnvironmentDepartment

EnvironmentClearance

29.09.2015

Investor's application for Environment Clearance was taken up in 95th SEIAA meeting held on 11.01.2016and the case was approved by the committee. However, investor has not yet received a formal copy of theenvironment clearance due to which Factory license and Consent to Establish are pending.19.07.2016 - Investor Update: The investor has obtained the copy of Environment clearance on 13.07.2016,the issue to be closed in the next investor meeting.

The issue was closed on12.08.2016

Closed

Page 34 of 35

Page 35: Maharashtra Industry Trade Investment Facilitation Cell · PDF fileMaharashtra Industry Trade Investment Facilitation Cell S.N o ... Maharashtra Industry Trade Investment Facilitation

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of the

ServiceApplication

dateIssue description and chronology

Decision taken in the investormeeting on 12.08.2016

IssueStatus

Minutes of MAITRI Investor meeting dated 12th August 2016

86 Wonder Cement Ltd Dhule MahagencoApproval for

lifting Fly Ashfor 25 Years

17.05.2016The Investor has made an application for to lifting Fly Ash from Bhusawal Thermal Power Plant. The investorwants this arrangement for 25 years starting from March 2018.

The tender will be soon floatedfor lifting Fly Ash from ThermalPower plant and MAITRI not topersue this case further, hencethe issue was closed on12.08.2016

Closed

87New Holland Fiat(India) Pvt. Ltd.

Chakan MIDC MIDC Infrastructure 19.07.2016

The unit is currently in the construction stage and due to unavailability of basic infrastructure, theconstruction is getting hampered-1) Absence of approach road between GE and the unit- due to lack of approach road, the constructionmaterial cannot be delivered at the project site. The investor was asked to use alternate road passingthrough Shinde village. However, Shinde village Gram Panchayat has issued a letter to investor asking not touse the village road as it is hampering the local villagers.2) MSEDL has also sanctioned the power of 4000KVA on 03.08.2015 but MIDC is yet to provideinfrastructure for power supply to the unit.3) Storm water drainage

MIDC is negotiating withfarmers to acquire the land (forapproach road). The work is inprogress. Dy. CEO, MIDC tovisit the plant in next 8 daysand MIDC to provide stormwater drainage to the unit innext 15 days .

Open

88Saj Food ProductsLtd. (Brisk Farm)

Butibori MIDC EPF/ESICApplication

Process05.06.2016

The investor wants to apply for online registration for EPF and ESIC, But trade license is the mandatorydocument for the same and which State Maharashtra does not issue so the investor needs to know theapplication process.

MAITRI to follow up with thedepartment to expedite thecase.

Open

89Saj Food ProductsLtd. (Brisk Farm)

Butibori MIDC DI PSI 24.06.2016

The investor has been informed by the JDI, that the investor needs to have the maximumamount of expenses included in our Project Report approved by the Banker in all heads of the "EligibleInvestments" and the Bank Approval Amount will get credence over the actual amount spent during grant ofsubsidies. In this connection, the investor would like to submit that, investor being new in the State ofMaharashtra coming in far from West Bengal, may need to revise certain aspects of our Project Report in viewof present expenses incurred and projected to be incurred.14.07.2016: Since the matter of incentives, eligible investment for the upcoming project and subsidies arepolicy related matters, MAITRI to close the case in the upcoming meeting

The issue was closed on12.08.2016

Closed

90Supremepetrochem Ltd.

Amodeshi,Raigad

Waterresources

department

Wateragreement

4.11.2015

The company is granted water quota (5 MLD) for 6 years from Chief Engineer, WRD on 03.11. 2015 and islifting water from Amba river. Investor has executed an agreement with WRD, Kolad for the same. A clause inthe agreement says that "if the customer desires to reduce/increase the quota, then he has to execute asupplementary agreement with the same authority for 1 year period against the sanctioned quota". The unitnow requires only 2 MLD and hence, they have submitted a supplementary agreement for signature, which ispending for execution. The draft agreement/proposal is forwarded to the EE,Kolad.

The department to look intothe matter and update MAITRIon the same.

Open

Page 35 of 35