magus rigid pavement
TRANSCRIPT
-
8/20/2019 Magus Rigid Pavement
1/13
© 2003-10 NeilsoftLimited
Renaissance Industrial Park, Bhiwandi
RIGID PAVEMENT DESIGN
Issue Description DetailsPrepared
ByChecked
ByApproved
ByClient
Approval
R0 Issued for ApprovalName SAM, AAB MRC MRC/DP
Date ! De"#$0 %& De"#$0 %' De"#$0
Neilsoft
1
-
8/20/2019 Magus Rigid Pavement
2/13
© 2003-10 NeilsoftLimited
Renaissance Industrial Park, Bhiwandi
Table of Contents
10 !"ecuti#e $ummar%
03
20 &esi'n (s)ects 0*
30 (ssum)tion
0+
*0 echnical om)arison 0.
+0 ommercial om)arison
0/
.0 onclusion
0
(nne"ure ( Road (rea alculations
0
(nne"ure B ostin' of Ri'id Pa#ement for arious 4rades of concrete
10
(nne"ure Roadwa% ross $ections
12
he roadwa% )a#ement re)ort is aimed at techno commercial com)arison
5etween #arious 'rades of concrete 6 thickness o)tions and the rates
considered are as )er 7I& for 7um5ai re'ion as a relati#e factor
2
-
8/20/2019 Magus Rigid Pavement
3/13
© 2003-10 NeilsoftLimited
Renaissance Industrial Park, Bhiwandi
1. Executive Summary
onsiderin' the hea#% truck tra8c comin' into the )remises, Renaissance
Industrial Park, Bhiwandi, it was alread% decided that Ri'id Pa#ement %)e to
5e )ro#ided for the entire roadwa% network inside the industrial )ark (
com)arison re)ort 9Ri'id Pa#ement om)arison, su5mitted to the client on
13th &ecem5er 2010: e#aluatin' #arious t%)es of ri'id )a#ements and a
decision was 'i#en that Ri'id Pa#ement with &owel Bars to 5e used for this
)ro;ect o
-
8/20/2019 Magus Rigid Pavement
4/13
© 2003-10 NeilsoftLimited
Renaissance Industrial Park, Bhiwandi
(lso heat of the h%dration will 5e less for 73+ as com)ared to other hi'her
'rades of concrete hat would reduce the surface cracks and would )ro#ide a
sustaina5le solution in lon' run
rans#erse cross slo)es are )ro#ided at 2 to take care of roadwa% water
draina'e It is )ro#ided on the hi'her side as there are no lon'itudinal slo)es
in certain )ortions of the roadwa% network and remainin' lon'itudinal slo)es
are also relati#el% 'entle, in addition to hea#% rainfall conditions
2. Design Aspects
Collowin' desi'n as)ects are considered while selectin' and
-
8/20/2019 Magus Rigid Pavement
5/13
© 2003-10 NeilsoftLimited
Renaissance Industrial Park, Bhiwandi
In ri'id )a#ements, structure deFects #er%little under loadin' due to the hi'h
modulus of elasticity of their surface
course Because of its relati#e ri'idit%, the)a#ement structure distri5utes loads o#era wide area with onl% one, or at most two,structural la%ers his also demands for a'ood com)action of su5 'rade for there>uired BR #aluePerformance of the ri'id )a#ement would5e 'o#erned 5% material )ro)erties,thickness of )a#ement and im)ortantl% construction )ractices and >ualit%control throu'hout the )rocess
3. Assumptions
&esi'n as )er IR +G2002, IR 1+G 2002 6 I$ *+.
$ite Location 7um5ai, 7aharashtra
&esi'n Life 20 Hears
4rade of concrete 73+
("le Load /0 R ra8c Intensit% .0 P&
(nnual Rate of ra8c 4rowth 00/+
&esi'n Dheel Load 20 k'
&esi'n ire )ressure +2/3 k'Ecm2
BR #alue 20
7in su5'rade modulus J'Ecm2Ecm
!lastic 7odulus of concrete 9!: 3 " 10+ k'Ecm2
hermal oe8cient of concrete - 10 " 10-. )er de'ree
PoissonKs Ratio 01+
$u5-'rade t%)e - DB7
Load safet% factor 12
ontraction ;oints are )ro#ided 5oth in trans#erse and lon'itudinal direction
rans#erse ;oint s)acin' is selected such that tem)erature and moisture
stresses do not )roduce intermediate crackin' 5etween ;oints
Contraction oint Direction Spacing !m"
5
http://training.ce.washington.edu/wsdot/Modules/04_design_parameters/04-2_body.htm#elastic_modulushttp://training.ce.washington.edu/wsdot/Modules/04_design_parameters/04-2_body.htm#elastic_modulus
-
8/20/2019 Magus Rigid Pavement
6/13
© 2003-10 NeilsoftLimited
Renaissance Industrial Park, Bhiwandi
Transverse Direction 3+
#ongitu$inal Direction 3/+
&owel 5ars are t%)icall% used at trans#erse ;oints to assist in load transfer ie
5ars are t%)icall% used at lon'itudinal ;oints to tie ad;acent sla5s
%ar
Type
%ar Diameter
!mm"
%ar Spacing
!mm"&emar's
Do(el
%ar32 2+0
Pro#ided in lon'itudinal
directionTie %ar 1. 33 Pro#ided in trans#erse direction
). Tec*nical Comparison
Concrete +ra$e
ConcreteSlab
T*ic'ness!mm"
Do(el %ar Tie %ar
Dia.!mm"
Spacing!mm"
#engt*!mm"
Dia.!mm"
Spacing!mm"
#engt*!mm"
,3- 20 32 200 .00 1. 1000 +0
M35 250 32 250 600 16 1000 850
,)- 2*0 32 300 .00 1. 1000 +0
,) 230 32 300 .00 1. 1000 +0
6
-
8/20/2019 Magus Rigid Pavement
7/13
© 2003-10 NeilsoftLimited
Renaissance Industrial Park, Bhiwandi
. Commercial Comparison
P/ASE0SE CST C,A&S 4 &ADS
P*ase
Concrete +ra$es
,3- ,3 ,)- ,)
P*ase 20+/ 1* 1/1 1*
P*ase 1120 100/ 101 102.
P*ase 1 0 01 0/
P*ase 5 11+3 103. 10* 10+.
t*er &oa$s 30 3*. 3+3 3+.3
7
-
8/20/2019 Magus Rigid Pavement
8/13
© 2003-10 NeilsoftLimited
Renaissance Industrial Park, Bhiwandi
Total Cost !Cr." 62.12 72.86 73.87 7).38
9. Conclusion
Pro;ect Road Network has a5out 20 Jm of len'th ha#in' dierent widths
ran'in' from 10 m to 3/ m ie from 2 lanes to Lanes Jee)in' in mind cost
of the #arious o)tions, o)tion with Mointed Plain oncrete Pa#ement of
concrete 4rade 73+ 6 )a#ement thickness 2+0 mm is recommended he
said desi'n works )ro#ided the necessar% com)action of su5 'rade and BR
#alues are achi#ed
8
-
8/20/2019 Magus Rigid Pavement
9/13
© 2003-10 NeilsoftLimited
Renaissance Industrial Park, Bhiwandi
Annexure A:
&oa$ Area Calculations
Area Statement
P*ase &oa$0i$t*!m"
#engt*!m"
Area!S;.m"
P*ase R2 21 /* 13.1R3 21 /0 1.3//
9
-
8/20/2019 Magus Rigid Pavement
10/13
© 2003-10 NeilsoftLimited
Renaissance Industrial Park, Bhiwandi
L1 10 +31 +31
Loadin' 1/ 3+.3 .0+.+
89 1--961
P*ase
R+ 21 .220 130.1
R. 1/2+ 2/01 *.+
R/ 1/2+ 2/01 *.+
R 1/2+ +3 2+
R 1/2+ +3 2+
R10 1/2+ *3* /+0
R11 1/2+ 3.*2 .23
3-)3.) )731
P*ase
L2 1/2+ +.12 .1
R1 1/2+ +.12 .1
R1 1/2+ +.12 .1
R20 1/2+ +.12 .1
R21 21 *.+2+ //0
281-.- )7)63
P*ase 5
R12 1/2+ 2/*2 */30
R13 1/2+ +0+3 /1.
R1* 1/2+ +3*1 21+
R1+ 1/2+ +.12 .1
R1. 1/2+ +.12 .1
R21 21 .+* 1*3+
3121.9 9)18
t*er&oa$s
R1 3/ 1*1* ++11
R* 2+ +3 1++
R1/ 1/2+ +.12 .1
!1 2+ 120+3 3++++
!2 2+ 12*0 3.*.
!3 2+ 12.2. 3/2*/
93-7.3 16-)-
Total 2-636 )-739
Annexure %:
Costing of ointe$ Plain Concrete Pavement for various gra$es of
concrete
Plain ointe$ Cement Concrete +ra$e ,3-
Concrete!Cu.m"
0%,!Cu.m"
Do(el!,T"
Tie !,T"Total
&ate !pers;.m"
-
8/20/2019 Magus Rigid Pavement
11/13
© 2003-10 NeilsoftLimited
Renaissance Industrial Park, Bhiwandi
&ate +300 1000 *2000 *2000
Total &ate &s. /1.203 101*313 ..00000 .300000
Area of roa$ *+03. *+03. *+03. *+03.
&ate per S;.m 1+0 22+0 21* 1* 20*3
())ro"imate cost of this o)tion would 5e Rs 220 rores
Plain ointe$ Cement Concrete +ra$e ,3
Concrete!Cu.m"
0%,!Cu.m" Do(el !,T" Tie !,T"
Total&ate!per
s;.m"
-
8/20/2019 Magus Rigid Pavement
12/13
© 2003-10 NeilsoftLimited
Renaissance Industrial Park, Bhiwandi
Area of roa$ *+03. *+03. *+03. *+03.
&ate per S;.m 1*/+ 22+0 1** 1* 1+
())ro"imate cost of this o)tion would 5e Rs 30 rores
Plain ointe$ Cement Concrete +ra$e ,)
Concrete!Cu.m"
0%,!Cu.m"
Do(el !,T" Tie !,T"
Total&ate!per
s;.m"
-
8/20/2019 Magus Rigid Pavement
13/13
© 2003-10 NeilsoftLimited
Renaissance Industrial Park, Bhiwandi
13