realm.Install signage in limited number and only in relation to the name of the business and not for the purpose of advertising products or services;
›
›
›
MABDevelopmentManual
-
MAB DEVELOPMENT MANUAL BUILT FORM ASSEMBLY2 ISSUE 01 26.11.13
The Tonsley Urban Design Guidelines should be used by those developing public and private buildings, streetscapes and landscape, as part of the redevelopment of Tonsley. Encumbrances are being established that will enforce the guidelines
be assessed on merit, understanding that not
Developments will also be assessed against the City of Marion’s Development Plan and planning approval required.
Conformance with the Tonsley Urban Design Guidelines and any approval provided by Renewal SA for developments at Tonsley do not constitute or take place of other statutory body approvals that
URBAN DESIGN GUIDELINES
It is intended that the guidelines will be reviewed periodically and updated as necessary as the project evolves to ensure they are relevant and current to service the needs of future development at Tonsley.
The guidelines have been purposely designed as
updated easily if required.
urban elements. This has been derived using a Life Cycle Assessment tool that evaluates environmental
TONSLEY URBAN DESIGN
PROTOCOL
TONSLEY MASTER PLAN
TONSLEY CULTURAL HISTORY REPORT
PROJECT OBJECTIVES
SOCIAL & COMMUNITY PLANNING ANALYSIS
DEVELOPMENTPLAN
PROPOSED DEVELOPMENT
SITE WIDE BUILT FORM DEVELOPMENT
MANUAL
MAB DEVELOPMENT MANUAL
PUBLIC DOMAIN MANUAL
TONSLEY SITE STRATEGIES
realm.Install signage in limited number and only in relation to the name of the business and not for the purpose of advertising products or services;
›
›
›
Maps, illustrations and images depicted throughout this document are indicative and may or may not reflect actual development of the site.
may be required (e.g. City of Marion planning approvals). It is the responsibility of the developer to ensure all applicable approvals are obtained.
-
MAB DEVELOPMENT MANUAL BUILT FORM ASSEMBLY3 ISSUE 01 26.11.13
MAB DEVELOPMENT MANUAL
BUILT FORM ASSEMBLYSY1 SECURITY 4SF1 STREET FRONTAGE 5TT1 TENANCY TYPES 6L01 EXAMPLE LAYOUTS 7L02 EXAMPLE LAYOUTS 8SP1 MAXIMUM SITE PARAMETERS 9
MAB ELEMENTSMP01 MATERIAL PALETTE 10
realm.Install signage in limited number and only in relation to the name of the business and not for the purpose of advertising products or services;
›
›
›
-
MAB DEVELOPMENT MANUAL BUILT FORM ASSEMBLY4 ISSUE 02 09.2019
SECURITY
The Main Assembly Building (MAB) is designed to achieve different levels of security for different uses.
The MAB common areas are designed to be publically accessible by foot at all times. Access toTenancies is maintained by tenants. MAB entrygates will be bollarded to prevent unauthorised vehicle access to the MAB. Toilets within service cores are publically accessible during core business hours, while tenants will be provided access cards to utilise these facilties after-hours.
DESIRED FUTURE CHARACTER
Security guards will patrol the MAB and the rest of the Tonsley site during core business hours and after-hours.
SY1
FLINDERS UNIVERSITY
SIEC
CARPARK
Tenancies
Urban Forests
Service Cores
0 25 50 100
realm.Install signage in limited number and only in relation to the name of the business and not for the purpose of advertising products or services;
›
›
›
-
MAB DEVELOPMENT MANUAL BUILT FORM ASSEMBLY5
STREET FRONTAGE
Tenancies with street frontages will be designed in a manner to encourage activation of internal streets by allowing direct connectivity and engagement with the public realm.
Tenancy frontages will achieve delineation between the public and private realm by way of facade setbacks, as outlined.
DESIRED FUTURE CHARACTER
Tenancies will:
› Promote activation & passive surveillance › Allow direct connectivity and engagement with the public
realm › Follow setbacks and activation as defined below › Have 75% transparency/active frontage on the public realm
interface (outlined in red/green). › Have 25% transparency/active frontage on laneways
(outlined in blue).
SF1
FLINDERS UNIVERSITY
SIEC
CARPARK 0m Setback
75% active frontage *
Maximum 75% of tenancy frontage will allow for an extension into the external public realm of 3m. The extension is permitted to those tenants providing successful active frontage solutions.
0m Setback (Primary frontage)75% active frontage *
0-2m Setback (Secondary frontage)25% active frontage *
Secured after hours
Tenancies
Urban Forests
Service Cores
* Activation as defined below. May also include service access as activation.
Active frontages are to contribute to the liveliness and vitality of streets by:Maximising entries or display windows, the use of transparent glazing, providing elements of visual interest, raised deck, consider sinage and wayfinding.
* Where facades are set back the existing floor finish is to match the finish of the pubic walkways.
0 25 50 100
1 LEVEL 00 1:500
No Setback 75% of tenancy frontage active
25% of tenancy frontage active
2m setback
realm.Install signage in limited number and only in relation to the name of the business and not for the purpose of advertising products or services;
›
›
›
ISSUE 02 09.2019
-
MAB DEVELOPMENT MANUAL BUILT FORM ASSEMBLY6
TENANCY TYPES
Tenancies within the MAB will demonstrate innovation and be exemplars of creative and alternative solutions, whilst demonstrating an appreciation for advanced clean tech manufacturing techniques.
The internal circulation strategy and existing building volume offers opportunities for the development of tenancies of different forms and scales, which can be individually tailored to suit the specific uses.
DESIRED FUTURE CHARACTER
Tenancies will: › Be designed by a registered architect and must demonstrate
a high standard of design › Allow future adaption and expansion through flexible
arrangements and construction › Allow future adaptive reuse opportunities; › Incorporate materials which demonstrate the new ‘industrial”; › Demonstrate sustainable principles; › Provide their own support structure and will not attach to the
existing structure; › Allow for the connection of all services overhead (with the
exception of sewer); › Incorporate all exposed services as expressive integrated
items; › Incorporate all artificial lighting requirements; › Incorporate waste bins within the tenancy. Enclosures are to
be screened; › Incorporate integrated signage which does not detract from
the inherent character of the MAB signage in the public realm;
TT1
Incorporate signage in limited number and only in relation to the name of the business and not for the purpose of advertising products or services;Maintain tenancy signage within tenancy zones - not in the public realm;
›
›
›
ISSUE 02 09.2019
Seek approval from Renewal SA on all signage aspects including,but not limited to design, materials, placement, installation, size and quantity
1-2/ Tonsley MAB pods, artist rendering
1 2
-
realm.Install signage in limited number and only in relation to the name of the business and not for the purpose of advertising products or services;
›
›
›
MAB DEVELOPMENT MANUAL BUILT FORM ASSEMBLY7
EXAMPLE LAYOUTS 1
TONSLEY POD INVESTIGATIONS
LOCATION_01 OPTIONS_01
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
27
27
28
28
29
29
30
30
31
31
AA
BB
CC
DD
EE
FF
GG
HH
AAAA
4020 m²
SMALLTENANCY
174 m²
SMALLTENANCY
1755 m²
LARGETENANCY
2824 m²
LARGETENANCY
3069 m²
LARGETENANCY
1602 m²
LARGETENANCY
1054 m²
LARGETENANCY
1283 m²
LARGETENANCY
516 m²
SMALLTENANCY
511 m²
SMALLTENANCY
919 m²
SMALLTENANCY
455 m²
SMALLTENANCY
1877 m²
SMALLTENANCY
746 m²
SMALLTENANCY
412 m²
SMALLTENANCY
1079 m²
SMALLTENANCY
438 m²
SMALLTENANCY
682 m²
SMALLTENANCY
1045 m²
SMALLTENANCY
FLINDERS UNI
TAFETENANCY
TIER 5TENANCY
SERVICECORE
SERVICECORE
SERVICE
SERVICE SERVICE
A31011
______________________________________________________
A31011
______________________________________________________
A31021
______________________________________________________
A31021
______________________________________________________
LAND
SCAP
E ARE
A
LANDSC
APE ARE
A
LAND
SCAP
ED AR
EA
LANDSC
APED AR
EA
EX.
EX.
EX.
EX.
EX.
EX.
A44021
______________________________________________________
EXISTING BASEMENTSLAB OUTLINE
EXISTING BASEMENTSLAB OUTLINE
II
2038
423
384
A44022
______________________________________________________
85344
77152
2038
420
384
1240
228
364
30576
073
152
67152
2438
4
2038
4
32470
48768
36576
12192
97536
73152
52768
48768
24384 10007
30391
36415
66967
73136
79159
66967
2338
420
384
2038
420
384
63145
42761
36761
6185
2438
4
134112
97536
36576
2038
4
158496
2038
420
384
02 A5105
01A5107
01A5108
04A5105
01A5105
Project number Revision
Status
Rev
CopyrightWOODS BAGOT
Description Date App'd
NotesCONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCINGWORK OR PREPARING WORKSHOP DRAWINGS. DO NOT SCALE DRAWING.
Drawing number
Checked Approved
50mm on original
Drawing title
Project
Scale
Client
@ A1 sheet size
TM
Date generated
A
1 : 500
C:\My Documents\Autodesk\Revit\RAC2013\140013_Architectural_A13_Central_adlnhn.rvt6-05-13 4:18:03 PM
FLOOR PLAN – GROUND
RENEWAL SA
Tonsley Park - MAB
CLOVELLY PARKSA
140013 A2201
NN MM
FOR TENDER
A ISSUE FOR TENDER 6/05/13 MM
LOCATION_01 MAKE
THINK
SELL
EXTERNAL SPACE
OPTION_01 OPTION_02 OPTION_03 OPTION_04OPTION 01 OPTION 02 OPTION 03
L01
Think- office use
Make- industrial use
Sell- administration/retail use
TONSLEY POD INVESTIGATIONS
LOCATION_01 OPTIONS_01
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20
21
21
22
22
23
23
24
24
25
25
26
26
27
27
28
28
29
29
30
30
31
31
AA
BB
CC
DD
EE
FF
GG
HH
AAAA
4020 m²
SMALLTENANCY
174 m²
SMALLTENANCY
1755 m²
LARGETENANCY
2824 m²
LARGETENANCY
3069 m²
LARGETENANCY
1602 m²
LARGETENANCY
1054 m²
LARGETENANCY
1283 m²
LARGETENANCY
516 m²
SMALLTENANCY
511 m²
SMALLTENANCY
919 m²
SMALLTENANCY
455 m²
SMALLTENANCY
1877 m²
SMALLTENANCY
746 m²
SMALLTENANCY
412 m²
SMALLTENANCY
1079 m²
SMALLTENANCY
438 m²
SMALLTENANCY
682 m²
SMALLTENANCY
1045 m²
SMALLTENANCY
FLINDERS UNI
TAFETENANCY
TIER 5TENANCY
SERVICECORE
SERVICECORE
SERVICE
SERVICE SERVICE
A31011
______________________________________________________
A31011
______________________________________________________
A31021
______________________________________________________
A31021
______________________________________________________
LAND
SCAP
E ARE
A
LANDSC
APE ARE
A
LAND
SCAP
ED AR
EA
LANDSC
APED AR
EA
EX.
EX.
EX.
EX.
EX.
EX.
A44021
______________________________________________________
EXISTING BASEMENTSLAB OUTLINE
EXISTING BASEMENTSLAB OUTLINE
II
2038
423
384
A44022
______________________________________________________
85344
77152
2038
420
384
1240
228
364
30576
073
152
67152
2438
4
2038
4
32470
48768
36576
12192
97536
73152
52768
48768
24384 10007
30391
36415
66967
73136
79159
66967
2338
420
384
2038
420
384
63145
42761
36761
6185
2438
4
134112
97536
36576
2038
4
158496
2038
420
384
02 A5105
01A5107
01A5108
04A5105
01A5105
Project number Revision
Status
Rev
CopyrightWOODS BAGOT
Description Date App'd
NotesCONTRACTOR MUST VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCINGWORK OR PREPARING WORKSHOP DRAWINGS. DO NOT SCALE DRAWING.
Drawing number
Checked Approved
50mm on original
Drawing title
Project
Scale
Client
@ A1 sheet size
TM
Date generated
A
1 : 500
C:\My Documents\Autodesk\Revit\RAC2013\140013_Architectural_A13_Central_adlnhn.rvt6-05-13 4:18:03 PM
FLOOR PLAN – GROUND
RENEWAL SA
Tonsley Park - MAB
CLOVELLY PARKSA
140013 A2201
NN MM
FOR TENDER
A ISSUE FOR TENDER 6/05/13 MM
LOCATION_01 MAKE
THINK
SELL
EXTERNAL SPACE
OPTION_01 OPTION_02 OPTION_03
ISSUE 02 09.2019
1
-
realm.Install signage in limited number and only in relation to the name of the business and not for the purpose of advertising products or services;
›
›
›
OPTION_04 OPTION_05 OPTION_06
MAB DEVELOPMENT MANUAL BUILT FORM ASSEMBLY8
L02EXAMPLE LAYOUTS 2
OPTION_04 OPTION_05 OPTION_06OPTION 04 OPTION 05 OPTION 06
Think- office use
Make- industrial use
Sell- administration/retail use
ISSUE 02 09.2019
-
realm.Install signage in limited number and only in relation to the name of the business and not for the purpose of advertising products or services;
›
›
›
MAB DEVELOPMENT MANUAL BUILT FORM ASSEMBLY9
MAXIMUM SIZE PARAMETERS
New structures will be contained within maximum spatial parameters, in order not to interfere with MAB environmental, lighting, fire and structural performance.
DESIRED FUTURE CHARACTER Tenancies will:
› Be separated from existing columns a min of 200 mm; › Have a maximum envelope height of 5 metres; › Be developed to incorporate the additional criteria within the
street frontage description.
SP1
ISSUE 02 09.2019
-
realm.Install signage in limited number and only in relation to the name of the business and not for the purpose of advertising products or services;
›
›
›
MAB DEVELOPMENT MANUAL BUILT FORM ASSEMBLY10
MATERIALS PALETTE
DESIRED FUTURE CHARACTER
› Glass › Sheet Metal (Non Profiled), Zincalume, Zinc, Steel, Copper,
Aluminum › Acrylic › Plastic › Fiberglass › Composite materials › Timber (sustainable timber certification) › Steel › Cork › Plywood › Recycled Rubber › Card Board (fire rated)
MATERIAL PALETTE:
The Main Assembly Building tenancy material palette will reinforce the industrial character of the space.
MP01
ISSUE 02 09.2019
-
realm.
Install signage in limited number and only in relation to the name of the business and not for the purpose of advertising products or services;
›
›
›