    Consolidated Annual Report on Activities Implemented under the

    Joint Programme Local Governance Support (LGSP)

    Report of the Administrative Agent for the LGSP

    for the period 1 January - 31 December 2011

    Multi-Partner Trust Fund Office

    Bureau of Management

    United Nations Development Programme

    http://mptf.undp.org

    31 May 2012

    http://mptf.undp.org/http://mptf.undp.org/http://mptf.undp.org/
  • 7/29/2019 Local Governance Support in East Timor

    2/46

    Page | 2

    PARTICIPATING UN ORGANIZATIONS

    United Nations Capital Development Fund (UNCDF)

    United Nations Development Programme (UNDP)

    CONTRIBUTING DONOR

    Irish Aid

  • 7/29/2019 Local Governance Support in East Timor

    3/46

    Page | 3

    Joint Programme: Local governance Support Programme (LGSP)

    REPORTING PERIOD: 1 JANUARY31 DECEMBER 2011

    Programme Title & NumberCountry, Locality(s), Thematic Area(s)

    Programme Title: Local Governance Support Programme

    (LGSP)

    Programme Number UNDP-BU: 45604 (Award ID), 53898

    (Project ID), UNCDF-BU (Irish): 45923 (Award ID), 54392

    (Project ID), UNCDF-BU (UNCDF core): 45924 (Award

    ID), 54393 (Project ID)MPTF Office Atlas Number: 00055656 (Award ID)

    Timor-Leste

    Local Governance & Decentralization, Poverty

    Reduction

    Participating Organization(s) Implementing Partners

    UNCDF and UNDP

    Ministry of State Administration and Territorial

    Management (MSATM)

    Programme/Project Cost (US$) Programme Duration (months)

    Agency Contribution

    UNDP: US$ 1,060,000

    UNCDF:US$ 650,000

    Overall Duration: 7 years

    Government Contribution

    US$ 9,768,515 (in-kind contribution: 2008-2011)Start Date: 01/2007

    Other Contribution (donors)

    Irish Aid:US$1,968,873(Pass-through funding)

    Irish Aid: US$ 838,795 (Cost-sharing)

    Norwegian Government: US$ 119,327 (Cost-sharing)

    End Date or Revised End Date: 12/2013

    TOTAL: US$ 13,820,510

    Operational Closure Date: N/A

    Expect Financial Closure Date: Project extension

    agreed by Project Steering Committee

    Programme Assessments/Mid-Term Evaluation Submitted By

    Assessment Completed - if applicable

    Two consultation missions regarding a two-year project

    extension (2012-2013) were carried out respectively in May

    and June 2011.

    Mid-Evaluation Report

    Y Yes No Date: 05/2010

    o Name: Alessandro Righetti, Chief Technical

    Advisor

    o Participating Organization (Lead): UNCDF

    o Email address: [email protected]

  • 7/29/2019 Local Governance Support in East Timor

    4/46

    Page | 4

    LIST OF ABBREVATIONS AND ACRONYMS

    AusAid Australian Aid

    CD Community Development

    CoM Council of Ministers

    DA District AssemblyDDC District Development Committee

    DNAF National Directorate for Administration and Finance

    DNAL National Directorate for Local Administration

    DNDLOT National Directorate for Local Development and Territorial Management

    DSF Decentralisation Strategic Framework

    GoTL Government of Timor-Leste

    IEC Information for Education and Communication

    ISD Infrastructure and Service Delivery

    LA Local Assembly

    LDF Local Development Fund

    LDP Local Development ProgramLG Local Governance

    LGOS Local Government Options Study

    LGSP Local Governance Support Program

    LGWG Local Governance Working Group

    LoA Letter of Agreement

    LPP Local Planning Process

    MC Minimum Condition

    MoF Ministry of Finance

    MSA Ministry of State Administration

    MSATM Ministry of State Administration and Territorial Management

    MTWGs Ministerial Technical Working Groups

    NGO Non-Governmental Organization

    NIM National Implementation Modality

    NP National Parliament

    PBGS Performance Base Grant System

    PDD/DDP Decentralised Development Programme

    PDID District Integrated Development Planning

    PEM Public Expenditure Management

    PFM Public Financial Management

    PIC Planning and Implementation Committee

    PSC Program Steering Committee

    SDA Sub-District Assembly

    SDDC Sub-District Development Committees

    SDP Suco Development Plan (also acronym for Strategic Development Plan 2011-2030)

    TL Timor-Leste

    ToT Training of Training

    TWG Technical Working Group

    UN United Nations

    UNCDF United Nations Capital Development Fund

    UNDAF United Nations Development Assistance Framework

    UNDP United Nations Development Program

    WG Working Group

  • 7/29/2019 Local Governance Support in East Timor

    5/46

    Page | 5

    TABLE OF CONTENTS

    Cover Page ................................................................................................................................ 1

    Summary of Project Title and Cost ........................................................................................ 3

    List of Abbreviations & Acronyms ....................................................................................... 4Table of Contents .................................................................................................................... 5

    List of Table .............................................................................................................................. 6

    List of Annexes ........................................................................................................................ 6

    PART I: NARRATIVE REPORTI. EXECUTIVE SUMMARY ................................................................................................ 7

    II. PROGRAMME OVERVIEW ......................................................................................... 9

    III. IMPLEMENTATION AND MONITORING ARRANGEMENTS ......................... 10

    IV. FINANCIAL AND HUMAN RESOURCES ............................................................... 12

    V. RECENT DEVELOPMENTS RELATED TO LOCAL GOVERNANCE IN

    TIMOR-LESTE ........................................................................................................... 12VI. ACTIVITIES, ACHIEVEMENTS AND CHALLENGES ........................................ 14

    Output 1: Local Development Programme ........................................................................ 14

    1.1.Support to Activities of Local Assemblies ........................................................................ 141.1.1 Support to Local Assemblies ...................................................................................... 14

    1.1.2 Minimum Condition Evaluation ............................................................................... 14

    1.1.3 Allocation of the LDF Budget and Recurrent Costs ................................................. 16

    1.1.4 Meeting of Local Assemblies ................................................................................... 16

    1.2.Finance ................................................................................................................................. 181.2.1. Transfer of LDF Allocation ................................................................................... 18

    1.2.2. Recurrent Costs ...................................................................................................... 19

    1.2.3. Letter of Agreement (LoA) between MSATM and LGSP .................................... 19

    1.3.Project Implementation ..................................................................................................... 201.3.1. Local Procurement Process and Implementation of LDP Projects ........................ 20

    1.4.The Planning Process for FY 2012 .................................................................................... 201.4.1. Project identification and prioritization ................................................................. 20

    1.5.Gender Support Activities ................................................................................................. 221.6.Capacity Building ............................................................................................................... 23

    1.6.1. Refresher training on local planning, finance and procurement process ............... 23

    1.6.2. AutoCad training for District Technical Staff ........................................................ 23

    1.6.3. Study tour on the integrated planning for local governance in Indonesia ........... 23Output 2: Policy And Legislation ........................................................................................ 23

    2.1Continued Support to Local Government Legislation ......................................................232.2Support the Drafting process and Approval of the PDID Decree Law ......................... 232.3Support the Production of Secondary Legislation .......................................................... 24

    2.3.1 Ministerial Dispatch on Planning Process .................................................................. 24

    2.3.2 Revision of MSATM Guidelines on Community Contracting ................................. 24

    2.4Policy Development ............................................................................................................ 252.4.1 Community Development .......................................................................................... 25

    2.4.2 Local Governance Working Group (LGWG) ........................................................... 25

    2.4.3 Technical Working Group (TWG) of Fiscal Decentralization ................................. 25Output 3: Support To Implementation Of Local Government Reforms ......................... 25

  • 7/29/2019 Local Governance Support in East Timor

    6/46

    Page | 6

    3.1Production of Social Communication Materials (SCM) .................................................. 263.1.1 Monthly Radio Programme .................................................................................... 26

    3.1.2 Monthly Bulletin ...................................................................................................... 26

    3.2Civic Education and Local Governance ............................................................................ 28Output 4: Programme Management ................................................................................... 29

    4.1Recruitment Process ........................................................................................................... 294.2Other issues .......................................................................................................................... 29

    V SUMMARY OF THE MAIN ACHIEVEMENTS AND LESSONS LEARNED IN

    2011 ................................................................................................................................ 29Achievements ............................................................................................................................ 29Lessons Learned ...................................................................................................................... 30

    VIII. THE WAY FORWARD: PROJECT EXTENSION & AWP 2012 ....................... 31

    PART II: FINANCIAL ERFORMANCE ........................................................................... 33

    X. LIST OF ANNEXES ....................................................................................................... 38

    LIST OF TABLES

    Table 1: LDP Minimum Conditions Indicators ................................................................ 15

    Table 2: Result of the Minimum Condition Evaluation for 2010 .................................... 15

    Table 3: LDF Capital Fund Allocation and Recurrent Costs for 2011 ........................... 16

    Table 4: Result of the first, second and Extra Ordinary Assemblies Meeting Per District

    in 2011 ........................................................................................................................... 18

    Table 5: Capital Fund Allocation for 2011 ........................................................................ 18Table 6: Allocation and Execution Status of 119,957 USD .............................................. 19

    Table 7: Procurement Phases .............................................................................................. 20

    Table 8: List of District Integrating Meetings ................................................................... 21

    Table 9: Number of Projects and Budget Allocation before and after the Budget Review

    Commission ................................................................................................................. 22

    Table 10: List of Produced Radio Program during the Report Period .......................... 26

    Table 11: List of Monthly Bulletin Topics ......................................................................... 26

    Table 12: The summary of views from respondents to Communication Check list for

    2011 ............................................................................................................................... 27

    LIST OF ANNEXES

    Annex 1: Summary of the project budget for MSATM for Fiscal Year 2012 ................ 38

    Annex 2: Brief Summary of the Approved Integrated District Development Planning

    (PDID) Decree Law ...................................................................................................... 40

    Annex 3: Annual Work Plan 2012: Local Governance Support Programme ................ 41

    Annex 4: List of LGSP Staff/Posts in 2011...45

  • 7/29/2019 Local Governance Support in East Timor

    7/46

    Page | 7

    I. Executive SummaryThe decentralization process in Timor-Leste started with the establishment of an Inter-

    Ministerial Technical Working Group in 2003, with the objective to study different options

    for decentralization in Timor-Leste. The working group involved members of all ministries

    under the leadership of the then Ministry of State Administration (MSA).

    Decentralization reforms have evolved since, resulting in the approval of a national

    decentralization policy and decentralization road map and the submission of a set of three

    local government laws to the National Parliament. Throughout this process, lessons learned

    from the pilot Local Development Programme have been fed systematically into the policy

    process and local capacities have been developed.

    The process has benefited from continuous support provided by the joint UNCDF-UNDP

    Local Governance Support Programme (LGSP) and its predecessor programs, the Local

    Governance Options Study and the Local Development Program (both supported by

    UNCDF) both at the policy level and at the local level. The overarching goal of the LGSP is

    to contribute towards poverty reduction in Timor-Leste. The LGSP has the primary objective

    of supporting the establishment of a fully-fledged local government system in Timor Leste by

    (i) providing policy-relevant lessons from pilot activities, (ii) assisting the government in

    formulating a comprehensive legal and regulatory framework for local government, and (iii)

    supporting implementation of local government reforms. Through achieving its primary

    objective, LGSP will thus contribute towards improving local-level infrastructure and service

    delivery, and reducing poverty. It is funded by the Government of Timor-Leste (GoTL), IrishAid, the Government of Norway, UNDP and UNCDF. The LGSP I was being implemented

    over a 5-year period (2007-2011). To ensure the achievement of this objective, project

    activities were implemented under three project outputs: Output 1: Procedures, processes

    and systems for effective local-level infrastructure and service delivery (ISD) and public

    expenditure and public financial management (PEM/PFM) are piloted in selected Districts,

    Sub-Districts and future Municipalities;Output 2: Support is provided to the GoTL for the

    establishment of an appropriate and comprehensive institutional, legal, and regulatory

    framework for local government; and Output 3: Support is provided to GoTL for the

    implementation of local government reforms.

    The Government of Timor-Leste requested UNDPUNCDF and other development partners

    to continue their support to MSATM and to the overall decentralization and local

    development agenda in TimorLeste. An LGSP extensionproject, LGSP II 2012-2013, was

    approved in December 2011 which reorients the interventions and strategies of the previous

    LGSP (LGSP I) to respond to the new policy environment, the 2012 national elections, and

    the still largely undefined local government framework and the current UNDAF cycle (2008

    2013). Two expected outputs were formulated for extension project are: Output 1: Improved

    capacity for local service delivery (ISD) by subnational bodies with increased citizen

    participation; and Output 2: Improved institutional, legal, and regulatory frameworkestablished in support of effective local governance.

  • 7/29/2019 Local Governance Support in East Timor

    8/46

    Page | 8

    The programme is implemented as an integrated part of the activities of the Ministry of State

    Administration and Territorial Management (MSATM). It follows UNDP/UNCDF

    procedures and manages all procurement processes through the UNDP Country office or the

    UNCDF Regional Centre. The Joint Programme is linked to the UN Development AssistanceFramework 2009-2013 (UNDAF): Outcome 1.1: State organs and institutions are more

    efficient, transparent, accountable, equitable, and gender responsive in planning and delivery

    of services; Output 1.1.3: The Government has a clear legal framework for decentralisation;

    and Output 1.1.4: The established local government institutions have the core capacities to

    fulfil their mandates. The project aims at supporting the National Priorities of Timor-Leste,

    with particular focus on promoting decentralization and local government reforms

    processes.

    During 2011 several key results were achieved. In particular, the project provided key

    support to the drafting of a decree-law on Integrated District Development Planning (known

    by its Tetum acronym PDID), which has been approved in January 2012 while this report is

    being drafted. The PDID decree law allows for the harmonization and synchronization of the

    different programmes implemented by the MSATM under a single framework, that

    incorporates many of the processes and procedures that the LGSP piloted through the LDP.

    The project also supported a six-fold expansion of bottom-up planning procedures, which

    mark a significant step in the expansion of LDP processes and procedures to the whole range

    of infrastructure and service delivery projects implemented by the MSATM. Although

    exceptional circumstances (particularly the legislative vacuum created by the delayedapproval of the PDID) caused that planning procedures were rather flexibly adhered to, this

    was a significant step forward.

    Furthermore, a Letter of Agreement (LoA) signed between UNDP and MSATM marks a

    significant step towards aligning with national systems, as it will permit to test the capacity of

    the MSATM to carry out activities in accordance with procedures that are previously agreed

    with the LGSP: this can be seen as the start of the transition from Direct Implementation

    (DIM) to National Implementation modalities (NIMs).

    Local government reforms did not take place during the original life span of LGSP and are

    not likely to take place during the period of its two-year extension. A new government should

    be formed around August 2012, and it is only likely to take its first important decisions

    during 2013.

  • 7/29/2019 Local Governance Support in East Timor

    9/46

    Page | 9

    PART I: NARRATIV EREPORT

    II. PROGRAMME OVERVIEWThe Local Governance Support Programme (LGSP) is a joint programme funded by the

    Government of Timor-Leste (GoTL), Irish Aid, the Government of Norway, UNDP and

    UNCDF; it is being implemented over a 5-year period (2007-2011). The overarching goal of

    the LGSP is to contribute towards poverty reduction in Timor-Leste. The Programmes

    objective is to support the establishment of accountable and effective local government and

    decentralisation, by endowing accountable local government bodies with greater

    responsibilities for planning, budgeting, and implementation of infrastructure and service

    delivery.

    To achieve its purpose, LGSP will deliver three key outputs:

    Output 1: Procedures, processes and systems for effective local-level infrastructure and

    service delivery (ISD) and public expenditure and public financial management

    (PEM/PFM) are piloted in selected Districts, Sub-Districts and future Municipalities.

    This output builds on the former Local Development Programme (LDP), which started as a

    national pilot programme in 2004 with the objective of testing different models for

    decentralization and local governance. The LDP supports capacity development at the local

    level through the provision of block grants to local assemblies, which are responsible for

    allocating and managing a small capital budget for local infrastructure programs, called the

    Local Development Fund (LDF). The first pilots started in 2005; in 2010 the LDP was up-

    scaled to all 13 districts, making it a nation-wide local development program. Once

    municipalities will be created in the context of decentralization, LGSP plans to support the

    establishment of local government systems and procedures in the new municipalities, and the

    continued strengthening of local capacities for public service provision.

    Output 2: Support is provided to the GoTL for the establishment of an appropriate and

    comprehensive institutional, legal, and regulatory framework for local government

    Through this output, which continues the work started by the Local Governance Options

    Study (LGOS) in 2003, the programme supports the development of a policy framework for

    the establishment of a fully-fledged local government system in Timor-Leste. This output

    includes the provision of technical support to the drafting, internal discussion and eventually

    external consultation of policy and legal instruments that are necessary to establish an

    effective and accountable local government in Timor-Leste.

  • 7/29/2019 Local Governance Support in East Timor

    10/46

    Page | 10

    Output 3: Support is provided to GoTL for the implementation of local government

    reforms

    This output refers to the actual set up of municipalities. The LGSPs support to the

    implementation of local government reforms will depend largely on final decisions about thephasing of this process. Following the postponement of municipal elections LGSP has

    focused on communication and civic educations activities for local governance and

    decentralization.

    The programme is implemented as an integrated part of the activities of the Ministry of State

    Administration and Territorial Management (MSATM). It follows UNDP/UNCDF

    procedures and manages all procurement processes through the UNDP Country office or the

    UNCDF Regional Centre.

    The Joint Programme is linked to the UN Development Assistance Framework 2009-2013

    (UNDAF) as below:

    Outcome 1.1: State organs and institutions are more efficient, transparent, accountable,

    equitable, and gender responsive in planning and delivery of services.

    Output 1.1.3: The Government has a clear legal framework for decentralisation

    Output 1.1.4: The established local government institutions have the core capacities to fulfil

    their mandates.

    The project aims at supporting the National Priorities of Timor-Leste, with particular focuson promoting decentralization and local government reforms processes.

    III. IMPLEMENTATION AND MONITORING ARRANGMENETS

    The programme is developed and implemented as an integrated part of the Ministry of State

    Administration and Territorial Management (MSATM). Until mid 2010, LGSP worked

    directly with and was embedded in the National Directorate for Local Development and

    Territorial Management (DNDLOT), which was created in 2008 to oversee the LDP pilot and

    the decentralization reform process.

    Following a request by the Minister in mid-2010, LGSP adjusted its structure to work with a

    broader counterpart structure, including the Director General and five key directorates within

    MSATM, depending on the subject concerned. The five directorates are: Directorate for

    Local Development (regarding the LDP), Directorate for Local Administration (regarding

    decentralization policy issues) Directorate of Finance, Directorate of Sucos, and Institute for

    Public Administration Reform (INAP) for capacity development issues. In addition, policy

    issues will be closely coordinated with the Minister of State Administration.

    As part of the Joint Programme of cooperation with the Government of Timor-Leste as fully

  • 7/29/2019 Local Governance Support in East Timor

    11/46

    Page | 11

    described in the Joint Programme Document dated 30 January 2012, it was agreed to

    establish a coordination mechanism which is called Steering Committee chaired by the

    Minister of State Administration and Territorial Management RDTL to facilitate the effective

    and efficient collaboration between the Participating UN Organizations and the host

    Government for the implementation of the Joint Programme.

    A Project Board (PB) was established to provide programme oversight and guidance. The PBmeets twice a year to discuss LGSP progress and endorse programme orientation. It isresponsible for endorsing the annual work plan, the annual progress reports, and provideguidance on project implementation, and adjustment required. The PB consists of: Minister ofMSATM (Chair), a senior MSATM officials directly involved in the programme; a UNCDFrepresentative; a UNDP representative; and one representative from each participatingdevelopment partner organization.

    The programme follows UNDP/UNCDF procedures and manages all procurement processes

    through the UNDP Country Office in TL or UNCDF Regional Center.

    LGSP operates a Monitoring Information System to manage data on project progress in a

    systematic manner. LGSP team meetings are being held on a regular basis and there are daily

    management meetings to discuss the progress, planned activities and any challenges as well

    as follow-up actions to address any area lagging behind. These meetings have proved to be

    essential for establishing a regular channel for communication and coordination within the

    LGSP team

    The Programme reports on a quarterly basis on the progress against assigned outputs andactivities, challenges and issues in the consolidated report. Annual reports are prepared and

    shared with the Ministry of State Administration and Territorial Management (MSATM) as

    well as donors, reporting on the achievements made and challenges encountered during the

    year.

    An internal programme review was conducted in August 2008, which had the main objective

    to evaluate LGSP design and progress. An external mid-term evaluation was conducted in

    March 2010, as part of the UNCDF Special Project Implementation Review Exercise

    (SPIRE) 2010-11.

    The Administrative AgentParticipating Organizations have appointed the UNDP MPTF Office to serve as theirAdministrative Agent (AA) for this Joint Programme. The AA is responsible for a range offund management services, including: (a) receipt, administration and management of donorcontributions; (b) transfer of funds approved by this Joint Programme to ParticipatingOrganisations; (c) Consolidate statements and reports, based on submissions provided to theAA by each Participating UN Organisation; (d) synthesis and consolidation of the individualannual narrative and financial progress reports submitted by each Participating Organizationfor submission to donors through the Steering Committee. Transparency and accountability

    of this Joint Programme operation is made available through Joint Programme web site of theMPTF Office GATEWAY at http://mptf.undp.org/factsheet/fund/JTP00.

    http://mptf.undp.org/factsheet/fund/JTP00http://mptf.undp.org/factsheet/fund/JTP00
  • 7/29/2019 Local Governance Support in East Timor

    12/46

    Page | 12

    IV. FINANCIAL AND HUMAN RESOURCESThe Programme is funded by Irish Aid, the Government of Norway, UNDP and UNCDF. TheGovernment of Timor-Leste also provides funds to the Local Development Programme (LDP),one of the LGSP components.

    In terms of Human Resources, the program had 20 posts with a total number of 21 staff

    throughout the year, which includes 4 international staff, and 17 national staff (see annex 4).

    V. RECENT DEVELOPMENTS RELATED TO LOCAL GOVERNANCE IN TIMOR-

    LESTE

    The Constitution of Timor-Leste contains an explicit commitment towards decentralization

    and local governance. Such commitment has, so far, been reflected in previous and current

    governments policies and decisions. While the State remains centralized, the GoTL under

    the leadership of MSATM has proceeded with the development of a policy framework for

    decentralization since 2003. This process reached a peak in 2009, when a set of three Local

    Government bills was submitted to the National Parliament: the Law on Administrative and

    Territorial Division, the Local Government Law and the Municipal Election Law.

    A year later (April 2010) the GoTL decided to slow the pace of reform and postponed

    municipal elections until after the 2012 national elections. Only the first of the three

    mentioned bills has been approved, while the other two are unlikely to be discussed by thepresent legislature.

    Starting in 2010, there has been a marked shift in focus related to decentralization and local

    governance issues. In particular, the government conceived a new programme, called

    Decentralized Development Programme (known by its Portuguese acronym PDD), which

    was introduced through the 2010 mid-year rectified budget. The PDD allocated a budget of

    around 31 million USD to be implemented directly by District Administrations for

    infrastructure projects up to a cost of 250,000 USD each.

    In 2011, the PDD was replaced by two separate Decentralized Development Programmes

    (PDD I and PDD II), the first of which included projects smaller than 150,000 USD (for a

    total of 15,520,000 USD), channelled via MSATM, while the second included projects which

    cost ranged from 150,000 USD to 500,000 USD (for a total of 28,811,000 USD), channelled

    via the Agency for National Development (Prime Ministers office). Additionally, other

    major spending programmes were initiated during this period, of which the biggest is the

    programme known as MDG-Suco that was channelled via the Agency for National

    Development.

    Through these programmes, a much bigger number of small and medium sized infrastructure

  • 7/29/2019 Local Governance Support in East Timor

    13/46

    Page | 13

    projects were delivered in rural areas. District Administration staff were empowered and

    trained to manage such projects; there were increased opportunities for employment of local

    workers; there were also increased opportunities for local contractors. However, while some

    PDD processes and procedures (especially for financial management) were adopted from the

    LDP, others (especially for planning and procurement) differed greatly, creating someconfusion and difficulties both at the central and local levels.

    Towards the end of 2010, the MSATM tried to overcome these difficulties through the

    development of an integrated approach that should effectively link LDP and PDD. Under this

    approach, an Integrated District Development Plan (known by its Tetum acronym PDID)

    would harmonize all processes and procedures for district-level implementation.

    Unfortunately, the conceptualization and the drafting of the PDID have taken longer than was

    initially envisaged, and only in September 2011 was the draft decree law presented to the

    CoM. Although the final discussion and approval could not take place within 2011, at the

    time of drafting this report the PDID had finally been approved by the CoM (11 January

    2012) and still only waiting for promulgation by the President of the Republic and subsequent

    publication in the official gazette (see section on PDID - 2.2 & Annex 2).

    Given the likelihood that future budgets continue to allocate increased spending at the local

    level, the attention is presently focused on strengthening the capacity of local structures to

    plan and manage infrastructure and service delivery projects. At the same time, discussions

    have recently started within the government (particularly MSATM and MoF) regarding the

    possibility to initiate a national mechanism to accelerate community development that would

    be planned and implemented at the suco level. Initial steps included an AusAid-financedstudy tour to Indonesia, as well as the creation, in October, of a technical WG through which

    the two ministries should continue to discuss the elaboration of a comprehensive approach

    towards local development. In the meantime, AusAid is supporting the establishment of a

    programme to which it would possibly contribute with 2 million USD in 2012 and 35 million

    USD during the following four years. UNCDF, UNDP and the WB are also participating in

    the debate.

    At this early stage it is still unclear in which way this new programme will fit into the

    processes to be established by the PDID, which represents the present government policy. At

    the time of writing, the CoM has just approved (18 January 2012) a resolution to establish a

    national mechanism to accelerate community development, thus giving the go ahead to the

    proposed programme.

    In 2010 the government also started working on its Strategic Development Plan 2011-2030

    (SDP), which is a more visionary exercise through which it aims to transition Timor-Leste

    from a low income to upper middle income country, with a healthy, well-educated and safe

    population by 2030. In July 2011 the parliament officially endorsed the SDP. Regarding

    decentralization, the SDP envisages that by 2015 a pilot program will be established in

    between three to five municipal chambers to work towards the gradual decentralisation of theexercise of government. This indicates that although decentralization is still a commitment,

  • 7/29/2019 Local Governance Support in East Timor

    14/46

    Page | 14

    the full establishment of municipalities throughout the country may require several more

    years, making it very important to have a clear interim approach to development and

    governance issues.

    Among other recent developments, in August 2011 the MoF presented to the CoM a draftdecree law on procurement issues (Omnibus Law). While the overall aim of the new law is

    to harmonize procurement procedures that are presently regulated by a vast set of at times

    incoherent pieces of legislation, there is fear that the new law might allow for an excessive

    simplification of procurement procedures. In particular, the present draft establishes that

    simplified procedures (meaning direct sourcing procurement, rather than tendering) would

    apply to all projects smaller than 100,000 USD, which would be a major step backward for

    the LGSP efforts to develop local capacities for project implementation. MSATM, with the

    support from LGSP, has prepared written comments to the present draft, arguing that in the

    case of projects smaller than 100,000 USD District Administrators should be empowered to

    choose among a range of different procurement procedures, including competitive tendering.

    It is unclear if and when the bill will be discussed again by the CoM.

    VI. ACTIVITIES, ACHIEVEMENTS AND CHALLENGES DURING THE

    REPORTING PERIOD

    Output 1: Local Development Programme

    Establish procedures, processes and systems for effective local-level infrastructure and

    service delivery (ISD) and public expenditure and public financial management (PEM/PFM)

    are piloted in selected Districts, Sub-Districts and Municipalities.

    1.1. Support to Activities of Local Assemblies1.1.1 Support to Local AssembliesLGSP continued to provide technical support to Local Assemblies in 13 Districts for the

    planning and implementation of projects financed through the Local Development Program

    (LDP). LGSP also assisted and observed Local Assembly (LA) Planning and ImplementationCommittees (PIC) in the planning process for 2012. During the reporting period all the 13

    Districts finalized their annual investment plans for the next project cycle.

    1.1.2 Minimum Condition EvaluationThe Minimum Conditions (MC) Evaluation has been conducted on a yearly basis since fiscal

    year 2005/2006. Its main objective is to provide recommendations to the MSATM with

    regard to the allocation of LDP funds for the following fiscal year: in particular, a positive

    assessment is a pre-condition for Districts to receive a new allocation the following year. In

    addition, the MC evaluation provides recommendations to the MSATM, Local Assembly

    (LA), Planning and Implementation Committee (PIC), Finance teams and LGSP on how to

  • 7/29/2019 Local Governance Support in East Timor

    15/46

    Page | 15

    improve their performance in the future.

    The MC evaluation scheme assesses Local Assemblies performance with regard to 11 basic

    governance indicators (see Table 2). This year, in consideration of the length of time in which

    they have been implementing LDP projects, eight Districts were fully evaluated, while threeDistricts (Ermera, Oe-cusse and Viqueque) were partially evaluated based on seven indicators

    and the two remaining Districts (Dili and Liquia) were evaluated based only on four

    indicators. The evaluation was carried out by DNDLOT as regulated by Ministerial Decree

    No. 1/2010DNDLOT/MSATM.

    Table 1: LDP Minimum Conditions Indicators

    Accountability:

    1. The Assembly was established according to MSATM regulations

    2. The Assembly conducted four meetings during the last year.

    3. The Assembly approved the current Investment Plan and Annual Budget.

    4. Implementation follows the Financial Regulations of Local Development Fund

    (LDF).

    5. The budget expenditure report of the last year was submitted to the Assembly.

    6. Last years audit report (where available) was submitted to the Assembly

    Transparency:

    7. Investment Plans and Annual Budgets are published on the public information boards.

    8. The minutes of the Assembly meetings are published on the public information

    boards.

    9. Documents related to the bidding process are published according to the FinancialRegulation.

    Local Contribution:

    10.A local contribution to projects financed by LDF was made.

    11.Operation & Maintenance followed LDF Financial regulations

    The MC evaluation was conducted between 7 and 16 February 2011 in each District and two

    Districts (Aileu and Lautem) did not fully comply with the set requirements and were

    consequently ranked only as sufficient with score inferior to 60 (see Table 2).

    The assessment also highlighted some more general weaknesses, particularly with regard to

    the transparency and local contribution indicators. More specifically, the assessment

    found that Local Assemblies will need to improve their performance with regard to ensuring

    that key information, e.g. information on Investment Plans and Annual Budgets and minutes

    of Local Assembly meetings, is published on public notice boards and is available to the

    public. The evaluation also found that communities did not always contribute to LDP

    projects, despite of the fact that LDP regulations require community involvement as a pre-

    condition to receive funding.

  • 7/29/2019 Local Governance Support in East Timor

    16/46

    Page | 16

    Table 2: Results of the Minimum Condition Evaluation for 2010

    District Evaluation Result Category

    Aileu 50.00 Sufficient

    Ainaro 90.07 Satisfactory

    Baucau 62.46 Good

    Bobonaro 69.14 Good

    Covalima 90.23 Satisfactory

    Dili 90.00 Satisfactory

    Ermera 69.79 Good

    Lautem 56.13 Sufficient

    Liquia 90.00 Satisfactory

    Manatuto 79.00 Good

    Manufahi 96.82 Very Satisfactory

    Oe-Cusse 70.45 Good

    Viqueque 75.00 Good

    1.1.3 Allocation of the LDF Budget and Recurrent CostsBased on the results of the MC evaluation for 2010, in February 2011 the MSATM on behalf

    of GoTL announced the Local Development Fund (LDF) allocation for 2011. The total

    amount is 3.5 million USD, which is allocated among the different districts based on their

    respective populations (see Table 3). Eleven districts received an allocation of $3.62 per

    capita, while the two districts (Dili and Liquia) which started implementing LDP projects

    only in 2010 received an allocation of $2.40 per capita. Following the announcement of the

    allocation, Local Assemblies confirmed that a total of 144 projects could be implemented as

    per approved by National Parliament in State budget for 2011.

    Table 3: LDF Capital Fund Allocation and Recurrent Costs for 2011

    District # of Projects Capital Fund (USD)Recurrent

    Cost (USD)

    Aileu 16 165,000 8,119

    Ainaro 9 216,000 7,596

    Baucau 18 405,000 11,792

    Bobonaro 8 324,000 12,446

    Covalima 14 218,000 9,923

    Dili 7 565,000 8,078Ermera 7 414,000 10,276

    Lautem 9 225,000 9,506

    Liquia 8 152,000 6,434

    Manatuto 12 157,000 8,674

    Manufahi 14 183,000 9,654

    Oe-cusse 9 236,000 7,473

    Viqueque 13 240,000 9,986

    Total 144 3.500.000 119,957

    1.1.4 Meetings of Local Assemblies

    First and second Local Assemblies meetings were held in all 13 districts. The purpose of thefirst Local Assembly (LA) meeting is to announce the results of the MC evaluation and to

  • 7/29/2019 Local Governance Support in East Timor

    17/46

    Page | 17

    inform assemblies about their final budget allocation, so that they can revise District

    Investment Plans and schedule the LA activities for the year. This year some of the LA

    members were disappointed with central-level decisions, as only 144 projects that were

    approved by the National Parliament coincided with the project proposals that had been

    earlier submitted by District Assemblies.

    Between the first and the second LA meetings, the Planning and Implementation Committees

    (PICs) proposed to cancel some of the approved projects as they had become unfeasible to be

    implemented due to natural disasters, some projects were implemented by NGOs and some

    projects were implemented in 2010. This proposal was subsequently approved during the

    second LA meeting, thereby reducing the total number of projects from 144 to 133.

    The second LA meeting, which was held between the months of July and September,

    discussed how to allocate the savings that originate following the bidding process, whenever

    contracts are issued for amounts that are lower than those indicated in the original budgets. In

    these cases, the savings that were made in each district can be reallocated by the LA to

    increase the budget of some of the existing projects, or sometimes to finance entirely new

    projects that had been earlier prioritised but not been financed. As a result of this discussion

    (see Table 4), eight new projects could be financed while 30 of the existing projects received

    some additional funding.

    In November, as there were still some small savings that originated from the bidding of the

    additional projects, some of the LAs held an extraordinary meeting in order to allocate such

    savings. In this way, 11 small projects were approved (mainly involving the rehabilitation ofprojects implemented during previous years). Given the small amounts involved, tendering

    processes and implementation could be successfully carried out before the end of the year.

    As Ministry Dispatch No. 10/2011 (please see points 1.3.1 and 2.2) only regulated the

    planning process up to the submission of proposals by the Sub-District level to the District

    level, there was a partial legislative vacuum that hampered the organization of the third and

    fourth LA meetings, which normally are organized to present and approve investment plans.

    In particular, the third LA meeting should have been conducted after the PIC prioritises all

    proposals, which did not happen until December. The prioritized proposals should then have

    been approved at the fourth LA meeting, while project proposals had in fact to be approved

    by September in order to fit into the regular budget process (please see section of planning

    1.3).

  • 7/29/2019 Local Governance Support in East Timor

    18/46

    Page | 18

    Table 4: Result of the First, Second and Extra Ordinary Assemblies Meeting per District in 2011

    [1] Some projects were cancelled due to natural disaster risks, project is implemented by other actors (e.g.NGOs) or some projects were implemented in previous year.

    [2] Some of the funds were reallocated to increase the budget of other projects, therefore, these are not

    calculated as a new project.

    1.2 Finance1.2.1 Transfer of LDF AllocationOn 30 September 2011, the MSATM transferred the capital fund of 3.5 million USD to

    district bank accounts. By the end of the year, final commitments and obligations were

    3,437,197 USD. The balance of 62,803 USD will be returned to the Banking and PaymentsAuthority (see Table 5).

    Table 5: Capital Fund Allocation for 2011

    District Allocation (USD) No of ProjectsCommitment and

    Obligation (USD)

    Balance from

    Obligation

    Aileu 165,000 8 153,122 11,878

    Ainaro 216,000 10 216,000 0

    Baucau 405,000 12 403,319 1,681

    Bobonaro 324,000 13 323,930 70

    Covalima 218,000 9 217,724 276

    District

    Date of I

    LA

    Meeting

    Approved

    projects (as

    per budget

    law)

    Projects

    remaining

    after

    cancellations

    proposed byPIC [1]

    Decisions taken by II LA

    Meeting (July-Sept)

    # New

    Projects

    Decided by

    Extraordinary

    Assembly

    Total

    ProjectsReallocated

    to existing

    projects[2]

    New

    projects

    Aileu 1-Mar 8 8 (3) 0 0 8

    Ainaro 16-Mar 9 8 (1) 0 1 9

    Baucau 23-Mar 16 11 (0) 1 0 12

    Bobonaro 7-Mar 12 12 (1) 0 1 13

    Covalima 1-Mar 9 9 (4) 0 1 10

    Dili 28-Feb 18 18 (1) 1 0 19

    Ermera 21-Mar 14 14 (2) 0 0 14

    Lautem 21-Mar 14 14 (3) 0 0 14

    Liquia 7-Mar 7 7 (1) 0 0 7

    Manatuto 5-Mar 13 12 (7) 0 7 19

    Manufahi 23-Mar 9 7 (7) 2 1 10

    Oe-cusse 21-Mar 7 7 (0) 3 0 10

    Viqueque 18-Mar 8 6 (0) 1 0 7

    TOTAL 144 133 (30) 8 11 152

  • 7/29/2019 Local Governance Support in East Timor

    19/46

    Page | 19

    Dili 565,000 19 565,000 0

    Ermera 414,000 14 394,808 19,192

    Lautem 225,000 14 225,000 0

    Lequia 152,000 7 152,000 0

    Manatuto 157,000 19 157,000 0Manufahi 185,000 10 182,950 50

    Oe-cusse 236,000 10 229,852 6,148

    Viqueque 240,000 7 216,493 23,507

    TOTAL 3,500,000 152 3,437,197 62,803

    1.2.2 Recurrent CostsAt the end of March 2011, MSATM transferred regular budget of US$119,957 to District

    bank accounts in order to finance LDP operational activities (see Table 6).

    Table 6: Allocation and Execution Status of 119,957 USD

    District Allocation Expenditure Balance

    Aileu 8,119 8,119 0

    Ainaro 7,596 7,596 0

    Baucau 11,792 11,792 0

    Bobonaro 12,446 12,446 0

    Covalima 9,923 9,923 0

    Dili 8,078 8,078 0

    Ermera 10,276 10,276 0

    Lautem 9,506 9,506 0Lequia 6,434 6,434 0

    Manatuto 8,674 8,674 0

    Manufahi 9,654 9,654 0

    Oe-cusse 7,473 7,473 0

    Viqueque 9,986 9,986 0

    Total 119,957 119,957 0.00

    1.2.3 Letter of Agreement (LoA) between MSATM and LGSPAt the meeting of the Project Steering Committee (PSC) that was held on 25 February 2011,

    parties agreed that UNDP will: (a) support the recruitment of thirteen district-based planningofficers and two national engineers, to be paid according to the salary grades and benefits of

    the Government of Timor-Leste; and (b) fund part of the operational costs associated with the

    LDP. Toward this end, UNDP hired a consultant to conduct a capacity assessment of the

    MSATM in May 2011. Based on the consultants recommendations, a Letter of Agreement

    (LoA) between MSATM and UNDP was signed on 12 August.

    The signature of the LoA allowed LGSP to partially finance the salaries of 42 technical staff

    in the districts who had been recruited by Local Assemblies in the past years and for whose

    salaries there were no sufficient funds in the State budget. LGSPs contribution has allowedfor the retention of these critical staff, while at the same time the MSATM has undertaken

  • 7/29/2019 Local Governance Support in East Timor

    20/46

    Page | 20

    actions to ensure that all of them will be again entirely financed through the State budget

    starting in January 2012. The signature of the LoA is also permitting the recruitment of 13

    additional staff at the district level and two at the national level, which contribution will be

    critical given that in 2012 the range of coverage of LGSP will be extended to a much greater

    number of projects.

    The signature of this LoA is also a valuable opportunity to test the capacities of the MSATM,

    in view of the planned shift of UNDPs assistance from Direct Implementation Modality

    (DIM) to National Implementation Modality (NIM) during the coming years. The MoF has

    already created a specific bank account into which funds can be transferred in conformity

    with the LoA. As modalities for such bank transfers and for financial reporting through Free

    Balance are still being worked out, it is likely that the first transfer will be done in early 2012.

    However, direct payments to 42 technical staff were made to retroactively cover for their

    salaries for much of year 2011.

    1.3 Project Implementation1.3.1 Local Procurement Processes and Implementation of LDP ProjectsDuring the reporting period, LAs carried out procurement processes according to the current

    LDP procedures (see Table 7). It should be noted that projects costing less than 15,000 USD

    do not require central approval by the MSATM; therefore, their implementation could

    generally start in June. Projects costing more than 15,000 USD were only granted central

    approval in July, so that their implementation could only start in August. All projects could

    be completely implemented by 31 December.

    Table 7: Procurement Phases

    Procurement Phase Date (month)

    Bid preparation March

    Bid Announcement MarchApril

    Pre bid Meeting 3th week of March

    Site visit 4th week of April1st May

    Bid Opening 3th week of May

    Bid doc Evaluation 4th week of May4th June

    Sign letter of acceptance 3rd week of Maylast week of July

    Local awarding and contracting 1st week of June1st week of August

    1.4 The planning process for FY 20121.4.1 Project identification and prioritizationIn view of the anticipated approval of the PDID decree law (please see Output II), in

    February 2011 the MSATM issued Ministerial Dispatch 10/2011, regulating the planning

    phases for the 2012 project cycle. The Dispatch only regulated the initial phases of the

    planning process, up to the submission of proposals from the Sub-District Development

    Committee (SDDC) to the District Development Committee (DDC); it further assumed that

    the PDID decree law would establish two different budgets (mainly depending on the size of

  • 7/29/2019 Local Governance Support in East Timor

    21/46

    Page | 21

    the projects). The fact that the decree law could not be approved within year 2011 caused that

    the following phases of the planning process were carried out in a sort of legislative vacuum,

    departing significantly from past LDP regulations.

    A first consequence of the application of the new Dispatch was that there were no communityconsultations at the Suco level, as Suco Councils selected their proposals among those

    identified through Suco Development Plans (SDP) that had been drafted in 2010 following a

    process of consultation with the relevant communities. Therefore, the new Dispatch provided

    that new consultations are only required when communities or suco councils would like to

    proposed projects that are not included in the SDPs.

    All projects proposed by the Sucos, as well as others proposed by line sectors at the Sub-

    District level, were submitted to the SDDC. By 6 May 2011, all the proposals that were

    prioritized by the SDDCs were sent to the LAs for discussion and screening. LAs and

    relevant line sectors were then able to finalise draft District Investment Plans for 2012. At the

    end of May, LAs organized District Integrated Meetings, in which relevant stakeholders were

    invited to discuss the proposed investment plans in order to avoid project duplications and to

    increase their technical capacity and skills. Participants included both state and non-state

    institutions. As a result of the meetings, the LAs recommended 714 project proposals with a

    total proposed allocation of 85,211,907 USD (see Table 8).

    Table 8: List of District Integrated Meetings

    District Meeting Date #Project Proposals Total amount (USD)

    Aileu 25/05/2011 37 5,090,000

    Ainaro 26/05/2011 82 7,032,000

    Baucau 30/05/2011 50 6,244,000

    Bobonaro 27/05/2011 66 8,241,500

    Covalima 27/05/2011 73 7,122,900

    Dili 25/05/2011 66 13,319,000

    Ermera 25/05/2011 64 5,293,828

    Lautem 27/05/2011 40 1,816,700

    Liquia 26/05/2011 37 4,232,000

    Manatuto 25/05/2011 26 4,483,000

    Manufahi 27/05/2011 66 3,941,600

    Oe-cusse 31/05/2011 47 4,848,700Viqueque 31/05/2011 60 13,546,679

    TOTAL 714 85,211,907

    All proposals were then presented and discussed at a national level meeting, the District

    Budget Consultation Workshop, which was held in Dili on 13 and 14 June. During this two-

    day workshop, District Administrators presented the proposed projects for their Districts.

    Relevant ministries were present to provide their appreciations. The main objective of the

    meeting was to synchronize the district investment plans with national level initiatives. As a

    follow up action to the meeting, technical staff from DNDLOT and LGSP met with District

    Administrators to rank and prioritise the proposed projects. As a result, a total of 281proposals were recommended for data verification prior to their submission to the Budget

  • 7/29/2019 Local Governance Support in East Timor

    22/46

    Page | 22

    Revision committee.

    On 15 August, without conducting data verification, DNDLOT sent to the Budget Revision

    Committee of the MoF a list of 216 proposed projects under the LDP (including 150 LDP

    projects and 66 Community Centres), plus a second list of 205 proposed projects for the PDD

    I (see Table 9). Following the review by the Budget Revision Committee, 199 of the 216LDP projects were included in the draft 2012 State Budget, with a total budget allocation of

    6,292,910 USD and 115 projects with a total budget of 7,415,000 for PDD I projects (see

    Summary of the project budget of MSATM in Annex 1).

    Table 9: Number of Projects and Budget Allocation before and after the Budget Review Commission

    District

    PDL Projects (including Community Centre) PDD Projects

    Proposed by DNDLOT Included in State

    budget

    Proposed by DNDLOT Included in State

    Budget

    Projects Budget Projects Budget #Project Budget #Projects Budget

    Aileu 10 417,477 10 368,000 11 922,000 6 610,000

    Ainaro 15 458,463 14 408,000 23 978,000 14 508,000

    Baucau 15 770,859 13 652,000 11 860,000 5 420,000

    Bobonaro 19 672,881 17 576,000 20 1,145,000 10 585,000

    Covalima 18 525,015 17 475,000 18 1,211,400 10 746,000

    Dili 16 728,579 14 529,000 21 1,432,000 11 846,000

    Ermera 24 847,731 22 748,000 21 1,372,000 15 1007,000

    Lautem 16 498,890 15 429,000 16 525,700 10 416,000

    Liquia 12 515,874 11 452,000 14 1,020,000 9 525,000

    Manatuto 13 381,945 12 356,000 6 660,000 3 160,000

    Manufahi 23 406,652 19 354,000 12 830,000 7 535,000Oe-cusse 22 561,733 19 464,000 21 1,143,500 9 599,000

    Viqueque 13 573,393 12 485,000 11 793,000 6 458,000

    TOTAL 216 7,359,492 195 6,296,000 205 12,892,600 115 7,415,000

    In late October 2011, the data verification process started for both LDP and DDP projects.

    While most proposed projects were sound, the verification teams found some cases in which

    budget allocations were not realistic, or the conditions at the project site were not fit for

    adequate project implementation.

    1.5 Gender Support ActivitiesIn January, LGSP produced a Gender training manual in Indonesian language. On 19 and 20

    January, LGSP also organized a two-day Training of Trainers (ToT) session for 10 LGSP and

    MSATM staff. LGSP has finalised the recruitment process to hire an international Gender

    Specialist, who should arrive in February 2012. Many of the gender-related activities

    included in the 2011 AWP are therefore being re-scheduled for the next year.

  • 7/29/2019 Local Governance Support in East Timor

    23/46

    Page | 23

    1.6 Capacity Building1.6.1 Refresher training on local planning, finance and procurement processTo develop capacities at both national and district levels, LGSP organized and carried out

    refresher training on local planning, finance and procurement processes. The session targeted24 participants from both districts and the central levels. The training was conducted from 30

    April to 1 May in Dili. As a continuation of this training, DNDLOT and LGSP staff is

    presently providing training to district administration treasury and finance teams. This

    activity is planned in five districts, three of which were already completed (Liquia, Ermera

    and Oe-cusse).

    1.6.2 AutoCAD training for District technical staffA total of 41 technical staff was trained on basic project design. A national short-term

    consultant was recruited to help LDP and DNDLOT teams to train the participants. Two

    training sessions were held in Dili, respectively from 10 to 14 and from 17 to 21 October.

    The objective of the training was to develop participants graphic design and the ir calculation

    specification skills.

    1.6.3 Study tour on the integrated Planning for Local Governance in IndonesiaA team consisting of 10 MSATM and LGSP staff went to Indonesia for one week (15-22

    December 2011) to receive training on Integrated Planning for Local Governance. The

    training was carried out at the Satunama Training Centre in Yogyakarta with the objective of

    helping participants in understanding the concepts, principles and alternative models of

    integrated development planning and to have an overview of legislative and conceptualframeworks for project design, implementation and monitoring.

    Output 2: Policy & Legislation

    Support is provided to GoTL for the establishment of an appropriate and comprehensive

    institutional, legal, and regulatory framework for local government

    2.1. Continued support to Local Government LegislationThe finalization of some pieces of the policy and legislative frameworks for decentralizationand local government was put on hold by the Government following the postponement of the

    municipal elections in April 2010. LGSP has therefore concentrated its efforts on supporting

    the drafting of other pieces of legislations that related to the improvement of the current PFM

    framework rather than with the establishment of future municipalities.

    Pending the recruitment of a legal adviser, a consultant has been hired during critical periods

    of the year in order to support the drafting of the PDID (please see 2.2). A legal advisor was

    also recruited and is expected to start her duties on 3 January 2012. Following the approval of

    the PDID, the legal adviser will support the legal drafting of the required subsidiary

  • 7/29/2019 Local Governance Support in East Timor

    24/46

    Page | 24

    legislation.

    2.2. Support the drafting process approval of the PDID Decree LawLGSP supported MSATM in drafting a decree law on the Integrated District Development

    Planning (PDID in Tetum acronym) and a legal consultant was recruited to help drafting andto submit the PDID. The PDID integrates sector-wide programmes (such as the DDP) with

    bottom-up programmes (such as the LDP). The PDID also streamlines and harmonizes local

    development processes and procedures for local planning, procurement, financial

    management, implementation and oversight, building as much as possible on the LDP rules

    and regulations.

    The draft Decree Law on PDID was initially presented to the council of Ministers (CoM) in

    October 2011 with the objective to obtain inputs from line ministries. A working group (WG)

    comprising of senior staff from MSATM and MoF (as further explained in point 2.4.3) was

    established in November to continue to discuss and finalize the PDID. The PDID was

    eventually approved by CoM on 11 January 2012, and at the time of drafting this report it is

    waiting for promulgation by the President of the Republic and for subsequent publication. A

    brief summary of the approved PDID is in Annex 6.2.

    2.3. Support the Production of Secondary Legislation2.3.1 Ministerial Dispatch on Planning Process

    In anticipation of the approval of the PDID decree law, in early 2011 LGSP supported the

    Ministry in drafting Ministerial dispatch No.10/2011, which regulates the planning processfor the 2012 project cycle. The dispatch builds on the LDP planning regulation, but it only

    covers the initial steps of the planning process, up to the submission of priority proposals to

    district assemblies by sub-district development committees and district-level sector

    departments. It also establishes that project identification at Suco level should take into

    consideration the Suco Development Plans that were drafted in 2010 through a participatory

    community process.

    2.3.2 Revision of MSATM Guidelines on Community Contracting

    LGSP assisted the MSATM in the revision of its guidelines on Community Contracting, in

    order to ensure that such guidelines are in line with Decree Law No 18/2011 that established

    PDD I and II. Some significant changes fix a threshold of USD 15,000 up to which contracts

    will mandatorily be adjudicated for community implementation, and a threshold of USD

    75,000 up to which community contracting will be used whenever technically feasible.

    Another important change is that the Project Implementation Committee will be able to

    request up to 75% of the total allocated funds, before the project is started. The revised

    version of the guidelines is waiting for Ministers approval.

  • 7/29/2019 Local Governance Support in East Timor

    25/46

    Page | 25

    2.4. Policy Development2.4.1 Community Development (CD)During the second half of the year, LGSP was involved in a process of discussion regarding

    the establishment of a government policy on a national mechanism to accelerate aCommunity Development (CD) process. LGSPs contribution included providing comments

    on a concept note development by the Government. As part of this debate, LGSP also took

    part in a two days workshop in November. LGSPs contributions focused on how any

    framework for future CD programmes should be an integrated part of the PDID process, so

    that different programmes and processes can all be linked together under a common strategy.

    This discussion seems to be extremely timely, as a new programme that might receive

    substantial financial support from AusAid and possibly other donors is envisaged to start in

    2012, with the first cycle of projects to be implemented in all sucos in early 2013. A

    Government Resolution on a national mechanism to accelerate community development was

    approved by the CoM on 18 January 2012, while this report is being drafted. The government

    resolution provides an official endorsement to the mentioned concept note, and aims at

    complementing the existing development plans so that, through an active involvement of

    citizens, they will be able to ensure an equitable intervention in all communities in Timor-

    Leste.

    2.4.2 Local Governance Working Group (LGWG)The LGWG was initiated by Irish Aid in July 2011 with the objective to gather together all

    the organizations that work on issues related to local governance. It meets monthly, and italso functions as a forum for members capacity development on the local governance related

    development issues.

    2.4.3 Technical Working Group (TWG) on Fiscal DecentralizationAs stated in (point 2.2), this Working Group (WG) comprising senior staff from Ministry of

    Finance (MoF) and Ministry of State Administration and Territorial Management (MSATM)

    was set up in September to discuss issues related to Fiscal Decentralisation, including PDID

    draft Decree Law and CD Concept notes. This TWG is envisaged to be a long term running

    working group, therefore, the group has developed and discussed a Terms of Reference for

    conducting a workshop on Fiscal Decentralisation in earlier 2012.

    Output 3: Support to Implementation of Local Government Reforms

    Support is provided to GoTL for the implementation of local government reforms

    LGSP continued to provide support to the MSATM in implementing communications and

    civic education focusing on local governance and the decentralization process, as well as

    ensuring press coverage of LGSP-MSATM joint activities. A new communication strategy

  • 7/29/2019 Local Governance Support in East Timor

    26/46

    Page | 26

    was elaborated involving all the relevant Directorates of the Ministry, and it was presented

    during a joint workshop in January 2011. The main objective of the strategy is to better adapt

    the outreach, social communication and civic education initiatives to the current scenario of

    the project, specifically in terms of key messages, audience, productions, activities and

    monitoring system.

    3.1. Production of Social Communication Materials (SCM)3.1.1 Monthly Radio Programme

    Seven editions of the monthly community radio programme (Development with

    Decentralization) were produced, distributed and aired at national and community level,

    through a network of 16 Community Radios (see Table 10).

    Table 10: List of Produced Radio Program during the Report Period

    No Topic of Radio Programme Edition/date1 Government allocates US$ 3.5 million to the local development fund

    January/February

    2 Districts and Sub-Districts receive the new information and suggestion

    box on local governance, development and decentralization March

    3 LDP making a difference in education: the story of the Vemasse

    Secondary School - also featuring an exclusive interview with the Irish

    Aid Head, Mr. Eoghan Walsh.

    April

    4 DDP and LDP moving towards integration - featuring an exclusive

    interview with Minister Arcangelo Leite, the Manufahi Administrator and

    the DNDLOT Chief of Department

    May

    5 MSATM completes the Local Development Programme MinimumConditions Evaluation in the Districts June

    6 New furniture is delivered to health centres in Liquia District with a

    LDP supported project

    September

    7 Training for 42 LDP Technical staff from 13 districts October/November

    3.1.2 Monthly Bulletin

    Seven editions of the monthly bulletin, both Tetum and English versions were produced (see

    Table 11) and distributed to the Districts, Sub-Districts, NGOs, UN Agencies, line ministries,

    National Parliament, universities, Donor community and uploaded on the MSATM website

    and the UNCDF global website.

    Table 11: List of Monthly Bulletin Topics

    No Topic of Monthly Bulletin Edition/Date

    1 New LDP training module on gender responsive local governance

    Revised regulations will harmonize LDP-DDP procedures

    "Our coffee plantations are now safe from flooding"

    New communication strategy to be approved soon

    February

    2 Government of Timor-Leste allocates 3.5 million to the Local

    Development Fund

    The "PDID" will open a new season for Local Development in Timor-

    LesteBrief History of the collaboration between the Ministry of State

    March

  • 7/29/2019 Local Governance Support in East Timor

    27/46

    Page | 27

    Administration and LGSP

    3 New Information and Suggestion Box is an opportunity for communities

    Communication Campaign on the Information Box kicks-off

    Local Governance approach makes the difference in Manufahi

    April

    4 Local assemblies will soon award 144 LDP projects for 2011

    "A country with no education is a country with no future"A Suco chief explains how the proposed construction of a secondary

    school became reality

    District profile: Baucau

    May/June

    5 The Ministry of State Administration and Territorial Management

    completes the LDP Minimum Conditions Evaluation in the Districts

    Districts discuss 2012 Budget, towards integrated planning

    July

    6 Monitoring by local assemblies is key for the LDP project

    implementation

    New furniture is delivered to 21 health centers and clinics in Liquia

    District profile: Liquia

    August/September

    7

    Verification and Implementation of PDL 2011/2012 CommencesStrengthening the Capacity of Local Development Program (LDP)

    Technical Staff Will Help Deliver Better Community Service

    PDID Decree Law Presented to the Council of Ministers

    October/November

    Compared to year 2010, a higher number of news and stories was issued, distributed to the

    national media and posted on the MSATM website. Eight news were produced in Tetun,

    English and Portuguese: four were published on the UNDP TL website, and four on the

    global UNCDF website.

    A new version of the LGSP Factsheet with updated figure and enriched content wasproduced, printed and distributed to the main national, local and international partners and

    stakeholders along the first semester of 2011. LGSP 2012 printing materials such as folder

    and note book were printed during the reporting date, except the delayed of 2012 calendar

    printing due to some technical failure experienced by the tender winner company.

    The Communication Unit also monitored the coverage of the decentralization process in the

    national print and broadcast media. A new Communication Check List was produced in

    collaboration with MSATM (DNDLOT) and distributed in the 13 Districts with the LDP

    team. The main objective of the check list is to receive feedback from District Local

    Authorities on the impact and dissemination of radio programmes, monthly bulletins, posters,

    information box installation and to receive suggestions on future publications and

    productions, including a video documentary and organization of thematic workshops. Results

    on collected data (see Table 12) will be used during the preparation of the 2012 Work Plan

    and Budget, to better reflect information and outreach needs as well as priorities in the field.

    Table 12: The summary of views from respondents to Communication Check list for 2011

    Type of EIC Materials Summary Analysis

    Monthly Bulletin The monthly bulletin provides significant details of information and data regarding

    the local development process in Timor-Leste. This bulletin has reached to district

    and sub-district level so far, and it is suggested that this Bulletin can be distributed to

    Sucos, Aldeia and Bairros, because rural areas community needs to know and keep

  • 7/29/2019 Local Governance Support in East Timor

    28/46

    Page | 28

    up to date the current and future likely local development in Timor-Leste.

    Monthly Radio

    Programme

    The monthly radio program brings a unique approach to disseminate information

    regarding development process to community in rural areas because a significant

    number of rural areas communities cannot read and write. This electronics media

    approach makes people aware of the PDD and LDP program for those who have

    radio.Information Board The information board is a useful information sharing tools to help local people to

    access to various information including on PDD and PDL projects, announcement of

    the LDP funds, vacancy announcement and some useful information data from other

    state and non-states institution such as NGO the district.

    In addition, LGSP supports the Ministry in making-over and re-styling the ministrys website,

    including insertion of new photo galleries and renewed few section appearances to be looked

    more attractive and substantially easy to access. Furthermore, to maintain and develop the

    ministrys website a website manual was produced and five (5) of the ministry staff were

    trained to self-maintain and developing the website in the future.

    3.2. Civic Education on Local GovernanceWith the postponement of the municipal elections to 2013/14, civic education activities were

    downsized and mostly focused on different initiatives aiming at raising awareness on the

    Local Governance key principles, such as transparency, bottom up participatory process and

    accountability in implementing local development projects.

    In particular, the new Information and Suggestion Boxes of the Ministry were distributed into

    all Districts and Sub-Districts, under the supervision of LGSP in March. An intensive

    communication campaign was organized by the team with the production of an illustrated

    poster designed by an international cartoonist then was distributed at the District and Sub-

    District level. In addition to that, a special edition of the Community Radio Programme and a

    longer and detailed version of the Bulletin were also developed by LGSP, besides a specific

    factsheet on the initiative and the organization of two presentations and workshops on the

    Suggestion Boxes which took place in Dili: the first one for the 13 District Administrators,

    and the second one for the 65 Sub-District Administrators. The first collection of suggestions,

    proposals and complaints channelled through the Box was conducted in mid-September, and

    only one letter of complaint was received from Oe-cusse. LGSP is presently assessing the

    letter that was received, following which it will discuss with MSATM whether the currentprocedures should be updated or whether the use of the information boxes should even be

    discontinued.

    A Learning Programme on communication related activities was organized in March May in

    collaboration with the UNMIT Training Centre for the 12 Communication Focal Points

    within the different MSATM Directorates. The course covered different topics including

    team work, priority management, and introductory lessons on the use of PowerPoint and

    Microsoft Publisher.

  • 7/29/2019 Local Governance Support in East Timor

    29/46

    Page | 29

    OUTPUT 4: Programme Management

    4.1. Recruitment processesDuring 2011, a number of recruitment processes were initiated and the positions advertised.Recruitment processes were finalized for the positions of LDP Coordinator (January 2011),

    Policy and Legislation Associate (May), Programme Manager (July, although the position

    was discontinued in December), Communications Associate (July) and Chief Technical

    Adviser (CTA). The following positions were filled in early January 2012, and the selected

    candidates have already started their duties at the time of drafting this report: Legal Adviser,

    Infrastructure Associate and Driver. Finally, recruitment processes for the positions of the

    Operations Manager, M&E Officer, Gender Adviser and Drivers Coordinator should also be

    finalized in early 2011.

    4.2. Other issuesDue to the internal restructuring within the MSATM, the Operations Unit and most of LDP

    team moved to a newly-built pre-fabricated office in April 2011. Currently, the team is spread

    over different buildings in the same Ministry compound.

    Office furniture that was no more in use was handed over to the MSATM, which further

    distributed it to Sub-District offices of Dili District.

    VII. SUMMARY OF THE MAIN ACHIEVEMENTS AND LESSONS LEARNED IN

    2011Since 2010, the local governance context has developed in a way that was not expected when

    the project was designed in 2006. In particular, the pace towards the establishment of

    municipalities has slowed considerably, while the focus has shifted towards a substantial

    increase in funding for small infrastructure projects to be planned and implemented locally.

    In this context, the following have been the main achievements and lessons learned by LGSP

    in 2012:

    Achievements

    Supported six-fold expansion of bottom-up planning procedures

    By supporting the drafting and implementation of new planning regulations (Dispatch

    10/2011) and the overall policy discussions around the PDID, LGSP has contributed to

    extending the bottom-up planning process for year 2012 to a much larger number of

    projects, totalling almost USD 20 million (up from 3.5 million in 2011). In this way, and

    although the planning process has been far from perfect during this initial year of

    application of the new regulations, LGSP has put the basis for extending its influence

    beyond the LDP, covering a much wider range of projects that will be locally

    implemented by the MSATM during 2012. This is very consistent with the goal of

    strengthening the overall efficiency and effectiveness of government capital resources.

  • 7/29/2019 Local Governance Support in East Timor

    30/46

    Page | 30

    Provided key support to PDID drafting

    Although the PDID Decree Law has yet to be approved, the political will showed by the

    MSATM and the technical support provided by LGSP have finally allowed for the

    presentation of the draft decree law to the CoM in October. On-going discussionsbetween MSATM and MoF should eventually lead to an agreed integrated approach,

    which allows for linking horizontal planning programs (e.g. the LDP) and sector-wide

    planning programs. Among other salient features of the present PDID draft, there are

    provisions that allow for multi-year planning and for the establishment of a Performance

    Based Grant System (PBGS).

    LoA signature

    The LoA signed between UNDP and MSATM marks a significant step in the relationship

    between the two institutions, as this can be seen as the start of the transition from Direct

    Implementation (DIM) to National Implementation modalities (NIMs). This will permit

    to test the capacity of the MSATM to carry out activities in accordance with procedures

    that are previously agreed with the LGSP. Once such procedures will have become

    normal practice for the MSATM, amounts covered by the LoA can be gradually increased

    until there is eventually a full transition to NIM modalities.

    Lessons Learned

    Need for timely approval of subsidiary legislation

    The year 2011 was marked by the continuous uncertainty regarding the approval of thePDID and the Omnibus decree law on procurement. Although year 2012 has started

    auspiciously with the approval of the PDID decree law on 11 January, it will be crucial

    that the related subsidiary legislations are quickly approved in order to allow for an

    orderly start of the planning phase for 2013 projects and the implementation phase for the

    2012 projects. Ideally both phases should be started by February. LGSP is currently

    providing support in the early drafting of the relevant secondary legislation to ensure

    timely approval and start their implementation.

    Need to ensure that established planning procedures are properly followedDuring 2011, bottom-up planning has expanded dramatically. However, exceptional

    circumstances (such as the uncertainty and legislative vacuum that accompanied the

    delayed approval of PDID) caused the planning procedures rather flexibly adhered to.

    (Please see sub-section 1.1.4 and 1.4.1 of this report for detailed explanation of this

    matter). As new procedures are currently being drafted for the whole PDID, it will be

    important to ensure that they are properly understood and followed by all stakeholders, in

    spite of the challenged posed by the electoral year. It will also be necessary to establish a

    coordination mechanism with the upcoming CD programme; in this sense it might be

    useful to have a common planning process for LDP in which the focus of both

    programmes would possibly be on projects bigger than 50,000 USD leaving the

  • 7/29/2019 Local Governance Support in East Timor

    31/46

    Page | 31

    responsibility of smaller projects to the new CD programme when it comes to

    implementation in 2013.

    Need to define whether LGSP should mainly support the implementation of LDP

    projects, or extend its support to the PDD as wellIt is important for the LDP to continue its transformation from a pilot programme into a

    fully-fledged support to the overall MSATM activities in the field of infrastructure and

    service delivery projects. At the same time, present legislation is not always conducive to

    this transformation processes as different procurement procedures were being followed in

    the implementation of PDD. In this context, LGSP can already provide support to the

    whole planning process, while LGSPs support to the implementation process of

    programmes other than LDP might depend on the final version of the Procurement decree

    law. It will be important for LGSP to maintain a regular dialogue with MSATM on this,

    and to be ready to further extend its support beyond LDP as soon as legislation becomes

    conducive to this.

    Need to start an early engagement in discussions with both the current and the

    subsequent government regarding LGSPs possible longer-term role.

    Local government reforms did not take place during the original life span of LGSP and

    are not likely to take place during the period of its two-year extension. A new government

    should be formed around August 2012, and it is only likely to take its first important

    decisions during 2013. For LGSP, it will be crucial to establish with it an early

    engagement and discussion about the possible role that the programme might play during

    the next UNDAF cycle (2014-2018). This may include support to local governmentreforms (if these gain new momentum), or alternative ways of helping the government in

    improving its PFM/PEM at the sub-national level.

    VIII. THE WAY FORWARD: PROJECT EXTENSION & WORK PLAN 2012

    The duration of the LGSP is from 2007 to 2011. However, early in 2011 the GoTL requested

    a two-year extension, until end-2013. Two UNDCF-UNDP missions were carried out

    respectively in May and June to initiate the design of the new project, which was then

    finalized in November. A meeting of the Project Steering Committee (PSC) was held on 13

    December to review and approve the extension project document.

    The extension was negotiated for a limited period of two years in order to align the project

    with the UNDAF cycle, but more importantly to take into account the fact that 2012 will be a

    period of transition, with presidential and parliamentary elections to be held and a new

    government to be formed: this means that important policy decisions may not be taken until

    at least the end of 2012. In view of this, only in 2013 it is likely to be clearer where does

    Timor-Leste want to go in terms of decentralization, and with what speed does it intend to

    undertake reform.

  • 7/29/2019 Local Governance Support in East Timor

    32/46

    Page | 32

    For this reason the project extension does not have Output 3 (Implementation of Local

    Government Reforms), and communication and public outreach activities become a cross-

    cutting issue.

    The project extension includes instead an expanded focus on Local Development, particularlyin regards to the creation of an enabling environment for increased community involvement

    in state processes. However, it is important to note that many of the proposed activities that

    would relate to this expanded focus of the LDP are yet unfunded. Therefore, the AWP 2012

    will not include such activities until there are concrete indications that they would find a

    donor.

    During the PSC meeting, the Minister explained that 2012 will be the last year for LDP, as all

    current development programmes will need to fully merge into the new PDID framework. In

    this perspective, he requested that LGSP focus on supporting the whole PDID process.

    Relevant aspects of the draft AWP 2012 were discussed during the last PSC meeting held on

    13 December 2011. The approved plan is in annex 6.3.

  • 7/29/2019 Local Governance Support in East Timor

    33/46

    Page | 33

    PART II: FINANCIAL PERFORMANCE

    The MPTF Office, as the Administrative Agent of the Local Governance SupportProgramme (LGSP) Timor-Leste Joint Programme, receives, administers and manages

    contributions from donors, and disburses these funds to the Participating Organizations inaccordance with the decisions of the Steering Committee. In addition it submits annualconsolidated reports, which report to donors on total contributions received, transfers made toParticipating UN Organizations for the implementation of approved projects and theexpenditures incurred against these projects. This financial report covers only funds receivedthrough the pass through funding modality (i.e. contributions from Irish Aid).

    1.Financial Overview

    During the reporting period