lng projects - cimtas lng proje… · •operational in 2002 •power, process, oem integrated...
TRANSCRIPT
LNG PROJECTS
C I M T A S G R O U P L o c a t i o n s
C I M T A S P I P E F A B R I C A T I O N A N D T R A D I N G L T D . C O .
• Spool Shop – 3,500
• Fitting Shop – 1,000
• LSAW Shop – 5,000
Capacity (tons/month)• Operational in 2002 as a Pipe Spool Shop
• Now an integrated Pipe Spool, Fitting & LSAW Pipe (Aug 2017) Shop
• Serving OG&C, Power, Construction, Mining and Metals, Water Industries
• 2 hrs/200 km from Istanbul & 2 km from 4 International Deep Sea Ports
• Operational in 2002• Power, Process, OEM Integrated Piping Solutions• Integrated Design & Engineering, Material Procurement,
Surface Treatment, Packing, Framing• Fittings, Flanges and Branch Connections• Cimtas Designed (Brand) Products: CIM-INSERT®& CIM LET®• Induction Bending (2 machines, 40 and 108 mm thk. P92)• ASME NPT, NS, NA Nuclear Certificates• Fenced Area: 120,000 sqm (1,292,000 sq ft)• Covered Shop and Office Space: 60,000 sqm (645,800 sq ft)• 4,500 tons/month fabrication capacity
C I M T A S P I P E F A B R I C A T I O N A N D T R A D I N G L T D . C O .
L N G P R O J E C T S
Project Name Location Tonnage
*Plant
Capacity Year
ELNG Egypt 5,500 7.2 2003-2004
EGLNG Equatorial Guinea 2,500 3.4 2005-2006
Angola LNG Angola 7,200 5.2 2009-2010
Queensland LNG Australia 9,800 8.5 2012-2013
Gladstone LNG Australia 13,200 7 2012-2013
AP LNG Australia 6,800 4.5 2012-2013
Sabine Pass LNG Train 1-2 U.S.A. 14,250 9 2013-2014
Sabine Pass LNG Train 3-4 U.S.A. 13,700 9 2014-2015
Angola LNG (Additional) Angola 1,300 5.2 2014-2015
Corpus Christi LNG Train 1-2 U.S.A. 13,700 9 2015-2016
Sabine Pass LNG Train 5 U.S.A. 6,900 4.5 2016-2017
TOTAL 94,850
*Total of 17 trains with 72.5 million tons per annum capacity
S i z e a n d M e t a l l u r g y B r e a k d o w n
Metalurgy Dia Inch Range Tonnage Materia
CS2" and below 1,950 CS1
3" - 24" 30,900 CS2
>24" 41,600 CS3
Sub Total 74,450
SS2" and below 1,050 SS1
3" - 24" 8,200 SS2
>24" 11,200 SS3
Sub Total 20,450
Grand Total 94,900
L N G P R O J E C T S
P R O J E C T M A N A G E M E N T
PMP® certified project managers and coordinators support the objectives to implement solutions with the lowest overall risk and highest customer satisfaction.
• Integrated change control to centrally manage and document change orders
•Communication Plan to clearly define how to communicate the right information to the right stakeholder at the right time
• Integrating, communicating and managing technical changes
•Managing suppliers and sub-contractors through cost, schedule and quality baselines
• Procurement, material handling, storage, packing
• Crating, Bundling, Containerizing, Framing
• 21 Portal & Semi-Portal cranes up to 30 tons capacity
• 49 Overhead cranes up to 25 tons capacity
• 100 logistics staff
• 2 hrs/ 200 kms from Istanbul
• 2 kms from 4 International Deep Sea Ports
• 50,000 sqm stock area
L O G I S T I C S
P R O C U R E M E N T
• Cost-efficient supply chain management
• Global sourcing
• Knowledge of local and int.’l markets and customs
• Wide range of approved well known suppliers
• Multi location central managed sourcing
• Experienced sourcing and procurement engineers
• Supplier qualification and evaluation
S c o p e
• Pipes
• Pipe Supports
• Fittings
• Flanges
• Valves
• Instruments
• Process Equipment Packages
Butterfly steam control valveVendor Inspection
P A C K I N G T Y P E S
Crating, Bundling, Containerizing• Regular weekly 500 tons of bulk spool shipments on priority basis worldwide.
2008 - 2015 Total : $ 345 M
G L O B A L S O U R C I N G
W O R L D W I D E D E L I V E R I E S O v e r 4 0 C o u n t r i e s