lng panel - pielc.org

12

Upload: others

Post on 07-Feb-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

PacificConnectorPipeline• 230-mile-long, 36-inch-diameter welded steel underground interstate

pipeline; • natural gas compressor station at Butte Falls, in Jackson County,

consisting of two new 10,310-horsepower (hp) compressor units; • four natural gas meter stations, including the Jordan Cove Receipt Meter

Station in Coos County, Clarks Branch Delivery Meter Station in Douglas County, Shady Cove Delivery Meter Station in Jackson County, and the adjoining Tule Lake, Russell Canyon, and Buck Butte Meter Stations in Klamath County;

• gas control communication system, consisting of new radio towers at each meter station and the compressor station, use of an existing communication site owned by Williams Northwest and leased space on seven other existing communication towers;

• mainline block valves (MLV) at approximately 16 locations along the Pacific Connector pipeline; and

• five pig2 launchers and receivers, four co-located with meter stations and the compressor station, and the fifth co-located with a MLV.

BiggerOverviewMap

Roguerivercrossing1

ODFW states, “The proposed crossing of the Rogue near Trail Creek is in an area that provides important spawning habitat for spring Chinook. 70% of the remaining spring Chinook habitat is below the proposed crossing. ... The inadvertent release of bentonite clay from a frac-out is a major concern due to potential impacts on fish and redds for spring Chinook and for the river ecology that supports a wide variety of species.”

NorthernSpo+edOwl:

Thepipelineheavilyimpactsnorthernspo>edowlhabitatintheheartoftheirrangeinOregon.*Thepipelineclearcutswithin80knownowlsitehomeranges.(4.6‐49).*Thepipelinewillevencutdirectlyinto4nestpatches(within600feetofthenesttree).• Over420acresofNSOhabitatisdirectlyclearcut(4.6‐43),withthousandsmoreacresdegradedinUnclearedStorageAreasandfragmentedinteriorhabitat.

MarbledMurrelets:

• LogslargetreeswithinmurreletcriVcalhabitat(CHUOR‐06‐d),• Logsoccupiedhabitat• Fragmentsforests,whichthreatensmurreletnestswithpredaVon.• Clearcuts84acresofsuitablehabitat• Creates4000acresofnewedgeeffects

Pipelinecenterline,CoosBayBLM

ImpactstoreservestofederallandmanagedundertheNorthwestForestPlan

Thisprojectclearcutsanddegradesover500hundredsacresintheRiparianReservesandtheLateSuccessionalReserves(LSR)protectedintheNorthwestForestPlan.

*Thepipelinecrosses24.47milesofthreeLSRs.*ThepipelinecrossesanaddiVonal4.56milesofriparianreserves.*37.44acresofforestedriparianreserveswouldbeclearcutfornewroads.*Totalacresofriparianreservesimpacted(newroads+UCSA+TEWA)notdisclosed.*358.55acresofLSRswouldbeclearcutinroadsandTEWAs.*488.6acresofLSRswouldbedegraded(including130acofUCSA).

Byle>erof12‐4‐08,theForestServiceinformedFERC"itisnotfeasibletousetheFERCEIStoconcurrentlyamendtheaffectedForestPlans"andthattheybelieve"aseparateForestServiceNEPAprocess"isrequired.

Byle>erof12‐17‐08,theBLMinformedFERCthat"theBLMwillparVcipatewiththeUSFSinanalyzingthenecessaryamendmentsthroughaseparateenvironmentalanalysis”.

ButagencymeeVngminutesof1‐9‐09statenoBLMplanamendmentisneeded.BLMexplains:

TheWOPRFEISconsideredtheproposedJordanCoveLNGfacilityandPacificConnectorprojectsinthecumulaVveeffectsanalysis...TheFederalEnergyRegulatoryCommissioniscompleVnganEISthatconsidersthebroadscaleandsite‐specificimpactsofthesetwoprojects….TheBLMiscooperaVngagencyinthepreparaVonofthatEIS.

InspiteoftheformaldecisionbytheFSandtheBLMthatatheFERCEISdoesnotadequatelyanalyzetheimpactsofplanamendmentsandthataseparateEA/EISisrequired,andfurtherthattheFSandtheBLMwillbejointlypreparingthisseparateEA/EIS,theBLMsuddenlydoesanaboutfaceclaimingtheFERCEISwilladequatelycovertheplanchanges.

ForestPlanAmendments,ornot….

Thehousecircledabove,nearDaysCreek,willbedrapedwithpaddedblanketstoprotectitfromtheflyingrockwhenthepipelinerouteisblastedopen150feetfromtheirfrontdoor.

Coospipeline

Old growth Madrone tree on private land threatened by pipeline.