algeria-europe gas pipeline via spain · venezuela lng trinidad&te lng nigeria lng libya lng...

31
1 Haga clic para cambiar el estilo de título Algeria-Europe gas pipeline via Spain

Upload: trinhxuyen

Post on 07-Apr-2018

226 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

1

Haga clic para cambiar el estilo de título

Algeria-Europe gas pipeline via Spain

Page 2: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

2

INDEX

II. Project Scope

III. Project Phases

IV. Key Points

V. MEDGAZ: A Strategic Project

VI. Timetable

VII. Construction Process

I. Introduction to the ProjectI. Introduction to the Project

Page 3: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

3

I. INTRODUCTION TO THE PROJECTBackground:

1970’s:

• The idea of building a direct gas pipeline between Algeria and Europe arises.

• Several feasibility studies take place.

• Technical limitations prevent the construction and operation of an ultra deepwater pipeline.

Year 2001:• The construction of an ultra

deepwater pipeline is feasible.• CEPSA and Sonatrach found

MEDGAZ.

Page 4: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

4

I. INTRODUCTION TO THE PROJECT

Objective:

MEDGAZ is a company specially constituted to design, build, and operatean Algeria-Europe gas pipeline via Spain, to improve security of energy supply and meet growing demand for natural gas.

Main pipelines

LNG terminals

MEDGAZMEDGAZ

Page 5: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

5

I. INTRODUCTION TO THE PROJECT

Shareholding :

Founding members: CEPSA and Sonatrach

Rest of shareholding: Iberdrola, Endesa and Gaz de France

CEPSA20%

SONATRACH36%GdF

12%

ENDESA12%

IBERDROLA20%

Page 6: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

6

INDEX

III. Project Phases

IV. Key points

V. MEDGAZ: A Strategic Project

VI. Timetable

VII. Construction process

I. Introduction to the Project

II. Project ScopeII. Project Scope

Page 7: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

7

II. PROJECT SCOPE

MEDGAZ

Albacete

Spanish Onshore

Transversal Axis

Algerian Onshore

Reception Terminal

Compressor Station

MEDGAZ

Route

Page 8: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

8

II. PROJECT SCOPE

Technical Summary:

Length: 210 kmDiameter: 24 inchesCapacity: 8 bcm/yearMaximum Depth: 2,165 mEstimated Investment: 900 M€Workforce:

• Over 2,000 people (construction phase)

• Over 100 persons (operation phase)

Page 9: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

9

MEDGAZ - Transportation SystemOFFSHORE SECTION

-2200-2100-2000-1900-1800-1700-1600-1500-1400-1300-1200-1100-1000-900-800-700-600-500-400-300-200-100

0

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200

KP (km)

Wat

er D

epth

(m)

ALGERIA SPAIN

Offshore Pipeline Profile

II. PROJECT SCOPE

Page 10: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

10

INDEX

IV. Key Points

V. MEDGAZ: A Strategic Project

VI. Timetable

VII. Construction Process

I. Introduction to the Project

II. Project Scope

III. Project PhasesIII. Project Phases

Page 11: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

11

III. PROJECT PHASES

Completed Stages

Conclusion of marine surveys

Conclusion of marine surveys

Conclusion of basic engineering (FEED)

Conclusion of basic engineering (FEED)

MEDGAZ, priority project

MEDGAZ, priority project

Conclusion of Environmental Impact Assessment (EIA)

Conclusion of Environmental Impact Assessment (EIA)

July July

June Oct.

MEDGAZ submits the project for approval

MEDGAZ submits the project for approval

Feb.

MEDGAZ becomes a company for construction

MEDGAZ becomes a company for construction

Jan.

End of public Information

End of public Information

July

Environmental Impact Declaration (DIA)

Environmental Impact Declaration (DIA)

Sept.

Administrative AuthorizationAdministrative Authorization

Oct.

Algerian ConcessionAlgerian Concession

2004 2005 20062004

Sept.

2006MEDGAZ Company for Study

F.I.D.F.I.D.

Dec.

2 0 0

1

2 0 0

9

Page 12: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

12

HUGIN 3000-GC Preparing to DiveHUGIN 3000-GC

509 Km. Visual inspection

2004 – Marine Surveys

Triton XL-14

15 km Geophysical

130 km Visual inspection

III. PROJECT PHASES

Page 13: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

13

INDEX

V. MEDGAZ: A Strategic Project

VI. Timetable

VII. Construction Process

I. Introduction to the Project

II. Project Scope

III. Project Phases

IV. Key PointsIV. Key Points

Page 14: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

14

IV. KEY POINTS

Improves security of supply

Is the most cost-effective way of supplying natural gas to Spain

Meets growing demand for natural gas in Europe

Makes a positive contribution towards the Kyoto Protocol implementation

Page 15: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

15

IV. KEY POINTS

Improves security of supply:“It is advisable to maintain a balance between NG/LNG supplies, in a way that neither of these two sources should fall below 1/3 of the total (…) to optimize the coverage(…).”

(Planning of Electrical Power and Gas Sectors. Development of Transportation Networks 2002-2011)

Page 16: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

16

IV. KEY POINTSImproves security of supply:

• MEDGAZ does not increase the Algerian energy dependence.

48.443.142.057.1Algerian gas share, % s./total volume

21.36.09.36.0

15.36.09.3----

14.45.09.4----

13.77.36.4----

Algerian gas importation, bcm/year• LNG, bcm/year• NG through GME, bcm/year• NG through MEDGAZ, bcm/year

43.735.534.023.7Spanish gas supply, bcm/year

2011200720052003Year

Sources: MITYC, CNE and Sonatrach

Page 17: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

17

IV. KEY POINTS

Most cost-effective way:

Most direct route

Shorter length (than GME*)

Lower energy cost and no transit tolls

Most cost-effective way of supplying natural gas to Southern Europe

*GME: Gasoducto Magreb Europa

OME, 2005

0 0,5 1 1,5 2 2,5 3 3,5

Russia LNG

Norway LNG Snohvit to Spain

Yemen LNG to West Med

Oman LNG to West Med

UAE LNG to West Med

Iran LNG

Qatar LNG to Spain

Venezuela LNG

Trinidad&Te LNG

Nigeria LNG

Libya LNG

Egypt LNG

Algeria LNG to Med

Algeria (via GME)

Algeria (via Medgaz)

$/MBTU

Production

Transport

Transit fees

Page 18: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

18

Conclusion: The increase in electrical power generation through combined cycle facilities, which are highly efficient and environmentally friendly, is the main cause for the increase of the Spanish demand for natural gas.

IV. KEY POINTSMeets growing demand:

Increase of natural gas demand in Spain (2005)

Sources: Sedigas and CNE

•Total: 17.6% more than 2004 .

•Domestic and commercial : 8.5% more than 2004.•Industrial: 3.2% more than 2004.•Power generation: 68.4% more than 2004.

2005. Distribución de las ventas de gas natural en España por mercados

Page 19: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

19

IV. KEY POINTSMeets growing demand:

Source: Spanish Ministry of Industry and CNE

0,00

20,00

40,00

60,00

80,00

100,00

120,00

2005 2006 2007 2008 2009 2010 2011

Año

bcm

/año

Magreb Larrau MedgazBarcelona Cartagena HuelvaBilbao Mugardos SaguntoMusel Otros (Tuy Badajoz Irún) Total AASSDemanda Anual Demanda Punta Total

Page 20: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

20

IV. KEY POINTS

Respects Kyoto Protocol:

MEDGAZ will deliver to the European market natural gas: a clean, efficient, versatile and safe hydrocarbon.

One of the main objectives of the countries that have ratified the Kyoto Protocolis to progressively reduce its CO2 emissions. In order to do so, they are increasingly relying on natural gas.

Page 21: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

21

INDEX

VI. Timetable

VII. Construction Process

I. Introduction to the Project

II. Project Scope

III. Project Phases

IV. Key Points

V. MEDGAZ: A Strategic ProjectV. MEDGAZ: A Strategic Project

Page 22: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

22

V. STRATEGIC PROJECT

Europe

Spain

AACC

“Project of Priority Interest within Trans-European Networks in the Energy Sector”

“Quick Start” Program

Financial aid for preliminary studies

The autonomous authorities have shown there firm support to the project

“Priority Project and Urgent: Planning of Electrical Power and Gas Sectors. Development of Transportation Networks 2005-2011” (MIN, 2006)

MEDGAZ is a strategic project for Spain, Algeria and the rest of EuropeMEDGAZ is a strategic project for Spain, Algeria and the rest of Europe

Page 23: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

23

INDEX

I. Introduction to the Project

II. Project Scope

III. Project Phases

IV. Key Points

V. MEDGAZ: A Strategic Project

VI. TimetableVI. Timetable

VII. Construction Process

Page 24: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

24

VI. TIMETABLE

MEDGAZ will adapt its schedule according to the agreements between the Spanish and Algerian authorities

1. Global Project

Page 25: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

25

INDEX

I. Introduction to the Project

II. Project Scope

III. Project Phases

IV. Key Points

V. MEDGAZ: A Strategic Project

VI. Timetable

VII. Construction ProcessVII. Construction Process

Page 26: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

26

Pipe lay methods:

VII. CONSTRUCTION PROCESS

Both shallow and deepwater areas

Welding and tending in horizontal position

Pipeline forms an “S” shape during tending process

Between 400 y 3.500 meters depth

Welding and tending in vertical position

Pipeline forms a “J” shape during the tending process

Page 27: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

27

VII. CONSTRUCTION PROCESS

1-

2-

Pipe section length: 12m

Diameter: 24 inches

Triple layer coating

The pipe sections are placed in the middle of the platform and raised up to the welding tower where they are to be welded at the girth joint using submerged arc welding equipment

Page 28: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

28

VII. CONSTRUCTION PROCESS

3 -

4 -

The pipes are aligned in the tower and welded using automated welding machineries

Each welded joint is individually tested by nondestructive techniques (NDT)

Page 29: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

29

VII. CONSTRUCTION PROCESS

5 -

6 -

The exposed welded joints are coated with two layers, one made of epoxy resin and the other of polypropylene to maintain continuity with the rest of the pipe

While these operations are taking place, the vessel slowly lays the pipeline on top of the seabed. The average velocity of construction is three kilometers per day

Page 30: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

30

VII. CONSTRUCTION PROCESS

The deep sea pipeline is mostly laid on top of the seabed, except in near-shore areas, where it is physically buried in order to minimize the effects of human activity and protect the pipeline from sea currents and storms. An automatic robotic trenching machine digs the trench where the pipeline is to be lowered

7 -

Page 31: Algeria-Europe gas pipeline via Spain · Venezuela LNG Trinidad&Te LNG Nigeria LNG Libya LNG Egypt LNG Algeria LNG to Med Algeria (via GME) Algeria (via Medgaz) $/MBTU Production

31

Haga clic para cambiar el estilo de título

Thank you for your attentionThank you for your attention

www.medgaz.com