Page 1: Legend: < 0.01 cGy.01-1 cGy 1-10 cGy Initial Radiation Tests 1 km

Legend: < 0.01 cGy .01-1 cGy 1-10 cGy

Initial Radiation Tests

1 km

Page 2: Legend: < 0.01 cGy.01-1 cGy 1-10 cGy Initial Radiation Tests 1 km

People Showing Radiation Symptoms(Locations at the Time of the Initial Alarms)

3515 508

X

5X

12X

4X

X2

5X

3X

2X

X4

X1

1 km

Page 3: Legend: < 0.01 cGy.01-1 cGy 1-10 cGy Initial Radiation Tests 1 km

Kuhistan Requested TasksTo determine the source of contamination, the area

/people contaminated Conduct of Hazard Modeling Conduct of Rad Survey

Validate modeling products Determine extent of area affected

To resolve the radiation contamination To secure the nuclear facility

Secure the areas (contaminated area, incident management areas)

To treat the people who have been exposed or may be exposed (several hundred all together?) Monitor evacuation & decontamination operations Medical Support

Assist local medical services as requested

Response to Plant leak as requested is beyond scope of CTF capability

Page 4: Legend: < 0.01 cGy.01-1 cGy 1-10 cGy Initial Radiation Tests 1 km

Implied CTF Tasks• Force Protection Measures

– Distribution of dosimeters, specialized detectors

• Conduct Info Ops– General Population– Affected people– Own forces

Page 5: Legend: < 0.01 cGy.01-1 cGy 1-10 cGy Initial Radiation Tests 1 km

CTF CONOPS• Phase 1 (now – 24hrs)

– Situation Assessment• Conduct of Hazard Modeling• Deploy Assessment Team• Deploy Liaison Teams• Deploy Rad Survey Teams

– Conduct Info Ops• Affected Population• General Population• Own Forces

Page 6: Legend: < 0.01 cGy.01-1 cGy 1-10 cGy Initial Radiation Tests 1 km

CTF CONOPS• Phase II (2 – 7 Days)

– Implement Force Protection Measure for Affected Forces

• Issue dosimeters, Specialized detectors

– Secure the exclusion areas– Deploy Monitoring Teams– Deploy Medical Assets– Establish Bypass for I-15– Co-ord for entry of IAEA Assessment Teams

• Phase III (7 days onwards)– Handover Area to Local Authorities & suitable

International Authority