Page 1: Kbe parking structures

parking structures

Cora Harkins, Manager of Business DevelopmentP: 860.284.7622E: [email protected]

Page 2: Kbe parking structures

DESIGN-BUILDER | CONSTRUCTION MANAGER | GENERAL CONTRACTOR

For clients in Municipal, Retail, Education, Senior Living, Hospitality, Corporate, and Federal markets

CONNECTICUT | NORTHEAST REGION & MARYLAND | MID-ATLANTIC REGION

Page 3: Kbe parking structures

a trusted partnerThrough our diverse experience, KBE Building Corporation can support the many construction needs of parking structures. Our preconstruction and construction experience includes work in municipal, university, retail, and senior living facilities.

KBE is committed to being a trusted construction partner for our clients and design teams. That trust is built on the integrity and experience of our people, and our many years of proven performance for hundreds of clients throughout Connecticut, the Northeast, and the Mid-Atlantic US.

a successful construction firm with integrity� KBE is a 54-year-old construction services firm with projects throughout New England and Mid Atlantic, and more than

$2.3 billion in construction volume over the last decade.

� Highly experienced Design-Builder, CM at Risk, CM as Advisor, and General Contractor.

� Committed to putting communities to work and exceeding our client’s SBE/MBE/WBE goals.

� One of the region’s largest merit shop construction firms. KBE offers our clients access to an extensive pool of qualified trade contracting firms, regardless of union or non-union affiliation, providing our clients with the most competitive pricing from the best qualified firms.

expert in-house staff� Staff of 120+ experienced construction professionals and support staff.

� Preconstruction and Estimating Groups with Certified Professional Estimators and Specialists in BIM, Site, and Mechanical/Electrical.

� 16 LEED Accredited Professionals, including Preconstruction and Construction staff.

experienced in...� Design|Build, Construction Management and General Contracting, with in-depth Preconstruction Planning Services.

� Partnering, LEED/Sustainable Design, Building Information Modeling, and Quality Control.

proven management processesWe initiate expansive communication throughout the Preconstruction and Construction process utilizing:

� Leading-edge web-based communication subcontractor and online plan room portals providing access to all project team members.

� Technology focus - we support our clients, staff and projects utilizing multiple software resources.

safety� Award winning safety program and performance.

� Experience Modification Rate significantly better then industry average of 1.0.

� All field staff are OSHA 30-Hour Certified for Construction Safety.

about kbe :: capabilities

Page 4: Kbe parking structures

science park parking garageNew Haven, CT

ownerWinstanley Construction Management, LLC

New Haven, CT

architect BL CompaniesMeriden, CT

services Design-Build & Constructor

cost $37.3 million

size/scope1,186 car structured parking; 5-story

22,700 sf retail space

schedule Aug 2008 to Oct 2009

description

The precast garage provides parking for 1,186 cars and supports the parking needs of tenants at the nearby 25 Science Park office building and surrounding area. The facility includes an additional 22,700 sf of street-level retail space for stores and restaurants. Science Park Parking Garage is set on an 80+ acre setting of industrial reuse land and buildings located near Yale’ University’s Science Hill.

Page 5: Kbe parking structures

summer place parking garageStamford, CT

ownerCity of Stamford

Stamford, CT

architect BL CompaniesMeridan, CT

services Design-Builder

cost $13 million

size/scope158,004 sf

498-car, 5-story

schedule May 2005 to Mar 2006

descriptionSet on a challenging site, adjacent and abutting an existing retail center. The elevator core was separated from the garage proper and enclosed by a decorative multi-colored curtain wall along its front.

Page 6: Kbe parking structures

stamford courthouse garageStamford, CT

ownerState of Connecticut, Department of Construction Services

Hartford, CT

architect BL CompaniesMeriden, CT

services Design-Builder and Constructor

cost $9.2 million

size/scope167,525 sf

509 parking spaces, 6-levels

schedule Feb 2005 to Sep 2005

description

The precast concrete superstructure is set on cast-in-place concrete foundations, with precast concrete shear walls for lateral force resistance. Openings have been provided in interior shear walls for passive security. One and a half levels of the new garage are set below grade, incorporating the required fire protection and ventilation measures. In the southeast corner, the new garage ties in at two levels of the existing underground parking facility. At the area of tie-in, the new facility spans the existing structure to avoid applying additional loads to the existing parking structure. Landscaping for the site has been designed for minimal maintenance and to preserve the open green space.

Page 7: Kbe parking structures

whitney center, parking garage and continuing care retirement communityHamden, CT

ownerWhitney Center,

Handen, CT

architect SFCS, Inc.Roanoke, VA

services Construction Manager at Risk

cost $50.6 million

size/scope 195,000 sf 7- story addition, and 2-level parking garage

schedule Jan 2010 to Aug 2011

description

2-level parking garage, new maintance garage and shop, renovation of multiple floors and areas of existing senior living facility, including kitchen/dining facilities, community center, and administrative offices. New addition of bistro, bank, library, salon, and restrooms. Upgrade of all related MEP and building systems. New addition provides 87 one- and two- bedroom living units, including all interior fit-out.

Page 8: Kbe parking structures

danbury police headquarters with parking garageDanbury, CT

ownerCity of Danbury

Danbury, CT

architect Jacunksi Humes Architects, LLC

services General Contractor

cost $26.3 million

size/scope 74,839 sf

schedule Aug 2007 Apr 2009

description

The new high-tech facility, with its graceful, 3-story Victorian-style aesthetic, provides both an engaging visual appeal and a high-visibility icon of public safety and security.

Interior features include a shooting range, 26-cell detention facility, bullet resistant sheathing, separate public areas, operational areas, high-density storage systems, central 911 dispatch for both fire and police, integrated security system. Exterior features include 5 vehicle bays, 2 bay sally port, CID lab, 3,000 sf precast parking deck with parking for 73 vehicles, and dual fuel mechanical systems, and landscaped plaza.

Page 9: Kbe parking structures

western connecticut state university centennial hall parking garage and residence hallDanbury, CT

owner State of Connecticut, Department of Construction ServicesHartford, CT

architect Newman ArchitectsNew Haven, CT

services Design-Builder and Constructor

cost $27 million

size/scope450-car parking garage

128,000 sf residence hall

schedule Oct 2003 to Oct 2004

noteworthy LEED-NC-v2 Certification

description

Design-Builder and Constructor for the 450-car, five-story, precast parking garage with adjacent 128,000 sf residence hall . Responsibilities included all related sitework, pre-cast wall-and-plank with traditional masonry, glass curtain walls, cold formed metal roof trusses, attic window freezes and all interiors. The parking structure is an open pre-cast spandrel system with a concrete frame. 11-month construction schedule.

Page 10: Kbe parking structures

sheraton hotel and parking garageWindsor Locks, CT

ownerR K Bradley Associates

West Hartford, CT

architect Steven S. Cohen ArchitectsPrinceton, NJ

services Construction Manager

cost $28 million

size/scope 300-car garage, 240 hotel rooms

description

300-car, two-level, below-grade precast parking garage and 240-room precast hotel. The garage houses the main electrical room for the garage and hotel as well as a large holding tank for the hotel sprinkler system. The first garage level is set on grade, and the second level precast double tee. The foundations for the garage perimeter is conventional spread footings. The central garage area supports the hotel with a six-foot thick concrete mat, which was constructed in a single continuous pour. The garage features open air ventilation and is fully sprinklered. The double-tees below the occupied hotel floors were sprayed with insulating material

The Sheraton Hotel is set between Terminals A and B of Bradley International Airport. Clear communication and intricate coordination among team members, as well as with the contractor for Terminal A, the FAA and the Aeronautics Division of the Connecticut DOT, was crucial to ensure the success of these concurrent construction projects.

Page 11: Kbe parking structures

bishop corner parking garageWest Hartford, CT

ownerE & A Northeast Limited Partners

Columbia, SC

architect Hoffman ArchitectsNorth Haven, CT

services General Contractor

cost $2.5 million

size/scope 450 car, 110,000 sf garage

schedule Dec 1998 to Mar 1999

description

Renovation of a 110,000 sf, 2-story parking garage. Scope of work included removal of the composite concrete slabs over metal deck, and replacement with new G-90 galvanized metal decking and concrete slabs that included admixtures to strengthen and enhance durability. Existing steel was cleaned and blasted, and repainted with special Tnemac coating.

Page 12: Kbe parking structures

www.kbebuilding.com