karnataka dp-sp structure
DESCRIPTION
11 KV DP STRUCTURE KARNATAKA EBTRANSCRIPT
-
MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
SCHEDULE OF RATES
NON REC GENERAL WORKSfor the year 2007
-
MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
SCHEDULE OF RATES FOR NON-REC, GENERAL WORKS
For the year 2007.
-
MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
Schedule of Rates effective from 01-06-2007
Preface:
1.0 The last revision of SR for labour was given effect from 01-05-2005 and for Materials from 01-12-2005.
2.0 MESCOM in its O.M No. AGM(A)/ AO(A)/ AAO(A)/ F-1039/ 21504-513, dated 05-03-2007
constituted a Committee comprising of the following members to study and revise the SR-2005
and submit a proposal for the year 2007.
i. Director (Technical) - Chairman
ii. Superintending Engineer (Ele) (Proc) - Member, Convener
iii. Superintending Engineer (Ele) (Tech) - Member
iv. Chief Engineer (Electy), Mangalore Zone - Member
v. Executive Engineer (Civil) - Member
vi. Executive Engineer (Purchase) - Member
vii. Accounts Officer (I/A), O&M Division, Mangalore - Member
3.0 The assistance of two retired Executive Engineers is also taken to prepare the report which is
verified by Technical and Accounts Committees formed for this purpose vide T.O O.M No:
MESCOM/SEE(P)/EE(W)/ 2007-08/217-221, dated 04-04-2007.
3.1 Now the revised SR for Materials and Labour have been prepared on the following basis:
a) In respect of materials which have been procured by MESCOM during the year 2006-07 and the purchase order includes the PV clause, the PO rate updated upto February
2007 is proposed.
b) In respect of materials, which have not been procured during 2006-07, the prevailing SR updated using the relevant PV and proposed, IEEMA price indices of April 2005 and
February 2007 are considered.
c) In respect of materials, which have not been procured and have no PV formula, the market rates obtained from the manufacturers/dealers is proposed.
d) In respect of some of the MS items like cross arms, clamps etc. the actual manufacturing cost has been worked out based on the cost of raw materials and labour charges as there
was a large difference in the prices obtained from the above methods.
e) For materials like 250kVA and 500kVA Distribution transformer and 11 KV UG cable, which have not been procured, by MESCOM and the rates worked out through
application of relevant PV, but is observed to differ largely with the current market
-
rates, the schedule of rates of BESCOM and KPTCL, which were revised, recently have
been proposed.
f) In respect of some of the items for which application of both MESCOM and BESCOM SR rates is possible, the rate, which is nearer to the market rate, has been adopted.
g) The BESCOM/KPTCL rates have been proposed for some of the new items and the
existing items for which the PV formula is not available as the above SRs were revised
recently.
3.2 The Labour charges of SR-2007 is based on Labour Index. Hence labour rates were increased by
11%.
4.0 The proposed Schedule of Rates (SR-2007) for Materials and Labour have been approved in the 22nd Board Meeting held on 11-05-2007. The SR-2007 will come into effect from 01-06-2007.
The following general guidelines may please be kept in view:
1) Squirrel ACSR (2 ACSR) conductor shall not be used for any new works and in accordance with B.O. No. B19/6723/95-96/21.6.2000 of KEB.
2) Minimum Size of the conductor to be used for all new 11KV lines shall be Rabbit ACSR only.
3) The Average span for new 11 KV lines in Urban areas shall be 40 Mtrs. instead of the present 67 Mtrs. in Rural areas the average span length shall be 50 Mtrs. instead of the present 85 Mtrs. The cost sheets have been worked out based on the above concepts.
4) Minimum size of the conductor to be used for all new L.T lines shall be Rabbit ACSR only in urban areas and Weasel Conductor in Rural areas.
5) For attending to the BREAK DOWN works for speedy restoration of Power supply payment of 25% more Labour charges than specified in the SR is continued.
6) Material code number for almost all materials have been provided in the SR and the same has to be used while preparation on the estimate.
7) All the field officers and inspecting officers should ensure that the materials used shall conform to the relevant ISI specifications and the works executed are in accordance with the approved drawings/stipulated norms. The UG cable/PVC wires used for the work shall carry ISI markings.
8) Guy set includes Anchor Rod, Turn buckle, Guy wire, Strain insulator, Guy clamp with Bolts, Nuts and Washer.
9) As per Government electrical inspectorate order No. CEG/D/T/13306/ 86-87 dated:17-12-1986 E.G Stirrups shall be used in the following locations:-
a) Within the town / village limits.
b) In the factory premises.
10) Provision for ACSR conductor includes sag at 1.5% and conductor accessories at 3% have been given separately in the cost data sheet.
-
11) Provision for inspectorate charge shall be made as a separate item in the estimate as per the rates that are inforce. The rate of inspectorate charges that are inforce is provided in the SR.
12) For short lines less than 1 Km the estimates shall be prepared for actual requirement of the
materials.
13) If concreting of poles is required separate provision has to be made in the estimate the rates for
which have being provided in the SR.
14) All transformers upto and inclusive of 25 KVA capacity are to be provided with GOS and HG fuse
units.
15) As per Board No. KEB/308/3/(82-83) dated:25-02-1993 of KEB and as per the decision of
Technical Committee meeting held on 25-06-1993, 25/63/100 KVA transformer shall be provided
with LT protection kit. Transformers with 250 KVA capacity and above shall be provided LT
distribution with MCCB. In city limits transformers with 100 KVA capacity shall be provided with
LT distribution box with MCB the rate for which has been furnished in the SR.
16) The LECs carrying out works on labour contract basis are authorised to purchase small items such
as Bolts and Nuts at SR rates where ever the execution of the work is held up due to non
availability of such materials provided the cost of such purchase is limited to 3% of the estimated
quantity.
17) If the scrap value of the cable proposed to be released is less than the sum of estimated labour for
such release, Depreciated value of the cable, road cutting charges payable to BMP and other civic
bodies than the releasing of the cable need not be resorted to. Otherwise the releasing work has to
be taken up as per the prevailing rates in SR.
18) The rates for new materials such as Metering Box, LT Capacitor etc., have been provided in the
SR.
19) Cost data sheets for erection of 25, 63 & 100 KVA DT on single pole 9.0 Mtr. RCC structure,
250 KVA on 11 Mtr. Spun pole structure, Installing RLMU for 15/25/63/100 KVA
Transformer, Compact RMUs, 11 KV and LT AB Cable, 11/0.43 KV Packaged Sub-stations
& LT capacitors to Distribution Transformers have been worked out and included in the SR
for easy reference.
20) Commonly used spares for conventional RMUs and for 11 KV GOS have been incorporated
in the new SR.
21) Relevant drawing have been incorporated in this new SR for easy reference.
22) Labour charges for releasing of materials shall be at 90% of the cost of erection.
23) The following additional components have to be included while preparing estimates for
APDRP/Distribution works which are executed on turnkey basis:-
-
a) Service tax @ 12.36% on labour cost. b) IDC (Interest During Construction) @ 5% on materials + labour cost.
c) Transportation cost from Stores to Site @ 2% on materials cost.
d) Watch and ward cost @ 1% on material cost.
e) Insurance charges @ 1% on material cost against theft & accidents.
f) Performance guarantee and loss of interest on margin money for Bank Guarantee (BG) @ 2.5% of the value of BG.
g) Statutory charges as per actuals (For Inspectorate, Civic body etc.,)
h) Compensation cost as per approved norms for tree cutting, crop insurance etc.
24) In estimates to be executed on Labour contract basis provision for Provident Fund @ 12% and ESI (at the prevailing rates wherever applicable) on Total Labour cost shall be included in the estimate as a separate item.
Convener SR Committee
Superintending Engineer (Ele) (Proc)
MESCOM, Mangalore.
-
Page No.Part-1
Cost sheets for 13.2/11 KV Distribution Lines and Transformer Centres 2007
Part- 2
Schedule of Rates for Standard Stock Materials 2007 .
Part- 3
Schedule of Rates for Labour 2007 ..
Part- 4
Schedule of rates for Labour 33 KV System .
Part- 5Technical Specification for Overhead and Underground Service Connection Works for the year 2007 .Part-6
Scale of Inspection Fees of Electrical Inspectorate Schedule ..
Part- 7
Sketches and Drawings
mangalore electricity supply company limited
Index
Non- REC General Works
-
Cost sheets for 13.2/11 KV Distribution Lines and Transformer Centres 2007
Part-1
-
SL.No Particulars Unit Qty Rate1 2 3 4 51 Materials cost
2 Labour charges
3 Employees cost @ 60% on labour charges
4 Contingencies @ 3% on material + labour cost
5 Service tax @ 12.36% on labour charges
6 IDC( Interest During Construction) @ 5% on material cost + labour cost
7 Transportation cost from stores to site @ 2% on material cost
8 Watch and ward cost @ 1% on material cost
9 Insurance cost against theft & accident @ 1% on material cost
10Performance guarantee and loss of
interest on margin money for BG @ 2.5% of the value of BG
11Statutory charges as per
actuals(Inspectorate charges, civic body charges etc.,)
12 Compensation cost for tree cutting etc., as per approved norms
13 Total cost in Rs.
TYPICAL COST DATA SHEET FOR TURNKEY WORK
Description of the work
Note:- Service tax is calculated at12.36% on Total labour charges
-
SL.No Particulars Amount (in Rs.)
1 Materials cost
2 Labour charges
3 Locality Allowance @ ..% on Labour charges
4 Employees cost @ 60% on Total labour charges (2+3)
5 Transportation cost from stores to site @ 2% on Material cost
6 Service Tax @ 12.36% on Total Labour Charges (2+3)
7 Provident Fund charges @ 12% on Total Labour charges (2+3)
8 ESI Charges @.....% (wherever applicable) on Total Labour charges (2+3)
9 Total cost of Estimate in Rs.
Note:-
Typical Cost Data Sheet for Labour contract work
This Cost Data Sheet is for preparing Estimates for awarding work on Labour Contract basis only.
-
SL.NO Particulars Unit Materials rate in Rs.
Labour charges (Casual)
in Rs1 2 3 4 5I RCC Poles
a) 9M 145kg WL (Using Tor-50 Steel) No 3492 397
b) 9M 150kg WL(Using Tor-50 Steel) sq. sec. No 4820 397
c) 8M 115kg WL (Using Tor-50 Steel) No 2356 318II PCC Poles
8M PCC Poles 140kg WL No 1517 318III PSC Poles
a) 8M 200kg WL No 1845 318
b) 9M 200kg WL No 2281 397IV Pre-Stressed Tubular Spun Pole
11M Long No 8365 675
V Double Pole Structure complete using a) 8M RCC Poles Set 8450 1162
b) 9M RCC Poles Set 10820 1218
c) For double circuit line using 9 M RCC Poles Set 11820 1366
VI Three Pole structure complete using a) 8M RCC Poles Set 14000 2267
b) 9M RCC Poles Set 17410 2351
VIITransformer Structure complete with cross arms braces, clamps, bolt&nuts and washers,
1) For 100 / 250 kVAa) Using 2 nos 8M RCC Poles Set 15200 1428b) Using 2nos 9M RCC Poles Set 17470 1586
2) For 63 / 25 kVAa) Using 2 nos 8M RCC Poles Set 10960 1332b) Using 2nos 9M RCC Poles Set 13230 1542
3)Single pole mounted transformer kit on 9 mtr RCC pole (square sec)a) for 25/63 kVA Transformer Set 3335 380
b) for 100 kVA Transformer Set 5730 380
4)For Single pole mounted transformer kit for 100/250kVA on 11 mtr spun pole
Set 17275 760
Note: The items V, VI, VII includes the cost of poles, structure materials & about 10 to 12 kg of G.I wire required for earthing of structure materials.
Rates of various Line materials and Labour charges used in cost sheets for general works
1
-
SL.NO Particulars Unit Materials rate in Rs.
Labour charges (Casual)
in Rs
VIII11 kV Horizontal cross arm with H.T.Single top support, clamp,bolts, nuts and washersa) For RCC/PSC Poles Set 360 37
b) For PCC Poles Set 355 37
IX11 kV Horizontal cross arm, clamp,bolts, nuts and washers for DC Lines
Set 275 37
X4-Pin cross arm with pole clamp , bolts, nuts and washers without bracesa) RCC / PSC Poles Set 229 37b) PCC Poles Set 224 37
XI2-Pin cross arm with pole clamp , bolts, nuts and washers without bracesa) RCC / PSC Poles Set 142 37b) PCC Poles Set 135 37
XIIHT Special Cross arm with cross arm for EG Stirrups, braces, clamps , bolts, nuts and washers
Set 1350 260
XIIILT Cross arm for vertical configuration with clamps,bolts,nuts and washers
Set 550 37
XIV HT Single Top support with bolt,nuts and washers
Set 75 37
XV LT Single Top support with bolt,nuts and washers
Set 63 37
XVI Insulatorsa) 11kV Pin insulator No 73 **b) No.15 Strain Insulator No 23 **c) No.8 Strain Insulator No 11 **d) 1.1 kV Pin Insulator No 28 **e) 45 kN Disc Insulator No 350 **f) 70 kN Disc Insulator(Ball&Socket type) No 360 **g) 90 kN Disc Insulator(Ball&Socket type) No 360 **h) 11 kV Solid core Insulator No 100 **i) 11 kV Post Insulator No 255 **j) Silcon rubber composite insulator No 270 **GI Barbed wire 12 swg MT 48800 **
XVII Conductora) Weasel ACSR km 19700 715
b) Rabbit ACSR km 32500 977
c) Coyote ACSR km 86700 1571
XVIII Gaurding material using 10 SWG G I wire (excluding cost of cross arms) mtr 20 7
2
-
SL.NO Particulars Unit Materials rate in Rs.
Labour charges (Casual)
in RsXIX Guy set Set 565 132XX EG Stirrup With GI Lacing Set/2Nos. 290 37XXI Spiral Earth Electrode Set 185 35
XXIIDistribution Transformer, 3-Phase, 11kV/433 V with oila) 15 kVA No 47100 426b) 25 kVA No 64100 715c) 63 kVA No 95300 715d) 100 kVA No 116330 1426e) 250 kVA No 239600 2140f) 500 kVA No 450000 2613
XXIIIDistribution Transformer, Single Phase,15 kVA, 11kV/250V, with oil
No 56600 426
XXIV 11 kV G O Sa) 200 A Single break Set 5350 165b) 400 A Double break Set 12850 165c) 200 A Single break vertical operation Set 6260 165
XXV 11 kV Solid Core HG Fuse Unit Set (3 Nos) 2325 84XXVI 11kV Class DOLO Cutouts Set (3 Nos) 1500 84XXVII Lightning Arresters
i) 9 kV , 5kA Metal oxide Type 3 Nos 1470 48ii) 9 kV , 5kA Polymeric Type 3 Nos 2610 48
XXVIII Transformer grounding a) Pipe Type Set 1350 214
b) Rod Type Set 1612 122
XXIX Concreting Material ( 1:4:8) as per DRG No.CES / DIS / 021a) Pole base 500x650x150 mm 120 **
b) 9M Supports(pole concreting) 400X400X1850 mm 730 **
c) 11M Tubular Supports(pole concreting) 400X400X2450 mm 966 **
d) 8 M Supports 400x400x1680 mm 662 **
e) Guy concreting 300x300x150 mm 33 **
3
-
SL.NO Particulars Unit Materials rate in Rs.
Labour charges (Casual)
in RsXXX 11 kV , 3 Core XLPE UG Cable
a) 95 Sq.mm km 859000 22312
b)120 Sq.mm km 1286000 22312
c) 240 Sq.mm km 1539000 23552d) 400 Sq.mm km 2412500 24790
XXXI
Fixing 3-phase LT Capacitor housed in a enclosure with necessary Fusses, wiring, mounting arrangement for
1 15/25 kVA DTC, 3 kVAr No. 750 170
2 63 kVA DTC, 9 kVAr No. 1330 170
3 100 kVA DTC, 18 kVAr No. 2475 200
4 250 kVA DTC, 27 kVAr No. 3940 235
5 500 kVA DTC, 54 kVAr No. 6975 245
XXXII
Providing Electronic Trivector Meters with associated CT's Metering Box etc., on LT side of Distribution Transformer Center
1 for 15/25 kVA DTC with CT ratio 50/5 Set 12325 500
2 for 50/63 kVA DTC with CT ratio 100/5 Set 11635 500
3 for 100 kVA DTC with CT ratio 150/5 Set 11440 500
4 for 250 kVA DTC with CT ratio 400/5 Set 11410 500
5 for 500 kVA DTC with CT ratio 800/5 Set 11590 500
XXXIIIInstalling RLMU for the existing Distribution T.Ca) for 25 kVA Set 42200 1470
b) for 63 kVA Set 50000 1470
c) for 100 kVA Set 61800 1470
4
-
RCC PSC RCC PSC
1 2 3 4 5 6
1 11 kV 3-Ph SC line with 40 mtrs span on 9 mtr supports using Rabbit conductor 255703 226639 17469 17469
2 11 kV 3-Ph SC line with 50 mtrs span on 9 mtr supports using Rabbit conductor 228925 205916 14939 14939
3 11 kV 3-Ph SC line with 50 mtrs span on 8 mtr supports using Rabbit conductor 202480 ** 13382 **
4 11 kV 3-Ph SC line with 40 mtrs span on 9 mtr supports using coyote conductor 456898 431085 21062 21062
5
11 kV 3 Ph. SC Line and 3 phase - 4 wire LT line on 9.0 mtr RCC Poles with an average span of 50mtrs using Rabbit Conductor for H.T. and WEASEL for L.T Lines
361267 ** 26063 **
6
11 kV 3 Ph. SC Line and 3 phase - 4 wire LT line on 9.0 mtr RCC Poles with an average span of 40 mtrs using Rabbit Conductor for H.T. and L.T Lines
446283 ** 31637 **
7 3 Ph. 4 wire LT line on 8 mtr PCC Supports with 60 mtrs span using Weasel Conductor 134590 ** ** 10199
8 3 Ph. 4 wire LT line on 8 mtr PSC Supports with 40 mtrs span using Rabbit Conductor 219621 ** ** 14773
9 3 Ph. 4 wire LT line on 9 mtr Supports with 40 mtrs span using Rabbit Conductor 263956 ** 16748 **
10
3 Ph. 5 wire LT line on 9.0 mtr supports Using Rabbit conductor with a span of 40mtrs (For Cities, Towns and Residential layouts)
310631 280357 18874 18874
11 3 Ph. 5 wire LT line with 8.0 mtr Supports Using Rabbit with an span of 50 mtrs 260395 250176 14764 14764
12 1 Ph. 3 wire LT line with 8.0 mtr Supports Using Weasel with an span of 50 mtrs 144244 134024 10979 10979
ABSTRACT OF COST DATA SHEET
Labour ChargesTotal cost using Spiral Earth Electrode/steel
Grounding systemPARTICULARS
Cost Data
Sheet No.
1
-
RCC PSC RCC PSC
1 2 3 4 5 6
Labour ChargesTotal cost using Spiral Earth Electrode/steel
Grounding systemPARTICULARS
Cost Data
Sheet No.
13
L.T 3 Ph. 5 wire LT line with continuous earth wire on 9.0 mtr RCC Poles Using RABBIT for phase, netural and street light control and 8 SWG G.L wire for continous ground wire with 40 mtrs span in vertical configuration
319408 ** 18540 **
1411 kV 3 ph. SC line on 9 mtr RCC pole using rabbit conductor with 40 mtrs span with vertical configuration in congested area
280665 ** 22388 **
15 Providing 2 pole structrue at the tapping point using RCC polea) 8 mtr RCC 32023 ** 1817 **b) 9 mtr RCC 34483 ** 1873 **
16 ERECTION OF 3 POLE STRUCTUREa) 8 mtr RCC 24125 ** 2900 **b) 9 mtr RCC 27669 ** 2984 **
17 PROVIDING METAL HOUSING BOX TO I.P SETS 2900 ** ** **
18 Laying of 1km length of 11kV 3 core 95 Sq.mm XLPE UG Cable 1137444 ** 105396 **
19 Laying of 1km length of 11kV 3 core 240 Sq.mm XLPE UG Cable 1822743 ** 106636 **
20 Laying of 1km length of 11kV 3 core 400 Sq.mm XLPE UG Cable 2701008 ** 107874 **
21 a) Erection of 3-ph, 11 kV/433V Distribution Transformer center using 8M Supports with LAa) 25 kVA 118851 ** 4586 **
b) 63 kVA 152556 ** 4586 **
c) 100 kVA 202497 ** 5393 **
d) 250 kVA 334409 ** 6107 **
b) Erection of 3-ph, 11 kV/433V Distribution Transformer center using 9mtr Supports with LA
a) 25 kVA 121457 ** 4796 **b) 63 kVA 155162 ** 4796 **c) 100 kVA 205020 ** 5551 **d) 250 kVA 336932 ** 6265 **
2
-
RCC PSC RCC PSC
1 2 3 4 5 6
Labour ChargesTotal cost using Spiral Earth Electrode/steel
Grounding systemPARTICULARS
Cost Data
Sheet No.
22 Erection of 25 kVA , 11kV/433V , Single pole mounted transformer centre 115225 ** 3707 **
23 Erection of 63 kVA , 11kV/433V , Single pole mounted transformer centre 148794 ** 3706 **
24 Erection of 100 kVA , 11kV/433V , Single pole mounted transformer centre 182342 ** 4992 **
25Erection of 250 kVA, 11kV/433V, Single pole mounted Distribution Transformer on 11mtrs spun pole with 3 GOS system
374396 ** 6225 **
26 Installing RLMU for the existing 15/25 kVA Distribution Transformer centre 44552 ** 1470 **
27 Installing RLMU for the existing 63 kVA Distribution Transformer centre 52352 ** 1470 **
28 Installing RLMU for the existing 100 kVA Distribution Transformer centre 64152 ** 1470 **
29Providing Compact RMU 11kV class VCB/SF6 Type (1 Incomer+2 Breakers+1 Outgoing)
1061900 ** ** **
30Providing Compact RMU 11kV class VCB/SF6 Type (1 Incomer+1Breakers+1 Outgoing)
661215 ** ** **
31 Providing Compact RMU 11kV class VCB/SF6 Type (1OD) 133173 ** ** **
32 Providing Compact RMU 11kV class VCB/SF6 Type (1VL) 402173 ** ** **
33
Running Single Circuit 11 kV 3 Phase Power line on 9 mtr RCC supports with average span of 30 mtrs using 3x95 Sqmm+1x95 Sqmm Aerial Bunched Cables (ABC)
956287 ** 88539 **
34
Running Single Circuit 1.1 kV 3 Phase 5 wire Power line on 9 mtr RCC supports with average span of 40 mtrs using 3x70 +1x16 +1x50 Sqmm Aerial Bunched Cables (ABC)
483383 ** 47299 **
35 Erection of Compact Pre-fabricated Packaged Sub-station 11kV / 433 V
a) With 500 kVA oil cooled transformer 1900000 ** 6000 **
b) With 750 kVA oil cooled transformer 2200000 ** 6000 **
3
-
RCC PSC RCC PSC
1 2 3 4 5 6
Labour ChargesTotal cost using Spiral Earth Electrode/steel
Grounding systemPARTICULARS
Cost Data
Sheet No.
c) With 990 kVA oil cooled transformer 2350000 ** 6000 **
36providing Electronic Trivector Meters with associated CT's Metering Box etc., on LT side of Distribution Transformer Centera) 15/25 kVA 12325 ** 500 **b) 50/63 kVA 11635 ** 500 **c) 100 kVA 11440 ** 500 **d) 250 kVA 11410 ** 500 **e) 500 kVA 11590 ** 500 **
37 providing LT Capacitors to the Distribution Transformersa) 3 kVAr 750 ** 170 **b) 9 kVAr 1330 ** 170 **c) 18 kVAr 2475 ** 200 **d) 27 kVAr 3940 ** 235 **e) 54 kVAr 6975 ** 245 **
4
-
RCC PSC
1 Line Supports Nos. 24 83808 54744
2 Horizontal cross arms with clamps, HTST supports bolts, nuts and washers Sets 24 8640 8640
3 D.P.Structure with 9 mtr RCC Poles Set 1 10820 10820
4 11 kV Pin insulators with GI pins No 72 5256 5256
5 45 kN Disc insulators No 6 2100 2100
6 Guy sets Set 6 3390 3390
7 Rabbit ACSR Conductor kms 3.045 98963 98963
8 Wedge connector for Rabbit conductor No 6 2808 2808
9 Spiral earth electrode No 26 4810 4810
10 EG Stirrups with G.I. wire lacing Set 24 6960 6960
11 Concreting materials for guy sets No 6 198 198
12 Labour charges
a) Casual 17469 17469
b) Regular 10481 10481
13 255703 226639
COST DATA SHEET - 1
ParticularsSL. No Qty9.0 Supports
Unit
Running Single circuit 11 kV , 3-Phase power line on 9.0 mtr supports with an average span of 40 mtrs using Rabbit ACSR conductor
Total cost / km in Rs.
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
-
RCC PSC
1 Line supports No 19 66348 43339
2 Horizontal cross arms with clamps, HTST supports, bolts, nuts and washers Set 19 6840 6840
3 D.P.Structure with 9 mtr RCC Poles Set 1 10820 10820
4 Pin Insulators 11 kV class with pins No 57 4161 4161
5 45 kN Disk Insulators No 6 2100 2100
6 Guy sets Set 6 3390 3390
7 Rabbit Conductor km 3.045 98963 98963
8 Wedge connector for Rabbit conductor No 6 2808 2808
9 Spiral earth Electrode No 21 3885 3885
10 EG Stirrups with G.I. wire lacing Set 19 5510 5510
11 Concreting material for guy sets No 6 198 198
12 Labour charges
a) casual 14939 14939
b) Regular * 8963 8963
13 228925 205916
Running Single circuit 11 kV , 3-Phase power line on 9.0 mtr supports with an average span of 50 mtrs using Rabbit ACSR conductor
COST DATA SHEET - 2
SL. No Particulars
9.0 mtr SupportsUnit Qty.
Total cost / km in Rs.
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
-
Rate /Unit Cost
Rate /Unit Cost
1 Line supports No 19 2356 44764 318 6042
2 Horizontal cross arms with clamps, HTST supports , bolts, nuts and washers Set 19 360 6840 37 703
3 RCC D.P.Structure on 8.0M Supports Set 1 8450 8450 1162 1162
4 Pin Insulators 11 kV class with pins No 57 73 4161 * *
5 45 kN Disk Insulators No 6 350 2100 * *
6 Guy sets Set 6 565 3390 132 792
7 Spiral earth Electrode No 21 185 3885 35 735
8 Rabbit Conductor km 3.045 32500 98963 977 2974.97
9 Wedge connectors for Rabbit conductor No 6 468 2808 45 270
10 EG Stirrups with G.I. wire lacing Set 19 290 5510 37 703
11 Concreting Materials No 6 33 198 * *
12 Labour charges
a) casual 13382 13382
b) Regular * 8029
13 202480
QtyParticulars
COST DATA SHEET -3
LabourCost
Running Single Circuit 11 kV 3 Phase Power Line on 8 mtr RCC supports with average span of 50 mtrs using Rabbit ACSR Conductor
UnitSL. No
Total cost / km in Rs.
Material cost
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
-
RCC PSC
1 Line supports No 23 80316 52463
2 Horizontal cross arms with clamps, HT ST Supports , bolts, nuts and washers Set 23 8280 8280
3 D.P.Structure with 9 mtr RCC Poles Set 2 21640 21640
4 Pin Insulators 11 kV class with GI pins No 69 5037 5037
5 70/90 kN Disk Insulators ball and socket type No 12 4200 4200
6 Strain clamps 3-bolt type for Disc insulators No 12 6012 6012
7 Guy sets Set 6 3390 3390
8 Strut poles with fish plates, clamps etc., No 4 7120 7120
9 Coyote ACSR Conductor km 3.045 264002 264002
10 Wedge connector for Coyote conductor No 12 11340 13380
11 Spiral earth electrode No 27 4995 4995
12 EG Stirrups with G.I. wire lacing Set 23 6670 6670
13 Concreting Materials No 6 198 198
14 Labour charges
a) casual 21062 21062
b) Regular * 12637 12637
15 456898 431085
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
Total cost / km in Rs.
Qty9 mtr Supports
COST DATA SHEET -4
SL. No Particulars Unit
Running Single Circuit 11 kV 3 Phase Power Line on 9 mtr supports with average span of 40 mtrs using COYOTE ACSR Conductor
-
SL. No Unit Qty
1 No 19
2 Set 19
3 Set 20
4 Set 1
5 No 57
6 No 76
7 No 6
8 No 8
9 Set 8
10 km 3.045
11 km 4.06
12 No 21
13
span 20
Sets 20
14 Wedge connectors for Rabbit conductor No 6
15 No 8
16
17
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
Weasel for LT lines
Spiral earth electrode
Guarding between HT & LT Lines
a) Guarding Materials
b) L.T.4 Pin cross arms, with pole clamps, bolts, nuts and washers
Concreting Materials for guy sets
Labour charges
Total cost / km in RS.
No.8 Strain Insulators
Guy sets
Rabbit for H.T. Lines
COST DATA SHEET - 5
Running single circuit 11 kV 3 Phase Power Line and 3 phase - 4 wire secondary line on 9 mtr RCC Poles (145 kg. W.L) with an average span of 50 mtrs using Rabbit
Conductor for H.T. and WEASEL for L.T Lines
Amount
66348
6840
Particulars
Line supports
11kV Horizontal cross arms with clamps, HTST Supports , bolts, nuts and washers
10820
4161
2128
2100
L.T.4 Pin cross arms, with pole clamps, bolts, nuts and washers 4580
Pin Insulators 11 kV class withGI Pins
Pin Insulators 1.1. kV class with GI Pins
45 kN Disk Insulators
D.P Structure with 9 mtr RCC Poles
264
27500
4580
2808
88
4520
98963
79982
3885
26063
15638
361267
a) casual
b) Regular *
-
SL. No Unit Qty
1 No 24
2 Set 24
3 Set 25
4 No 1
5 No 72
6 No 96
7 No 6
8 No 8
9 Set 8
10 km 7.105
11 No 26
12
span 25
Sets 25
13 Wedge connectors for Rabbit conductor No 6
14 No 8
15
16
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
45 kN Disk Insulators
No.8 Strain Insulators
Guy sets
Pin Insulators 1.1. kV class with GI Pins
a) Guarding Materials
b) L.T.4 Pin cross arms, with pole clamps, bolts, nuts and washers
L.T.4 Pin cross arms, with pole clamps, bolts, nuts and washers
D.P.Structure with 9 mtr RCC Poles
83808
Particulars
8640
Rabbit for H.T.and LT Lines
Spiral earth electrode
Guarding between HT & LT Lines
Concreting Materials for guy sets
Pin Insulators 11 kV class with GI Pins
11kV Horizontal cross arms with clamps, HTST Supports , bolts, nuts and washers
Line supports
Running single circuit 11 kV 3 Phase Power Line and 3 phase - 4 wire secondary line on 9 mtr RCC Poles (145 kg. W.L) with an average span of 40 mtrs using Rabbit
Conductor for H.T. and L.T Lines
Amount
Labour charges
a) casual
b) Regular *
Total cost / km in Rs.
COST DATA SHEET -6
446283
5725
10820
5256
2688
4520
230913
18982
27500
5725
4810
264
31637
2808
2100
88
-
AmountPCC
Poles1 Line supports No 15 22755
2 4 Pin cross arms with pole clamps bolts nuts and washers Set 16 3584
3 No 1 2439
3 Pin Insulators 1.1. kV class No 60 1680
4 No.8 Strain Insulators No 8 88
5 Guy sets Set 8 4520
6 Weasel ACSR Conductor km 4.06 79982
7 Spiral earth electrode No 16 2960
8 Concreting Materials for guy sets No 8 264
9 Labour charges
a) casual 10199
b) Regular * 6119
10 134590
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
COST DATA SHEET NO-7
Running LT 3 phase 4-Wire power line on 8 mtr Long PCC Poles using Weasel conductor with an average span of 60 mtrs
SL. No Particulars
8 mtr RCC Pole
Total cost / km in Rs.
Unit Qty
-
SL. No Unit Qty Amont
1 No 25 46125
2 Set 25 5725
3 No 96 2688
4 No 8 88
5 Set 8 4520
6 km 4.06 131950
7 Spiral earth electrode No 25 4625
8 No 8 264
14773
8864
10 219621
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
9
Labour charges
a) Casual
b) Regular
Rabbit ACSR Conductor
Concretting materials for Guy sets
Total cost / km in Rs.
4 Pin cross arms with clamps, bolt & nuts washers etc.,
COST SHEET - 8
Running LT 3-Phase 4-Wire line on 8 mtr Long PSC Poles using Rabbit conductor with an average span of 40 mtrs.
Guy sets
1.1 kV Pin insulator with GI pins
No.8 Strain insulators
Particulars
Line Supports
-
SL. No Unit Qty Amont
1 No 25 87300
2 Set 25 5725
3 No 96 2688
4 No 8 88
5 Set 8 4520
6 km 4.06 131950
7 Spiral earth electrode No 25 4625
8 No 8 264
16748
10049
10 263956
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
4 Pin cross arms with clamps, bolt & nuts washers etc.,
No.8 Strain insulators
Concretting materials for Guy sets
b) Regular
Labour charges
a) Casual
1.1 kV Pin insulator with GI pins
Particulars
Line Supports
COST SHEET - 9Running LT 3-Phase 4-Wire line on 9 mtr Long RCC Poles using Rabbit
conductor with an average span of 40 mtrs.
Guy sets
Rabbit ACSR Conductor
Total cost / km in Rs.
9
-
RCC PSC
1 Line supports No 25 87300 57025
2 4 Pin cross arms with pole clamps bolts nuts and washers Set 25 5725 5725
3 2 Pin cross arm with clamps, bolts and nuts Set 25 3550 3550
4 Pin Insulators 1.1. kV class with GI Pins No 120 3360 3360
5 No.8 Strain Insulators No 10 110 110
6 Guy sets Set 8 4520 4520
7 Rabbit ACSR conductor for Phases, Neutral and Street light control km 5.075 164937.5 164938
8 Spiral earth electrode No 25 4625 4625
9 Concreting Materials for guy sets No 8 264 264
10 Street light meter housing box with CT Ratio 50/5A, Accuracy class-2 No 1 2570 2570
11 Energy meter Single phase 5-20A No 1 836 836
12 Automatic control switch for switching ON/OFF of St.Lights No 1 1850 1850
13 PVC Pipe 40 mm dia mtrs 6 186 186
14 PVC Insulated wire 25 Sq.mm Single core multi stranded mtrs 25 599 599
Labour charges
a) casual 18874 18874
b) Regular * 11325 11325
16 310631 280357
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
UnitSL. No Particualrs Qty
Running L.T 3 Phase 5 wire power line on 9 mtr supports Using Rabbit ACSR conductor with a span of 40 mtrs (For Cities, Towns and Residential layouts)
COST DATA SHEET -10
9 mtr Supports
15
Total cost / km in Rs.
-
SL. No Particulars Unit Qty
8 mtr RCC
8 mtr PSC
1 Line supports No 20 47120 36900
2 4 Pin cross arms with pole clamps bolts, nuts and washers Set 20 4580 4580
3 2 pin cross arm with clamps, bolts and nuts Set 20 2840 2840
4 Pin Insulators 1.1 kV class with GI Pins No 95 2660 2660
5 No.8 Strain Insulators No 10 110 110
6 Guy sets Set 8 4520 4520
7 Rabbit ACSR conductor km 5.075 164937.5 164938
8 Spiral earth electrode No 20 3700 3700
9 Concreting Materials for guy sets No 8 264 264
10 Street light Meter housing box with CT ratio 50/5A with accuracy class-2 No 1 2570 2570
11 Energy meter single phase 5-20A No 1 836 836
12 Automatic control switch for switching ON/OFF of St.lights No 1 1850 1850
13 PVC Pipe 40 mm dia mtr 6 186 186
14 PVC Insulated wire 25 Sq.mm Single core multistrand mtr 25 599 599
Labour charges
a) casual 14764 14764
b) Regular * 8859 8859
16 260395 250176
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
Running L.T 3 Phase 5 wire line on 8 mtr Supports Using Rabbit ACSR with an average of 50 mtrs span
COST DATA SHEET -11
15
Total cost per km in Rs.
-
RCC PSC1 Line supports No 20 47120 36900
2 4 Pin cross arms with pole clamps bolts nuts and washers Set 20 4580 4580
3 Pin Insulators 1.1 kV class No 57 1596 1596
4 No.8 Strain Insulators No 6 66 66
5 Guy sets Set 6 3390 3390
6 WEASEL ACSR conductor km 3.045 59987 59987
7 Spiral earth electrode No 20 3700 3700
8 Concreting Materials for guy sets No 6 198 198
9 Street light meter housing box with CT ratio 50/5A accuracy class -2 No 1 2570 2570
10 Energy meter single phase 5-20A No 1 836 836
11 Automatic control switch for switching ON/OFF of St/lights No 1 1850 1850
12 PVC Pipe 40 Sq.mm dia mtr 6 186 186
13 PVC Insulated wire 25 Sq.mm single core multistrand mtr 25 599 599
Labour charges
a) casual 10979 10979
b) Regular * 6588 6588
15 144244 134024
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
Unit
COST DATA SHEET -12
SL. No
14
Total cost per km in Rs.
Running L.T single Phase 3 wire power line on 8 mtr supports with an average span of 50 mtrs Using Weasel Conductor
Qty. 8 mtr SupportsParticulars
-
SL. No Particulars Unit Qty 9 mtr RCC
1 Line supports No 25 87300
2 Fabricated verical cross arms with pole clamps, bolts, nuts and washers Set 26 14300
3 Pin Insulators 1.1 kV class No 104 2912
4 No.8 Strain Insulators No 48 528
5 Guy sets Set 12 6780
6 Rabbit ACSR conductor km 5.075 164938
7 No.8 SWG GI wire for continous Earth wire km1.015
(103kgs) 4491
8 8 SWg GI wire for guard loops kg 26 1134
9 Concreting Materials for guy sets No 12 396
10 Street light meter housing box with CT ratio 50/5A, accuracy class-2 No 1 2570
11 Energy meter single phase 5-20A No 1 836
1`2 Automatic control switch for switching ON/OFF of street lights No 1 1850
13 PVC Pipe 40 mm dia mtr 6 186
14 PVC Insulated wire 25 Sq.mm single core multistrand mtr 25 599
15 Spiral earth electrode Nos. 5 925
Labour charges
a) casual 18540
b) Regular * 11124
17 319408
While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
Running L.T 3 Phase 5 wire power line with continous earth wire on 9 mtr RCC Poles (145 kg.W.L) Using RABBIT for phase, netural and street light
control and 8 SWG G.I wire for continous ground wire with 40 mtrs span in vertical configuration
Total cost per km in Rs.Note: Only in congested narrow lanes/areas vertical formation with continous earth wire multi-earthed neutral be adopted. Guard loop between continous earth wire, on top mutli-earthed netural at bottom enclosing all active conductors are to be provided at 1 m distance on either side of pole.
16
COST DATA SHEET -13
-
SL. No Particulars Unit Qty 9 mtr RCC
1 R.C.C Pole 9.0 M No 25 87300
2Special cross arm with cross arm for E.G Stirrups Braces, clamps Bolts & Nuts Washers
Set 25 33750
3 11 kV pin insulators No 75 5475
4 45 kN Disc insulator No 6 2100
5 Guy set complete Set 9 5085
6 Spiral Earth Electrode No 25 4625
7 EG Stirrups with G.I. wire lacing Set 25 7250
8 Rabbit ACSR conductor km 3.045 98963
9 Concrete for Guy set Nos. 9 297
10 labour charges
a) Casual 22388
b) Regular 13433
11 280665
Note
1
2
3456
Brace 50x50x6 mm MS Angle 0.850 mtr long- 1 No.Support piece for fixing EG stirrup 50x50x6 mm MS Angle 0.865 mtr long- 1 No.
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
Cross Arm for fixing E.G Stirrups 1N0.RCC Pole Clamps- No 5. -1No.50x6 mm Flat 1.8 mtr, long- 1 No.
Special cross arms 50x50x6 mm MS 0.715 mtr long 3-Nos.
Item 2 includes, the following
Running single circuit 11 kV 3 phase power line on 9 mtr RCC pole using rabbit conductor with 40 mtrs span with vertical configuration in congested
area
Total Cost per km in Rs.
COST DATA SHEET -14
-
SL. No Paritculars Unit Qty 8mtr RCC 9mtr RCC
1 RCC D.P structure Set 1 8450 10820
3 45 kN Disc Insulators No 6 2100 2100
4 Guy Set Set 2 1130 1130
5 Spiral Earth Electrode No 2 370 370
6 Concrete for Guy set No 2 66 66
7 Labour Charges
a) Casual 1496 1552
b) Regular 898 931
Total (A) 14510 16969
Part -B SWITCH GEAR
8 11 kV 400 A D/B GOS Set 1 12850 12850
9 H-Frame for mounting GOS No 1 2650 2650
10 DOLO Cut Out Set 1 1500 1500
11 Labour Charges
a) Casual 321 321
b) Regular 193 193
12 17514 17514
13 32023 34483
Providing 2 pole structrue at the tapping point using RCC poles
Total (B)
Total (A+B)
Part- A. Lines
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
COST DATA SHEET -15
-
SL. No Particulars Unit Qty 8mtr RCC 9mtr RCC
1 3 pole structure complete Set 1 14000 17410
2 Spiral Earth Electrode No 3 555 555
3 45 kN Disc Insulator No 6 2100 2100
4 Guy set Set 4 2260 2260
5 11 kV Pin Insulator with GI Pins No 6 438 438
6 Concrete for Guy set No 4 132 132
7 Labour Charges
a) Casual 2900 2984
b) Regular 1740 1790
8 24125 27669
ERECTION OF 3 POLE STRUCTURE
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
COST DATA SHEET -16
Total cost / km in Rs.
-
SL. No Particualrs Unit Qty Amount
1
Supplying and provide metal meter housing box as per ESCOM's design and specification and fixing it with, clamps bolts and nuts and provide 3 phase meter supplied by MESCOM
No 1 1878
2
Supplying fixing and wiring phase, 4 wire with 10 Sq.mm Al. wire single core of grade 650/1100 V in 32 to 40 mm dia PVC pipe with necessary water tight bends etc. the PVC pipe should be of not less than 2 mm thick
mtr 4 800
3
Supplying and providing spiral earth electrodes with 8 SWG G.I wire as per ESCOM's specification for earthing the meter and the base
No 1 222
2900Total cost / Box
ESTIMATE FOR PROVIDING METAL HOUSING BOX TO I.P SETS
COST DATA SHEET -17
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
-
SL. No Description Unit QTY Amount
1 11 kV Class 3X 95 Sq.mm XLPE UG Cable km 1 859000
2 Straight through jointing kits HS Type suitable for 95 Sq.mm Cable No 3 11010
3 Cable termination kit Out door / In door HS Type Suitable for 95 Sq.mm No 2 4350
4 Cable covering tiles 250X250X40 mm No 4000 16400
5 Sand Cmt 60 54000
6 RCC Hume pipe, 2000 mm long, 150 mm dia No 50 12500
7 Collars for RCC Hume pipe No 30 1500
8 GI Pipe, 150 mm dia for drain crossing, cable raising etc., mtr 8 7200
9 Route and joint indicating stones No 30 2850
968810
10 Labour charges
a) Cable trench excavation, 1000x0.6x1=600, Ordinary soil Cmt 600 50400
b) Laying of cable in trench km 1 22312
c) Refilling and consolidation Cmt 550 15400
d) Making of straight through joints No 3 4836
e) Making of cable terminations No 2 2726
f) Covering the cable with tiles km 1 1363
g) Spreading Sand and forming with Sand round the cable km 1 4957
h) Laying of RCC Hume pipes mtr 100 2100
i) Laying of GI Pipe mtr 8 192
j) Laying of Route and Joint indicating stones No 30 1110
Total Labour Charges
a) Casual 105396
b) Regular 63238
11 Rates for Reinstatements of Roads
13 1137444Total cost / km in Rs.
As per the prevailing rates of respective Municipalties/City Corporation
COST DATA SHEET NO - 18For laying of 1km length of 11kV 3 core 95 Sq.mm UG Cable
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
Total
-
SL. No Description Unit QTY Amount
1 11 kV Class 3X 240 Sq.mm XLPE UG Cable km 1 1539000
2 Straight through jointing kits HS Type suitable for 240 Sq.mm Cable No 3 13275
3 Cable termination kit Out door / In door HS Type Suitable for 240 Sq.mm No 2 5400
4 Cable covering tiles 250X250X40 mm No 4000 16400
5 Sand Cmt 60 54000
6 RCC Hume pipe, 2000 mm long, 150 mm Dia No 50 12500
7 Collars for RCC Hume pipe No 30 1500
8 GI Pipe, 150 mm dia for drain crossing, cable raising etc., mtr 8 7200
9 Route and joint indicating stones No 30 2850
1652125
10 Labour charges
a) Cable trench excavation, 1000x0.6x1=600, Ordinary soil Cmt 600 50400
b) Laying of cable in trench km 1 23552
c) Refilling and consolidation Cmt 550 15400
d) Making of straight through joints No 3 4836
e) Making of cable terminations No 2 2726
f) Covering the cable with tiles km 1 1363
g) Spreading Sand and forming with Sand round the cable km 1 4957
h) Laying of RCC Hume pipes mtr 100 2100
i) Laying of GI Pipe mtr 8 192
j) Laying of Route and Joint indicating stones No 30 1110
11 Total Labour Charges
a) Casual 106636
b) Regular 63982
12 Rates for Reinstatements of Roads
13 1822743
For laying of 1km length of 11kV 3 core 240 Sq.mm XLPE UG Cable
Total cost / km in Rs.
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
COST DATA SHEET NO - 19
Total
As per the prevailing rates of respective Municipalties/City Corporation
-
SL. No Description Unit QTY Amount
1 11 kV Class 3X 400 Sq.mm XLPE UG Cable km 1 2412500
2 Straight through jointing kits HS Type suitable for 400 Sq.mm Cable No 3 16020
3 Cable termination kit Out door / In door HS Type Suitable for 400 Sq.mm No 2 5440
4 Cable covering tiles 250X250X40 mm No 4000 16400
5 Sand Cmt 60 54000
6 RCC Hume pipe, 2000 mm long, 150 mm Dia No 50 12500
7 Collars for RCC Hume pipe No 30 1500
8 GI Pipe, 150 mm dia for drain crossing, cable raising etc., mtr 8 7200
9 Route and joint indicating stones No 30 2850
2528410
10 Labour charges
a) Cable trench excavation, 1000x0.6x1=600, Ordinary soil Cmt 600 50400
b) Laying of cable in trench km 1 24790
c) Refilling and consolidation Cmt 550 15400
d) Making of straight through joints No 3 4836
e) Making of cable terminations No 2 2726
f) Covering the cable with tiles km 1 1363
g) Spreading Sand and forming with Sand round the cable km 1 4957
h) Laying of RCC Hume pipes mtr 100 2100
i) Laying of GI Pipe mtr 8 192
j) Laying of Route and Joint indicating stones No 30 1110
11 Total Labour Charges
a) Casual 107874
b) Regular 64724
12 Rates for Reinstatements of Roads
13 2701008
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
As per the prevailing rates of respective Municipalties/City Corporation
Total cost / km in Rs.
For laying of 1km length of 11kV 3 core 400 Sq.mm UG Cable
COST DATA SHEET NO - 20
Total
-
Rate /Unit Cost
Rate /Unit Cost
1 R.C.C Poles 9.0 mtr long Nos. 34 3492 118728 397 13498
2 11kV Class 3phase Aerial Bunched Cable 3x95 Sq mm + 95 Sq mm kms 1.015 541310 549430 19500 19792.5
3 Cable Straight thru' joint kits suitable for 95 Sq mm Sets 3 4100 12300 1617 4851
4 T-Jointing kits Sets 12 5200 62400 2020 24240
5 Termination kits Sets 15 2600 39000 1367 20505
6 Suspension clamp assembly including pole clamps Sets 30 450 13500 75 2250
7 Dead end clamp / Anchor clamp assembly including brackets, pole clamps Sets 12 400 4800 100 1200
8 11 kV lightning Arrester, for Aerial Bunched Cables Set (3Nos) 2 2010 4020 70 140
9 Guy sets Sets 6 565 3390 132 792
10 Grounding connection for messenger wire Nos. 4 162 648 17 68
11 Anchor sleave for messenger wire Nos. 4 30 120 3 12
12 Spiral earth electrodes Nos. 34 185 6290 35 1190
13 Labour Charges
a) Casual 88539
b) Regular 53123
14 956287
Unit QtyMaterial cost LabourCost
Running Single Circuit 11 kV 3 Phase Power Line on 9 mtr RCC supports with average span of 30 mtrs using 3x95 Sqmm+1x95 Sqmm Aerial Bunched Cables (ABC)
COST DATA SHEET - 33
SL. No Particulars
Total cost / km in Rs.
-
Rate /Unit Cost
Rate /Unit Cost
1 R.C.C Poles 9.0 mtr long Nos. 25 3492 87300 397 9925
2 1.1kV Class 3phase Aerial Bunched Cable of size 3x70+1x16+1x50 Sq mm kms 1.015 216020 219260 17500 17762.5
3 Three phase Distribution box for 6 connections Nos. 20 1500 30000 350 7000
4Piercing connector suitable for 16 Sq.mm-70 Sq.mm AB Cable- Service connections & streetlight connections
Nos. 25/60 210/300 23250 50 4250
5 Suspension clamp assembly including pole clamps Sets 20 450 9000 75 1500
6 Dead end clamp / Anchor clamp assembly including brackets, pole clamps Sets 16 400 6400 100 1600
7 Universal hook, Bolts & nuts Nos. 16 200 3200 75 1200
8 T-connector KZ3 95 Nos. 8 515 4120 85 680
9 Cable Straight thru' joint kits suitable for 70 Sq mm Sets 5 400 2000 100 500
10 Pre-Insulated lugs-CPTAU for 70 Sq.mm Nos. 8 400 3200 100 800
11 End cap for 50/70 Sqmm Nos. 50 25 1250 3 150
12 Guy sets Sets 8 565 4520 132 1056
13 PVC Insulated wire i6/25 Sq mm mtrs 400 23.95 9580 * *
14 Spiral earth electrodes Nos. 25 185 4625 35 875
15 Labour Charges
a) Casual 47299
b) Regular 28379
483383Total cost / km in Rs.
COST DATA SHEET - 34
Running Single Circuit 1.1 kV 3 Phase 5 Wire Power Line on 9 mtr RCC supports with average span of 40 mtrs using 3x70+1x16+1x50 Sqmm Aerial Bunched Cables (ABC)
SL. No Particulars Unit Qty
Material cost LabourCost
-
Sl.No
Particulars Unit Qty 250kVA 100kVA 63kVA 25kVA
1 A. Transformera) 9 mtr RCC DP Transformer Structure Set 1 17470 17470 13230 13230
b) 8 mtr RCC DP Transformer Structure Set 1 15200 15200 10960 10960
2 11 kV Pin insulators No 3 219 219 219 219
3 45 kN disc insulators No 3 1050 1050 1050 1050
4 Guy set Set 4 2260 2260 2260 2260
5
11 kV/433 V 3 phase 50 Cys Distribution Transformer with oil Off Load Tap changer
No 1 239600 116330 95300 64100
6 Earthing materials pipe type for grounding Set 3 4050 4050 4050 4050
7 AC devices, Danger Board, Bird guards etc Ls 1000 1000 1000 1000
8 Concreting for Guy sets No 4 132 132 132 132
9 GI Wire 10 SWG kg 40 1610 1610 1610 1610
10 Guy wire 7/10 SWG kg 40 1752 1752 1752 1752
Total using 9 mtr Poles 269143 145873 120603 89403
Total using 8 mtr Poles 266873 143603 118333 87133
11 Labour Charges
I) using 9 mtr Poles
a) Casual 4896 4182 3427 3427
b) Regular 2938 2509 2056 2056
ii) using 8 mtr poles
a) Casual 4738 4024 3217 3217
b) Regular 2843 2414 1930 1930
COST DATA SHEET -21
ERECTION OF 3 PHASE11 kV/433 V DISTRIBUTION TRANSFORMER CENTRE
-
12 Total for A
I) Using 9 mtr Poles 276977 152564 126086 94886
ii) using 8 mtr poles 274454 150041 123480 92280
13B. 11 kV lightning Arrester , Metal oxide, 9 kV, 5 kA
Set (3No
s)1 1470 1470 1470 1470
14 Labour Charges
a) Casual 48 48 48 48
b) Regular 29 29 29 29
15 Total for B 1547 1547 1547 1547
C-Switch gear
a) LT Protection kit for 25 kVA/ 63 kVA/ 100 kVA & Distribution box for 100 & 250kVA with MCBs
No 1 18675 18675 1630 1630
b) LT witing kit for LT protection kit (Please see B.o.M - 8 & 9)
No 1 18535 11005 4475 1280
c) LT Metering box for housing ETV Meter with CT(Please see C.D.S -24)
No 1 11410 11440 11635 12325
17 HG Fuse, 11 kV Solid Core Type ( 3Nos) Set 1 2325 2325 2325 2325
18 GOS 200 A single break No 1 5350 5350 5350 5350
19 Labour Charges
a) Casual 1321 1321 1321 1321
b) Regular 793 793 793 793
20 Total for C 58409 50909 27529 25024
21 Total (A+B+C)
336932 205020 155162 121457
334409 202497 152556 118851
Note: Provision for actual quantity of additional materials viz 45 kN disc insulator 11 kV pin insulators ACSR/AAA Conductor, Transparent Alkathin Tube, PG Clamps and Terminal Connectors etc. Whenever required may be made in the estimate separately for formation of bus and tapping the OH line to HT side terminals of transformer.
1) Using 9 mtr Poles
2) Using 8 mtr Poles
16
-
Set 1900000
Set 2200000
Set 2350000
Set 6000
1
Packaged Sub-station 11kV/433 V consisting of 3 way SF6/VCB insulated compact RMU, oil cooled type copper wound transformer and L.T section with one ACB as incoming and 7 nos. outgoing MCCB feeders, and with encloser made of electronically Galvanized sheets as per the technical specifications
Providing Compact Pre-fabricated Packaged Sub-station 11kV / 433 V
COST DATA SHEET -35
Installing & fixing the compact pre-fabricated packaged sub-station 500/750/990 kVA transformer on the existing concrete plinth.(This does not include the cost of plinth, cable duct,laying & termination of cable etc. provision for the same shall be made separately as per the prevailing rates depending on the site conditions)
2
(i) With 500 kVA oil cooled transformer
(ii) With 750 kVA oil cooled transformer
(iii) With 990 kVA oil cooled transformer
-
Rate / unit Cost
Rate / unit Cost
1 9 mtr long RCC pole ( Square Section) Nos 1 4820 4820 397 397
2 11kV Pin insulators with pins Nos 3 73 219 ** **
3 45 kN Disc insulator Nos 3 350 1050 ** **
4 Guy set complete Set 1 565 565 132 132
5 Single pole TC set suitable for 25 kVA Transformer Set 1 3335 3335 380 380
6 25 kVA,11kV/433Volts 3 phase 50 cycles Dist. Tr. with Oil Nos 1 64100 64100 715 715
7 Earthing materials pipe type for grounding Set 3 1350 4050 214 642
8 Concreting materials for 9 mtr RCC Pole Nos 1 730 730 ** **
9 Concreting materials for Guy sets Nos 1 33 33 ** **
10 GI Wire 10 SWG kg 40 40.25 1610 ** **
11 Guy wire 7/10 SWG kg 40 43.8 1752 ** **
12 Lightning Arresters 9 kV(3 Nos) Set 1 1470 1470 48 48
13 LT Metering Box for housing the ETV Meter with CT's Set 1 12325 12325 500 500
14 a) LT Protection kit Nos 1 1630 1630 572 572
b) LT Wiring kit Set 1 1280 1280 * *
15 HG Fuse, 11 kV Solid Core Type (3 Nos) Set 1 2325 2325 84 84
16 11 kV, 200 Amps, single break GOS Set 1 5350 5350 165 165
17 H-Frame for mounting GOS Set 1 2650 2650 72 72
18 Labour Charges
a) Casual 3707
b) Regular 2224
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
Total cost for erection of a single pole mounted 25kVA Transformer in Rs 115225
COST DATA SHEET - 22Erection of 25 kVA , 11kV/433V , Single pole mounted transformer centre
Sl. No Materials Unit Qty.
Material cost Lobour Cost
-
Rate / unit Cost
Rate / unit Cost
1 9 mtr long RCC pole ( Square Section) Nos 1 4820 4820 397 397
2 11kV Pin insulators with pins Nos 3 73 219 ** **
3 45 kN Disc insulator Nos 3 350 1050 ** **
4 Guy set complete Set 1 565 565 132 132
5 Single pole TC set suitable for 63 kVA Transformer Set 1 3335 3335 380 380
6 63 kVA,11kV/433Volts 3 phase 50 cycles Dist. Tr. with Oil Nos 1 95300 95300 715 715
7 Earthing materials pipe type for grounding Set 3 1350 4050 214 642
8 Concreting materials for 9 mtr RCC Pole Nos 1 730 730 ** **
9 Concreting materials for Guy sets Nos 1 33 33 ** **
10 GI Wire 10 SWG kg 40 40.25 1576 ** **
11 Guy wire 7/10 SWG kg 40 43.8 1752 ** **
12 Lightning Arresters 9 kV(3 Nos) Set 1 1470 1470 48 48
13 LT Metering Box for housing the ETV Meter with CT's Set 1 11635 11635 500 500
14 a) LT Protection kit Nos 1 1630 1630 572 572
b) LT Wiring kit Set 1 4475 4475 * *
15 HG Fuse, 11 kV Solid Core Type (3 Nos) Set 1 2325 2250 84 84
16 11 kV, 200 Amps, single break GOS Set 1 5350 5350 165 165
17 H-Frame for mounting GOS Set 1 2650 2650 71 71
18 Labour Charges
a) Casual 3706
b) Regular 2198
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
COST DATA SHEET - 23Erection of 63 kVA , 11kV/433V , Single pole mounted transformer centre
Material cost Lobour Cost
Total cost for erection of a single pole mounted 63kVA Transformer is Rs 148794
Sl. No Materials Unit Qty.
-
Rate / unit Cost
Rate / unit Cost
1 9 mtr long RCC pole ( Square Section) Nos 1 4820 4820 397 397
2 11kV Pin insulators with pins Nos 3 73 219 ** **
3 45 kN Disc insulator Nos 3 350 1050 ** **
4 Guy set complete Set 1 565 565 132 132
5 Single pole TC set suitable for 100 kVA Transformer Set 1 5730 5730 380 380
6100 kVA,11kV/433Volts 3 phase 50 cycles Dist. Tr. with Oil
Nos 1 116330 116330 1426 1426
7 Earthing materials pipe type for grounding Set 3 1350 4050 215 645
8 Concreting materials for 9 mtr RCC Pole Nos 1 730 730 ** **
9 Concreting materials for Guy sets Nos 1 33 33 ** **
10 GI Wire 10 SWG kg 40 40.25 1576 ** **
11 Guy wire 7/10 SWG kg 40 43.8 1752 ** **
12 Lightning Arresters 9 kV(3 Nos) Set 1 1470 1470 48 48
13 LT Metering Box for housing the ETV Meter with CT's Set 1 11440 11440 500 500
14 a) LT Protection kit Nos 2 1630 3260 572 1144
b) LT Wiring kit Set 1 11005 11005 * *
15 HG Fuse, 11 kV Solid Core Type (3 Nos) Set 1 2325 2325 84 84
16 11 kV, 200 Amps, single break GOS Set 1 5350 5350 165 165
17 H-Frame for mounting GOS Set 1 2650 2650 71 71
18 Labour Charges
a) Casual 4992 4992
b) Regular 2995
Total cost for erection of a single pole mounted 100 kVA Transformer is Rs
182342
COST DATA SHEET - 24
Erection of 100 kVA , 11kV/433V , Single pole mounted transformer centre
Sl. No Materials Unit Qty.
Material cost Lobour Cost
-
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
-
Rate/ unit Cost Rate/Unit Cost
1LT CT's Class-1 accuracy ring type ratio 50/5 for 15/25 kVA DTC
Set (3
Nos) 1 1965 1965 85 85
2LT CT's Class-0.5 accuracy ring type ratio 100/5 for 50/63 kVA DTC
Set (3
Nos) 1 1275 1275 85 85
3LT CT's Class-0.5 accuracy ring type ratio 150/5 for 100 kVA DTC
Set (3
Nos) 1 1080 1080 85 85
4LT CT's Class-0.5 accuracy ring type ratio 400/5 for 250 kVA DTC
Set (3
Nos) 1 1050 1050 85 85
5LT CT's Class-0.5 accuracy ring type ratio 800/5 for 500 kVA DTC
Set (3
Nos) 1 1230 1230 85 85
6 Electronic Trivector Meter 3-phase 4 wire No 1 6710 6710 250 250
7LT Tamper proof Box for housing the ETV Meters with Busbars, wiring etc.,
No 1 3650 3650 165 165
Total Cost (Rs.)
a)15/25 kVA DTC
b) 63 kVA DTC
c)100 kVA DTC
d) 250 kVA DTC
e) 500 kVA DTC
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
Material cost Labour costSl. No Materials Unit QTY.
COST DATA SHEET-36For providing Electronic Trivector Meters with associated CT's Metering Box etc., on
LT side of Distribution Transformer Center
12325
11440
11410
11590
11635
-
Rate/ unit Cost Rate/Unit Cost
1
Fixing 3 kVAr 3-phase LT Capacitor housed in a enclosure with necessary Fusses, wiring, mounting arrangement for 15/25 kVA DTC
Set 1 750 750 170 170
2
Fixing 9 kVAr 3-phase LT Capacitor housed in a enclosure with necessary Fusses, wiring, mounting arrangement for 63 kVA DTC
Set 1 1330 1330 170 170
3
Fixing 18 kVAr 3-phase LT Capacitor housed in a enclosure with necessary Fusses, wiring, mounting arrangement for 100 kVA DTC
Set 1 2475 2475 200 200
4
Fixing 27 kVAr 3-phase LT Capacitor housed in a enclosure with necessary Fusses, wiring, mounting arrangement for 250 kVA DTC
Set 1 3940 3940 235 235
5
Fixing 54 kVAr 3-phase LT Capacitor housed in a enclosure with necessary Fusses, wiring, mounting arrangement for 300/500 kVA DTC
Set 1 6975 6975 245 245
For providing L.T Capacitor to the Distribution Transformer
COST DATA SHEET-37
Material cost Labour costSl. No Materials Unit QTY.
-
Rate/ unit Cost
Rate/ unit Cost
1 Spun pole 11.0 mtr long No 1 8365 8365 675 675
2 Single pole transformer structure kit for 250kVA Set 1 17275 17275 760 760
3 HT Single top support with bolts, nuts & washers No 9 75 675 37 333
4 11kV pin insulator with pins No 9 73 657 ** **
5 Rabbit ACSR Conductor for jumps mtr 50 32.5 1625 1 50
6 Alkathene tube 19mm dia and in coils of 30 mtrs Coil 2 480 960 ** **
7 Cement concretting Cmt 1.4 966 1352 ** **
8 GI Wire 10 SWG kg 50 40.25 2013 ** **
9 Guy wire 7/10 SWG kg 50 43.8 2190 ** **
10 Copper terminals 95 Sq.mm for jumps No 6 45 270 ** **
11 GI Pipe 100 mm dia mtr 10 850 8500 ** **
12 PVC Pipe 150 mm dia mtr 20 262 5240 ** **
13 PVC bend 150 mm dia No 8 40 320 ** **
14 PVC pipe (25mm dia) mtr 40 21 840 ** **
15250 kVA Distribution Transformer, 11kV/433V with Oil
No 1 239600 239600 2140 2140
16 200A Single break GOS Set 3 5350 16050 165 495
17 HG Fuse unit 11kV Solid core typeSet
(3 Nos.) 1 2325 2325 84 84
18Rod earthing with 40 mm dia 3 mtrs long MS Rod as per specification & drawing
Nos 3 1612 4836 122 366
19 LT Metering Box for housing the ETV Meter with CT's Set 1 11410 11410 500 500
20 LT Distribution box for 250 kVA including wiring No 1 18675 18675 572 572
21 LT Wiring kit for 250 kVA Set 1 18535 18535 * *
22 11kV Lightning Arresters Set (3 Nos.) 1 1470 1470 48 48
23 PVC Insulation tape in rolls of 10 mtrs Roll 3 14 42 ** **
24 Horizontal cross arms No 4 206 824 37 148
25 MS Fish plate No 9 43 387 6 54
26 Labour Charges
a) Casual 6225 6225b) Regular 3735
27 374396Total cost in Rs
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of general guidelines.
COST DATA SHEET-25Erection of 250 KVA, 11kV/433V, Single pole mounted Distribution Transformer on
11.0 mtr spun pole with GOS system
Sl. No Materials Unit Quantity
Material cost Labour cost
-
Rate/ unit Cost
1 No. 1 1044600 1044600
2 cmt 2.0 84 168
3 cmt 1.0 2308 2308
4 cmt 1.5 3011 4517
5 cmt 2.0 87 174
6 Sq. mtr 15.0 93 1395
7 Nos. 4 1240 4960
8 Set 1 310 310
9 Set 2 1734 3468
1061900
RMU (4way), One In comer + Two Breakers +one out going (2OD + 2 VL), 350 MVA, 630A
Unit Quantity
COST DATA SHEET-29
Providing Compact RMU 11kV Class SF6/VCB Type (1 Incomer+2 Breakers+1 Outgoing)
Sl. No
Material costMaterials
Rod type earthing with 40 mm dia 3 mtrs long MS rod as per specification & drawing including Labour charges
Total cost in Rs
Earth Excavation for R.M.U. Foundation depositing of earth on bank up to a lead of 50 mtrs and with a lift up to 1.5 mtrs
Providing and Laying Granite or Basalt or trap jelly concrete 1:4:8 proporation using 40 mm and down size jelly for foundation laid in 15 cm thick layers and well compacted including curing complete (including material rate for cement, jelly, sand and labour)
Lettering the RMU with enamel paint and also writing single line diagram of each panel, caution Board, Danger Board etc., including cost of Paint, Brush etc.,
Providing and laying granite basalt or trap jelly cement concrete 1:2:4 proportion using 20 mm and down size jelly including Mixing laying Tamping. Curing and finished for exposed faces with necessary centering and form work etc., complete (including material rate for cement, sand, jelly and labour)
Lifting of excess earth up to distance of 10 km
Plastering concrete surface in cement mortar 1:4, 20 mm thick inclusive of smooth rendering curing etc., complete.
Fixing foundation frame of MS channel 100X50mm and MS angle 40X40X5mm welding, fixing in concrete, aligning the RMU on foundation bed, assembly of units, connecting Bus Bars from panel to panel etc., complete.
-
Rate/ unit Cost
1 No. 1 647000 647000
2 cmt 1.5 84 126
3 cmt 0.75 2308 1731
4 cmt 1.2 3011 3613
5 cmt 1.5 87 131
6 Sq. mtr 12.0 93 1116
7 Nos. 3 1240 3720
8 Set 1 310 310
9 Set 2 1734 3468
661215
COST DATA SHEET-30
RMU (3way), One In comer + one Breaker +one out going (2OD + 1 VL), 350 MVA, 630A
Earth Excavation for R.M.U. Foundation depositing of earth on bank up to a lead of 50 mtrs and with a lift up to 1.5 mtrs
Providing and Laying Granite or Basalt or trap jelly concrete 1:4:8 proporation using 40 mm and down size jelly for foundation laid in 15 cm thick layers and well compacted including curing complete (including material rate for cement, jelly, sand and labour)
Providing and laying granite basalt or trap jelly cement concrete 1:2:4 proportion using 20 mm and down size jelly including Mixing laying Tamping. Curing and finished for exposed faces with necessary centering and form work etc., complete (including material rate for cement, sand, jelly and labour)
Providing Compact RMU 11kV Class SF6/VCB Type (1 Incomer+1 Breaker+1 Outgoing)
Sl. No Materials Unit Quantity
Material cost
Rod type earthing with 40 mm dia 3 mtrs long MS rod as per specification & drawing including Labour charges
Total cost in Rs
Lifting of excess earth up to distance of 10 km
Plastering concrete surface in cement mortar 1:4, 20 mm thick inclusive of smooth rendering curing etc., complete.
Fixing foundation frame of MS channel 100X50mm and MS angle 40X40X5mm welding, fixing in concrete, aligning the RMU on foundation bed, assembly of units, connecting Bus Bars from panel to panel etc., complete.
Lettering the RMU with enamel paint and also writing single line diagram of each panel, caution Board, Danger Board etc., including cost of Paint, Brush etc.,
-
Rate/ unit Cost
1 No. 1 126000 126000
2 cmt 0.5 84 42
3 cmt 0.25 2308 577
4 cmt 0.38 3011 1144
5 cmt 0.5 87 44
6 Sq. mtr 3.75 93 349
7 No. 1 1240 1240
8 Set 1 310 310
9 Set 2 1734 3468
133173
COST DATA SHEET-31
Providing Compact RMU 11kV Class SF6/VCB Type (1OD) Material cost
Compact RMU 11kV Class SF6/VCB Type (1OD)
Earth Excavation for R.M.U. Foundation depositing of earth on bank up to a lead of 50 mtrs and with a lift up to 1.5 mtrs
Providing and Laying Granite or Basalt or trap jelly concrete 1:4:8 proporation using 40 mm and down size jelly for foundation laid in 15 cm thick layers and well compacted including curing complete (including material rate for cement, jelly, sand and labour)
Sl. No Materials Unit Quantity
Lettering the RMU with enamel paint and also writing single line diagram of each panel, caution Board, Danger Board etc., including cost of Paint, Brush etc.,
Rod type earthing with 40 mm dia 3 mtrs long MS rod as per specification & drawing including Labour charges
Total cost in Rs
Providing and laying granite basalt or trap jelly cement concrete 1:2:4 proportion using 20 mm and down size jelly including Mixing laying Tamping. Curing and finished for exposed faces with necessary centering and form work etc., complete (including material rate for cement, sand, jelly and labour)
Lifting of excess earth up to distance of 10 km
Plastering concrete surface in cement mortar 1:4, 20 mm thick inclusive of smooth rendering curing etc., complete.
Fixing foundation frame of MS channel 100X50mm and MS angle 40X40X5mm welding, fixing in concrete, aligning the RMU on foundation bed, assembly of units, connecting Bus Bars from panel to panel etc., complete.
-
Rate/ unit Cost
1 No. 1 395000 395000
2 cmt 0.5 84 42
3 cmt 0.25 2308 577
4 cmt 0.38 3011 1144
5 cmt 0.5 87 44
6 Sq. mtr 3.75 93 349
7 No. 1 1240 1240
8 Set 1 310 310
9 Set 2 1734 3468
402173
Material cost
Compact RMU 11kV Class SF6/VCB Type (1VL) 350 MVA, 630A
Earth Excavation for R.M.U. Foundation depositing of earth on bank up to a lead of 50 mtrs and with a lift up to 1.5 mtrs
Providing and Laying Granite or Basalt or trap jelly concrete 1:4:8 proporation using 40 mm and down size jelly for foundation laid in 15 cm thick layers and well compacted including curing complete (including material rate for cement, jelly, sand and labour)
Providing and laying granite basalt or trap jelly cement concrete 1:2:4 proportion using 20 mm and down size jelly including Mixing laying Tamping. Curing and finished for exposed faces with necessary centering and form work etc., complete (including material rate for cement, sand, jelly and labour)
COST DATA SHEET-32
Providing Compact RMU 11kV Class SF6/VCB Type (1VL)
Sl. No Materials Unit Quantity
Rod type earthing with 40 mm dia 3 mtrs long MS rod as per specification & drawing including Labour charges
Total cost in Rs
Lifting of excess earth up to distance of 10 km
Plastering concrete surface in cement mortar 1:4, 20 mm thick inclusive of smooth rendering curing etc., complete.
Fixing foundation frame of MS channel 100X50mm and MS angle 40X40X5mm welding, fixing in concrete, aligning the RMU on foundation bed, assembly of units, connecting Bus Bars from panel to panel etc., complete.
Lettering the RMU with enamel paint and also writing single line diagram of each panel, caution Board, Danger Board etc., including cost of Paint, Brush etc.,
-
1 Metallic Enclosure with Busbars No 1 6255 6255
2 Programmable Logic Controllers with communication ports No 1 12370 12370
3 GSM Modem No 1 6680 66804 MCCB- 40 Amps for 15/25 kVA DTC No 1 1605 16055 MCB 6 amps No 1 247 247
6 Contactors- 40 Amps for 15/25 kVA DTC
No 2 2200 4400
7 Current Transformers 50/5 amps for 15/25 kVA DTC No 3 655 1965
8 Energy meter ETV type No 1 6710 6710
9Transformer wiring kit to Connect RLM Unit box to the transformer using PVC aluminium lead wire, Lugs etc.,
Set 1 1280 1280
10 Miscellaneous materials L/s 68811 Labour Charges
a) Casual 1470b) Regular 882
12 44552Total CostNote:(1) For 15 /25 kVA Transformer feeding to individual IP sets, use only one contactor & without MCCB . (2) For 15 kVA transformer under own your transformer scheme (OYT), The RLM Units shall house 2/4 output without MCCB. One contactor of 30 amps rating in conjunction with the PLC is sufficient.
COST DATA SHEET - 26Installing RLMU for the existing 15/25 kVA Distribution Transformer CenterSl No
Particulars Unit Qty Rate/ Unit
Cost
-
1 Metallic Enclosure with Busbars No 1 6255 6255
2 Programmable Logic Controllers with communication ports No 1 12370 12370
3 GSM Modem No 1 6680 6680
4 MCCB-100 Amps for 63 kVA DTC No 1 1605 1605
5 MCB 6 amps No 1 247 247
6 Contactors- 100 Amps for 63 kVA DTC No 2 4700 9400
7 Current Transformers 100/5 amps for 63 kVA DTC No 3 425 1275
8 Energy meter ETV type No 1 6710 6710
9Transformer wiring kit to Connect RLM Unit box to the transformer using PVC aluminium lead wire, Lugs etc.,
Set 1 4665 4665
10 Miscellaneous materials L/s 79311 Labour Charges
a) Casual 1470b) Regular 882
12 52352Total Cost
COST DATA SHEET - 27Installing RLMU for the existing 63 kVA Distribution Transformer Center
Sl No Particulars Unit Qty
Rate/ Unit Cost
-
1 Metallic Enclosure with Busbars No 1 6255 6255
2 Programmable Logic Controllers with communication ports No 1 12370 12370
3 GSM Modem No 1 6680 6680
4 MCCB-160 Amps for 100 kVA DTC No 1 3100 3100
5 MCB 6 amps No 1 247 247
6 Contactors- 160 Amps for100 kVA DTC No 2 6550 13100
7 Current Transformers 150/5 amps for 100 kVA DTC No 3 360 1080
8 Energy meter ETV type No 1 6710 6710
9Transformer wiring kit to Connect RLM Unit box to the transformer using PVC aluminium lead wire, Lugs etc.,
Set 1 11365 11365
10 Miscellaneous materials L/s 893Labour Chargesa) Casual 1470b) Regular 882
12 64152
11
Total Cost
Rate/ Unit
Cost
COST DATA SHEET - 28
Installing RLMU for the existing 100 kVA Distribution Transformer Center
Sl No
Particulars Unit Qty
-
Schedule of Rates for Standard Stock Materials 2007
Part-2
-
Page 1
Line Supports
1 RCC Pole-9.0M Long, 145 kg WL 200105 3235 No. 3492
2 RCC Pole-9.0M Long, 145 kg WL sq. section 200106 New Item No. 4820
3 RCC Pole-8.0M Long, 115 kg WL 200103 2165 No. 2356
4 PCC Pole-8.0M Long, 140 kg WL 200003 1382 No. 1517
5 PSC Pole-8.0M Long, 200 kg WL 200004 1712 No. 1845
6 PSC Pole -9.0M Long, 200 kg WL 200006 2081 No. 2281
7 Pre-Stressed Tubular Spun Pole 11M Long 200120 6600 No. 8365
8 RCC Pole-9.5M Long, 350 kg WL for 33kV Lines 200107 3910 No. 4163
9Strut pole made of released MS Rail pole or Tubular pole along with clamp fish plate, bolts & nuts
200514 1650 No. 1780
10 11 Mtrs. Long pole made of I Beam (MS) section size 200x100mm 25.9kg/mtr. 200621 New Item No. 13300
11 11 Mtrs. Long pole made of I Beam (MS) section size 175x85mm 19.5kg/mtr.
200610 New Item No. 9100
Cross Arms (MS)
1 11kV Horizontal X arms 279020 150 No 206
2 11kV Special 3pin X arm 279013 395 No 500
3 L.T. 4Pin X arms 279014 125 No 160
4 L.T. 2Pin X arms 279012 55 No 73
5 L.T.S.T Support 50X6mm flat 279091 30 No 38
6 H.T.S.T Support 50X6mm flat 279092 44 No 50
7 Brace for LT 4pin X arm (600mm long) 279082 95 No 102
8 Brace for 11 kV special 3pin X arm (900mm long) 279083 130 No 140
9 L.T.Cross arms for vertical configuration 279017 320 No 345
10 EG Stirrups (MS) with GI wire lacing 279130 139 No 145
11 Spiral Earth Electrode 281683 160 No 185
Clamps (MS)
1 RCC Pole clamp 279523 38 No 44
2 PCC Pole clamp 279503 37 No 39
3 PSC Pole clamp 279510 38 No 44
4 PCC Pole clamp type A for LT X arm 279502 35 No 39
5 PCC Pole clamp type A for X arm upto 1M from pole top 279522 35 No 39
Rate in Rs.
Rate as per S.R 2005 (in
Rs.)
Schedule of Rates for Standard Stock Materials 2007
Sl No Name of the Material Material Code
Unit of Measure
ment
-
Page 2
Rate in Rs.
Rate as per S.R 2005 (in
Rs.)
Sl No Name of the Material Material Code
Unit of Measure
ment
6 Clamps for fixing MV Lamp control box, fuse box/St light fixture on rail pole 279550 45 No 52
7 Guy clamp 279650 40 No 468 Turn buckle (GI) 279146 115 No 1349 Rcc pole type C clamp for GOS operating handle 279524 40 No 43
10 MS Fish Plate 279800 40 No 43
11 Strain Clamps, 3 Bolt type for 70/90 kN Disc Insulator 285076 400 No 501
Insulators1 11kV Pin Insulatror (Shell only) 283005 30 No 342 11kV Pin Insulatror (G.I Pin only) 283055 38 No 393 1.1kV Pin Insulatror (Shell only) 283003 9 No 104 1.1kV Pin Insulatror (G.I Pin only) 283053 18 No 185 NO.8 Strain Insulator 283158 9 No 116 NO.15 Strain Insulator 283166 20 No 237 DISC Insulators 45kN 283040 268 No 3508 DISC Insulators 70kN, Ball & Socket type 283017 300 No 3609 DISC Insulators 90kN, Ball & Socket type 283018 300 No 360
10 DISC Insulators 120kN, Ball & Socket type 283021 365 No 39011 11kV Solid Core Insulator 283321 95 No 10012 11kV Post Insulator 283101 240 No 25513 Silcon rubber composite insulator 283320 New Item No 270
Conductor1 Weasel ACSR 284105 14930 km 197002 Rabbit ACSR 284108 25490 km 325003 Coyote ACSR 284116 67216 km 867004 Lynx ACSR 284120 New Item km 242080
Guy Wire & G.I.Wire1 7/10 SWG Guy Wire 281110 43500 MT 438002 8 SWG G.I.Wire 281008 42000 MT 436003 10 SWG G.I.Wire 281010 36800 MT 402504 Anchor Rod using 12mm rounds 279140 90 No 1005 G.I Barbed Wire 12 SWG 281205 42010 MT 48800
P.G.Clamps1 Coyote to Coyote 285515 210 No 2402 Rabbit to Rabbit 285510 55 No 703 Weasel to Rabbit 285549 55 No 704 Weasel to Weasel 285509 55 No 585 Squirrel to Weasel 285548 54 No 56
-
Page 3
Rate in Rs.
Rate as per S.R 2005 (in
Rs.)
Sl No Name of the Material Material Code
Unit of Measure
ment
6 T-Clamps for Rabbit conductor with hot dipped galvanized bolts, Nuts and Washers 285600 175 Set 219
7 Single Tension Clamp Suitable for Rabbit 285068 441 No 498
8 Single Tension Clamp Suitable for Coyote 285076 572 No 716
DTs-3Phase, 11kV/433V
1 Distribution Transformer-15kVA, Copper Winding 321301 36790 No 47100
2 Distribution Transformer-25kVA, Almunium Wdg. 321304 35560 No 64100
3 Distribution Transformer-63kVA, Almunium Wdg. 321306 51269 No 95300
4 Distribution Transformer-100kVA, Almunium Wdg. 321310 62849 No 116330
5 Distribution Transformer-250kVA, Almunium Wdg. 321325 127310 No 239600
6 Distribution Transformer-500kVA, Almunium Wdg. 321350 216730 No 450000
Distribution Transformer- Amorphous Core 11kV/433V
1 Distribution Transformer-25kVA 321376 63174 No 94350
2 Distribution Transformer-63kVA 321377 97162 No 145000
3 Distribution Transformer-100kVA 321380 97162 No 145000
Distribution Transformer Self Protected 11kV/433V
1 100 kVA 321365 New Item No 118500
2 250 kVA 321370 New Item No 238300
DTs-Single phase, 11kV/250V
1 Distribution Transformer- 15 kVA, 11kV/1.73/0.25, with MCCB 321302 37210 No 56600
2 Distribution Transformer 15 kVA, 11kV/0.25kV Amorphouse core copper winding with MCCB 321303 41673 No 61200
3 Distribution Transformer- 10 kVA, Copper winding, 11kV/250V 321300 New Item No 35500
Transformer Oil
1 EHV Grade Transformer oil -new 601400 39842 k.Ltr 44100
2 Reclaimed oil 601410 17700 k.Ltr 19400
3 Contaminated oil 601420 14000 k.Ltr 15400
L.T.Protection
1 L.T.Protection kit for 25kVA to 100kVA DTCs 301107 1523 No. 1630
L.T.Distribution Box
2 L.T.Distribution Box for 100 / 250 kVA DTC with MCBs 301230 13714 No. 18675
L.T.Wiring kit for LT protection kit
1 For 25 kVA DTC 301151 800 Set 1280
-
Page 4
Rate in Rs.
Rate as per S.R 2005 (in
Rs.)
Sl No Name of the Material Material Code
Unit of Measure
ment
2 For 63 kVA DTC 301152 2165 Set 4475
3 For 100 kVA DTC 301153 8500 Set 11005
4 For 250 kVA DTC 301154 12800 Set 18535
Lightning Arresters
1 L.A. 9kV, 5kA, Metal Oxide 303200 487 No 490
2 L.A. 9kV, 5kA, Polymeric type 303205 891 No 870
H.G.Fuse Unit
1 11kV Class, Solid core 720 720 No. 775
T.C.Sets
1 25/63kVA T.C.Sets 279110 5340 Set 5720
2 100/300 kVA T.C.Sets 279120 9960 Set 9960
3 Single Pole Mounted Transformer kit for 250 kVA on 11 mtr spun poles 279125 16410 Set 17275
4 Single Pole Mounted Transformer kit for 25/63kVA for RCC Poles 279115 3335 Set 3335
5 Single Pole Mounted Transformer kit for 100kVA for RCC Poles 279125 5350 Set 5730
G.O.S
1 11kV G.O.S 200A Single break 304212 4700 Set 5350
2 11kV G.O.S 200A Single break, vertically operated 304213 5813 Set 6260
3 11kV G.O.S 400A Double break 304224 11920 Set 12850
4 11kV G.O.S.Mounting H-Frame set for 200A Single break 279149 2060 Set 2650
5 Male and female contacts with Bolts and Nuts for 11 KV 200A GOS (3 Male and 3 Female contacts each) New Item ** Set 1990
6 11 kV DOLO Cutouts 302011 1395 Set 1500
7 11 kV 400A Special Roaster GOS 304204 7960 Set 8575
D.P.Sets
1 D.P.Sets 279100 2827 Set 3400
3 Pole Structure Kit
1 3 Pole Structure material 279015 6068 Set 6500
C-Type fired wedge Boltless connector
1 Rabbit to Rabbit ACSR conductor 285570 466 No 468
2 Coyote to Coyote ACSR conductor 285575 908 No 945
3 Rabbit to Coyote ACSR conductor 285572 New Item No 790
H-Clamps
1 Rabbit to Rabbit 285585 New Item No. 70
2 Coyote to Coyote 285587 New Item No. 360
-
Page 5
Rate in Rs.
Rate as per S.R 2005 (in
Rs.)
Sl No Name of the Material Material Code
Unit of Measure
ment
3 Rabbit to Coyote 285586 New Item No. 340
4 Two hole paddle( Rabbit ACSR) 285590 New Item No. 285
5 Microweg Connector 285594 New Item No. 90
L.T.Feeder piller box
1 LT Feeder Piller box 8 way with cutouts 31380 31380 No 33585
2 LT Feeder Piller box 12way with cutouts 36130 36130 No 38670
L.T.Spacers
1 L.T.Line Spacers 284502 47 No 47
2 LT Spacer for TC Wiring 284503 New Item No 28
Armoured L.T.UG Cable 1.1kV Class
1 6 Sq.mm, 2 Core 287054 32970 km 34135
41510 km 43700
54300 km 59260
40290 km 44730
66220 km 74300
62650 km 68700
75130 km 89200
5 50 Sq.mm, 4 core 287209 109870 km 136000
6 70 Sq.mm, 4 core 287210 181040 km 214000
7 95 Sq.mm, 4 core 287211 263730 km 307100
8 120Sq.mm , 4 core 287212 289190 km 345500
9 150 Sq.mm, 4 core 287213 313330 km 386500
10 185Sq.mm, 4 core 287214 407650 km 497000
11 240 Sq.mm, 4 core 287216 578370 km 692000
12 400 Sq. mm 4 Core 287218 812450 km 996000
Compression type Aluminium Tubular in line connector for Aluminium conductor
1 10 288605 12 No. 2
2 16 288606 15 No. 2
3 25 288607 18 No. 3
4 35 288608 22 No. 4
5 50 288609 31 No. 5
6 70 288610 55 No. 9
7 95 288611 57 No. 10
8 120 288612 84 No. 15
4 25 Sq.mm, 2Core/4 Core
2 10 Sq.mm, 2Core /4Core
3 16 Sq.mm, 2Core/4 Core
287055/ 287205
287056/ 287206
287057/ 287207
-
Page 6
Rate in Rs.
Rate as per S.R 2005 (in
Rs.)
Sl No Name of the Material Material Code
Unit of Measure
ment
9 150 288613 118 No. 21
10 185 288614 144 No. 25
11 240 288616 237 No. 41
12 400 288617 501 No. 85
Epoxy Straight through jointing kits suitable for 1.1 kV class LT UG Cables Size in SQ.MM
1 10 Sq.mm, 2 Core 288170 336 Set 510
2 10 Sq.mm, 4 Core 288174 390 Set 595
3 16 Sq.mm, 2 Core 288171 390 Set 595
4 16 Sq.mm, 4 Core 288175 390 Set 595
5 25 Sq.mm, 2 Core 288172 390 Set 595
6 25 Sq.mm, 4 Core 288176 412 Set 640
7 50 Sq.mm, 4 core 288178 492 Set 730
8 70 Sq.mm, 3.5/4 core 288179 510 Set 900
9 95 Sq.mm, 3.5/4 core 288180 618 Set 900
10 120 Sq mm 3.5/4 core 288181 690 Set 1420
11 185 Sq mm 3.5/4 core 288183 1092 Set 1465
12 240 Sq.mm,3.5/4 core 288185 1896 Set 1870
13 400 Sq. mm 3.5/4 Core 288187 2190 Set 2770Epoxy Terminating kit ( pothead) suitable for 1.1 kV class LT UG Cables
1 Up to 4C x 50 sq.mm 288150 New Item Set 330
2 3.5 x 70/95/120 sq. mm 288159 New Item Set 390
3 3.5 x 150/185 sq. mm 288163 New Item Set 490
4 3.5 x 225/240/300 sq. mm 288165 New Item Set 600
5 3.5 x 400/500 sq. mm 288166 New Item Set 730Cast Iron Terminating kit ( pothead) suitable for 1.1 kV class LT UG Cables
1 2.5 to 25 sq.mm 288168 New Item Set 180
2 35 to 95 sq.mm 288169 New Item Set 280
11kV 3 Core XLPE UG Cable
1 11kV 3 Core XLPE UG Cable-95Sq.mm 287340 655270 km 859000
2 11kV 3 Core XLPE UG Cable-120 Sq.mm 287342 905990 km 1286000
3 11kV 3 Core XLPE UG Cable-240Sq.mm 287345 1060800 km 1539000
4 11kV 3 Core XLPE UG Cable-400Sq.mm 287350 1606800 km 2412500
Conventional RMUs (VCB Type)
-
Page 7
Rate in Rs.
Rate as per S.R 2005 (in
Rs.)
Sl No Name of the Material Material Code
Unit of Measure
ment
1(a) RMU, One In comer +3 Breakers +one out going (2OD + 3VL), 350 MVA, 800A with Cu Bus 302310 1481000 Set 1493665
1(b) RMU, One In comer +3 Breakers +one out going (2OD + 3VL), 350 MVA, 800A with Al Bus 302311 New Item Set 1436470
2(a) One Breaker (VL) panel with Cu Busbar 302315 294809 No 296010
2(b) One Breaker (VL) panel with Al Busbar 302316 New Item No 292725
3(a) RMU, One In comer + One Breakers +one out going(2OD + 1 VL), 350 MVA, 800A with Cu Bus 302320 877840 Set 885395
3(b) RMU, One In comer + One Breakers +one out going(2OD + 1 VL), 350 MVA, 800A with Al Bus 302321 New Item Set 851070
4(a) RMU (2OD + 1 VL), 250 MVA, 400A, VCB Type with Cu Busbar 302325 877840 Set 885395
4(b) RMU (2OD + 1 VL), 250 MVA, 400A, VCB Type with Cu Busbar 302326 New Item Set 851070
Conventional RMU Spares (VCB Type)
1 Bus support insulator with stem 506505 605 No 800
2 CTs trom bone type, 11kV Class, 200-100/5A, VA-15, Class 5P-10 506520 11715 No 15500
3 CTs resin cast, 11kV Class,400-200/5A, UA15, Class 5P-10 506525 11715 No 15500
4 Spout grid Insulator assembly (Back) 506530 2660 No 3510
5 Spout grid Insulator assembly (Front) 506535 2660 No 3510
6 PT Insulator (Spout) 3 Nos 506540 355 No 370
7 Shunt trip coil 506545 625 No 825
8 Closing coil 506550 625 No 825
9 Plug assembly for grid 800A , 6 Nos 506555 990 No 1305
10 Para plast compound 506560 475 kg 620
11 PT Fuse(NT) 11kV/V3 Amps with out stem, VTF Type-11 506565 1650 No 2175
12 Insulated housing 506510 New Item No 2984513 Switch insulators left/ right/ centre 506515 New Item No 383014 Vacuum interruptor 20 kA 506570 New Item No 2600015 Shower contact 506580 New Item No 880
Compact RMUs, (VCB / SF6 Type) with Al Busbar
1 RMU (3 way), One In comer + One Breaker +one out going (2OD + 1 VL), 350 MVA, 650A 302340 698485 Unit 647000
2 RMU(4way), One In comer + Two Breakers +one out going (2OD + 2 VL), 350 MVA, 650A 302345 1036850 Unit 1044600
3 RMU(5way), One In comer + Three Breakers +