Junction Box/Distribution Box Specification Date: 7 Jan 2014 No. Remarks 1 cert 2 cert 3 4 drawing 5 cert No. Description UOM Qty Remarks 1 4 core 35mm2 insulated flexible armoured power cable m 100 For incoming from genset. Please propose brand and size of cable 2 Plug, 4 Pole, 150A ea 1 for incoming from getnset. 415V 3 Receptacle, 4 Pole, 150A ea 1 for incoming from getnset. 415V 4 Receptacles, KRS-304 SU -78 460 VAC; Killark ea 4 5 Receptacles, KRJ-604 SU-78; Killark ea 4 6 Receptacles, UGRO-2032 250 Vac , 20 Amp; killark ea 12 Single Phase 7 150A MCB ea 1 for 150A Plug 8 60A MCB ea 4 for Killark KRJ-604 SU 9 30A MCB ea 4 for Killark KRJ-304 SU 10 15A MCB ea 12 for Killark UGRO-2032 No. Remarks 1 cert 2 3 drawing 4 No. Description UOM Qty Remarks 1 Receptacles, KRJ-604 SU-78; Killark ea 1 incoming from Main Junction Box 2 Plug, KRJ-604 SU-78; Killark ea 1 Incoming from Main Junction box 3 Receptacles, UGRO-2032 250 Vac , 20 Amp; killark ea 10 Single Phase 4 60A MCB ea 1 for Killark KRJ-604 SU 5 15A MCB ea 10 for Killark UGRO-2032 DRAFT Should c/w mounting for 1-1/2" pipe Should c/w as built ex box drawing and electric schematic Technical Requirement All receptacles should be at side of junction box to reduce the depth of junction box Description Should c/w Earth Fault Relay (EFR) Secondary Junction Box Description General Requirement Explosion proof junction box c/w cert. Suitable for Zone 2 service. Technical Requirement General Requirement Main Junction Box Explosion proof junction box c/w cert. Suitable for Zone 2 service. Should c/w DNV certified transport skid/frame with 4 point lifting and forklift pocket Should c/w grounding point Should c/w as built skid/frame drawing, ex box drawing and electric schematic

Upload: khongcom

Post on 23-Oct-2015

45 views

Category:

Documents


21 download

DESCRIPTION

Junction box requirement and specification.

TRANSCRIPT

Page 1: Junction Box Specification

Junction Box/Distribution Box Specification Date: 7 Jan 2014

No. Remarks1 cert

2 cert34 drawing5 cert

No. Description UOM Qty Remarks

1 4 core 35mm2 insulated flexible armoured power cable m 100For incoming from

genset. Please propose brand and size of cable

2 Plug, 4 Pole, 150A ea 1 for incoming from getnset. 415V

3 Receptacle, 4 Pole, 150A ea 1 for incoming from getnset. 415V

4 Receptacles, KRS-304 SU -78 460 VAC; Killark ea 45 Receptacles, KRJ-604 SU-78; Killark ea 46 Receptacles, UGRO-2032 250 Vac , 20 Amp; killark ea 12 Single Phase7 150A MCB ea 1 for 150A Plug8 60A MCB ea 4 for Killark KRJ-604 SU9 30A MCB ea 4 for Killark KRJ-304 SU

10 15A MCB ea 12 for Killark UGRO-2032

No. Remarks1 cert23 drawing4

No. Description UOM Qty Remarks1 Receptacles, KRJ-604 SU-78; Killark ea 1 incoming from Main

Junction Box2 Plug, KRJ-604 SU-78; Killark ea 1 Incoming from Main

Junction box3 Receptacles, UGRO-2032 250 Vac , 20 Amp; killark ea 10 Single Phase4 60A MCB ea 1 for Killark KRJ-604 SU5 15A MCB ea 10 for Killark UGRO-2032

DRAFT

Should c/w mounting for 1-1/2" pipeShould c/w as built ex box drawing and electric schematic

Technical Requirement

All receptacles should be at side of junction box to reduce the depth of junction box

Description

Should c/w Earth Fault Relay (EFR)

Secondary Junction Box

DescriptionGeneral Requirement

Explosion proof junction box c/w cert. Suitable for Zone 2 service.

Technical Requirement

General RequirementMain Junction Box

Explosion proof junction box c/w cert. Suitable for Zone 2 service. Should c/w DNV certified transport skid/frame with 4 point lifting and forklift pocketShould c/w grounding pointShould c/w as built skid/frame drawing, ex box drawing and electric schematic

Page 2: Junction Box Specification

Application

Main Junctin BoxSecondary

Supply from Genset

Standing at platform deck

Hanging at stair tower (1-1/2" hand rail)

150A Plug and Receptacle