junction box specification
DESCRIPTION
Junction box requirement and specification.TRANSCRIPT
Junction Box/Distribution Box Specification Date: 7 Jan 2014
No. Remarks1 cert
2 cert34 drawing5 cert
No. Description UOM Qty Remarks
1 4 core 35mm2 insulated flexible armoured power cable m 100For incoming from
genset. Please propose brand and size of cable
2 Plug, 4 Pole, 150A ea 1 for incoming from getnset. 415V
3 Receptacle, 4 Pole, 150A ea 1 for incoming from getnset. 415V
4 Receptacles, KRS-304 SU -78 460 VAC; Killark ea 45 Receptacles, KRJ-604 SU-78; Killark ea 46 Receptacles, UGRO-2032 250 Vac , 20 Amp; killark ea 12 Single Phase7 150A MCB ea 1 for 150A Plug8 60A MCB ea 4 for Killark KRJ-604 SU9 30A MCB ea 4 for Killark KRJ-304 SU
10 15A MCB ea 12 for Killark UGRO-2032
No. Remarks1 cert23 drawing4
No. Description UOM Qty Remarks1 Receptacles, KRJ-604 SU-78; Killark ea 1 incoming from Main
Junction Box2 Plug, KRJ-604 SU-78; Killark ea 1 Incoming from Main
Junction box3 Receptacles, UGRO-2032 250 Vac , 20 Amp; killark ea 10 Single Phase4 60A MCB ea 1 for Killark KRJ-604 SU5 15A MCB ea 10 for Killark UGRO-2032
DRAFT
Should c/w mounting for 1-1/2" pipeShould c/w as built ex box drawing and electric schematic
Technical Requirement
All receptacles should be at side of junction box to reduce the depth of junction box
Description
Should c/w Earth Fault Relay (EFR)
Secondary Junction Box
DescriptionGeneral Requirement
Explosion proof junction box c/w cert. Suitable for Zone 2 service.
Technical Requirement
General RequirementMain Junction Box
Explosion proof junction box c/w cert. Suitable for Zone 2 service. Should c/w DNV certified transport skid/frame with 4 point lifting and forklift pocketShould c/w grounding pointShould c/w as built skid/frame drawing, ex box drawing and electric schematic
Application
Main Junctin BoxSecondary
Supply from Genset
Standing at platform deck
Hanging at stair tower (1-1/2" hand rail)
150A Plug and Receptacle