İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
In order to solve the transportation and infrastructure issues of İstanbul, which is one of the leading metropolises of the globe, “Directorate of Infrastructure Services” has the responsibility of constructing roads, viaducts, road junctions, highway tunnels; making creek rehabilitations and organizing the infrastructures of officially authorized institutions.
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
The highway tunnels, metrobus line and some of the junctions constructed by “Directorate of Infrastructure Services”;
NO. COMPLETED CONSTRUCTIONS
1 KAĞITHANE - PİYALEPAŞA HIGHWAY TUNNEL
2 BOMONTİ - DOLMABAHÇE HIGHWAY TUNNEL
3 SARIYER – ÇAYIRBAŞI HIGHWAY TUNNEL
4 AVCILAR - KADIKÖY METROBUS LINE
5 YEŞİLKÖY POOL JUNCTION
6 ATATÜRK AIRPORT ACCESS ROADS AND JUNCTION
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
Kağıthane - Piyalepaşa Highway Tunnel was built as two parallel tubes whose length are 1610 meters each. The total cost of the tunnel and the access roads is about $110,000,000.
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
Kağıthane - Piyalepaşa Highway Tunnel
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
Kağıthane - Piyalepaşa Highway Tunnel
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
Kağıthane - Piyalepaşa Highway Tunnel
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
Bomonti - Dolmabahçe Highway Tunnel was built as two parallel tubes whose length are 2350 meters each. The total cost of the tunnel and the access roads is about $180,000,000.
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
Sarıyer - Çayırbaşı Highway Tunnel was built as two parallel tubes whose length are 2000 meters each. The total cost of the tunnel and the access roads is about $140,000,000.
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
The length of Avcılar-Kadıköy Metrobus Line is 40,000 meters and the total cost is about $250,000,000.
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
Avcılar-Kadıköy Metrobus Line
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
Avcılar-Kadıköy Metrobus Line
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
Avcılar-Kadıköy Metrobus Line
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
During Yeşilköy Pool Junction Construction, the traffic around the pool was placed underground, providing a relief to the area. The cost is about $2,500,000.
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
Yeşilköy Pool Junction
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
Completing Atatürk Airport Access Roads And Junction Construction, the traffic problem around the airport, caused by vehicles going in and out was solved. The cost is about $40,000,000.
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
Atatürk Airport Access Roads And Junction Construction
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
Atatürk Airport Access Roads And Junction Construction
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
Atatürk Airport Access Roads And Junction Construction
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
The creeks which are complated to be rehabilitated by “Directorate of Infrastructure Issues”.
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
The creeks which are complated to be rehabilitated by “Directorate of Infrastructure Issues”.
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
The creeks which are complated to be rehabilitated by “Directorate of Infrastructure Issues”.
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
The highway tunnels which are planned to be constructed by “Directorate of Infrastructure Services”.
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
The highway tunnels which are planned to be constructed by “Directorate of Infrastructure Services”.
With the tunnels mentioned above, the traffic of many districts are carried to underground and creating new squares and avenues. The amount of the budget which is planned to be used in order to construct the highway tunnels are about $1,000,000,000. (37.060,00 mt)
NO. THE HIGHWAY TUNNELS WHICH ARE PLANNED TO BE CONSTRUCTED
1 FULYA - LEVAZIM HIGHWAY TUNNEL CONSTRUCTION 2250 mt
2 ZİNCİRLİDERE - LEVAZIM HIGHWAY TUNNEL CONSTRUCTION 1400 mt
3 LEVAZIM – AKATLAR HIGHWAY TUNNEL CONSTRUCTION 3360 mt
4 AYAZAĞA-AKATLAR HIGHWAY TUNNEL CONSTRUCTION 2300 mt
5 AKATLAR –DERBENT HIGHWAY TUNNEL CONSTRUCTION 2290 mt
6 DERBENT - ÇAYIRBAŞI HIGHWAY TUNNEL CONSTRUCTION 2650 mt
7 KAĞITHANE – HAVALİMANI HIGHWAY TUNNEL CONSTRUCTION 24900 mt
8 EYÜP, SİLAHTARAĞA STREET – GOP STREET HIGHWAY TUNNEL CONSTRUCTION 200mt
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
The creeks which are planned to be rehabilitated by “Directorate of Infrastructure Issues”.
NO. THE CREEKS WHICH ARE PLANNED TO BE REHABILITATED
1 KADIKÖY KURBAĞALIDERE STREAM IMPROVEMENT
2 KURBAĞALIDERE STREAM IMPROVEMENT
3 ÜSKÜDAR ÇAVUŞDERE STREAM IMPROVEMENT
4 KÂĞITHANE DERESİ STREAM IMPROVEMENT
5 İKİTELLİ PAPAZ STREAM IMPROVEMENT
6 KÜÇÜKÇEKMECE HASANOĞLU STREAM IMPROVEMENT
7 KEMERDERE ÇIRÇIR BRANCH STREAM IMPROVEMENT
8 SİLİVRİ BOĞLUCA, KARILAR BRANCHES STREAM IMPROVEMENT
9 SİLİVRİ, KIRLANGIÇ BRANCH STREAM IMPROVEMENT
10 SİLİVRİ FENER BRANCH STREAM IMPROVEMENT
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
The creeks which are planned to be rehabilitated by “Directorate of Infrastructure Services”.
NO. THE CREEKS WHICH ARE PLANNED TO BE REHABILITATED
11 SİLİVRİ KOYUNDERE STREAM IMPROVEMENT
12 BAŞAKŞEHİR EŞKİNOZ DERESİ STREAM IMPROVEMENT
13 AVCILAR EŞKİNOZ DERESİ STREAM IMPROVEMENT
14 SELİMPAŞA KOCADERE STREAM IMPROVEMENT
15 ÇATALCA LOMBORLOZ DERESİ STREAM IMPROVEMENT
16 ÜSKÜDAR BÜLBÜLDERESİ STREAM IMPROVEMENT
17 ESENYURT HARAMİDERE STREAM IMPROVEMENT
18 PENDİK KEMİKLİDERE STREAM IMPROVEMENT
19 MALTEPE ÇAMAŞIRCI DERESİ STREAM IMPROVEMENT
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
The amount of the budget which is planned to be used in order to rehabilitate the mentioned creeks is about $300,000,000.
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
The roads, viaducts, road junctions which are planned to be constructed by “Directorate of Infrastructure Services”
NO. THE ROADS, VIADUCTS, ROAD JUNCTIONS WHICH ARE PLANNED TO BE CONSTRUCTED
1 KÜÇÜKÇEKMECE, BORUSAN JUNCTION - 20 TEMMUZ AVENUE ROAD REHABILITATION CONSTRUCTION
2ROAD-JUNCTION CONSTRUCTION OF ÜSKÜDAR-ÜMRANİYE TEM ACCESS ROAD AND ESKİ KISIKLI AVN. INTERSECTION
3 SARIYER, İSTİNYE BAYIRI (VAKIFBAHÇE) ROAD, JUNCTION CONSTRUCTION
4 ROAD-JUNCTION CONSTRUCTION OF PENDİK, D-100 HIGHWAY – CUMHURİYET AVENUE INTERSECTION
5 ROAD-JUNCTION CONSTRUCTION OF KARTAL, SANAYİ AVENUE - YAKACIK AVENUE INTERSECTION
6 BÜYÜKÇEKMECE, D-100 HIGHWAY (TÜYAP) ROAD, JUNCTION CONSTRUCTION
7 BAYRAMPAŞA, 12. STREET ELEVATION LOWERING CONSTRUCTION
8 BÜYÜKÇEKMECE, D-100 HIGHWAY BİZİMKENT JUNCTION CONSTRUCTION
9ROAD-JUNCTION CONSTRUCTION OF BEYLİKDÜZÜ, YAVUZ SULTAN SELİM AND TURGUT ÖZAL BOULEVARDS INTERSECTION
10 BAĞCILAR, ATEŞTUĞLA JUNCTION CONSTRUCTION
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
The roads, viaducts, road junctions which are planned to be constructed by “Directorate of Infrastructure Services”
NO. THE ROADS, VIADUCTS, ROAD JUNCTIONS WHICH ARE PLANNED TO BE CONSTRUCTED
11ROAD-JUNCTION CONSTRUCTION OF BAĞCILAR, İNÖNÜ AVN.-12 EYLÜL AVN., MASLAK AVN., ATATÜRK AVN. INTERSECTION
12 SİLİVRİ, GÜMÜŞYAKA D-100 HIGHWAY ROAD, JUNCTION CONSTRUCTION
13ROAD-JUNCTION CONSTRUCTION OF GAZİOSMANPAŞA, GALERİ AVN.-HEKİMSUYU AVN. INTERSECTION
14 ESENLER, ÜÇYÜZLÜ JUNCTION CONSTRUCTION
15CONSTRUCTION OF TCDD SUBWAY FOR THE ACCESS ROADS OF HADIMKÖY, YEŞİLPINAR, NAKKAŞ VILLAGES
16 JUNCTION CONSTRUCTION OF EYÜP, AYVANSARAY AVN.-D100 ACCESS ROADS INTERSECTION
17 PENDİK, D-100 HIGHWAY TAVŞANTEPE ROAD-JUNCTION CONSTRUCTION
18 ROAD-JUNCTION CONSTRUCTION OF KARTAL, KARTAL AVN. - ÇETİN ST. INTERSECTION
19 EYÜP, PİRİNÇCİ KÖY YOLU AVN., İKİKEMER DERE GEÇİŞİ ROAD-JUNCTION CONSTRUCTION
20 MALTEPE, BAŞIBÜYÜK-SAMANDRA ROAD-JUNCTION CONSTRUCTION
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
The roads, viaducts, road junctions which are planned to be constructed by “Directorate of Infrastructure Services”
NO. THE ROADS, VIADUCTS, ROAD JUNCTIONS WHICH ARE PLANNED TO BE CONSTRUCTED
21 İSTANBUL TEKSTİL GİYİM KOOPERATİFİ - BAŞAKŞEHİR 4. ETAP ROAD-JUNCTION CONSTRUCTION
22 ROAD-JUNCTION CONSTRUCTION OF EYÜP, GALERİ AVN.- MAREŞAL FEVZİ ÇAKMAK AVN.
23OVERPASS CONSTRUCTION TO MAHMUTBEY WEST JUNCTION - BAHÇEŞEHİR TEM NORTH, SOUTH SIDE ROADS
24 KADIKÖY, KARAMANÇİFTLİK AVN. - 3004 AVN. BRİDGE, JUNCTION AND ROAD CONSTRUCTION
25 EDİRNEKAPI ROAD-JUNCTION CONSTRUCTION
26 BAĞCILAR, ESENLER AVN. - GÜNGÖREN AVN. - 6. ST. ROAD REHABILITATION
27 KÜÇÜKÇEKMECE, SAKARYA AVN., HALKALI SQUARE ROAD-JUNCTION CONSTRUCTION
28 KÜÇÜKÇEKMECE, İSTANBUL AVN. - YARIMBURGAZ AVN ROAD-JUNCTION CONSTRUCTION
29ROAD-JUNCTION CONSTRUCTION OF BAHÇELİEVLER, ÇOBANÇEŞME JUNCTION E-5 SIDE ROAD INTERSECTION
30 BAKIRKÖY, WORLD TRADE CENTER - SAHİL YOLU ROAD-JUNCTION CONSTRUCTION
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
The roads, viaducts, road junctions which are planned to be constructed by “Directorate of Infrastructure Services”
NO. THE ROADS, VIADUCTS, ROAD JUNCTIONS WHICH ARE PLANNED TO BE CONSTRUCTED
31 AVCILAR, FİRÜZKÖY TAHTAKALE ROAD CONSTRUCTION
32 KARTAL, D-100 HIGHWAY– A2 ROAD - ÇANAKKALE AVN. JUNCTION CONSTRUCTION
33 ROAD-JUNCTION CONSTRUCTION OF KARTAL, KARTAL AVN. - ÇETİN ST. INTERSECTION
34 BAYRAMPAŞA, TUNA AVN. – YAHYA KEMAL AVN. ROAD-JUNCTION CONSTRUCTION
35 MALTEPE, BAĞDAT AVN ROAD-JUNCTION CONSTRUCTION
36 GAZİOSMANPAŞA, HEKİMSUYU AVN. OVERPASS CONSTRUCTION
37 BAŞAKŞEHİR, 4. ETAP - ESKİEDİRNE ASFALTI
38 ARNAVUTKÖY - TAYAKADIN ARASI YOL İNŞAATI ROAD-JUNCTION CONSTRUCTION
39 WIDENING THE D-100 HIGHWAY BETWEEN KARTAL – PENDİK
40 RESTORATION OF TAKSİM SQUARE
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
RESTORATION OF TAKSİM SQUARE
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services
The amount of the budget which is planned to be used in order to construct the the roads, viaducts, road junctions are about $400,000,000.
İstanbul Metropolitan MunicipalityDepartment of Science AffairsDirectorate of Infrastructure Services