Government of Nepal Ministry of Water Resources Department of Irrigation Planning, Design, and Monitoring & Evaluation Division Jawalakhel, Lalitpur DEVELOPMENT OF DATABASE FOR IRRIGATION DEVELOPMENT IN NEPAL Draft Report FINAL REPORT March, 2007 CENTER FOR ENGINEERING RESEARC AND DEVELOPMENT Bishanlnagar, Kathmandu - 4. P.O. Box: 9839, Tel: 4431433 Email: [email protected]

Upload: aditya2053

Post on 08-Nov-2014

269 views

Category:

Documents


10 download

DESCRIPTION

irrigation

TRANSCRIPT

Page 1: Irrigation Database

Government of Nepal Ministry of Water Resources Department of Irrigation Planning, Design, and Monitoring & Evaluation Division Jawalakhel, Lalitpur

DEVELOPMENT OF DATABASE FOR IRRIGATION DEVELOPMENT IN NEPAL

Draft Report FINAL REPORT March, 2007

CENTER FOR ENGINEERING RESEARC AND DEVELOPMENT Bishanlnagar, Kathmandu - 4. P.O. Box: 9839, Tel: 4431433

Email: [email protected]

Page 2: Irrigation Database

ACRONOMY AC Actual Completed ADB Asian Development Bank ADB/N Agricultural Development Bank of Nepal ADPJ Agricultural Development Project, Janakpur AGRIL/Y Agricultural Year AIC Agricultural Input Corporation APP Agricultural Prospective Plan CA Command Area CAD Command Area Development CBS Central Bureau of Statistics CCA Culturable Command Area CGISP Community Ground Water Irrigation Sector project Comp, Completed Dev. Int. Development Intensity DBID Data Base for Irrigation Development DIDP Dhaulagiri Irrigation Development Project DIO District Irrigation Office DOA Department of Agriculture DOI Department of Irrigation DTW Deep Tubewell ED Extensive Development ECC European Economic Community ERIP East Rapti Irrigation Project FIWUD Farm Irrigation and Water Utilization Division FMIS Farmer Managed Irrigation System GADP Gandaki Anchal Agricultural Development Programme GCA Gross Command Area GTZ German Technical Cooperation GW Ground Water HFP Hill Food Programme ID Intensive Development IDA International Development Agency IDP-MWR Irrigation Development Project Mid-Western Region ILC Irrigation Line of Credit ILO International Labour Organization INGO International Non-Governmental Organization Irr. Cap Irrigation Capability ISP Irrigation Sector Project JICA Japanese International Cooperation Agency JM Joint Management KBIRD Karnali Bheri Integrated Rural Development Project KHILL Koshi Hill Area Rural Development Project KHARDEP Koshi Hill Area Integrated Rural Development Project KOR Gorvement of Koria MAIN Maintenance Programme MINOR Minor Irrigation Programme MPLD Ministry of Panchyat and Local Development MS Monsoon Season M Hill Mechi Hill Programme MIRDP Mahakali Integrated Rural Development Project MTW Medium Tubewell NCA Net Command Area N/CARE CARE/Nepal

Page 3: Irrigation Database

NGO Non-Governmental Organization NISP Nepal Irrigation Sector Programme NITP Non-Conventional Irrigation Technology Project PC Project Completed PDSP Planning and Design Strengthening Project PEOPLE People Participation Programme PP Participatory Programme RIRDP Rapti Integrated Rural Development Project SAU Saudi Fund SAPL Second Agriculture Program Loan SHIP Second Hill Irrigation Project SI Small Irrigation SINKALAMA Sindhupalchowk Kavreplanchowk Lalitpur and Makwanpur

Irrigation Project SIP Small Irrigation Programme SIRDP Sagarmatha Integrated Rural Development Project SISP Second Irrigation Sector Project SNV Netherland Development Cooperation STW Sallow Tubewell TO Turn Over UI Un-irrigated UNCDF United Nation Capital Development Fund UNDP United Nation Development Programme USAID United Stats Agency for International Development VDC Village Development Committee WECS Water and Energy Commission Secretariat WUA Water User Association WUI Water Use Inventory YR Year Round

Page 4: Irrigation Database

TABLE OF CONTENTS

Page no: Acronyms 1. Introduction 1

2. Objective of the Study 1

3. Scope of Works 1

4. Data Incorporated from Different Agencies for 2

4.1 Surface Water Irrigation 2 4.2 Ground Water Irrigation 2 4.3 Non-Conventional Irrigation 2

5. Irrigation Database Compilation 2

6. Highlights of Irrigation Development 3

6.1 Total Area vs Irrigated Area 3 6.2 Scheme-wise Irrigated Area 4 6.3 Present Status with CCA for Surface irrigation 4 6.4 Present Status with CCA for Ground Water irrigation 4 6.5 Present Status with Size of Project for Surface irrigation 4 6.6 CCA under Ecological Regions (Excluding Non-Assisted FMIS) 5 6.7 CCA under Development Regions (Excluding Non-Assisted FMIS) 5 6.8 Monsoon vs Year Round 5 6.9 ID vs ED and CAD 5 6.10 Planned vs Developed Command Area 6

List of Tables Table–1 Ecological and Physiographical Division of the Districts of Nepal 7 Table -2 Present Status of DOI Surface Projects 10 Table -3 Command Area of Surface Farmer’s Managed Irrigation Scheme. 18 Table -4 Summary of total command area of Surface Farmer Managed

Irrigation Scheme up-to 2005/06 (Agency Assisted) . 157 Table -5 Status of Shallow Tubewell in Nepal up-to 2005/06. 162 Table -6 Status of Deep Tubewell in Nepal up-to 2005/06. 163 Table -7 Present Level of Irrigation Development. 164 Table -8 Non Conventional Projects. 166 Table -8.1 Details of Non Conventional Projects. 168 Table -9 Planned vs Developed Command Area. 169 Table-10 Summary of Net Command Area (NCA) of Surface Irrigation System. 170

Page 5: Irrigation Database

ACKNOWLEDGEMENTS

We would like to express our sincere gratitude to Planning, Design, Monitoring and Evaluation Division of Department of Irrigation for giving us the opportunity to carry out the present job of the Development of Database for Irrigation Development in Nepal (DDIDN).

The Consultants extend thanks to the Er. Sudhir Man Baisyat, Deputy Director General, Er. Rajendra Prasad Adhikari, Senior Divisional Engineer and Er. Basu Dev Timilsina DoI for their valuable suggestions and guidelines during the preparation of this study. We would like to express our heartily appreciation to Mr. Pratap Singh Tater, Senior Divisional Hydrologist, DoI and GWFOs, Ground Water Resources Development Project and Er. Niranjan Dev Pandey, Project Manager, Non-Conventional Irrigation Technology Project, DoI. for their co-operation and support for the Report. We are thankful to Agricultural Development Bank, Nepal and CARE Nepal, GTZ Nepal and SNV Nepal for their cooperation and sincere help in providing data and informations. We are also thankful to all who helped us during data collection of Irrigation systems.

CENTER FOR ENGINEERING RESEARCH AND DEVELOPMENT (CERD)

Page 6: Irrigation Database

1

1. INTRODUCTION

Department of Irrigation (Dol), for the last 10 years, has been working in various circumstances for the purposeful implementation of Management Information System within its organizational capabilities as part of Information System Planning. So far, it has been successful in making the staffs feel the need of computer and its capabilities for enhancing their day to day work. The use of computers has been limited mostly to preparing reports, tables, charts and letters and in few cases storing these outputs for future uses. Presently data on Irrigation Development in Nepal have been prepared by different divisions and sections of the Department on the basis of as and when needed. Due to the lack of central database system, the authenticity and integrity of such data has been in question at times. Thus there is a great need of central database system for consistent and proper data sets for the proper planning and development of the nation’s irrigation systems. Hence database storage, retrieval and analysis has become more and more important and relevant nowadays for better planning of the nation’s irrigation development and also for information dissemination on what the department has been doing over the years.

For the purpose of updating the Data Base for Irrigation Development in Nepal (DBID), on a regular basis a “DBID System” has to be developed so that, every year’s data can be entered and updated reports can be printed and published. Department of Irrigation, Management Information System Section wishes to engage local consulting firms to develop a ‘DBID System” for its regular update of data.

2. OBJECTIVE OF THE STUDY

The objective of study will be as follows;

• Review and update (if data set is missing) of existing DBID published in 1997. • Update the same with the new data set up to fiscal year 2005/06 provided by Department of

Irrigation, ADB/N, NGOs, INGOs and other agencies if any. • Submit the new document of DBID in hardcopy and printable form.

3. SCOPE OF WORKS

The scope of works limits to develop a part of module of Management Information System, DBID Application Module. /

• Review existing DBID published in 1997, • Make appropriate updates in DBID in exiting application, which will be beneficial to the

organizational needs • The Data on Standard tables in existing DBID should be verified with additional Data as

required. • Install all the data of the existing DBID up-to 1995/96 and update with the current data set

till FY 2005/06. • Consultant will also obtain the data set from ADB/N and other NGOs/INGOs, which are

involved in developing irrigation systems and include it in updated DBID.

Page 7: Irrigation Database

2

4. Data incorporated from Different Agencies

4.1 Surface Water Irrigation In the existing DBID, the Sub-projects under Irrigation Line of Credit were on-going as well as completed. To avoid duplication and confusion, the Sub-projects data are replaced as per ILC Project Completion Report . As Nepal Irrigation Sector Project (NISP) was implemented as continuation of ILC project, the list of ongoing sub-projects of ILC are omitted. The completed and ongoing sub-projects under NISP are entered from its PCR. Similarly, the status of on-going and completed projects under Irrigation Sector Project (ISP) is omitted from the existing DBID and entered as per PCR of ISP. The on-going project of Second Irrigation Sector Project is also omitted from existing DBID and entered as per PCR of SISP. Data of the IDP-MWR Project is entered from its PCR. This project was started on 1998 and completed on 2004. After completion of SISP and NISP, one new project namely MIP is introduced and being implemented to cover the rehabilitation work of Irrigation system of Nepal. The data of this project is collected from DOI and entered in DBID. In existing DBID, the data provided by ADB/N was entered as project-wise. But, at present, the data provided by ADB/N is district-wise and the name of project is also not provided. The command area development work under surface irrigation system by the ADB/N is limited after the 1995/96, so the recent data is not incorporated, which may mislead. 4.2 Ground Water Irrigation In existing DBID the details of DOI Ground Water Projects are not listed. The project-wise data of Sallow Tubewell and Deep Tubewell are collected from the Ground Water Field Offices and worked out with the help of Senior Geo-hydrologist of DOI The recent district-wise data on Shallow Tubewell is collected from Agricultural Development Bank/Nepal and incorporated to the DBID, where as the data of Agricultural Development Project, Janakpur is taken from the existing DBID. 4.3 Non-Conventional Irrigation The data on Non-Conventional Irrigation Project are updated by collecting the data from Non-Conventional Irrigation Technology Project of the Department of Irrigation. 5. Irrigation Database Compilation The following tables are developed for compilation of Irrigation Database. Table–1 Ecological and Physiographical Division of the Districts of Nepal Table -2 Present Status of DOI Surface Projects

(Chapakot I.P, Rampur Phant I.P. and Rainastar I.P. are rehabilitated under NISP program but it is still being operated under Project Joint Management, hence these are omitted from DOI project)

Page 8: Irrigation Database

3

Table -3 Command Area of Surface Farmer’s Managed Irrigation Scheme. (Agency Assisted) (For FMIS, the data up-to 1988, data after 1988 up-to 1994/95 is included along with date from 1994/95 to 2005/06 in this table. This table includes the data of NISP, ILC, ISP, SISP, ERIP, IDP-MWR and MIP along with the previous data)

Table -4 Summary of total command area of Surface Farmer Managed Irrigation Scheme up-to

2005/06 (Agency Assisted) (The table includes the summary of new and rehabilitation project from all agencies

executed projects.) Table -5 Status of Shallow Tubewell in Nepal up-to 2005/06 (Up-to-date status of Shallow Tubewell is collected from DOI, Ground Water

Division and ADB/N. The data of ADPJ is taken from existing DBID.) Table -6 Status of Deep Tubewell in Nepal up-to 2005/06 Table -7 Present Level of Irrigation Development (All DOI, FMIS and Non-Assisted Project of Surface Water, Shallow and Deep

Tubewell of DOI and other Agency are compiled in this table.) Table -8 Non Conventional Projects

(District-wise data of existing DBID is up-dated from the data provided by NITP – DOI)

Table -8.1 Detail of Non Conventional Projects (Details of data provided by NITP – DOI) Table -9 Planned vs Developed Command Area

(This table includes the summary of all Surface Water Projects such as planned, developed and yet to be developed GCA and CCA. (excluding Non-Assisted FMIS)

Table-10 Summary of Net Command Area (NCA) of Surface Irrigation System

( Summary under development region , ecological region, project type and agency’s name )

6. Highlights of Irrigation Development The highlight of irrigation development till 2005/06 has been summarized in followings Status of Government and Non-Governmental assistance in Surface and Ground water Project and Non-assisted FMIS 6.1 Total Area vs Irrigated Area Description Area (ha) Table Total Area 264,1742 Table -7 Total Irrigable Area 1,765,840 Table -7 Total Irrigated Area 1,251,406 Table -7

Page 9: Irrigation Database

4

6.2 Scheme-wise Irrigated Area Scheme Command Area (ha) Table Surface Water 960,237 Table -7 Ground Water 278,158 Table -7 Non Conventional Projects 13,011 Table -7 Total Irrigated Area(Ha.) 1,251,406 6.3 Present Status with CCA for Surface irrigation Agency Command Area (ha) Remarks DOI Project 314,521 Table - 7Agency Assisted FMIS Project, New 38,169 Table - 7Agency Assisted FMIS Project, Rehabilitation 295,258 Table - 7Non Assisted FMIS 312,289 Table - 7Total 960,237 6.4 Present Status with CCA for Ground Water irrigation (A) Shallow Tubewell Agency No Command

area (ha) Remarks

DOI Project 14,427 53,964 Table - 5 Agricultural Development Project, Janakpur 2,593 18,151 Table - 5 ADBN 50,685 1,67,943 Table - 5 Total 67,705 2,40,058 (B) Deep Tubewell/ Medium Tubewell Agency No Command

area Remarks

DOI Project 630 34,455 Table - 6 Agricultural Development Project, Janakpur 81 3,645 Table – 6 Total 711 38,100 6.5 Present Status with Size of Project for Surface irrigation Project Category DOI FMIS Total CCA (ha) Major 269,310 31,800 301,110Large 11,613 16,710 28,323Medium 30,978 220,670 251,648Small 2620 64,247 66,867Total 314,521 333,427 647,948

Criteria: Project Terai Hill Major CCA> 5000 ha CCA>1000 ha Large 2000 ha> CCA> 5000 ha 500 ha> CCA> 1000 ha Medium 200 ha> CCA> 2000 ha 50 ha> CCA> 500 ha Small CCA< 2000 ha CCA< 50 ha

Page 10: Irrigation Database

5

6.6 CCA under Ecological Regions (Including Assisted FMIS)

Category Surface Water Ground Water (ha)

Total (ha) DOI FMIS Total (ha)

Terai 295,698 209,815 505,513 277,426 782,939 Hill 16,963 100,531 117,494 732 118,226 Mountain 1,860 23,081 24,941 24,941 Total 314,521 333,427 647,948 278,158 926,106

Note: The Command area in Ground Water in Hill is to be referred as Inner Terai. 6.7 CCA Under Development Regions (Excluding Non-Assisted FMIS)

Region Surface Water Ground Water (ha)

Total (ha) DOI FMIS Total (ha)

Eastern 128,070 78,436 206,506 91,037 297,543Central 123,412 95,163 218,575 83,636 302,211Western 34,681 61,388 96,069 47,461 143,530Mid-Western 6,122 69,353 75,475 23,511 98,986Far Western 22,236 29,087 51,323 32,513 83,836Total 314,521 333,427 647,948 278,158 926,106

6.8 Monsoon vs Year Round

Category Surface Water Ground Water (ha)

Total (ha) DOI FMIS Total (ha)

Monsoon (MS) 142,309 38,352 180,661 180,661Year Round (YR) 172,212 295,075 467,287 278,158 745,445Total of Nepal 314,521 333,427 647,948 278,158 926,106

For 866 FMIS Projects CCA 82724 ha, which have no MS or YR status available, CCA is included in Year Monsoon and Year Round as per its weight-age. 6.9 ED vs ID and CAD

Category Surface Water Ground Water (ha) Total (ha)DOI FMIS Total (ha)

ED 110,440 78,173 188,613 - 188,613ID 47,958 255,253 303,211 278,158 581,369CAD 156,123 1 156,124 156,124Total 314,521 333,427 647,948 278,158 926,106

For 533 FMIS Projects CCA 64905 ha, which have no ED or ID and CAD status available, CCA is included in ED and ID by its weight-age. Criteria: Extensive Development (ED):- All schemes having primary and secondary canal but

lacking tertiary canal system, service block size 300 to 500 ha

Intensive Development (ID) :- All schemes having primary and secondary canal and tertiary canal system, service block size 30 to 50 ha

Command Area Development (CAD) :- All schemes ID plus quaternary, service block size 3 to 5 ha

Page 11: Irrigation Database

6

6.10 Planned vs Developed Command Area Category No of

Project Planned GCA (ha)

Planned CCA (ha)

Developed GCA (ha)

Developed CCA (ha)

FMIS 3,005 448,084 367,481 406,788 333,427 DOI 179 389,799 314,921 389,267 314,521Total 3,184 837,883 682,402 796,055 647,948

Page 12: Irrigation Database

TABLE 1Ecological and Physiographical Division of the Districts of Nepal

valley Slope Valley Slope Valley Slope High Himal

Eastern RegionJhapa Mechi Eastern Terai 156891 93.4 6.2 0.2 0.1 0.1 0 0 0Morang Koshi Eastern Terai 184680 82.4 0.6 8.3 0 8.7 0 0 0Sunsari Koshi Eastern Terai 127076 91.1 0.6 5.8 0 2.5 0 0 0Saptari Sagarmatha Eastern Terai 135929 76.7 1.2 22.1 0 0 0 0 0Siraha Sagarmatha Eastern Terai 122797 77.3 2.7 20 0 0 0 0 0Eastern Terai 727373 84.2 2.3 11.3 0.0 2.3 0.0 0.0 0.0Ilam Mechi Eastern Hill 171725 1.5 3.9 22.5 2.3 66.6 0 3.2 0Panchthar Mechi Eastern Hill 124589 0 0 0 1.9 84.4 0 13.1 0.6Terathum Koshi Eastern Hill 67163 0 0 0 1.2 98.2 0 0.6 0Dhankuta Koshi Eastern Hill 90020 0 0 0.1 5.4 94.5 0 0 0Bhojpur Koshi Eastern Hill 150994 0 0 0 3 85.2 0 11.8 0Udaypur Sagarmatha Eastern Hill 203169 3.6 18 34.8 1.7 41.9 0 0 0Khotang Sagarmatha Eastern Hill 160864 0 0 0 2.6 81.5 0 15.9 0Okhaldhunga Sagarmatha Eastern Hill 108503 0 0 0 2.8 74.4 0 22.8 0Eastern Hill 1077027 0.6 2.7 7.2 2.6 78.3 0.0 8.4 0.1Taplejung Mechi Eastern Mountain 364221 0 0 0 0 12.6 0.1 38.2 49.1Sankhuwasawa Koshi Eastern Mountain 345729 0 0 0 0.9 23.4 0.2 42.6 32.9Solukhumbu Sagarmatha Eastern Mountain 339776 0 0 0 0 0.8 0.1 40.3 58.8Eastern Mountain 1049726 0.0 0.0 0.0 0.3 12.3 0.1 40.4 46.9

Central RegionDhanusha Janakpur Central Terai 121746 75 3.6 21.4 0 0 0 0 0Mahottari Janakpur Central Terai 98745 83.1 2.7 14.2 0 0 0 0 0Sarlahi Janakpur Central Terai 126327 84.7 1.9 13.4 0 0 0 0 0Rautahat Narayani Central Terai 103709 92.5 0.1 7.4 0 0 0 0 0Bara Narayani Central Terai 129564 87.2 0.8 12 0 0 0 0 0Parsa Narayani Central Terai 138943 65.1 14.1 20.8 0 0 0 0 0Chitwan Narayani Central Terai 219454 0 52.8 33.6 0.3 13.3 0 0 0Central Terai 938488 69.7 10.9 17.5 0.0 1.9 0.0 0.0 0.0Sindhuli Janakpur Central Hill 247709 0 14.4 47.8 1.3 36.5 0 0 0Ramechap Janakpur Central Hill 150194 0 0 0 2.1 69.3 0.3 12 16.3Makawanpur Narayani Central Hill 239076 0 16.6 42.6 2.5 38.2 0 0 0.1Kavre Planchowk Bagmati Central Hill 140485 0 0.3 2.7 6 91 0 0 0Lalitpur Bagmati Central Hill 39267 0 0.8 0.7 24.1 74.4 0 0 0Bhaktapur Bagmati Central Hill 12017 0 0 0 60.2 39.8 0 0 0Kathmandu Bagmati Central Hill 41202 0 0 0 47.4 52.6 0 0 0Nuwakot Bagmati Central Hill 119649 0 0 0 8.3 76 0 13.5 2.2

High MountainTotal Area (Ha.) Terai

Physiographic Division (% of area)

District Zone Development Region

Ecological Belt

Siwalik Middle Mountain

7

Page 13: Irrigation Database

TABLE 1Ecological and Physiographical Division of the Districts of Nepal

valley Slope Valley Slope Valley Slope High Himal

High MountainTotal Area (Ha.) Terai

Physiographic Division (% of area)

District Zone Development Region

Ecological Belt

Siwalik Middle Mountain

Dhading Bagmati Central Hill 192487 0 0 0 4.8 66.3 0 21.5 7.4Central Hill 1182086 0.0 3.6 10.4 17.4 60.5 0.0 5.2 2.9Dolakha Janakpur Central Mountain 214278 0 0 0 0.3 24.4 0.2 38.1 37Sindhupalchowk Bagmati Central Mountain 248096 0 0 0 1.2 32.9 0.2 45.2 20.5Rasuwa Bagmati Central Mountain 151179 0 0 0 0.1 2.7 0.4 45.4 51.4Central Mountain 613553 0.0 0.0 0.0 0.5 20.0 0.3 42.9 36.3

Western RegionNawalparasi Lumbini Western Terai 201613 27.5 24.6 32.5 1.9 13.5 0 0 0Rupandehi Lumbini Western Terai 141351 85 0 14.5 0 0.5 0 0 0Kapilvastu Lumbini Western Terai 175694 83.7 0 16.3 0 0 0 0 0Western Terai 518658 65.4 8.2 21.1 0.6 4.7 0.0 0.0 0.0Palpa Lumbini Western Hill 136595 0 0.9 18.4 6.7 74 0 0 0Arghakhanchi Lumbini Western Hill 123272 0 2.6 31.5 2.7 63.2 0 0 0Gulmi Lumbini Western Hill 107918 0 0 0 5 95 0 0 0Tanahu Gandaki Western Hill 156878 0 1.1 0.7 13.9 84.3 0 0 0Syangja Gandaki Western Hill 103555 0 0 0 8.4 91.6 0 0 0Gorkha Gandaki Western Hill 361469 0 0 0 5.1 24 0.2 24.7 46Lamjung Gandaki Western Hill 170871 0 0 0 5.4 37.2 0.5 38.2 18.7Kaski Gandaki Western Hill 213167 0 0 0 8.8 29.7 0.4 30.4 30.7Parbat Dhawalagiri Western Hill 54931 0 0 0 7.6 76.6 0.2 15.6 0Baglung Dhawalagiri Western Hill 182745 0 0 0 1.5 35.7 2.2 53.4 7.2Myagdi Dhawalagiri Western Hill 230007 0 0 0 0.2 2.4 0.7 54.5 42.2Western Hill 1841408 0.0 0.4 4.6 5.9 55.8 0.4 19.7 13.2Manang Gandaki Western Mountain 219625 0 0 0 0 0 0.1 5.2 94.7Mustang Dhawalagiri Western Mountain 355951 0 0 0 0 0 0.1 1.2 98.7Western Mountain 575576 0 0 0 0 0 0.1 3.2 96.7

Mid-Western RegionDang Rapti Mid-Western Terai 297339 0.1 38.5 45.9 0.2 15.3 0 0 0Banke Bheri Mid-Western Terai 235983 49.5 9.9 38 0 2.6 0 0 0Bardiya Bheri Mid-Western Terai 203553 69.3 4.8 25.9 0 0 0 0 0Mid-Western Terai 736875 39.6 17.7 36.6 0.1 6.0 0.0 0.0 0.0Pyuthan Rapti Mid-Western Hill 129521 0 1 2.8 4.9 83.8 0 7.5 0Rolpa Rapti Mid-Western Hill 187149 0 0 0 0.7 73.4 0 25.9 0Salyan Rapti Mid-Western Hill 150102 0 0 0 3.6 96.4 0 0 0Rukum Rapti Mid-Western Hill 290675 0 0 0 0.8 9.5 1 67.1 21.6

8

Page 14: Irrigation Database

TABLE 1Ecological and Physiographical Division of the Districts of Nepal

valley Slope Valley Slope Valley Slope High Himal

High MountainTotal Area (Ha.) Terai

Physiographic Division (% of area)

District Zone Development Region

Ecological Belt

Siwalik Middle Mountain

Surkhet Bheri Mid-Western Hill 249017 0 12.5 42.9 1.1 43.5 0 0 0Jajarkot Bheri Mid-Western Hill 222183 0 0 0 1 27.9 0.4 60.8 9.9Dailekh Bheri Mid-Western Hill 150054 0 0 0 2 81.4 0 16.6 0Mid-Western Hill 1378701 0.0 1.9 6.5 2.0 59.4 0.2 25.4 4.5Dolpa Karnali Mid-Western mountain 793230 0 0 0 0.2 0 0.1 12.3 87.4Jumla Karnali Mid-Western mountain 254365 0 0 0 0 0 2.3 63.6 34.1Kalikot Karnali Mid-Western mountain 174927 0 0 0 0 0 0.3 99.7 0Mugu Karnali Mid-Western mountain 358282 0 0 0 0 0 0.2 47.4 52.4Humla Karnali Mid-Western mountain 583826 0 0 0 0 0.3 0.5 17 82.2Mid-Western Mountain 2164630 0.0 0.0 0.0 0.0 0.1 0.7 48.0 51.2

Far-Western RegionKailali Seti Mid-Western Terai 324791 59.8 1.4 38.6 0.1 0.1 0 0 0Kanchanpur Mahakali Mid-Western Terai 163678 87.5 0 12.5 0 0 0 0 0Far-Western Terai 488469 73.7 0.7 25.6 0.1 0.1 0.0 0.0 0.0Achham Seti Mid-Western Hill 169224 0 0 0 1.8 87.3 0 10.9 0Doti Seti Mid-Western Hill 205704 0 0.3 3.9 1.8 90.5 0 3.5 0Dadeldhura Mahakali Mid-Western Hill 149525 0.1 4.6 21.5 1.1 72.7 0 0 0Baitadi Mahakali Mid-Western Hill 148678 0 0 0 1.1 98.1 0 0.8 0Far-Western Hill 673131 0.0 1.2 6.4 1.5 87.2 0.0 3.8 0.0Bajura Seti Mid-Western Mountain 202177 0 0 0 0 1.7 1 80 17.3Bajhang Seti Mid-Western Mountain 347560 0 0 0 1.7 10 0.8 42.7 44.8Darchula Mahakali Mid-Western Mountain 232960 0 0 0 0.5 15.9 0.3 40.9 42.4Far-Western Mountain 782697 0.0 0.0 0.0 0.7 9.2 0.7 54.5 34.8

2854126 28.3 1.7 6.2 1.0 31.0 0.0 16.3 15.72734127 23.2 4.8 9.3 6.0 27.5 0.1 16.0 13.12935642 21.8 2.9 8.6 2.2 20.2 0.2 7.6 36.64280206 13.2 6.6 14.4 0.7 21.8 0.3 24.5 18.61944297 24.6 0.6 10.6 0.7 32.1 0.2 19.4 11.6

3409863 66.5 8.0 22.4 0.2 3.0 0.0 0.0 0.06152353 0.1 2.0 7.0 5.9 68.2 0.1 12.5 4.15186182 0.0 0.0 0.0 0.3 8.3 0.4 37.8 53.2

14748398 22.2 3.3 9.8 2.1 26.5 0.2 16.8 19.1

Total by Development RegionEastern DistrictsCentral DistrictsWestern Districts

Hill DistrictsMountain DistrictsTotal for all Districts

Mid Western DistrictsFar Western Districts

Totals by Ecological BeltTerai Districts

9

Page 15: Irrigation Database

TABLE 2Present Status of DOI Surface Projects

Eastern Development Region Terai Ecological Belt

KANKAI JHAPA 100 AC 1991 YR TOTAL 9600 8000 9600 8000 7000 1700 0 0 DOI NO ADB 11 KANKAI ID 1877CAD 6123

Total of JHAPA District 1 9600 8000 9600 8000 7000 1700 0 0

SUNSARI-MORANG P-3 MORANG 100 AC 1975 YR TOTAL 39375 33500 39375 33500 15924 3400 0 0 DOI NO INDIA 4 KOSHI ED 19900CAD 13600

Total of MORANG District 1 39375 33500 39375 33500 15924 3400 0 0

KOSI SAP TARI 100 AC 1990 MS ID 43125 34500 43125 34500 25000 15000 0 0 DOI NO INDIA 12 KOSHI AMSOTA SAP TARI 100 AC 1989 MS ED 500 400 500 400 400 0 0 0 SIRDP NO ADB 12 SIWALIK RIVERBHABADA DAHA SAP TARI 100 AC 1989 MS ID 88 70 88 70 70 0 0 0 SIRDP NO ANB 12 SIWALIK RIVERCHAPIN MIP SAP TARI 100 AC 1986 MS ED 375 300 375 300 150 90 0 0 SIRDP NO ADB 12 SIWALIK RIVERDEO DHARA MIP SAP TARI 100 AC 1985 MS ED 500 400 500 400 200 120 0 0 SIRDP NO ADB 12 SIWALIK RIVERJHORADAH MIP SAP TARI 100 AC 1988 MS ID 75 60 75 60 30 15 0 0 SIRDP NO ADB 12 SIWALIK RIVERKURRHA SAP TARI 100 AC 1989 MS ID 175 140 175 140 140 0 0 0 SIRDP NO ADB 12 SIWALIK RIVERLABAKESWOR SAP TARI 100 AC 1989 MS ID 25 20 25 20 20 0 0 0 SIRDP NO ADB 12 SIWALIK RIVERLOHAJARA DAHA SAP TARI 100 AC 1989 MS ID 125 100 125 100 100 0 0 0 SIRDP NO ADB 12 SIWALIK RIVERBAMANA MIP SAP TARI 100 AC 1988 MS ED 500 400 500 400 200 120 0 0 SIRDP NO ADB 12 SIWALIK RIVERBISANARIYADAHA SAP TARI 100 AC 1989 MS ID 44 35 44 35 35 0 0 0 SIRDP NO ADB 12 SIWALIK RIVERTotal of SAP TARI District 11 45532 36425 45532 36425 26345 15345 0 0

KAMALA SIRAHA 100 AC 1984 MS TOTAL 15625 12500 15620 12500 5000 2000 0 0 DOI NO GoN 10 KAMALAED 9700CAD 2800

BELAHIDAHA SIRAHA 100 AC 1989 MS ID 88 70 88 70 70 0 0 0 SIRDP NO ADB 12 SIWALIK RIVERBETAHA KHOLA SIRAHA 100 AC 1987 MS ED 125 100 125 100 100 0 0 0 SIRDP NO ADB 12 SIWALIK RIVERBHAWARADAH MIP SIRAHA 100 AC 1989 MS ED 250 200 250 200 100 58 0 0 SIRDP NO ADB 12 SIWALIK RIVERJARUWA MIP SIRAHA 100 AC 1989 MS ID 25 20 25 20 10 5 0 0 SIRDP NO ADB 12 SIWALIK RIVERJIRJHIRE SIRAHA 100 AC 1989 MS ED 125 100 125 100 1002 0 0 0 SIRDP NO ADB 12 SIWALIK RIVERJIWA KHOLA MIP SIRAHA 100 AC 1989 MS ED 500 400 500 400 400 0 0 0 SIRDP NO ADB 12 SIWALIK RIVERKALYANDEHI SIRAHA 100 AC 1988 MS ED 375 300 375 300 300 0 0 0 SIRDP NO ADB 12 SIWALIK RIVERKATANYA DHAR SIRAHA 100 AC 1989 MS ID 188 150 188 150 150 0 0 0 SIRDP NO ADB 12 SIWALIK RIVERKHURAKIYAHI SIRAHA 100 AC 1989 MS ID 125 100 125 100 100 0 0 0 SIRDP NO ADB 12 SIWALIK RIVERKHUTTI(EASTERN) SIRAHA 100 AC 1987 MS ID 181 145 181 145 145 0 0 0 SIRDP NO AND 12 SIWALIK RIVERKHUTTI DAM (WESTERN) SIRAHA 100 AC 1988 MS ED 125 100 125 100 100 88 0 0 SIRDP NO ADB 12 SIWALIK RIVERLOHAJARA KHOLA SIRAHA 100 AC 1989 MS ID 250 200 250 200 200 0 0 0 SIRDP NO ADB 12 SIWALIK RIVERLOHAJARA UPPER SIRAHA 100 AC 1989 MS ID 125 100 125 100 100 0 0 0 SIRDP NO ADB 12 SIWALIK RIVERMUTANIDAH MIP SIRAHA 100 AC 1988 MS ED 100 80 100 80 40 23 0 0 SIRDP NO ADB 12 SIWALIK RIVERSETAPATRE II LALPUR SIRAHA 100 AC 1989 MS ID 63 50 36 50 50 0 0 0 SIRDP NO ADB 12 SIWALIK RIVERSITUBAHI DAHA SIRAHA 100 AC 1989 MS ID 63 50 63 50 50 0 0 0 SIRDP NO ADB 12 SIWALIK RIVERBASANTPUR SIRAHA 100 AC 1989 MS ID 188 150 188 150 150 0 0 0 SIRDP NO ADB 12 SIWALIK RIVER

Net Gross Net Gross Summer Net

Planned Command Area (ha.)

Developed Command Area

Irrigated Command Area (ha.)

WinterIrri

gatio

n C

apab

ilityActual

Completed (AC) / Planned

Completion (PC) Year D

evel

oped

In

tens

ity

Basin Name

Perc

enta

ge

District Project

Ongoing Command Area

Prog

ram

me

Turn

Ove

r

Fund

ing

Bas

in

Num

ber

Gross

10

Page 16: Irrigation Database

TABLE 2Present Status of DOI Surface Projects

Net Gross Net Gross Summer Net

Planned Command Area (ha.)

Developed Command Area

Irrigated Command Area (ha.)

WinterIrri

gatio

n C

apab

ilityActual

Completed (AC) / Planned

Completion (PC) Year D

evel

oped

In

tens

ity

Basin Name

Perc

enta

ge

District Project

Ongoing Command Area

Prog

ram

me

Turn

Ove

r

Fund

ing

Bas

in

Num

ber

Gross

Total of SIRAHA District 18 18521 14815 18489 14815 8067 2174 0 0

SUNSARI-MORANG P-1 SUNSARI 100 AC 1988 YR CAD 12187 9750 12187 9750 9320 2925 0 0 DOI NO IND/IDA 4 KOSHISUNSARI-MORANG P-2 SUNSARI 100 AC 1995 YR CAD 20875 16700 20875 16700 16355 4950 0 0 DOI NO IND/IDA 4 KOSHISUNSARI-MORANG P-3 SUNSARI 100 AC 1975 YR ED 10062 8050 10062 8050 7396 2000 0 0 DOI NO IND 4 KOSHITotal of SUNSARI District 3 43124 34500 43124 34500 33071 9875 0 0

Total of EASTERN > Terai 34 156152 127240 156120 127240 90407 32494 0 0

Eastern Development Region Hill Ecological Belt

NERPA KHOTANG 100 AC 1983 MS ED 250 200 250 200 100 50 0 0 DOI NO GoN 4 KOSHITotal of KHOTANG District 1 250 200 250 200 100 50 0 0

RAMPUR TAR OKHALDHUNGA 100 AC 1983 MS ED 300 240 300 240 240 0 0 0 DOI NO GoN 4 KOSHITotal of OKHALDHUNGA District 1 300 240 300 240 240 0 0 0

ASARE KULO MIP UDAYAPUR 100 AC 1988 MS ED 63 50 63 50 25 25 0 0 SIRDP NO ADB 4 KOSHICHILAUNE KHOLA MIP UDAYAPUR 100 AC 1988 MS ED 94 75 94 75 37 35 0 0 SIRDP NO ADB 4 KOSHIKALI KHOLA BHUMRA UDAYAPUR 100 AC 1989 MS ID 50 40 50 40 40 0 0 0 SIRDP NO ADB 4 KOSHIKARAUJE UDAYAPUR 100 AC 1988 MS ID 63 50 63 50 50 0 0 0 SIRDP NO ADB 4 KOSHISARAHI KHOLA UDAYAPUR 100 AC 1988 MS ID 94 75 94 75 75 0 0 0 SIRDP NO ADB 4 KOSHISARASWOTI KHOLA UDAYAPUR 100 AC 1988 YR ID 63 50 63 50 50 0 0 0 SIRDP NO ADB 4 KOSHISWAROP TAR MIP UDAYAPUR 100 AC 1989 MS ED 62 50 62 50 25 25 0 0 SIRDP NO ADB 4 KOSHITotal of UDAYAPUR District 7 489 390 489 390 302 85 0 0

Total of EASTERN > Hill 9 1039 830 1039 830 642 135 0 0

Total of EASTERN Region 43 157191 128070 157159 128070 91049 32629 0 0

Central Development Region Terai Ecological Belt

SIRSIA-DUDHORA BARA 85 AC MS ED 1275 1020 1275 1020 850 170 0 0 DOI NO MU/USAI 12 SIWALIK RIVERNARAYANI PHASE-II BARA 100 AC YR CAD 12700 15900 12700 15900 12700 12700 12700 0 0 DOI NO IND/IDA 3 GANDAKTotal of BARA District 2 17175 13720 17175 13720 13550 12870 0 0

PITHUWA CHITWAN 100 AC MS CAD 600 500 600 500 500 100 0 0 DOI NO GoN 3 GANDAKCHITWAN CHITWAN 100 AC 1988 YR CAD 13400 10400 13400 10400 8300 2000 0 0 DOI NO GoN/ADB 3 GANDAKTotal of CHITWAN District 2 14000 10900 14000 10900 8800 2100 0 0

HARDINATH DHANUSHA 100 AC MS ED 2400 2000 2400 2000 1000 500 0 0 DOI NO GoN/IND 12 SIWALIK RIVERKAMALA DHANUSHA 100 AC 1984 MS ED 15625 12500 15625 12500 5000 2000 0 0 DOI NO GoN 10 KAMLATotal of DHANUSHA District 2 18025 14500 18025 14500 6000 2500 0 0

SIRSIA-DUDHORA PARSA 100 AC MS ED 225 180 225 180 150 30 0 0 DOI NO GoN/USAI 12 SIWALIK RIVER

11

Page 17: Irrigation Database

TABLE 2Present Status of DOI Surface Projects

Net Gross Net Gross Summer Net

Planned Command Area (ha.)

Developed Command Area

Irrigated Command Area (ha.)

WinterIrri

gatio

n C

apab

ilityActual

Completed (AC) / Planned

Completion (PC) Year D

evel

oped

In

tens

ity

Basin Name

Perc

enta

ge

District Project

Ongoing Command Area

Prog

ram

me

Turn

Ove

r

Fund

ing

Bas

in

Num

ber

Gross

NARAYANI PHASE-I PARSA 100 AC 1981 YR CAD 19875 16000 19875 16000 15297 14835 0 0 DOI NO IND/IDA 3 GANDAKTotal of PARSA District 2 20100 16180 20100 16180 15447 14865 0 0

BAGMATI RAUTAHAT 100 AC MS TOTAL 28450 23000 28450 23600 18838 0 0 0 DOI NO GoN/SAU 12 SIWALIK RIVERED 4762CAD 18838

JHAJ RAUTAHAT 100 AC 1996 MS ED 1875 1500 1875 1500 1500 600 0 0 DOI NO GoN/IND 12 SIWALIK RIVERNARAYANI PHASE-I RAUTAHAT 100 AC YR ED 10875 8700 10875 8700Total of RAUTAHAT District 2 41200 33200 41200 33800 20338 600 0 0

1.25BAGMATI SARLAHI 100 PC 2000 MS TOTAL 28250 22600 29000 23200 10162 0 0 0 DOI NO GoN/SAU 9 BAGMATI

ED 13038CAD 10162

MANUSMARA SARLAHI 100 AC 1981 YR CAD 6000 5800 6000 5800 5000 1000 0 0 DOI NO GoN/IND 12 SIWALIK RIVERTotal of SARLAHI District 2 34250 28400 35000 29000 15162 1000 0 0

Total of CENTRAL > Terai 12 144750 116900 145500 118100 79297 33935 0 0

Central Development Region Hill Ecological Belt

BIDOUL BHAKTAPUR 100 AC MS ED 81 65 81 65 40 20 0 0 DOI NO GoN 9 BAGMATIDHUNGE DHARA BHAKTAPUR 100 AC MS ED 338 270 338 270 80 80 0 0 DOI NO GoN 9 BAGMATIGHATTE KULO BHAKTAPUR 100 AC MS ED 437 350 437 350 150 50 0 0 DOI NO GoN 9 BAGMATIHANUMANTE BHAKTAPUR 100 AC 1984 MS ED 125 100 125 100 60 60 0 0 DOI NO GoN 9 BAGMATIKUTUNJE BHAKTAPUR 100 AC MS ED 56 45 56 45 30 10 0 0 DOI NO GoN 9 BAGMATIMAHADEV KHOLA BHAKTAPUR 100 AC MS ED 468 375 468 375 210 80 0 0 DOI NO GoN/INDI 9 BAGMATITotal of BHAKTAPUR District 6 1505 1205 1505 1205 570 300 0 0

GAJUI TAR DHADING 100 AC 1973 MS ED 125 100 125 100 100 60 0 0 DOI NO GoN 3 GANDAKKALLERI TAR DHADING 100 AC 1979 MS ED 250 200 250 200 200 0 0 0 DOI NO GoN 3 GANDAKPIPAL TAR DHADING 100 AC MS ED 75 60 75 60 30 30 0 0 DOI NO GoN 3 GANDKTotal of DHADING District 3 450 360 450 360 330 90 0 0

BALAJU KATHMANDU 100 AC MS ED 75 60 75 60 50 25 0 0 DOI NO GoN 9 BAGMATIBALKHU KATHMANDU 100 AC MS ID 30 25 30 25 25 15 0 0 DOI NO GoN 9 BAGMATIBISHAMBARA KATHMANDU 100 AC MS ED 250 200 250 200 200 120 0 0 DOI NO GoN 9 BAGMATIBOSAN KATHMANDU 100 AC MS ED 325 260 325 260 100 50 0 0 DOI NO GoN 9 BAGMATIBUDHANILKANTHA KATHMANDU 100 AC MS ED 250 200 250 200 120 60 0 0 DOI NO GoN 9 BAGMATICHITE KULO KATHMANDU 100 AC MS ID 12 10 12 10 10 0 0 0 DOI NO GoN 9 BAGMATIDAKSHINKALI KATHMANDU 100 AC MS ED 125 100 125 100 70 35 0 0 DOI NO GoN 9 BAGMATIGOKARNA KATHMANDU 100 AC MS ED 470 375 470 375 150 75 0 0 DOI NO GoN 9 BAGMATIICHADOL KATHMANDU 100 AC MS ED 90 70 90 70 55 25 0 0 DOI NO GoN 9 BAGMATIINDRAYANI KATHMANDU 100 AC MS ED 180 145 180 145 100 50 0 0 DOI NO GoN 9 BAGMATIKUDALI KULO KATHMANDU 100 AC MS ID 12 10 12 10 10 0 0 0 DOI NO GoN 9 BAGMATIPASHUPATI KATHMANDU 100 AC MS ED 94 75 94 75 20 20 0 0 DOI NO GoN 9 BAGMATI

12

Page 18: Irrigation Database

TABLE 2Present Status of DOI Surface Projects

Net Gross Net Gross Summer Net

Planned Command Area (ha.)

Developed Command Area

Irrigated Command Area (ha.)

WinterIrri

gatio

n C

apab

ilityActual

Completed (AC) / Planned

Completion (PC) Year D

evel

oped

In

tens

ity

Basin Name

Perc

enta

ge

District Project

Ongoing Command Area

Prog

ram

me

Turn

Ove

r

Fund

ing

Bas

in

Num

ber

Gross

PHARPING DHUNGED KATHMANDU 100 AC MS ED 250 200 250 200 100 50 0 0 DOI NO` GoN 9 BAGMATISANKHU KATHMANDU 100 AC MS ED 250 200 250 200 100 50 0 0 DOI NO GoN 9 BAGMATITOKHA KATHMANDU 100 AC ME ED 250 200 250 200 150 75 0 0 DOI NO GoN 9 BAGMATITotal of KATHMANDU District 15 2663 2130 2663 2130 1260 650 0 0

BHORLEKULU LALITPUR 100 AC MS ED 62 50 62 50 50 0 0 0 DOI NO GoN 9 BAGMATIGODAVARI LALITPUR 100 AC MS ED 125 100 125 100 100 100 0 0 DOI NO GoN/INDI 9 BAGMATIKOTKHU LALITPUR 100 AC MS ED 450 360 450 360 275 140 0 0 DOI NO GoN/INDI 9 BAGMATIKUMBHEWHWAR LALITPUR 100 AC MS ED 62 50 62 50 30 10 0 0 DOI NO GoN/INDI 9 BAGMATILUBHU LALITPUR 100 AC MS ED 188 150 188 150 150 90 0 0 DOI NO GoN 9 BAGMATITIKA BHAIRAB-I LALITPUR 100 AC MS ED 500 400 500 400 400 250 0 0 DOI NO GoN/INDI 9 BAGMATITIKA BHAIRAB-2 LALITPUR 100 AC 1974 MS ED 375 300 375 300 300 150 0 0 DOI NO GoN/INDI 9 BAGMATITotal of LALITPUR District 7 1762 1410 1762 1410 1305 740 0 0

BAT TAR LIFT NUWAKOT 100 AC 1979 YR ED 530 424 530 424 424 0 0 0 DOI NO GoN 3 GANDAKGADKHAR NUWAKOT 100 AC 1982 YR ID 125 100 125 100 100 100 0 0 DOI NO IDA 3 GANDAKLABDHU-DHIKUREE-S NUWAKOT 100 AC 1982 YR ID 310 248 310 248 180 100 0 0 DOI NO IDA 3 GANDAKSIMARA NUWAKOT 100 AC 1992 YR ED 500 400 500 400 400 250 0 0 DOI NO IDA 3 GANDAKTotal of NUWAKOT District 4 1465 1172 1465 1172 1104 450 0 0

GWANG KHOLA SINDHULI 100 AC 1976 MS ED 75 60 75 60 60 60 0 0 DOI NO GoN 9 BAGMATITotal of SINDHULI District 1 75 60 75 60 60 60 0 0

Total of CENTRAL > Hill 36 7920 6337 7920 6337 4629 2290 0 0

GHYANG KHOLA DOLAKHA 100 AC MS ED 200 175 200 175 175 100 0 0 DOI NO GoN 4 KOSHITotal of DOLAKHA District 1 200 175 200 175 175 100 0 0

Total of CENTRAL > Mountain 1 200 175 200 175 175 100 0 0

Total of CENTRAL Region 49 152870 123412 153620 124612 84101 36325 0 0

Western Development Region Terai Ecological Belt

SURAHI KAPILBASTU 100 AC 1987 MS ED 500 400 500 400 300 0 0 0 DOI NO GoN 12 SIWALIK RIVERBANGANGA KAPILBASTU 100 AC 1980 MS CAD 8125 6500 8125 6500 6200 1000 0 0 DOI NO GoN/ADB 7 BANGANGATotal of KAPILBASTU District 2 8625 6900 8625 6900 6500 1000 0 0

BULING TAR NAWALPARASI 100 AC 1987 MS ID 350 280 350 280 280 225 0 0 DOI NO GoN 3 GANDAKDED GAON TAR NAWALPARASI 100 AC 1976 MS ED 240 150 240 150 150 50 0 0 DOI NO ADB 3 GANDAKWEST GANDAK NAWALPARASI 100 AC 1983 YR CAD 16300 13400 16300 13400 10300 6180 0 0 DOI NO IND/ADB 3 GANDAKTotal of NAWALPARASI District 3 16890 13830 16890 13830 10730 6455 0 0

SIYARIKAHARIYA RUPANDEHI 100 AC 1991 MS ED 2125 1700 2125 1700 1700 0 0 0 DOI NO GoN 8 TINAUMARCHAWAR LIFT RUPANDEHI 100 AC 1995 YR TOTAL 7000 5600 7000 5600 2900 1180 0 0 DOI NO UNCDF 8 TNAU

13

Page 19: Irrigation Database

TABLE 2Present Status of DOI Surface Projects

Net Gross Net Gross Summer Net

Planned Command Area (ha.)

Developed Command Area

Irrigated Command Area (ha.)

WinterIrri

gatio

n C

apab

ilityActual

Completed (AC) / Planned

Completion (PC) Year D

evel

oped

In

tens

ity

Basin Name

Perc

enta

ge

District Project

Ongoing Command Area

Prog

ram

me

Turn

Ove

r

Fund

ing

Bas

in

Num

ber

Gross

ED 2650CAD 2950

Total of RUPANDEHI District 2 9125 7300 9125 7300 4600 1180 0 0

Total of WESTERN > Terai 7 34640 28030 34640 28030 21830 8635 0 0

Western Development Region Hill Ecological Belt

ARU TAR GORKHA 100 AC 1989 MS ED 125 100 125 100 100 50 0 0 DOI NO ILO 3 GANDAKBHIMSEN KULO GORKHA 100 AC 1981 YR ED 94 75 94 75 75 50 0 0 DOI NO GoN 3 GANDAKCHEPE TAR GORKHA 100 AC 1985 MS ED 75 60 75 60 60 5 0 0 DOI NO USAID 3 GANDAKCHORKATE TAR GORKHA 100 AC 1985 MS ED 137 110 137 110 60 20 0 0 DOI NO USAID 3 GANDAKDHUWAKOT GORKHA 100 AC 1985 MS ED 55 44 55 44 44 44 0 0 DOI NO USAID 3 GANDAKMALLA TAR GORKHA 100 AC 1986 MS ED 125 100 125 100 50 30 0 0 DOI NO USAID 3 GANDAKTotal of GORKHA District 6 611 489 611 489 389 199 0 0

APCHAUR COFFE GULMI 100 AC 1981 YR ID 125 100 125 100 100 50 0 0 DOI NO GoN 3 GANDAKARGENTICHAP GULMI 100 AC 1981 MS ED 75 60 75 60 60 30 0 0 DOI NO GoN 3 GANDAKTotal of GULMI District 2 200 160 200 160 160 80 0 0

BEGNAS KASKI 100 AC 1989 YR ED 725 580 725 580 580 580 0 0 DOI YES ADB 3 GANDAKBIJAYAPUR KASKI 100 AC 1989 MS ID 1600 1280 1600 1280 1000 300 0 0 DOI NO ADB 3 GANDAKPOKHARA KASKI 100 AC 1985 YR ID 1275 1030 1275 1030 1030 300 0 0 DOI NO CHINA 3 GANDAKHYANKGA KASKI 100 AC 1989 MS ID 412 330 412 330 330 200 0 0 DOI NO ADB 3 GANDAKPHEWA TAL KASKI 100 AC 1983 YR ED 400 320 400 320 320 100 0 0 DOI NO G/IND/UN 3 GANDAKSARDU KHOLA PURAN KASKI 100 PC 1997 YR ED 438 350 250 200 200 100 188 150 ILC NO IDA 3 GANDAKTotal of KASKI District 6 4850 3890 4662 3740 3460 1580 188 150

BHORLE TAR LAMJUNG 100 AC 1983 YR ID 250 200 250 200 200 200 0 0 DOI NO ILO 3 GANDAKHANDE TAR LAMJUNG 100 AC 1977 MS ED 337 270 337 270 220 50 0 0 DOI NO GoN 3 GANDAKRAMGHA TAR LAMJUNG 100 AC 1977 MS ED 305 244 305 244 100 50 0 0 DOI NO GoN 3 GANDAK`Total of LAMJUNG District 3 892 714 892 714 520 300 0 0

KACHALPHANT PALPA 100 AC 1991 MS ED 353 282 353 282 282 0 0 0 DOI NO GoN 3 GANDAKTotal of PALPA District 1 353 282 353 282 282 0 0 0

GYANDI PARBAT 100 AC 1978 MS ED 125 100 125 100 60 30 0 0 DOI NO GoN 3 GANDAKPHALEBAS PARBAT 100 AC 1989 MS ID 406 325 406 325 325 75 0 0 DOI NO ADB 3 GANDAKTotal of PARBAT District 2 531 425 531 425 385 105 0 0

KISAN ADHIGHAT SYANGJA 100 PC 1997 YR ED 312 250 0 0 0 0 312 250 ILC NO IDA 3 GANDAKTotal of SYANGJA District 1 312 250 0 0 0 0 312 250

ATRAULIPUTRAR TANAHU 100 AC 1996 YR ED 563 450 563 450 450 300 0 0 ILC NO IDA 3 GANDAKSAJHA TAR TANAHU 100 AC 1968 MS ID 50 40 50 40 40 20 0 0 DOI NO GoN 3 GANDAKSANGHE PATYANI TANAHU 100 AC 1968 MS ED 375 300 375 300 100 50 0 0 DOI NO GoN 3 GANDAK

14

Page 20: Irrigation Database

TABLE 2Present Status of DOI Surface Projects

Net Gross Net Gross Summer Net

Planned Command Area (ha.)

Developed Command Area

Irrigated Command Area (ha.)

WinterIrri

gatio

n C

apab

ilityActual

Completed (AC) / Planned

Completion (PC) Year D

evel

oped

In

tens

ity

Basin Name

Perc

enta

ge

District Project

Ongoing Command Area

Prog

ram

me

Turn

Ove

r

Fund

ing

Bas

in

Num

ber

Gross

Total of TANAHU District 3 988 790 988 790 590 370 0 0

Total of WESTERN > Hill 24 8737 7000 8237 6600 5786 2634 500 400

Western Development Region Mountain Ecological Belt

CHHONUP MUSTANG 100 AC 1985 MS ED 64 51 64 51 51 0 0 0 DOI NO GoN 3 GANDAKTotal of MUSTANG District 1 64 51 64 51 51 0 0 0

Total of WESTERN > Mountain 1 64 51 64 51 51 0 0 0

Total of WESTERN Region 32 43441 35081 42941 34681 27667 11269 500 400

Mid-Western Development Region Terai Ecological Belt

DUNDUWA BANKE 100 AC 1968 MS ED 1560 1250 1560 1250 500 100 0 0 DOI NO GoN 6 WEST RAPTITotal of BANKE District 1 1560 1250 1560 1250 500 100 0 0

BADAIYA TAL BARDIYA 100 AC MS ED 600 480 600 480 480 50 0 0 DOI NO GoN 5 BABAICHAPALA TAL BARDIYA 100 AC MS ED 600 480 600 480 480 50 0 0 DOI NO GoN 5 BABAIBABAI IP BARDIYA 8800Total of BARDIYA District 2 1200 960 1200 9760 960 100 0 0

BELGHARE DANG 100 AC 1989 MS ED 425 340 425 340 100 0 0 0 RIRDP NO USAID 5 BABAIDUGHARE DANG 100 AC 1988 MS ED 200 160 200 160 160 100 0 0 DOI NO GoN 5 BABAIGOBARDIHA DANG 100 AC 1985 MS ED 544 435 544 435 435 0 0 0 RIRDP NO USAID 5 BABAIGWAR DANG 100 AC 1985 MS ED 1000 800 1000 800 400 100 0 0 DOI NO GoN/ILO 5 BABAIARJUN KHOLA DANG 100 AC 1992 YR ED 625 500 625 500 475 200 0 0 DOI NO EEC 5 BABAITotal of DANG District 5 2794 2235 2794 2235 1570 400 0 0

Total of MID-WESTERN > Terai 8 5554 4445 5554 13245 3030 600 0 0

Mid-Western Development Region Hill Ecological Belt

DHARMABATI PYUTHAN 100 AC 1985 YR ID 425 340 425 340 340 200 0 0 RIRDP NO USAID 6 WEST RAPTITotal of PYUTHAN District 1 425 340 425 340 340 200 0 0

CHAURJAHARI RUKUM 100 AC 1978 MS ED 750 600 750 600 300 300 0 0 DOI NO GoN 2 KARNALITotal of RUKUM District 1 750 600 750 600 300 300 0 0

KHORKE KHOLA SURKHET 100 AC 1993 YR ID 163 130 163 130 108 100 0 0 DOI NO GoN 2 KARNALIKAPRICHOUR SURKHET 100 AC 1991 YR ID 321 257 321 257 257 85 0 0 DOI NO GoN 2 KARNALITotal of SURKHET District 2 484 387 484 387 365 185 0 0

15

Page 21: Irrigation Database

TABLE 2Present Status of DOI Surface Projects

Net Gross Net Gross Summer Net

Planned Command Area (ha.)

Developed Command Area

Irrigated Command Area (ha.)

WinterIrri

gatio

n C

apab

ilityActual

Completed (AC) / Planned

Completion (PC) Year D

evel

oped

In

tens

ity

Basin Name

Perc

enta

ge

District Project

Ongoing Command Area

Prog

ram

me

Turn

Ove

r

Fund

ing

Bas

in

Num

ber

Gross

Total of MID-WESTERN > Hill 4 1659 1327 1659 1327 1005 685 0 0

Total of MID-WESTERN Region 12 7213 5772 7213 14572 4035 1285 0 0

Far-Western Development Region Terai Ecological Belt

KHUTIA PHASE 1 KAILALI 100 AC 1987 MS ED 1875 1500 1875 1500 1500 0 0 0 DOI NO A 2 KARNALIMOHANA KAILALI 100 AC 1987 YR ED 5670 3500 5670 3500 2000 1200 0 0 DOI NO MG/KORE 2 KARNALIPATHRAIYA KAILALI 100 AC 1974 MS ID 2700 2133 2700 2133 2000 500 0 0 DOI NO GoN 2 KARNALITotal of KAILALI District 3 10245 7133 10245 7133 5500 1700 0 0

MAHAKALI PHASE-I KANCHANPUR 100 AC 1987 YR CAD 5520 4800 5520 4800 4000 3000 0 0 DOI NO GoN/IDA 1 MAHAKALIMAHAKALI PHASE-II KANCHANPUR 100 PC 1998 YR TOTAL 8500 6800 8500 6800 5100 3000 0 0 DOI NO IDA 1 MAHAKALI

ED 1700CAD 5100

Total of KANCHANPUR District 2 14020 11600 14020 11600 9100 6000 0 0

Total of FAR-WESTERN > Terai 5 24265 18733 24265 18733 14600 7700 0 0

Far-Western Development Region Hill Ecological Belt

BABLA ACHHAM 100 AC 1994 YR ID 312 250 312 250 250 250 0 0 SHIP NO ADB 2 KARNALICHANDIKA ACHHAM 100 AC 1994 YR ID 94 75 94 75 75 75 0 0 SHIP NO ADB 2 KARNALIKHAPDAD ACHHAM 100 AC 1994 YR ID 175 140 175 140 140 140 0 0 SHIP NO ADB 2 KARNALILUNGRELI PRBELI ACHHAM 100 AC 1994 YR ID 176 141 176 141 141 141 0 0 SHIP NO ADB 2 KARNALIMAJ GAON ACHHAM 100 AC 1994 YR ED 75 60 75 60 60 60 0 0 SHIP NO ADB 2 KARNALISU TAR ACHHAM 100 AC 1994 YR ID 175 140 175 140 140 140 0 0 SHIP NO ADB 2 KARNALIVARDADEVI ACHHAM 100 AC 1992 YR ID 81 65 81 65 65 65 0 0 SHIP NO ADB 2 KARNALITotal of ACHHAM District 7 1088 871 1088 871 871 871 0 0

AGADEGAD BAITADI 100 AC 1982 MS ED 75 60 75 60 60 30 0 0 DOI NO GoN 1 MAHAKALIBANKU BAITADI 100 AC 1985 MS ED 75 60 75 60 60 0 0 0 MIRDP NO IDA 1 MAHAKALISHUNGELI BAITADI 100 AC 1986 MS ID 25 20 25 20 20 0 0 0 MIRDP NO IDA 1 MAHAKALISERA BAITADI 100 AC 1985 MS ED 75 60 75 60 60 0 0 0 MIRDP NO IDA 1 MAHAKALISURNAIYAGAD BAITADI 100 AC 1985 MS ED 244 195 244 195 195 100 0 0 DOI NO GoN 1 MAHAKALITotal of BAITADI District 5 494 395 494 395 395 130 0 0

BANDURASAIN DOTI 100 AC 1994 YR ID 194 155 194 155 155 100 0 0 SHIP NO ADB 2 KARNALIDIPAYAL EAST DOTI 100 AC 1994 YR ID 69 55 69 55 55 45 0 0 SHIP NO ADB 2 KARNALIDIPAYAL WEST DOTI 100 AC 1994 YR ID 56 45 56 45 45 0 0 0 SHIP NO ADB 2 KARNALIKADAMANDUU DOTI 100 AC 1994 YR ID 175 140 175 140 140 140 0 0 SHIP NO ADB 2 KARNALIKAPHLESWORI I DOTI 100 AC 1994 YR ID 75 60 75 60 60 60 0 0 SHIP NO ADB 2 KARNALIKAPHLESWORI II DOTI 100 AC 1994 YR ID 35 28 35 28 28 28 0 0 SHIP NO ADB 2 KARNALILATAMANDU DOTI 100 AC 1994 YR ID 150 120 150 120 120 120 0 0 SHIP NO ADB 2 KARNALITotal of DOTI District 7 754 603 754 603 603 493 0 0

16

Page 22: Irrigation Database

TABLE 2Present Status of DOI Surface Projects

Net Gross Net Gross Summer Net

Planned Command Area (ha.)

Developed Command Area

Irrigated Command Area (ha.)

WinterIrri

gatio

n C

apab

ilityActual

Completed (AC) / Planned

Completion (PC) Year D

evel

oped

In

tens

ity

Basin Name

Perc

enta

ge

District Project

Ongoing Command Area

Prog

ram

me

Turn

Ove

r

Fund

ing

Bas

in

Num

ber

Gross

Total of FAR-WESTERN > Hill 19 2336 1869 2336 1869 1869 1494 0 0

Far-Western Development Region Mountain Ecological Belt

BISKET BAJHANG 100 AC 1992 YR ID 111 89 111 89 89 89 0 0 SHIP NO ADB 2 KARNALIDEURA BAJHANG 100 AC 1990 YR ID 43 34 43 34 34 34 0 0 SHIP NO ADB 2 KARNALISUNGRI JUIL SYSTEM BAJHANG 100 AC 1990 YR ID 31 25 31 25 25 25 0 0 SHIP NO ADB 2 KARNALIGAIRASELA BAJHANG 100 AC 1989 YR ID 55 44 55 44 44 44 0 0 SHIP NO ADB 2 KARNALIJUIL EAST BAJHANG 100 AC 1994 YR ID 95 76 95 76 76 76 0 0 SHIP NO ADB 2 KARNALIJUIL WEST BAJHANG 100 AC 1994 YR ID 120 96 120 96 96 96 0 0 SHIP NO ADB 2 KARNALIKHEIRA BAJHANG 100 AC 1994 YR ID 88 70 88 70 70 70 0 0 SHIP NO ADB 2 KARNALIKUCH BAJHANG 100 AC 1989 YR ID 85 68 85 68 68 68 0 0 SHIP NO ADB 2 KARNALIMAJHI GAON BAJHANG 100 AC 1989 YR ID 213 170 213 170 170 170 0 0 SHIP NO ADB 2 KARNALIPIKHET BAJHANG 100 AC 1994 YR ID 194 155 194 155 155 155 0 0 SHIP NO ADB 2 KARNALIPUJARIKOT BAJHANG 100 AC 1994 YR ID 51 41 51 41 41 41 0 0 SHIP NO ADB 2 KARNALIRITHAPATA SUBEDI BAJHANG 100 AC 1989 YR ID 156 125 156 125 125 125 0 0 SHIP NO ADB 2 KARNALIRUINA BAGAR BAJHANG 100 AC 1994 YR ID 43 34 43 34 34 34 0 0 SHIP NO ADB 2 KARNALITALKOT DANTOLI BAJHANG 100 AC 1994 YR ID 215 172 215 172 172 172 0 0 SHIP NO ADB 2 KARNALITHAPA GAON BAJHANG 100 AC 1994 YR ID 194 155 194 155 155 155 0 0 SHIP NO ADB 2 KARNALITotal of BAJHANG District 15 1694 1354 1694 1354 1354 1354 0 0

BANDHU BAJURA 100 AC 1990 YR ID 63 50 63 50 50 50 0 0 SHIP NO ADB 2 KARNALIGOTHI BAJURA 100 AC 1994 YR ID 100 80 100 80 80 80 0 0 SHIP NO ADB 2 KARNALIKOLTI BAJURA 100 AC 1994 YR ID 188 150 188 150 150 150 0 0 SHIP NO ADB 2 KARNALITotal of BAJURA District 3 351 280 351 280 280 280 0 0

Total of FAR-WESTERN > Mountain 18 2045 1634 2045 1634 1634 1634 0 0

Total of FAR-WESTERN Region 42 28646 22236 28646 22236 18103 10828 0 0

Total of Nepal 178 389361 314571 389579 324171 224955 92336 500 400

17

Page 23: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross Net

ADB/N>JHAPA>NEWBAGDORA 100 JHAPA AC 1993 ID 46 37 46 37 37 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERBHUTLUNG 100 JHAPA AC 1996 ED 422 338 422 338 200 100 0 0 0 ADB/N YES ADB/N 12 SIWALIK RIVERDURGAVITTAPATH 100 JHAPA AC 1992 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERGEURIYA KHOLA 100 JHAPA AC 1996 ID 170 136 170 136 136 80 40 0 0 ADB/N YES ADB/N 12 SIWALIK RIVERLAFADI KHOLA 100 JHAPA AC 1994 ID 212 170 212 170 170 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERSOMBARE PAINI 100 JHAPA AC 1992 ID 36 29 36 29 29 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERSUNMAYA BISAL PAINI 100 JHAPA AC 1992 ID 55 44 55 44 44 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERTOTAL of ADB/N > JHAPA > NEW 7 972 779 972 779 641 180 40 0 0

ADB/N>JHAPA>REHABILITATIONBETANI KHOLA 100 JHAPA AC 1992 ID 46 37 46 37 37 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERBHALU KHOLA 100 JHAPA AC 1990 ID 53 42 53 42 42 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERBHALU KHOLA DAMAKA 100 JHAPA AC 1993 ID 96 77 96 77 77 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERBHARATI KULO 100 JHAPA AC 1993 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERBHUTRE KHOLA 100 JHAPA AC 1992 ID 40 32 40 32 32 32 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERBHUTULUNG 100 JHAPA AC 1990 ID 108 86 108 86 86 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERCHHATIWAINI 100 JHAPA AC 1996 ID 90 72 90 72 72 43 20 0 0 ADB/N YES ADB/N 12 SIWALIK RIVERDHAKRE GAUDA 100 JHAPA AC 1995 ID 291 233 291 233 233 140 70 0 0 ADB/N YES ADB/N 12 SIWALIK RIVERDHANGRI 100 JHAPA AC 1992 ID 84 67 84 67 67 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERDHANSINGH BANDH 100 JHAPA AC 1992 ID 51 41 51 41 41 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERDIPENI PANI 100 JHAPA AC 1192 ID 34 72 34 27 27 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERGAURIYA BANDH 100 JHAPA AC 1993 ID 70 56 70 56 56 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERJALAKANYA 100 JHAPA AC 1994 ID 88 70 88 70 70 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERJHAMBUJHAR 100 JHAPA AC 1990 ID 35 28 35 28 28 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERKATTELBHALU KHOLA 100 JHAPA AC 1992 ID 54 43 54 43 43 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERKRISHI BIKAS KV 100 JHAPA AC 1990 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERLILIYA KHOLA 100 JHAPA AC 1992 ID 125 100 125 100 100 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERNINDA DHOBI KHOLA 100 JHAPA AC 1993 ED 393 314 393 314 314 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERPALIYA KHOLA 100 JHAPA AC 1994 ID 329 263 329 263 263 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERSANWA KHOLA 100 JHAPA AC 1992 ED 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERSATI JHOLA 100 JHAPA AC 1992 ID 59 47 59 47 47 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERSHARDA KULO 100 JHAPA AC 1990 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERSUKUNE PAINI 100 JHAPA AC 1995 ID 128 102 128 102 102 61 30 0 0 ADB/N YES ADB/N 12 SIWALIK RIVERSUNAMAIBISHAL PAINI 100 JHAPA AC 1993 ID 100 80 100 80 80 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERTUKRE PAINI 100 JHAPA AC 1991 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERBHARATI BANDH 100 JHAPA AC 1991 ID 33 26 33 26 26 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERTOTAL of ADB/N > JHAPA > REHABILITATION 26 2462 2013 2462 1968 1968 276 120 0 0

TOTAL of JHAPA District 33 3434 2792 3434 2747 2609 456 160 0 0

ADB/N>MORANG>NEWBOHARA BANDH 100 MORANG AC 1992 ID 108 86 108 86 86 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER

Perc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

18

Page 24: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

CHARIGUWADHULAKI 100 MORANG AC 1992 ID 76 61 76 61 61 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERJHALJHALI KHOLA 100 MORANG AC 1995 ID 63 50 63 50 50 30 15 0 0 ADB/N YES ADB/N 12 SIWALIK RIVERPELTIMARI 100 MORANG AC 1994 ID 221 177 221 177 177 0 0 0 0 ADB/N YES ADB/N 12 SIWALIKRIVERTOTAL of ADB/N > MORANG > NEW 4 468 374 468 374 374 30 15 0 0

ADB/N>MORANG>REHABILITATIONALTAI KHOLA 100 MORANG AC 1990 ID 124 99 124 99 99 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERBETAUNA BEL BARI8 100 MORANG AC 1992 ID 44 35 44 35 35 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERBHORJANA 2 100 MORANG AC 1989 ID 150 120 150 120 120 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERBHUWA KHOLA 100 MORANG AC 1989 ID 115 92 115 92 92 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERBHUWA KHOLA 100 MORANG AC 1990 ID 331 265 331 265 265 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERBIRTA PAINI 100 MORANG AC 1995 ID 50 40 50 40 40 24 12 0 0 ADB/N YES ADB/N 12 SIWALIK RIVERBISNPURHOKLABAR 100 MORANG AC 1993 ID 334 267 334 267 267 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERCHANDRANAR-9 100 MORANG AC 1992 ID 60 48 60 48 48 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERDHUDHAPAINEBAHU 100 MORANG AC 1993 ID 175 140 175 140 140 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER DOVANKHOLA 100 MORANG AC 1996 ID 213 170 213 170 170 100 50 0 0 ADB/N YES ADB/N 12 SIWALIK RIVERJANASAHAYOG 100 MORANG AC 1991 ID 166 133 166 133 133 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERKAIR KHOLA 7 100 MORANG AC 1991 ID 60 48 60 48 48 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERKAIR KHOLA -2 100 MORANG AC 1991 ED 33 26 33 26 26 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERKAJALA KHOLA 100 MORANG AC 1993 ID 308 246 304 246 246 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERKARIWANA4 100 MORANG AC 1993 ID 93 74 93 74 74 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERKATANU KHOLA 100 MORANG AC 1995 ID 213 170 213 170 170 0 0 0 0 ADB/N YES ADB/N 12 SIWALIK RIVERKATNU KHOLA 100 MORANG AC 1991 ED 159 127 159 127 127 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERKHAIR KHOLA -5 100 MORANG AC 1993 ED 68 54 68 54 54 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERKHHADO KHOLA 6,7,8 100 MORANG AC 1992 ED 129 103 129 103 103 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERKISTI PAINI 100 MORANG AC 1995 ID 83 66 83 66 66 40 20 0 0 ADB/N YES ADB/N 12 SIWALIK RIVERKUIRE KHOLA 100 MORANG AC 1996 ID 244 195 244 195 195 117 50 0 0 ADB/N YES ADB/N 12 SIWALIK RIVERKUMAR GAONHARAICHA 100 MORANG AC 1995 ID 38 30 38 30 30 18 9 0 0 ADB/N YES ADB/N 12 SIWALIK RIVERLATIHOLIPATHARI 100 MORANG AC 1993 ID 101 87 101 87 87 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERMAJUWA2 100 MORANG AC 1991 ID 113 90 113 90 90 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERPATHARGHATTA-8 100 MORANG AC 1991 ID 35 28 35 28 28 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERPATRAWA 100 MORANG AC 1994 ID 45 36 45 36 36 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERSETUMARI,HARAICHA 100 MORANG AC 1996 ID 59 47 59 47 47 28 12 0 0 ADB/N YES ADB/N 12 SIWALIK RIVERBHORJANA 3 100 MORANG AC 1994 ID 34 27 34 27 27 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERTOTAL of ADB/N > MORANG > REHABILITATION 28 3577 2863 3573 2863 2863 327 153 0 0

TOTAL of MORANG District 32 4045 3237 4041 3237 3237 357 168 0 0

ADB/N>SUNSARI>REHABILITATIONAMAHA KHOLA 100 SUNSARI AC 1993 ED 625 500 625 500 500 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERSANKARBELI 100 SUNSARI AC 1994 ID 166 133 166 133 133 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERTOTAL of ADB/N > SUNSARI > REHABILITATION 2 791 633 791 633 633 0 0 0 0

TOTAL of SUNSARI District 2 791 633 791 633 633 0 0 0 0

ADB/N>SIRAHA>REHABILITATION

19

Page 25: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

SITAPUR 100 SIRAHA AC 1992 MS ID 71 57 71 57 57 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERTOTAL of ADB/N > SIRAHA > REHABILITATION 1 71 57 71 57 57 0 0 0 0

TOTAL of SIRAHA District 1 71 57 71 57 57 0 0 0 0

TOTAL of EASTERN > Terai 68 8341 6719 8337 6674 6536 813 328 0 0

ADB/N>DHANKUTA>REHABILITATIONJALLAD KHOLA 100 DHANKUTA AC 1995 ID 219 175 219 175 175 100 50 0 0 ADB/N YES ADB/N 4 KOSHITOTAL of ADB/N > DHANKUTA > REHABILITATION 1 219 175 219 175 175 100 50 0 0

TOTAL of DHANKUTA District 1 219 175 219 175 175 100 50 0 0

ADB/N>ILAM>NEWJAU BARI KHOLA 100 ILAM AC 1995 ID 14 11 14 11 11 6 3 0 0 ADB/N YES ADB/N 11 KANKAIJIL KHOLA 100 ILAM AC 1995 ID 19 15 19 15 15 9 4 0 0 ADB/N YES ADB/N 11 KANKAITOTAL of ADB/N > ILAM > NEW 2 33 26 33 26 26 15 7 0 0

ADB/N>ILAM>REHABILITATIONDHUNGRE KHOLA 100 ILAM AC 1995 ID 5 4 5 4 4 2 1 0 0 ADB/N YES ADB/N 11 KANKAITOTAL of ADB/N > ILAM > REHABILITATION 1 5 4 5 4 4 2 1 0 0

TOTAL of ILAM District 3 38 30 38 30 30 17 8 0 0

ADB/N>KHOTANG>NEWSIMLEK HOLA 100 KHOTANG AC 1995 ID 19 15 19 15 15 10 4 0 0 ADB/N YES ADB/N 4 KOSHITOTAL of ADB/N > KHOTANG > NEW 1 19 15 19 15 15 10 4 0 0

TOTAL of KHOTANG District 1 19 15 19 15 15 10 4 0 0

ADB/N>OKHALDHUNGA>NEWBIMIRE KHOLA TAL-6 100 OKHALDHUNGA AC 1992 ID 6 5 6 5 5 0 0 0 0 ADB/N NO ADB/N 4 KOSHIBIMIRE KHOLA TALUWA-7 100 OKHALDHUNGA AC 1992 ID 11 9 11 9 9 0 0 0 0 ADB/N NO ADB/N 4 KOSHIDAMATI KHOLA 100 OKHALDHUNGA AC 1995 ID 13 10 13 10 10 6 3 0 0 ADB/N YES ADB/N 4 KOSHIJOR PANI 100 OKHALDHUNGA AC 1994 ID 94 75 94 75 75 0 0 0 0 ADB/N NO ADB/N 4 KOSHIJOR PANIKESHARI 100 OKHALDHUNGA AC 1995 ID 50 40 50 40 40 24 6 0 0 ADB/N YES ADB/N 4 KOSHIKETUKI KHOLA 100 OKHALDHUNGA AC 1994 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 4 KOSHIMAHURI KHOLA 100 OKHALDHUNGA AC 1992 ID 6 5 6 5 5 0 0 0 0 ADB/N NO ADB/N 4 KOSHITOTAL of ADB/N > OKHALDHUNGA > NEW 7 211 169 211 169 169 30 9 0 0

ADB/N>OKHALDHUNGA>REHABILITATIONAMBOTE KUWA KHOLA 100 OKHALDHUNGA AC 1993 ID 8 6 8 6 6 0 0 0 0 ADB/N NO ADB/N 4 KOSHIGHATE KHOLA 100 OKHALDHUNGA AC 1990 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 4 KOSHIMUNA KHOLA 100 OKHALDHUNGA AC 1995 ID 41 33 41 33 33 19 9 0 0 ADB/N YES 4 KOSHISAJHAGARA THULO CHOUR 100 OKHALDHUNGA AC 1992 ID 10 8 10 8 8 0 0 0 0 ADB/N NO ADB/N 4 KOSHITOTAL of ADB/N > OKHALDHUNGA > REHABILITATION 4 72 57 72 57 57 19 9 0 0

20

Page 26: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of OKHALDHUNGA District 11 283 226 283 226 226 49 18 0 0

ADB/N>PANCHTHAR>NEWRATAMATE 100 PANCHTHAR AC 1995 ID 23 18 23 18 18 10 5 0 0 ADB/N YES ADB/N 4 KOSHITOTAL of ADB/N > PANCHTHAR > NEW 1 23 18 23 18 18 10 5 0 0

ADB/N>PANCHTHAR>REHABILITATIONLOKHARUMBA 100 PANCHTHAR AC 1994 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 4 KOSHISAWA KHOLA 100 PANCHTHAR AC 1994 ID 20 16 20 16 16 0 0 0 0 ADB/N NO ADB/N 4 KOSHITOTAL of ADB/N > PANCHTHAR > REHABILITATION 2 39 31 39 31 31 0 0 0 0

TOTAL of PANCHTHAR District 3 62 49 62 49 49 10 5 0 0

ADB/N>UDAYPUR>NEWBHSRSUWA KHOLA 100 UDAYPUR AC 1992 ID 18 14 18 14 14 0 0 0 0 ADB/N NO ADB/N 4 KOSHITOTAL of ADB/N > UDAYPUR > NEW 1 18 14 18 14 14 0 0 0 0

ADB/N>UDAYPUR>REHABILITATIONAANP TAR 100 UDAYPUR AC 1992 ID 11 9 11 9 9 0 0 0 0 ADB/N NO ADB 4 KOSHIBAIJANATH KULO 100 UDAYPUR AC 1993 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 4 KOSHIBHU TAR KHOLA 100 UDAYPUR AC 1993 ID 14 11 14 11 11 0 0 0 0 ADB/N NO ADB/N 4 KOSHIBRINDAVAN 100 UDAYPUR AC 1993 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 4 KOSHITOTAL of ADB/N > UDAYPUR > REHABILITATION 4 51 40 51 40 40 0 0 0 0

TOTAL of UDAYPUR District 5 69 54 69 54 54 0 0 0 0

ADB/N>SANKHUWASABHA>NEWKAGUNE KHOLA 100 SANKHUWASABHA AC 1995 ID 38 30 38 30 30 18 9 0 0 ADB/N YES ADB/N 4 KOSHITOTAL of ADB/N > SANKHUWASABHA > NEW 1 38 30 38 30 30 18 9 0 0

ADB/N>SANKHUWASABHA>REHABILITATIONKHE KUWA KHOLA 100 SANKHUWASABHA AC 1991 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 4 KOSHIMALTA KULO 100 SANKHUWASABHA AC 1992 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 4 KOSHISUBYUN 100 SANKHUWASABHA AC 1994 ID 41 33 41 33 33 0 0 0 0 ADB/N NO ADB/N 4 KOSHITOTAL of ADB/N > SANKHUWASABHA > REHABILITATION 3 79 63 79 63 63 0 0 0 0

TOTAL of SANKHUWASABHA District 4 117 93 117 93 93 18 9 0 0

TOTAL of EASTERN > Hill 28 807 642 807 642 642 204 94 0 0

TOTAL of EASTERN Region 96 9148 7361 9144 7316 7178 1017 422 0 0

ADB/N>CHITWAN>NEWBURIRAPTI-III 100 CHITWAN AC 1995 ID 330 264 330 264 264 158 70 0 0 ADB/N YES ADB/N 3 GANDAKTOTAL of ADB/N > CHITWAN > NEW 1 330 264 330 264 264 158 70 0 0

21

Page 27: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

ADB/N>CHITWAN>REHABILITATIONKHUMJOR1V 100 CHITWAN AC 1992 ID 85 68 85 68 68 0 0 0 0 ADB/N NO ADB/N 3 GANDAKMEGHALU 100 CHITWAN AC 1992 ID 80 64 80 64 64 0 0 0 0 ADB/N NO ADB/N 3 GANDAKPAMPHA KHOLA 100 CHITWAN AC 1992 ID 87 70 87 70 70 0 0 0 0 ADB/N NO ADB/N 3 GANDAKTOTAL of ADB/N > CHITWAN > REHABILITATION 3 252 202 252 202 202 0 0 0 0

TOTAL of CHITWAN District 4 582 466 582 466 466 158 70 0 0

ADB/N>DHANUSHA>REHABILITATIONBASNIYA KHOLA 100 DHANUSHA AC 1993 ID 75 60 75 60 60 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERRATU KHOLA 100 DHANUSHA AC 1989 ID 88 70 88 70 70 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERTOTAL of ADB/N > DHANUSHA > REHABILITATION 2 163 130 163 130 130 0 0 0 0

TOTAL of DHANUSHA District 2 163 130 163 130 130 0 0 0 0

ADB/N>PARSA>NEWBULBULE KHOLA 100 PARSA AC 1994 ID 53 42 53 42 42 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERTOTAL of ADB/N > PARSA > NEW 1 53 42 53 42 42 0 0 0 0

ADB/N>PARSA>REHABILITATIONCHORMI KHOLA 100 PARSA AC 1990 ID 228 182 228 182 182 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERTHULO CHOUR 100 PARSA AC 1889 ID 33 26 33 26 26 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERTOTAL of ADB/N > PARSA > REHABILITATION 2 261 208 261 208 208 0 0 0 0

TOTAL of PARSA District 3 314 250 314 250 250 0 0 0 0

ADB/N>SARLAHI>REHABILITATIONBHAWARI KHOLA 100 SARLAHI AC 1992 ID 78 62 78 62 62 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERGODIYA KHOLA 100 SARLAHI AC 1993 ID 98 78 98 78 78 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERKALIGOR 100 SARLAHI AC 1990 ED 500 400 500 400 400 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERLAXMANPUR 100 SARLAHI AC 1989 ID 250 200 250 200 200 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERTOTAL of ADB/N > SARLAHI > REHABILITATION 4 926 740 926 740 740 0 0 0 0

TOTAL of SARLAHI District 4 926 740 926 740 740 0 0 0 0

TOTAL of CENTRAL>Terai 13 1985 1586 1985 1586 1586 158 70 0 0

ADB/N>DHADING>NEWASRULI TAR 100 DHADING AC 1994 ID 8 6 8 6 6 0 0 0 0 ADB/N NO ADB/N 3 GANDAKBAGUWA KHOLA 100 DHADING AC 1994 ID 9 7 9 7 7 0 0 0 0 ADB/N NO ADB/N 3 GANDAKBAJ KHET 100 DHADING AC 1994 ID 6 5 6 5 5 0 0 0 0 ADB/N NO ADB/N 3 GANDAKBAR KHOLA 100 DHADING AC 1992 ID 18 14 18 14 14 0 0 0 0 ADB/N NO ADB/N 3 GANDAKBEAKHU KHOLA 100 DHADING AC 1996 ID 25 20 25 20 25 12 6 0 0 ADB/N NO ADB/N 3 GANDAKBHAJRDIP 100 DHADING AC 1992 ID 10 8 10 8 8 0 0 0 0 ADB/N NO ADB/N 3 GANDAKBHALU KHOLA 100 DHADING AC 1992 ID 8 6 8 6 6 0 0 0 0 ADB/N NO ADB/N 3 GANDAK

22

Page 28: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

BHAMANGPIDA 100 DHADING AC 1995 ID 14 11 14 11 11 7 3 0 0 ADB/N YES ADB/N 3 GANDAKCHANAUTE PHANT 100 DHADING AC 1994 ID 14 11 14 11 11 0 0 0 0 ADB/N NO ADB/N 3 GANDAKCHURAMANI 100 DHADING AC 1995 ID 8 6 8 6 6 3 1 0 0 ADB/N YES ADB/N 3 GANDAKDANAGADE 100 DHADING AC 1996 ID 9 7 9 7 7 4 2 0 0 ADB/N YES ADB/N 3 GANDAKGADARE KHOLA 100 DHADING AC 1994 ID 14 11 14 11 11 0 0 0 0 ADB/N NO ADB/N 3 GANDAKHAS TAR 100 DHADING AC 1996 ID 9 7 9 7 7 4 2 0 0 ADB/N YES ADB/N 3 GANDAKHUGDI KHOLA 100 DHADING AC 1995 ID 23 18 23 18 18 10 5 0 0 ADB/N YES ADB/N 3 GANDAKKHAIRENI KHOLA 100 DHADING AC 1994 ID 9 7 9 7 7 0 0 0 0 ADB/N NO ADB/N 3 GANDAKMAHADEV BESI 100 DHADING AC 1995 ID 38 30 38 30 30 18 9 0 0 ADB/N YES ADB/N 3 GANDAKMALEKHU KHOLA 100 DHADING AC 1994 ID 18 14 18 14 14 0 0 0 0 ADB/N NO ADB/N 3 GANDAKMANE GAON 100 DHADING AC 1995 ID 44 35 44 35 35 21 10 0 0 ADB/N YES ADB/N 3 GANDAKMUL KHOLA 100 DHADING AC 1992 ID 63 50 63 50 50 0 0 0 0 ADB/N NO ADB/N 3 GANDAKPACHASE KHOLA 100 DHADING AC 1992 ID 14 11 14 11 11 0 0 0 0 ADB/N NO ADB/N 3 GANDAKSADI KHOLA 100 DHADING AC 1992 ID 16 13 16 13 13 0 0 0 0 ADB/N NO ADB/N 3 GANDAKSAUNE KHOLA 100 DHADING AC 1995 ID 13 10 13 10 10 6 3 0 0 ADB/N YES ADB/N 3 GANDAKSETI PAKHA 100 DHADING AC 1994 ID 5 4 5 4 4 0 0 0 0 ADB/N NO ADB/N 3 GANDAKSHANKAR KHOLA 100 DHADING AC 1996 ID 9 7 9 7 7 4 2 0 0 ADB/N YES ADB/N 3 GANDAKTHARPU DHARA 100 DHADING AC 1994 ID 10 8 10 8 8 0 0 0 0 ADB/N NO ADB/N 3 GANDAKTOTAL of ADB/N > DHADING > NEW 25 414 326 414 326 331 89 43 0 0

ADB/N>DHADING>REHABILITATIONAHALE KHOLA 100 DHADING AC 1994 ID 16 13 16 13 13 0 0 0 0 ADB/N NO ADB/N 3 GANDAKAHALI GAON 100 DHADING AC 1990 ID 6 5 6 5 5 0 0 0 0 ADB/N NO ADB/N 3 GANDAKANP TARINIKAANTHA 100 DHADING AC 1994 ID 24 19 24 19 19 0 0 0 0 ADB/N NO ADB/N 3 GANDAKBEL TAR,GAJURI-4 100 DHADING AC 1996 ID 31 25 31 25 25 15 7 0 0 ADB/N YES ADB/N 3 GANDAKBIKHYAKHRT 100 DHADING AC 1995 ID 16 13 16 13 13 7 3 0 0 ADB/N YES ADB/N 3 GANDAKBIRKHE TAR 100 DHADING AC 1994 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 3 GANDAKCHA KHOLA 100 DHADING AC 1993 ID 38 30 38 30 30 0 0 0 0 ADB/N NO ADB/N 3 GANDAKCHAKRA KHOLA 100 DHADING AC 1992 ID 30 24 30 24 24 0 0 0 0 ADB/N NO ADB/N 3 GANDAK DANDA TALE 100 DHADING AC 1994 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 3 GANDAKDANGDUNGE KHOLA 100 DHADING AC 1993 ID 55 44 55 44 44 0 0 0 0 ADB/N NO ADB/N 3 GANDAKDANSINGKHARKA 100 DHADING AC 1994 ID 25 20 25 20 20 0 0 0 0 ADB/N NO ADB/N 3 GANDAKDHODENI KHOLA 100 DHADING AC 1990 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 3 GANDAKDHONEHISOKAS-3 100 DHADING AC 1993 ID 16 13 16 13 13 0 0 0 0 ADB/N NO ADB/N 3 GANDAKFEDI KHOLA 100 DHADING PC 1993 ID 8 6 8 6 6 0 0 0 0 ADB/N NO ADB/N 3 GANDAKGARANG 100 DHADING AC 1994 ID 25 20 25 20 20 0 0 0 0 ADB/N NO ADB/N 3 GANDAKGARDUWA KHOLA 100 DHADING AC 1993 ID 10 8 10 8 8 0 0 0 0 ADB/N NO ADB/N 3 GANDAKGHATTE KHOLA 100 DHADING AC 1994 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 3 GANDAKGHUMTI KHOLA 100 DHADING AC 1994 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 3 GANDAKGUMDI-3 100 DHADING AC 1991 ID 6 5 6 5 5 0 0 0 0 ADB/N NO ADB/N 3 GANDAKJAMU TARBELKHU 100 DHADING AC 1993 ID 113 90 113 90 90 0 0 0 0 ADB/N NO ADB/N 3 GANDAKJOGI TAR 100 DHADING AC 1994 ID 25 20 25 20 20 0 0 0 0 ADB/N NO ADB/N 3 GANDAKJORGAHATTE,PIDA 100 DHADING AC 1995 ID 15 12 15 12 12 7 3 0 0 ADB/N YES ADB/N 3 GANDAKKADAM KHOLA 100 DHADING AC 1992 ID 23 18 23 18 18 0 0 0 0 ADB/N NO ADB/N 3 GANDAKKALI TAR 100 DHADING AC 1993 ID 26 21 26 21 21 0 0 0 0 ADB/N NO ADB/N 3 GANDAKKARELITHIMKA 100 DHADING AC 1993 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 3 GANDAK

23

Page 29: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

KARKI DANDA 100 DHADING AC 1990 ID 20 16 20 16 16 0 0 0 0 ADB/N NO ADB/N 3 GANDAKKARTIKE TAR 100 DHADING AC 1994 ID 18 14 18 14 14 0 0 0 0 ADB/N NO ADB/N 3 GANDAKKHAR BARI 100 DHADING AC 1992 ID 10 8 10 8 8 0 0 0 0 ADB/N NO ADB/N 3 GANDAKKUPA KHOLA 100 DHADING AC 1990 ID 10 8 10 8 8 0 0 0 0 ADB/N NO ADB/N 3 GANDAKMAHESHKHALA-8 100 DHADING AC 1993 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 3 GANDAKMAHES TARKALLERI-3 100 DHADING AC 1992 ID 25 20 25 20 20 0 0 0 0 ADB/N NO ADB/N 3 GANDAKMULKHARKA 100 DHADING AC 1994 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 3 GANDAKODARE KHOLA 100 DHADING AC 1992 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 3 GANDAKPAKHURE,PIDA 100 DHADING AC 1995 ID 15 12 15 12 12 7 3 0 0 ADB/N YES ADB/N 3 GANDAKPALAKHU KHOLA 100 DHADING AC 1990 ID 8 6 8 6 6 0 0 0 0 ADB/N NO ADB/N 3 GANDAKPANCHAKANYA 100 DHADING AC 1994 ID 25 20 25 20 20 0 0 0 0 ADB/N NO ADB/N 3 GANDAKRIST TAR 100 DHADING AC 1994 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 3 GANDAKSANYASI TAR 100 DHADING AC 1995 ID 33 26 33 26 26 15 7 0 0 ADB/N YES ADB/N 3 GANDAKSIMLANA KHET 100 DHADING AC 1994 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 3 GANDAKSIMLE TARKHARI-7 100 DHADING AC 1992 ID 56 45 56 45 45 0 0 0 0 ADB/N NO ADB/N 3 GANDAKTHULO KHOLA 100 DHADING AC 1994 ID 9 7 9 7 7 0 0 0 0 ADB/N NO ADB/N 3 GANDAKTHULO PHANT 100 DHADING AC 1994 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 3 GANDAKWANGRANG 100 DHADING AC 1994 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 3 GANDAKTOTAL of ADB/N > DHADING > REHABILITATION 43 978 778 978 778 778 51 23 0 0

TOTAL of DHADING District 68 1392 1104 1392 1104 1109 140 66 0 0

ADB/N>KATHMANDU>NEWPANCHAPAL 100 KATHMANDU AC 1992 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 9 BAGMATITOTAL of ADB/N > KATHMANDU > NEW 1 31 25 31 25 25 0 0 0 0

ADB/N>KATHMANDU>REHABILITATIONDHAKAL GAON 100 KATHMANDU AC 1992 ID 25 20 25 20 20 0 0 0 0 ADB/N NO ADB/N 9 BAGMATITOTAL of ADB/N > KATHMANDU > REHABILITATION 1 25 20 25 20 20 0 0 0 0

TOTAL of KATHMANDU District 2 56 45 56 45 45 0 0 0 0

ADB/N>KAVRE>NEWJANAJAGRITI 100 KAVRE AC 1992 ID 88 70 88 70 70 0 0 0 0 ADB/N NO ADB/N 4 KOSHIROSI-1 100 KAVRE AC 1995 ID 18 14 18 14 14 8 4 0 0 ADB/N YES ADB/N 4 KOSHITOTAL of ADB/N > KAVRE > NEW 2 106 84 106 84 84 8 4 0 0

ADB/N>KAVRE>REHABILITATIONBHASME KHOLA 100 KAVRE AC 1995 ID 29 23 29 23 23 13 6 0 0 ADB/N YES ADB/N 4 KOSHICHA KHOLA 100 KAVRE AC 1989 ID 156 125 156 125 125 0 0 0 0 ADB/N NO ADB/N 4 KOSHICHHANGE KHOLA 100 KAVRE AC 1996 ID 25 20 25 20 20 12 6 0 0 ADB/N YES ADB/N 4 KOSHIJAMUNEY KHOLA 100 KAVRE AC 1990 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 4 KOSHIPOTA KHOLA 100 KAVRE AC 1995 ID 19 15 19 15 15 9 4 0 0 ADB/N YES ADB/N 4 KOSHIROSHI-II 100 KAVRE AC 1995 ID 10 8 10 8 8 4 2 0 0 ADB/N YES ADB/N 4 KOSHITOTAL of ADB/N > KAVRE > REHABILITATION 6 270 216 270 216 216 38 18 0 0

24

Page 30: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of KAVRE District 8 376 300 376 300 300 46 22 0 0

ADB/N>MAKAWANPUR>REHABILITATIONRAJAIYA 100 MAKAWANPUR AC 1989 ID 32 25 32 25 25 0 0 0 0 ADB/N NO ADB/N 3 GANDAKTOTAL of ADB/N > MAKAWANPUR > REHABILITATION 1 32 25 32 25 25 0 0 0 0

TOTAL of MAKAWANPUR District 1 32 25 32 25 25 0 0 0 0

ADB/N>NUWAKOT>NEWKAMERA KHOLA 100 NUWAKOT AC 1995 ID 6 5 6 5 5 3 1 0 0 ADB/N YES ADB/N 3 GANDAKTOTAL of ADB/N > NUWAKOT > NEW 1 6 5 6 5 5 3 1 0 0

ADB/N>NUWAKOT>REHABILITATIONADHRI KHOLA 100 NUWAKOT AC 1990 ID 88 70 88 70 70 0 0 0 0 ADB/N NO ADB/N 3 GANDAKAHALE KHOLA 100 NUWAKOT AC 1992 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 3 GANDAKBALKUMARI 100 NUWAKOT AC 1991 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 3 GANDAKBIRMAN TAR 100 NUWAKOT AC 1990 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 3 GANDAKJHANKRI KHOLA 100 NUWAKOT AC 1992 ID 44 35 44 35 35 0 0 0 0 ADB/N NO ADB/N 3 GANDAKKARANG KHOLA 100 NUWAKOT AC 1991 ID 38 30 38 30 30 0 0 0 0 ADB/N NO ADB/N 3 GANDAKLACHI KHOLA 100 NUWAKOT AC 1992 ID 69 55 69 55 55 0 0 0 0 ADB/N NO ADB/N 3 GANDAKMAN DADA 100 NUWAKOT AC 1990 ID 44 35 44 35 35 0 0 0 0 ADB/N NO ADB/N 3 GANDAKPANCHAKANYA 100 NUWAKOT AC 1991 ID 88 70 88 70 70 0 0 0 0 ADB/N NO ADB/N 3 GANDAKSANO BHORLE 100 NUWAKOT AC 1989 ID 32 25 32 25 25 0 0 0 0 ADB/N NO ADB/N 3 GANDAKTHAPREK 100 NUWAKOT AC 1991 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 3 GANDAKTHULO CHOUR 100 NUWAKOT AC 1989 ID 33 26 33 26 26 0 0 0 0 ADB/N NO ADB/N 3 GANDAKKARTIKE KHLOA 100 NUWAKOT AC 1991 ID 44 35 44 35 35 0 0 0 0 ADB/N NO ADB/N 3 GANDAKTOTAL of ADB/N > NUWAKOT > REHABILITATION 13 586 466 586 466 466 0 0 0 0

TOTAL of NUWAKOT District 14 592 471 592 471 471 3 1 0 0

ADB/N>RAMECHAP>NEWSURKE KHOLA 100 RAMECHAP AC 1995 ID 113 90 113 90 90 54 27 0 0 ADB/N YES ADB/N 4 KOSHITOTAL of ADB/N > RAMECHAP > NEW 1 113 90 113 90 90 54 27 0 0

ADB/N>RAMECHAP>REHABILITATIONCHHANGE KHOLA 100 RAMECHAP AC 1995 ID 31 25 31 25 25 15 7 0 0 ADB/N YES ADB/N 4 KOSHI DHARA PANI POKHARA 100 RAMECHAP AC 1993 ID 6 5 6 5 5 0 0 0 0 ADB/N NO ADB/N 4 KOSHI DHARAPANI 100 RAMECHAP AC 1994 ID 7 6 7 6 6 0 0 0 0 ADB/N NO ADB/N 4 KOSHIDORAMBA 100 RAMECHAP AC 1992 ID 7 6 7 6 6 0 0 0 0 ADB/N NO ADB/N 4 KOSHIJHARINI KHOLA 100 RAMECHAP AC 1993 ID 38 30 38 30 30 0 0 0 0 ADB/N NO ADB/N 4 KOSHITOTAL of ADB/N > RAMECHAP > REHABILITATION 5 89 72 89 72 72 15 7 0 0

TOTAL of RAMECHAP District 6 202 162 202 162 162 69 34 0 0

ADB/N>SINDHULI>NEWCHANDRA KHOLA 100 SINDHULI AC 1994 ID 41 33 41 33 33 0 0 0 0 ADB/N NO ADB/N 9 BAGMATI

25

Page 31: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

DURANDER 100 SINDHULI AC 1994 ID 44 35 44 35 35 0 0 0 0 ADB/N NO ADB/N 9 BAGMATITOTAL of ADB/N > SINDHULI > NEW 2 85 68 85 68 68 0 0 0 0

ADB/N>SINDHULI>REHABILITATIONJARU TARDEBREKH 100 SINDHULI AC 1992 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 9 BAGMATITOTAL of ADB/N > SINDHULI > REHABILITATION 1 31 25 31 25 25 0 0 0 0

TOTAL of SINDHULI District 3 116 93 116 93 93 0 0 0 0

ADB/N>DOLAKHA>REHABILITATIONADHERI KHOLA AWALE 100 DOLAKHA AC 1993 ID 30 24 30 24 24 0 0 0 0 ADB/N NO ADB/N 4 KOSHIADHERI KHOLA SAWANE 100 DOLAKHA AC 1993 125 100 125 100 100 0 0 0 0 ADB/N NO ADB/N 4 KOSHIFADKE KHOLA 100 DOLAKHA AC 1992 ID 14 11 14 11 14 0 0 0 0 ADB/N NO ADB/N 4 KOSHIGHAYANG KHOLA 100 DOLAKHA AC 1995 ID 94 75 94 75 75 45 20 0 0 ADB/N YES ADB/N 4 KOSHILOHARE KHOLA 100 DOLAKHA AC 1996 ID 94 75 94 75 75 45 20 0 0 ADB/N YES ADB/N 4 KOSHILORARE KHOLA 100 DOLAKHA AC 1993 ID 94 75 94 75 75 0 0 0 0 ADB/N NO ADB/N 4 KOSHIODARE KHOLA 100 DOLAKHA AC 1993 ID 15 12 15 12 12 0 0 0 0 ADB/N NO ADB/N 4 KOSHITOTAL of ADB/N > DOLAKHA > REHABILITATION 7 466 372 466 372 375 90 40 0 0

TOTAL of DOLAKHA District 7 466 372 466 372 375 90 40 0 0

ADB/N>SINDHUPALCHOWK>NEWBARAMCHI KHOLA 100 SINDHUPALCHOWK AC 1995 ID 25 20 25 20 20 12 6 0 0 ADB/N YES ADB/N 4 KOSHIGADARE KHOLA 100 SINDHUPALCHOWK AC 1995 ID 25 20 25 20 20 12 6 0 0 ADB/N YES ADB/N 4 KOSHIKEURENI KHOLA -1 100 SINDHUPALCHOWK AC 1995 ID 6 5 6 5 5 3 1 0 0 ADB/N YES ADB/N 4 KOSHIKEURENI KHOLA -2 100 SINDHUPALCHOWK AC 1995 ID 5 4 5 4 4 2 1 0 0 ADB/N YES ADB/N 4 KOSHITOTAL of ADB/N > SINDHUPALCHOWK > NEW 4 61 49 61 49 49 29 14 0 0

ADB/N>SINDHUPALCHOWK>REHABILITATIONCHEPE KHOLA 100 SINDHUPALCHOWK AC 1994 ID 15 12 15 12 12 0 0 0 0 ADB/N NO ADB/N 4 KOSHIGHATTE KHOLA 100 SINDHUPALCHOWK AC 1989 ID 38 30 38 30 30 0 0 0 0 ADB/N NO ADB/N 4 KOSHITOTAL of ADB/N > SINDHUPALCHOWK > REHABILITATION 2 53 42 53 42 42 0 0 0 0

TOTAL of SINDHUPALCHOWK District 6 114 91 114 91 91 29 14 0 0

TOTAL of CENTRAL>Hill 115 3346 2663 3346 2663 2671 377 177 0 0

TOTAL of CENTRAL Region 128 5331 4249 5331 4249 4257 535 247 0 0

ADB/N>KAPILVASTU>NEWBHORLABASE,KOTIE 100 KAPILVASTU AC 1992 ID 134 107 134 107 107 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVERKACHUWA KHOLA 100 KAPILVASTU AC 1995 ID 100 80 100 80 80 48 24 0 0 ADB/N YES ADB/N 12 SIWALIK RIVERTOTAL of ADB/N > KAPILVASTU > NEW 2 234 187 234 187 187 48 24 0 0

TOTAL of KAPILVASTU District 2 234 187 234 187 187 48 24 0 0

26

Page 32: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

ADB/N>NAWALPARASI>NEWCHIURI KHOLA 100 NAWALPARASI AC 1992 ID 10 8 10 8 8 0 0 0 0 ADB/N YES ADB/N 3 GANDAKDANGRAI KHOLA 100 NAWALPARASI AC 1996 ID 104 83 104 83 83 50 20 0 0 ADB/N YES ADB/N 3 GANDAKTOTAL of ADB/N > NAWALPARASI > NEW 2 114 91 114 91 91 50 20 0 0

ADB/N>NAWALPARASI>REHABILITATIONAMAL TARI 100 NAWALPARASI AC 1992 ID 125 100 125 100 100 0 0 0 0 ADB/N NO ADB/N 3 GANDAKAMARASAGANGOLI 100 NAWALPARASI AC 1992 ID 43 34 43 34 34 0 0 0 0 ADB/N NO ADB/N 3 GANDAKBARA KHOLA 100 NAWALPARASI AC 1991 ID 209 167 209 167 137 0 0 0 0 ADB/N NO ADB/N 3 GANDAKGAIDAKOT 100 NAWALPARASI AC 1993 ID 73 58 73 58 58 0 0 0 0 ADB/N YES ADB/N 3 GANDAKGANGARANI 100 NAWALPARASI AC 1994 ID 38 30 38 30 30 0 0 0 0 ADB/N NO ADB/N 3 GANDAKJAYSSHREE KHOLA 100 NAWALPARASI AC 1995 ID 38 30 38 30 30 18 9 0 0 ADB/N YES ADB/N 3 GANDAKJHARI KHOLA 100 NAWALPARASI AC 1993 ID 84 67 84 67 67 0 0 0 0 ADB/N NO ADB/N 3 GANDAKULTI KHOLA 100 NAWALPARASI AC 1994 ID 85 68 85 68 68 0 0 0 0 ADB/N NO ADB/N 3 GANDAKTOTAL of ADB/N > NAWALPARASI > REHABILITATION 8 695 554 695 554 524 18 9 0 0

TOTAL of NAWALPARASI District 10 809 645 809 645 615 68 29 0 0

ADB/N>RUPANDEHI>NEWBARUWA KHOLA 100 RUPANDEHI AC 1994 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 8 TINAUTOTAL of ADB/N > RUPANDEHI > NEW 1 19 15 19 15 15 0 0 0 0

ADB/N>RUPANDEHI>REHABILITATIONBARCHAWA KHOLA 100 RUPANDEHI AC 1994 ID 94 75 94 75 94 0 0 0 0 ADB/N NO ADB/N 8 TINAUGAURI BANDH 100 RUPANDEHI AC 1989 ID 265 212 265 212 212 0 0 0 0 ADB/N NO ADB/N 8 TINAUKANCHAN KHOLA PAN BARI 100 RUPANDEHI AC 1995 ID 50 40 50 40 40 20 10 0 0 ADB/N YES ADB/N 8 TINAUPAHELA KHOLA 100 RUPANDEHI AC 1992 ID 23 18 23 18 23 0 0 0 0 ADB/N NO ADB/N 8 TINAUSUNKAUDA 100 RUPANDEHI AC 1991 ID 21 17 21 17 17 0 0 0 0 ADB/N NO ADB/N 8 TINAUKANCHAN KHOLA JHIMJIME 100 RUPANDEHI AC 1995 ED 375 300 375 300 180 90 0 0 0 ADB/N YES ADB/N 8 TINAUTOTAL of ADB/N > RUPANDEHI > REHABILITATION 6 828 662 828 662 566 110 10 0 0

TOTAL of RUPANDEHI District 7 847 677 847 677 581 110 10 0 0

TOTAL of WESTERN>Terai 19 1890 1509 1890 1509 1383 226 63 0 0

ADB/N>ARGHAKHANCHI>NEWDUNGESERA 100 ARGHAKHANCHI AC 1995 ID 44 35 44 35 35 21 10 0 0 ADB/N YES ADB/N 6 WEST RAPTISIMAL PANI 100 ARGHAKHANCHI AC 1992 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 6 WEST RAPTITOTAL of ADB/N > ARGHAKHANCHI > NEW 2 63 50 63 50 50 21 10 0 0

ADB/N>ARGHAKHANCHI>REHABILITATIONBANGANASITAPUR 100 ARGHAKHANCHI AC 1990 ID 16 13 16 13 13 0 0 0 0 ADB/N NO ADB/N 6 WEST RAPTITOTAL of ADB/N > ARGHAKHANCHI > REHABILITATION 1 16 13 16 13 13 0 0 0 0

TOTAL of ARGHAKHANCHI District 3 79 63 79 63 63 21 10 0 0

27

Page 33: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

ADB/N>BAGLUNG>NEWSAR KUWA 100 BAGLUNG AC 1996 ID 11 9 11 9 9 5 2 0 0 ADB/N YES ADB/N 3 GANDAKTOTAL of ADB/N > BAGLUNG > NEW 1 11 9 11 9 9 5 2 0 0

ADB/N>BAGLUNG>REHABILITATIONBANDRE.MALLIKA 100 BAGLUNG AC 1995 ID 13 10 13 10 10 6 3 0 0 ADB/N YES ADB/N 3 GANDAKTAKIL KHOLA 100 BAGLUNG AC 1990 ID 29 23 29 23 23 0 0 0 0 ADB/N NO ADB/N 3 GANDAKTOTAL of ADB/N > BAGLUNG > REHABILITATION 2 42 33 42 33 33 6 3 0 0

TOTAL of BAGLUNG District 3 53 42 53 42 42 11 5 0 0

ADB/N>GORKHA>NEWBHANDARTHOWK 100 GORKHA AC 1996 ID 125 100 125 100 100 60 30 0 0 ADB/N YES ADB/N 3 GANDAKJUGDI TAR 100 GORKHA AC 1996 ID 20 16 20 16 16 9 4 0 0 ADB/N YES ADB/N 3 GANDAKSATBISE PHANT 100 GORKHA AC 1994 ID 18 14 18 14 14 0 0 0 0 ADB/N NO ADB/N 3 GANDAKSILLING TAR 100 GORKHA AC 1995 ID 6 5 6 5 5 3 1 0 0 ADB/N YES ADB/N 3 GANDAKULTER TAR 100 GORKHA AC 1996 ID 15 12 15 12 12 7 3 0 0 ADB/N YES ADB/N 3 GANDAKTOTAL of ADB/N > GORKHA > NEW 5 184 147 184 147 147 79 38 0 0

ADB/N>GORKHA>REHABILITATIONGAHIRE GAON 100 GORKHA AC 1993 ID 50 40 50 40 0 0 0 0 0 ADB/N YES ADB/N 3 GANDAKGANAKHU 100 GORKHA AC 1995 ID 50 40 50 40 40 24 10 0 0 ADB/N YES ADB/N 3 GANDAKJUDI KHOLA 100 GORKHA AC 1991 ID 21 17 21 17 17 0 0 0 0 ADB/N NO ADB/N 3 GANDAKPANDURE 100 GORKHA AC 1992 ID 20 16 20 16 16 0 0 0 0 ADB/N NO ADB/N 3 GANDAKSIMAL TAR BHORLE 100 GORKHA AC 1992 ID 6 5 6 5 5 0 0 0 0 ADB/N NO ADB/N 3 GANDAKTILARAM KHOLA 100 GORKHA AC 1990 ED 24 19 24 19 19 0 0 0 0 ADB/N NO ADB/N 3 GANDAKTOTAL of ADB/N > GORKHA > REHABILITATION 6 171 137 171 137 97 24 10 0 0

TOTAL of GORKHA District 11 355 284 355 284 244 103 48 0 0

ADB/N>GULMI>NEWANTHAUNA KULO 100 GULMI AC 1992 ID 11 9 11 9 9 0 0 0 0 ADB/N NO ADB/N 3 GANDAKBHARSE KHOLA JUN 100 GULMI AC 1992 ID 54 43 54 43 43 0 0 0 0 ADB/N NO ADB/N 3 GANDAKJIMDI KHOLA 100 GULMI AC 1992 ID 6 5 6 5 5 0 0 0 0 ADB/N YES ADB/N 3 GANDAKSAYAMURI 100 GULMI AC 1992 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 3 GANDAKTOTAL of ADB/N > GULMI > NEW 4 84 67 84 67 67 0 0 0 0

ADB/N>GULMI>REHABILITATIONDUMRE KHARKA 100 GULMI AC 1992 ID 16 13 16 13 13 0 0 0 0 ADB/N NO ADB/N 3 GANDAKJUMDI KHOLA 100 GULMI AC 1990 ID 30 24 30 24 24 0 0 0 0 ADB/N NO ADB/N 3 GANDAKTOTAL of ADB/N > GULMI > REHABILITATION 2 46 37 46 37 37 0 0 0 0

TOTAL of GULMI District 6 130 104 130 104 104 0 0 0 0

ADB/N>KASKI>NEWARUKHARKA 100 KASKI AC 1994 ID 7 6 7 6 6 0 0 0 0 ADB/N NO ADB/N 3 GANDAK

28

Page 34: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

DOBILA 100 KASKI AC 1996 ID 25 20 25 20 20 12 6 0 0 ADB/N YES ADB/N 3 GANDAKTOR KHOLA 100 KASKI AC 1995 ID 13 10 13 10 10 6 3 0 0 ADB/N YES ADB/N 3 GANDAKTOTAL of ADB/N > KASKI > NEW 3 45 36 45 36 36 18 9 0 0

ADB/N>KASKI>REHABILITATIONBISAUNA 100 KASKI AC 1992 ID 10 8 10 8 8 0 0 0 0 ADB/N NO ADB/N 3 GANDAKDHABKUNA 100 KASKI AC 1996 ID 15 12 15 12 12 7 3 0 0 ADB/N YES ADB/N 3 GANDAKGYAPUMAJUWAI 100 KASKI AC 1993 ID 9 7 9 7 7 0 0 0 0 ADB/N NO ADB/N 3 GANDAKMAUJA-3,KAVRE 100 KASKI AC 1992 ID 7 6 7 6 6 0 0 0 0 ADB/N NO ADB/N 3 GANDAKMAUJA-7BISAUNA 100 KASKI AC 1991 ID 9 7 9 7 7 0 0 0 0 ADB/N NO ADB/N 3 GANDAKTOTAL of ADB/N > KASKI > REHABILITATION 5 50 40 50 40 40 7 3 0 0

TOTAL of KASKI District 8 95 76 95 76 76 25 12 0 0

ADB/N>LAMJUNG>REHABILITATIONDHODSING 100 LAMJUNG AC 1990 ID 19 15 19 15 15 0 0 0 0 ADB/N YES ADB/N 3 GANDAKTOTAL of ADB/N > LAMJUNG > REHABILITATION 1 19 15 19 15 15 0 0 0 0

TOTAL of LAMJUNG District 1 19 15 19 15 15 0 0 0 0

ADB/N>MYAGDI>REHABILITATIONHANIYAJHAR 100 MYAGDI AC 1990 ID 16 13 16 13 13 0 0 0 0 ADB/N NO ADB/N 3 GADDAKTOTAL of ADB/N > MYAGDI > REHABILITATION 1 16 13 16 13 13 0 0 0 0

TOTAL of MYAGDI District 1 16 13 16 13 13 0 0 0 0

ADB/N>PALPA>REHABILITATIONCHIS TARI 100 PALPA AC 1992 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 3 GANDAKKARANDHI KHOLA 100 PALPA AC 1992 ID 18 14 18 14 14 0 0 0 0 ADB/N NO ADB/N 3 GANDAKKUKHUREDHAP 100 PALPA AC 1990 ID 33 26 33 26 26 0 0 0 0 ADB/N NO ADB/N 3 GANDAKSIMTADI KULO 100 PALPA AC 1995 ID 5 4 5 4 4 2 1 0 0 ADB/N YES ADB/N 3 GANDAKSISNE KHOLA 100 PALPA AC 1992 ID 7 6 7 6 6 0 0 0 0 ADB/N NO ADB/N 3 GANDAKSISNE KHOLA DOVAN 100 PALPA AC 1993 ID 25 20 25 20 20 0 0 0 0 ADB/N NO ADB/N 3 GANDAKTOTAL of ADB/N > PALPA > REHABILITATION 6 101 80 101 80 80 2 1 0 0

TOTAL of PALPA District 6 101 80 101 80 80 2 1 0 0

ADB/N>PARBAT>REHABILITATIONBAJUNG,BEDA KHET 100 PARBAT AC 1995 ID 20 16 20 16 16 10 5 0 0 ADB/N YES ADB/N 3 GANDAKLUNGDI KHOLA 100 PARBAT AC 1995 ID 48 38 48 38 38 22 10 0 0 ADB/N YES ADB/N 3 GANDAKTOTAL of ADB/N > PARBAT > REHABILITATION 2 68 54 68 54 54 32 15 0 0

TOTAL of PARBAT District 2 68 54 68 54 54 32 15 0 0

ADB/N>SYANGJA>NEWMAJHUWA 100 SYANGJA AC 1996 ID 9 7 9 7 7 4 2 0 0 ADB/N YES ADB/N 3 GANDAK

29

Page 35: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of ADB/N > SYANGJA > NEW 1 9 7 9 7 7 4 2 0 0

ADB/N>SYANGJA>REHABILITATIONAMBOTECHHINNEBAS 100 SYANGJA AC 1996 ID 20 16 20 16 16 9 4 0 0 ADB/N YES ADB/N 3 GANDAKKHORDI, CHANDIBHANJYAG 100 SYANGJA AC 1995 ID 11 9 11 9 9 5 2 0 0 ADB/N YES ADB/N 3 GANDAKMAJUWA 100 SYANGJA AC 1994 ID 23 18 23 18 18 0 0 0 0 ADB/N NO ADB/N 3 GANDAKTHULAKHEL 100 SYANGJA AC 1996 ID 11 9 11 9 9 5 2 0 0 ADB/N YES ADB/N 3 GANDAKTOTAL of ADB/N > SYANGJA > REHABILITATION 4 65 52 65 52 52 19 8 0 0

TOTAL of SYANGJA District 5 74 59 74 59 59 23 10 0 0

ADB/N>TANAHU>NEWSIUDENLANBU 100 TANAHU AC 1995 ID 19 15 19 15 15 9 4 0 0 ADB/N YES ADB/N 3 GANDAKTHULADHUNGE PLANT 100 TANAHU AC 1995 ID 6 5 6 5 5 3 1 0 0 ADB/N YES ADB/N 3 GANDAKTOTAL of ADB/N > TANAHU > NEW 2 25 20 25 20 20 12 5 0 0

ADB/N>TANAHU>REHABILITATIONBABGE KHOLA 100 TANAHU AC 1993 ID 11 9 11 9 9 0 0 0 0 ADB/N NO ADB/N 3 GANDAKBARAHA KHOLA 100 TANAHU AC 1993 ID 11 9 11 9 9 0 0 0 0 ADB/N NO ADB/N 3 GANDAKBARBANJYANG 100 TANAHU AC 1992 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 3 GANDAKTOTAL of ADB/N > TANAHU > REHABILITATION 3 35 28 35 28 28 0 0 0 0

TOTAL of TANAHU District 5 60 48 60 48 48 12 5 0 0

TOTAL of WESTERN >Hill 51 1050 838 1050 838 798 229 106 0 0

ADB/N>MUSTANG>REHABILITATIONMARPHA 100 MUSTANG AC 1996 ID 26 21 26 21 21 12 6 0 0 ADB/N YES ADB/N 3 GANDAKTOTAL of ADB/N > MUSTANG > REHABILITATION 1 26 21 26 21 21 12 6 0 0

TOTAL of MUSTANG District 1 26 21 26 21 21 12 6 0 0

TOTAL of WESTERN >Mountain 1 26 21 26 21 21 12 6 0 0

TOTAL of WESTERN Region 71 2966 2368 2966 2368 2202 467 175 0 0

ADB/N>BARDIYA>REHABILITATIONKALIGAUDI 100 BARDIYA AC 1992 ID 266 213 266 213 213 0 0 0 0 ADB/N NO ADB/N 5 BABAITOTAL of ADB/N > BARDIYA > REHABILITATION 1 266 213 266 213 213 0 0 0 0

TOTAL of BARDIYA District 1 266 213 266 213 213 0 0 0 0

ADB/N>DANG>NEWGANGDI 100 DANG AC 1995 ID 190 152 190 152 152 90 45 0 0 ADB/N YES ADB/N 5 BABAIRAMPURRSIMAL TAR 100 DANG AC 1995 ID 50 40 50 40 40 24 12 0 0 ADB/N YES ADB/N 5 BABAITOTAL of ADB/N > DANG > NEW 2 240 192 240 192 192 114 57 0 0

30

Page 36: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

ADB/N>DANG>REHABILITATIONAMBAPUR-1 100 DANG AC 1995 ID 81 65 81 65 65 39 19 0 0 ADB/N YES ADB/N 5 BABAIANIPUR 100 DANG AC 1994 ID 21 17 21 17 17 0 0 0 0 ADB/N NO ADB/N 5 BABAIBALIM KHOLA 100 DANG AC 1989 ID 316 253 316 253 253 0 0 0 0 ADB/N NO ADB/N 5 BABAIBHITTORIYA 100 DANG AC 1989 ID 100 80 100 80 80 0 0 0 0 ADB/N NO ADB/N 5 BABAIBULBULE 100 DANG AC 1989 ID 113 90 113 90 90 0 0 0 0 ADB/N NO ADB/N 5 BABAIGHORNETI 100 DANG AC 1994 ID 38 30 38 30 30 0 0 0 0 ADB/N NO ADB/N 5 BABAIGUMNAHA 100 DANG AC 1993 ID 125 100 125 100 100 0 0 0 0 ADB/N NO ADB/N 5 BABAIGWAR,RANIGAR KHOLA 100 DANG AC 1993 ED 484 387 484 387 387 0 0 0 0 ADB/N NO ADB/N 5 BABAIKANJUWAR 100 DANG AC 1989 ID 100 80 100 80 90 0 0 0 0 ADB/N NO ADB/N 5 BABAIKUMALGARHI 100 DANG AC 1989 ID 66 53 66 53 53 0 0 0 0 ADB/N NO ADB/N 5 BABAIMANIPUR11 100 DANG AC 1994 ID 75 60 75 60 60 0 0 0 0 ADB/N NO ADB/N 5 BABAIPARSADUWA 100 DANG AC 1995 ID 234 187 234 187 187 112 50 0 0 ADB/N YES ADB/N 5 BABAISALIWAN 100 DANG AC 1994 ID 26 21 26 21 26 0 0 0 0 ADB/N NO ADB/N 5 BABAISONPURNARTI 100 DANG AC 1994 ID 25 20 25 20 20 0 0 0 0 ADB/N NO ADB/N 5 BABAIUNERIA KHOLA 100 DANG AC 1995 ID 209 167 209 167 167 100 50 0 0 ADB/N YES ADB/N 5 BABAITOTAL of ADB/N > DANG > REHABILITATION 15 2013 1610 2013 1610 1625 251 119 0 0

TOTAL of DANG District 17 2253 1802 2253 1802 1817 365 176 0 0

TOTAL of MID-WESTERN >Terai 18 2519 2015 2519 2015 2030 365 176 0 0

ADB/N>JAJARKOT>REHABILITATIONCHHAYACHHATRA 100 JAJARKOT AC 1993 ID 6 5 6 5 5 0 0 0 0 ADB/N NO ADB/N 2 KARNALIGIME 100 JAJARKOT AC 1992 ID 44 35 44 35 35 0 0 0 0 ADB/N NO ADB/N 2 KARNALITOTAL of ADB/N > JAJARKOT > REHABILITATION 2 50 40 50 40 40 0 0 0 0

TOTAL of JAJARKOT District 2 50 40 50 40 40 0 0 0 0

ADB/N>PYUTHAN>REHABILITATIONDARBAN 100 PYUTHAN AC 1994 ID 100 80 100 80 80 0 0 0 0 ADB/N NO ADB/N 6 WEST RAPTIJARI KHOLA 100 PYUTHAN AC 1989 ID 125 100 125 100 100 0 0 0 0 ADB/N NO ADB/N 6 WEST RAPTIJHILIBANG 100 PYUTHAN AC 1991 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 6 WEST RAPTIKWEDI 100 PYUTHAN AC 1995 ID 81 65 81 65 65 39 18 0 0 ADB/N YES ADB/N 6 WEST RAPTITOTAL of ADB/N > PYUTHAN > REHABILITATION 4 319 255 319 255 255 39 18 0 0

TOTAL of PYUTHAN District 4 319 255 319 255 255 39 18 0 0

ADB/N>ROLPA>REHABILITATIONCHENETA 100 ROLPA AC 1992 ID 73 58 73 58 58 0 0 0 0 ADB/N NO ADB/N 6 WEST RAPTITOTAL of ADB/N > ROLPA > REHABILITATION 1 73 58 73 58 58 0 0 0 0

TOTAL of ROLPA District 1 73 58 73 58 58 0 0 0 0

ADB/N>SALYAN>REHABILITATION

31

Page 37: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

GHODAMARE 100 SALYAN AC 1989 ID 32 25 32 25 25 0 0 0 0 ADB/N NO ADB/N 5 BABAILAMAJULA 100 SALYAN AC 1995 ID 15 12 15 12 12 7 3 0 0 ADB/N YES ADB/N 5 BABAIPHALABANG 100 SALYAN AC 1995 ID 19 15 19 15 15 9 4 0 0 ADB/N YES ADB/N 5 BABAI TARI KULO 100 SALYAN AC 1995 ID 8 6 8 6 6 3 1 0 0 ADB/N YES ADB/N 5 BABAITATAKEBUDA 100 SALYAN AC 1995 ID 24 19 24 19 19 11 5 0 0 ADB/N YES ADB/N 5 BABAITRABENITAULERAHA 100 SALYAN AC 1995 ID 15 12 15 12 12 7 3 0 0 ADB/N YES ADB/N 5 BABAITRIBENI DADALUHAN 100 SALYAN AC 1995 ID 38 30 38 30 30 18 9 0 0 ADB/N YES ADB/N 5 BABAITOTAL of ADB/N > SALYAN > REHABILITATION 7 151 119 151 119 119 55 25 0 0

TOTAL of SALYAN District 7 151 119 151 119 119 55 25 0 0

ADB/N>SURKHET>NEWLUKAIGHORETO 100 SURKHET AC 1996 ID 11 9 11 9 9 5 2 0 0 ADB/N YES ADB/N 2 KARNALIMEL PANI 100 SURKHET AC 1996 ID 13 10 13 10 10 6 3 3 0 ADB/N YES ADB/N 2 KARNALITOTAL of ADB/N > SURKHET > NEW 2 24 19 24 19 19 11 5 3 0

ADB/N>SURKHET>REHABILITATIONGOCHE KHOLA 100 SURKHET AC 1992 ID 14 11 14 11 11 0 0 0 0 ADB/N NO ADB/N 2 KARNALIMALARANI 100 SURKHET AC 1994 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 2 KARNALISIDHHAPUR 100 SURKHET AC 1996 ID 19 15 19 15 15 9 4 0 0 ADB/N YES ADB/N 2 KARNALITOTAL of ADB/N > SURKHET > REHABILITATION 3 52 41 52 41 41 9 4 0 0

TOTAL of SURKHET District 5 76 60 76 60 60 20 9 3 0

TOTAL of MID-WESTERN >Hill 19 669 532 669 532 532 114 52 3 0

TOTAL of MID-WESTERN Region 37 3188 2547 3188 2547 2562 479 228 3 0

ADB/N>KAILALI>REHABILITATIONJARUWA 100 KAILALI AC 1990 ID 50 40 50 40 40 0 0 0 0 ADB/N NO ADB/N 2 KARNALIKALI NALA 100 KAILALI AC 1992 ID 25 20 25 20 20 0 0 0 0 ADB/N NO ADB/N 2 KARNALITOTAL of ADB/N > KAILALI > REHABILITATION 2 75 60 75 60 60 0 0 0 0

TOTAL of KAILALI District 2 75 60 75 60 60 0 0 0 0

ADB/N>KANCHANPUR>NEWADB/N>KANCHANPUR>NEW 100 KANCHANPUR AC 1992 ID 79 63 79 63 63 0 0 0 0 ADB/N NO ADB/N 1 MAHAKALITATO PANI 100 KANCHANPUR AC 1992 ID 50 40 50 40 40 0 0 0 0 ADB/N NO ADB/N 1 MAHAKALITOTAL of ADB/N > KANCHANPUR > NEW 2 129 103 129 103 103 0 0 0 0

ADB/N>KANCHANPUR>REHABILITATIONSIDHINATH 100 KANCHANPUR AC 1993 ID 44 35 44 35 35 0 0 0 0 ADB/N NO ADB/N 1 MAHAKALITOTAL of ADB/N > KANCHANPUR > REHABILITATION 1 44 35 44 35 35 0 0 0 0

TOTAL of KANCHANPUR District 3 173 138 173 138 138 0 0 0 0

32

Page 38: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of FAR-WESTERN >Terai 5 248 198 248 198 198 0 0 0 0

ADB/N>ACHHAM>NEWAGALI KHOLA 100 ACHHAM AC 1995 ID 13 10 13 10 10 6 3 0 0 ADB/N YES ADB/N 2 KARNALIHATIKOT 100 ACHHAM AC 1994 ID 8 6 8 6 6 0 0 0 0 ADB/N NO ADB/N 2 KANALIJANALIMUNGRA 100 ACHHAM AC 1994 ID 25 20 25 20 20 0 0 0 0 ADB/N NO ADB/N 2 KARNALIKABADI KHOLA 100 ACHHAM AC 1995 ID 94 75 94 75 75 45 22 0 0 ADB/N YES ADB/N 2 KARNALIPAIRA KHOLA 100 ACHHAM AC 1996 ID 9 7 9 7 7 4 4 0 0 ADB/N YES ADB/N 2 KARNALISIMTOLA 100 ACHHAM AC 1996 ID 19 15 19 15 15 9 4 0 0 ADB/N YES ADB/N 2 KARNALITOTAL of ADB/N > ACHHAM > NEW 6 168 133 168 133 133 64 33 0 0

TOTAL of ACHHAM District 6 168 133 168 133 133 64 33 0 0

ADB/N>BAITADI>NEWHATRANGA 100 BAITADI AC 1996 ID 38 30 38 30 30 18 9 0 0 ADB/N YES ADB/N 1 MAHAKALITOTAL of ADB/N > BAITADI > NEW 1 38 30 38 30 30 18 9 0 0

ADB/N>BAITADI>REHABILITATIONSANTOSHI KULO 100 BAITADI AC 1994 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 1 MAHAKALISORADI CHOUR 100 BAITADI AC 1994 ID 6 5 6 5 5 0 0 0 0 ADB/N NO ADB/N 1 MAHAKALIUPALLOBATULLA 100 BAITADI AC 1994 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 1 MAHAKALITOTAL of ADB/N > BAITADI > REHABILITATION 3 32 25 32 25 25 0 0 0 0

TOTAL of BAITADI District 4 70 55 70 55 55 18 9 0 0

ADB/N>DADELDHURA>NEWNAWADURGA 100 DADELDHURA AC 1996 ID 9 7 9 7 7 4 2 0 0 ADB/N YES ADB/N 1 MAHAKALITOTAL of ADB/N > DADELDHURA > NEW 1 9 7 9 7 7 4 2 0 0

ADB/N>DADELDHURA>REHABILITATIONGHATIGARD 100 DADELDHURA AC 1996 ID 9 7 9 7 7 4 2 0 0 ADB/N YES ADB/N 1 MAHAKALINAWADURGA 100 DADELDHURA AC 1993 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 1 MAHAKALITOTAL of ADB/N > DADELDHURA > REHABILITATION 2 22 17 22 17 17 4 2 0 0

TOTAL of DADELDHURA District 3 31 24 31 24 24 8 4 0 0

TOTAL of FAR-WESTERN >Hill 13 269 212 269 212 212 90 46 0 0

ADB/N>DARCHULA>NEWFARSHI KHOLA 100 DARCHULA AC 1995 ID 15 12 15 12 12 7 3 0 0 ADB/N YES ADB/N 1 MAHAKALIPATAPALI 100 DARCHULA AC 1995 ID 13 10 13 10 10 6 3 0 0 ADB/N YES ADB/N 1 MAHAKALITOTAL of ADB/N > DARCHULA > NEW 2 28 22 28 22 22 13 6 0 0

TOTAL of DARCHULA District 2 28 22 28 22 22 13 6 0 0

TOTAL of FAR-WESTERN >Mountain 2 28 22 28 22 22 13 6 0 0

33

Page 39: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of FAR-WESTERN Region 20 545 432 545 432 432 103 52 0 0

TOTAL of ADB/N 352 21178 16957 21174 16912 16631 2601 1124 3 0

AGRIL>MORANG>REHABILITATIONCHIRADHAR 100 MORANG AC 125 100 125 100 100 0 0 0 0 AGRIL NO GoN 12 SIWALIK RIVERKAJALA 100 MORANG AC 288 230 288 230 230 0 0 0 0 AGRIL NO GoN 12 SIWALIK RIVERTOTAL of AGRIL > MORANG > REHABILITATION 2 413 330 413 330 330 0 0 0 0

TOTAL of MORANG District 2 413 330 413 330 330 0 0 0 0

AGRIL>SUNSARI>REHABILITATIONBAJH GADHA 100 SUNSARI AC 187 150 187 150 150 0 0 0 0 AGRIL NO GoN 12 SIWALIK RIVERTOTAL of AGRIL > SUNSARI > REHABILITATION 1 187 150 187 150 150 0 0 0 0

TOTAL of SUNSARI District 1 187 150 187 150 150 0 0 0 0

TOTAL of EASTERN > Terai 3 600 480 600 480 480 0 0 0 0

TOTAL of EASTERN Region 3 600 480 600 480 480 0 0 0 0

AGRIL>LAMJUNG>REHABILITATIONSATRASAI KULO 100 LAMJUNG AC 75 60 75 60 60 0 0 0 0 AGRIL NO GoN 3 GANDAKTOTAL of AGRIL > LAMJUNG > REHABILITATION 1 75 60 75 60 60 0 0 0 0

TOTAL of LAMJUNG District 1 75 60 75 60 60 0 0 0 0

TOTAL of WESTERN >Hill 1 75 60 75 60 60 0 0 0 0

TOTAL of WESTERN Region 1 75 60 75 60 60 0 0 0 0

AGRIL>PYUTHAN>REHABILITATIONBIJULI BIRAULLA 100 PYUTHAN AC 75 60 75 60 60 0 0 0 0 AGRIL NO GoN 6 WEST RAPTITOTAL of AGRIL > PYUTHAN > REHABILITATION 1 75 60 75 60 60 0 0 0 0

TOTAL of PYUTHAN District 1 75 60 75 60 60 0 0 0 0

TOTAL of MID WESTERN >Hill 1 75 60 75 60 60 0 0 0 0

TOTAL of MID WESTERN Region 1 75 60 75 60 60 0 0 0 0

TOTAL of AGRIL 5 750 600 750 600 600 0 0 0 0

DIDP>BAGLUNG>NEWCHISTI 100 BAGLUNG AC 1996 YR ID 63 50 63 50 50 50 25 0 0 DIDP NO DANIDA 3 GANDAK

34

Page 40: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

HARI CHAUR 100 BAGLUNG AC 1996 YR ID 81 65 81 65 65 65 30 0 0 DIDP NO DANIDA 3 GANDAKLEKHANI 100 BAGLUNG AC 1996 YR ID 82 69 82 69 69 69 30 0 0 DIDP YES DANIDA 3 GANDAKMASALGAUN 100 BAGLUNG PC 1997 YR ID 50 40 50 40 40 30 20 0 0 DIDP NO DANIDA 3 GANDAKTOTAL of DIDP > BAGLUNG > NEW 4 276 224 276 224 224 214 105 0 0

DIDP>BAGLUNG>REHABILITATIONAMALCHUR 100 BAGLUNG AC 1993 YR ID 44 35 44 35 35 30 0 0 0 DIDP NO DANIDA 3 GANDAKARDJEWA 100 BAGLUNG AC 1994 YR ID 25 20 25 20 20 20 0 0 0 DIDP NO DANIDA 3 GANDAKBHINGITHE 100 BAGLUNG AC 1994 YR ID 40 32 40 32 32 32 0 0 0 DIDP NO DANIDA 3 GANDAKBIHU 100 BAGLUNG AC 1996 YR ID 13 10 13 10 10 10 5 0 0 DIDP NO DANIDA 3 GANDAKBUDHATHOK 100 BAGLUNG AC 1996 YR ID 25 20 25 20 20 20 15 0 0 DIDP NO DANIDA 3 GANDAKGWALI CHAUR 100 BAGLUNG AC 1994 YR ID 56 45 56 45 45 45 0 0 0 DIDP NO DANIDA 3 GANDAKHARAPATA 100 BAGLUNG AC 1995 YR ID 13 10 13 10 10 10 5 0 0 DIDP YES DANIDA 3 GANDAKHUGDISIR 100 BAGLUNG AC 1993 YR ID 11 9 11 9 9 9 0 0 0 DIDP NO DANIDA 3 GANDAKKUDLEPANGRA KHOLA 100 BAGLUNG AC 1996 YR ID 19 15 19 15 15 15 10 0 0 DIDP NO DANIDA 3 GANDAKKUIDANGTANK 100 BAGLUNG AC 1993 YR ID 14 11 14 11 11 11 0 0 0 DIDP NO DANIDA 3 GANDAKKUSI GAON 100 BAGLUNG AC 1994 YR ID 10 8 10 8 8 6 0 0 0 DIDP NO DANIDA 3 GANDAKKUSMISERA 100 BAGLUNG AC 1994 YR ID 37 30 37 30 30 30 0 0 0 DIDP NO DANIDA 3 GANDAKNARAYANSTHA 100 BAGLUNG AC 1993 YR ID 25 20 25 20 20 16 0 0 0 DIDP NO DANIDA 3 GANDAKHULUWA 100 BAGLUNG AC 1995 YR ID 21 17 21 17 17 17 10 0 0 DIDP YES DANIDA 3 GANDAKTOTAL of DIDP > BAGLUNG > REHABILITATION 14 353 282 353 282 282 271 45 0 0

TOTAL of BAGLUNG District 18 629 506 629 506 506 485 150 0 0

DIDP>MYAGDI>NEWARMAN 100 MYAGDI AC 1996 YR ID 59 47 59 47 47 47 30 0 0 DIDP NO DANIDA 3 GANDAKBAGAR PHANT 100 MYAGDI AC 1993 YR ID 31 25 31 25 25 15 0 0 0 DIDP NO DANIDA 3 GANDAKBHEDOKHOR 100 MYAGDI AC 1995 YR ID 50 40 50 40 40 40 20 0 0 DIDP YES DANIDA 3 GANDAKPAKHU 100 MYAGDI AC 1994 YR ID 32 25 32 25 25 10 0 0 0 DIDP NO DANIDA 3 GANDAKPOKA PHANT 100 MYAGDI AC 1995 YR ID 29 23 29 23 23 23 10 0 0 DIDP YES DANIDA 3 GANDAKTOTAL of DIDP > MYAGDI > NEW 5 201 160 201 160 160 135 60 0 0

DIDP>MYAGDI>REHABILITATIONBABIYR CHAUR 100 MYAGDI AC 1992 YR ID 31 25 31 25 25 25 0 0 0 DIDP NO DANIDA 3 GANDAKCHHISWANG 100 MYAGDI AC 1993 YR ID 24 19 24 19 19 19 0 0 0 DIDP NO DANIDA 3 GANDAKKASKERI 100 MYAGDI AC 1993 YR ID 29 23 29 23 23 23 0 0 0 DIDP NO DANIDA 3 GANDAKKAWETETUSARE PANI 100 MYAGDI AC 1994 YR ID 50 40 50 40 40 40 0 0 0 DIDP NO DANIDA 3 GANDAKKHAR PANI 100 MYAGDI AC 1993 YR ID 18 14 18 14 14 14 0 0 0 DIDP NO DANIDA 3 GANDAKPIPALBOT 100 MYAGDI AC 1993 YR ID 39 31 39 31 31 31 0 0 0 DIDP NO DANIDA 3 GANDAKRANBANG 100 MYAGDI AC 1992 YR ID 75 60 75 60 60 60 0 0 0 DIDP NO DANIDA 3 GANDAKRATNE CHAUR KULO 100 MYAGDI AC 1996 YR ID 31 25 31 25 25 25 10 0 0 DIDP NO DANIDA 3 GANDAKRATNE CHOUR KULO 100 MYAGDI AC 1996 YR ID 31 25 31 25 25 25 10 0 0 DIDP NO DANIDA 3 GANDAKSERA PHAT 100 MYAGDI AC 1992 YR ID 19 15 19 15 15 15 0 0 0 DIDP NO DANIDA 3 GANDAKTATO PANI 100 MYAGDI AC 1894 YR ID 35 28 35 28 28 28 0 0 0 DIDP NO DANIDA 3 GANDAKTOTAL of DIDP > MYAGDI > REHABILITATION 11 382 305 382 305 305 305 20 0 0

35

Page 41: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of MYAGDI District 16 583 465 583 465 465 440 80 0 0

DIDP>PARBAT>NEWANYA CHAUR 100 PARBAT AC 1993 YR ID 13 10 13 10 10 10 0 0 0 DIDP NO DANIDA 3 GANDAKCHARKANG 100 PARBAT AC 1996 YR ID 50 40 50 40 40 40 20 0 0 DIDP NO DANIDA 3 GANDAKMARANGSING 100 PARBAT AC 1994 YR ID 32 18 32 18 18 18 0 0 0 DIDP NO DANIDA 3 GANDAKRATOCHAUKA 100 PARBAT AC 1994 YR ID 15 12 15 12 12 10 0 0 0 DIDP NO DANIDA 3 GANDAKTOTAL of DIDP > PARBAT > NEW 4 110 80 110 80 80 78 20 0 0

DIDP>PARBAT>REHABILITATIONBACHHA KHOLA 100 PARBAT AC 1994 YR ID 63 50 63 50 50 50 0 0 0 DIDP NO DANIDA 3 GANDAKBHURTULA 100 PARBAT AC 1993 YR ID 13 10 13 10 10 10 0 0 0 DIDP NO DANIDA 3 GANDAKDANABAGAR 100 PARBAT AC 1995 YR ID 13 10 13 10 10 10 5 0 0 DIDP YES DANIDA 3 GANDAKDHAIRING 100 PARBAT PC 1997 YR ID 53 42 0 0 0 0 0 53 42 DIDP NO DANIDA 3 GANDAKJAHARE 100 PARBAT AC 1992 YR ID 75 60 75 60 60 60 0 0 0 DIDP NO DANIDA 3 GANDAKKARNASPANGARANG 100 PARBAT AC 1994 YR ID 41 33 41 33 33 33 0 0 0 DIDP NO DANIDA 3 GANDAKKHURKOTPANG 100 PARBAT AC 1995 YR ID 125 100 125 100 100 100 60 0 0 DIDP YES DANIDA 3 GANDAKKURGHA 100 PARBAT AC 1993 YR ID 100 80 100 80 80 40 0 0 0 DIDP NO DANIDA 3 GANDAKLAMAPATA 100 PARBAT AC 1993 YR ID 38 30 38 30 30 20 0 0 0 DIDP NO DANIDA 3 GANDAKPARAL KHOLA 100 PARBAT AC 1996 YR ID 44 35 44 35 35 35 20 0 0 DIDP NO DANIDA 3 GANDAKPIPAL TARI 100 PARBAT AC 1996 YR ID 25 20 25 20 20 20 10 0 0 DIDP NO DANIDA 3 GANDAKSETO PHAT 100 PARBAT AC 1993 YR ID 25 20 25 20 20 20 0 0 0 DIDP NO DANIDA 3 GANDAKSIUDI KULO 100 PARBAT AC 1996 YR ID 25 20 25 20 20 20 10 0 0 DIDP NO DANIDA 3 GANDAKSUN TARI 100 PARBAT AC 1992 YR ID 10 8 10 8 8 4 0 0 0 DIDP NO DANIDA 3 GANDAKTOTAL of DIDP > PARBAT > REHABILITATION 14 650 518 597 476 476 422 105 53 42

TOTAL of PARBAT District 18 760 598 707 556 556 500 125 53 42

TOTAL of WESTERN >Hill 52 1972 1569 1919 1527 1527 1425 355 53 42

DIDP>MUSTANG>NEWNAURIKOT 100 MUSTANG AC 1992 YR ID 69 55 69 55 55 0 0 0 0 DIDP NO DANIDA 3 GANDAKTOTAL of DIDP > MUSTANG > NEW 1 69 55 69 55 55 0 0 0 0

DIDP>MUSTANG>REHABILITATIONCHARANG 100 MUSTANG AC 1996 YR ID 94 75 94 75 75 0 0 0 0 DIDP NO DANIDA 3 GANDAKCHHAIRO 100 MUSTANG AC 1993 YR ID 20 16 20 16 16 0 0 0 0 DIDP NO DANIDA 3 GANDAKDHAKMAR 100 MUSTANG AC 1996 YR ID 88 70 88 70 70 0 0 0 0 DIDP NO DANIDA 3 GANDAKGHAMI 100 MUSTANG AC 1995 YR ID 100 80 100 80 80 0 0 0 0 DIDP YES DANIDA 3 GANDAKHELKU DHITAP 100 MUSTANG AC 1993 YR ID 62 45 62 45 45 0 0 0 0 DIDP NO DANIDA 3 GANDAKLOMANGHTHANG 100 MUSTANG AC 1995 YR ID 88 70 88 70 70 0 0 0 0 DIDP YES DANIDA 3 GANDAKMARANG 100 MUSTANG AC 1994 YR ID 100 80 100 80 80 0 0 0 0 DIDP NO DANIDA 3 GANDAKPHUWA 100 MUSTANG AC 1996 YR ID 25 20 25 20 20 0 0 0 0 DIDP NO DANIDA 3 GANDAKSAURU PHANT 100 MUSTANG AC 1995 YR ID 23 18 23 18 18 0 0 0 0 DIDP YES DANIDA 3 GANDAKSYANG 100 MUSTANG AC 1993 YR ID 88 70 88 70 70 0 0 0 0 DIDP NO DANIDA 3 GANDAKTHIMINI 100 MUSTANG AC 1993 YR ID 52 42 52 42 42 0 0 0 0 DIDP NO DANIDA 3 GANDAK

36

Page 42: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TIRI 100 MUSTANG AC 1993 YR ID 14 11 14 11 11 0 0 0 0 DIDP NO DANIDA 3 GANDAKTOTAL of DIDP > MUSTANG > REHABILITATION 12 754 597 754 597 597 0 0 0 0

TOTAL of MUSTANG District 13 823 652 823 652 652 0 0 0 0

TOTAL of WESTERN >Mountain 13 823 652 823 652 652 0 0 0 0

TOTAL of WESTERN Region 65 2795 2221 2742 2179 2179 1425 355 53 42

TOTAL of DIDP 65 2795 2221 2742 2179 2179 1425 355 53 42

DOI>JHAPA>REHABILITATIONGHAGARA 100 JHAPA AC 1993 MS ID 94 75 94 75 75 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERTELIA KHOLA DHARAMPUR 100 JHAPA AC 1989 YR ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERTOTAL of DOI > JHAPA > REHABILITATION 2 157 125 157 125 125 0 0 0 0

TOTAL of JHAPA District 2 157 125 157 125 125 0 0 0 0

DOI>MORANG>REHABILITATIONDAMEHAT 100 MORANG AC 1990 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERDANS KHOLA 100 MORANG AC 1992 MS ID 75 60 75 60 60 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERDANYA 100 MORANG AC 1990 MS ID 94 75 94 75 75 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERKARONG 100 MORANG AC 1990 MS ID 200 160 200 160 160 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERKHADERALLADIYA 100 MORANG AC 1989 MS ID 125 100 125 100 125 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERKHADOM KHOLA 100 MORANG AC 1990 MS ID 255 204 255 204 204 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERKHANDAM KHOLA 100 MORANG AC 1989 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERRAT BANDH 100 MORANG AC 1990 MS ID 150 120 150 120 120 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERSAKRAKATHAHARII 100 MORANG AC 1990 MS ID 88 70 88 70 70 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERTATANARIYA 100 MORANG AC 1990 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERTELI KHOLA 100 MORANG AC 1992 MS ID 138 110 138 110 110 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERTOTAL of DOI > MORANG > REHABILITATION 11 1500 1199 1500 1199 1224 0 0 0 0

TOTAL of MORANG District 11 1500 1199 1500 1199 1224 0 0 0 0

DOI>SAPTARI>REHABILITATIONKHURARIYA 100 SAPTARI AC 1992 MS DOI 200 160 200 160 160 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERTOTAL of DOI > SAPTARI > REHABILITATION 1 200 160 200 160 160 0 0 0 0

TOTAL of SAPTARI District 1 200 160 200 160 160 0 0 0 0

DOI>SUNSARI>REHABILITATIONGARUN KHOLA 100 SUNSARI AC 1989 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER PHATAUDHERA KHOLA 100 SUNSARI AC 1989 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERTOTAL of DOI > SUNSARI > REHABILITATION 2 250 200 250 200 200 0 0 0 0

TOTAL of SUNSARI District 2 250 200 250 200 200 0 0 0 0

37

Page 43: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of EASTERN > Terai 16 2107 1684 2107 1684 1709 0 0 0 0

DOI>BHOJPUR>REHABILITATIONARUNODAYA KULO 100 BHOJPUR AC 1993 MS ID 150 120 150 120 120 0 0 0 0 DOI NO GoN 4 KOSHICHAUKI DADA 100 BHOJPUR AC 1990 MS ID 44 35 44 35 44 0 0 0 0 DOI NO GoN 4 KOSHIDOSADE KHOLA 100 BHOJPUR AC 1989 YR ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 4 KOSHIKISHAN KULO 100 BHOJPUR AC 1990 MS ID 18 15 18 15 15 0 0 0 0 DOI NO GoN 4 KOSHISINDRANG 100 BHOJPUR AC 1990 MS ID 50 40 50 40 40 0 0 0 0 DOI NO GoN 4 KOSHIYAKU KULO 100 BHOJPUR AC 1993 MS ID 75 60 75 60 60 0 0 0 0 DOI NO GoN 4 KOSHIYANGTANG 100 BHOJPUR AC 1989 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 4 KOSHIARUNODAYA KULO 100 BHOJPUR AC 1989 MS ID 19 15 19 15 15 0 0 0 0 DOI NO GoN 4 KOSHITOTAL of DOI > BHOJPUR > REHABILITATION 8 482 385 482 385 394 0 0 0 0

TOTAL of BHOJPUR District 8 482 385 482 385 394 0 0 0 0

DOI>DHANKUTA>REHABILITATIONAMBOTE 100 DHANKUTA AC 1991 MS ID 21 17 21 17 17 0 0 0 0 DOI NO GoN 4 KOSHIBITENDRA 100 DHANKUTA AC 1990 MS ID 4 3 4 3 3 0 0 0 0 DOI NO GoN 4 KOSHIBODHE 100 DHANKUTA AC 1991 MS ID 26 21 26 21 21 0 0 0 0 DOI NO GoN 4 KOSHICHHARUWAFARM 100 DHANKUTA AC 1989 MS ID 88 70 88 70 70 0 0 0 0 DOI NO GoN 4 KOSHIDENJ 100 DHANKUTA AC 1990 MS ID 31 25 31 25 25 0 0 0 0 DOI NO GoN 4 KOSHIHANSAMORANG 100 DHANKUTA AC 1992 MS ID 25 20 25 20 20 0 0 0 0 DOI NO GoN 4 KOSHIKEWA KHOLA 100 DHANKUTA AC 1991 MS ID 89 71 89 71 71 0 0 0 0 DOI NO GoN 4 KOSHILAMI TAR 100 DHANKUTA AC 1993 MS ID 23 18 23 18 18 0 0 0 0 DOI NO GoN 4 KOSHILEGUWA 100 DHANKUTA AC 1990 MS ID 30 24 30 24 24 0 0 0 0 DOI NO GoN 4 KOSHILEWATI KHOLA 100 DHANKUTA AC 1990 MS ID 31 25 31 25 25 0 0 0 0 DOI NO GoN 4 KOSHIMADIPUNG 100 DHANKUTA AC 1989 YR ID 19 15 19 15 15 0 0 0 0 DOI NO GoN 4 KOSHIMASIM TAR 100 DHANKUTA AC 1990 MS ID 31 25 31 25 25 0 0 0 0 DOI NO GoN 4 KOSHINIBUWAKHOLE 100 DHANKUTA AC 1989 YR ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 4 KOSHIPHALAME TAR 100 DHANKUTA AC 1989 YR ID 19 15 19 15 15 0 0 0 0 DOI NO GoN 4 KOSHIPHALM TAR 100 DHANKUTA AC 1990 MS ID 25 20 25 20 20 0 0 0 0 DOI NO GoN 4 KOSHIPIPALE 100 DHANKUTA AC 1989 YR ID 189 150 189 150 150 0 0 0 0 DOI NO GoN 4 KOSHIRAJAIYA 100 DHANKUTA AC 1992 MS ID 44 35 44 35 35 0 0 0 0 DOI NO GoN 4 KOSHITATO PANI TAR 100 DHANKUTA AC 1991 MS ID 106 85 106 85 85 0 0 0 0 DOI NO GoN 4 KOSHITOTAL of DOI > DHANKUTA > REHABILITATION 18 864 689 864 689 689 0 0 0 0

TOTAL of DHANKUTA District 18 864 689 864 689 689 0 0 0 0

DOI>ILAM>REHABILITATIONGODAKSETI BESI1.2.3 100 ILAM AC 1989 MS ID 100 80 100 80 80 0 0 0 0 DOI NO GoN 11 KOSHIHILEE KHOLA 100 ILAM AC 1993 MS ID 156 125 156 125 125 0 0 0 0 DOI NO GoN 11 KOSHITOTAL of DOI > ILAM > REHABILITATION 2 256 205 256 205 205 0 0 0 0

TOTAL of ILAM District 2 256 205 256 205 205 0 0 0 0

38

Page 44: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

DOI>KHOTANG>REHABILITATIONCHHORAMBU KULO 100 KHOTANG AC 1989 YR ID 94 75 94 75 75 0 0 0 0 DOI NO GoN 4 KOSHIDARPAFARM 100 KHOTANG AC 1989 YR ID 100 80 100 80 80 0 0 0 0 DOI NO GoN 4 KOSHIKAMTILIFARM 100 KHOTANG AC 1989 YR ID 38 30 38 30 30 0 0 0 0 DOI NO GoN 4 KOSHIREKAR KHET 100 KHOTANG AC 1989 YR ID 38 30 38 30 30 0 0 0 0 DOI NO GoN 4 KOSHISAWAKATAHARE KULO 100 KHOTANG AC 1989 YR ID 100 80 100 80 80 0 0 0 0 DOI NO GoN 4 KOSHITABA KHOLA 100 KHOTANG AC 1989 YR ID 25 20 25 20 20 0 0 0 0 DOI NO GoN 4 KOSHITHI KUWA KHOLA 100 KHOTANG AC 1989 YR ID 25 20 25 20 20 0 0 0 0 DOI NO GoN 4 KOSHITOTAL of DOI > KHOTANG > REHABILITATION 7 420 335 420 335 335 0 0 0 0

TOTAL of KHOTANG District 7 420 335 420 335 335 0 0 0 0

DOI>OKHALDHUNGA>REHABILITATIONDEVT TAR 100 OKHALDHUNGA AC 1989 MS ID 21 17 21 17 17 0 0 0 0 DOI NO GoN 4 KOSHIGAMNANG TAR 100 OKHALDHUNGA AC 1989 MS ID 100 80 100 80 80 0 0 0 0 DOI NO GoN 4 KOSHIGHARTI GAONKAPHALBOTE 100 OKHALDHUNGA AC 1990 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 4 KOSHIMANIKHA 100 OKHALDHUNGA AC 1991 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 4 KOSHIPHEDIGUT 100 OKHALDHUNGA AC 1989 MS ID 68 54 68 54 54 0 0 0 0 DOI NO GoN 4 KOSHIRAGANI KULO 100 OKHALDHUNGA AC 1989 MS ID 38 30 38 30 30 0 0 0 0 DOI NO GoN 4 KOSHIRANGADIP 100 OKHALDHUNGA AC 1992 MS ID 31 25 31 25 25 0 0 0 0 DOI NO GoN 4 KOSHISRI CHAUR 100 OKHALDHUNGA AC 1992 MS ID 100 80 100 80 80 0 0 0 0 DOI NO GoN 4 KOSHITOTAL of DOI > OKHALDHUNGA > REHABILITATION 8 484 386 484 386 386 0 0 0 0

TOTAL of OKHALDHUNGA District 8 484 386 484 386 386 0 0 0 0

DOI>PANCHTHAR>REHABILITATIONLIMBA 100 PANCHTHAR AC 1989 MS ID 38 30 38 30 30 0 0 0 0 DOI NO GoN 4 KOSHISABASERO KULO 100 PANCHTHAR AC 1989 MD ID 25 20 25 20 20 0 0 0 0 DOI NO GoN 4 KOSHITOTAL of DOI > PANCHTHAR > REHABILITATION 2 63 50 63 50 50 0 0 0 0

TOTAL of PANCHTHAR District 2 63 50 63 50 50 0 0 0 0

DOI>TERATHUM>REHABILITATIONHIGUWA 100 TERATHUM AC 1990 YR ID 96 71 96 71 71 0 0 0 0 DOI NO GoN 4 KOSHIPHUGUWA KHOLA 100 TERATHUM AC 1992 YR ED 125 100 125 100 100 38 0 0 0 DOI NO GoN 4 KOSHITOTAL of DOI > TERATHUM > REHABILITATION 2 221 171 221 171 171 38 0 0 0

TOTAL of TERATHUM District 2 221 171 221 171 171 38 0 0 0

DOI>UDAYPUR>REHABILITATIONBAN KHOLA 100 UDAYPUR AC 1989 YR ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 4 KOSHIBHARLE KHOLA 100 UDAYPUR AC 1989 YR ID 13 10 13 10 10 0 0 0 0 DOI NO GoN 4 KOSHICHHORANGA 100 UDAYPUR AC 1989 MS ID 24 19 24 19 19 0 0 0 0 DOI NO GoN 4 KOSHIGAL TAR 100 UDAYPUR AC 1989 YR ID 13 10 13 10 10 0 0 0 0 DOI NO GoN 4 KOSHIGHORAUNA 100 UDAYPUR AC 1992 MS ID 24 19 24 19 19 0 0 0 0 DOI NO GoN 4 KOSHIKA TARIFARM 100 UDAYPUR AC 1989 YR ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 4 KOSHI

39

Page 45: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

KATERI 100 UDAYPUR AC 1990 MS ID 31 31 31 31 31 0 0 0 0 DOI NO GoN 4 KOSHIRU PANI KHOLA 100 UDAYPUR AC 1992 MS ID 31 25 31 25 25 0 0 0 0 DOI NO GoN 4 KOSHISUKHASUNDARI 100 UDAYPUR AC 1992 MS ID 31 25 31 25 25 0 0 0 0 DOI NO GoN 4 KOSHITAWAKHOLE 100 UDAYPUR AC 1989 YR ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 4 KOSHIMURKUMCHI 100 UDAYPUR AC 1989 YR ID 63 50 63 50 50 12 0 0 0 DOI NO GoN 4 KOSHITOTAL of DOI > UDAYPUR > REHABILITATION 11 481 389 481 389 389 12 0 0 0

TOTAL of UDAYPUR District 11 481 389 481 389 389 12 0 0 0

TOTAL of EASTERN > Hill 58 3271 2610 3271 2610 2619 50 0 0 0

DOI>SANKHUWASABHA>REHABILITATIONAKHIBHUE 100 SANKHUWASABHA AC 1990 MS ID 13 10 13 10 10 0 0 0 0 DOI NO GoN 4 KOSHIDHUPA 100 SANKHUWASABHA AC 1990 MS ID 38 30 38 30 30 0 0 0 0 DOI NO GoN 4 KOSHILAHACHUG 100 SANKHUWASABHA AC 1989 YR ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 4 KOSHIMADIMULKHARKA 100 SANKHUWASABHA AC 1990 MS ID 38 30 38 30 30 0 0 0 0 DOI NO GoN 4 KOSHIMADIRAMBENI 100 SANKHUWASABHA AC 1990 MS ID 14 11 14 11 11 0 0 0 0 DOI NO GoN 4 KOSHIMAWADIN 100 SANKHUWASABHA AC 1990 MS ID 156 125 156 125 125 0 0 0 0 DOI NO GoN 4 KOSHINEWMADIMULKHARKA 100 SANKHUWASABHA AC 1990 MS ED 13 10 13 10 10 0 0 0 0 DOI NO GoN 4 KOSHINUNDHALI 100 SANKHUWASABHA AC 1989 YR ID 19 15 19 15 15 0 0 0 0 DOI NO GoN 4 KOSHIPAGMARAJ KULO 100 SANKHUWASABHA AC 1991 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 4 KOSHISIDHAKALI 100 SANKHUWASABHA AC 1992 MS ID 33 26 33 26 26 0 0 0 0 DOI NO GoN 4 KOSHISYALE BESI 100 SANKHUWASABHA AC 1989 YR ID 38 30 38 30 30 0 0 0 0 DOI NO GoN 4 KOSHISYAMUN 100 SANKHUWASABHA AC 1990 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 4 KOSHITOTAL of DOI > SANKHUWASABHA > REHABILITATION 12 675 537 675 537 537 0 0 0 0

TOTAL of SANKHUWASABHA District 12 675 537 675 537 537 0 0 0 0

DOI>SOLUKHUMBU>REHABILITATIONBHUNBHUWA 100 SOLUKHUMBU AC 1990 MS ID 106 85 106 85 85 0 0 0 0 DOI NO GoN 4 KOSHIKHAHARE KHOLA 100 SOLUKHUMBU AC 1992 MS ID 144 115 144 115 115 0 0 0 0 DOI NO GoN 4 KOSHISIKU KHOLA 100 SOLUKHUMBU AC 1991 YR ID 150 120 150 120 120 0 0 0 0 DOI NO GoN 4 KOSHITOTAL of DOI > SOLUKHUMBU > REHABILITATION 3 400 320 400 320 320 0 0 0 0

TOTAL of SOLUKHUMBU District 3 400 320 400 320 320 0 0 0 0

TOTAL of EASTERN > Mountain 15 1075 857 1075 857 857 0 0 0 0

TOTAL of EASTERN Region 89 6453 5151 6453 5151 5185 50 0 0 0

DOI>BARA>REHABILITATIONBALARAMPUR 100 BARA PC 1990 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERBANJARIA 100 BARA AC 1990 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER BARIYARPURULO 100 BARA AC 1989 MS ED 875 700 875 700 700 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERBHABUBAN 100 BARA AC 1990 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERCHUTAHA 100 BARA AC 1990 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER

40

Page 46: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

ENARAWANAL KULO 100 BARA AC 1989 MS ED 750 600 750 600 600 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERTOTAL of DOI > BARA > REHABILITATION 6 2063 1650 2063 1650 1650 0 0 0 0

TOTAL of BARA District 6 2063 1650 2063 1650 1650 0 0 0 0

DOI>CHITWAN>REHABILITATIONBHANDARA 100 CHITWAN AC 1990 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 3 GANDAKKALYANPURMADI 100 CHITWAN AC 1990 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 3 GANDAKKHAIRANIJAMAUL 100 CHITWAN AC 1989 YR ID 188 150 188 150 150 60 0 0 0 DOI NO GoN 3 GANDAKPATIHANIPARSA 100 CHITWAN AC 1989 YR ED 500 400 500 400 400 150 0 0 0 DOI NO GoN 3 GANDAKRADI GAONJINELI 100 CHITWAN AC 1991 MS ID 250 200 250 200 200 0 0 0 0 DOI NO GoN 3 GANDAKROYAGANGSHINAGA 100 CHITWAN AC 1991 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 3 GANDAKSUKRANAGAR 100 CHITWAN AC 1990 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 3 GANDAKTOTAL of DOI > CHITWAN > REHABILITATION 7 1376 1100 1376 1100 1100 210 0 0 0

TOTAL of CHITWAN District 7 1376 1100 1376 1100 1100 210 0 0 0

DOI>DHANUSHA>NEWKAGIPAIN 100 DHANUSHA AC 188 150 188 150 150 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERKAGIPAIN YAMBA BHARI 100 DHANUSHA AC 281 225 281 225 225 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERTOTAL of DOI > DHANUSHA > NEW 2 469 375 469 375 375 0 0 0 0

TOTAL of DHANUSHA District 2 469 375 469 375 375 0 0 0 0

DOI>MAHOTTARI>REHABILITATIONANKUSE 100 MAHOTTARI AC 1990 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERBIJALPUR 100 MAHOTTARI AC 1990 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERKUTUMESWORI 100 MAHOTTARI AC 1996 MS ED 500 400 500 400 400 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERTOTAL of DOI > MAHOTTARI > REHABILITATION 3 626 500 626 500 500 0 0 0 0

TOTAL of MAHOTTARI District 3 626 500 626 500 500 0 0 0 0

DOI>PARSA>REHABILITATIONCHAMRI NANDI 100 PARSA AC 1989 YR ED 500 400 500 400 400 400 0 0 0 DOI NO GoN 12 SIWALIK RIVERTHUTE KHOLA 100 PARSA AC 1992 YR ID 38 30 38 30 30 20 0 0 0 DOI NO GoN 12 SIWALIK RIVERTOTAL of DOI > PARSA > REHABILITATION 2 538 430 538 430 430 420 0 0 0

TOTAL of PARSA District 2 538 430 538 430 430 420 0 0 0

DOI>RAUTAHAT>REHABILITATIONGAURAHI GUTHI 100 RAUTAHAT AC 1990 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERTOTAL of DOI > RAUTAHAT > REHABILITATION 1 63 50 63 50 50 0 0 0 0

TOTAL of RAUTAHAT District 1 63 50 63 50 50 0 0 0 0

41

Page 47: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

DOI>SARLAHI>REHABILITATIONMANPUR 100 SARLAHI AC 1989 YR ID 250 200 250 200 200 20 0 0 0 DOI NO GoN 12 SIWALIK RIVERMAUKELAWA 100 SARLAHI AC 1990 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERPHIRHIRRYA 100 SARLAHI AC 1989 YR ID 63 50 63 50 50 20 0 0 0 DOI NO GoN 12 SIWALIK RIVERTOTAL of DOI > SARLAHI > REHABILITATION 3 438 350 438 350 350 40 0 0 0

TOTAL of SARLAHI District 3 438 350 438 350 350 40 0 0 0

TOTAL of CENTRAL > Terai 24 5573 4455 5573 4455 4455 670 0 0 0

DOI>BHAKTAPUR>REHABILITATIONSUTTI KHOLA 100 BHAKTAPUR AC 1991 YR ID 31 25 31 25 20 20 0 0 0 DOI NO GoN 9 BAGMATITOTAL of DOI > BHAKTAPUR > REHABILITATION 1 31 25 31 25 20 20 0 0 0

TOTAL of BHAKTAPUR District 1 31 25 31 25 20 20 0 0 0

DOI>DHADING>REHABILITATIONBHIRKOT 100 DHADING AC 1989 MS ID 25 20 25 20 20 0 0 0 0 DOI NO GoN 3 GANDAKTOTAL of DOI > DHADING > REHABILITATION 1 25 20 25 20 20 0 0 0 0

TOTAL of DHADING District 1 25 20 25 20 20 0 0 0 0

DOI>KATHMANDU>REHABILITATIONBALUWA 100 KATHMANDU AC 1991 YR ID 31 25 31 25 25 10 0 0 0 DOI NO GoN 9 BAGMATIBISHNUDEVI 100 KATHMANDU AC 1991 YR ID 38 30 38 30 30 12 0 0 0 DOI NO GoN 9 BAGMATIDALLU KHOLA 100 KATHMANDU AC 1989 MS ID 13 10 13 10 10 0 0 0 0 DOI NO GoN 9 BAGMATIETAKOT KHOLA 100 KATHMANDU AC 1989 MS ID 4 3 4 3 3 0 0 0 0 DOI NO GoN 9 BAGMATILUPANG KHOLA 100 KATHMANDU AC 1989 YR ID 6 5 6 5 5 2 0 0 0 DOI NO GoN 9 BAGMATISALINADI 100 KATHMANDU AC 1989 YR ID 188 150 188 150 150 60 0 0 0 DOI NO GoN 9 BAGMATISUNDARIJAL7,8 100 KATHMANDU AC 1990 ED 25 20 25 20 20 0 0 0 0 DOI NO GoN 9 BAGMATITOTAL of DOI > KATHMANDU > REHABILITATION 7 305 243 305 243 243 84 0 0 0

TOTAL of KATHMANDU District 7 305 243 305 243 243 84 0 0 0

DOI>KAVRE>REHABILITATIONDHADAURE TAR 100 KAVRE AC 1989 YR ID 10 8 10 8 8 4 0 0 0 DOI NO GoN 4 KOSHIKHAHAREPANGU,7,9 100 KAVRE AC 1989 YR ID 15 12 15 12 12 6 0 0 0 DOI NO GoN 4 KOSHILAPCHE 100 KAVRE AC 1989 YR ID 15 12 15 12 12 6 0 0 0 DOI NO GoN 4 KOSHI POKHARI NARAYANS 100 KAVRE AC 1992 MS ID 44 35 44 35 35 0 0 0 0 DOI NO GoN 4 KOSHITOTAL of DOI > KAVRE > REHABILITATION 4 84 67 84 67 67 16 0 0 0

TOTAL of KAVRE District 4 84 67 84 67 67 16 0 0 0

DOI>LALITPUR>REHABILITATIONGIMIDI 100 LALITPUR AC 1989 YR ID 25 20 25 20 20 8 0 0 0 DOI NO GoN 9 BAGMATIKHOKANA KULO 100 LALITPUR AC 1991 YR ID 30 24 30 24 24 24 0 0 0 DOI NO GoN 9 BAGMATI

42

Page 48: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

LUKUMIBEBI 100 LALITPUR AC 1989 YR ID 13 10 13 10 10 5 0 0 0 DOI NO GoN 9 BAGMATIMANIKHEL 100 LALITPUR AC 1990 MS ID 5 4 5 4 4 0 0 0 0 DOI NO GoN 9 BAGMATIPYU TAR 100 LALITPUR AC 1990 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 9 BAGMATISAIBU KULO 100 LALITPUR AC 1989 YR ID 125 100 125 100 100 50 0 0 0 DOI NO GoN 9 BAGMATITHAIBAKULI 100 LALITPUR AC 1991 YR ED 38 30 38 30 30 30 0 0 0 DOI NO GoN 9 BAGMATITOTAL of DOI > LALITPUR > REHABILITATION 7 261 208 261 208 208 127 0 0 0

TOTAL of LALITPUR District 7 261 208 261 208 208 127 0 0 0

DOI>MAKAWANPUR>NEWNAM TAR 100 MAKAWANPUR AC 63 50 63 50 50 0 0 0 0 DOI NO GoN 3 GANDAKTOTAL of DOI > MAKAWANPUR > NEW 1 63 50 63 50 50 0 0 0 0

DOI>MAKAWANPUR>REHABILITATIONHADI KHOLA 100 MAKAWANPUR AC 1992 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 3 GANDAKNIBUWA TAR 100 MAKAWANPUR AC 1992 MS ID 13 10 13 10 10 10 0 0 0 DOI NO GoN 3 GANDAKRAJ GAON 100 MAKAWANPUR AC 1989 YR ID 75 60 75 60 60 24 0 0 0 DOI NO GoN 3 GANDAKSISNERI 100 MAKAWANPUR AC 1992 YR ID 25 20 25 20 20 8 0 0 0 DOI NO GoN 3 GANDAKSISNERIMUL KHOLA 100 MAKAWANPUR AC 1989 MS ID 69 55 69 55 55 0 0 0 0 DOI NO GoN 3 GANDAKTOTAL of DOI > MAKAWANPUR > REHABILITATION 5 207 165 207 165 165 52 0 0 0

TOTAL of MAKAWANPUR District 6 270 215 270 215 215 52 0 0 0

DOI>NUWAKOT>REHABILITATIONBELKOT 100 NUWAKOT AC 1990 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 3 GANDAKCHAU TARADIHI 100 NUWAKOT AC 1991 MS ID 69 55 69 55 55 0 0 0 0 DOI NO GoN 3 GANDAKPHAGATE BANDH 100 NUWAKOT AC 1990 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 3 GANDAKSAMARI 100 NUWAKOT AC 1990 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 3 GANDAKSUKHARI 100 NUWAKOT AC 1991 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 3 GANDAKTOTAL of DOI > NUWAKOT > REHABILITATION 5 207 165 207 165 165 30 0 0 0

TOTAL of NUWAKOT District 5 207 165 207 165 165 30 0 0 0

DOI>RAMECHAP>REHABILITATIONAKASEMANTHALI 100 RAMECHAP AC 1990 YR ID 44 35 44 35 35 15 0 0 0 DOI NO GoN 4 KOSHIBAGAMATI 100 RAMECHAP AC 1990 YR ID 25 20 25 20 25 8 0 0 0 DOI NO GoN 4 KOSHIBAI TALI 100 RAMECHAP AC 1990 YR ID 28 22 28 22 22 10 0 0 0 DOI NO GoN 4 KOSHIBRAMHABISNU 100 RAMECHAP AC 1990 YR ID 19 15 19 15 15 6 0 0 0 DOI NO GoN 4 KOSHIHILEDEVI 100 RAMECHAP AC 1990 YR ID 63 50 63 50 50 201 0 0 0 DOI NO GoN 4 KOSHIMUGI TAR 100 RAMECHAP AC 1990 YR ID 25 20 25 20 20 8 0 0 0 DOI NO GoN 4 KOSHIPHARPU 100 RAMECHAP AC 1991 YR ID 44 35 44 35 35 12 0 0 0 DOI NO GoN 4 KOSHITOTAL of DOI > RAMECHAP > REHABILITATION 7 248 197 248 197 202 260 0 0 0

TOTAL of RAMECHAP District 7 248 197 248 197 202 260 0 0 0

43

Page 49: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

DOI>SINDHULI>REHABILITATIONKAPILAKOT 100 SINDHULI AC 1992 YR ED 688 550 688 550 225 180 0 0 0 DOI NO GoN 9 BAGMATISOKAN 100 SINDHULI AC 1990 YR ID 75 60 75 60 60 20 0 0 0 DOI NO GoN 9 BAGMATITOTAL of DOI > SINDHULI > REHABILITATION 2 763 610 763 610 285 200 0 0 0

TOTAL of SINDHULI District 2 763 610 763 610 285 200 0 0 0

TOTAL of CENTRAL > Hill 40 2194 1750 2194 1750 1425 789 0 0 0

DOI>DOLAKHA>REHABILITATIONBADUR KHOLA 100 DOLAKHA AC 1991 MS ID 38 30 38 30 30 0 0 0 0 DOI NO GoN 4 KOSHIJHAKERE KHOLA 100 DOLAKHA AC 1989 MS ID 188 150 188 150 150 0 0 0 0 DOI NO GoN 4 KOSHISAMSAPIPAL KULO 100 DOLAKHA AC 1989 YR ID 13 10 13 10 10 0 0 0 0 DOI NO GoN 4 KOSHITHULO KHOLA 100 DOLAKHA AC 1991 MS ED 63 50 63 50 50 0 0 0 0 DOI NO GoN 4 KOSHITOTAL of DOI > DOLAKHA > REHABILITATION 4 302 240 302 240 240 0 0 0 0

TOTAL of DOLAKHA District 4 302 240 302 240 240 0 0 0 0

TOTAL of CENTRAL > Mountain 4 302 240 302 240 240 0 0 0 0

DOI>SINDHUPALCHOWK>REHABILITATIONBASKHARKA 100 SINDHUPALCHOWK AC 1990 YR ID 63 50 63 50 50 20 0 0 0 DOI NO GoN 4 KOSHIBHIM TAR 100 SINDHUPALCHOWK AC 1990 YR ID 13 10 13 10 10 4 0 0 0 DOI NO GoN 4 KOSHIDHUSKOT 100 SINDHUPALCHOWK AC 1990 YR ID 25 20 25 20 20 8 0 0 0 DOI NO GoN 4 KOSHIDHUSKOT TAR 100 SINDHUPALCHOWK AC 187 150 187 150 150 0 0 0 0 DOI NO GoN 4 KOSHIGHATTE KHOLA 100 SINDHUPALCHOWK AC 1990 YR ID 25 20 25 20 20 8 0 0 0 DOI NO GoN 4 KOSHIGHORTHALI 100 SINDHUPALCHOWK AC 1990 YR ID 13 10 13 10 10 4 0 0 0 DOI NO GoN 4 KOSHIHADI KHOLA 100 SINDHUPALCHOWK AC 1990 YR ID 25 20 25 20 20 8 0 0 0 DOI NO GoN 4 KOSHILAGARCHE 100 SINDHUPALCHOWK AC 1990 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 4 KOSHIRAMCHE 100 SINDHUPALCHOWK AC 1990 YR ID 63 50 63 50 50 20 0 0 0 DOI NO GoN 4 KOSHISELANG 100 SINDHUPALCHOWK AC 1990 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 4 KOSHISIPA POKHARI 100 SINDHUPALCHOWK AC 1990 YR ID 13 10 13 10 10 5 0 0 0 DOI NO GoN 4 KOSHITHAGALDHAP 100 SINDHUPALCHOWK AC 1990 YR ID 25 20 25 20 20 8 0 0 0 DOI NO GoN 4 KOSHITHOKARPA 100 SINDHUPALCHOWK AC 1992 YR ID 219 175 219 175 175 70 0 0 0 DOI NO HGM 4 KOSHITOTAL of DOI > SINDHUPALCHOWK > REHABILITATION 13 721 575 721 575 575 175 0 0 0

TOTAL of SINDHUPALCHOWK District 13 721 575 721 575 575 175 0 0 0

TOTAL of CENTRAL > Hill 13 721 575 721 575 575 175 0 0 0

TOTAL of CENTRAL Region 81 8790 7020 8790 7020 6695 1634 0 0 0

DOI>KAPILVASTU>NEWKARMA 100 KAPILVASTU AC 1992 YR ID 188 150 188 150 150 50 0 0 0 DOI NO GoN 12 SIWALIK RIVERTOTAL of DOI > KAPILVASTU > NEW 1 188 150 188 150 150 50 0 0 0

44

Page 50: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

DOI>KAPILVASTU>REHABILITATIONKANCHANIYA 100 KAPILVASTU AC 1992 YR ID 375 300 375 300 300 150 0 0 0 DOI NO GoN 12 SIWALIK RIVERSAKUNIYA TAL 100 KAPILVASTU AC 1991 MS ED 188 150 188 150 150 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERSHANKARPUR 100 KAPILVASTU AC 1989 MS ID 56 46 56 46 37 0 0 0 0 DOI NO GoN 12 SIWALIK RIVERTOTAL of DOI > KAPILVASTU > REHABILITATION 3 619 496 619 496 487 150 0 0 0

TOTAL of KAPILVASTU District 4 807 646 807 646 637 200 0 0 0

DOI>NAWALPARASI>REHABILITATIONBHUTAHA 100 NAWALPARASI AC 1990 MS ID 38 30 38 30 30 0 0 0 0 DOI NO GoN 3 GANDAKMUKUNDAPUR 100 NAWALPARASI AC 1990 MS ID 50 40 50 40 40 0 0 0 0 DOI NO GoN 3 GANDAKPOKHARAPALHI 100 NAWALPARASI AC 1990 MS ID 288 230 288 230 230 0 0 0 0 DOI NO GoN 3 GANDAKTORKETGHAT 100 NAWALPARASI AC 1990 MS ID 7 5 7 5 5 0 0 0 0 DOI NO GoN 3 GANDAKTOTAL of DOI > NAWALPARASI > REHABILITATION 4 383 305 383 305 305 0 0 0 0

TOTAL of NAWALPARASI District 4 383 305 383 305 305 0 0 0 0

DOI>RUPANDEHI>REHABILITATIONKUNJALAPUR 100 RUPANDEHI AC 1991 YR ID 163 130 163 130 130 15 0 0 0 DOI NO GoN 8 TINAUPARAUHA 100 RUPANDEHI AC 1990 YR ID 625 500 625 500 500 500 100 0 0 DOI NO GoN 8 TINAU TARKULAWA 100 RUPANDEHI AC 1991 MS ID 375 300 375 300 300 150 0 0 0 DOI NO GoN 8 TINAUTENUHAWA 100 RUPANDEHI AC 1992 YR ID 1000 800 1000 800 800 300 0 0 0 DOI NO GoN 8 TINAUTOTAL of DOI > RUPANDEHI > REHABILITATION 4 2163 1730 2163 1730 1730 965 100 0 0

TOTAL of RUPANDEHI District 4 2163 1730 2163 1730 1730 965 100 0 0

TOTAL of WESTERN > Terai 12 3353 2681 3353 2681 2672 1165 100 0 0

DOI>ARGHAKHANCHI>REHABILITATIONBEL TARI 100 ARGHAKHANCHI AC 1989 YR ID 6 4 6 4 4 4 0 0 0 DOI NO HGM 6 WEST RAPTIPAWAMABIR 100 ARGHAKHANCHI AC 1991 YR ID 63 50 63 50 50 50 0 0 0 DOI NO GoN 6 WEST RAPTIPAWARA TAR 100 ARGHAKHANCHI AC 1989 YR ID 63 50 63 50 50 50 0 0 0 DOI NO GoN 6 WEST RAPTI TARIKE TAR 100 ARGHAKHANCHI AC 1989 YR ID 13 10 13 10 10 10 0 0 0 DOI YES GoN 6 WEST RAPTITOTAL of DOI > ARGHAKHANCHI > REHABILITATION 4 145 114 145 114 114 114 0 0 0

TOTAL of ARGHAKHANCHI District 4 145 114 145 114 114 114 0 0 0

DOI>BAGLUNG>REHABILITATIONBAS KHOLA 100 BAGLUNG AC 1989 YR ID 18 15 18 15 15 15 0 0 0 DOI NO GoN 3 GANDAKCHHUSANG 100 BAGLUNG AC 1989 YR ID 32 25 32 25 15 10 0 0 0 DOI NO GoN 3 GANDAKDHUNGE KHOLA 100 BAGLUNG AC 1989 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 3 GANDAKMALMA 100 BAGLUNG AC 1990 MS ID 44 35 44 35 35 0 0 0 0 DOI NO GoN 3 GANDAKNISHI 100 BAGLUNG AC 1990 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 3 GANDAKSAR KUWA 100 BAGLUNG AC 1989 YR ID 18 15 18 15 5 0 0 0 0 DOI NO GoN 3 GANDAKTIRKE 100 BAGLUNG AC 1989 YR ID 10 8 10 8 8 8 0 0 0 DOI NO GoN 3 GANDAKYARA 100 BAGLUNG AC 1989 YR ID 23 18 23 18 10 10 0 0 0 DOI NO GoN 3 GANDAK

45

Page 51: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of DOI > BAGLUNG > REHABILITATION 8 271 216 271 216 188 43 0 0 0

TOTAL of BAGLUNG District 8 271 216 271 216 188 43 0 0 0

DOI>GULMI>REHABILITATIONARBENITHUMKIJETHIKA 100 GULMI AC 1989 YR ID 38 30 38 30 30 30 0 0 0 DOI NO GoN 3 GANDAKCHALDH KHOLA 100 GULMI AC 1991 YR ID 71 57 71 57 37 37 0 0 0 DOI NO GoN 3 GANDAKRABENIKHULO 100 GULMI AC 1992 YR ID 70 56 70 56 56 0 0 0 0 DOI NO GoN 3 GANDAKTOTAL of DOI > GULMI > REHABILITATION 3 179 143 179 143 123 67 0 0 0

TOTAL of GULMI District 3 179 143 179 143 123 67 0 0 0

DOI>KASKI>REHABILITATIONGHANDRUK 100 KASKI AC 1991 YR ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 3 GANDAKLAHACHOKJOGI CHOUR 100 KASKI AC 1989 YR ID 10 8 10 8 8 4 0 0 0 DOI NO GoN 3 GANDAKPARCHE 100 KASKI AC 1990 YR ID 40 32 40 32 32 15 0 0 0 DOI NO GoN 3 GANDAKRIVAN 100 KASKI AC 1992 MS ID 28 22 28 22 22 0 0 0 0 DOI NO GoN 3 GANDAKSHISUWA 100 KASKI AC 1990 YR ID 125 100 125 100 50 25 0 0 0 DOI NO GoN 3 GANDAKUPALLOLAHOCKOK 100 KASKI AC 1989 YR ID 57 45 57 45 45 25 0 0 0 DOI NO GoN 3 GANDAKTOTAL of DOI > KASKI > REHABILITATION 6 323 257 323 257 207 69 0 0 0

TOTAL of KASKI District 6 323 257 323 257 207 69 0 0 0

DOI>LAMJUNG>REHABILITATIONDITHA VILLAGE PANCHA 100 LAMJUNG AC 62 50 62 50 50 0 0 0 0 DOI NO GoN 3 GANDAKJITA 100 LAMJUNG AC 1992 YR ID 63 50 63 50 50 25 25 0 0 DOI NO GoN 3 GANDAKPARAJULI BESI 100 LAMJUNG AC 125 100 125 100 100 0 0 0 0 DOI NO GoN 3 GANDAKTOTAL of DOI > LAMJUNG > REHABILITATION 3 250 200 250 200 200 25 25 0 0

TOTAL of LAMJUNG District 3 250 200 250 200 200 25 25 0 0

DOI>MYAGDI>REHABILITATIONADHERI KHOLA 100 MYAGDI AC 1990 YR ID 31 25 31 25 25 10 0 0 0 DOI NO GoN 3 GANDAKASHKARE 100 MYAGDI AC 75 60 75 60 60 0 0 0 0 DOI NO GoN 3 GANDAKCHHARI KHOLA FAR 100 MYAGDI AC 1990 YR ID 50 40 50 40 40 10 0 0 0 DOI NO GoN 3 GANDAKDHUKU KHOLA 100 MYAGDI AC 1991 YR ID 32 25 32 25 25 5 0 0 0 DOI NO GoN 3 GANDAKRAKHUBHAGABATI 100 MYAGDI AC 1989 MS ID 14 11 14 11 11 0 0 0 0 DOI NO GoN 3 GANDAKRATNE CHOUR 100 MYAGDI AC 1990 YR ID 25 20 25 20 10 10 0 0 0 DOI NO GoN 3 GANDAKSATMULE 100 MYAGDI AC 1990 YR ID 84 65 84 65 65 40 5 0 0 DOI NO GoN 3 GANDAKSISNERI DANUBASE 100 MYAGDI AC 1990 YR ID 25 20 25 20 20 5 0 0 0 DOI NO GoN 3 GANDAKSISNERI GIDUMOR 100 MYAGDI AC 1989 MS ID 38 30 38 30 30 30 0 0 0 DOI NO GoN 3 GANDAKTURIA 100 MYAGDI AC 250 200 250 200 200 0 0 0 0 DOI NO GoN 3 GANDAKTOTAL of DOI > MYAGDI > REHABILITATION 10 624 496 624 496 486 110 5 0 0

TOTAL of MYAGDI District 10 624 496 624 496 486 110 5 0 0

46

Page 52: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

DOI>PALPA>REHABILITATIONCHAMRINANDI 100 PALPA AC 1989 MS ID 500 400 500 400 400 0 0 0 0 DOI NO GoN 3 GANDAKGEJAHEKLANG 100 PALPA AC 1991 MS ID 50 40 50 40 20 0 0 0 0 DOI NO GoN 3 GANDAKSALIBANYAKLE TAR 100 PALPA AC 1991 MS ID 63 50 63 50 10 0 0 0 0 DOI NO GoN 3 GANDAKTOTAL of DOI > PALPA > REHABILITATION 3 613 490 613 490 430 0 0 0 0

TOTAL of PALPA District 3 613 490 613 490 430 0 0 0 0

DOI>PARBAT>REHABILITATIONBHARUWA KHOLA 100 PARBAT AC 1989 YR ID 57 45 57 45 45 45 0 0 0 DOI NO GoN 3 GANDAKCHALISELULO 100 PARBAT AC 1989 YR ID 63 50 63 50 50 50 0 0 0 DOI NO GoN 3 GANDAKDURLUNG 100 PARBAT AC 1989 YR ID 7 5 7 5 5 5 0 0 0 DOI NO GoN 3 GANDAKGHORNI KHOLA 100 PARBAT AC 1989 YR ID 3 2 3 2 2 2 0 0 0 DOI NO GoN 3 GANDAKOKHADI KULO 100 PARBAT AC 1990 YR ID 81 65 81 65 65 30 0 0 0 DOI NO GoN 3 GANDAKPATI KHOLA 100 PARBAT AC 1990 MS ID 25 20 25 20 110 0 0 0 0 DOI NO GoN 3 GANDAKTOTAL of DOI > PARBAT > REHABILITATION 6 236 187 236 187 277 132 0 0 0

TOTAL of PARBAT District 6 236 187 236 187 277 132 0 0 0

DOI>TANAHU>REHABILITATIONPYUDHAR TAR 100 TANAHU AC 1991 YR ID 64 51 64 51 51 50 0 0 0 DOI NO GoN 3 GANDAKTOTAL of DOI > TANAHU > REHABILITATION 1 64 51 64 51 51 50 0 0 0

TOTAL of TANAHU District 1 64 51 64 51 51 50 0 0 0

TOTAL of WESTERN > Hill 44 2705 2154 2705 2154 2076 610 30 0 0

DOI>MANANG>REHABILITATIONDABAL 100 MANANG AC 1989 YR ID 16 12 16 12 12 12 0 0 0 DOI NO GoN 3 GANDAKDHUNGE KHOLA 100 MANANG AC 1989 YR ID 63 50 63 50 50 50 0 0 0 DOI NO GoN 3 GANDAKNAR 100 MANANG AC 1989 YR ID 32 25 32 25 25 25 0 0 0 DOI NO GoN 3 GANDAKTOTAL of DOI > MANANG > REHABILITATION 3 111 87 111 87 87 87 0 0 0

TOTAL of MANANG District 3 111 87 111 87 87 87 0 0 0

DOI>MUSTANG>REHABILITATIONCHHUSANG 100 MUSTANG AC 1990 YR ED 31 25 31 25 25 25 0 0 0 DOI NO GoN 3 GANDAKDHIIRRIGATION 100 MUSTANG AC 1990 YR ID 35 28 35 28 28 28 0 0 0 DOI NO GoN 3 GANDAKSOPI 100 MUSTANG AC 1991 YR ID 25 20 25 20 20 20 0 0 0 DOI NO GoN 3 GANDAKTOTAL of DOI > MUSTANG > REHABILITATION 3 91 73 91 73 73 73 0 0 0

TOTAL of MUSTANG District 3 91 73 91 73 73 73 0 0 0

TOTAL of WESTERN > Mountain 6 202 160 202 160 160 160 0 0 0

TOTAL of WESTERN Region 62 6260 4995 6260 4995 4908 1935 130 0 0

47

Page 53: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

DOI>BANKE>REHABILITATIONTI TARIYA 100 BANKE AC 1990 MS ID 25 20 25 20 20 0 0 0 0 DOI NO GoN 6 WEST RAPTITOTAL of DOI > BANKE > REHABILITATION 1 25 20 25 20 20 0 0 0 0

TOTAL of BANKE District 1 25 20 25 20 20 0 0 0 0

DOI>BARDIYA>REHABILITATIONBABAI IP 100 BARDIYA PC 1999 YR ED 16500 13200 8750 7000 7000 40000 0 7750 6200 DOI NO] GoN 5 BABAIBUDHI KULO 100 BARDIYA AC 1989 YR ID 625 500 625 500 500 500 0 0 0 DOI NO GoN 5 BABAIKAIYAN NALA 100 BARDIYA AC 1989 MS ID 250 200 250 200 200 0 0 0 0 DOI NO GoN 5 BABAIMADIRAJDULO 100 BARDIYA AC 1989 YR ID 250 200 250 200 200 100 0 0 0 DOI NO GoN 5 BABAIMANAU KULO 100 BARDIYA AC 1989 YR ED 375 300 375 300 300 150 0 0 0 DOI NO GoN 5 BABAIRAJAPUR IP 100 BARDIYA PC 1999 YR ED 15790 13000 15790 13000 0 0 0 0 0 DOI NO ADB 5 BABAITAPARAMAMPUR KULO 100 BARDIYA AC 1989 YR ED 1000 800 1000 800 800 600 0 0 0 DOI NO GoN 5 BABAI TARA TAL 100 BARDIYA AC 1990 YR ID 25 20 25 20 20 20 0 0 0 DOI NO GoN 5 BABAITI TARIYA BANDH 100 BARDIYA AC 1989 MS ID 188 150 188 150 150 0 0 0 0 DOI NO GoN 5 BABAITOTAL of DOI > BARDIYA > REHABILITATION 9 35003 28370 27253 22170 9170 41370 0 7750 6200

TOTAL of BARDIYA District 9 35003 28370 27253 22170 9170 41370 0 7750 6200

DOI>DANG>REHABILITATIONDHANAURI 100 DANG AC 1989 YR ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 5 BABAIGHORAHAMAMPUR 100 DANG AC 1989 YR ED 1125 900 1125 900 900 400 0 0 0 DOI NO GoN 5 BABAIHALWAR 100 DANG AC 1989 YR ID 63 50 63 50 50 30 0 0 0 DOI NO GoN 5 BABAIHALWAR 100 DANG AC 1989 YR ID 125 100 125 100 100 24 0 0 0 DOI NO GoN 5 BABAIKODIYASOTA 100 DANG AC 1989 YR ED 625 500 625 500 500 0 0 0 0 DOI NO GoN 5 BABAILOHATIYA 100 DANG AC 1989 MS ED 38 30 38 30 30 0 0 0 0 DOI NO GoN 5 BABAIMAWA 100 DANG AC 1989 MS ED 5 4 5 4 4 0 0 0 0 DOI NO GoN 5 BABAIPHALKAPUR 100 DANG AC 1989 YR ED 286 229 286 229 229 80 0 0 0 DOI NO GoN 5 BABAIPARGANA KULO IP 100 DANG AC 2006 YR ID 6800 5800 6800 5800 5800 4000 2000 0 0 DOI NO KUBAIT 6 WEST RAPTISUDI KULO 100 DANG AC 1989 YR ED 125 100 125 100 100 50 0 0 0 DOI NO GoN 5 BABAITOTAL of DOI > DANG > REHABILITATION 10 9317 7813 9317 7813 7813 4584 2000 0 0

TOTAL of DANG District 10 9317 7813 9317 7813 7813 4584 2000 0 0

TOTAL of MID-WESTERN > Terai 20 44345 36203 36595 30003 17003 45954 2000 7750 6200

DOI>DAILEKH>NEWHANETA 100 DAILEKH AC 1994 YR ID 16 13 16 13 13 6 0 0 0 DOI NO GoN 2 KARNALIMAPHUWA 100 DAILEKH AC 1994 YR ID 19 13 19 13 13 8 0 0 0 DOI NO GoN 2 KARNALICHAMUNDA 100 DAILEKH AC 1994 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 2 KARNALITOTAL of DOI > DAILEKH > NEW 3 60 46 60 46 46 24 0 0 0

DOI>DAILEKH>REHABILITATIONBHAR TALE 100 DAILEKH AC 1995 YR ID 19 15 19 15 15 15 0 0 0 DOI YES GoN 2 KARNALI

48

Page 54: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

BHERIKALIKATHAN 100 DAILEKH AC 1990 YR ID 19 15 19 15 15 10 0 0 0 DOI NO GoN 2 KARNALICHAMUNDA 100 DAILEKH AC 1995 YR ID 38 30 38 30 30 30 0 0 0 DOI YES GoN 2 KARNALIKHARIGAIRA 100 DAILEKH AC 1990 YR ID 19 15 19 15 15 8 0 0 0 DOI NO GoN 2 KARNALILAKURI 100 DAILEKH AC 1990 YR ID 15 12 15 12 12 6 0 0 0 DOI NO GoN 2 KARNALILOHA TAR 100 DAILEKH AC 1989 YR ID 38 30 38 30 30 15 0 0 0 DOI NO GoN 2 KARNALIMAPHUWA 100 DAILEKH AC 1995 YR ID 16 13 16 13 13 13 0 0 0 DOI YES GoN 2 KARNALITOTAL of DOI > DAILEKH > REHABILITATION 7 164 130 164 130 130 97 0 0 0

TOTAL of DAILEKH District 10 224 176 224 176 176 121 0 0 0

DOI>JAJARKOT>REHABILITATIONHOLU KHOLA 100 JAJARKOT AC 1993 YR ID 59 47 59 47 47 25 0 0 0 DOI NO GoN 2 KARNALIKRISAK KULO 100 JAJARKOT AC 1989 YR ID 75 60 75 60 60 30 0 0 0 DOI NO GoN 2 KARNALIMOLU KHOLA 100 JAJARKOT AC 1989 YR ID 69 55 69 55 55 30 0 0 0 DOI NO GoN 2 KARNALIPARIMAIDI 100 JAJARKOT AC 1990 YR ID 15 12 15 12 12 6 0 0 0 DOI NO GoN 2 KARNALIRAWAT GAON 100 JAJARKOT AC 1992 YR ID 65 20 65 20 20 10 0 0 0 DOI NO GoN 2 KARNALIRAWAT KHOLA 100 JAJARKOT AC 1993 YR ID 31 25 31 25 25 12 0 0 0 DOI NO GoN 2 KARNALITOTAL of DOI > JAJARKOT > REHABILITATION 6 314 219 314 219 219 113 0 0 0

TOTAL of JAJARKOT District 6 314 219 314 219 219 113 0 0 0

DOI>PYUTHAN>REHABILITATIONKOTGACNMADHICHAUN 100 PYUTHAN AC 1989 YR ED 9 7 9 7 7 0 0 0 0 DOI NO GoN 6 WEST RAPTIMAWA 100 PYUTHAN AC 1989 YR ID 5 4 5 4 4 4 0 0 0 DOI NO SNV 6 WEST RAPTITOTAL of DOI > PYUTHAN > REHABILITATION 2 14 11 14 11 11 4 0 0 0

TOTAL of PYUTHAN District 2 14 11 14 11 11 4 0 0 0

DOI>ROLPA>REHABILITATIONDHAWANGCHAPNA 100 ROLPA AC 1990 ID 36 29 36 29 29 10 0 0 0 DOI NO GoN 6 WEST RAPTIGHABANGSNA 100 ROLPA AC 1990 YR ID 1 1 1 1 1 1 0 0 0 DOI NO GoN 6 WEST RAPTIMADHI CHAUR 100 ROLPA AC 1993 YR ID 48 39 48 39 27 27 0 0 0 DOI NO GoN 6 WEST RAPTIMANGHAT 100 ROLPA AC 1989 YR ID 47 37 47 37 47 47 7 0 0 DOI NO GoN 6 WEST RAPTIMIRTANG 100 ROLPA AC 1990 MS ID 10 8 10 8 8 8 0 0 0 DOI NO GoN 6 WEST RAPTITHULOKUNG KHOLA 100 ROLPA AC 1993 YR ID 144 115 144 115 85 40 0 0 0 DOI NO GoN 6 WEST RAPTITOTAL of DOI > ROLPA > REHABILITATION 6 286 229 286 229 197 133 7 0 0

TOTAL of ROLPA District 6 286 229 286 229 197 133 7 0 0

DOI>RUKUM>REHABILITATIONBALUWA CHAUR 100 RUKUM AC 1989 YR ID 25 20 25 20 20 5 0 0 0 DOI NO GoN 2 KARNALIJANGAKHAWA 100 RUKUM AC 1989 YR ID 25 20 25 20 20 5 0 0 0 DOI NO GoN 2 KARNALIMAGARRAJ KULO 100 RUKUM AC 1989 YR ID 25 20 25 20 20 5 0 0 0 DOI NO GoN 2 KARNALINATHIGAD 100 RUKUM AC 1990 YR ID 63 50 63 50 50 35 0 0 0 DOI NO GoN 2 KARNALISMA 100 RUKUM AC 1990 MS ID 19 15 19 15 15 0 0 0 0 DOI NO GoN 2 KARNALITOTAL of DOI > RUKUM > REHABILITATION 5 157 125 157 125 125 50 0 0 0

49

Page 55: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of RUKUM District 5 157 125 157 125 125 50 0 0 0

DOI>SALYAN>REHABILITATIONKALA KHET 100 SALYAN AC 1989 MS ID 23 18 23 18 18 0 0 0 0 DOI NO GoN 5 BABAISAMSAPIPAL KULO 100 SALYAN AC 1989 MS ID 13 10 13 10 10 0 0 0 0 DOI NO GoN 5 BABAITATKE KULO 100 SALYAN AC 1989 MS ID 59 47 59 47 47 0 0 0 0 DOI NO GoN 5 BABAITOTAL of DOI > SALYAN > REHABILITATION 3 95 75 95 75 75 0 0 0 0

TOTAL of SALYAN District 3 95 75 95 75 75 0 0 0 0

DOI>SURKHET>REHABILITATIONDASARATHPUR 100 SURKHET AC 1989 YR ID 143 114 143 114 114 0 0 0 0 DOI NO GoN 2 KARNALIGAM KHOLA 100 SURKHET AC 1991 MS ID 88 70 88 70 70 0 0 0 0 DOI NO GoN 2 KARNALIMEHALKUMA 100 SURKHET AC 1989 YR ID 69 55 69 55 55 0 0 0 0 DOI NO GoN 2 KARNALISALKHANI 100 SURKHET AC 1991 MS ID 19 15 19 15 15 15 0 0 0 DOI NO GoN 2 KARNALITOTAL of DOI > SURKHET > REHABILITATION 4 319 254 319 254 254 15 0 0 0

TOTAL of SURKHET District 4 319 254 319 254 254 15 0 0 0

TOTAL of MID-WESTERN > Hill 36 1409 1089 1409 1089 1057 436 7 0 0

DOI>DOLPA>NEWCHUGAD 100 DOLPA AC 1994 YR ID 88 70 88 70 70 35 0 0 0 DOI NO GoN 6 WEST RAPTITOTAL of DOI > DOLPA > NEW 1 88 70 88 70 70 35 0 0 0

DOI>DOLPA>REHABILITATIONCHU GAON 100 DOLPA AC 1995 YR ID 55 44 55 44 44 44 0 0 0 DOI NO GoN 6 WEST RAPTIDHUPIJULA 100 DOLPA AC 1989 YR ID 38 30 38 30 30 25 0 0 0 DOI NO GoN 6 WEST RAPTIJUPHAL TAR 100 DOLPA AC 1992 YR ID 46 38 46 38 38 20 0 0 0 DOI NO GoN 6 WEST RAPTIJUPHAL TAR 2 100 DOLPA AC 1993 YR ID 88 70 88 70 70 35 0 0 0 DOI NO GoN 6 WEST RAPTIKONASIP 100 DOLPA AC 1995 YR ID 56 45 56 45 45 45 0 0 0 DOI NO GoN 6 WEST RAPTIMAJ PHANT 100 DOLPA AC 1990 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 6 WEST RAPTIPALCHA KHOLA 100 DOLPA AC 1995 YR ID 13 10 13 10 10 10 0 0 0 DOI NO GoN 6 WEST RAPTIPALUNGA 100 DOLPA AC 1995 YR ID 25 20 25 20 20 20 0 0 0 DOI NO GoN 6 WEST RAPTIRALLE 100 DOLPA AC 1992 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 6 WEST RAPTITOTAL of DOI > DOLPA > REHABILITATION 9 371 297 371 297 297 219 0 0 0

TOTAL of DOLPA District 10 459 367 459 367 367 254 0 0 0

DOI>HUMLA>REHABILITATIONMELCHAM 100 HUMLA AC 1993 YR ID 51 41 51 41 41 41 0 0 0 DOI NO GoN 2 KARNALIYANCHU 100 HUMLA AC 1993 YR ID 56 45 56 45 45 45 0 0 0 DOI NO GoN 2 KARNALITOTAL of DOI > HUMLA > REHABILITATION 2 107 86 107 86 86 86 0 0 0

TOTAL of HUMLA District 2 107 86 107 86 86 86 0 0 0

50

Page 56: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

DOI>JUMLA>REHABILITATIONLUM KHOLA 100 JUMLA AC 1995 YR ID 6 5 6 5 5 5 0 0 0 DOI NO GoN 2 KARNALI TALIUMIP 100 JUMLA AC 1995 YR ID 38 30 38 30 30 30 0 0 0 DOI NO GoN 2 KARNALITOTAL of DOI > JUMLA > REHABILITATION 2 44 35 44 35 35 35 0 0 0

TOTAL of JUMLA District 2 44 35 44 35 35 35 0 0 0

DOI>KALIKOT>REHABILITATIONRAKU 100 KALIKOT AC 1994 YR ID 130 104 130 104 104 104 0 0 0 DOI NO GoN 2 KARNALISUKATTIYA 100 KALIKOT AC 1994 YR ID 61 49 61 49 49 49 0 0 0 DOI NO GoN 2 KARNALITOTAL of DOI > KALIKOT > REHABILITATION 2 191 153 191 153 153 153 0 0 0

TOTAL of KALIKOT District 2 191 153 191 153 153 153 0 0 0

DOI>MUGU>REHABILITATIONKHANAYA 100 MUGU AC 1989 YR ID 25 20 25 20 20 20 0 0 0 DOI NO GoN 2 KARNALILATE KHOLA 100 MUGU AC 1990 YR ID 6 5 6 5 5 5 0 0 0 DOI NO GoN 2 KARNALITOTAL of DOI > MUGU > REHABILITATION 2 31 25 31 25 25 25 0 0 0

TOTAL of MUGU District 2 31 25 31 25 25 25 0 0 0

TOTAL of MID-WESTERN > Mountain 18 832 666 832 666 666 553 0 0 0

TOTAL of MID-WESTERN Region 74 46586 37958 38836 31758 18726 46943 2007 7750 6200

DOI>KAILALI>REHABILITATIONBAGDAULI 100 KAILALI AC 1992 YR ID 250 200 250 200 200 100 0 0 0 DOI NO GoN 2 KARNALINAIJALI 100 KAILALI AC 1989 YR ID 188 150 188 150 150 75 0 0 0 DOI NO GoN 2 KARNALIRANIJAMARA 100 KAILALI AC 1991 YR ED 3125 2500 3125 2500 2500 1600 0 0 0 DOI NO GoN 2 KARNALITOTAL of DOI > KAILALI > REHABILITATION 3 3563 2850 3563 2850 2850 1775 0 0 0

TOTAL of KAILALI District 3 3563 2850 3563 2850 2850 1775 0 0 0

TOTAL of FAR-WESTERN > Terai 3 3563 2850 3563 2850 2850 1775 0 0 0

DOI>ACHHAM>REHABILITATIONBHAGESWORI 100 ACHHAM AC 1989 YR ID 38 30 38 30 30 15 0 0 0 DOI NO GoN 2 KARNALIMOTELA 100 ACHHAM AC 1989 YR ID 19 15 19 15 15 15 0 0 0 DOI NO GoN 2 KARNALINANDEGADA 100 ACHHAM AC 1989 YR ID 38 30 38 30 30 10 0 0 0 DOI NO GoN 2 KARNALIPRANOLI 100 ACHHAM AC 1989 YR ID 25 20 25 20 20 0 0 0 0 DOI NO GoN 2 KARNALITOTAL of DOI > ACHHAM > REHABILITATION 4 120 95 120 95 95 40 0 0 0

TOTAL of ACHHAM District 4 120 95 120 95 95 40 0 0 0

51

Page 57: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

DOI>BAITADI>REHABILITATIONBIKULIMONAULI 100 BAITADI AC 1989 YR ID 7 5 7 5 5 4 0 0 0 DOI NO GoN 1 MAHAKALIGANTHALI KULO 100 BAITADI AC 1989 YR ID 7 5 7 5 5 4 0 0 0 DOI NO GoN 1 MAHAKALIJAIJALI 100 BAITADI AC 1990 YR ID 63 50 63 50 50 15 0 0 0 DOI NO GoN 1 MAHAKALIRAULAGAD KULO 100 BAITADI AC 1989 YR ID 13 10 13 10 10 5 0 0 0 DOI NO GoN 1 MAHAKALISANENA 100 BAITADI AC 1989 YR ID 38 30 38 30 15 10 0 0 0 DOI NO GoN 1 MAHAKALISIMA TAL 100 BAITADI AC 1990 YR ID 13 10 13 10 10 4 0 0 0 DOI NO GoN 1 MAHAKALITHULO KHOLA 100 BAITADI AC 1989 YR ID 63 50 63 50 50 25 0 0 0 DOI NO GoN 1 MAHAKALITOTAL of DOI > BAITADI > REHABILITATION 7 204 160 204 160 145 67 0 0 0

TOTAL of BAITADI District 7 204 160 204 160 145 67 0 0 0

DOI>DOTI>REHABILITATIONBAJKADENI 100 DOTI AC 1989 YR ID 19 15 19 15 15 8 0 0 0 DOI NO GoN 2 KARNALIDHOLTADA 100 DOTI AC 1989 YR ID 38 30 38 30 30 55 0 0 0 DOI NO GoN 2 KARNALISAL GAON 100 DOTI AC 1989 YR ID 19 15 19 15 15 8 0 0 0 DOI NO GoN 2 KARNALITOTAL of DOI > DOTI > REHABILITATION 3 76 60 76 60 60 71 0 0 0

TOTAL of DOTI District 3 76 60 76 60 60 71 0 0 0

TOTAL of FAR-WESTERN > Hill 14 400 315 400 315 300 178 0 0 0

DOI>DARCHULA>REHABILITATIONBASKOTGOKULESWOR 100 DARCHULA AC 1989 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 1 MAHAKALIDINSI 100 DARCHULA AC 1989 YR ID 19 15 19 15 15 8 0 0 0 DOI NO GoN 1 MAHAKALIHUTI GAON 100 DARCHULA AC 1989 YR ID 19 15 19 15 15 8 0 0 0 DOI NO GoN 1 MAHAKALIJAK KULO 100 DARCHULA AC 1989 YR ID 13 10 13 10 10 5 0 0 0 DOI NO GoN 1 MAHAKALI KHETIGAD 100 DARCHULA AC 1989 YR ID 19 15 19 15 15 8 0 0 0 DOI NO GoN 1 MAHAKALINAYALGOKULESWORN 100 DARCHULA AC 1989 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 1 MAHAKALITOTAL of DOI > DARCHULA > REHABILITATION 6 120 95 120 95 95 49 0 0 0

TOTAL of DARCHULA District 6 120 95 120 95 95 49 0 0 0

TOTAL of FAR-WESTERN > Mountain 6 120 95 120 95 95 49 0 0 0

TOTAL of FAR-WESTERN Region 23 4083 3260 4083 3260 3245 2002 0 0 0

TOTAL of DOI 329 72172 58384 64422 52184 38759 52564 2137 7750 6200

ERIP>CHITWAN>REHABILITATIONAITEBAGAR KULO 100 CHITWAN AC 1995 YR ID 63 50 63 50 50 38 38 0 0 ERIP NO ADB 3 GANDAKAMILIYAGHOLE KULO 100 CHITWAN AC 1996 YR ED 110 88 110 88 0 0 0 110 88 ERIP NO ADB 3 GANDAKAMIRIT KULO 100 CHITWAN AC 1995 YR ID 94 75 94 75 75 56 56 0 0 ERIP NO ADB 3 GANDAKBACHHYALI KULO 100 CHITWAN AC 1994 YR ID 328 262 328 262 262 262 0 0 0 ERIP NO ADB 3 GANDAKBADGAUR KULO 100 CHITWAN AC 1996 YR ED 228 182 228 182 0 0 0 228 182 ERIP NO ADB 3 GANDAKBAGARBELIDIYA KULO 100 CHITWAN AC 1996 YR ED 16 13 16 13 0 0 0 16 13 ERIP NO ADB 3 GANDAK

52

Page 58: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

BAHERA KULO 100 CHITWAN AC 1996 YR ED 19 15 19 15 0 0 0 19 15 ERIP NO ADB 3 GANDAKBAIREN KULO 100 CHITWAN AC 1996 YR ED 133 106 133 106 0 0 0 133 106 ERIP NO ADB 3 GANDAKBAKULAHAR KULO 100 CHITWAN AC 1996 YR ID 78 62 78 62 0 0 0 78 62 ERIP NO ADB 3 GANDAKBASYAULI KULO 100 CHITWAN AC 1996 YR ED 49 39 49 39 0 0 0 49 39 ERIP NO ADB 3 GANDAKBEIDIYABAGAR 100 CHITWAN AC 1994 YR ID 19 15 19 15 15 15 0 0 0 ERIP NO ADB 3 GANDAKBELIDOHA KULO 100 CHITWAN AC 1994 YR ID 94 75 94 75 75 75 0 0 0 ERIP NO ADB 3 GANDAKBELUWA KULO 100 CHITWAN AC 1996 YR ED 73 58 73 58 0 0 0 73 58 ERIP NO ADB 3 GANDAKBELUWA KULO 100 CHITWAN AC 1996 YR ED 11 9 11 9 0 0 0 11 9 ERIP NO ADB 3 GANDAKBHUTAHA KULO 100 CHITWAN AC 1996 YR ED 135 108 135 108 0 0 0 135 108 ERIP NO ADB 3 GANDAKBUDHI KULO 100 CHITWAN AC 1996 YR ED 43 34 43 34 0 0 0 43 34 ERIP NO ADB 3 GANDAKBUDHIRAPTI KULO 100 CHITWAN AC 1994 YR ID 144 115 144 115 115 115 0 0 0 ERIP NO ADB 3 GANDAKCHA TARA KULO 100 CHITWAN AC 1996 YR ED 28 22 28 22 0 0 0 28 22 ERIP NO ADB 3 GANDAKCHHATIWAN GAIDACHHAP 100 CHITWAN AC 1995 YR ID 118 94 118 94 94 45 30 0 0 ERIP NO ADB 3 GANDAKCHIPLETI KULO 100 CHITWAN PC 1996 YR ID 181 145 50 40 40 20 0 131 105 ERIP NO ADB 3 GANDAKCHURIGHOL KULO 100 CHITWAN PC 1997 YR ID 63 50 13 10 10 0 0 50 40 ERIP NO ADB 3 GANDAKDAITYA KULO 100 CHITWAN PC 1997 YR ID 75 60 63 50 50 0 0 12 10 ERIP NO ADB 3 GANDAKDEBAOULI KULO 100 CHITWAN AC 1996 YR ED 33 26 33 26 0 0 0 33 26 ERIP NO ADB 3 GANDAK DHARAMPUR KULO 100 CHITWAN AC 1996 YR ED 149 119 149 119 0 0 0 149 119 ERIP NO ADB 3 GANDAKDHUDHKOSHI KULO 100 CHITWAN AC 1996 YR ED 58 46 58 46 0 0 0 58 46 ERIP NO ADB 3 GANDAKDHUNGRE PARSA KULO 100 CHITWAN AC 1996 YR ED 13 10 13 10 0 0 0 13 10 ERIP NO ADB 3 GANDAKDORANGI KULO 100 CHITWAN PC 1996 YR ED 118 94 118 94 0 0 0 118 94 ERIP NO ADB 3 GANDAKEAST BAHARI KULO 100 CHITWAN AC 1996 YR ED 38 30 38 30 0 0 0 38 30 ERIP NO ADB 3 GANDAKGAIDA DHAP KULO 100 CHITWAN AC 1996 YR ED 20 16 20 16 0 0 0 20 16 ERIP NO ADB 3 GANDAKGAUCHAR KULO 100 CHITWAN AC 1996 YR ED 3 2 3 2 0 0 0 3 2 ERIP NO ADB 3 GANDAKGODHAP KULO 100 CHITWAN AC 1996 YR ED 9 7 9 7 0 0 0 9 7 ERIP NO ADB 3 GANDAKHARDI KULO 100 CHITWAN AC 1994 YR ID 115 92 115 92 92 92 0 0 0 ERIP NO ADB 3 GANDAKHAZIPURBAHERI KULO 100 CHITWAN AC 1996 YR ED 139 111 139 111 0 0 0 139 111 ERIP NO ADB 3 GANDAKJANAKALYANKHA 100 CHITWAN AC 1994 YR ID 148 118 148 118 118 118 0 0 0 ERIP NO ADB 3 GANDAKJANAKPUR KULO 100 CHITWAN AC 1994 YR ID 288 230 288 230 230 230 0 0 0 ERIP NO ADB 3 GANDAKJANKALYANGA KULO 100 CHITWAN AC 1994 YR ID 63 50 63 50 50 50 0 0 0 ERIP NO ADB 3 GANDAKJAPKAULI KULO 100 CHITWAN AC 1996 YR ED 99 79 99 79 0 0 0 99 79 ERIP NO ADB 3 GANDAKJARUWA 1 KULO 100 CHITWAN AC 1995 YR ID 38 30 38 30 30 15 15 0 0 ERIP NO ADB 3 GANDAKJARUWA 2 KULO 100 CHITWAN AC 1995 YR ID 38 30 38 30 30 15 15 0 0 ERIP NO ADB 3 GANDAKJHUBANI KULO 100 CHITWAN AC 1994 YR ID 220 176 220 176 176 176 0 0 0 ERIP NO ADB 3 GANDAKJHURJHUE KULO 100 CHITWAN AC 1996 YR ED 60 48 60 48 0 0 0 60 48 ERIP NO ADB 3 GANDAKJIVANPUR KULO 100 CHITWAN AC 1994 YR ID 51 41 51 41 41 41 0 0 0 ERIP NO ADB 3 GANDAKJYAMIRE KULO 100 CHITWAN AC 1996 YR ED 51 41 51 41 0 0 0 51 41 ERIP NO ADB 3 GANDAKKANKALI KULO 100 CHITWAN PC 1997 YR ED 460 368 423 338 338 0 0 37 30 ERIP NO ADB 3 GANDAKKAPIYA KULO 100 CHITWAN AC 1995 YR ID 100 80 100 80 80 60 60 0 0 ERIP NO ADB 3 GANDAKKARIYA KULO 100 CHITWAN AC 1996 YR ED 28 22 28 22 0 0 0 28 22 ERIP NO ADB 3 GANDAKKASHI GAON KULO 100 CHITWAN AC 1995 YR ID 115 92 115 92 92 45 30 0 0 ERIP NO ADB 3 GANDAKKATHAR&GOTHAULI KULO 100 CHITWAN AC 1996 YR ED 75 60 75 60 0 0 0 75 60 ERIP NO ADB 3 GANDAKKATHAR KULO 100 CHITWAN AC 1996 YR ED 131 105 131 105 0 0 0 131 105 ERIP NO ADB 3 GANDAKKATHAR KULO 100 CHITWAN AC 1996 YR ED 229 183 229 183 0 0 0 229 183 ERIP NO ADB 3 GANDAKKATHAR PAINI KULO 100 CHITWAN AC 1994 YR ID 254 203 254 203 203 203 0 0 0 ERIP NO ADB 3 GANDAKKHARKHUTTEKHULO 100 CHITWAN PC 1997 YR ID 94 75 38 30 30 30 30 56 45 ERIP NO ADB 3 GANDAK

53

Page 59: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

KHARKHUTTELOWERKUL 100 CHITWAN AC 1994 YR ID 59 47 59 47 47 47 0 0 0 ERIP NO ADB 3 GANDAKKHARKHUTTEUPPER KULO 100 CHITWAN AC 1994 YR ID 71 57 71 57 57 57 0 0 0 ERIP NO ADB 3 GANDAKKHARTHUTTE-1 100 CHITWAN AC 1996 YR ED 86 69 86 69 0 0 0 86 69 ERIP NO ADB 3 GANDAKKYAMPA KULO 100 CHITWAN AC 1996 YR ID 113 90 113 90 90 45 30 0 0 ERIP NO ADB 3 GANDAKLA BARIPATENI KULO 100 CHITWAN PC 1997 YR ID 63 50 38 30 30 0 0 25 20 ERIP NO ADB 3 GANDAKLAMAI KULO 100 CHITWAN PC 1997 YR ID 113 90 100 80 80 50 0 13 10 ERIP NO ADB 3 GANDAKLAUROGHOL KULO 100 CHITWAN AC 1995 YR ID 94 75 94 75 75 40 30 0 0 ERIP NO ADB 3 GANDAKMAHADEV KULO 100 CHITWAN AC 1995 YR ID 113 90 113 90 90 68 68 0 0 ERIP NO ADB 3 GANDAKMAINAHA KULO 100 CHITWAN AC 1996 YR ED 31 25 31 25 0 0 0 31 25 ERIP NO ADB 3 GANDAKMAJHUE KULO 100 CHITWAN PC 1997 YR ID 250 200 164 131 131 98 98 86 69 ERIP NO ADB 3 GANDAKMANGIYACHUHADI 100 CHITWAN AC 1996 YR ED 130 104 130 104 0 0 0 130 104 ERIP NO ADB 3 GANDAKMUDAVIR KULO 100 CHITWAN AC 1994 YR ID 181 145 181 145 145 145 0 0 0 ERIP NO ADB 3 GANDAKNAUBIGHE KULO 100 CHITWAN AC 1996 YR ED 23 18 23 18 0 0 0 23 18 ERIP NO ADB 3 GANDAKOHARMARIBERIYA 100 CHITWAN AC 1994 YR ED 435 348 435 348 348 348 0 0 0 ERIP NO ADB 3 GANDAKPADARIYA KULO 100 CHITWAN AC 1994 YR ID 174 139 174 139 139 139 0 0 0 ERIP NO ADB 3 GANDAKPAMPA KULO 100 CHITWAN AC 1996 YR ID 100 80 100 80 80 40 30 0 0 ERIP NO ADB 3 GANDAK PANISARADHAP KULO 100 CHITWAN PC 1995 YR ID 38 30 38 30 30 15 15 0 0 ERIP NO ADB 3 GANDAKPARAJULI KULO 100 CHITWAN AC 1994 YR ID 6 5 6 5 5 5 0 0 0 ERIP NO ADB 3 GANDAKPARSA KULO 100 CHITWAN PC 1997 YR ID 198 158 60 48 48 30 0 138 110 ERIP NO ADB 3 GAMDAKPARSAUNI KULO 100 CHITWAN AC 1996 YR ED 123 98 123 98 0 0 0 123 98 ERIP NO ADB 3 GANDAKPHESERNAPHESERNI KULO 100 CHITWAN AC 1996 YR ID 71 57 71 57 0 0 0 71 57 ERIP NO ADB 3 GANDAKPIPARABHD GAON 100 CHITWAN AC 1994 YR ID 253 202 253 202 202 202 0 0 0 ERIP NO ADB 3 GANDAKPITHUWA KULO 100 CHITWAN PC 1997 YR ID 750 600 313 250 250 100 0 437 350 ERIP NO ADB 3 GANDAKPRATAPPURBAGAR 100 CHITWAN AC 1996 YR ED 23 18 23 18 0 0 0 23 18 ERIP NO ADB 3 GANDAKPRATAPPUR KULO 100 CHITWAN AC 1994 YR ID 329 263 329 263 263 263 0 0 0 ERIP NO ADB 3 GANDAKPUCHH BARIMAJOEE KULO 100 CHITWAN AC 1996 YR ED 78 62 78 62 0 0 0 78 62 ERIP NO ADB 3 GANDAKPUR BARI KULO 100 CHITWAN AC 1994 YR ID 33 26 33 26 26 26 0 0 0 ERIP NO ADB 3 GANDAKPURBSRIBAGAR KULO 100 CHITWAN AC 1996 YR ED 16 13 16 13 0 0 0 16 13 ERIP NO ADB 3 GANDAKSANTANA KULO 100 CHITWAN AC 1996 YR ED 283 226 283 226 0 0 0 283 226 ERIP NO ADB 3 GANDAKSATHIBIGHE KULO 100 CHITWAN AC 1996 YR ED 60 48 60 48 0 0 0 60 48 ERIP NO ADB 3 GANDAKSAUNPUR KULO 100 CHITWAN AC 1996 YR ED 96 77 96 77 0 0 0 96 77 ERIP NO ADB 3 GANDAKSHANTICHOWK KULO 100 CHITWAN AC 1996 YR ED 26 21 26 21 0 0 0 26 21 ERIP NO ADB 3 GANDAKSHUDHI KULO 100 CHITWAN AC 1996 YR ED 244 195 244 195 0 0 0 244 195 ERIP NO ADB 3 GANDAKSHUKHA1 KULO 100 CHITWAN AC 1996 YR ID 44 35 44 35 35 20 15 0 0 ERIP NO ADB 3 GANDAKSHUKHA2 KULO 100 CHITWAN AC 1996 YR ID 33 26 33 26 26 15 10 0 0 ERIP NO ADB 3 GANDAKSISABAS KULO 100 CHITWAN AC 1994 YR ID 134 107 134 107 107 107 0 0 0 ERIP NO ADB 3 GANDAKSISANGADI KULO 100 CHITWAN AC 1994 YR ID 26 21 26 21 21 21 0 0 0 ERIP NO ADB 3 GANDAKSISUWARI KULO 100 CHITWAN AC 1996 YR ED 40 32 40 32 0 0 0 40 32 ERIP NO ADB 3 GANDAKSI TAL PANI KULO 100 CHITWAN AC 1995 YR ID 38 30 38 30 30 15 10 0 0 ERIP NO ADB 3 GANDAKSUKAMBASHI KULO 100 CHITWAN AC 1996 YR ED 23 18 23 18 0 0 0 23 18 ERIP NO ADB 3 GANDAKSUKHA KHOLA KULO 100 CHITWAN AC 1996 YR ED 59 47 59 47 0 0 0 59 47 ERIP NO ADB 3 GANDAKSURTANA KULO 100 CHITWAN AC 1995 YR ID 231 185 231 185 185 139 139 0 0 ERIP NO ADB 3 GANDAKTADAULI KULO 100 CHITWAN AC 1994 YR ID 96 77 96 77 77 77 0 0 0 ERIP NO ADB 3 GANDAKTHANBUNGKALI KULO 100 CHITWAN PC 1997 YR ID 495 396 295 236 236 200 100 200 160 ERIP NO ADB 3 GANDAKTUGDUDHKOSHI KULO 100 CHITWAN AC 1995 YR ID 25 20 25 20 20 10 10 0 0 ERIP NO ADB 3 GANDAKTULSIPUR KULO 100 CHITWAN AC 1996 YR ED 44 35 44 35 0 0 0 44 35 ERIP NO ADB 3 GANDAK

54

Page 60: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

UNANTOLEDHUSENI KULO 100 CHITWAN AC 1996 YR ED 15 12 15 12 0 0 0 15 12 ERIP NO ADB 3 GANDAKWESTBAHARI KULO 100 CHITWAN AC 1996 YR ED 95 76 95 76 0 0 0 95 76 ERIP NO ADB 3 GANDAKTOTAL of ERIP > CHITWAN > REHABILITATION 100 11400 9104 10215 8155 5169 4023 829 4927 3935

TOTAL of CHITWAN District 100 11400 9104 10215 8155 5169 4023 829 4927 3935

TOTAL of CENTRAL > Terai 100 11400 9104 10215 8155 5169 4023 829 4927 3935

TOTAL of Central Region 100 11400 9104 10215 8155 5169 4023 829 4927 3935

TOTAL of > ERIP 100 11400 9104 10215 8155 5169 4023 829 4927 3935

FIWUD>JHAPA>REHABILITATIONDHAIJAN 100 JHAPA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERREKHA PAINI 100 JHAPA AC 100 80 100 80 80 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERTOTAL of FIWUD > JHAPA > REHABILITATION 2 225 180 225 180 180 0 0 0 0

TOTAL of JHAPA District 2 225 180 225 180 180 0 0 0 0

FIWUD>SIRAHA>REHABILITATIONGAGAN KHOLA 100 SIRAHA AC 375 300 375 300 300 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERKAMAL PANI 100 SIRAHA AC 375 300 375 300 300 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERTOTAL of FIWUD > SIRAHA > REHABILITATION 2 750 600 750 600 600 0 0 0 0

TOTAL of SIRAHA District 2 750 600 750 600 600 0 0 0 0

FIWUD>SUNSARI>REHABILITATIONBAKLAURI 100 SUNSARI AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERSUKUMARI 100 SUNSARI AC 625 500 625 500 500 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERTOTAL of FIWUD > SUNSARI > REHABILITATION 2 750 600 750 600 600 0 0 0 0

TOTAL of SUNSARI District 2 750 600 750 600 600 0 0 0 0

TOTAL of EASTERN > Terai 6 1725 1380 1725 1380 1380 0 0 0 0

FIWUD>BHOJPUR>NEWCHAMPE 100 BHOJPUR AC 250 200 250 200 200 0 0 0 0 FIWUD NO GoN 4 KOSHITOTAL of FIWUD > BHOJPUR > NEW 1 250 200 250 200 200 0 0 0 0

TOTAL of BHOJPUR District 1 250 200 250 200 200 0 0 0 0

FIWUD>DHANKUTA>NEWGUTHI TAR POND 100 DHANKUTA AC 6 5 6 5 5 0 0 0 0 FIWUD NO GoN 4 KOSHIKAVRE 100 DHANKUTA AC 38 30 38 30 30 0 0 0 0 FIWUD NO GoN 4 KOSHIMULGHAT 100 DHANKUTA AC 44 35 44 35 35 0 0 0 0 FIWUD NO GoN 4 KOSHITOTAL of FIWUD > DHANKUTA > NEW 3 88 70 88 70 70 0 0 0 0

55

Page 61: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of DHANKUTA District 3 88 70 88 70 70 0 0 0 0

FIWUD>KHOTANG>NEWBULKU 100 KHOTANG AC 19 15 19 15 15 0 0 0 0 FIWUD NO GoN 4 KOSHICHYAN DANDA 100 KHOTANG AC 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 4 KOSHIDORPA 100 KHOTANG AC 313 250 313 250 250 0 0 0 0 FIWUD NO GoN 4 KOSHIEKCHHANGE 100 KHOTANG AC 250 200 250 200 200 0 0 0 0 FIWUD NO GoN 4 KOSHIMAKSHING TAR 100 KHOTANG AC 4 3 4 3 3 0 0 0 0 FIWUD NO GoN 4 KOSHITOTAL of FIWUD > KHOTANG > NEW 5 649 518 649 518 518 0 0 0 0

TOTAL of KHOTANG District 5 649 518 649 518 518 0 0 0 0

FIWUD>OKHALDHUNGA>NEWKHATA 100 OKHALDHUNGA AC 4 3 4 3 3 0 0 0 0 FIWUD NO GoN 4 KOSHIKUTUNJE 100 OKHALDHUNGA AC 26 21 26 21 21 0 0 0 0 FIWUD NO GoN 4 KOSHIMAMKHA 100 OKHALDHUNGA AC 7 5 7 5 5 0 0 0 0 FIWUD NO GoN 4 KOSHITOTAL of FIWUD > OKHALDHUNGA > NEW 3 37 29 37 29 29 0 0 0 0

TOTAL of OKHALDHUNGA District 3 37 29 37 29 29 0 0 0 0

FIWUD>PANCHTHAR>NEWKAFALBOTE 100 PANCHTHAR AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 4 KOSHITOTAL of FIWUD > PANCHTHAR > NEW 1 188 150 188 150 150 0 0 0 0

TOTAL of PANCHTHAR District 1 188 150 188 150 150 0 0 0 0

FIWUD>TERATHUM>NEWHALCHOK 100 TERATHUM AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 4 KOSHITELIYA KHOLA 100 TERATHUM AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 4 KOSHIUWA KHOLA 100 TERATHUM AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 4 KOSHITOTAL of FIWUD > TERATHUM > NEW 3 281 225 281 225 225 0 0 0 0

FIWUD>TERATHUM>REHABILITATIONHATTIHAL 100 TERATHUM AC 38 30 38 30 30 0 0 0 0 FIWUD NO GoN 4 KOSHIJIRIKHIMTI 100 TERATHUM AC 375 300 375 300 300 0 0 0 0 FIWUD NO GoN 4 KOSHILOHATOPA 100 TERATHUM AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 4 KOSHITOTAL of FIWUD > TERATHUM > REHABILITATION 3 538 430 538 430 430 0 0 0 0

TOTAL of TERATHUM District 6 819 655 819 655 655 0 0 0 0

FIWUD>UDAYPUR>REHABILITATIONBASHA 100 UDAYPUR AC 69 55 69 55 55 0 0 0 0 FIWUD NO GoN 4 KOSHITOTAL of FIWUD > UDAYPUR > REHABILITATION 1 69 55 69 55 55 0 0 0 0

TOTAL of UDAYPUR District 1 69 55 69 55 55 0 0 0 0

56

Page 62: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of EASTERN > Hill 20 2100 1677 2100 1677 1677 0 0 0 0

TOTAL of EASTERN Region 26 3825 3057 3825 3057 3057 0 0 0 0

FIWUD>CHITWAN>REHABILITATIONBAD GAON 100 CHITWAN AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 3 GANDAKBIRENDRA NAGAR 100 CHITWAN AC YR ID 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 3 GANDAKDUNGE KHOLA 100 CHITWAN AC 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 3 GANDAKJAGATPUR 100 CHITWAN AC 250 200 250 200 200 0 0 0 0 FIWUD NO GoN 3 GANDAKJUNPUR 100 CHITWAN AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 3 GANDAKKAHIRANI 100 CHITWAN AC 250 200 250 200 200 0 0 0 0 FIWUD NO GoN 3 GANDAKKAPIYA KUMROJ 100 CHITWAN AC 250 200 250 200 200 0 0 0 0 FIWUD NO GoN 3 GANDAKKATHARA(A) 100 CHITWAN AC 500 400 500 400 400 0 0 0 0 FIWUD NO GoN 3 GANDAKLADARI 100 CHITWAN AC 75 60 75 60 60 0 0 0 0 FIWUD NO GoN 3 GANDAKMAJHUI 100 CHITWAN AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 3 GANDAKTANAHI 100 CHITWAN AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 3 GANDAKTOTAL of FIWUD > CHITWAN > REHABILITATION 11 2140 1710 2140 1710 1710 0 0 0 0

TOTAL of CHITWAN District 11 2140 1710 2140 1710 1710 0 0 0 0

FIWUD>DHANUSHA>NEWBALHA KATHAL 100 DHANUSHA AC 100 80 100 80 80 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERBIGHI 100 DHANUSHA AC 150 120 150 120 120 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERDALDALE GHIGH 100 DHANUSHA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERGALAIYA 100 DHANUSHA AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERLI TARA 100 DHANUSHA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERMARUWAHI 100 DHANUSHA AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERPAIN BI BI 100 DHANUSHA AC 94 75 94 75 75 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERSINUJODA 100 DHANUSHA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERTOTAL of FIWUD > DHANUSHA > NEW 8 938 750 938 750 750 0 0 0 0

FIWUD>DHANUSHA>REHABILITATIONAGANGIR 100 DHANUSHA AC 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERAMARI 100 DHANUSHA AC 250 200 250 200 200 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERAUMARA 100 DHANUSHA AC 28 22 28 22 22 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERBACHARAJA 100 DHANUSHA AC 156 125 156 125 125 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERBAGDI MOGALIYA 100 DHANUSHA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERBAIGAPIPARADI 100 DHANUSHA AC 94 75 94 75 75 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERBAKCHURA 100 DHANUSHA AC 94 75 94 75 75 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERBANGUHAI 100 DHANUSHA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERBASAHI 100 DHANUSHA AC 13 10 13 10 10 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERBIDHI 100 DHANUSHA AC 625 500 625 500 500 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERBIRTA KULO 100 DHANUSHA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERBU JA NADI 100 DHANUSHA AC 156 125 156 125 125 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERCHAUBAHI 100 DHANUSHA AC 94 75 94 75 75 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER

57

Page 63: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

DA BARI 100 DHANUSHA AC 13 10 13 10 10 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERDHADAR KULO 100 DHANUSHA AC 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERDUCHAMATI 100 DHANUSHA AC 250 200 250 200 200 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERGAGATIYA BANDH 100 DHANUSHA AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERGAGDAR KHOLA 100 DHANUSHA AC 94 75 94 75 75 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERGANESHPUR 100 DHANUSHA AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERJALLAD 100 DHANUSHA AC 313 250 313 250 250 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERJHOJHHI KATAIYA 100 DHANUSHA AC 69 55 69 55 55 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERKAGI BANDH 100 DHANUSHA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERKAMALA SAWNPUR 100 DHANUSHA AC 106 85 106 85 85 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERLOHAN 100 DHANUSHA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERLOHARA KHOLA 100 DHANUSHA AC 88 70 88 70 70 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERMADHUBASA 100 DHANUSHA AC 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERMAGALHAIYA 100 DHANUSHA AC 94 75 94 75 75 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERMECHI KULO 100 DHANUSHA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERMITHILAYSHWAR 100 DHANUSHA AC 313 250 313 250 250 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERPUJAGARI 100 DHANUSHA AC 10 8 10 8 8 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERPURANO JALLADHA 100 DHANUSHA AC 313 250 313 250 250 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERSATOKHAR 100 DHANUSHA AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERSIDHIPAI 100 DHANUSHA AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERSILAMI 100 DHANUSHA AC 25 20 25 20 20 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERSIMA 100 DHANUSHA AC 15 12 15 12 12 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERSUGRAHAI 100 DHANUSHA AC 16 13 16 13 13 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERTHUMCHUNA 100 DHANUSHA AC 156 125 156 125 125 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERTILCHO 100 DHANUSHA AC 94 75 94 75 75 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERVAS KHOLA 100 DHANUSHA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERVUGALIYA 100 DHANUSHA AC 94 75 94 75 75 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERTOTAL of FIWUD > DHANUSHA > REHABILITATION 40 5389 4305 5389 4305 4305 0 0 0 0

TOTAL of DHANUSHA District 48 6327 5055 6327 5055 5055 0 0 0 0

FIWUD>MAHOTTARI>NEWJUDO 100 MAHOTTARI AC 113 90 113 90 90 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERTOTAL of FIWUD > MAHOTTARI > NEW 1 113 90 113 90 90 0 0 0 0

TOTAL of MAHOTTARI District 1 113 90 113 90 90 0 0 0 0

FIWUD>PARSA>NEWANARA 100 PARSA AC 10 8 10 8 8 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERTOTAL of FIWUD > PARSA > NEW 1 10 8 10 8 8 0 0 0 0

TOTAL of PARSA District 1 10 8 10 8 8 0 0 0 0

FIWUD>RAUTAHAT>NEWLAL BAKIA 100 RAUTAHAT AC 3125 2500 3125 2500 2500 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERTOTAL of FIWUD > RAUTAHAT > NEW 1 3125 2500 3125 2500 2500 0 0 0 0

58

Page 64: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of RAUTAHAT District 1 3125 2500 3125 2500 2500 0 0 0 0

TOTAL of CENTRAL > Terai 62 11715 9363 11715 9363 9363 0 0 0 0

FIWUD>BHAKTAPUR>NEWDHUNGE KHOLA 100 BHAKTAPUR AC 4 3 4 3 3 0 0 0 0 FIWUD NO GoN 9 BAGMATINARAYANTHALI 100 BHAKTAPUR AC 38 30 38 30 30 0 0 0 0 FIWUD NO GoN 9 BAGMATITOTAL of FIWUD > BHAKTAPUR > NEW 2 42 33 42 33 33 0 0 0 0

TOTAL of BHAKTAPUR District 2 42 33 42 33 33 0 0 0 0

FIWUD>DHADING>REHABILITATIONTABAL BESI 100 DHADING AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 3 GANDAKTOTAL of FIWUD > DHADING > REHABILITATION 1 125 100 125 100 100 0 0 0 0

TOTAL of DHADING District 1 125 100 125 100 100 0 0 0 0

FIWUD>KATHMANDU>NEWBAGMATI 100 KATHMANDU AC 313 250 313 250 250 0 0 0 0 FIWUD NO GoN 9 BAGMATITOTAL of FIWUD > KATHMANDU > NEW 1 313 250 313 250 250 0 0 0 0

TOTAL of KATHMANDU District 1 313 250 313 250 250 0 0 0 0

FIWUD>KAVRE>NEWBALTHALI 100 KAVRE AC 69 55 69 55 55 0 0 0 0 FIWUD NO GoN 4 KOSHIBHYAGURE KHOLA 100 KAVRE AC 100 80 100 80 80 0 0 0 0 FIWUD NO GoN 4 KOSHITOTAL of FIWUD > KAVRE > NEW 2 169 135 169 135 135 0 0 0 0

TOTAL of KAVRE District 2 169 135 169 135 135 0 0 0 0

FIWUD>NUWAKOT>NEWBETINI KHOLA 100 NUWAKOT AC 88 70 88 70 70 0 0 0 0 FIWUD NO GoN 3 GANDAKBHANJYANG BHURUNG 100 NUWAKOT AC 88 70 88 70 70 0 0 0 0 FIWUD NO GoN 3 GANDAKCHHUPANG KHOLA 100 NUWAKOT AC 313 250 313 250 250 0 0 0 0 FIWUD NO GoN 3 GANDAKCHHYANG KHOLA 100 NUWAKOT AC 250 200 250 200 200 0 0 0 0 FIWUD NO GoN 3 GANDAKDUICHHANGE 100 NUWAKOT AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 3 GANDAKGOMATI KHOLA 100 NUWAKOT AC 38 30 38 30 30 0 0 0 0 FIWUD NO GoN 3 GANDAKMAJHUWA 100 NUWAKOT AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 3 GANDAKTOTAL of FIWUD > NUWAKOT > NEW 7 1153 920 1153 920 920 0 0 0 0

TOTAL of NUWAKOT District 7 1153 920 1153 920 920 0 0 0 0

FIWUD>RAMECHAP>NEWBHATAULI KHOLA 100 RAMECHAP AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 4 KOSHIBIRE KHOLA 100 RAMECHAP AC 3 2 3 2 2 0 0 0 0 FIWUD NO GoN 4 KOSHI

59

Page 65: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

BOHORA KHOLA 100 RAMECHAP AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 4 KOSHIHALUWA KHOLA 100 RAMECHAP AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 4 KOSHIJUNGA GHORANG 100 RAMECHAP AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 4 KOSHIKARARE KHOLA 100 RAMECHAP AC 25 20 25 20 20 0 0 0 0 FIWUD NO GoN 4 KOSHIKARKI TAR 100 RAMECHAP AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 4 KOSHIMAJUWA 100 RAMECHAP AC 3 2 3 2 2 0 0 0 0 FIWUD NO GoN 4 KOSHIWALING KHOLA 100 RAMECHAP AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 4 KOSHITOTAL of FIWUD > RAMECHAP > NEW 9 531 424 531 424 424 0 0 0 0

FIWUD>RAMECHAP>REHABILITATIONBABIYA KHARKA 100 RAMECHAP AC 1 1 1 1 1 0 0 0 0 FIWUD NO GoN 4 KOSHIBATHARE KHOLA 100 RAMECHAP AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 4 KOSHIBHYAGURE KHOLA 100 RAMECHAP AC 29 23 29 23 23 0 0 0 0 FIWUD NO GoN 4 KOSHIUTISE 100 RAMECHAP AC 6 5 6 5 5 0 0 0 0 FIWUD NO GoN 4 KOSHITOTAL of FIWUD > RAMECHAP > REHABILITATION 4 67 54 67 54 54 0 0 0 0

TOTAL of RAMECHAP District 13 598 478 598 478 478 0 0 0 0

FIWUD>SINDHULI>NEWANDHERI KHOLA 100 SINDHULI AC 206 165 206 165 165 0 0 0 0 FIWUD NO GoN 9 BAGMATIBARAHA PALASE 100 SINDHULI AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 9 BAGMATIDHAMI DUMARIA 100 SINDHULI AC 49 39 49 39 39 0 0 0 0 FIWUD NO GoN 9 BAGMATITHULO KHOLA 100 SINDHULI AC 75 60 75 60 60 0 0 0 0 FIWUD NO GoN 9 BAGMATITOTAL of FIWUD > SINDHULI > NEW 4 518 414 518 414 414 0 0 0 0

FIWUD>SINDHULI>REHABILITATIONBARDEU TAR 100 SINDHULI AC 8 6 8 6 6 0 0 0 0 FIWUD NO GoN 9 BAGMATIBATONIGALE 100 SINDHULI AC 19 15 19 15 15 0 0 0 0 FIWUD NO GoN 9 BAGMATI CHAURAHI KHOLA 100 SINDHULI AC 43 34 43 34 34 0 0 0 0 FIWUD NO GoN 9 BAGMATIGAIRI KHET 100 SINDHULI AC 13 10 13 10 10 0 0 0 0 FIWUD NO GoN 9 BAGMATIKAMALA 100 SINDHULI AC 49 39 49 39 39 0 0 0 0 FIWUD NO GoN 9 BAGMATIKHAT TAR 100 SINDHULI AC 20 16 20 16 16 0 0 0 0 FIWUD NO GoN 9 BAGMATIKHOPI KHARA 100 SINDHULI AC 24 19 24 19 19 0 0 0 0 FIWUD NO GoN 9 BAGMATIKHURKOT 100 SINDHULI AC 96 77 96 77 77 0 0 0 0 FIWUD NO GoN 9 BAGMATILAMU KULO 100 SINDHULI AC 10 8 10 8 8 0 0 0 0 FIWUD NO GoN 9 BAGMATINIGALE 100 SINDHULI AC 3 2 3 2 2 0 0 0 0 FIWUD NO GoN 9 BAGMATI POKHARI KHET 100 SINDHULI AC 6 5 6 5 5 0 0 0 0 FIWUD NO GoN 9 BAGMATISINDHULI 100 SINDHULI AC 6 5 6 5 5 0 0 0 0 FIWUD NO GoN 9 BAGMATITOTAL of FIWUD > SINDHULI > REHABILITATION 12 297 236 297 236 236 0 0 0 0

TOTAL of SINDHULI District 16 815 650 815 650 650 0 0 0 0

TOTAL of CENTRAL > Hill 42 3215 2566 3215 2566 2566 0 0 0 0

FIWUD>DOLAKHA>REHABILITATIONDOLTI KHOLA 100 DOLAKHA AC 25 20 25 20 20 0 0 0 0 FIWUD NO GoN 4 KOSHI

60

Page 66: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of FIWUD > DOLAKHA > REHABILITATION 1 25 20 25 20 20 0 0 0 0

TOTAL of DOLAKHA District 1 25 20 25 20 20 0 0 0 0

FIWUD>RASUWA>NEWPHALAKHU KHOLA 100 RASUWA AC 38 30 38 30 30 0 0 0 0 FIWUD NO GoN 3 GANDAKTOTAL of FIWUD > RASUWA > NEW 1 38 30 38 30 30 0 0 0 0

TOTAL of RASUWA District 1 38 30 38 30 30 0 0 0 0

TOTAL of CENTRAL > Mountain 2 63 50 63 50 50 0 0 0 0

FIWUD>SINDHUPALCHOWK>NEWHOSTE KHOLA 100 SINDHUPALCHOWK AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 4 KOSHITOTAL of FIWUD > SINDHUPALCHOWK > NEW 1 125 100 125 100 100 0 0 0 0

TOTAL of SINDHUPALCHOWK District 1 125 100 125 100 100 0 0 0 0

TOTAL of CENTRAL > Hill 1 125 100 125 100 100 0 0 0 0

TOTAL of CENTRAL Region 107 15118 12079 15118 12079 12079 0 0 0 0

FIWUD>KAPILVASTU>REHABILITATIONMAURMA(150 HA) 100 KAPILVASTU AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVERTOTAL of FIWUD > KAPILVASTU > REHABILITATION 1 188 150 188 150 150 0 0 0 0

TOTAL of KAPILVASTU District 1 188 150 188 150 150 0 0 0 0

FIWUD>NAWALPARASI>NEWMISRAULI BHALUWA 100 NAWALPARASI AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 3 GANDAKTOTAL of FIWUD > NAWALPARASI > NEW 1 125 100 125 100 100 0 0 0 0

TOTAL of NAWALPARASI District 1 125 100 125 100 100 0 0 0 0

FIWUD>RUPANDEHI>REHABILITATIONHAGANI KHOLA 100 RUPANDEHI AC 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 8 TINAUMUDIYARI KHOLA 100 RUPANDEHI AC 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 8 TINAUSOTA JHARANA 100 RUPANDEHI AC 150 120 150 120 120 0 0 0 0 FIWUD NO GoN 8 TINAUTOTAL of FIWUD > RUPANDEHI > REHABILITATION 3 276 220 276 220 220 0 0 0 0

TOTAL of RUPANDEHI District 3 276 220 276 220 220 0 0 0 0

TOTAL of WESTERN>Terai 5 589 470 589 470 470 0 0 0 0

FIWUD>ARGHAKHANCHI>REHABILITATIONCHORIKA SOLATRA 100 ARGHAKHANCHI AC 10 8 10 8 8 0 0 0 0 FIWUD NO GoN 6 WEST RAPTI

61

Page 67: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

MANDRE KHOLA 100 ARGHAKHANCHI AC 94 75 94 75 75 0 0 0 0 FIWUD NO GoN 6 WEST RAPTISICHKHOK 100 ARGHAKHANCHI AC 29 23 29 23 23 0 0 0 0 FIWUD NO GoN 6 WEST RAPTITOTAL of FIWUD > ARGHAKHANCHI > REHABILITATION 3 133 106 133 106 106 0 0 0 0

TOTAL of ARGHAKHANCHI District 3 133 106 133 106 106 0 0 0 0

FIWUD>BAGLUNG>NEWGHUDI KHOLA 100 BAGLUNG AC 75 60 75 60 60 0 0 0 0 FIWUD NO GoN 3 GANDAKTOTAL of FIWUD > BAGLUNG > NEW 1 75 60 75 60 60 0 0 0 0

FIWUD>BAGLUNG>REHABILITATIONDHAPA KHOLA 100 BAGLUNG AC 81 65 81 65 65 0 0 0 0 FIWUD NO GoN 3 GANDAKLUBHUWA KHOLA 100 BAGLUNG AC 25 20 25 20 20 0 0 0 0 FIWUD NO GoN 3 GANDAKTOTAL of FIWUD > BAGLUNG > REHABILITATION 2 106 85 106 85 85 0 0 0 0

TOTAL of BAGLUNG District 3 181 145 181 145 145 0 0 0 0

FIWUD>GULMI>NEWHILE KHOLA 100 GULMI AC 55 44 55 44 44 0 0 0 0 FIWUD NO GoN 3 GANDAKTOTAL of FIWUD > GULMI > NEW 1 55 44 55 44 44 0 0 0 0

TOTAL of GULMI District 1 55 44 55 44 44 0 0 0 0

FIWUD>MYAGDI>NEWPHAURE KHOLA 100 MYAGDI AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 3 GANDAKTOTAL of FIWUD > MYAGDI > NEW 1 31 25 31 25 25 0 0 0 0

FIWUD>MYAGDI>REHABILITATIONNILDAHA 100 MYAGDI AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 3 GANDAKTHULO KHOLA 100 MYAGDI AC 156 125 156 125 125 0 0 0 0 FIWUD NO GoN 3 GANDAKTOTAL of FIWUD > MYAGDI > REHABILITATION 2 187 150 187 150 150 0 0 0 0

TOTAL of MYAGDI District 3 218 175 218 175 175 0 0 0 0

FIWUD>PALPA>NEWGALCHA PHANT 100 PALPA AC 13 10 13 10 10 0 0 0 0 FIWUD NO GoN 3 GANDAKGIJAN CHOUR PANCHE 100 PALPA AC 5 4 5 4 4 0 0 0 0 FIWUD NO GoN 3 GANDAKTOTAL of FIWUD > PALPA > NEW 2 18 14 18 14 14 0 0 0 0

FIWUD>PALPA>REHABILITATIONSERA DANDA 100 PALPA AC 19 15 19 15 15 0 0 0 0 FIWUD NO GoN 3 GANDAKTOTAL of FIWUD > PALPA > REHABILITATION 1 19 15 19 15 15 0 0 0 0

TOTAL of PALPA District 3 37 29 37 29 29 0 0 0 0

62

Page 68: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

FIWUD>PARBAT>NEWBARAUTE-SYAL 100 PARBAT AC 25 20 25 20 20 0 0 0 0 FIWUD NO GoN 3 GANDAKGADE KHOLA 100 PARBAT AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 3 GANDAKKHANDULA 100 PARBAT AC 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 3 GANDAKSIRU BARI 100 PARBAT AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 3 GANDAKTOTAL of FIWUD > PARBAT > NEW 4 150 120 150 120 120 0 0 0 0

FIWUD>PARBAT>REHABILITATIONARTHAR DANDAKHARK 100 PARBAT AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 3 GANDAKCHINNE KHOLA 100 PARBAT AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 3 GANDAKDHAIRING LOUGDI 100 PARBAT AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 3 GANDAKGAHARE KHOLA 100 PARBAT AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 3 GANDAKJHARUWA 100 PARBAT AC 25 20 25 20 20 0 0 0 0 FIWUD NO GoN 3 GANDAKJHYAPLE KHOLA 100 PARBAT AC 10 8 10 8 8 0 0 0 0 FIWUD NO GoN 3 GANDAKLASTI KHOLA 100 PARBAT AC 56 45 56 45 45 0 0 0 0 FIWUD NO GoN 3 GANDAKSUNDARE KHOLA 100 PARBAT AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 3 GANDAKKHAHARE KHOLA 100 PARBAT AC 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 3 GANDAKRAYOU 100 PARBAT AC 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 3 GANDAKTOTAL of FIWUD > PARBAT > REHABILITATION 10 372 298 372 298 298 0 0 0 0

TOTAL of PARBAT District 14 522 418 522 418 418 0 0 0 0

TOTAL of WESTERN> Hill 27 1146 917 1146 917 917 0 0 0 0

TOTAL of WESTERN Region 32 1735 1387 1735 1387 1387 0 0 0 0

FIWUD>BANKE>REHABILITATIONNIBUWA CHAPPARGADI 100 BANKE AC 75 60 75 60 60 0 0 0 0 FIWUD NO GoN 6 WEST RAPTITOTAL of FIWUD > BANKE > REHABILITATION 1 75 60 75 60 60 0 0 0 0

TOTAL of BANKE District 1 75 60 75 60 60 0 0 0 0

TOTAL ofMID-WESTERN> Terai 1 75 60 75 60 60 0 0 0 0

FIWUD>JAJARKOT>NEWCHOKHA 100 JAJARKOT AC 19 15 19 15 15 0 0 0 0 FIWUD NO GoN 2 KARNALIMATELA 100 JAJARKOT AC 50 40 50 40 40 0 0 0 0 FIWUD NO GoN 2 KARNALINABALGAR 100 JAJARKOT AC 75 60 75 60 60 0 0 0 0 FIWUD NO GoN 2 KARNALI TAL CHHAHARA 100 JAJARKOT AC 44 35 44 35 35 0 0 0 0 FIWUD NO GoN 2 KARNALITOTAL of FIWUD > JAJARKOT > NEW 4 188 150 188 150 150 0 0 0 0

TOTAL of JAJARKOT District 4 188 150 188 150 150 0 0 0 0

FIWUD>ROLPA>REHABILITATIONJAWAL KHOLA 100 ROLPA AC 75 60 75 60 60 0 0 0 0 FIWUD NO GoN 6 WEST RAPTITOTAL of FIWUD > ROLPA > REHABILITATION 1 75 60 75 60 60 0 0 0 0

63

Page 69: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of ROLPA District 1 75 60 75 60 60 0 0 0 0

FIWUD>RUKUM>NEWCHANDRIWANG 100 RUKUM AC 19 15 19 15 15 0 0 0 0 FIWUD NO GoN 2 KARNALITOTAL of FIWUD > RUKUM > NEW 1 19 15 19 15 15 0 0 0 0

FIWUD>RUKUM>REHABILITATIONRIJEGAD 100 RUKUM AC 50 40 50 40 40 0 0 0 0 FIWUD NO GoN 2 KARNALITOTAL of FIWUD > RUKUM > REHABILITATION 1 50 40 50 40 40 0 0 0 0

TOTAL of RUKUM District 2 69 55 69 55 55 0 0 0 0

FIWUD>SALYAN>REHABILITATIONGOTH KHOLA 100 SALYAN AC 48 38 48 38 38 0 0 0 0 FIWUD NO GoN 5 BABAIPHARULA CHAUR 100 SALYAN AC 54 43 54 43 43 0 0 0 0 FIWUD NO GoN 5 BABAITOTAL of FIWUD > SALYAN > REHABILITATION 2 102 81 102 81 81 0 0 0 0

TOTAL of SALYAN District 2 102 81 102 81 81 0 0 0 0

TOTAL of MID-WESTERN> Hill 9 434 346 434 346 346 0 0 0 0

FIWUD>DOLPA>NEWSHANTI CHHETRA HORTI 100 DOLPA AC 9 7 9 7 7 0 0 0 0 FIWUD NO GoN 6 WEST RAPTITOTAL of FIWUD > DOLPA > NEW 1 9 7 9 7 7 0 0 0 0

TOTAL of DOLPA District 1 9 7 9 7 7 0 0 0 0

FIWUD>KALIKOT>REHABILITATIONCHHATI 100 KALIKOT AC 194 155 194 155 155 0 0 0 0 FIWUD NO GoN 2 KARNALI KHOLA KHARKA 100 KALIKOT AC 625 500 625 500 500 0 0 0 0 FIWUD NO GoN 2 KARNALITOTAL of FIWUD > KALIKOT > REHABILITATION 2 819 655 819 655 655 0 0 0 0

TOTAL of KALIKOT District 2 819 655 819 655 655 0 0 0 0

TOTAL of MID-WESTERN> Mountain 3 828 662 828 662 662 0 0 0 0

TOTAL of MID-WESTERN Region 13 1337 1068 1337 1068 1068 0 0 0 0

FIWUD>KAILALI>REHABILITATIONKULDIYO 100 KAILALI AC 156 125 156 125 125 0 0 0 0 FIWUD NO GoN 2 KARNALIPRATAPPUR CHAWRAHI 100 KAILALI AC 156 125 156 125 125 0 0 0 0 FIWUD NO GoN 2 KARNALITOTAL of FIWUD > KAILALI > REHABILITATION 2 312 250 312 250 250 0 0 0 0

TOTAL of KAILALI District 2 312 250 312 250 250 0 0 0 0

64

Page 70: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of FAR-WESTERN> Terai 2 312 250 312 250 250 0 0 0 0

FIWUD>ACHHAM>REHABILITATIONDARTA 100 ACHHAM AC 38 30 38 30 30 0 0 0 0 FIWUD NO GoN 2 KARNALITAUSI 100 ACHHAM AC 123 98 123 98 98 0 0 0 0 FIWUD NO GoN 2 KARNALITOTAL of FIWUD > ACHHAM > REHABILITATION 2 161 128 161 128 128 0 0 0 0

TOTAL of ACHHAM District 2 161 128 161 128 128 0 0 0 0

FIWUD>BAITADI>REHABILITATIONBANGAMLA 100 BAITADI AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 1 MAHAKALIDADELA 100 BAITADI AC 75 60 75 60 60 0 0 0 0 FIWUD NO GoN 1 MAHAKALITOTAL of FIWUD > BAITADI > REHABILITATION 2 263 210 263 210 210 0 0 0 0

TOTAL of BAITADI District 2 263 210 263 210 210 0 0 0 0

FIWUD>DOTI>REHABILITATIONBALASEN 100 DOTI AC 1 1 1 1 1 0 0 0 0 FIWUD NO GoN 2 KARNALIBHAGETADA & MUDETH 100 DOTI AC 6 5 6 5 5 0 0 0 0 FIWUD NO GoN 2 KARNALICHINITUYANI 100 DOTI AC 38 30 38 30 30 0 0 0 0 FIWUD NO GoN 2 KARNALIGANDI GAD 100 DOTI AC 13 10 13 10 10 0 0 0 0 FIWUD NO GoN 2 KARNALIGHOL TADA 100 DOTI AC 50 40 50 40 40 0 0 0 0 FIWUD NO GoN 2 KARNALIJHINGABASTI 100 DOTI AC 50 40 50 40 40 0 0 0 0 FIWUD NO GoN 2 KARNALIKALAGAD 100 DOTI AC 13 10 13 10 10 0 0 0 0 FIWUD NO GoN 2 KARNALIKOTI GAON 100 DOTI AC 19 15 19 15 15 0 0 0 0 FIWUD NO GoN 2 KARNALILAMONTE 100 DOTI AC 25 20 25 20 20 0 0 0 0 FIWUD NO GoN 2 KARNALIPUNNA 100 DOTI AC 38 30 38 30 30 0 0 0 0 FIWUD NO GoN 2 KARNALISAMAR KHAL 100 100 DOTI AC 30 24 30 24 24 0 0 0 0 FIWUD NO GoN 2 KARNALITIJALI 100 DOTI AC 25 20 25 20 20 0 0 0 0 FIWUD NO GoN 2 KARNALITOTAL of FIWUD > DOTI > REHABILITATION 12 308 245 308 245 245 0 0 0 0

TOTAL of DOTI District 12 308 245 308 245 245 0 0 0 0

TOTAL of FAR-WESTERN>Hill 16 732 583 732 583 583 0 0 0 0

FIWUD>BAJHANG>REHABILITATIONCHAINPUR 100 BAJHANG AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 2 KARNALITOTAL of FIWUD > BAJHANG > REHABILITATION 1 31 25 31 25 25 0 0 0 0

TOTAL of BAJHANG District 1 31 25 31 25 25 0 0 0 0

TOTAL of FAR-WESTERN>Mountain 1 31 25 31 25 25 0 0 0 0

TOTAL of FAR-WESTERN Region 19 1075 858 1075 858 858 0 0 0 0

TOTAL of > FIWUD 197 23090 18449 23090 18449 18449 0 0 0 0

65

Page 71: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

GADP>LAMJUNG>NEW DOVANLIFT 100 LAMJUNG AC MS CAD 2 1 2 1 1 0 0 0 0 GADP NO GTZ 3 GANDAKSWREESWARA 100 LAMJUNG AC MS ID 5 4 5 4 4 0 0 0 0 GADP NO GTZ 3 GANDAKTAKSAR HEAD REG 100 LAMJUNG AC MS ID 50 40 50 40 40 0 0 0 0 GADP NO GTZ 3 GANDAKPHIRDI LIFT 100 LAMJUNG AC MS ED 62 50 62 50 50 0 0 0 0 GADP NO GTZ 3 GANDAKTOTAL of GADP > LAMJUNG > NEW 4 119 95 119 95 95 0 0 0 0

TOTAL of LAMJUNG District 4 119 95 119 95 95 0 0 0 0

GADP>SYANGJA>NEWKARED DANDA 100 SYANGJA AC MS ID 19 15 19 15 15 0 0 0 0 GADP NO GTZ 3 GANDAKTOTAL of GADP > SYANGJA > NEW 1 19 15 19 15 15 0 0 0 0

TOTAL of SYANGJA District 1 19 15 19 15 15 0 0 0 0

GADP>TANAHU>REHABILITATIONBAISJAGAR 100 TANAHU AC MS ID 12 10 12 10 10 0 0 0 0 GADP NO GTZ 3 GANDAKTOTAL of GADP > TANAHU > REHABILITATION 1 12 10 12 10 10 0 0 0 0

TOTAL of TANAHU District 1 12 10 12 10 10 0 0 0 0

TOTAL of WESTERN>Hill 6 150 120 150 120 120 0 0 0 0

TOTAL of WESTERN Region 6 150 120 150 120 120 0 0 0 0

TOTAL of GADP 6 150 120 150 120 120 0 0 0 0

GTZ>DHADING>NEWKARKI DADA 100 DHADING AC 231 185 231 185 185 0 0 0 0 GTZ NO GTZ 3 GANDAKTOTAL of GTZ > DHADING > NEW 1 231 185 231 185 185 0 0 0 0

TOTAL of DHADING District 1 231 185 231 185 185 0 0 0 0

TOTAL of CENTRAL >Hill 1 231 185 231 185 185 0 0 0 0

TOTAL of CENTRAL Region 1 231 185 231 185 185 0 0 0 0

TOTAL of > GTZ 1 231 185 231 185 185 0 0 0 0

HFP>GORKHA>REHABILITATIONANDHERI KHOLA 100 GORKHA AC YR 63 50 63 50 50 0 0 0 0 HFP NO IDA 3 GANDAKBENI KHOLA 100 GORKHA AC ED 63 50 63 50 50 0 0 0 0 HFP NO IDA 3 GANDAKBLANG KHOLA 100 GORKHA AC 16 13 16 13 13 0 0 0 0 HFP NO IDA 3 GANDAKDARAUDI KHOLA 100 GORKHA AC YR 13 10 13 10 10 0 0 0 0 HFP NO IDA 3 GANDAKDHAKDE KHOLA 100 GORKHA AC YR 144 115 144 115 115 0 0 0 0 HFP NO IDA 3 GANDAK

66

Page 72: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

MULAPENG KHOLA 100 GORKHA AC YR 13 10 13 10 10 0 0 0 0 HFP NO IDA 3 GANDAKRAUDI KHOLA 100 GORKHA AC YR 25 20 25 20 20 0 0 0 0 HFP NO IDA 3 GANDAKSIRDI KHOLA 100 GORKHA AC YR 63 50 63 50 50 0 0 0 0 HFP NO IDA 3 GANDAKTAUDI KHOLA 100 GORKHA AC MS 63 50 63 50 50 0 0 0 0 HFP NO IDA 3 GANDAKTOTAL of HFP > GORKHA > REHABILITATION 9 463 368 463 368 368 0 0 0 0

TOTAL of GORKHA District 9 463 368 463 368 368 0 0 0 0

HFP>LAMJUNG>REHABILITATIONBHIDIM KHOLA 100 LAMJUNG AC YR 125 100 125 100 100 0 0 0 0 HFP NO IDA 3 GANDAKBISEDI KHOLA 100 LAMJUNG AC YR 25 20 25 20 20 0 0 0 0 HFP NO IDA 3 GANDAKDHAD KHOLA 100 LAMJUNG AC YR 81 65 81 65 65 0 0 0 0 HFP NO IDA 3 GANDAKDHUWA KHOLA 100 LAMJUNG AC YR 31 25 31 25 25 0 0 0 0 HFP NO IDA 3 GANDAKJYAMITRE KHOLA 100 LAMJUNG AC YR 75 60 75 60 60 0 0 0 0 HFP NO IDA 3 GANDAKKHAHARE KHOLA 100 LAMJUNG AC YR 63 50 63 50 50 0 0 0 0 HFP NO IDA 3 GANDAKKHALI MARANG 100 LAMJUNG AC YR 88 70 88 70 70 0 0 0 0 HFP NO IDA 3 GANDAKPAUDI KHOLA 100 LAMJUNG AC YR 19 15 19 15 15 0 0 0 0 HFP NO IDA 3 GANDAKROPLE KHOLA 100 LAMJUNG AC YR 44 35 44 35 35 0 0 0 0 HFP NO IDA 3 GANDAKRUMATAKO KHOLA 100 LAMJUNG AC YR 50 40 50 40 40 0 0 0 0 HFP NO IDA 3 GANDAKSISUERI KHOLA 100 LAMJUNG AC 19 15 19 15 15 0 0 0 0 HFP NO IDA 3 GANDAK TARDO KHOLA 100 LAMJUNG AC 23 18 23 18 18 0 0 0 0 HFP NO IDA 3 GANDAKTOTAL of HFP > LAMJUNG > REHABILITATION 12 643 513 643 513 513 0 0 0 0

TOTAL of LAMJUNG District 12 643 513 643 513 513 0 0 0 0

HFP>SYANGJA>REHABILITATIONANDHI KHOLA 100 SYANGJA AC YR 63 50 63 50 50 0 0 0 0 HFP NO IDA 3 GANDAKBATANG KHOLA 100 SYANGJA AC YR 34 27 34 27 27 0 0 0 0 HFP NO IDA 3 GANDAKBODI KHOLA 100 SYANGJA AC 38 30 38 30 30 0 0 0 0 HFP NO IDA 3 GANDAKCHHORE KHOLA 100 SYANGJA AC YR 50 40 50 40 40 0 0 0 0 HFP NO IDA 3 GANDAKCHITI KHOLA 100 SYANGJA AC MS 125 100 125 100 100 0 0 0 0 HFP NO IDA 3 GANDAKDOLCHE KHOLA 100 SYANGJA AC 63 50 63 50 50 0 0 0 0 HFP NO IDA 3 GANDAKGUDI KHOLA 100 SYANGJA AC YR 31 25 31 25 25 0 0 0 0 HFP NO IDA 3 GANDAKJARE KHOLA 100 SYANGJA AC YR 38 30 38 30 30 0 0 0 0 HFP NO IDA 3 GANDAKJYAGDI KHOLA 100 SYANGJA AC MS 88 70 88 70 70 0 0 0 0 HFP NO IDA 3 GANDAKKEBARE KHOLA 100 SYANGJA AC 40 32 40 32 32 0 0 0 0 HFP NO IDA 3 GANDAKLABDI KHOLA 100 SYANGJA AC 63 50 63 50 50 0 0 0 0 HFP NO IDA 3 GANDAKMIRDI KHOLA 100 SYANGJA AC YR 31 25 31 25 25 0 0 0 0 HFP NO IDA 3 GANDAKMULUNG KHOLA 100 SYANGJA AC YR 38 30 38 30 30 0 0 0 0 HFP NO IDA 3 GANDAKTHULO TAL 100 SYANGJA AC 25 20 25 20 20 0 0 0 0 HFP NO IDA 3 GANDAKTOTAL of HFP > SYANGJA > REHABILITATION 14 727 579 727 579 579 0 0 0 0

TOTAL of SYANGJA District 14 727 579 727 579 579 0 0 0 0

HFP>TANAHU>REHABILITATIONBANDE KHOLA 100 TANAHU AC YR 63 50 63 50 50 0 0 0 0 HFP NO IDA 3 GANDAK

67

Page 73: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

BYANDI KHOLA 100 TANAHU AC YR 38 30 38 30 30 0 0 0 0 HFP NO IDA 3 GANDAKCHUNDI K (BASANTPUR) 100 TANAHU AC 63 50 63 50 50 0 0 0 0 HFP NO IDA 3 GANDAKCHUNDI KHOLA (CHITTI) 100 TANAHU AC YR 38 30 38 30 30 0 0 0 0 HFP NO IDA 3 GANDAKDAUDI KHOLA 100 TANAHU AC YR 38 30 38 30 30 0 0 0 0 HFP NO IDA 3 GANDAKDHALESTI KHOLA 100 TANAHU AC 39 31 39 31 31 0 0 0 0 HFP NO IDA 3 GANDAKKULANG KHOLA 100 TANAHU AC 38 30 38 30 30 0 0 0 0 HFP NO IDA 3 GANDAKTHASAM KANDI KHOLA 100 TANAHU AC 38 30 38 30 30 0 0 0 0 HFP NO IDA 3 GANDAKTOTAL of HFP > TANAHU > REHABILITATION 8 355 281 355 281 281 0 0 0 0

TOTAL of TANAHU District 8 355 281 355 281 281 0 0 0 0

TOTAL of WESTERN >Hill 43 2188 1741 2188 1741 1741 0 0 0 0

TOTAL of WESTERN Region 43 2188 1741 2188 1741 1741 0 0 0 0

TOTAL of > HFP 43 2188 1741 2188 1741 1741 0 0 0 0

IDP>BANKE>REHABILITATIONPROJECT 100 BANKE PC 2004 YR ID 3035 2580 3035 2580 0 0 0 0 0 IDP NO EU 6 WEST RAPTITOTAL of IDP > BANKE > REHABILITATION 1 3035 2580 3035 2580 0 0 0 0 0

TOTAL of BANKE District 1 3035 2580 3035 2580 0 0 0 0 0

TOTAL of MID- WESTERN > Terai 1 3035 2580 3035 2580 0 0 0 0 0

IDP>DAILEKH>REHABILITATIONKULO 100 DAILEKH PC 2003 YR ID 82 70 82 70 0 0 0 0 0 IDP NO EU 2 KARNALIBELPATA 100 DAILEKH PC 2003 YR ID 56 48 56 48 0 0 0 0 0 IDP NO EU 2 KARNALIKAL BHAIRAB 100 DAILEKH PC 2003 YR ID 24 20 24 20 0 0 0 0 0 IDP NO EU 2 KARNALISHERI & CHUNDI KULO 100 DAILEKH PC 2003 YR ID 53 45 53 45 0 0 0 0 0 IDP NO EU 2 KARNALI TARA CHAUR 100 DAILEKH PC 2003 YR ID 104 88 104 88 0 0 0 0 0 IDP NO EU 2 KARNALITOTAL of IDP > DAILEKH > REHABILITATION 5 319 271 319 271 0 0 0 0 0

TOTAL of DAILEKH District 5 319 271 319 271 0 0 0 0 0

IDP>SURKHET>REHABILITATIONBARAINCHE (GHATTE KULO) 100 SURKHET PC 2003 YR ID 120 102 120 102 0 0 0 0 0 IDP NO EU 2 KARNALIDANG KHOLA 100 SURKHET PC 2003 YR ID 124 105 124 105 0 0 0 0 0 IDP NO EU 2 KARNALIDULALTHAI 100 SURKHET PC 2003 YR ID 94 80 94 80 0 0 0 0 0 IDP NO EU 2 KARNALISALKOT 100 SURKHET PC 2003 YR ID 71 60 71 60 0 0 0 0 0 IDP NO EU 2 KARNALITOTAL of IDP > SURKHET > REHABILITATION 4 409 347 409 347 0 0 0 0 0

TOTAL of SURKHET District 4 409 347 409 347 0 0 0 0 0

TOTAL of MID- WESTERN > Hill 9 728 618 728 618 0 0 0 0 0

68

Page 74: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

IDP>KALIKOT>REHABILITATIONBAIDUNGA 100 KALIKOT PC 2003 YR ID 94 80 94 80 0 0 0 0 0 IDP NO EU 2 KARNALICHILKHAYA 100 KALIKOT PC 2003 YR ID 182 155 182 155 0 0 0 0 0 IDP NO EU 2 KARNALIDHIMNIYA 100 KALIKOT PC 2003 YR ID 88 75 88 75 0 0 0 0 0 IDP NO EU 2 KARNALINAGMAGAD 100 KALIKOT PC 2003 YR ID 88 75 88 75 0 0 0 0 0 IDP NO EU 2 KARNALITHULO KULO 100 KALIKOT PC 2003 YR ID 118 100 118 100 0 0 0 0 0 IDP NO EU 2 KARNALITOTAL of IDP > KALIKOT > REHABILITATION 5 570 485 570 485 0 0 0 0 0

TOTAL of KALIKOT District 5 570 485 570 485 0 0 0 0 0

TOTAL of MID- WESTERN > Mountain 5 570 485 570 485 0 0 0 0 0

TOTAL of MID- WESTERN Region 15 4333 3683 4333 3683 0 0 0 0 0

TOTAL of IDP 15 4333 3683 4333 3683 0 0 0 0 0

ILC>KAPILVASTU>REHABILITATIONDOHANI 100 KAPILVASTU AC 1996 YR ID 353 300 353 300 300 0 0 0 0 ILC YES IDA 12 SIWALIK RIVERHUDERHAWA 100 KAPILVASTU AC 1997 YR ID 412 350 412 350 0 0 0 0 0 ILC NO ADB 12 SIWALIKRIVERJABAI SAKUNI 100 KAPILVASTU AC 1996 YR ED 823 700 823 700 700 0 0 0 0 ILC NO IDA 12 SIWALIK RIVERJAHADI 100 KAPILVASTU AC 1996 YR ID 588 500 588 500 500 0 0 0 0 ILC YES IDA 12 SIWALIK RIVERPHULIK 100 KAPILVASTU AC 1996 YR ED 1176 1000 1176 1000 1000 0 0 0 0 ILC NO IDA 12 SIWALIK RIVERBHADEHAR 100 KAPILVASTU AC 1996 YR ED 1059 900 1059 900 900 0 0 0 0 ILC NO IDA 12 SIWALIK RIVERTOTAL of ILC > KAPILVASTU > REHABILITATION 6 4411 3750 4411 3750 3400 0 0 0 0

TOTAL of KAPILVASTU District 6 4411 3750 4411 3750 3400 0 0 0 0

ILC>NAWALPARASI>REHABILITATIONDANGOR KHOLA 100 NAWALPARASI AC 1996 MS ID 125 100 125 100 100 0 0 0 0 ILC NO IDA 3 GANDAKDANTE 100 NAWALPARASI AC 1996 MS ID 63 50 63 50 50 0 0 0 0 ILC NO IDA 3 GANDAKDEDGAUN TAR 100 NAWALPARASI AC 1996 YR ID 265 225 265 225 225 0 0 0 0 ILC YES IDA 3 GANDAKDUMKIBAS 100 NAWALPARASI AC 1996 YR ID 58 50 58 50 50 0 0 0 0 ILC NO IDA 3 GANDAKJALUKE GHUMURE 100 NAWALPARASI AC 1996 MS ID 185 148 185 148 148 0 0 0 0 ILC NO IDA 3 GANDAKMATHAR 100 NAWALPARASI AC 1991 YR ID 15 12 15 12 12 0 0 0 0 ILC NO IDA 3 GANDAKPATAWARI 100 NAWALPARASI AC 1991 MS ID 131 105 131 105 105 0 0 0 0 ILC NO IDA 3 GANDAKRAMUEAPUR 100 NAWALPARASI AC 1996 MS ID 123 98 123 98 98 0 0 0 0 ILC NO IDA 3 GANDAKSUKHAURA 100 NAWALPARASI AC 1996 MS ID 75 60 75 60 60 0 0 0 0 ILC NO IDA 3 GANDAKBHUTAHA 100 NAWALPARASI AC 1996 MS ID 63 50 63 50 50 0 0 0 0 ILC NO IDA 3 GANDAKPUSAHA 100 NAWALPARASI AC 1996 MS ID 750 600 750 600 600 0 0 0 0 ILC NO IDA 3 GANDAKALHAWAL 100 NAWALPARASI AC 1996 MS ID 250 200 250 200 200 0 0 0 0 ILC NO IDA 3 GANDAKDHURSARI 100 NAWALPARASI AC 1996 MS ID 38 30 38 30 30 0 0 0 0 ILC NO IDA 3 GANDAKARUN KHOLA 100 NAWALPARASI AC 1996 YR ID 250 200 250 200 200 80 0 0 0 ILC NO IDA 3 GANDAKJAYASHREE KHOLA 100 NAWALPARASI AC 1996 YR ID 250 258 250 258 258 100 50 0 0 ILC NO IDA 3 GANDAKTOTAL of ILC > NAWALPARASI > REHABILITATION 15 2641 2186 2641 2186 2186 180 50 0 0

TOTAL of NAWALPARASI District 15 2641 2186 2641 2186 2186 180 50 0 0

69

Page 75: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

ILC>RUPANDEHI>REHABILITATIONINGURIYA 100 RUPANDEHI AC 1996 YR ID 117 100 117 100 100 0 0 0 0 ILC NO IDA 8 TINAULAPSI KHOLA 100 RUPANDEHI AC 1996 YR ID 250 200 250 200 200 200 0 0 0 ILC NO IDA 8 TINAUGOTHWA BHUHKA 100 RUPANDEHI AC 1996 YR ID 500 400 500 400 400 400 0 0 0 ILC NO IDA 8 TINAU DANDA 100 RUPANDEHI AC 1996 YR ED 1063 850 1063 850 850 175 500 0 0 ILC NO IDA 8 TINAUTOTAL of ILC > RUPANDEHI > REHABILITATION 4 1930 1550 1930 1550 1550 775 500 0 0

TOTAL of RUPANDEHI District 4 1930 1550 1930 1550 1550 775 500 0 0

TOTAL of WESTERN > Terai 25 8982 7486 8982 7486 7136 955 550 0 0

ILC>ARGHAKHANCHI>REHABILITATIONARCHAL 100 ARGHAKHANCHI AC 1996 YR ID 64 51 64 51 51 30 15 0 0 ILC NO IDA 6 WEST RAPTICHIDIKA 100 ARGHAKHANCHI AC 1996 YR ID 90 77 90 77 77 77 0 0 0 ILC NO IDA 6 WEST RAPTIDAMJING TAR T 100 ARGHAKHANCHI AC 1996 YR ID 21 18 21 18 18 0 0 0 0 ILC YES IDA 6 WEST RAPTIGARNAYA TARI 100 ARGHAKHANCHI AC 1996 YR ID 56 45 56 45 45 45 0 0 0 ILC NO IDA 6 WEST RAPTIGORKHE KULO 100 ARGHAKHANCHI AC 1997 YR ID 45 38 45 38 0 0 0 0 0 ILC NO ADB 6 WEST RAPTIGOTHIBANG 100 ARGHAKHANCHI AC 1996 YR ID 81 65 81 65 65 30 20 0 0 ILC NO IDA 6 WEST RAPTIJALUKE 100 ARGHAKHANCHI AC 1996 YR ID 94 75 94 75 75 25 20 0 0 ILC NO IDA 6 WEST RAPTIJARE KHOLA 100 ARGHAKHANCHI AC 1997 YR ID 26 22 26 22 0 0 0 0 0 ILC NO ADB 6 WEST RAPTIKALLERI 100 ARGHAKHANCHI AC 1996 YR ID 89 71 89 71 71 71 0 0 0 ILC NO IDA 6 WEST RAPTIPOWER TART 100 ARGHAKHANCHI AC 1996 YR ID 76 65 76 65 65 0 0 0 0 ILC YES IDA 6 WEST RAPTIRIGDIBALEBANG 100 ARGHAKHANCHI AC 1997 YR ID 107 91 107 91 0 0 0 0 0 ILC NO ADB 6 WEST RAPTISIT KHOLA 100 ARGHAKHANCHI AC 1996 YR ID 125 100 125 100 100 100 0 0 0 ILC NO IDA 6 WEST RAPTIBAGI KHOLA 100 ARGHAKHANCHI AC 1996 YR ID 45 36 45 36 36 36 0 0 0 ILC NO IDA 6 WESTRAPTIPHARASAWA 1100 ARGHAKHANCHI AC 1996 MS ID 19 15 19 15 15 0 0 0 0 ILC NO IDA 6 WESTRAPTIDURGA PHANT 100 ARGHAKHANCHI AC 1996 YR ID 94 75 94 75 75 75 0 0 0 ILC NO IDA 6 WESTRAPTIPHUDABANG 100 ARGHAKHANCHI AC 1996 YR ID 75 60 75 60 60 35 18 0 0 ILC NO IDA 6 WESTRAPTIHARISINGKHOR 100 ARGHAKHANCHI PC 1996 YR ID 25 20 25 20 20 10 0 0 0 ILC NO IDA 6 WESTRAPTITOTAL of ILC > ARGHAKHANCHI > REHABILITATION 17 1132 924 1132 924 773 534 73 0 0

TOTAL of ARGHAKHANCHI District 17 1132 924 1132 924 773 534 73 0 0

ILC>GORKHA>REHABILITATIONAARU TAR 100 GORKHA AC 1996 YR ID 118 100 118 100 100 0 0 0 0 ILC YES IDA 3 GANDAKANP TARI 100 GORKHA AC 1996 YR ID 19 15 19 15 15 10 5 0 0 ILC NO IDA 3 GANDAKAPRIK BHOGTENI 100 GORKHA AC 1996 YR ID 75 60 75 60 60 35 15 0 0 ILC NO IDA 3 GANDAKBANGHARI 100 GORKHA AC 1996 YR ID 5 4 5 4 4 4 0 0 0 ILC NO IDA 3 GANDAKBASPUR TAR 100 GORKHA AC 1991 YR ID 50 40 50 40 40 40 40 0 0 ILC NO IDA 3 GANDAKBHIMSEN KULO 100 GORKHA AC 1996 YR ID 88 75 88 75 75 0 0 0 0 ILC YES IDA 3 GANDAKBIRTA KHOLA 100 GORKHA AC 1996 YR ID 71 60 71 60 60 0 0 0 0 ILC NO IDA 3 GANDAKBUDDHI KULO 100 GORKHA AC 1996 YR ID 194 165 194 165 165 0 0 0 0 ILC NO IDA 3 GANDAKCHHEPE TAR 100 GORKHA AC 1996 YR ID 71 60 71 60 60 0 0 0 0 ILC YES IDA 3 GANDAKCHORKATE TAR 100 GORKHA AC 1996 YR ID 130 110 130 110 130 130 0 0 0 ILC NO IDA 3 GANDAKDHUNDURE 100 GORKHA AC 1996 YR ID 59 50 59 50 50 0 0 0 0 ILC NO IDA 3 GANDAK

70

Page 76: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

DRABYA SHAH KULO 100 GORKHA AC 1992 YR ID 31 25 31 25 25 5 0 0 0 ILC NO IDA 3 GANDAKKHAR KHOLA 100 GORKHA AC 1996 MS ID 63 50 63 50 50 45 0 0 0 ILC NO IDA 3 GANDAKMUGE PHANT 100 GORKHA AC 1996 YR ID 19 15 19 15 15 15 5 0 0 ILC NO IDA 3 GANDAKNIMEL PHANT 100 GORKHA AC 1991 YR ID 94 75 94 75 75 60 0 0 0 ILC NO IDA 3 GANDAKPAM KHOLA 100 GORKHA AC 1991 YR ID 78 62 78 62 60 60 0 0 0 ILC NO IDA 3 GANDAKPASUPATI TAR 100 GORKHA AC 1996 MS ID 33 26 33 26 26 0 0 0 0 ILC NO IDA 3 GANDAKPOKHARA TAR 100 GORKHA AC 1996 YR ID 88 75 88 75 75 75 0 0 0 ILC NO IDA 3 GANDAKRUDUM PHALIM 100 GORKHA AC 1996 YR ID 31 25 31 25 25 5 0 0 0 ILC NO IDA 3 GANDAKKAL TARI 100 GORKHA AC 1996 YR ID 70 60 70 60 60 0 0 0 0 ILC NO IDA 3 GANDAKTHAPA TAR 100 GORKHA AC 1996 MS ID 55 44 55 44 44 0 0 0 0 ILC NO IDA 3 GANDAKJAU BARI 100 GORKHA AC 1996 YR ID 63 50 63 50 30 30 15 0 0 ILC NO IDA 3 GANDAKRAMCHEDIHI TAR 100 GORKHA AC 1996 YR ID 81 65 81 65 65 40 20 0 0 ILC NO IDA 3 GANDAKCHHOTE TAR 100 GORKHA AC 1997 YR ID 35 30 35 30 0 0 0 0 0 ILC NO ADB 3 GANDAKTOTAL of ILC > GORKHA > REHABILITATION 24 1621 1341 1621 1341 1309 554 100 0 0

TOTAL of GORKHA District 24 1621 1341 1621 1341 1309 554 100 0 0

ILC>GULMI>REHABILITATIONARBENI 100 GULMI AC 1996 YR ID 71 57 71 57 57 30 15 0 0 ILC NO IDA 3 GANDAKCHHALDI 100 GULMI AC 1996 YR ID 35 30 35 30 30 0 0 0 0 ILC YES IDA 3 GANDAKDAMAI GHAT 100 GULMI AC 1997 YR ID 45 38 45 38 0 0 0 0 0 ILC NO ADB 3 GANDAKJAMUNE TARI 100 GULMI AC 1996 YR ID 19 15 19 15 15 15 0 0 0 ILC NO IDA 3 GANDAKJHERDI KHOLA 100 GULMI AC 1996 YR ID 63 50 63 50 50 30 0 0 0 ILC NO IDA 3 GANDAKLASAHA 100 GULMI AC 1996 YR ID 25 22 25 22 22 0 0 0 0 ILC NO IDA 3 GANDAKNINTHARA 100 GULMI AC 1996 YR ID 9 7 9 7 7 25 0 0 0 ILC NO IDA 3 GANDAKRUPAKOT 100 GULMI AC 1996 MS ID 75 60 75 60 60 6 0 0 0 ILC NO IDA 3 GANDAK TARDI KHOLA 100 GULMI AC 1996 YR ID 75 60 75 60 60 30 0 0 0 ILC NO IDA 3 GANDAKTURANG 100 GULMI AC 1997 YR ID 106 90 106 90 0 0 0 0 0 ILC NO ADB 3 GANDAKMISIKOT 100 GULMI AC 1996 YR ID 29 25 29 25 25 0 0 0 0 ILC NO ADB 3 GANDAKCHILLI DAMAI 100 GULMI AC 1996 MS ID 69 55 69 55 55 0 0 0 0 ILC NO IDA 3 GANDAKDHUMKA PHANT 100 GULMI AC 1996 YR ID 125 100 125 100 100 60 30 0 0 ILC NO IDA 3 GANDAK BESIKA CHAUR 100 GULMI AC 1996 MS ID 33 26 33 26 26 0 0 0 0 ILC NO IDA 3 GANDAKSOTA PHANT 100 GULMI AC 1996 YR ID 44 35 44 35 35 18 10 0 0 ILC NO IDA 3 GANDAKGAN TARI 100 GULMI AC 1996 YR ID 38 31 38 31 25 10 0 7 5 ILC NO IDA 3 GANDAKBUWA PHANT 100 GULMI AC 1996 YR ID 31 25 31 25 25 25 12 0 0 ILC NO IDA 3 GANDAKTOTAL of ILC > GULMI > REHABILITATION 17 892 726 892 726 592 249 67 7 5

TOTAL of GULMI District 17 892 726 892 726 592 249 67 7 5

ILC>KASKI>REHABILITATIONBHAIMAL PHANT 100 KASKI AC 1997 YR ID 173 147 173 147 0 0 0 0 0 ILC NO ADB 3 GANDAKCHIMRO PHANT 100 KASKI AC 1993 YR ID 75 60 75 60 50 30 0 0 0 ILC NO IDA 3 GANDAKDHI TAL 100 KASKI AC 1991 YR ID 30 24 30 24 24 20 0 0 0 ILC NO IDA 3 GANDAKIDI KHOLA 100 KASKI AC 1996 YR ID 81 65 81 65 65 60 0 0 0 ILC NO IDA 3 GANDAKJHOBANG 100 KASKI AC 1996 YR ID 38 30 38 30 30 25 20 0 0 ILC NO IDA 3 GANDAKJOGI CHAUR 100 KASKI AC 1991 YR ID 175 140 175 140 140 70 0 0 0 ILC NO IDA 3 GANDAK

71

Page 77: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

LUMLE 100 KASKI AC 1996 YR ID 46 37 46 37 37 37 0 0 0 ILC NO IDA 3 GANDAKSANDHI KHET 100 KASKI AC 1993 YR ID 38 30 38 30 25 15 0 0 0 ILC NO IDA 3 GANDAK TALLO LAHACHOK 100 KASKI AC 1996 YR ID 106 90 106 90 90 40 20 0 0 ILC NO IDA 3 GANDAKTAUNISWARA 100 KASKI AC 1996 YR ID 176 150 176 150 150 0 0 0 0 ILC NO IDA 3 GANDAKAISELU CHAUR 100 KASKI AC 1996 YR ID 69 55 69 55 55 45 0 0 0 ILC NO IDA 3 GANDAKGADUWA 100 KASKI AC 1996 YR ID 63 50 63 50 50 40 0 0 0 ILC NO IDA 3 GANDAKKIM BESI 100 KASKI AC 1996 YR ID 63 50 63 50 40 30 20 0 0 ILC NO IDA 3 GANDAKGHACHOK 100 KASKI AC 1991 YR ID 250 200 250 200 150 100 0 0 0 ILC NO IDA 3 GANDAKTOTAL of ILC > KASKI > REHABILITATION 14 1383 1128 1383 1128 906 512 60 0 0

TOTAL of KASKI District 14 1383 1128 1383 1128 906 512 60 0 0

ILC>LAMJUNG>REHABILITATIONBAHRA BESI 100 LAMJUNG AC 1996 YR ID 19 15 19 15 15 10 0 0 0 ILC NO IDA 3 GANDAKBANJH KHET 100 LAMJUNG AC 1996 MS ID 10 8 10 8 8 8 0 0 0 ILC NO IDA 3 GANDAKBARBOTE 100 LAMJUNG AC 1996 YR ID 44 35 44 35 35 35 0 0 0 ILC NO IDA 3 GANDAKBETINI 100 LAMJUNG AC 1996 YR ID 53 45 53 45 45 0 0 0 0 ILC NO IDA 3 GANDAK BHORLE TAR 100 LAMJUNG AC 1996 YR ID 259 220 259 220 220 0 0 0 0 ILC YES IDA 3 GANDAKBHUJUNG RAMCHE 100 LAMJUNG AC 1996 MS ID 30 25 30 25 25 0 0 0 0 ILC NO IDA 3 GANDAKBOHARA GAUN 100 LAMJUNG AC 1990 MS ID 55 44 55 44 44 0 0 0 0 ILC NO IDA 3 GANDAKDHAND BESI 100 LAMJUNG AC 1996 YR ID 19 15 19 15 15 10 5 0 0 ILC NO IDA 3 GANDAKDUMAN 100 LAMJUNG AC 1996 YR ID 88 75 88 75 75 30 20 0 0 ILC NO IDA 3 GANDAKGAIRI GATERI 100 LAMJUNG AC 1997 YR ID 71 60 71 60 0 0 0 0 0 ILC NO ADB 3 GANDAKGHOPTE KHOLA 100 LAMJUNG AC 1996 MS ID 45 40 45 40 40 0 0 0 0 ILC NO IDA 3 GANDAKHANDE TAR 100 LAMJUNG AC 1996 YR ID 294 250 294 250 250 0 0 0 0 ILC YES IDA 3 GANDAKKYARANO 100 LAMJUNG AC 1996 YR ID 31 25 31 25 25 10 5 0 0 ILC NO IDA 3 GANDAKMASHAR KO KULO 100 LAMJUNG AC 1990 YR ID 23 18 23 18 18 15 2 0 0 ILC NO IDA 3 GANDAKNAUBISE ( BHAKUNDE R) 100 LAMJUNG AC 1996 MS ID 35 30 35 30 30 0 0 0 0 ILC NO IDA 3 GANDAKPAINSI KHOLA 100 LAMJUNG AC 1996 YR ID 63 50 63 50 50 25 10 0 0 ILC NO IDA 3 GANDAKRAMGHA TAR 100 LAMJUNG AC 1996 YR ID 259 220 259 220 220 0 0 0 0 ILC YES IDA 3 GANDAKSAIL PHEDI 100 LAMJUNG AC 1996 MS ID 31 25 31 25 25 0 0 0 0 ILC NO IDA 3 GANDAKSHERA PHANT 100 LAMJUNG AC 1996 MS ID 17 15 17 15 15 0 0 ILC NO IDA 3 GANDAKSIRU PANI 100 LAMJUNG AC 1996 MS ID 25 20 25 20 20 0 0 0 0 ILC NO IDA 3 GANDAKTHAR CHAUR 100 LAMJUNG AC 1996 MS ID 40 35 40 35 35 0 0 0 0 ILC NO IDA 3 GANDAKKAMALI KHORIA 100 LAMJUNG AC 1991 YR ID 61 49 61 49 49 49 20 0 0 ILC NO IDA 3 GANDAKKARAPUR TAR 100 LAMJUNG AC 1996 YR ID 118 100 118 100 100 0 0 0 0 ILC NO IDA 0 GANDAKKALYAN MAJUWA 100 LAMJUNG AC 1992 YR ID 156 125 156 125 125 0 0 0 0 ILC NO IDA 3 GANDAKCHUROTE 100 LAMJUNG AC 1996 MS ID 19 15 19 15 15 0 0 0 0 ILC NO IDA 3 GANDAKTOTAL of ILC > LAMJUNG > REHABILITATION 25 1865 1559 1865 1559 1499 192 62 0 0

TOTAL of LAMJUNG District 25 1865 1559 1865 1559 1499 192 62 0 0

ILC>PALPA>REHABILITATIONBANS TARI 100 PALPA AC 1996 YR ID 13 10 13 10 10 10 0 0 0 ILC NO IDA 3 GANDAKCHHERLUNG KULO 100 PALPA AC 1996 YR ID 133 106 133 106 106 50 25 0 0 ILC NO IDA 3 GANDAKGHURCHIS PHANT 100 PALPA AC 1996 YR ID 63 50 63 50 40 40 0 0 0 ILC NO IDA 3 GANDAK

72

Page 78: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

HARIJOL KHOLA 100 PALPA AC 1996 YR ID 34 37 34 37 30 30 0 0 0 ILC NO IDA 3 GANDAKHEKLANG CHHANGLING 100 PALPA AC 1996 YR ID 44 35 44 35 35 30 0 0 0 ILC NO IDA 3 GANDAKJHUMSA KHET 100 PALPA AC 1996 YR ID 35 30 35 30 35 0 0 0 100 ILC NO IDA 3 GANDAKKHURSANE 100 PALPA AC 1996 YR ID 10 8 10 8 8 8 0 0 0 ILC NO IDA 3 GANDAKLAGHUWA PHANT 100 PALPA AC 1996 YR ID 25 20 25 20 20 20 0 0 0 ILC NO IDA 3 GANDAKLAMGTANG KHOLA 100 PALPA AC 1996 YR ID 16 13 16 13 13 13 0 0 0 ILC NO IDA 3 GANDAKMAHILI KULO 100 PALPA AC 1997 YR ID 49 42 49 42 0 0 0 0 0 ILC NO ADB 3 GANDAKMAJH KO KULO 100 PALPA AC 1996 YR ID 15 13 15 13 0 0 0 0 0 ILC NO IDA 3 GANDAKSAINJU KULO 100 PALPA AC 1992 YR ID 38 30 38 30 30 25 0 0 0 ILC NO IDA 3 GANDAKTAMLOK 100 PALPA AC 1997 YR ID 9 8 9 8 0 0 0 0 0 ILC NO ADB 3 GANDAKWAIREGHAT 100 PALPA AC 1997 YR ID 18 15 18 15 0 0 0 0 0 ILC NO ADB 3 GANDAKCHEWA PHANT 100 PALPA AC 1996 MS ID 31 25 31 25 25 20 0 0 0 ILC NO IDA 3 GANDAKNIKI CHAUR 100 PALPA AC 1996 YR ID 38 30 38 30 30 30 0 0 0 ILC NO IDA 3 GANDAKRAJ KULO JETHI 100 PALPA AC 1996 YR ID 75 60 75 60 60 60 0 0 0 ILC NO IDA 3 GANDAKCHHERLUNG (LOWER) 100 PALPA AC 1996 YR ID 66 56 66 56 50 0 0 0 0 ILC NO IDA 3 GANDAKBEJAD 100 PALPA AC 1996 MS ID 63 50 63 50 50 0 0 0 0 ILC NO IDA 3 GANDAKCHHEDUWA KULO 100 PALPA AC 1994 YR ID 54 43 54 43 43 20 0 0 0 ILC NO IDA 3 GANDAKULTEY KHOLA 100 PALPA AC 1996 YR ID 23 18 23 18 18 12 0 0 0 ILC NO IDA 3 GANDAKTOTAL of ILC > PALPA > REHABILITATION 21 852 699 852 699 603 368 25 0 100

TOTAL of PALPA District 21 852 699 852 699 603 368 25 0 100

ILC>SYANGJA>REHABILITATIONANDHI KHALTA 100 SYANGJA AC 1996 YR ID 38 30 38 30 30 30 5 0 0 ILC NO IDA 3 GANDAKASHIV MAGHANE 100 SYANGJA AC 1990 YR ID 28 22 28 22 22 5 1 0 0 ILC NO IDA 3 GANDAKBADA CHAUR 100 SYANGJA AC 1991 YR ID 25 20 25 20 20 20 5 0 0 ILC NO IDA 3 GANDAKBAGAR KHET 100 SYANGJA AC 1990 YR ID 44 35 44 35 25 18 5 0 0 ILC NO IDA 3 GANDAKCHAULANE PHANT 100 SYANGJA AC 1996 YR ID 23 20 25 20 20 0 0 0 0 ILC NO IDA 3 GANDAKCHHAHARE BANSKOT 100 SYANGJA AC 1996 YR ID 8 7 10 7 7 0 0 0 0 ILC NO IDA 3 GANDAKCHILAUNEBAS 100 SYANGJA AC 1996 YR ID 59 50 59 50 50 0 0 0 0 ILC NO IDA 3 GANDAKDHANGLING 100 SYANGJA AC 1996 YR ID 38 32 38 32 32 0 0 0 0 ILC NO IDA 3 GANDAKDHANUBASE 100 SYANGJA AC 1996 YR ID 18 15 18 15 15 0 0 0 0 ILC NO IDA 3 GANDAKDHAPUK SIMAL 100 SYANGJA AC 1996 YR ID 59 50 59 50 50 0 0 0 0 ILC NO IDA 3 GANDAKFIRFIRE BARAHAR 100 SYANGJA AC 1996 YR ID 47 40 45 40 40 0 0 0 0 ILC NO IDA 3 GANDAKGAIRE BARI 100 SYANGJA AC 1996 YR ID 12 11 14 11 11 11 0 0 0 ILC NO IDA 3 GANDAKHILAMARANG 100 SYANGJA AC 1996 YR ID 47 40 50 40 40 35 6 0 0 ILC NO IDA 3 GANDAKJAYASHARA 100 SYANGJA AC 1996 YR ID 108 16 20 16 16 10 0 0 0 ILC NO IDA 3 GANDAKJYAGDI BARABISE 100 SYANGJA AC 1996 YR ID 50 40 50 40 40 40 15 0 0 ILC NO IDA 3 GANDAKKHALTE KHOLA 100 SYANGJA AC 1996 YR ID 11 10 15 10 10 0 0 0 0 ILC NO IDA 3 GANDAKLABSIBOT MAJUWA 100 SYANGJA AC 1996 YR ID 25 20 25 20 20 20 0 0 0 ILC NO IDA 3 GANDAKLAMANGE PHANT 100 SYANGJA AC 1990 YR ID 93 74 93 74 74 70 25 0 0 ILC NO IDA 3 GANDAKNAULO KULO 100 SYANGJA AC 1996 YR ID 31 25 31 25 25 25 0 0 0 ILC NO IDA 3 GANDAKPAREWA 100 SYANGJA AC 1990 YR ID 38 30 38 30 18 18 8 0 0 ILC NO IDA 3 GANDAKPAUWA LABSIBOT 100 SYANGJA AC 1996 YR ID 15 12 15 12 12 12 5 0 0 ILC NO IDA 3 GANDAKPIPAL TARI 100 SYANGJA AC 1997 YR ID 47 40 47 40 0 0 0 0 0 ILC NO ADB 3 GANDAKSHANKHAR PHANT 100 SYANGJA AC 1996 YR ID 70 60 65 60 60 0 0 0 0 ILC NO IDA 3 GANDAK

73

Page 79: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

SIMAL CHAUR 100 SYANGJA AC 1996 YR ID 43 37 42 37 37 0 0 0 0 ILC NO IDA 3 GANDAKSTHAN CHAUR 100 SYANGJA AC 1996 YR ID 28 22 28 22 22 22 5 0 0 ILC NO IDA 3 GANDAKTAMA PANI KEWARE 100 SYANGJA AC 1996 YR ED 46 37 46 37 37 18 0 0 0 ILC NO IDA 3 GANDAKUTTAK PHANT 100 SYANGJA AC 1990 YR ID 38 30 38 30 30 30 5 0 0 ILC NO IDA 3 GANDAKNIBUWA KHARKA 100 SYANGJA AC 1990 YR ID 38 30 38 30 30 10 10 0 0 ILC NO IDA 3 GANDAKBANGSING 100 SYANGJA AC 1990 YR ID 150 120 150 120 120 100 25 0 0 ILC NO IDA 3 GANDAKTIKAJA TALLO PHANT 100 SYANGJA AC 1996 YR ID 35 28 35 28 28 28 14 0 0 ILC NO IDA 3 GANDAKTHULI BESI 100 SYANGJA AC 1996 YR ED 306 245 306 245 245 0 0 0 0 ILC NO IDA 3 GANDAKSURANDI 100 SYANGJA AC 1996 YR ID 56 45 46 45 45 30 0 10 8 ILC NO IDA 3 GANDAKTOTAL of ILC > SYANGJA > REHABILITATION 32 1674 1293 1581 1293 1231 552 134 10 8

TOTAL of SYANGJA District 32 1674 1293 1581 1293 1231 552 134 10 8

ILC>TANAHU>REHABILITATIONANP TARI 100 TANAHU AC 1996 YR ID 50 40 50 40 40 20 5 0 0 ILC NO IDA 3 GANDAKBACHYANGDI PHANT 100 TANAHU AC 1996 YR ID 33 26 33 26 26 26 0 0 0 ILC NO IDA 3 GANDAKBARAH KULO 100 TANAHU AC 1996 YR ID 35 30 35 30 30 0 0 0 0 ILC NO IDA 3 GANDAKBUDUWA 100 TANAHU AC 1996 YR ID 56 45 56 45 45 20 5 0 0 ILC NO IDA 3 GANDAKDURGE TARI 100 TANAHU AC 1996 YR ID 50 40 50 40 40 20 10 0 0 ILC NO IDA 3 GANDAKGAIRI BAGUWA 100 TANAHU AC 1996 YR ID 68 54 68 54 54 25 6 0 0 ILC NO IDA 3 GANDAKKALESTI 100 TANAHU AC 1996 YR ID 45 36 45 36 36 15 5 0 0 ILC NO IDA 3 GANDAKKANDELE KULO 100 TANAHU AC 1996 YR ID 24 19 24 19 19 5 0 0 0 ILC NO IDA 3 GANDAKKANDER TARI 100 TANAHU AC 1996 YR ID 29 25 29 25 25 0 0 0 0 ILC NO IDA 3 GANDAKKA TARI 100 TANAHU AC 1996 YR ID 50 40 50 40 40 20 5 0 0 ILC NO IDA 3 GANDAKMARYAN GHAT 100 TANAHU AC 1990 YR ID 50 40 50 40 40 40 0 0 0 ILC NO IDA 3 GANDAKNAYA TAR 100 TANAHU AC 1991 YR ID 113 90 113 90 90 30 0 0 0 ILC NO IDA 3 GANDAKPATLE BARAHBISHE 100 TANAHU AC 1996 YR ID 56 45 56 45 45 20 6 0 0 ILC NO IDA 3 GANDAKPAYER PHAT 100 TANAHU AC 1996 YR ID 41 33 41 33 33 10 0 0 0 ILC NO IDA 3 GANDAKPHEDI KHOLA 100 TANAHU AC 1996 YR ID 44 35 44 35 35 20 5 0 0 ILC NO IDA 3 GANDAKPIPAL TARI 100 TANAHU AC 1996 YR ID 56 45 56 45 45 25 10 0 0 ILC NO IDA 3 GANDAKPOKHAREL PHANT 100 TANAHU AC 1996 YR ID 44 35 44 35 35 35 0 0 0 ILC NO IDA 3 GANDAKSAJHA TAR 100 TANAHU AC 1996 YR ID 71 60 71 60 60 0 0 0 0 ILC YES IDA 3 GANDAKSATRA SAYA KYAMIN 100 TANAHU AC 1996 YR ID 41 35 41 35 35 20 15 0 0 ILC NO IDA 3 GANDAKSATRA SAYA PHANT 100 TANAHU AC 1996 YR ID 71 60 71 60 60 0 0 0 0 ILC NO IDA 3 GANDAKSERA PACHPANNE 100 TANAHU AC 1996 YR ID 38 30 38 30 30 30 0 0 0 ILC NO IDA 3 GANDAKSERA KHET 100 TANAHU AC 1996 YR ID 23 18 23 18 18 18 0 0 0 ILC NO IDA 3 GANDAKSHERA PHANT 100 TANAHU AC 1997 YR ID 41 35 41 35 0 0 0 0 0 ILC NO ADB 3 GANDAKSUMAL TARI 100 TANAHU AC 1996 YR ID 25 20 25 20 20 20 0 0 0 ILC NO IDA 3 GANDAKTHULO TAR 100 TANAHU AC 1997 YR ID 53 45 53 45 0 0 0 0 0 ILC NO ADB 3 GANDAKSANGRALE PHAT 100 TANAHU AC 1990 YR ID 19 15 19 15 15 4 0 0 0 ILC NO IDA 3 GANDAKGADHI JHAURI 100 TANAHU AC 1996 YR ID 63 50 63 50 50 50 0 0 0 ILC NO IDA 3 GANDAKBULDI BIRTA 100 TANAHU AC 1996 YR ID 23 18 23 18 18 18 0 0 0 ILC NO IDA 3 GANDAKKAFLE AMRENI PHANT 100 TANAHU AC 1996 YR ID 43 34 43 34 34 34 0 0 0 ILC NO IDA 3 GANDAKTOTAL of ILC > TANAHU > REHABILITATION 29 1355 1098 1355 1098 1018 525 72 0 0

TOTAL of TANAHU District 29 1355 1098 1355 1098 1018 525 72 0 0

74

Page 80: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of WESTERN > Hill 179 10774 8768 10681 8768 7931 3486 593 17 113

ILC>MANANG>REHABILITATIONGENZANO 100 MANANG AC 1997 YR ID 82 70 82 70 0 0 0 0 0 ILC NO ADB 3 GANDAKJIKRE 100 MANANG AC 1996 YR ID 31 25 31 25 25 25 15 0 0 ILC NO IDA 3 GANDAKKYANG 100 MANANG AC 1996 YR ID 19 15 19 15 15 15 0 0 0 ILC NO IDA 3 GANDAKTILICHE 100 MANANG AC 1996 YR ID 38 30 38 30 30 30 20 0 0 ILC NO IDA 3 GANDAKTOTAL of ILC > MANANG > REHABILITATION 4 170 140 170 140 70 70 35 0 0

TOTAL of MANANG District 4 170 140 170 140 70 70 35 0 0

TOTAL of WESTERN > Mountain 4 170 140 170 140 70 70 35 0 0

TOTAL of WESTERN Region 208 19926 16394 19833 16394 15137 4511 1178 17 113

ILC>BANKE>REHABILITATIONCHISHA PANI-NAUBASTA 100 BANKE AC 1996 YR ID 353 300 353 300 300 0 0 0 0 ILC NO IDA 6 WEST RAPTIDHUMIYA IRRIGATION PROJECT 100 BANKE AC 1996 YR ID 259 220 259 220 220 0 0 0 0 ILC NO IDA 6 WEST RAPTIKIRAN NALA 100 BANKE AC 1997 YR ID 194 165 194 165 0 0 0 0 0 ILC NO ADB 6 WEST RAPTINEBUWA FARM 100 BANKE AC 1997 YR ID 176 150 176 150 0 0 0 0 0 ILC NO ADB 6 WEST RAPTIPARUWA IP 100 BANKE AC 1996 YR ID 118 100 118 100 100 0 0 0 0 ILC NO IDA 6 WEST RAPTITOTAL of ILC > BANKE > REHABILITATION 5 1100 935 1100 935 620 0 0 0 0

TOTAL of BANKE District 5 1100 935 1100 935 620 0 0 0 0

ILC>BARDIYA>REHABILITATIONSURYA PATUWA 100 BARDIYA AC 1997 YR ID 1529 1300 1529 1300 0 0 0 0 0 ILC NO ADB 5 BABAITOTAL of ILC > BARDIYA > REHABILITATION 1 1529 1300 1529 1300 0 0 0 0 0

TOTAL of BARDIYA District 1 1529 1300 1529 1300 0 0 0 0 0

ILC>DANG>REHABILITATIONCHILIYA 100 DANG AC 1996 YR ID 118 100 118 100 100 0 0 0 0 ILC NO IDA 5 BABAIGOBARDIHA BADKAPATH 100 DANG AC 1997 YR ID 535 455 535 455 0 0 0 0 0 ILC NO ADB 5 BABAIKACHELA KACHILI 100 DANG AC 1996 YR ID 235 200 235 200 200 0 0 0 0 ILC NO IDA 5 BABAIKATUWA KHOLA 100 DANG AC 1996 YR ID 391 332 391 332 332 0 0 0 0 ILC NO IDA 5 BABAIRANIGAD 100 DANG AC 1996 YR ID 260 221 260 221 221 0 0 0 0 ILC NO IDA 5 BABAIRATANPUR 100 DANG AC 1997 YR ID 147 125 147 125 0 0 0 0 0 ILC NO ADB 5 BABAISAPAILA PARASPUR 100 DANG AC 1996 YR ID 236 201 236 201 201 0 0 0 0 ILC NO IDA 5 BABAICHAUWA KHOLA 100 DANG AC 1996 YR ID 529 450 529 450 450 0 0 0 0 ILC NO IDA 5 BABAITOTAL of ILC > DANG > REHABILITATION 8 2451 2084 2451 2084 1504 0 0 0 0

TOTAL of DANG District 8 2451 2084 2451 2084 1504 0 0 0 0

TOTAL of MID-WESTERN > Terai 14 5080 4319 5080 4319 2124 0 0 0 0

75

Page 81: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

ILC>DAILEKH>REHABILITATION BESIKHADA PAL CHAUR 100 DAILEKH AC 1997 YR ID 94 80 94 80 0 0 0 0 0 ILC NO ADB 5 BABAITOTAL of ILC > DAILEKH > REHABILITATION 1 94 80 94 80 0 0 0 0 0

TOTAL of DAILEKH District 1 94 80 94 80 0 0 0 0 0

ILC>JAJARKOT>REHABILITATIONGHATTE KHOLA 100 JAJARKOT AC 1996 YR ID 35 30 35 30 30 0 0 0 0 ILC NO IDA 2 KARNALIHOLU KHOLA 100 JAJARKOT AC 1997 YR ID 65 55 65 55 0 0 0 0 0 ILC NO ADB 2 KARNALIJHUPRA KHOLA 100 JAJARKOT AC 1996 YR ID 29 25 29 25 25 0 0 0 0 ILC NO IDA 2 KARNALIRAWATGAUN 100 JAJARKOT AC 1997 YR ID 29 25 29 25 0 0 0 0 0 ILC NO ADB 2 KARNALISIR CHAUR 100 JAJARKOT AC 1996 YR ID 59 50 59 50 50 0 0 0 0 ILC NO IDA 2 KARNALISIRUGAR MONAGAR 100 JAJARKOT AC 1996 YR ID 47 40 47 40 40 0 0 0 0 ILC NO IDA 2 KARNALITOTAL of ILC > JAJARKOT > REHABILITATION 6 264 225 264 225 145 0 0 0 0

TOTAL of JAJARKOT District 6 264 225 264 225 145 0 0 0 0

ILC>PYUTHAN>REHABILITATIONBADAHARA SARIWANG 100 PYUTHAN AC 1996 YR ID 41 35 41 35 35 0 0 0 0 ILC NO IDA 6 WEST RAPTIDAWANGWANG 100 PYUTHAN AC 1996 YR ID 94 80 90 80 80 0 0 0 0 ILC NO IDA 6 WEST RAPTIRANI KULO 100 PYUTHAN AC 1996 YR ID 224 190 224 190 190 0 0 0 0 ILC NO IDA 6 WEST RAPTISAMUNDRA PHANT 100 PYUTHAN AC 1996 YR ID 106 90 106 90 90 0 0 0 0 ILC NO IDA 6 WEST RAPTITOTAL of ILC > PYUTHAN > REHABILITATION 4 465 395 461 395 395 0 0 0 0

TOTAL of PYUTHAN District 4 465 395 461 395 395 0 0 0 0

ILC>ROLPA>REHABILITATIONCHHAPNETA 100 ROLPA AC 1996 YR ID 24 20 24 20 20 0 0 0 0 ILC NO IDA 6 WEST RAPTIGHODA KHOLA 100 ROLPA AC 1996 YR ID 147 125 147 125 125 0 0 0 0 ILC NO IDA 6 WEST RAPTISAIWANG 100 ROLPA AC 1996 YR ID 153 130 153 130 130 0 0 0 0 ILC NO IDA 6 WEST RAPTITOTAL of ILC > ROLPA > REHABILITATION 3 324 275 324 275 275 0 0 0 0

TOTAL of ROLPA District 3 324 275 324 275 275 0 0 0 0

ILC>RUKUM>REHABILITATIONSIMLI 100 RUKUM AC 1996 YR ID 47 40 47 40 40 0 0 0 0 ILC NO IDA 2 KARNALIMAGMA 100 RUKUM AC 1996 YR ID 82 70 82 70 70 0 0 0 0 ILC NO IDA 2 KARNALITOTAL of ILC > RUKUM > REHABILITATION 2 129 110 129 110 110 0 0 0 0

TOTAL of RUKUM District 2 129 110 129 110 110 0 0 0 0

ILC>SALYAN>REHABILITATIONGARIJIULA 100 SALYAN AC 1996 YR ID 147 125 147 125 125 0 0 0 0 ILC NO IDA 5 BABAILAHAGHAT 100 SALYAN AC 1996 YR ID 59 50 59 50 50 0 0 0 0 ILC NO IDA 5 BABAISI TALPATI 100 SALYAN AC 1996 YR ID 60 51 60 51 51 0 0 0 0 ILC NO IDA 5 BABAI

76

Page 82: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of ILC > SALYAN > REHABILITATION 3 266 226 266 226 226 0 0 0 0

TOTAL of SALYAN District 3 266 226 266 226 226 0 0 0 0

ILC>SURKHET>REHABILITATIONBETANI KHOLA 100 SURKHET AC 1996 YR ID 118 100 118 100 100 0 0 0 0 ILC NO IDA 2 KARNALIBHAPRA KHOLA 100 SURKHET AC 1997 YR ID 82 70 82 70 0 0 0 0 0 ILC NO ADB 2 KARNALIGHUM KHAHARE 100 SURKHET AC 1996 YR ID 115 98 115 98 98 0 0 0 0 ILC NO IDA 2 KARNALIKARE KHOLA 100 SURKHET AC 1997 YR ID 35 30 35 30 0 0 0 0 0 ILC NO ADB 2 KARNALILEKPHARSA 100 SURKHET AC 1996 YR ID 129 110 129 110 110 0 0 0 0 ILC NO IDA 2 KARNALIPAGAMA 100 SURKHET AC 1996 YR ID 124 105 124 105 105 0 0 0 0 ILC NO IDA 2 KARNALISALKOT 100 SURKHET AC 1996 YR ID 588 500 588 500 500 0 0 0 0 ILC NO IDA 2 KARNALITOTAL of ILC > SURKHET > REHABILITATION 7 1191 1013 1191 1013 913 0 0 0 0

TOTAL of SURKHET District 7 1191 1013 1191 1013 913 0 0 0 0

TOTAL of MID-WESTERN > Hill 26 2733 2324 2729 2324 2064 0 0 0 0

ILC>DOLPA>REHABILITATIONPHULCHUNG 100 DOLPA PC 1997 YR ID 38 30 28 22 22 22 15 10 8 ILC NO IDA 6 WEST RAPTITOTAL of ILC > DOLPA > REHABILITATION 1 38 30 28 22 22 22 15 10 8

TOTAL of DOLPA District 1 38 30 28 22 22 22 15 10 8

ILC>HUMLA>REHABILITATIONHUNEGAD 100 HUMLA AC 1996 YR ID 24 20 24 20 20 0 0 0 0 ILC NO IDA 2 KARNALITOTAL of ILC > HUMLA > REHABILITATION 1 24 20 24 20 20 0 0 0 0

TOTAL of HUMLA District 1 24 20 24 20 20 0 0 0 0

ILC>MUGU>REHABILITATIONGULM 100 MUGU AC 1997 YR ID 71 60 71 60 0 0 0 0 0 ILC NO ADB 3 GANDAKTOTAL of ILC > MUGU > REHABILITATION 1 71 60 71 60 0 0 0 0 0

TOTAL of MUGU District 1 71 60 71 60 0 0 0 0 0

TOTAL of MID-WESTERN > Mountain 3 133 110 123 102 42 22 15 10 8

TOTAL of MID-WESTERN Region 43 7946 6753 7932 6745 4230 22 15 10 86723

ILC>KAILALI>REHABILITATIONBHAJANI 100 KAILALI AC 1996 YR ID 824 700 824 700 700 0 0 0 0 ILC NO IDA 2 KARNALIKHURKHURIA 100 KAILALI AC 1996 YR ID 765 650 765 650 650 0 0 0 0 ILC NO IDA 2 KARNALIMACHHELI 100 KAILALI AC 1996 YR ID 47 40 47 40 40 0 0 0 0 ILC NO IDA 2 KARNALIMUNUWA 100 KAILALI AC 1996 YR ID 529 450 529 450 450 0 0 0 0 ILC NO IDA 2 KARNALITEDI 100 KAILALI AC 1996 YR ID 1765 1500 1765 1500 1500 0 0 0 0 ILC NO IDA 2 KARNALI

77

Page 83: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of ILC > KAILALI > REHABILITATION 5 3930 3340 3930 3340 3340 0 0 0 0

TOTAL of KAILALI District 5 3930 3340 3930 3340 3340 0 0 0 0

ILC>KANCHANPUR>REHABILITATIONBACHHELA 100 KANCHANPUR AC 1996 YR ID 176 150 176 150 150 0 0 0 0 ILC NO IDA 1 MAHAKALIBAGUN 100 KANCHANPUR AC 1996 YR ID 176 150 176 150 150 0 0 0 0 ILC NO IDA 1 MAHAKALIBRAHMADEO 100 KANCHANPUR AC 1996 YR ID 235 200 235 200 200 0 0 0 0 ILC NO IDA 1 MAHAKALITOTAL of ILC > KANCHANPUR > REHABILITATION 3 587 500 587 500 500 0 0 0 0

TOTAL of KANCHANPUR District 3 587 500 587 500 500 0 0 0 0

TOTAL of FAR-WESTERN >Terai 8 4517 3840 4517 3840 3840 0 0 0 0

ILC>ACHHAM>REHABILITATIONBARDADEVI 100 ACHHAM AC 1996 YR ID 76 65 76 65 65 0 0 0 0 ILC YES IDA 2 KARNALIKHAPTAD 100 ACHHAM AC 1996 YR ID 165 140 165 140 140 0 0 0 0 ILC YES IDA 2 KARNALIMAUAGON 100 ACHHAM AC 1996 YR ID 71 60 71 60 60 0 0 0 0 ILC YES IDA 2 KARNALISUT TAR 100 ACHHAM AC 1996 YR ID 165 140 165 140 140 0 0 0 0 ILC YES IDA 2 KARNALITANE KUNA 100 ACHHAM AC 2000 YR ID 47 40 47 40 0 0 0 0 0 ILC NO ADB 2 KARNALITOTAL of ILC > ACHHAM > REHABILITATION 5 524 445 524 445 405 0 0 0 0

TOTAL of ACHHAM District 5 524 445 524 445 405 0 0 0 0

ILC>BAITADI>REHABILITATIONNANGAUN 100 BAITADI AC 1999 YR ID 29 25 29 25 0 0 0 0 0 ILC NO ADB 1 MAHAKALISATGAD 100 BAITADI AC 1996 YR ID 176 150 176 150 150 0 0 0 0 ILC NO IDA 1 MAHAKALISURNAYAGED 100 BAITADI AC 2001 YR ID 118 100 118 100 0 0 0 0 0 ILC YES ADB 1 MAHAKALITOTAL of ILC > BAITADI > REHABILITATION 3 323 275 323 275 150 0 0 0 0

TOTAL of BAITADI District 3 323 275 323 275 150 0 0 0 0

ILC>DADELDHURA>REHABILITATIONKAKRIGHAT 100 DADELDHURA AC 1996 YR ID 35 30 35 30 30 0 0 0 0 ILC NO IDA 1 MAHAKALIPARIGAUN 100 DADELDHURA AC 1996 YR ID 235 200 235 200 200 0 0 0 0 ILC NO IDA 1 MAHAKALIRANA GAON 100 DADELDHURA AC 1996 YR ID 100 85 100 85 85 0 0 0 0 ILC NO IDA 1 MAHAKALISADANI 100 DADELDHURA AC 1998 YR ID 212 180 212 180 0 0 0 0 0 ILC NO ADB 1 MAHAKALISELTUNA 100 DADELDHURA AC 1996 YR ID 129 110 129 110 110 0 0 0 0 ILC NO IDA 1 MAHAKALITOTAL of ILC > DADELDHURA > REHABILITATION 5 711 605 711 605 425 0 0 0 0

TOTAL of DADELDHURA District 5 711 605 711 605 425 0 0 0 0

TOTAL of FAR-WESTERN > Hill 13 1558 1325 1558 1325 980 0 0 0 0

ILC>BAJHANG>REHABILITATIONDEURA (T) 100 BAJHANG AC 1996 YR ID 40 34 40 34 34 0 0 0 0 ILC YES IDA 2 KARNALI

78

Page 84: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

KHAIRA T 100 BAJHANG AC 1996 YR ID 82 70 82 70 70 0 0 0 0 ILC YES IDA 2 KARNALIPI KHET T 100 BAJHANG AC 1996 YR ID 59 50 59 50 50 0 0 0 0 ILC YES IDA 2 KARNALI TALKOT 100 BAJHANG AC 1996 YR ID 202 172 202 172 172 0 0 0 0 ILC YES IDA 2 KARNALITOTAL of ILC > BAJHANG > REHABILITATION 4 383 326 383 326 326 0 0 0 0

TOTAL of BAJHANG District 4 383 326 383 326 326 0 0 0 0

ILC>BAJURA>REHABILITATIONJERA 100 BAJURA AC 1996 YR ID 94 80 94 80 80 0 0 0 0 ILC YES IDA 2 KARNALILAMGAUN 100 BAJURA AC 1996 YR ID 59 50 59 50 50 0 0 0 0 ILC YES IDA 2 KARNALIPUDA BABLA 100 BAJURA AC 1996 YR ID 41 35 41 35 35 0 0 0 0 ILC YES IDA 2 KARNALITOTAL of ILC > BAJURA > REHABILITATION 3 194 165 194 165 165 0 0 0 0

TOTAL of BAJURA District 3 194 165 194 165 165 0 0 0 0

ILC>DARCHULA>REHABILITATIONGADPARI 100 DARCHULA AC 1996 YR ID 96 82 96 82 82 0 0 0 0 ILC NO IDA 1 MAHAKALIPOTIBAGER 100 DARCHULA AC 1996 YR ID 312 265 312 265 265 0 0 0 0 ILC NO IDA 1 MAHAKALIRADAM 100 DARCHULA AC 1996 YR ID 41 35 41 35 35 0 0 0 0 ILC NO IDA 1 MAHAKALITOTAL of ILC > DARCHULA > REHABILITATION 3 449 382 449 382 382 0 0 0 0

TOTAL of DARCHULA District 3 449 382 449 382 382 0 0 0 0

TOTAL of FAR-WESTERN > Mountain 10 1026 873 1026 873 873 0 0 0 0

TOTAL of FAR-WESTERN Region 31 7101 6038 7101 6038 5693 0 0 0 0

TOTAL of ILC 282 34973 29185 34866 29177 25060 4533 1193 27 121

ISP>JHAPA>NEWADHUWA KHOLA 100 JHAPA PC1997 YR ED 750 600 750 600 600 400 0 750 600 ISP NO ADB 12 SIWALIK RIVERBETANI 100 JHAPA AC1992 MS ID 165 140 165 140 150 30 0 0 0 ISP NO ADB 12 SIWALIK RIVERBHUTENI 100 JHAPA AC1994 MS ED 500 400 500 400 400 100 0 0 0 ISP NO ADB 12 SIWALIK RIVERDUDAMANI KHOLA 100 JHAPA AC1996 YR ID 125 100 125 100 100 40 20 0 0 ISP NO ADB 12 SIWALIK RIVERHARIYA 100 JHAPA AC1993 MS ED 619 495 619 495 495 375 0 0 0 ISP NO ADB 12 SIWALIK RIVERMASALE PAINI 100 JHAPA AC1992 MS ID 188 150 188 150 150 90 0 0 0 ISP NO ADB 12 SIWALIK RIVERRAM CHANDRA KHOLA 100 JHAPA AC1996 YR ID 175 140 175 140 140 40 20 0 0 ISP NO ADB 12 SIWALIK RIVERTOTAL of ISP > JHAPA > NEW 7 2522 2025 2522 2025 2035 1075 40 750 600

ISP>JHAPA>REHABILITATIONBARBADASHI 100 JHAPA AC1994 MS ID 188 150 188 150 150 75 15 0 0 ISP NO ADB 12 SIWALIK RIVERBHUTENI SAINIK IP 100 JHAPA AC1996 YR ED 488 350 488 350 350 100 100 0 0 ISP NO ADB 12 SIWALIK RIVERDEONIYA 100 JHAPA AC1994 MS ID 219 175 219 175 175 100 0 0 0 ISP NO ADB 12 SIWALIK RIVERDHARDHARE KHOLA 100 JHAPA AC1996 YR ID 188 150 188 150 150 40 0 0 0 ISP NO ADB 12 SIWALIK RIVERDHYANGRI 100 JHAPA AC1994 MS ID 263 250 263 250 250 50 10 0 0 ISP NO ADB 12 SIWALIK RIVERGEURIYA 100 JHAPA AC1994 MS ED 235 200 235 200 300 100 0 0 0 ISP NO ADB 12 SIWALIK RIVER

79

Page 85: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

HARCHANA 100 JHAPA AC1994 MS ID 282 240 282 240 250 100 10 0 0 ISP NO ADB 12 SIWALIK RIVERKARKIPANI 100 JHAPA PC1997 YR ID 281 225 281 225 0 0 0 281 225 ISP NO ADB 12 SIWALIK RIVERLAXIMI BIRING 100 JHAPA AC1994 MS ID 125 100 125 100 100 55 15 0 0 ISP NO ADB 12 SIWALIK RIVERMIYABADDI 100 JHAPA AC1993 MS ID 281 225 281 225 225 100 10 0 0 ISP YES ADB 12 SIWALIK RIVERRAJPAINI 100 JHAPA PC1997 YR ID 250 200 250 200 0 0 0 250 200 ISP NO ADB 12 SIWALIK RIVERREKHA BELGACHHI 100 JHAPA AC1996 YR ID 188 150 188 150 150 100 50 0 0 ISP NO ADB 12 SIWALIK RIVERREKHA KHOLA 100 JHAPA AC1996 YR ID 250 200 250 200 200 100 20 0 0 ISP NO ADB 12 SIWALIK RIVERSANUMAI 100 JHAPA PC1997 YR ED 750 600 750 600 0 0 0 750 600 ISP NO ADB 12 SIWALIK RIVERSURUNGA KHOLA 100 JHAPA AC1996 YR ED 750 600 750 600 600 250 50 0 0 ISP NO ADB 12 SIWALIK RIVERTIMAI 100 JHAPA AC1993 MS ED 375 300 375 300 300 100 20 0 0 ISP YES ADB 12 SIWALIK RIVERTUDBARI 100 JHAPA AC1994 MS ID 188 150 188 150 150 75 15 0 0 ISP NO ADB 12 SIWALIK RIVERPUUER TIMAI 100 JHAPA AC1994 MS ID 282 240 282 240 240 144 58 0 0 ISP NO ADB 12 SIWALIK RIVERTOTAL of ISP > JHAPA > REHABILITATION 18 5583 4505 5583 4505 3590 1489 373 1281 1025

TOTAL of JHAPA District 25 8105 6530 8105 6530 5625 2564 413 2031 1625

ISP>MORANG>NEWGACHHIYA 100 MORANG AC 1993 MS ED 375 300 375 300 300 0 0 0 0 ISP YES ADB 12 SIWALIK RIVERTOTAL of ISP > MORANG > NEW 1 375 300 375 300 300 0 0 0 0

ISP>MORANG>REHABILITATIONADARS 100 MORANG AC1993 MS ID 588 500 308 500 246 0 0 0 0 ISP YES ADB 12 SIWALIK RIVERBELBARI 100 MORANG AC1993 MS ID 802 682 802 682 47 0 0 0 0 ISP NO ADB 12 SIWALIK RIVERBHALUWA 100 MORANG AC1995 YR ID 291 233 291 233 233 90 0 0 0 ISP YES ADB 12 SIWALIK RIVERBIHIBARE 100 MORANG AC1993 MS ED 588 500 588 500 350 0 0 0 0 ISP YES ADB 12 SIWALIK RIVERCHHADHARE SITA 100 MORANG AC1996 YR ID 176 150 176 150 230 200 0 0 0 ISP YES ADB 12 SIWALIK RIVERDANS MORANG 100 MORANG AC1996 YR ID 625 500 625 500 500 200 0 0 0 ISP YES ADB 12 SIWALIK RIVERGARAME JHODA 100 MORANG AC1996 YR ID 400 320 400 320 320 130 0 0 0 ISP YES ADB 12 SIWALIK RIVERKAIR 100 MORANG AC1995 YR ID 325 260 325 260 260 100 0 0 0 ISP YES ADB 12 SIWALIK RIVERKALI KHOLA 100 MORANG AC1996 YR ID 188 150 188 150 150 60 0 0 0 ISP YES ADB 12 SIWALIK RIVERKISTI KHOLA 100 MORANG AC1996 YR ID 250 200 250 200 200 80 0 0 0 ISP YES ADB 12 SIWALIK RIVERMADHUMALLA 100 MORANG AC1996 YR ED 613 490 613 490 490 200 0 0 0 ISP YES ADB 12 SIWALIK RIVERMUSARGHATTA 100 MORANG PC1997 YR ED 750 600 750 600 0 0 0 750 600 ISP NO ADB 12 SIWALIK RIVERSITA DANS KERKHA 100 MORANG AC1996 YR ED 625 500 625 500 500 200 0 0 0 ISP YES ADB 12 SIWALIK RIVERSUKHANI (THALAHA) 100 MORANG AC1995 YR ID 193 154 193 154 154 60 0 0 0 ISP YES ADB 12 SIWALIK RIVERTOTAL of ISP > MORANG > REHABILITATION 14 6414 5239 6134 5239 3680 1320 0 750 600

TOTAL of MORANG District 15 6789 5539 6509 5539 3980 1320 0 750 600

ISP>SAPTARI>REHABILITATIONBIRDHANA 100 SAPTARI AC1993 MS ID 250 200 250 200 200 0 0 0 0 ISP NO ADB 12 SIWALIK RIVERDUMJOR 100 SAPTARI PC1997 YR ID 350 280 350 280 0 0 0 350 280 ISP NO ADB 12 SIWALIK RIVERKAJARA DHAHA 100 SAPTARI AC1992 MS ID 376 320 376 320 220 0 0 0 0 ISP YES ADB 12 SIWALIK RIVERKHADAK 100 SAPTARI AC1992 MS ED 353 300 353 300 500 0 0 0 0 ISP YES ADB 12 SIWALIK RIVERKHANDO 100 SAPTARI AC1996 YR ED 1225 980 1225 980 980 250 0 0 0 ISP YES ADB 12 SIWALIK RIVERMAHULI 100 SAPTARI AC1996 YR ED 1313 1050 1313 1050 1050 250 0 0 0 ISP YES ADB 12 SIWALIK RIVER

80

Page 86: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

SUNDARI 100 SAPTARI AC1996 YR ED 1500 1200 1500 1200 1200 300 0 0 0 ISP YES ADB 12 SIWALIK RIVERTOTAL of ISP > SAPTARI > REHABILITATION 7 5367 4330 5367 4330 4150 800 0 350 280

TOTAL of SAPTARI District 7 5367 4330 5367 4330 4150 800 0 350 280

ISP>SIRAHA>NEWNIRDHANA 100 SIRAHA AC1995 YR ID 312 250 312 200 250 75 0 0 0 ISP YES ADB 12 SIWALIK RIVERTOTAL of ISP > SIRAHA > NEW 1 312 250 312 200 250 75 0 0 0

ISP>SIRAHA>REHABILITATIONBANO 100 SIRAHA AC1994 MS ED 555 444 555 444 444 0 0 0 0 ISP NO ADB 12 SIWALIK RIVERBATAHA 100 SIRAHA AC1996 ID 313 250 313 250 250 60 0 0 0 ISP YES ADB 12 SIWALIK RIVERJARUWA 100 SIRAHA PC1997 YR ID 156 125 156 125 0 0 0 156 125 ISP NO ADB 12 SIWALIK RIVERKAMALA UTTARAYANI 100 SIRAHA AC1996 YR ED 675 540 675 540 540 140 0 0 0 ISP YES ADB 12 SIWALIK RIVERMAINABATE II 100 SIRAHA AC1995 YR ID 188 150 188 150 150 50 0 0 0 ISP YES ADB 12 SIWALIK RIVERMAINABATI I 100 SIRAHA AC1994 MS ED 529 450 529 450 490 0 0 0 0 ISP NO ADB 12 SIWALIK RIVERSARASWOTI DHUMUHAN 100 SIRAHA PC1997 YR ED 375 300 375 300 0 0 0 375 300 ISP NO ADB 12 SIWALIK RIVERTOTAL of ISP > SIRAHA > REHABILITATION 7 2791 2259 2791 2259 1874 250 0 531 425

TOTAL of SIRAHA District 8 3103 2509 3103 2459 2124 325 0 531 425

ISP>SUNSARI>NEWTENGRATEN GRIBHABA 100 SUNSARI AC1995 YR ID 138 110 138 110 110 50 0 0 0 ISP YES ADB 12 SIWALIK RIVERTOTAL of ISP > SUNSARI > NEW 1 138 110 138 110 110 50 0 0 0

ISP>SUNSARI>REHABILITATIONBAUKA 100 SUNSARI AC1994 MS ID 265 225 265 225 125 0 0 0 0 ISP NO ADB 12 SIWALIK RIVERBUDHI PATERWA 100 SUNSARI AC1994 MS ID 176 150 176 150 210 0 0 0 0 ISP NO ADB 12 SIWALIK RIVERGALPHARIYA 100 SUNSARI AC1994 MS ID 235 200 235 200 180 0 0 0 0 ISP NO ADB 12 SIWALIK RIVERHARIPUR 100 SUNSARI PC1997 YR ID 750 600 750 600 0 0 0 750 600 ISP NO ADB 12 SIWALIK RIVERKAJARA 100 SUNSARI AC1995 YR ID 294 250 294 250 204 80 0 0 0 ISP YES ADB 12 SIWALIK RIVERKHARSALA 100 SUNSARI AC1994 MS ID 250 200 250 200 200 0 0 0 0 ISP NO ADB 12 SIWALIK RIVERMADHUWAN 100 SUNSARI AC1994 MS ID 250 200 250 200 200 0 0 0 0 ISP NO ADB 12 SIWALIK RIVERDUMRAHA PATUDHAR 100 SUNSARI AC1995 YR ED 524 445 524 445 400 160 0 0 0 ISP YES ADB 12 SIWALIK RIVERSERA 100 SUNSARI AC1995 YR ED 500 400 500 400 400 160 0 0 0 ISP YES ADB 12 SIWALIK RIVERTENGRA 100 SUNSARI AC1993 MS ID 359 305 359 305 266 0 0 0 0 ISP NO ADB 12 SIWALIK RIVERWEST KUSHAHA 100 SUNSARI AC1993 MS ID 559 475 559 475 475 285 114 0 0 ISP NO ADB 12 SIWALIK RIVERTOTAL of ISP > SUNSARI > REHABILITATION 11 4162 3450 4162 3450 2660 685 114 750 600

TOTAL of SUNSARI District 12 4300 3560 4300 3560 2770 735 114 750 600

TOTAL of EASTERN > Terai 67 27664 22468 27384 22418 18649 5744 527 4412 3530

ISP>BHOJPUR>NEWAMTEK 100 BHOJPUR PC1997 YR ID 288 230 230 230 230 200 0 288 230 ISP NO ADB 4 KOSHI

81

Page 87: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

HOMTANG 100 BHOJPUR PC1997 YR ID 38 30 38 30 30 20 0 38 30 ISP NO ADB 4 KOSHITOTAL of ISP > BHOJPUR > NEW 2 326 260 268 260 260 220 0 326 260

ISP>BHOJPUR>REHABILITATIONHAJARE BESHI 100 BHOJPUR AC1996 ID 250 200 250 200 200 150 100 0 0 ISP NO ADB 4 KOSHITOTAL of ISP > BHOJPUR > REHABILITATION 1 250 200 250 200 200 150 100 0 0

TOTAL of BHOJPUR District 3 576 460 518 460 460 370 100 326 260

ISP>DHANKUTA>NEWAKHWUTAR 100 DHANKUTA AC1993 MS ID 38 30 38 30 30 0 0 0 0 ISP YES ADB 4 KOSHIMALBASE 100 DHANKUTA PC1997 YR ID 70 56 70 56 56 40 0 70 56 ISP NO ADB 4 KOSHIPURAMTIM 100 DHANKUTA PC1997 YR ID 200 150 200 150 150 120 0 200 160 ISP NO ADB 4 KOSHISURALE 100 DHANKUTA AC1995 YR ID 25 20 25 20 20 10 10 0 0 ISP YES ADB 4 KOSHITOTAL of ISP > DHANKUTA > NEW 4 333 256 333 256 256 170 10 270 216

ISP>DHANKUTA>REHABILITATIONKHAIRENI 100 DHANKUTA AC1993 MS ID 75 60 75 60 60 0 0 0 0 ISP NO ADB 4 KOSHIKHARDEP 100 DHANKUTA AC1992 MS ID 141 113 141 113 111 0 0 0 0 ISP YES ADB 4 KOSHIKUSE TAR 100 DHANKUTA AC1993 MS ID 40 32 40 32 30 0 0 0 0 ISP YES ADB 4 KOSHILAXMI KULO 100 DHANKUTA AC1995 YR ID 75 60 75 60 60 40 20 0 0 ISP YES ADB 4 KOSHIPHAPRE 100 DHANKUTA AC1992 MS ID 94 75 94 75 73 0 0 0 0 ISP YES ADB 4 KOSHITOTAL of ISP > DHANKUTA > REHABILITATION 5 425 340 425 340 334 40 20 0 0

TOTAL of DHANKUTA District 9 758 596 758 596 590 210 30 270 216

ISP>ILAM>NEWBHULKE KHOLA 100 ILAM AC1995 YR ID 75 60 75 60 60 40 20 0 0 ISP YES ADB 11 KANKAIKOCHE KHOLA 100 ILAM AC1996 YR ID 125 100 125 100 100 50 25 0 0 ISP YES ADB 11 KANKAILAMADUWALI 100 ILAM AC1992 MS ID 94 80 94 80 80 0 0 0 0 ISP YES ADB 11 KANKAINUNSARI 100 ILAM AC1994 YR ID 69 55 69 55 43 0 0 0 0 ISP NO ADB 11 KANKAISOYANG 100 ILAM AC1993 MS ID 59 50 59 50 80 0 0 0 0 ISP YES ADB 11 KANKAITHULO PUWA 100 ILAM AC1993 MS ID 206 175 206 175 200 175 0 0 0 ISP YES ADB 11 KANKAIDEUMAI KHOLA 100 ILAM AC1993 MS ID 147 125 147 125 125 75 30 0 0 ISP NO ADB 11 KANKAITOTAL of ISP > ILAM > NEW 7 775 645 775 645 688 340 75 0 0

ISP>ILAM>REHABILITATIONASHEWA 100 ILAM AC1995 YR ID 156 125 156 125 125 70 40 0 0 ISP YES ADB 11 KANKAICHHANGE 100 ILAM AC1994 MS ID 81 65 81 65 65 0 0 0 0 ISP YES ADB 11 KANKAICHITRE KHOLA 100 ILAM AC1995 YR ID 163 130 163 130 130 80 20 0 0 ISP YES ADB 11 KANKAIDHUWAN 100 ILAM AC1994 MS ID 250 200 250 200 200 0 0 0 0 ISP NO ADB 11 KANKAIGHATTE KHOLA 100 ILAM AC1995 YR ID 118 100 118 100 110 70 30 0 0 ISP YES ADB 11 KANKAILEWA KHOLA 100 ILAM AC1995 YR ID 125 100 125 100 100 60 40 0 0 ISP YES ADB 11 KANKAISEWA 100 ILAM AC1994 MS ED 100 80 100 80 80 0 0 0 0 ISP NO ADB 11 KANKAISOYANG KHOLA 100 ILAM AC1993 MS ID 188 150 188 150 150 0 0 0 0 ISP NO ADB 11 KANKAISURKESYANBU 100 ILAM AC1995 YR ID 143 114 143 114 114 70 40 0 0 ISP YES ADB 11 KANKAI

82

Page 88: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of ISP > ILAM > REHABILITATION 9 1324 1064 1324 1064 1074 350 170 0 0

TOTAL of ILAM District 16 2099 1709 2099 1709 1762 690 245 0 0

ISP>KHOTANG>NEWJORLAPSI 100 KHOTANG AC1996 YR ID 294 235 294 235 235 100 0 0 0 ISP YES ADB 4 KOSHIMEWA KHOLA 100 KHOTANG PC1997 YR ID 63 50 63 50 0 0 0 63 50 ISP NO ADB 4 KOSHITOTAL of ISP > KHOTANG > NEW 2 357 285 357 285 235 100 0 63 50

ISP>KHOTANG>REHABILITATIONHAWARNAMCHIM 100 KHOTANG PC1997 YR ID 219 175 219 175 0 0 0 219 175 ISP NO ADB 4 KOSHIKHARUWA 100 KHOTANG AC1993 MS ID 166 133 166 133 133 0 0 0 0 ISP NO ADB 4 KOSHINIRMALI DADA 100 KHOTANG AC1993 MS ID 87 74 87 74 100 0 0 0 0 ISP NO ADB 4 KOSHISAWA 100 KHOTANG AC1995 YR ID 165 132 165 132 132 100 50 0 0 ISP NO ADB 4 KOSHITAWA KHOLA 100 KHOTANG AC1996 YR ID 219 175 219 175 175 175 100 0 0 ISP YES ADB 4 KOSHIRAWA 100 KHOTANG AC1996 YR ID 141 120 141 120 120 72 29 0 0 ISP NO ADB 4 KOSHITOTAL of ISP > KHOTANG > REHABILITATION 6 997 809 997 809 660 347 179 219 175

TOTAL of KHOTANG District 8 1354 1094 1354 1094 895 447 179 282 225

ISP>OKHALDHUNGA>NEWMOLI KHOLA 100 OKHALDHUNGA PC1997 YR ID 69 55 0 55 0 0 0 69 55 ISP NO ADB 4 KOSHITOTAL of ISP > OKHALDHUNGA > NEW 1 69 55 0 55 0 0 0 69 55

ISP>OKHALDHUNGA>REHABILITATIONJUKE KHOLA 100 OKHALDHUNGA AC1994 MS ID 50 40 50 40 40 0 0 0 0 ISP NO ADB 4 KOSHIKUL KHOLA 100 OKHALDHUNGA PC1997 YR ID 50 40 50 40 0 0 0 50 40 ISP NO ADB 4 KOSHIPHULBARI 100 OKHALDHUNGA AC1994 MS ID 78 55 78 55 55 0 0 0 0 ISP NO ADB 4 KOSHIRIYALE TAR 100 OKHALDHUNGA AC1993 MS ID 153 122 153 122 122 0 0 0 0 ISP NO ADB 4 KOSHISALPU KHOLA 100 OKHALDHUNGA AC1995 YR ID 118 100 118 100 135 100 50 0 0 ISP YES ADB 4 KOSHITARKERA BARI 100 OKHALDHUNGA AC1993 MS ID 38 32 38 32 36 0 0 0 0 ISP NO ADB 4 KOSHITOTAL of ISP > OKHALDHUNGA > REHABILITATION 6 487 389 487 389 388 100 50 50 40

TOTAL of OKHALDHUNGA District 7 556 444 487 444 388 100 50 119 95

ISP>PANCHTHAR>NEWCHOKMAGU 100 PANCHTHAR PC1997 YR ID 100 80 100 80 0 0 0 100 80 ISP NO ADB 4 KOSHIDHUWAN 100 PANCHTHAR AC1993 YR ID 113 90 113 90 90 50 0 0 0 ISP YES ADB 4 KOSHITHADO KHOLA 100 PANCHTHAR AC1995 YR ID 75 60 75 60 60 36 20 0 0 ISP YES ADB 4 KOSHITOTAL of ISP > PANCHTHAR > NEW 3 288 230 288 230 150 86 20 100 80

ISP>PANCHTHAR>REHABILITATIONARUBOTE 100 PANCHTHAR AC1993 YR ID 134 107 134 107 107 20 0 0 0 ISP YES ADB 4 KOSHICHYAN THAPU 100 PANCHTHAR AC1995 YR ID 138 110 138 110 110 70 20 0 0 ISP YES ADB 4 KOSHIKERABARI 100 PANCHTHAR AC1994 YR ID 40 32 40 32 32 10 0 0 0 ISP NO ADB 4 KOSHILANKHUWA 100 PANCHTHAR PC1997 YR ID 50 40 50 40 0 0 0 50 40 ISP NO ADB 4 KOSHI

83

Page 89: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

MABEWA 100 PANCHTHAR AC1996 YR ID 144 115 144 115 115 55 40 0 0 ISP YES ADB 4 KOSHISHERMA 100 PANCHTHAR AC1994 YR ID 71 60 71 60 67 20 0 0 0 ISP YES ADB 4 KOSHISUBHANG 100 PANCHTHAR AC1995 YR ID 313 250 313 250 250 150 110 0 0 ISP YES ADB 4 KOSHITOTAL of ISP > PANCHTHAR > REHABILITATION 7 890 714 890 714 681 325 170 50 40

TOTAL of PANCHTHAR District 10 1178 944 1178 944 831 411 190 150 120

ISP>TERATHUM>NEWJORGURAS 100 TERATHUM AC1995 YR ID 75 60 60 60 60 40 20 15 0 ISP YES ADB 4 KOSHISAPHEK 100 TERATHUM AC1996 YR ID 47 40 47 40 30 30 30 0 0 ISP YES ADB 4 KOSHISOLMA MEGHA 100 TERATHUM AC1996 YR ID 188 150 150 150 150 100 80 38 0 ISP YES ADB 4 KOSHITELIYA 100 TERATHUM PC1997 YR ID 88 70 88 70 0 0 0 88 70 ISP NO ADB 4 KOSHITOTAL of ISP > TERATHUM > NEW 4 398 320 345 320 240 170 130 141 70

ISP>TERATHUM>REHABILITATIONHUIDE 100 TERATHUM AC1994 YR ID 116 93 116 93 93 0 0 0 0 ISP YES ADB 4 KOSHIIWA 100 TERATHUM AC1992 YR ID 168 143 168 143 70 0 0 0 0 ISP YES ADB 4 KOSHIKHORUNGE 100 TERATHUM AC1994 MS ID 125 100 125 100 100 0 0 0 0 ISP YES ADB 4 KOSHITOTAL of ISP > TERATHUM > REHABILITATION 3 409 336 409 336 263 0 0 0 0

TOTAL of TERATHUM District 7 807 656 754 656 503 170 130 141 70

ISP>UDAYAPUR>NEWASARE BHUSUNE 100 UDAYAPUR PC1997 YR ID 180 144 180 144 0 0 0 180 144 ISP NO ADB 4 KOSHIKANG KHOLA YAP UDAYAPUR AC1996 YR ID 125 100 125 100 100 80 50 0 0 ISP YES ADB 4 KOSHIKHAMBU 100 UDAYAPUR AC1994 MS ID 75 60 75 60 60 0 0 0 0 ISP NO ADB 4 KOSHINEPAL TAR 100 UDAYAPUR AC1994 MS ID 49 39 49 39 39 0 0 0 0 ISP NO ADB 4 KOSHITAPESWORI 100 UDAYAPUR AC1996 YR ID 268 214 268 214 214 200 150 0 0 ISP YES ADB 4 KOSHITAPRANG 100 UDAYAPUR AC1996 YR ID 59 50 59 50 70 60 50 0 0 ISP YES ADB 4 KOSHITOTAL of ISP > UDAYAPUR > NEW 6 756 607 756 607 483 340 250 180 144

ISP>UDAYAPUR>REHABILITATIONBARUWA 100 UDAYAPUR AC1992 MS ID 176 150 176 150 70 0 0 0 0 ISP YES ADB 4 KOSHIMALI KHOLA 100 UDAYAPUR AC1994 MS ID 125 100 125 100 100 0 0 0 0 ISP NO ADB 4 KOSHILAMA KHOLA BASAHA 8,9 100 UDAYAPUR AC1994 MS ID 235 200 235 200 115 0 0 0 0 ISP NO ADB 4 KOSHISIWAI KHOLA 100 UDAYAPUR AC1994 MS ID 88 70 88 70 70 0 0 0 0 ISP NO ADB 4 KOSHITOTAL of ISP > UDAYAPUR > REHABILITATION 4 624 520 624 520 355 0 0 0 0

TOTAL of UDAYAPUR District 10 1380 1127 1380 1127 838 340 250 180 144

TOTAL of EASTERN > Hill 70 8708 7030 8528 7030 6267 2738 1174 1468 1130

ISP>SANKHUWASABHA>NEWPANGMA 100 SANKHUWASABHA AC1994 MS ID 60 48 60 48 48 0 0 0 0 ISP NO ADB 4 KOSHISISUWA TAR 100 SANKHUWASABHA AC1994 MS ID 51 43 51 43 40 0 0 0 0 ISP NO ADB 4 KOSHITOTAL of ISP > SANKHUWASABHA > NEW 2 111 91 111 91 88 0 0 0 0

84

Page 90: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

ISP>SANKHUWASABHA>REHABILITATIONBAGHA 100 SANKHUWASABHA AC1993 MS ID 152 129 152 129 100 0 0 0 0 ISP NO ADB 4 KOSHIMALTA 100 SANKHUWASABHA AC1993 MS ID 81 65 81 65 65 0 0 0 0 ISP NO ADB 4 KOSHIMALTA KHOLA 100 SANKHUWASABHA AC1994 MS ID 158 134 158 134 120 0 0 0 0 ISP NO ADB 4 KOSHI RAJ KULO 100 SANKHUWASABHA AC1995 ID 325 260 325 260 260 200 100 0 0 ISP YES ADB 4 KOSHITOTAL of ISP > SANKHUWASABHA > REHABILITATION 4 716 588 716 588 545 200 100 0 0

TOTAL of SANKHUWASABHA District 6 827 679 827 679 633 200 100 0 0

ISP>SOLUKHUMBU>NEWMUKLI 100 SOLUKHUMBU AC1994 MS ID 50 40 50 40 40 0 0 0 0 ISP NO ADB 4 KOSHITOTAL of ISP > SOLUKHUMBU > NEW 1 50 40 50 40 40 0 0 0 0

ISP>SOLUKHUMBU>REHABILITATIONKANGEL 100 SOLUKHUMBU AC1993 MS ID 67 57 39 57 55 0 0 0 0 ISP NO ADB 4 KOSHIBARAKHU 100 SOLUKHUMBU AC1995 YR ID 125 100 125 100 100 80 50 0 0 ISP YES ADB 4 KOSHIMUDHE KHOLA 100 SOLUKHUMBU PC1997 YR ID 200 160 200 160 0 0 0 200 160 ISP NO ADB 4 KOSHIPURANA GAON 100 SOLUKHUMBU AC1994 MS ID 75 60 75 60 60 0 0 0 0 ISP NO ADB 4 KOSHISALYAN 100 SOLUKHUMBU AC1992 MS ID 63 35 63 35 50 0 0 0 0 ISP NO ADB 4 KOSHITADI KHALPA 100 SOLUKHUMBU AC1996 YR ID 69 55 69 55 55 30 20 0 0 ISP NO ADB 4 KOSHIKHISULU 100 SOLUKHUMBU AC1996 YR ID 65 55 65 55 55 33 13 0 0 ISP NO ADB 4 KOSHITOTAL of ISP > SOLUKHUMBU > REHABILITATION 7 664 522 636 522 375 143 83 200 160

TOTAL of SOLUKHUMBU District 8 714 562 686 562 415 143 83 200 160

ISP>TAPLEJUNG>NEWAGRI 100 TAPLEJUNG AC1996 YR ID 75 60 75 60 60 35 15 0 0 ISP NO ADB 4 KOSHIKANUWA 100 TAPLEJUNG AC1994 YR ID 125 100 125 100 100 30 0 0 0 ISP NO ADB 4 KOSHI'KHOKLING 100 TAPLEJUNG AC1994 YR ID 178 150 178 150 150 25 0 0 0 ISP YES ADCB 4 KOSHIMAWA 100 TAPLEJUNG AC1996 YR ID 75 60 75 60 60 25 10 0 0 ISP NO ADB 4 KOSHITOTAL of ISP > TAPLEJUNG > NEW 4 453 370 453 370 370 115 25 0 0

ISP>TAPLEJUNG>REHABILITATIONHEREWA 100 TAPLEJUNG AC1995 YR ID 75 60 75 60 60 40 20 0 0 ISP YES ADB 4 KOSHIJAWA KHOLA 100 TAPLEJUNG AC1994 YR ID 250 200 250 200 200 50 0 0 0 ISP NO ADB 4 KOSHINAREWA 100 TAPLEJUNG AC1996 YR ID 125 100 125 100 100 30 15 0 0 ISP YES ADB 4 KOSHITOTAL of ISP > TAPLEJUNG > REHABILITATION 3 450 360 450 360 360 120 35 0 0

TOTAL of TAPLEJUNG District 7 903 730 903 730 730 235 60 0 0

TOTAL of EASTERN > Mountain 21 2444 1971 2416 1971 1778 578 243 200 160

TOTAL of EASTERN Region 158 38816 31469 38328 31419 26694 9060 1944 6080 4820

ISP>BARA>REHABILITATION

85

Page 91: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

IMRITI 100 BARA AC1993 YR ID 1625 1300 1625 1300 1300 0 0 0 0 ISP NO ADB 12 SIWALIK RIVERMAJHANA 100 BARA PC1997 YR ID 219 175 219 175 0 0 0 219 175 ISP NO ADB 12 SIWALIK RIVERTHALAHI 100 BARA AC1996 YR ED 936 796 936 796 800 200 10 0 0 ISP YES ADB 12 SIWALIK RIVERTOTAL of ISP > BARA > REHABILITATION 3 2780 2271 2780 2271 2100 200 10 219 175

TOTAL of BARA District 3 2780 2271 2780 2271 2100 200 10 219 175

ISP>CHITWAN>NEWMAROTH 100 CHITWAN AC1995 YR ED 312 265 312 265 300 270 130 0 0 ISP YES ADB 3 GANDAKTOTAL of ISP > CHITWAN > NEW 1 312 265 312 265 300 270 130 0 0

ISP>CHITWAN>REHABILITATIONANJANA TAL 100 CHITWAN AC1996 YR ED 688 550 688 550 550 270 100 0 0 ISP NO ADB 3 GANDAKGANGA NAGAR 100 CHITWAN AC1993 MS ID 275 220 275 220 220 220 0 0 0 ISP YES ADB 3 GANDAKGOPAL NAGAR 100 CHITWAN AC1996 YR ID 158 134 158 134 162 100 50 0 0 ISP NO ADB 3 GANDAKJAMAKALYAN 100 CHITWAN AC1993 YR ID 188 150 188 150 150 100 0 0 0 ISP NO ADB 3 GANDAKMADUVAR 100 CHITWAN AC1991 MS ID 141 113 141 113 75 0 0 0 0 ISP YES ADB 3 GANDAKPATIHANI PARSA 100 CHITWAN AC1996 YR ED 831 665 831 665 665 400 200 0 0 ISP NO ADB 3 GANDAKSISABAS 100 CHITWAN AC1991 YR ID 145 123 145 123 113 100 0 0 0 ISP YES ADB 3 GANDAKUPALLORIHU 100 CHITWAN AC1996 YR ID 191 162 191 162 100 100 50 0 0 ISP NO ADB 3 GANDAKLAGUTA PARSA 100 CHITWAN AC1996 YR ID 120 102 120 102 102 61 24 0 0 ISP NO ADB 3 GANDAKTOTAL of ISP > CHITWAN > REHABILITATION 9 2737 2219 2737 2219 2137 1351 424 0 0

TOTAL of CHITWAN District 10 3049 2484 3049 2484 2437 1621 554 0 0

ISP>DHANUSHA>NEWCHARNATHA 100 DHANUSHA AC1994 YR ID 500 400 500 400 300 150 0 0 0 ISP NO ADB 12 SIWALIK RIVRTOTAL of ISP > DHANUSHA > NEW 1 500 400 500 400 300 150 0 0 0

ISP>DHANUSHA>REHABILITATIONBALAGANGA 100 DHANUSHA AC1995 YR ED 500 400 500 400 400 100 0 0 0 ISP YES ADB 12 SIWALIK RIVERTOTAL of ISP > DHANUSHA > REHABILITATION 1 500 400 500 400 400 100 0 0 0

TOTAL of DHANUSHA District 2 1000 800 1000 800 700 250 0 0 0

ISP>MAHOTTARI>REHABILITATIONBANKE(JIJHA GULARIA) 100 MAHOTTARI AC1994 MS ED 235 200 235 200 412 0 0 0 0 ISP NO ADB 12 SIWALIK RIVERKUTUMESWORI 100 MAHOTTARI AC1995 YR ID 250 200 250 200 200 10 0 0 0 ISP YS ADB 12 SIWALIK RIVERLARKAWA 100 MAHOTTARI AC1993 MS ED 375 300 375 300 300 0 0 0 0 ISP NO ADB 12 SIWALIK RIVERMARAHA 100 MAHOTTARI AC1995 YR ED 500 400 500 400 400 120 0 0 0 ISP YES ADB 12 SIWALIK RIVERRUPAMI NADI 100 MAHOTTARI AC1993 MS ID 231 185 231 185 185 0 0 0 0 ISP NO ADB 12 SIWALIK RIVERTOTAL of ISP > MAHOTTARI > REHABILITATION 5 1591 1285 1591 1285 1497 130 0 0 0

TOTAL of MAHOTTARI District 5 1591 1285 1591 1285 1497 130 0 0 0

86

Page 92: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

ISP>PARSA>NEWPHOKAHA 100 PARSA AC1995 YR ID 188 150 188 150 150 100 50 0 0 ISP NO ADB 12 SIWLAIK RIVERTOTAL of ISP > PARSA > NEW 1 188 150 188 150 150 100 50 0 0

ISP>PARSA>REHABILITATIONBAHURWA PHANTI 100 PARSA AC1994 MS ID 325 260 325 260 260 0 0 0 0 ISP NO ADB 12 SIWALIK RIVERBASDILWA 100 PARSA AC1994 YR ID 163 130 163 130 100 20 0 0 0 ISP NO ADB 12 SIWALIK RIVERBAUGI 100 PARSA AC1994 YR ID 208 166 208 166 166 30 0 0 0 ISP YES ADB 12 SIWALIK RIVERCHARKHAWA 100 PARSA AC1995 YR ED 438 350 438 350 350 150 0 0 0 ISP NO ADB 12 SIWALIK RIVERDODA 100 PARSA AC1993 YR ID 125 100 125 100 100 10 0 0 0 ISP NO ADB 12 SIWALIK RIVERJAGNAHA 100 PARSA AC1992 YR ID 201 161 201 161 161 5 0 0 0 ISP YES ADB 12 SIWALIK RIVERLAXMIPUR 100 PARSA AC1995 YR ID 169 135 169 135 135 100 25 0 0 ISP NO ADB 12 SIWALIK RIVERNAURANGIYA BANTH 100 PARSA AC1995 YR ID 369 295 369 295 295 150 100 0 0 ISP YES ADB 12 SIWALIK RIVERPATHARAIYA 100 PARSA AC1995 YR ID 64 51 64 51 51 25 20 0 0 ISP YES ADB 12 SIWALIK RIVERSUBARNAPUR BASATPUR 100 PARSA AC1996 YR ED 620 495 620 495 496 150 100 0 0 ISP NO ADB 12 SIWLIK RIVERTOTAL of ISP > PARSA > REHABILITATION 10 2682 2143 2682 2143 2114 640 245 0 0

TOTAL of PARSA District 11 2870 2293 2870 2293 2264 740 295 0 0

ISP>RAUTAHAT>REHABILITATIONARUWA KHOLA 100 RAUTAHAT AC1993 MS ID 313 250 313 250 250 0 0 0 0 ISP NO ADB 12 SIWALIK RIVERCHANDI 100 RAUTAHAT AC1991 MS ID 313 250 313 250 250 0 0 0 0 ISP NO ADB 12 SIWALIK RIVERGUJARA KHOLA 100 RAUTAHAT AC1996 YR ID 250 200 250 200 200 50 0 0 0 ISP YES ADB 12 SIWALIK RIVERHARIHARPUR 100 RAUTAHAT AC1994 MS ID 313 250 313 250 250 0 0 0 0 ISP NO ADB 12 SIWALIK RIVERKAMDEHI 100 RAUTAHAT AC1993 MS ID 250 200 250 200 200 0 0 0 0 ISP YES ADB 12 SIWALIK RIVERLOHIMIYA BANDTH 100 RAUTAHAT AC1993 MS ED 583 466 583 466 466 0 0 0 0 ISP NO ADB 12 SIWALIK RIVERPATHARABUDHARA 100 RAUTAHAT AC1996 YR ED 540 432 540 432 432 150 0 0 0 ISP YES ADB 12 SIWALIK RIVERSIMRA BHAWANIPUR 100 RAUTAHAT AC1996 YR ED 473 402 473 402 530 200 250 0 0 ISP YES ADB 12 SIWALIK RIVERKHOTHIYAR 100 RAUTAHAT AC1996 YR ED 138 117 138 117 117 70 28 0 0 ISP NO ADB 12 SIWALIK RIVERTOTAL of ISP > RAUTAHAT > REHABILITATION 9 3173 2567 3173 2567 2695 470 278 0 0

TOTAL of RAUTAHAT District 9 3173 2567 3173 2567 2695 470 278 0 0

ISP>SARLAHI>REHABILITATIONBHAKTIPUR 100 SARLAHI AC1994 YR ID 188 150 188 150 150 30 0 0 0 ISP NO ADB 12 SIWALIK RIVERFARAHADAWA 100 SARLAHI AC1993 YR ED 375 300 375 300 300 60 0 0 0 ISP NO ADB 12 SIWALIK RIVERHARIPURWA 100 SARLAHI AC1996 YR ED 744 595 744 595 595 300 100 0 0 ISP YES ADB 12 SIWALIK RIVERJINGARWA 100 SARLAHI AC1994 YR ED 470 376 470 376 376 70 0 0 0 ISP NO ADB 12 SIWALIK RIVERKISHANPUR 100 SARLAHI AC1993 YR ID 413 330 413 330 330 30 0 0 0 ISP NO ADB 12 SIWALIK RIVERTOTAL of ISP > SARLAHI > REHABILITATION 5 2190 1751 2190 1751 1751 490 100 0 0

TOTAL of SARLAHI District 5 2190 1751 2190 1751 1751 490 100 0 0

TOTAL of CENTRAL> Terai 45 16653 13451 16653 13451 13444 3901 1237 219 175

87

Page 93: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

ISP>BHAKTAPUR>REHABILITATIONBARSHIK KHOLA 100 BHAKTAPUR AC1995 YR ID 71 60 71 60 85 24 16 0 0 ISP YES ADB 9 BAGMATIBHINGALI 100 BHAKTAPUR AC1994 YR ID 45 36 45 36 36 20 0 0 0 ISP NO ADB 9 BAGMATIBRAMIMAYANI 100 BHAKTAPUR AC1995 YR ID 38 30 38 32 30 9 6 0 0 ISP YES ADB 9 BAGMATICHAKHKHU KHOLA 100 BHAKTAPUR AC1992 YR ID 74 59 74 59 59 40 0 0 0 ISP NO ADB 9 BAGMATIDHAUKHA DOL 100 BHAKTAPUR AC1996 YR ID 75 60 75 52 60 24 15 0 0 ISP NO ADB 9 BAGMATIDHUMBU KULO 100 BHAKTAPUR AC1996 YR ID 163 130 163 90 130 50 30 0 0 ISP NO ADB 9 BAGMATIDHUNGE I 100 BHAKTAPUR AC1996 YR ID 69 55 69 55 55 21 15 0 0 ISP NO ADB 9 BAGMATIDHUNGRE II 100 BHAKTAPUR AC1995 YR ID 40 32 40 32 32 9 6 0 0 ISP YES ADB 9 BAGMATIDHUSI PHANT 100 BHAKTAPUR AC1994 YR ID 40 32 40 32 32 25 0 0 0 ISP NO ADB 9 BAGMATIDOKE KHOLA I 100 BHAKTAPUR AC1992 YR ID 36 29 36 29 29 20 0 0 0 ISP NO ADB 9 BAGMATIDOKE KHOLA II 100 BHAKTAPUR AC1993 YR ID 45 36 45 38 36 20 0 0 0 ISP NO ADB 9 BAGMATIDOVAN KHOLA 100 BHAKTAPUR AC1993 YR ID 69 55 69 55 55 30 0 0 0 ISP NO ADB 9 BAGMATIGHATTE KHOLA 100 BHAKTAPUR AC1993 YR ID 38 30 38 30 30 20 0 0 0 ISP NO ADB 9 BAGMATIHARMANCHA 100 BHAKTAPUR AC1993 YR ID 63 50 63 50 50 38 0 0 0 ISP NO ADB 9 BAGMATIKHASYANG KUSUNG 100 BHAKTAPUR AC1993 YR ID 50 40 50 40 40 10 0 0 0 ISP NO ADB 9 BAGMATIMULSHAGHU 100 BHAKTAPUR AC1996 YR ID 69 55 69 55 55 22 15 0 0 ISP NO ADB 9 BAGMATINANABU 100 BHAKTAPUR AC1993 YR ID 98 78 98 78 78 40 0 0 0 ISP NO ADB 9 BAGMATIRANIKOT KULO 100 BHAKTAPUR AC1996 YR ID 63 50 63 50 50 20 15 0 0 ISP NO ADB 9 BAGMATISUITI KHOLA KALI 100 BHAKTAPUR AC1991 YR ID 29 23 29 23 23 20 0 0 0 ISP NO ADB 9 BAGMATIAMDOL 100 BHAKTAPUR AC1991 YR ID 14 12 14 12 12 7 3 0 0 ISP NO ADB 9 BAGMATITOTAL of ISP > BHAKTAPUR > REHABILITATION 20 1189 952 1189 908 977 469 121 0 0

TOTAL of BHAKTAPUR District 20 1189 952 1189 908 977 469 121 0 0

ISP>DHADING>NEWBAHUNSTHAN 100 DHADING AC1996 YR ID 88 70 88 70 70 35 35 0 0 ISP NO ADB 3 GANDAKBISAL TAR 100 DHADING AC1996 YR ID 88 70 88 70 70 35 35 0 0 ISP NO ADB 3 GANDAKRICHOK TAR 100 DHADING PC1997 YR ID 188 150 0 150 0 0 0 188 150 ISP NO ADB 3 GANDAKTOTAL of ISP > DHADING > NEW 3 364 290 176 290 140 70 70 188 150

ISP>DHADING>REHABILITATIONGOMATI 100 DHADING AC1992 YR ID 56 48 56 48 48 48 48 0 0 ISP NO ADB 3 GANDAKKHAIRENI TAR 100 DHADING AC1993 YR ID 31 25 31 25 25 20 10 0 0 ISP NO ADB 3 GANDAKKUDULE TAR 100 DHADING AC1996 YR ID 44 30 44 30 35 20 20 0 0 ISP NO ADB 3 GANDAKMAJHITAR KAMPUTAR 100 DHADING AC1996 YR ID 39 31 39 31 31 15 15 0 0 ISP NO ADB 3 GANDAKMAJI TAR 100 DHADING AC1991 YR ID 60 48 60 48 48 48 17 0 0 ISP NO ADB 3 GANDAKULTI TAR 100 DHADING AC1994 YR ID 38 30 38 30 30 30 30 0 0 ISP NO ADB 3 GANDAKPAREWA TAR 100 DHADING AC1994 YR ID 118 100 118 100 100 60 24 0 0 ISP NO ADB 3 GANDAKTOTAL of ISP > DHADING > REHABILITATION 7 386 312 386 312 317 241 164 0 0

TOTAL of DHADING District 10 750 602 562 602 457 311 234 188 150

ISP>KATHMANDU>NEWBHARE 100 KATHMANDU AC1994 YR ID 125 100 125 100 100 40 0 0 0 ISP NO ADB 9 BGMATILAMABAGAR 100 KATHMANDU AC1991 YR ID 45 36 45 36 36 14 0 0 0 ISP YES ADB 9 BAGMATI

88

Page 94: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

SATGHATTE 100 KATHMANDU PC1998 YR ID 156 125 156 125 0 0 0 156 125 ISP NO ADB 9 BAGMATIBAGAMTAR SUNDARIJAL 100 KATHMANDU AC1996 YR ID 188 150 188 150 150 105 45 0 0 ISP NO ADB 9 BAGMATITAUDAH BOSAN 100 KATHMANDU AC1993 YR ID 63 50 63 50 50 20 0 0 0 ISP NO ADB 9 BAGMATITOTAL of ISP > KATHMANDU > NEW 5 577 461 577 461 336 179 45 156 125

ISP>KATHMANDU>REHABILITATIONBALAMBU 100 KATHMANDU AC1992 YR ID 63 50 63 50 50 20 0 0 0 ISP NO ADB 9 BAGMATICHUNIKHEL 100 KATHMANDU AC1993 YR ID 69 55 69 55 55 22 0 0 0 ISP NO ADB 9 BAGMATIDHULOPURO 100 KATHMANDU AC1992 YR ID 38 30 38 30 30 12 0 0 0 ISP NO ADB 9 BAGMATIDHUNGANAABEST 100 KATHMANDU AC1994 YR ID 100 80 100 80 80 32 0 0 0 ISP NO ADB 9 BAGMATINARAYAN KHOLA 100 KATHMANDU AC1992 YR ID 65 52 65 52 52 210 0 0 0 ISP NO ADB 9 BAGMATIPANCHWANE 100 KATHMANDU AC1992 YR ID 26 21 26 21 21 8 0 0 0 ISP YES ADB 9 BAGMATIPATI CHOUR 100 KATHMANDU AC1990 MS ID 62 50 62 50 50 0 0 0 0 ISP YES ADB 9 BAGMATISALEPAKHURE 100 KATHMANDU AC1994 YR ID 64 52 64 52 52 20 0 0 0 ISP NO ADB 9 BAGMATISESMANI 100 KATHMANDU AC1996 YR ID 69 55 69 55 55 38 27 0 0 ISP NO ADB 9 BAGMATISETI DEVI 100 KATHMANDU AC1994 YR ID 40 32 40 32 32 13 0 0 0 ISP NO ADB 9 BAGMATISHESNARAYAN 100 KATHMANDU AC1996 YR ID 88 70 88 70 70 49 21 0 0 ISP NO ADB 9 BAGMATISWET BARAHI 100 KATHMANDU AC1993 YR ID 125 100 125 100 100 40 0 0 0 ISP YES ADB 9 BAGMATITAUKHEL 100 KATHMANDU AC1993 YR ID 38 30 38 30 30 12 0 0 0 ISP YES ADB 9 BAGMATITHADO KULO 100 KATHMANDU AC1994 YR ID 100 80 100 80 80 32 0 0 0 ISP NO ADB 9 BAGMATIBAIRE 100 KATHMANDU AC1994 YR ID 47 40 47 40 40 24 10 0 0 ISP NO ADB 9 BAGMATITOTAL of ISP > KATHMANDU > REHABILITATION 15 994 797 994 797 797 532 58 0 0

TOTAL of KATHMANDU District 20 1571 1258 1571 1258 1133 711 103 156 125

ISP>KAVRE>NEWGHATTE 100 KAVRE PC1998 YR ID 138 110 0 33 0 0 0 138 110 ISP NO ADB 4 KOSHINARAYAN TAR 100 KAVRE AC1994 YR ID 94 75 94 75 75 20 0 0 0 ISP NO ADB 4 KOSHIPIPAL TAR 100 KAVRE AC1996 YR ID 100 85 100 85 40 16 5 0 0 ISP NO ADB 4 KOSHISALLERI 100 KAVRE AC1994 YR ID 75 60 75 60 60 30 0 0 0 ISP NO ADB 4 KOSHITOTAL of ISP > KAVRE > NEW 4 407 330 269 253 175 66 5 138 110

ISP>KAVRE>REHABILITATIONARUBOTE 100 KAVRE AC1990 YR ID 30 24 30 24 24 24 0 0 0 ISP YES ADB 4 KOSHIBALTHALI 100 KAVRE AC1994 YR ID 100 80 100 80 80 40 0 0 0 ISP NO ADB 4 KOSHICHITEDOBAN 100 KAVRE AC1993 YR ID 209 167 209 167 167 100 0 0 0 ISP YES ADB 4 KOSHIDADCHA BESI 100 KAVRE AC1992 YR ID 71 57 71 57 57 57 0 0 0 ISP NO ADB 4 KOSHIDEVHUNI TAR 100 KAVRE AC1991 YR ID 41 33 41 33 33 33 0 0 0 ISP NO ADB 4 KOSHIINARABAHAN 100 KAVRE AC1993 YR ID 90 72 90 72 72 30 0 0 0 ISP YES ADB 4 KOSHIJOL KHOLA 100 KAVRE AC1995 YR ID 65 55 65 55 70 35 30 0 0 ISP YES ADB 4 KOSHIKENDRA KULO 100 KAVRE AC1995 YR ID 18 14 18 14 14 7 7 0 0 ISP YES ADB 4 KOSHINYASILA JELAPATI 100 KAVRE AC1996 YR ID 45 36 45 36 36 16 5 0 0 ISP NO ADB 4 KOSHISALLERIIL 100 KAVRE PC197 YR ID 44 35 44 35 0 0 0 44 35 ISP NO ADB 4 KOSHISIMLE MAJHUWA 100 KAVRE AC1995 YR ID 59 50 59 50 45 22 15 0 0 ISP YES ADB 4 KOSHISINGE CHAINPUR 100 KAVRE AC1996 YR ID 120 96 120 96 96 40 10 0 0 ISP NO ADB 4 KOSHI

89

Page 95: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TARKE TAR 100 KAVRE AC1996 YR ID 61 52 61 52 42 16 5 0 0 ISP YES ADB 4 KOSHITOTAL of ISP > KAVRE > REHABILITATION 13 953 771 953 771 736 420 72 44 35

TOTAL of KAVRE District 17 1360 1101 1222 1024 911 486 77 182 145

ISP>LALITPUR>REHABILITATIONAASHRANG 100 LALITPUR AC1996 YR ID 69 55 69 55 55 30 10 0 0 ISP NO ADB 9 BAGMATIBUGMATI 100 LALITPUR AC1992 YR ID 79 63 79 63 63 63 0 0 0 ISP NO ADB 9 BAGMATIBUMOUDI 100 LALITPUR AC1992 YR ID 94 75 94 75 75 25 15 0 0 ISP YES ADB 9 BAGMATICHHAMPI 100 LALITPUR AC1992 MS ID 156 125 156 125 125 115 5 0 0 ISP NO ADB 9 BAGMATIDHANABU 100 LALITPUR AC1996 YR ID 31 25 31 25 25 20 5 0 0 ISP NO ADB 9 BAGMATIHARISHIDDHI 100 LALITPUR AC1996 YR ID 100 80 100 80 80 40 20 0 0 ISP NO ADB 9 BAGMATIKHAKDOOL 100 LALITPUR AC1994 YR ID 31 25 31 25 25 25 0 0 0 ISP NO ADB 9 BAGMATILABADOL 100 LALITPUR AC1996 YR ID 44 35 44 35 35 20 10 0 0 ISP NO ADB 9 BAGMATIMAJHA KHOLA 100 LALITPUR AC1993 YR ID 125 100 125 100 100 90 3 0 0 ISP NO ADB 9 BAGMATIMAKAL 100 LALITPUR AC1994 YR ID 112 90 112 90 90 90 2 0 0 ISP NO ADBN 9 BAGMATIMOTIRAJ KULO 100 LALITPUR AC1993 YR ID 81 65 81 65 65 55 0 0 0 ISP NO ADBN 9 BAGMATIMULPANI 100 LALITPUR AC1993 YR ID 75 60 75 60 60 45 0 0 0 ISP NO ADBN 9 BAGMATINAGDHAHA 100 LALITPUR AC1994 YR ID 38 30 38 30 30 25 0 0 0 ISP NO ADBN 9 BAGMATIPIPALEDHOL 100 LALITPUR AC1996 YR ID 113 90 113 90 90 50 25 0 0 ISP NO ADBN 9 BAGMATIPYUTAR 100 LALITPUR AC1996 YR ID 63 50 63 50 50 25 10 0 0 ISP YES AFBN 9 BAGMATISIDHIPUR 100 LALITPUR AC1993 YR ID 188 150 188 150 150 135 5 0 0 ISP NO ADBN 9 BAGMATISIRKHA D0L 100 LALITPUR AC1993 YR ID 156 125 156 125 125 52 0 0 0 ISP NO ADBN 9 BAGMATITIKABHAIRAB 100 LALITPUR AC1993 YR ID 353 300 353 300 300 180 72 0 0 ISP NO ADB 9 BAGMATITOTAL of ISP > LALITPUR > REHABILITATION 18 1908 1543 1908 1543 1543 1085 182 0 0

TOTAL of LALITPUR District 18 1908 1543 1908 1543 1543 1085 182 0 0

ISP>MAKAWANPUR>NEWCHYAUCHYAU 100 MAKAWANPUR AC1996 YR ID 124 99 124 99 99 50 25 0 0 ISP NO ADBN 3 GANDAKDOOBO 100 MAKAWANPUR AC1996 YR ID 63 50 63 50 50 25 12 0 0 ISP NO ADBN 3 GANDAKKALIKA TAR 100 MAKAWANPUR AC1996 YR ID 100 80 100 80 80 40 20 0 0 ISP YES ADBN 3 GANDAKKARMACHULI 100 MAKAWANPUR AC1994 YR ID 112 90 112 90 90 40 0 0 0 ISP NO ADBN 3 GANDAKRAPTINAWALPUR11 100 MAKAWANPUR AC1995 YR ID 63 50 63 50 50 30 20 0 0 ISP YES ADBN 3 GANDAKTOTAL of ISP > MAKAWANPUR > NEW 5 462 369 462 369 369 185 77 0 0

ISP>MAKAWANPUR>REHABILITATIONDARDARA 100 MAKAWANPUR AC1993 YR ID 131 105 131 105 105 0 0 0 0 ISP NO ADBM 3 GANDAKGHATTEDAMAR 100 MAKAWANPUR AC1993 YR ID 71 60 71 60 65 30 0 0 0 ISP NO ADBN 3 GANDAKGURUBIRTA 100 MAKAWANPUR AC1995 YR ID 134 107 134 107 107 65 50 0 0 ISP YES ADBN 3 GANDAKJUINA 100 MAKAWANPUR AC1996 YR ID 33 28 33 28 25 12 6 0 0 ISP NO ADBN 3 GANDAKJYAMIRE 100 MAKAWANPUR AC1993 YR ID 156 125 156 125 125 60 0 0 0 ISP NO ADBN 3 GANDAKKALIDAMAR 100 MAKAWANPUR AC1993 YR ID 40 32 40 32 32 16 0 0 0 ISP NO ADBN 3 GANDAKLAMKHET 100 MAKAWANPUR AC1993 YR ID 75 60 75 60 60 25 0 0 0 ISP NO ADBN 3 GANDAKPALDAMAR 100 MAKAWANPUR AC1993 YR ID 38 30 38 30 30 12 0 0 0 ISP NO ADBN 3 GANDAKPAWASVOLLRY 100 MAKAWANPUR AC1994 YR ID 106 85 106 85 85 40 0 0 0 ISP NO ADBN 3 GANDAK

90

Page 96: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

RAPTI NAWALPUR 100 MAKAWANPUR AC1993 YR ID 125 100 125 100 100 0 0 0 0 ISP YES ADBN 3 GANDAKKUDULE 100 MAKAWANPUR AC1993 YR ID 41 35 41 35 35 21 8 0 0 ISP NO ADB 3 GANDAKTOTAL of ISP > MAKAWANPUR > REHABILITATION 11 950 767 950 767 769 281 64 0 0

TOTAL of MAKAWANPUR District 16 1412 1136 1412 1136 1138 466 141 0 0

ISP>NUWAKOT>NEWDHORKU KHOLA 100 NUWAKOT AC 1996 YR ID 182 155 182 155 120 120 120 0 0 ISP NO ADB 3 GANDAKDUMRE CHOUR 100 NUWAKOT AC 1995 YR ID 200 160 200 160 160 100 80 0 0 ISP NO ADB 3 GANDAKKANLEPACHISI 100 NUWAKOT AC 1994 YR ID 59 47 59 47 47 20 0 0 0 ISP NO ADB 3 GANDAKSUNKHANI 100 NUWAKOT AC 1996 YR ID 75 60 75 60 60 60 60 0 0 ISP NO ADB 3 GANDAKWANKAL 100 NUWAKOT AC 1994 YR ID 60 48 60 48 48 30 12 0 0 ISP NO ADB 3 GANDAKTOTAL of ISP > NUWAKOT > NEW 5 576 470 576 470 435 330 272 0 0

ISP>NUWAKOT>REHABILITATIONANGUTAR 100 NUWAKOT AC 1993 YR ID 100 80 100 80 80 40 0 0 0 ISP YES ADB 3 GANDAKARCHALE PHANT 100 NUWAKOT AC 1994 YR ID 75 60 75 60 60 30 0 0 0 ISP NO ADB 3 GANDAKBASPANI 100 NUWAKOT AC 1993 YR ID 35 28 35 28 28 14 0 0 0 ISP NO ADB 3 GANDAKBASUKOT 100 NUWAKOT AC 1994 YR ID 250 200 250 200 200 100 0 0 0 ISP YES ADB 3 GANDAKDARSHANTAR 100 NUWAKOT AC1994 YR ID 75 60 75 60 60 30 0 0 0 ISP NO ADBN 3 GANDAKSINKESTIN 100 NUWAKOT AC1994 YR ID 13 11 13 11 11 7 3 0 0 ISP NO ADB 3 GANDAKSIMARA 100 NUWAKOT AC1994 YR ID 471 400 471 400 400 240 96 0 0 ISP NO ADB 3 GANDAKTOTAL of ISP > NUWAKOT > REHABILITATION 7 1019 839 1019 839 839 461 99 0 0

TOTAL of NUWAKOT District 12 1595 1309 1595 1309 1274 791 371 0 0

ISP>RAMECHHAP>NEWBAMAUTI 100 RAMECHHAP AC1996 YR ED 375 300 375 300 300 300 300 0 0 ISP NO ADBN 4 KOSHIP 100 RAMECHHAP AC1995 YR ID 100 80 100 80 80 80 80 0 0 ISP YES ADBN 4 KOSHIDIPALETODKE 100 RAMECHHAP AC1995 YR ID 63 50 63 50 50 50 50 0 0 ISP YES ADBN 4 KOSHIPHALATE 100 RAMECHHAP AC1996 YR ID 63 50 63 50 50 50 50 0 0 ISP NO ADB 4 KOSHITOTAL of ISP > RAMECHHAP > NEW 4 601 480 601 480 480 480 480 0 0

ISP>RAMECHHAP>REHABILITATIONADHERI KHOLA 100 RAMECHHAP AC1993 YR ID 38 30 38 30 30 15 0 0 0 ISP NO HMG 4 KOSHIBETALI 100 RAMECHHAP AC1994 YR ID 150 120 150 120 120 50 0 0 0 ISP NO ADB 4 KOSHIBITILTAR 100 RAMECHHAP AC1994 YR ID 26 21 26 21 21 8 0 0 0 ISP NO ADB 4 KOSHICHIADI SINDURETAR 100 RAMECHHAP AC1994 YR ID 76 61 76 61 61 24 0 0 0 ISP NO ADB 4 KOSHIDOVANK HOLA 100 RAMECHHAP AC1994 YR ID 80 64 80 64 64 32 0 0 0 ISP NO ADB 4 KOSHIGAGALT TAR 100 RAMECHHAP AC1994 YR ID 144 115 144 115 115 56 0 0 0 ISP NO ADB 4 KOSHIKHALPU KHOLA 100 RAMECHHAP AC1994 YR ID 231 185 231 185 185 70 0 0 0 ISP NO ADB 4 KOSHIKHIMTI 100 RAMECHHAP AC1994 YR ID 71 57 71 57 57 25 0 0 0 ISP NO ADB 4 KOSHILARKU KHOLA 100 RAMECHHAP AC1993 YR ID 43 34 43 34 34 15 0 0 0 ISP NO ADB 4 KOSHINILAKANTHESWOR 100 RAMECHHAP AC1995 YR ID 25 20 25 20 20 20 20 0 0 ISP YES ADB 4 KOSHITAMAKOSHI 100 RAMECHHAP AC1994 YR ID 58 43 58 43 43 16 0 0 0 ISP NO ADB 4 KOSHITILPUNG KHOLA 100 RAMECHHAP AC1993 YR ID 41 33 41 33 33 12 0 0 0 ISP NO ADB 4 KOSHI

91

Page 97: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

PHEDI 100 RAMECHHAP AC1993 YR ID 35 30 35 30 30 18 7 0 0 ISP NO ADB 4 KOSHITOTAL of ISP > RAMECHHAP > REHABILITATION 13 1018 813 1018 813 813 361 27 0 0

TOTAL of RAMECHHAP District 17 1619 1293 1619 1293 1293 841 507 0 0

ISP>SINDHULI>NEWDHAMILE 100 SINDHULI AC1993 YR ID 75 60 75 60 60 24 0 0 0 ISP YES ADB 9 BAGMATIKAMALAMAISTHAN 100 SINDHULI AC1993 YR ID 80 70 80 70 70 30 0 0 0 ISP NO ADB 9 BAGMATIPHALATE KHOLA 100 SINDHULI AC1996 YR ID 125 100 125 100 100 50 0 0 0 ISP YES ADB 9 BAGMATIPIPALABADHI 100 SINDHULI AC1996 YR ID 100 80 100 80 80 40 0 0 0 ISP YES ADB 9 BAGMATIHARSAHI 100 SINDHULI AC 1995 YR ED 375 300 375 300 300 180 100 0 0 ISP YES ADB 9 BAGMATITOTAL of ISP > SINDHULI > NEW 5 755 610 755 610 610 324 100 0 0

ISP>SINDHULI>REHABILITATIONBHALU KHOLA 100 SINDHULI AC1993 YR ID 125 100 125 100 100 40 0 0 0 ISP YES ADB 9 BAGMATIGAUDALI KHOLA 100 SINDHULI AC1993 YR ID 100 80 100 80 80 30 0 0 0 ISP YES ADB 9 BAGAMATIPANSAYAMAJHI TAR 100 SINDHULI AC1993 YR ID 50 40 50 40 40 15 0 0 0 ISP YES ADB 9 BAGAMATIBHOHARI TAR 100 SINDHULI AC1993 YR ID 59 50 59 50 50 30 12 0 0 ISP NO ADB 9 BAGMATITOTAL of ISP > SINDHULI > REHABILITATION 4 334 270 334 270 270 115 12 0 0

TOTAL of SINDHULI District 9 1089 880 1089 880 880 439 112 0 0

TOTAL of CENTRAL> Hill 139 12493 10074 12167 9953 9606 5599 1848 526 420

ISP>DOLAKHA>NEWADHERI KHOLA 100 DOLAKHA AC1993 YR ID 559 355 559 355 447 0 0 0 0 ISP NO ADB 4 KOSHIGHATTE 100 DOLAKHA AC1996 YR ID 59 50 59 50 250 125 0 0 0 ISP NO ADB 4 KOSHIJILU KHOLA 100 DOLAKHA AC1996 YR ID 63 50 63 50 50 25 0 0 0 ISP NO ADB 4 KOSHIKAIJALE KHOLA 100 DOLAKHA AC1995 YR ID 88 70 88 70 70 28 15 0 0 ISP NO ADB 4 KOSHIKHANI KHOLA 100 DOLAKHA AC1996 YR ID 273 218 273 218 218 109 0 0 0 ISP NO ADB 4 KOSHIPHATKE KHOLA 100 DOLAKHA AC1995 YR ID 188 150 188 150 150 60 30 0 0 ISP YES ADB 4 KOSHISAHARE TAR 100 DOLAKHA AC1993 YR ID 38 30 38 30 30 20 0 0 0 ISP NO ADB 4 KOSHITOTAL of ISP > DOLAKHA > NEW 7 1268 923 1268 923 1215 367 45 0 0

ISP>DOLAKHA>REHABILITATIONDOLI KHOLA 100 DOLAKHA AC1996 YR ID 163 130 163 130 130 65 0 0 0 ISP NO ADB 4 KOSHIGOPI KHOLA 100 DOLAKHA AC1993 YR ID 100 80 100 80 80 40 0 0 0 ISP NO ADB 4 KOSHIKHANAKIGYANG 100 DOLAKHA AC1994 MS ID 63 50 63 50 50 0 0 0 0 ISP NO ADB 4 KOSHIMARING KHOLA 100 DOLAKHA AC1994 YR ID 63 50 63 50 50 25 0 0 0 ISP YES ADB 4 KOSHIGHATTE 100 DOLAKHA AC1993 YR ID 241 205 241 205 205 123 49 0 0 ISP NO ADB 4 KOSHITOTAL of ISP > DOLAKHA > REHABILITATION 5 630 515 630 515 515 253 49 0 0

TOTAL of DOLAKHA District 12 1898 1438 1898 1438 1730 620 94 0 0

ISP>RASUWA>NEWDUNESWARA 100 RASUWA AC1995 YR ID 44 35 44 35 35 35 35 0 0 ISP YES ADB 3 GANDAK

92

Page 98: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

MACHET KHOLA 100 RASUWA AC1996 YR ID 47 40 47 40 80 80 40 0 0 ISP NO ADB 3 GANDAKSANGLE KHOLA 100 RASUWA AC1994 YR ID 131 105 131 105 105 40 0 0 0 ISP NO ADB 3 GANDAKSIPCHONG 100 RASUWA AC1994 YR ID 142 114 142 114 114 45 0 0 0 ISP NO ADB 3 GANDAKTOTAL of ISP > RASUWA > NEW 4 364 294 364 294 334 200 75 0 0

ISP>RASUWA>REHABILITATIONBETAGAUDA 100 RASUWA AC1993 YR ID 125 100 125 100 100 40 0 0 0 ISP NO ADB 3 GANDAKRUPSE PHANT 100 RASUWA AC1994 YR ID 75 60 75 60 60 30 0 0 0 ISP NO ADB 3 GANDAKTOTAL of ISP > RASUWA > REHABILITATION 2 200 160 200 160 160 70 0 0 0

TOTAL of RASUWA District 6 564 454 564 454 494 270 75 0 0

ISP>SINDHUPALCHOWK>NEWDAHA POKHARI 100 SINDHUPALCHOWK AC1995 YR ID 50 40 50 40 40 20 15 0 0 ISP YES ADB 4 KOSHIGHICHHE KHOLA 100 SINDHUPALCHOWK AC1995 YR ID 71 60 71 60 60 30 20 0 0 ISP YES ADB 4 KOSHIHADI KHOLA 100 SINDHUPALCHOWK AC1996 YR ID 96 82 96 82 90 90 90 0 0 ISP YES ADB 4 KOSHIJYAMIRE 100 SINDHUPALCHOWK AC1995 YR ID 75 60 75 60 60 45 20 0 0 ISP YES ADB 4 KOSHILAPSITHUME 100 SINDHUPALCHOWK AC1994 YR ID 44 35 44 35 35 17 0 0 0 ISP NO ADB 4 KOSHIBHOTENAMLANG 100 SINDHUPALCHOWK AC1996 YR ID 106 85 106 85 85 50 35 0 0 ISP YES ADB 4 KOSHIPHALATA 100 SINDHUPALCHOWK AC1996 YR ID 38 30 38 30 30 20 10 0 0 ISP YES ADB 4 KOSHITHULOPHAKAR 100 SINDHUPALCHOWK AC1994 YR ID 75 60 75 60 60 30 0 0 0 ISP NO ADB 4 KOSHITOTAL of ISP > SINDHUPALCHOWK > NEW 8 555 452 555 452 460 302 190 0 0

ISP>SINDHUPALCHOWK>REHABILITATIONCHILAUNEKHET 100 SINDHUPALCHOWK AC1996 YR ID 44 35 44 35 35 30 30 0 0 ISP YES ADB 4 KOSHIDHARMEMGURE 100 SINDHUPALCHOWK AC1994 YR ID 94 75 94 75 75 35 0 0 0 ISP YES ADB 4 KOSHIKYAMUNEMOHAN 100 SINDHUPALCHOWK AC1993 YR ID 75 60 75 60 60 30 0 0 0 ISP YES ADB 4 KOSHIMUL KULO 100 SINDHUPALCHOWK AC1991 YR ID 50 40 50 40 40 16 0 0 0 ISP YES ADB 4 KOSHIPANGTANG 100 SINDHUPALCHOWK AC1993 YR ID 71 60 71 60 45 20 0 0 0 ISP YES ADB 4 KOSHISIMPANI 100 SINDHUPALCHOWK AC1995 YR ID 75 60 75 60 60 45 40 0 0 ISP YES ADB 4 KOSHITARKET PHANT 100 SINDHUPALCHOWK AC1993 YR ID 31 25 31 25 25 10 0 0 0 ISP YES ADB 4 KOSHITHULO KULO 100 SINDHUPALCHOWK 71 60 71 60 60 36 14 0 0 ISP NO ADB 4 KOSHITOTAL of ISP > SINDHUPALCHOWK > REHABILITATION 8 511 415 511 415 400 222 84 0 0

TOTAL of SINDHUPALCHOWK District 16 1066 867 1066 867 860 524 274 0 0

TOTAL of CENTRAL > Mountain 34 3528 2759 3528 2759 3084 1414 443 0 0

TOTAL of CENTRAL Region 218 32674 26284 32348 26163 26134 10914 3528 745 595

TOTAL of ISP 376 71490 57753 70676 57582 52828 19974 5472 6825 5415

K-BIRD>DAILEKH>NEWVEHRI KAHLIKATHUM 100 DAILEKH AC 1994 YR ID 19 15 19 15 15 8 0 0 0 K-BIRD NO A 2 KARNALITOTAL of K-BIRD > DAILEKH > NEW 1 19 15 19 15 15 8 0 0 0

93

Page 99: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

K-BIRD>DAILEKH>REHABILITATIONBADA BHAIRAB 100 DAILEKH AC 1993 YR ID 31 25 31 25 25 15 0 0 0 K-BIRD NO A 2 KARNALIGAURI 100 DAILEKH AC 1994 YR ID 11 9 11 9 9 4 0 0 0 K-BIRD NO A 2 KARNALIJANAK KHOLA 100 DAILEKH AC 1993 YR ID 31 25 31 25 25 12 0 0 0 K-BIRD NO A 2 KARNALILAKURI POKHARI 100 DAILEKH AC 1993 YR ID 25 20 25 20 20 10 0 0 0 K-BIRD NO A 2 KARNALINANETA 100 DAILEKH AC 1993 YR ID 31 25 31 25 25 12 0 0 0 K-BIRD NO A 2 KARNALITOTAL of K-BIRD > DAILEKH > REHABILITATION 5 129 104 129 104 104 53 0 0 0

TOTAL of DAILEKH District 6 148 119 148 119 119 61 0 0 0

K-BIRD>SURKHET>NEWGHALGHALE 100 SURKHET AC 1994 YR ID 212 170 212 170 170 70 0 0 0 K-BIRD NO A 2 KARNALIKALYAN LABNA(NYABAL) 100 SURKHET AC 1994 MS ID 155 124 155 124 124 100 0 0 0 K-BIRD NO A 2 KARNALI TALLO BHOKRENI 100 SURKHET AC 1994 YR ID 250 200 250 200 200 150 0 0 0 K-BIRD NO A 2 KARNALITOTAL of K-BIRD > SURKHET > NEW 3 617 494 617 494 494 320 0 0 0

K-BIRD>SURKHET>REHABILITATIONKATA KUWA 100 SURKHET AC 1992 MS ID 56 45 56 45 45 0 0 0 0 K-BIRD NO A 2 KARNALIMATHILLO BHOKRNJ 100 SURKHET AC 1992 MS ID 250 200 250 200 200 0 0 0 0 K-BIRD NO A 2 KARNALISAHARE 100 SURKHET AC 1992 MS ID 325 260 325 260 260 0 0 0 0 K-BIRD NO A 2 KARNALISATAKANE CHAURASE 100 SURKHET AC 1994 YR ID 138 110 138 110 110 110 0 0 0 K-BIRD NO A 2 KARNALITOTAL of K-BIRD > SURKHET > REHABILITATION 4 769 615 769 615 615 110 0 0 0

TOTAL of SURKHET District 7 1386 1109 1386 1109 1109 430 0 0 0

TOTAL of MID-WESTERN > Hill 13 1534 1228 1534 1228 1228 491 0 0 0

K-BIRD>JUMLA>REHABILITATIONBIRATRAJ KULO 100 JUMLA AC 1992 YR ID 188 150 188 150 150 150 0 0 0 K-BIRD NO A 2 KARNALIBODKI 100 JUMLA AC 1992 YR ID 19 15 19 15 15 15 0 0 0 K-BIRD NO A 2 KARNALICHANDAN NATH 100 JUMLA AC 1992 YR ID 13 10 13 10 10 10 0 0 0 K-BIRD NO A 2 KARNALITOTAL of K-BIRD > JUMLA > REHABILITATION 3 220 175 220 175 175 175 0 0 0

TOTAL of JUMLA District 3 220 175 220 175 175 175 0 0 0

TOTAL of MID-WESTERN > Mountain 3 220 175 220 175 175 175 0 0 0

TOTAL of MID-WESTERN Region 16 1754 1403 1754 1403 1403 666 0 0 0

TOTAL of K-BIRD 16 1754 1403 1754 1403 1403 666 0 0 0

KHILL>BHOJPUR>REHABILITATIONBOYA 100 BHOJPUR AC 125 100 125 100 100 0 0 0 0 KHILL NO BRITISH 4 KOSHIBUKULA 100 BHOJPUR AC 25 20 25 20 20 0 0 0 0 KHILL NO BRITISH 4 KOSHIDEWANG TAR 100 BHOJPUR AC 25 20 25 20 20 0 0 0 0 KHILL NO BRITISH 4 KOSHIMAJUWA TAR 100 BHOJPUR AC 50 40 50 40 40 0 0 0 0 KHILL NO BRITISH 4 KOSHI

94

Page 100: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

MANEBHANJHANG 100 BHOJPUR AC 31 25 31 25 25 0 0 0 0 KHILL NO BRITISH 4 KOSHIPANCHKANYA 100 BHOJPUR AC 94 75 94 75 75 0 0 0 0 KHILL NO BRITISH 4 KOSHITOTAL of KHILL > BHOJPUR > REHABILITATION 6 350 280 350 280 280 0 0 0 0

TOTAL of BHOJPUR District 6 350 280 350 280 280 0 0 0 0

KHILL>DHANKUTA>NEWBHAISE 100 DHANKUTA AC 43 34 43 34 34 0 0 0 0 KHILL NO BRITISH 4 KOSHIHATHI KHARKA 100 DHANKUTA AC 31 25 31 25 25 0 0 0 0 KHILL NO BRITISH 4 KOSHISANO 100 DHANKUTA AC 44 35 44 35 35 0 0 0 0 KHILL NO BRITISH 4 KOSHITOTAL of KHILL > DHANKUTA > NEW 3 118 94 118 94 94 0 0 0 0

KHILL>DHANKUTA>REHABILITATIONBELHARA BESI 100 DHANKUTA AC 50 40 50 40 40 0 0 0 0 KHILL NO BRITISH 4 KOSHICHUNGMANG 100 DHANKUTA AC 38 30 38 30 30 0 0 0 0 KHILL NO BRITISH 4 KOSHI DANDA GAON 100 DHANKUTA AC 75 60 75 60 60 0 0 0 0 KHILL NO BRITISH 4 KOSHI DHARA PANI 100 DHANKUTA AC 25 20 25 20 20 0 0 0 0 KHILL NO BRITISH 4 KOSHIDILUNGA TAR 100 DHANKUTA AC 11 9 11 9 9 0 0 0 0 KHILL NO BRITISH 4 KOSHIHATHI TAR 100 DHANKUTA AC 13 10 13 10 10 0 0 0 0 KHILL NO BRITISH 4 KOSHIJITPUR 100 DHANKUTA AC 56 45 56 45 45 0 0 0 0 KHILL NO BRITISH 4 KOSHIPILIYA TAR 100 DHANKUTA AC 19 15 19 15 15 0 0 0 0 KHILL NO BRITISH 4 KOSHITOTAL of KHILL > DHANKUTA > REHABILITATION 8 287 229 287 229 229 0 0 0 0

TOTAL of DHANKUTA District 11 405 323 405 323 323 0 0 0 0

KHILL>TEHRATHUM>NEWBASANTAPUR 100 TEHRATHUM AC 50 40 50 40 40 0 0 0 0 KHILL NO BRITISH 4 KOSHITOTAL of KHILL > TEHRATHUM > NEW 1 50 40 50 40 40 0 0 0 0

KHILL>TEHRATHUM>REHABILITATIONHATTISAR 100 TEHRATHUM AC 44 35 44 35 35 0 0 0 0 KHILL NO BRITISH 4 KOSHIMORHANG 100 TEHRATHUM AC 63 50 63 50 50 0 0 0 0 KHILL NO BRITISH 4 KOSHIPIGUWA 100 TEHRATHUM AC 188 150 188 150 150 0 0 0 0 KHILL NO BRITISH 4 KOSHISAMDU 100 TEHRATHUM AC 125 100 125 100 100 0 0 0 0 KHILL NO BRITISH 4 KOSHISUNGNAM 100 TEHRATHUM AC 31 25 31 25 25 0 0 0 0 KHILL NO BRITISH 4 KOSHITOTAL of KHILL > TEHRATHUM > REHABILITATION 5 451 360 451 360 360 0 0 0 0

TOTAL of TEHRATHUM District 6 501 400 501 400 400 0 0 0 0

TOTAL of EASTERN > Hill 23 1256 1003 1256 1003 1003 0 0 0 0

KHILL>SANKHUWASABHA>NEWKURKUSANI 100 SANKHUWASABHA AC 38 30 38 30 30 0 0 0 0 KHILL NO BRITISH 4 KOSHIMALIMULKHARK 100 SANKHUWASABHA AC 38 30 38 30 30 0 0 0 0 KHILL NO BRITISH 4 KOSHITOTAL of KHILL > SANKHUWASABHA > NEW 2 76 60 76 60 60 0 0 0 0

95

Page 101: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

KHILL>SANKHUWASABHA>REHABILITATIONBARDEO 100 SANKHUWASABHA AC 19 15 19 15 15 0 0 0 0 KHILL NO BRITISH 4 KOSHIHIDANGMA 100 SANKHUWASABHA AC 94 75 94 75 75 0 0 0 0 KHILL NO BRITISH 4 KOSHIMALINGA 100 SANKHUWASABHA AC 63 50 63 50 50 0 0 0 0 KHILL NO BRITISH 4 KOSHIMBHUWA 100 SANKHUWASABHA AC 56 45 56 45 45 0 0 0 0 KHILL NO BRITISH 4 KOSHIM TALPATI 100 SANKHUWASABHA AC 69 55 69 55 55 0 0 0 0 KHILL NO BRITISH 4 KOSHINUBHA 100 SANKHUWASABHA AC 50 40 50 40 40 0 0 0 0 KHILL NO BRITISH 4 KOSHIPAIRAINI 100 SANKHUWASABHA AC 13 10 13 10 10 0 0 0 0 KHILL NO BRITISH 4 KOSHIRAMA PHOK 100 SANKHUWASABHA AC 63 50 63 50 50 0 0 0 0 KHILL NO BRITISH 4 KOSHITOTAL of KHILL > SANKHUWASABHA > REHABILITATION 8 427 340 427 340 340 0 0 0 0

TOTAL of SANKHUWASABHA District 10 503 400 503 400 400 0 0 0 0

TOTAL of EASTERN > Mountain 10 503 400 503 400 400 0 0 0 0

TOTAL of EASTERN Region 33 1759 1403 1759 1403 1403 0 0 0 0

TOTAL of KHILL 33 1759 1403 1759 1403 1403 0 0 0 0

M/HILL>ILAM>NEWPHAKPHA 7,9 100 ILAM AC 1994 YR ID 75 60 75 60 60 24 0 0 0 M/HILL NO SNV 11 KANKAIPUWA MAJHWA -6,9 100 ILAM PC 1997 YR 180 144 0 0 0 0 0 180 144 M/HILL NO SNV 11 KANKAITOTAL of M/HILL > ILAM > NEW 2 255 204 75 60 60 24 0 180 144

M/HILL>ILAM>REHABILITATIONAMCHOKE 2,5 100 ILAM AC 1994 YR ID 54 43 54 43 43 16 0 0 0 M/HILL NO SNV 11 KANKAICHISA PANI- 5,6,7 100 ILAM AC 1992 YR ID 63 50 63 50 50 5 0 0 0 M/HILL NO SNV 11 KANKAIEKATAPPA 8,9 100 ILAM AC 1994 YR ID 65 52 65 52 52 20 0 0 0 M/HILL NO SNV 11 KANKAIGODAK 100 ILAM AC 1992 YR ID 100 80 100 80 80 80 0 0 0 M/HILL NO SNV 11 KANKAILAXMIPUR-6 100 ILAM AC 1992 YR ID 44 35 44 35 35 5 0 0 0 M/HILL NO SNV 11 KANKAILUMLE 100 ILAM AC 1995 YR ID 38 30 38 30 30 10 5 0 0 M/HILL NO SNV 11 KANKAIMANGALBARE 1,9 100 ILAM AC 1992 YR ID 125 100 125 100 100 100 0 0 0 M/HILL NO SNV 11 KANKAIPHUIYATAPPA 3,7,2 100 ILAM AC 1994 YR ID 69 55 69 55 55 22 0 0 0 M/HILL NO SNV 11 KANKAIPUWA MAJUWA ( TALKHARK) 100 ILAM PC 1997 YR ID 166 133 0 0 0 0 0 166 133 M/HILL NO SNV 11 KANKAIPUWA MAJUWA6,9 100 ILAM AC 1996 YR ID 188 150 188 150 150 70 30 0 0 M/HILL NO SNV 11 KANKAISAKHEJUNG 100 ILAM PC 1997 YR ID 63 50 0 0 0 0 0 63 50 M/HILL NO SNV 11 KANKAISAKPHARAN 100 ILAM AC 1995 YR ID 25 20 25 20 20 10 5 0 0 M/HILL NO SNV 11 KANKAISANGRUMBA-5,6 100 ILAM AC 1992 YR ID 69 55 69 55 55 55 0 0 0 M/HILL NO SNV 11 KANKAISHANTI DANDA-3 100 ILAM AC 1992 MS ID 94 75 94 75 75 75 0 0 0 M/HILL NO SNV 11 KANKAISHANTI DANDA-9 100 ILAM AC 1992 YR ID 100 80 100 80 80 40 0 0 0 M/HILL NO SNV 11 KANKAISIDHI THUMKA 2 100 ILAM AC 1992 YR ID 25 20 25 20 20 20 0 0 0 M/HILL NO SNV 11 KANKAISOYAK 100 ILAM AC 1992 YR ID 31 25 31 25 25 25 0 0 0 M/HILL NO SNV 11 KANKAITOTAL of M/HILL > ILAM > REHABILITATION 17 1319 1053 1090 870 870 553 40 229 183

TOTAL of ILAM District 19 1574 1257 1165 930 930 577 40 409 327

96

Page 102: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

M/HILL>PANCHTHAR>NEWEKTIN 1,4,5,6 100 PANCHTHAR AC 1994 YR ID 41 33 41 33 33 12 0 0 0 M/HILL NO SNV 4 KOSHITOTAL of M/HILL > PANCHTHAR > NEW 1 41 33 41 33 33 12 0 0 0

M/HILL>PANCHTHAR>REHABILITATIONBIMIRE 100 PANCHTHAR PC 1997 YR ID 31 25 0 0 0 0 0 31 25 M/HILL NO SNV 4 KOSHIEKTIN 1,2,5 100 PANCHTHAR AC 1994 YR ID 34 27 34 27 27 10 0 0 0 M/HILL NO SNV 4 KOSHILUNGRUPA 5,6 100 PANCHTHAR AC 1992 YR ID 50 40 50 40 40 40 0 0 0 M/HILL NO SNV 4 KOSHIMEMENG MATHILLO 100 PANCHTHAR AC 1994 YR ID 44 35 44 35 35 14 0 0 0 M/HILL NO SNV 4 KOSHIMEMING TALLO 100 PANCHTHAR AC 1994 YR ID 56 45 56 45 45 18 0 0 0 M/HILL NO SNV 4 KOSHINAGI-8 100 PANCHTHAR AC 1996 YR ID 31 25 31 25 25 10 5 0 0 M/HILL NO SNV 4 KOSHINAGIN 100 PANCHTHAR AC 1992 MS ID 38 30 38 30 30 0 0 0 0 M/HILL NO SNV 4 KOSHIPAUWA SARTAP 100 PANCHTHAR AC 1991 YR ID 69 55 69 55 55 45 0 0 0 M/HILL NO SNV 4 KOSHIPHALAICHA-4,6 100 PANCHTHAR AC 1995 YR ID 88 70 88 70 70 30 15 0 0 M/HILL NO SNV 4 KOSHIPHIDIM 100 PANCHTHAR AC 1991 YR ID 100 80 100 80 80 50 0 0 0 M/HILL NO SNV 4 KOSHISALLERI 100 PANCHTHAR AC 1992 YR ID 121 97 121 97 80 75 0 0 0 M/HILL NO SNV 4 KOSHITHARUP-4,6 100 PANCHTHAR AC 1995 YR ID 125 100 125 100 100 50 25 0 0 M/HILL NO SNV 4 KOSHIYOYAM-4,5,6 100 PANCHTHAR AC 1996 YR ID 38 30 38 30 30 15 10 0 0 M/HILL NO SNV 4 KOSHITOTAL of M/HILL > PANCHTHAR > REHABILITATION 13 825 659 794 634 617 357 55 31 25

TOTAL of PANCHTHAR District 14 866 692 835 667 650 369 55 31 25

TOTAL of EASTERN > Hill 33 2440 1949 2000 1597 1580 946 95 440 352

M/HILL>TAPLEJUNG>REHABILITATIONDHUNGE SANGU 100 TAPLEJUNG AC 1992 YR ID 188 150 188 150 50 0 0 0 0 M/HILL NO SNV 4 KOSHIDOKHU-3 100 TAPLEJUNG AC 1991 MS ID 26 21 26 21 21 0 0 0 0 M/HILL NO SNV 4 KOSHIHANGPANG 100 TAPLEJUNG AC 1992 YR ID 63 50 63 50 50 10 0 0 0 M/HILL NO SNV 4 KOSHIKHEJUNIM 2,3 100 TAPLEJUNG AC 1994 YR ID 94 75 94 75 75 30 0 0 0 M/HILL NO SNV 4 KOSHILINSHEP 100 TAPLEJUNG AC 1995 YR ID 88 70 88 70 70 40 20 0 0 M/HILL NO SNV 4 KOSHINIGURADIN 100 TAPLEJUNG AC 1992 MS ID 31 25 31 25 25 0 0 0 0 M/HILL NO SNV 4 KOSHIPHURUMBU 100 TAPLEJUNG AC 1994 YR ID 50 40 50 40 40 16 0 0 0 M/HILL NO SNV 4 KOSHIPHURUMBU(7) 100 TAPLEJUNG AC 1995 YR ID 100 80 100 80 80 40 20 0 0 M/HILL NO SNV 4 KOSHISIWADIN 3,6,8 100 TAPLEJUNG AC 1994 YR ID 125 100 125 100 100 40 0 0 0 M/HILL NO SNV 4 KOSHITHECHUMBU-6,8 100 TAPLEJUNG AC 1991 MS ID 50 40 50 40 40 0 0 0 0 M/HILL NO SNV 4 KOSHITHECHUMBU-7 100 TAPLEJUNG AC 1991 MS ID 50 40 50 40 40 0 0 0 0 M/HILL NO SNV 4 KOSHITHUKIMBA 100 TAPLEJUNG AC 1995 YR ID 241 193 241 193 193 80 40 0 0 M/HILL NO SNV 4 KOSHITIRINGE 1,2,3,4,6 100 TAPLEJUNG AC 1991 MS ID 56 45 56 45 45 0 0 0 0 M/HILL NO SNV 4 KOSHITOTAL of M/HILL > TAPLEJUNG > REHABILITATION 13 1162 929 1162 929 829 256 80 0 0

TOTAL of TAPLEJUNG District 13 1162 929 1162 929 829 256 80 0 0

TOTAL of EASTERN > Mountain 13 1162 929 1162 929 829 256 80 0 0

TOTAL of EASTERN Region 46 3602 2878 3162 2526 2409 1202 175 440 352

97

Page 103: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of M/HILL 46 3602 2878 3162 2526 2409 1202 175 440 352

MAIN>JHAPA>REHABILITATIONMAWA KHOLA 100 JHAPA AC 250 200 250 200 200 0 0 0 0 MAIN NO GoN 12 SIWALIK RIVERTOTAL of MAIN > JHAPA > REHABILITATION 1 250 200 250 200 200 0 0 0 0

TOTAL of JHAPA District 1 250 200 250 200 200 0 0 0 0

TOTAL of EASTERN > Terai 1 250 200 250 200 200 0 0 0 0

MAIN>KHOTANG>REHABILITATIONSAMJU KHOLA 100 KHOTANG AC 62 50 62 50 50 0 0 0 0 MAIN NO GoN 4 KOSHITOTAL of MAIN > KHOTANG > REHABILITATION 1 62 50 62 50 50 0 0 0 0

TOTAL of KHOTANG District 1 62 50 62 50 50 0 0 0 0

TOTAL of EASTERN > Hill 1 62 50 62 50 50 0 0 0 0

TOTAL of EASTERN Region 2 312 250 312 250 250 0 0 0 0

MAIN>DHADING>REHABILITATIONDUDURUNG 100 DHADING AC 15 12 15 12 12 0 0 0 0 MAIN NO GoN 3 GANDAKTOTAL of MAIN > DHADING > REHABILITATION 1 15 12 15 12 12 0 0 0 0

TOTAL of DHADING District 1 15 12 15 12 12 0 0 0 0

MAIN>RAMECHAP>REHABILITATIONMUGI TAR 100 RAMECHAP AC 62 50 62 50 50 0 0 0 0 MAIN NO GoN 4 KOSHITOTAL of MAIN > RAMECHAP > REHABILITATION 1 62 50 62 50 50 0 0 0 0

TOTAL of RAMECHAP District 1 62 50 62 50 50 0 0 0 0

TOTAL of CENTRAL> Hill 2 77 62 77 62 62 0 0 0 0

TOTAL of CENTRAL Region 2 77 62 77 62 62 0 0 0 0

MAIN>NAWALPARASI>REHABILITATIONBARTIPUR 100 NAWALPARASI AC 125 100 125 100 100 0 0 0 0 MAIN NO GoN 3 GANDAKTANG KHOLA 100 NAWALPARASI AC 125 100 125 100 100 0 0 0 0 MAIN NO GoN 3 GANDAKTOTAL of MAIN > NAWALPARASI > REHABILITATION 2 250 200 250 200 200 0 0 0 0

TOTAL of NAWALPARASI District 2 250 200 250 200 200 0 0 0 0

MAIN>RUPANDEHI>REHABILITATIONPAHELA KHOLA 100 RUPANDEHI AC 250 200 250 200 200 0 0 0 0 MAIN NO GoN 8 TINAUTOTAL of MAIN > RUPANDEHI > REHABILITATION 1 250 200 250 200 200 0 0 0 0

98

Page 104: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of RUPANDEHI District 1 250 200 250 200 200 0 0 0 0

TOTAL of WESTERNL> Terai 3 500 400 500 400 400 0 0 0 0

MAIN>GORKHA>REHABILITATIONDHAWA TAR 100 GORKHA AC 63 50 63 50 50 0 0 0 0 MAIN NO GoN 3 GANDAKTOTAL of MAIN > GORKHA > REHABILITATION 1 63 50 63 50 50 0 0 0 0

TOTAL of GORKHA District 1 63 50 63 50 50 0 0 0 0

MAIN>LAMJUNG>REHABILITATIONBANGRE BESI 100 LAMJUNG AC YR 62 50 62 50 50 0 0 0 0 MAIN NO GoN 3 GANDAKTOTAL of MAIN > LAMJUNG > REHABILITATION 1 62 50 62 50 50 0 0 0 0

TOTAL of LAMJUNG District 1 62 50 62 50 50 0 0 0 0

MAIN>TANAHU>REHABILITATIONRISHINCH PATAN KUTIA 100 TANAHU AC 37 30 37 30 30 0 0 0 0 MAIN NO GoN 3 GANDAKTOTAL of MAIN > TANAHU > REHABILITATION 1 37 30 37 30 30 0 0 0 0

TOTAL of TANAHU District 1 37 30 37 30 30 0 0 0 0

TOTAL of WESTERNL> Hill 3 162 130 162 130 130 0 0 0 0

MAIN>MUSTANG>REHABILITATIONCHAILE 100 MUSTANG AC 7 6 7 6 6 0 0 0 0 MAIN NO GoN 3 GANDAKCHETANG 100 MUSTANG AC 25 20 25 20 20 0 0 0 0 MAIN NO GoN 3 GANDAKCHUKSANG 100 MUSTANG AC 5 4 5 4 4 0 0 0 0 MAIN NO GoN 3 GANDAKJHANG 100 MUSTANG AC 25 20 25 20 20 0 0 0 0 MAIN NO GoN 3 GANDAKTANGWE 100 MUSTANG AC 44 35 44 35 35 0 0 0 0 MAIN NO GoN 3 GANDAKTOTAL of MAIN > MUSTANG > REHABILITATION 5 106 85 106 85 85 0 0 0 0

TOTAL of MUSTANG District 5 106 85 106 85 85 0 0 0 0

TOTAL of WESTERN> Mountain 5 106 85 106 85 85 0 0 0 0

TOTAL of WESTERN Region 11 768 615 768 615 615 0 0 0 0

MAIN>DANG>REHABILITATIONCHAIME KHOLA 100 DANG AC 1050 840 1050 840 840 0 0 0 0 MAIN NO GoN 5 BABAISANKRAM KHOLA 100 DANG AC 250 200 250 200 200 0 0 0 0 MAIN NO GoN 5 BABAITOTAL of MAIN > DANG > REHABILITATION 2 1300 1040 1300 1040 1040 0 0 0 0

TOTAL of DANG District 2 1300 1040 1300 1040 1040 0 0 0 0

99

Page 105: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of MID-WESTERN> Terai 2 1300 1040 1300 1040 1040 0 0 0 0

TOTAL of MID-WESTERN Region 2 1300 1040 1300 1040 1040 0 0 0 0

MAIN>BAITADI>REHABILITATIONBAGARI 100 BAITADI AC 94 75 94 75 75 0 0 0 0 MAIN NO GoN 1 MAHAKALITUNGELI 100 BAITADI AC 94 75 94 75 75 0 0 0 0 MAIN NO GoN 1 MAHAKALITOTAL of MAIN > BAITADI > REHABILITATION 2 188 150 188 150 150 0 0 0 0

TOTAL of BAITADI District 2 188 150 188 150 150 0 0 0 0

TOTAL of FAR-WESTERN> Hill 2 188 150 188 150 150 0 0 0 0

TOTAL of FAR-WESTERN Region 2 188 150 188 150 150 0 0 0 0

TOTAL of MAIN 19 2645 2117 2645 2117 2117 0 0 0 0

MIN>MORANG>REHABILITATIONBAGHI PROJECT 100 MORANG AC 50 40 50 40 40 0 0 0 0 MIN NO IND 12 SIWALIK RIVERDARLOKHA DIVERSION 100 MORANG AC 550 440 550 440 440 0 0 0 0 MIN NO IND 12 SIWALIK RIVERGADHI DIVERSION 100 MORANG AC 50 40 50 40 40 0 0 0 0 MIN NO IND 12 SIWALIK RIVERGHORJANA REGULATOR 100 MORANG AC 50 40 50 40 40 0 0 0 0 MIN NO IND 12 SIWALIK RIVERGOURIA 100 MORANG AC 50 40 50 40 40 0 0 0 0 MIN NO IND 12 SIWALIK RIVERKATHANDU DIVERSION 100 MORANG AC 100 80 100 80 80 0 0 0 0 MIN NO IND 12 SIWALIK RIVERKOCHANI DIVERSION 100 MORANG AC 50 40 50 40 40 0 0 0 0 MIN NO IND 12 SIWALIK RIVERMANGALAPUR POKHARI 100 MORANG AC 25 20 25 20 20 0 0 0 0 MIN NO IND 12 SIWALIK RIVERMARIA 100 MORANG AC 500 400 500 400 400 0 0 0 0 MIN NO IND 12 SIWALIK RIVERSAGAR 100 MORANG AC 250 200 250 200 200 0 0 0 0 MIN NO IND 12 SIWALIK RIVERSUKNA PAIN 100 MORANG AC 250 200 250 200 200 0 0 0 0 MIN NO IND 12 SIWALIK RIVERTOTAL of MIN > MORANG > REHABILITATION 11 1925 1540 1925 1540 1540 0 0 0 0

TOTAL of MORANG District 11 1925 1540 1925 1540 1540 0 0 0 0

MIN>SAPTARI>REHABILITATIONMUTANI 100 SAPTARI AC 500 400 500 400 400 0 0 0 0 MIN NO IND 12 SIWALIK RIVERPANCHI 100 SAPTARI AC 400 320 400 320 320 0 0 0 0 MIN NO IND 12 SIWALIK RIVERTOTAL of MIN > SAPTARI > REHABILITATION 2 900 720 900 720 720 0 0 0 0

TOTAL of SAPTARI District 2 900 720 900 720 720 0 0 0 0

MIN>SIRAHA>REHABILITATIONBABURAM KHOLA 100 SIRAHA AC 1250 1000 1250 1000 1000 0 0 0 0 MIN NO IND 12 SIWALIK RIVERGAGAN NADI 100 SIRAHA AC 1500 1200 1500 1200 1200 0 0 0 0 MIN NO IND 12 SIWALIK RIVERLOMANIA BANDH 100 SIRAHA AC 500 400 500 400 400 0 0 0 0 MIN NO IND 12 SIWALIK RIVERRAJOKHAR POKHARI 100 SIRAHA AC 75 60 75 60 60 0 0 0 0 MIN NO IND 12 SIWALIK RIVERRAMPUR KAMALA WARI 100 SIRAHA AC 25 20 25 20 20 0 0 0 0 MIN NO IND 12 SIWALIK RIVER

100

Page 106: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of MIN > SIRAHA > REHABILITATION 5 3350 2680 3350 2680 2680 0 0 0 0

TOTAL of SIRAHA District 5 3350 2680 3350 2680 2680 0 0 0 0

MIN>SUNSARI>REHABILITATIONBAJHGATA TUNNEL 100 SUNSARI AC 600 480 600 480 480 0 0 0 0 MIN NO IND 12 SIWALIK RIVERPADARIA-GARUDA 100 SUNSARI AC 250 200 250 200 200 0 0 0 0 MIN NO IND 12 SIWALIK RIVERSIGIA DAHA KACHCHAW 100 SUNSARI AC 250 200 250 200 200 0 0 0 0 MIN NO IND 12 SIWALIK RIVERTOTAL of MIN > SUNSARI > REHABILITATION 3 1100 880 1100 880 880 0 0 0 0

TOTAL of SUNSARI District 3 1100 880 1100 880 880 0 0 0 0

TOTAL of EASTERN > Terai 21 7275 5820 7275 5820 5820 0 0 0 0

TOTAL of EASTERN Region 21 7275 5820 7275 5820 5820 0 0 0 0

MIN>BARA>REHABILITATIONBEHATANI LIFT 100 BARA AC 150 120 150 120 120 0 0 0 0 MIN NO IND 12 SIWALIK RIVERGADHAL 100 BARA AC 62 50 62 50 50 0 0 0 0 MIN NO IND 12 SIWALIK RIVERJAMUNI 100 BARA AC 1000 800 1000 800 800 0 0 0 0 MIN NO IND 12 SIWALIK RIVERPASAHA 100 BARA AC 2000 1600 2000 1600 1600 0 0 0 0 MIN NO IND 12 SIWALIK RIVERTOTAL of MIN > BARA > REHABILITATION 4 3212 2570 3212 2570 2570 0 0 0 0

TOTAL of BARA District 4 3212 2570 3212 2570 2570 0 0 0 0

MIN>CHITWAN>REHABILITATIONANANDPUR 100 CHITWAN AC 13 10 13 10 10 0 0 0 0 MIN NO IND 3 GANDAKKRISHNAPUR 100 CHITWAN AC 200 160 200 160 160 0 0 0 0 MIN NO IND 3 GANDAKKUSATTA OVERSEAS 100 CHITWAN AC 150 120 150 120 120 0 0 0 0 MIN NO IND 3 GANDAKLOWER KERUNGA 100 CHITWAN AC 25 20 25 20 20 0 0 0 0 MIN NO IND 3 GANDAKPUNGI KHOLA 100 CHITWAN AC 75 60 75 60 60 0 0 0 0 MIN NO IND 3 GANDAKUPPER KERUNGA 100 CHITWAN AC 100 80 100 80 80 0 0 0 0 MIN NO IND 3 GANDAKTOTAL of MIN > CHITWAN > REHABILITATION 6 563 450 563 450 450 0 0 0 0

TOTAL of CHITWAN District 6 563 450 563 450 450 0 0 0 0

MIN>DHANUSHA>NEWJAMUNI 100 DHANUSHA AC 250 200 250 200 200 0 0 0 0 MIN NO IND 12 SIWALIK RIVERTOTAL of MIN > DHANUSHA > NEW 1 250 200 250 200 200 0 0 0 0

TOTAL of DHANUSHA District 1 250 200 250 200 200 0 0 0 0

MIN>PARSA>REHABILITATIONCHAMARI 100 PARSA AC 200 160 200 160 160 0 0 0 0 MIN NO IND 12 SIWALIK RIVERGANGOLA 100 PARSA AC 12 10 12 10 10 0 0 0 0 MIN NO IND 12 SIWALIK RIVERORIA 100 PARSA AC 400 320 400 320 320 0 0 0 0 MIN NO IND 12 SIWALIK RIVER

101

Page 107: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

PATLAIYA-MOHANA 100 PARSA AC 100 80 100 80 80 0 0 0 0 MIN NO IND 12 SIWALIK RIVERRAHAT KUWA-BHABHAN 100 PARSA AC 12 10 12 10 10 0 0 0 0 MIN NO IND 12 SIWALIK RIVERRAHAT- KUWA SUWARNP 100 PARSA AC 13 10 13 10 10 0 0 0 0 MIN NO IND 12 SIWALIK RIVERTHOUDUWA 100 PARSA AC 500 400 500 400 400 0 0 0 0 MIN NO IND 12 SIWALIK RIVERTILAWE MINOR 100 PARSA AC 100 80 100 80 80 0 0 0 0 MIN NO IND 12 SIWALIK RIVERTOTAL of MIN > PARSA > REHABILITATION 8 1337 1070 1337 1070 1070 0 0 0 0

TOTAL of PARSA District 8 1337 1070 1337 1070 1070 0 0 0 0

MIN>RAUTAHAT>REHABILITATIONBALUWA JABDI 100 RAUTAHAT AC 1250 1000 1250 1000 1000 0 0 0 0 MIN NO IND 12 SIWALIK RIVERBHA KUWA 100 RAUTAHAT AC 500 400 500 400 400 0 0 0 0 MIN NO IND 12 SIWALIK RIVERBHA KUWA DUMARIA 100 RAUTAHAT AC 500 400 500 400 400 0 0 0 0 MIN NO IND 12 SIWALIK RIVERHATAUNA BRANCH 100 RAUTAHAT AC 250 200 250 200 200 0 0 0 0 MIN NO IND 12 SIWALIK RIVERJALAIYA BULKAI 100 RAUTAHAT AC 150 120 150 120 120 0 0 0 0 MIN NO IND 12 SIWALIK RIVERKHARAIYA DAH 100 RAUTAHAT AC 400 320 400 320 320 0 0 0 0 MIN NO IND 12 SIWALIK RIVERMANUSMARA 100 RAUTAHAT AC 750 600 750 600 600 0 0 0 0 MIN NO IND 12 SIWALIK RIVERRAMPUR KHOPASI 100 RAUTAHAT AC 20 16 20 16 16 0 0 0 0 MIN NO IND 12 SIWALIK RIVERTOTAL of MIN > RAUTAHAT > REHABILITATION 8 3820 3056 3820 3056 3056 0 0 0 0

TOTAL of RAUTAHAT District 8 3820 3056 3820 3056 3056 0 0 0 0

MIN>SARLAHI>REHABILITATIONHARIYAI PROJECT 100 SARLAHI AC 50 40 50 40 40 0 0 0 0 MIN NO IND 12 SIWALIK RIVERTOTAL of MIN > SARLAHI > REHABILITATION 1 50 40 50 40 40 0 0 0 0

TOTAL of SARLAHI District 1 50 40 50 40 40 0 0 0 0

TOTAL of CENTRAL > Terai 28 9232 7386 9232 7386 7386 0 0 0 0

MIN>BHAKTAPUR>REHABILITATIONKATHURAJ KULO 100 BHAKTAPUR AC 500 400 500 400 400 0 0 0 0 MIN NO IND 9 BAGMATIKYTHUDHAL 100 BHAKTAPUR AC 50 40 50 40 40 0 0 0 0 MIN NO IND 9 BAGMATILAPSE TAR 100 BHAKTAPUR AC 75 60 75 60 60 0 0 0 0 MIN NO IND 9 BAGMATI NALA KULO 100 BHAKTAPUR AC 150 120 150 120 120 0 0 0 0 MIN NO IND 9 BAGMATISURYABINAYAK 100 BHAKTAPUR AC 62 50 62 50 50 0 0 0 0 MIN NO IND 9 BAGMATITHIMI MANOHARA KULO 100 BHAKTAPUR AC 50 40 50 40 40 0 0 0 0 MIN NO IND 9 BAGMATIWALARKU KULO 100 BHAKTAPUR AC 50 40 50 40 40 0 0 0 0 MIN NO IND 9 BAGMATIYUG DHARA KULO 100 BHAKTAPUR AC 500 400 500 400 400 0 0 0 0 MIN NO IND 9 BAGMATITOTAL of MIN > BHAKTAPUR > REHABILITATION 8 1437 1150 1437 1150 1150 0 0 0 0

TOTAL of BHAKTAPUR District 8 1437 1150 1437 1150 1150 0 0 0 0

MIN>KATHMANDU>REHABILITATIONGAGAL INDRAYANI KUL 100 KATHMANDU AC 162 130 162 130 130 0 0 0 0 MIN NO IND 9 BAGMATITUKUCHA RAJ KULO 100 KATHMANDU AC 38 30 38 30 30 0 0 0 0 MIN NO IND 9 BAGMATI

102

Page 108: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of MIN > KATHMANDU > REHABILITATION 2 200 160 200 160 160 0 0 0 0

TOTAL of KATHMANDU District 2 200 160 200 160 160 0 0 0 0

MIN>LALITPUR>REHABILITATIONAPHAL KULO 100 LALITPUR AC 312 250 312 250 250 0 0 0 0 MIN NO IND 9 BAGMATIIKUD KULO 100 LALITPUR AC 150 120 150 120 120 0 0 0 0 MIN NO IND 9 BAGMATIKAMBHU KULO 100 LALITPUR AC 62 50 62 50 50 0 0 0 0 MIN NO IND 9 BAGMATILELE KULO 100 LALITPUR AC 32 25 32 25 25 0 0 0 0 MIN NO IND 9 BAGMATILUBHU KULO 100 LALITPUR AC 575 460 575 460 460 0 0 0 0 MIN NO IND 9 BAGMATITOTAL of MIN > LALITPUR > REHABILITATION 5 1131 905 1131 905 905 0 0 0 0

TOTAL of LALITPUR District 5 1131 905 1131 905 905 0 0 0 0

MIN>NUWAKOT>REHABILITATIONANDHERI KHOLA 100 NUWAKOT AC 300 240 300 240 240 0 0 0 0 MIN NO IND 3 GANDAKTOTAL of MIN > NUWAKOT > REHABILITATION 1 300 240 300 240 240 0 0 0 0

TOTAL of NUWAKOT District 1 300 240 300 240 240 0 0 0 0

TOTAL of CENTRAL > Hill 16 3068 2455 3068 2455 2455 0 0 0 0

TOTAL of CENTRAL Region 44 12300 9841 12300 9841 9841 0 0 0 0

MIN>KAPILBASTU>REHABILITATIONJAMUAR DIVERSION 100 KAPILBASTU AC 750 600 750 600 600 0 0 0 0 MIN NO IND 12 SIWALIK RIVERMARTHI PROJECT 100 KAPILBASTU AC 1000 800 1000 800 800 0 0 0 0 MIN NO IND 12 SIWALIK RIVERTOTAL of MIN > KAPILBASTU > REHABILITATION 2 1750 1400 1750 1400 1400 0 0 0 0

TOTAL of KAPILBASTU District 2 1750 1400 1750 1400 1400 0 0 0 0

MIN>NAWALPARASI>REHABILITATIONGAIDAKOT 100 NAWALPARASI AC 25 20 25 20 20 0 0 0 0 MIN NO IND 3 GANDAKHULASI DIVERSION 100 NAWALPARASI AC 250 200 250 200 200 0 0 0 0 MIN NO IND 3 GANDAKPOTAHA RESERVOIR 100 NAWALPARASI AC 75 60 75 60 60 0 0 0 0 MIN NO IND 3 GANDAKTOTAL of MIN > NAWALPARASI > REHABILITATION 3 350 280 350 280 280 0 0 0 0

TOTAL of NAWALPARASI District 3 350 280 350 280 280 0 0 0 0

MIN>RUPANDEHI>REHABILITATIONSOLAH CHATTIS KULO 100 RUPANDEHI AC 7500 6000 7500 6000 6000 0 0 0 0 MIN NO IND 8 TINAUTELLER NALA 100 RUPANDEHI AC 250 200 250 200 200 0 0 0 0 MIN NO IND 8 TINAUTOTAL of MIN > RUPANDEHI > REHABILITATION 2 7750 6200 7750 6200 6200 0 0 0 0

TOTAL of RUPANDEHI District 2 7750 6200 7750 6200 6200 0 0 0 0

103

Page 109: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of WESTERN > Terai 7 9850 7880 9850 7880 7880 0 0 0 0

MIN>BAGLUNG>REHABILITATIONKUDLE AND KATHE KUL 100 BAGLUNG AC 75 60 75 60 60 0 0 0 0 MIN NO IND 3 GANDAKTOTAL of MIN > BAGLUNG > REHABILITATION 1 75 60 75 60 60 0 0 0 0

TOTAL of BAGLUNG District 1 75 60 75 60 60 0 0 0 0

MIN>LAMJUNG>REHABILITATIONCHISANKHA BESI 100 LAMJUNG AC 150 120 150 120 120 0 0 0 0 MIN NO IND 3 GANDAKMULMULE 100 LAMJUNG AC YR ID 30 24 30 24 24 0 0 0 0 MIN NO IND 3 GANDAKTOTAL of MIN > LAMJUNG > REHABILITATION 2 180 144 180 144 144 0 0 0 0

TOTAL of LAMJUNG District 2 180 144 180 144 144 0 0 0 0

MIN>MYGADI>REHABILITATIONBABIA CHOUR 100 MYGADI AC YR ED 25 20 25 20 20 0 0 0 0 MIN NO IND 3 GANDAKTOTAL of MIN > MYGADI > REHABILITATION 1 25 20 25 20 20 0 0 0 0

TOTAL of MYGADI District 1 25 20 25 20 20 0 0 0 0

TOTAL of WESTERN > Hill 4 280 224 280 224 224 0 0 0 0

TOTAL of WESTERN Region 11 10130 8104 10130 8104 8104 0 0 0 0

MIN>BANKE>REHABILITATIONPURAIYA TAL 100 BANKE AC 300 240 300 240 240 0 0 0 0 MIN NO IND 6 WEST RAPTISHURUW(GARWA GAO) 100 BANKE AC 200 160 200 160 160 0 0 0 0 MIN NO IND 6 WEST RAPTITOTAL of MIN > BANKE > REHABILITATION 2 500 400 500 400 400 0 0 0 0

TOTAL of BANKE District 2 500 400 500 400 400 0 0 0 0

MIN>BARDIYA>REHABILITATIONGULARIA KULO 100 BARDIYA AC 50 40 50 40 40 0 0 0 0 MIN NO IND 5 BABAIMANPUR TAPARA 100 BARDIYA AC 50 40 50 40 40 0 0 0 0 MIN NO IND 5 BABAITOTAL of MIN > BARDIYA > REHABILITATION 2 100 80 100 80 80 0 0 0 0

TOTAL of BARDIYA District 2 100 80 100 80 80 0 0 0 0

MIN>DANG>REHABILITATIONBELA PROJECT 100 DANG AC 250 200 250 200 200 0 0 0 0 MIN NO IND 5 BABAIBHOTE DAH 100 DANG AC 50 40 50 40 40 0 0 0 0 MIN NO IND 5 BABAICHANDANPUR 100 DANG AC 200 160 200 160 160 0 0 0 0 MIN NO IND 5 BABAICHARANGE DAH 100 DANG AC 75 60 75 60 60 0 0 0 0 MIN NO IND 5 BABAIRAKSE CHOUR 100 DANG AC 50 40 50 40 40 0 0 0 0 MIN NO IND 5 BABAITOTAL of MIN > DANG > REHABILITATION 5 625 500 625 500 500 0 0 0 0

104

Page 110: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of DANG District 5 625 500 625 500 500 0 0 0 0

TOTAL of MID-WESTERN > Terai 9 1225 980 1225 980 980 0 0 0 0

MIN>SALYAN>REHABILITATIONGHATTE KHOLA 100 SALYAN AC 25 20 25 20 20 0 0 0 0 MIN NO IND 5 BABAITOTAL of MIN > SALYAN > REHABILITATION 1 25 20 25 20 20 0 0 0 0

TOTAL of SALYAN District 1 25 20 25 20 20 0 0 0 0

TOTAL of MID-WESTERN > Hill 1 25 20 25 20 20 0 0 0 0

TOTAL of MID-WESTERN Region 10 1250 1000 1250 1000 1000 0 0 0 0

MIN>KAILALI>REHABILITATIONGULAR GAPPA PUMP 100 KAILALI AC 225 180 225 180 180 0 0 0 0 MIN NO IND 2 KARNALIGURGI DIVERSION 100 KAILALI AC 2687 2150 2687 2150 2150 0 0 0 0 MIN NO IND 2 KARNALIKAILALI NANA 100 KAILALI AC 700 560 700 560 560 0 0 0 0 MIN NO IND 2 KARNALIKATENI NALA 100 KAILALI AC 1500 1200 1500 1200 1200 0 0 0 0 MIN NO IND 2 KARNALIKHARETI PUMP 100 KAILALI AC 225 180 225 180 180 0 0 0 0 MIN NO IND 2 KARNALIPAHALWANPUR PUMP 100 KAILALI AC 225 180 225 180 180 0 0 0 0 MIN NO IND 2 KARNALISHUKTI 100 KAILALI AC 250 200 250 200 200 0 0 0 0 MIN NO IND 2 KARNALITOTAL of MIN > KAILALI > REHABILITATION 7 5812 4650 5812 4650 4650 0 0 0 0

TOTAL of KAILALI District 7 5812 4650 5812 4650 4650 0 0 0 0

MIN>KANCHANPUR>REHABILITATIONROUTELI KHOLA 100 KANCHANPUR AC 900 720 900 720 720 0 0 0 0 MIN NO IND 1 MAHAKALITOTAL of MIN > KANCHANPUR > REHABILITATION 1 900 720 900 720 720 0 0 0 0

TOTAL of KANCHANPUR District 1 900 720 900 720 720 0 0 0 0

TOTAL of FAR-WESTERN > Terai 8 6712 5370 6712 5370 5370 0 0 0 0

TOTAL of FAR-WESTERN Region 8 6712 5370 6712 5370 5370 0 0 0 0

TOTAL of MIN 94 37667 30135 37667 30135 30135 0 0 0 0

MIP>JHAPA>NEWMANSAPUR 100 JHAPA PC 2006 YR ID 241 205 241 200 0 0 0 0 0 MIP YES DOI 12 SIWALIK RIVERTOTAL of MIP > JHAPA > NEW 1 241 205 241 200 0 0 0 0 0

MIP>JHAPA>ON GOINGSIDHI KHOLA 100 JHAPA PC 2006 YR ID 1882 1600 0 0 0 0 0 0 0 MIP NO DOI 12 SIWALIK RIVERTOTAL of MIP > JHAPA > ON GOING 1 1882 1600 0 0 0 0 0 0 0

105

Page 111: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of JHAPA District 2 2123 1805 241 200 0 0 0 0 0

MIP>MORANGBHUWA CHISANG 100 MORANG PC 2006 YR ID 353 300 353 285 0 0 0 0 0 MIP NO DOI 12 SIWALIK RIVERTOTAL of MIP > MORANG 1 353 300 353 285 0 0 0 0 0

TOTAL of MORANG District 1 353 300 353 285 0 0 0 0 0

MIP>SUNSARI>ON GOINGTEGRA KHOLA 100 SUNSARI PC 2006 YR ID 276 235 0 0 0 0 0 0 0 MIP NO DOI 12 SIWALIK RIVERTOTAL of MIP > SUNSARI > ON GOING 1 276 235 0 0 0 0 0 0 0

TOTAL of SUNSARI District 1 276 235 0 0 0 0 0 0 0

TOTAL of EASTERN > Terai 4 2752 2340 594 485 0 0 0 0 0

MIP>DHANKUTATATO PANI TAR 100 DHANKUTA PC 2006 YR ID 135 115 135 115 0 0 0 0 0 MIP NO DOI 4 KOSHITOTAL of MIP > DHANKUTA 1 135 115 135 115 0 0 0 0 0

TOTAL of DHANKUTA District 1 135 115 135 115 0 0 0 0 0

MIP>ILAM>ON GOINGTHULO CHAJHO 100 ILAM PC 2006 YR ID 235 200 0 0 0 0 0 0 0 MIP NO DOI 11 KOSHITOTAL of MIP > ILAM > ON GOING 1 235 200 0 0 0 0 0 0 0

TOTAL of ILAM District 1 235 200 0 0 0 0 0 0 0

MIP>TEHRATHUM>ON GOINGPAREUWA KHOLA 100 TEHRATHUM PC 2006 YR ID 235 200 0 0 0 0 0 0 0 MIP NO DOI 4 KOSHITOTAL of MIP > TEHRATHUM > ON GOING 1 235 200 0 0 0 0 0 0 0

TOTAL of TEHRATHUM District 1 235 200 0 0 0 0 0 0 0

MIP>KHOTANGKALI KHOLA 100 KHOTANG PC 2006 YR ID 80 70 80 70 0 0 0 0 0 MIP NO DOI 4 KOSHITOTAL of MIP > KHOTANG 1 80 70 80 70 0 0 0 0 0

TOTAL of KHOTANG District 1 80 70 80 70 0 0 0 0 0

MIP>UDAYPUR>U TARITAWA 100 UDAYPUR PC 2006 YR ID 300 250 300 250 0 0 0 0 0 MIP NO DOI 4 KOSHITOTAL of MIP > UDAYPUR > 1 300 250 300 250 0 0 0 0 0

TOTAL of UDAYPUR District 1 300 250 300 250 0 0 0 0 0

106

Page 112: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of EASTERN > Hill 4 905 765 435 435 0 0 0 0 0

TOTAL of EASTERN Region 8 3657 3105 1029 920 0 0 0 0 0

107

Page 113: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

MIP>BARA>ON GOINGTIYAR 100 BARA PC 2006 YR ID 611 519 0 0 0 0 0 0 0 MIP NO DOI 12 SIWALIK RIVERTOTAL of MIP > BARA > ON GOING 1 611 519 0 0 0 0 0 0 0

TOTAL of BARA District 1 611 519 0 0 0 0 0 0 0

MIP>PARSA>ON GOINGNAU GHACHI 100 PARSA PC 2006 YR ID 588 500 0 0 0 0 0 0 0 MIP NO DOI 12 SIWALIK RIVERTOTAL of MIP > PARSA > ON GOING 1 588 500 0 0 0 0 0 0 0

TOTAL of PARSA District 1 588 500 0 0 0 0 0 0 0

MIP>RAUTAHAT>LALMATIYA 100 RAUTAHAT PC 2006 YR ID 359 305 359 305 0 0 0 0 0 MIP NO DOI 12 SIWALIK RIVERTOTAL of MIP > RAUTAHAT > 1 359 305 359 305 0 0 0 0 0

TOTAL of RAUTAHAT District 1 359 305 359 305 0 0 0 0 0

TOTAL of CENTRAL > Terai 3 1558 1324 359 305 0 0 0 0 0

MIP>DHADING>ON GOINGAP TAR 100 DHADING PC 2006 YR ID 176 150 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAKARCHALEY TAR 100 DHADING PC 2006 YR ID 118 100 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAKBASHERI LAPDANDA 100 DHADING PC 2006 YR ID 100 60 100 60 0 0 0 0 0 MIP NO DOI 3 GANDAKGUHALE 100 DHADING PC 2007 YR ID 35 30 35 30ADAMTAR 101 DHADING PC 2007 YR ID 27 25 27 25DHUSHA TAR 100 DHADING PC 2006 YR ID 71 60 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAKMANKHU TAR BEL TAR 100 DHADING PC 2006 YR ID 40 34 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAKSAMAN TAR 100 DHADING PC 2006 YR ID 42 36 42 36 0 0 0 0 0 MIP NO DOI 3 GANDAKTALO RAMPUR TAR 100 DHADING PC 2006 YR ID 71 60 71 60 0 0 0 0 0 MIP NO DOI 3 GANDAKTOTAL of MIP > DHADING > ON GOING 9 680 555 275 211 0 0 0 0 0

TOTAL of DHADING District 9 680 555 275 211 0 0 0 0 0

MIP>LALITPUR>ON GOINGTADHA 100 LALITPUR PC 2006 YR ID 59 50 0 0 0 0 0 0 0 MIP NO DOI 9 BAGMATITOTAL of MIP > LALITPUR > ON GOING 1 59 50 0 0 0 0 0 0 0

TOTAL of LALITPUR District 1 59 50 0 0 0 0 0 0 0

MIP>MAKAWANPUR>NEWKURLEYDHAMAR 100 MAKAWANPUR PC 2006 YR ID 65 55 65 55 0 0 0 0 0 MIP YES DOI 3 GANDAKTOTAL of MIP > MAKAWANPUR > NEW 1 65 55 65 55 0 0 0 0 0

MIP>MAKAWANPUR>CHURADHUL RATAMATEY 100 MAKAWANPUR PC 2006 YR ID 118 100 118 100 0 0 0 0 0 MIP NO DOI 3 GANDAK

108

Page 114: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of MIP > MAKAWANPUR > ON GOING 1 118 100 118 100 0 0 0 0 0

109

Page 115: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of MAKAWANPUR District 2 183 155 183 155 0 0 0 0 0

MIP>NUWAKOT>ON GOINGKHARANEY SATBHSEY 100 NUWAKOT PC 2006 YR ID 294 250 0 0 0 0 0 0 0 MIP YES DOI 3 GANDAKTOTAL of MIP > NUWAKOT > ON GOING 1 294 250 0 0 0 0 0 0 0

TOTAL of NUWAKOT District 1 294 250 0 0 0 0 0 0 0

MIP>RAMECHAP>ON GOINGJEYMIREY 100 RAMECHAP PC 2006 YR ID 35 30 0 0 0 0 0 0 0 MIP NO DOI 4 KOSHITOTAL of MIP > RAMECHAP > ON GOING 1 35 30 0 0 0 0 0 0 0

TOTAL of RAMECHAP District 1 35 30 0 0 0 0 0 0 0

MIP>SINDHULI>ON GOINGKUDULE 100 SINDHULI PC 2007 YR ID 22 20 22 20BHEMAN 100 SINDHULI PC 2006 YR ID 353 300 0 0 0 0 0 0 0 MIP NO DOI 9 BAGMATITOTAL of MIP > SINDHULI > ON GOING 1 375 320 22 20 0 0 0 0 0

TOTAL of SINDHULI District 1 375 320 22 20 0 0 0 0 0

TOTAL of CENTRAL > Hill 15 1626 1360 480 386 0 0 0 0 0

MIP>DOLAKHA>ON GOINGADHERI 100 DOLAKHA PC 2006 YR ID 176 150 176 150 0 0 0 0 0 MIP NO DOI 4 KOSHIDHADEY KHOLA 100 DOLAKHA PC 2006 YR ID 294 250 0 0 0 0 0 0 0 MIP NO DOI 4 KOSHITOTAL of MIP > DOLAKHA > ON GOING 2 470 400 176 150 0 0 0 0 0

TOTAL of DOLAKHA District 2 470 400 176 150 0 0 0 0 0

MIP>KAVREMALPI LILAWATI 100 KAVRE PC 2007 YR ID 330 300 330 300 0 0 0 0 0 MIP NO DOI 4 KOSHICHURI KHARAHE 100 KAVRE PC 2007 YR ID 130 125 130 125 0 0 0 0 0 MIP NO DOI 4 KOSHITOTAL of MIP > KAVRE > ON GOING 2 460 425 460 425 0 0 0 0 0

TOTAL of KAVRE District 2 460 425 460 425 0 0 0 0 0

MIP>SINDHUPALCHOWK>ON GOINGBHUSI KHOLA 100 SINDHUPALCHOWK PC 2006 YR ID 235 200 0 0 0 0 0 0 0 MIP NO DOI 4 KOSHICHURI KARKHA 100 SINDHUPALCHOWK PC 2006 YR ID 147 125 0 0 0 0 0 0 0 MIP NO DOI 4 KOSHITOTAL of MIP > SINDHUPALCHOWK > ON GOING 2 382 325 0 0 0 0 0 0 0

TOTAL of SINDHUPALCHOWK District 2 382 325 0 0 0 0 0 0 0

TOTAL of CENTRAL > Mountain 4 852 725 176 575 0 0 0 0 0

110

Page 116: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of CENTRAL Region 22 4036 3409 1015 1266 0 0 0 0 0

MIP>KAPILVASTU>ON GOINGSINGREYGHAT 100 KAPILVASTU PC 2006 YR ID 2968 2523 0 0 0 0 0 0 0 MIP NO DOI 12 SIWALIK RIVERTOTAL of MIP > KAPILVASTU > ON GOING 1 2968 2523 0 0 0 0 0 0 0

TOTAL of KAPILVASTU District 1 2968 2523 0 0 0 0 0 0 0

111

Page 117: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

MIP>NAWALPARASI>ON GOINGBANSH KHOLA 100 NAWALPARASI PC 2006 YR ID 334 284 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAKPANBHARA 100 NAWALPARASI PC 2006 YR ID 235 200 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAKTOTAL of MIP > NAWALPARASI > ON GOING 2 569 484 0 0 0 0 0 0 0

TOTAL of NAWALPARASI District 2 569 484 0 0 0 0 0 0 0

MIP>RUPANDEHI>ON GOINGGAIDHAWA TAL 100 RUPANDEHI PC 2006 YR ID 367 312 367 312 0 0 0 0 0 MIP NO DOI 8 TINAUDHUNGE BANDH 101 RUPANDEHI PC 2007 YR ID 320 300 320 300TOTAL of MIP > RUPANDEHI > ON GOING 1 687 612 687 612 0 0 0 0 0

TOTAL of RUPANDEHI District 1 687 612 687 612 0 0 0 0 0

TOTAL of WESTERN > Terai 4 4224 3619 687 612 0 0 0 0 0

MIP>ARGHAKHACHI>ON GOINGLAPEYSAT MAR 100 ARGHAKHACHI PC 2006 YR ID 118 100 0 0 0 0 0 0 0 MIP NO DOI 6 WEST RAPTITOTAL of MIP > ARGHAKHACHI > ON GOING 1 118 100 0 0 0 0 0 0 0

TOTAL of ARGHAKHACHI District 1 118 100 0 0 0 0 0 0 0

MIP>GORKHA>ON GOINGKUNDHUR TAR 100 GORKHA PC 2006 YR ID 647 550 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAKTOTAL of MIP > GORKHA > ON GOING 1 647 550 0 0 0 0 0 0 0

TOTAL of GORKHA District 1 647 550 0 0 0 0 0 0 0

MIP>GULMI>ON GOINGBHAGAWHA 100 GULMI PC 2006 YR ID 118 100 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAKTOTAL of MIP > GULMI > ON GOING 1 118 100 0 0 0 0 0 0 0

TOTAL of GULMI District 1 118 100 0 0 0 0 0 0 0

MIP>KASKI>ON GOINGKODHI KHOLA 100 KASKI PC 2006 YR ID 182 155 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAKTOTAL of MIP > KASKI > ON GOING 1 182 155 0 0 0 0 0 0 0

TOTAL of KASKI District 1 182 155 0 0 0 0 0 0 0

MIP>LAMJUNG>ON GOINGPAGREYHARABOT 100 LAMJUNG PC 2006 YR ID 365 310 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAKTOTAL of MIP > LAMJUNG > ON GOING 1 365 310 0 0 0 0 0 0 0

TOTAL of LAMJUNG District 1 365 310 0 0 0 0 0 0 0

112

Page 118: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

MIP>MYAGDI>ON GOINGRATO KHOLA 100 MYAGDI PC 2006 YR ID 73 62 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAKTOTAL of MIP > MYAGDI > ON GOING 1 73 62 0 0 0 0 0 0 0

TOTAL of MYAGDI District 1 73 62 0 0 0 0 0 0 0

MIP>PALPA>ON GOINGBHALAYA TAR 100 PALPA PC 2006 YR ID 412 350 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAKHEKLANG PHANT 100 PALPA PC 2007 YR ID 160 150 160 150TOTAL of MIP > PALPA > ON GOING 1 572 500 160 150 0 0 0 0 0

TOTAL of PALPA District 1 572 500 160 150 0 0 0 0 0

MIP>PARBAT>ON GOINGLIMI THANA 100 PARBAT PC 2006 YR ID 124 105 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAKMALLAJ 100 PARBAT PC 2006 YR ID 494 420 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAKSILMI 100 PARBAT PC 2006 YR ID 120 105 120 105 0 0 0 0 0 MIP NO DOI 3 GANDAKTOTAL of MIP > PARBAT > ON GOING 3 738 630 120 105 0 0 0 0 0

TOTAL of PARBAT District 3 738 630 120 105 0 0 0 0 0

MIP>TANAHU>ON GOINGPIPAL TAR 100 TANAHU PC 2006 YR ID 294 250 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAKTOTAL of MIP > TANAHU > ON GOING 1 294 250 0 0 0 0 0 0 0

TOTAL of TANAHU District 1 294 250 0 0 0 0 0 0 0

TOTAL of WESTERN > Hill 10 2742 2347 280 255 0 0 0 0 0

TOTAL of WESTERN Region 14 6966 5966 967 867 0 0 0 0 0

MIP>DANG>ON GOINGDANG MIP

KARJAHI SATGAYA KULO 100 DANG PC 2006 YR ID 478 406 0 0 0 0 0 0 0 MIP NO DOI 5 BABAIKHACHAREY KULO 100 DANG PC 2006 YR ID 588 500 588 500 0 0 0 0 0 MIP NO DOI 5 BABAITOTAL of MIP > DANG > ON GOING 2 1066 906 588 500 0 0 0 0 0

TOTAL of DANG District 2 1066 906 588 500 0 0 0 0 0

MIP>BARDIYA>ON GOINGDODHARI TARA TAL 100 BARDIYA PC 2006 YR ID 2941 2500 0 0 0 0 0 0 0 MIP NO DOI 5 BABAI

BARDIYA 0 MIP NO DOI 5 BABAITOTAL of MIP > BARDIYA > ON GOING 1 2941 2500 0 0 0 0 0 0 0

TOTAL of BARDIYA District 1 2941 2500 0 0 0 0 0 0 0

113

Page 119: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of MID- WESTERN > Terai 2 1066 3406 588 500 0 0 0 0 0

MIP>RUKUM>ON GOINGRUKUMKOT 100 RUKUM PC 2006 YR ID 353 300 0 0 0 0 0 0 0 MIP NO DOI 2 KARNALITOTAL of MIP > RUKUM > ON GOING 1 353 300 0 0 0 0 0 0 0

TOTAL of RUKUM District 1 353 300 0 0 0 0 0 0 0

114

Page 120: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

MIP>SALYAN>ON GOINGTHULAJEWLA 100 SALYAN PC 2006 YR ID 94 80 94 80 0 0 0 0 0 MIP NO DOI 5 BABAITOTAL of MIP > SALYAN > ON GOING 1 94 80 94 80 0 0 0 0 0

TOTAL of SALYAN District 1 94 80 94 80 0 0 0 0 0

MIP>SURKHET>REHABILITATIONNAYAGAUN 100 SURKHET PC 2006 YR ID 176 150 176 150 0 0 0 0 0 MIP YES DOI 2 KARNALITOTAL of MIP > SURKHET > REHABILITATION 1 176 150 176 150 0 0 0 0 0

MIP>SURKHET>ON GOINGTANGLYNI 100 SURKHET PC 2006 YR ID 588 500 0 0 0 0 0 0 0 MIP NO DOI 2 KARNALITOTAL of MIP > SURKHET > ON GOING 1 588 500 0 0 0 0 0 0 0

TOTAL of SURKHET District 2 764 650 176 150 0 0 0 0 0

MIP>PYUTHANNAU KULO 100 PYUTHAN PC 2006 YR ID 80 70 80 70 0 0 0 0 0 MIP NO DOI 5 BABAITOTAL of MIP > PYUTHAN > ON GOING 1 80 70 80 70 0 0 0 0 0

TOTAL of PYUTHAN District 1 80 70 80 70 0 0 0 0 0

TOTAL of MID- WESTERN > Hill 4 1291 1100 350 300 0 0 0 0 0

MIP>DOLPA>ON GOINGMAJPHALA 100 DOLPA PC 2006 YR ID 346 294 0 0 0 0 0 0 0 MIP NO DOI 6 WEST RAPTITOTAL of MIP > DOLPA > ON GOING 1 346 294 0 0 0 0 0 0 0

TOTAL of DOLPA District 1 346 294 0 0 0 0 0 0 0

MIP>HUMLATHIHE 100 HUMLA PC 2006 YR ID 176 150 0 0 0 0 0 0 0 MIP NO DOI 2 KARNALITOTAL of MIP > HUMLA > ON GOING 1 176 150 0 0 0 0 0 0 0

TOTAL of HUMLA District 1 176 150 0 0 0 0 0 0 0

MIP>JUMLA>ON GOINGDHUPIJEWLA 100 JUMLA PC 2006 YR ID 47 35 47 35 0 0 0 0 0 MIP NO DOI 2 KARNALITHEHE 100 JUMLA PC 2006 YR ID 110 100 110 100 0 0 0 0 0 MIP NO DOI 5 BABAITOTAL of MIP > JUMLA > ON GOING 1 157 135 157 135 0 0 0 0 0

TOTAL of JUMLA District 1 157 135 157 135 0 0 0 0 0

TOTAL of MID- WESTERN > Mountain 3 679 579 157 135 0 0 0 0 0

115

Page 121: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of MID- WESTERN Region 9 3036 5085 1095 935 0 0 0 0 0

MIP>KAILALI>ON GOINGGHURGHI BADH 100 KAILALI PC 2006 YR ID 706 600 0 0 0 0 0 0 0 MIP NO DOI 2 KARNALITOTAL of MIP > KAILALI > ON GOING 1 706 600 0 0 0 0 0 0 0

TOTAL of KAILALI District 1 706 600 0 0 0 0 0 0 0

116

Page 122: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of FAR - WESTERN > Terai 1 706 600 0 0 0 0 0 0 0

MIP>ACHHAM>ON GOINGSISNEY CHOWREY 100 ACHHAM PC 2006 YR ID 47 40 0 0 0 0 0 0 0 MIP NO DOI 2 KARNALITOTAL of MIP > ACHHAM > ON GOING 1 47 40 0 0 0 0 0 0 0

TOTAL of ACHHAM District 1 47 40 0 0 0 0 0 0 0

MIP>BAITADI>ON GOINGBARDIYA KHOLA 100 BAITADI PC 2006 YR ID 229 195 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAKDHUNGHEY BANDH 100 BAITADI PC 2006 YR ID 353 300 0 0 0 0 0 0 0 MIP NO DOI 8 TINAUKIMUWA KHOLA 100 BAITADI PC 2006 YR ID 171 145 0 0 0 0 0 0 0 MIP NO DOI 2 KARNALIMALPI LILAWATI 100 BAITADI PC 2006 YR ID 353 300 0 0 0 0 0 0 0 MIP NO DOI 4 KOSHIPATAN BAGHADI 100 BAITADI PC 2006 YR ID 100 85 100 85 0 0 0 0 0 MIP NO DOI 1 MAHAKALIRAMCHOKE PHANT 100 BAITADI PC 2006 YR ID 176 150 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAKUKHU 100 BAITADI PC 2006 YR ID 124 105 0 0 0 0 0 0 0 MIP NO DOI 1 MAHAKALITOTAL of MIP > BAITADI > ON GOING 7 1506 1280 100 85 0 0 0 0 0

TOTAL of BAITADI District 7 1506 1280 100 85 0 0 0 0 0

MIP>DADELDHURA>ON GOINGKOIRALA KHOLA 100 DADELDHURA PC 2006 YR ID 118 100 0 0 0 0 0 0 0 MIP NO DOI 1 MAHAKALITOTAL of MIP > DADELDHURA > ON GOING 1 118 100 0 0 0 0 0 0 0

TOTAL of DADELDHURA District 1 118 100 0 0 0 0 0 0 0

TOTAL of FAR - WESTERN > Hill 9 1671 1420 100 85 0 0 0 0 0

MIP>BAJHANG>ON GOING TALKOT DATOLA 100 BAJHANG PC 2006 YR ID 75 64 0 0 0 0 0 0 0 MIP NO DOI 2 KARNALITOTAL of MIP > BAJHANG > ON GOING 1 75 64 0 0 0 0 0 0 0

TOTAL of BAJHANG District 1 75 64 0 0 0 0 0 0 0

MIP>DOTIMATEYLA PRTOLA 100 DOTI PC 2006 YR ID 130 120 130 120 0 0 0 0 0 MIP NO DOI 2 KARNALITOTAL of MIP > DOTI > ON GOING 1 130 120 130 120 0 0 0 0 0

TOTAL of DOTI District 1 130 120 130 120 0 0 0 0 0

MIP>DARCHULAUKU 100 DARCHULA PC 2006 YR ID 115 105 115 105 0 0 0 0 0 MIP NO DOI 2 KARNALIMIP>DARCHULA 1 115 105 115 105 0 0 0 0 0

TOTAL of DARCHULA District 1 115 105 115 105 0 0 0 0 0

117

Page 123: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of FAR - WESTERN > Mountain 2 205 184 130 225 0 0 0 0 0

TOTAL of FAR - WESTERN Region 12 2582 2204 230 310 0 0 0 0 0

TOTAL of MIP 65 20277 19769 4336 4298 0 0 0 0 0

118

Page 124: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

MPLD>ILAM>REHABILITATIONDHUSENI 100 ILAM AC 188 150 188 150 150 0 0 0 0 MPLD NO ILO 11 KANKAISHANTIPUR 100 ILAM AC 88 70 88 70 70 0 0 0 0 MPLD NO ILO 11 KANKAITOTAL of MPLD > ILAM > REHABILITATION 2 276 220 276 220 220 0 0 0 0

TOTAL of ILAM District 2 276 220 276 220 220 0 0 0 0

MPLD>KHOTANG>REHABILITATIONHAUN CHAUR 100 KHOTANG AC 75 60 75 60 60 0 0 0 0 MPLD NO ILO 4 KOSHITOTAL of MPLD > KHOTANG > REHABILITATION 1 75 60 75 60 60 0 0 0 0

TOTAL of KHOTANG District 1 75 60 75 60 60 0 0 0 0

MPLD>OKHALDHUNGA>REHABILITATIONMOLUNG 100 OKHALDHUNGA AC 188 150 188 150 150 0 0 0 0 MPLD NO ILO 4 KOSHITOTAL of MPLD > OKHALDHUNGA > REHABILITATION 1 188 150 188 150 150 0 0 0 0

TOTAL of OKHALDHUNGA District 1 188 150 188 150 150 0 0 0 0

TOTAL of EASTERN > Hill 4 539 430 539 430 430 0 0 0 0

TOTAL of EASTERN Region 4 539 430 539 430 430 0 0 0 0

MPLD>DHADING>REHABILITATIONMARPARK I 100 DHADING AC 50 40 50 40 40 0 0 0 0 MPLD NO ILO 3 GANDAKMARPARK II 100 DHADING AC 75 60 75 60 60 0 0 0 0 MPLD NO ILO 3 GANDAKSATYADEVI 100 DHADING AC 125 100 125 100 100 0 0 0 0 MPLD NO ILO 3 GANDAKTOTAL of MPLD > DHADING > REHABILITATION 3 250 200 250 200 200 0 0 0 0

TOTAL of DHADING District 3 250 200 250 200 200 0 0 0 0

MPLD>RAMECHAP>REHABILITATIONDARKHA 100 RAMECHAP AC 50 40 50 40 40 0 0 0 0 MPLD NO ILO 4 KOSHITOTAL of MPLD > RAMECHAP > REHABILITATION 1 50 0 50 40 40 0 0 0 0

TOTAL of RAMECHAP District 1 50 40 50 40 40 0 0 0 0

TOTAL of CENTRAL > Hill 4 300 240 300 240 240 0 0 0 0

MPLD>SINDHUPALCHOWK>REHABILITATIONJAELE KHOLA 100 SINDHUPALCHOWK AC 25 20 25 20 20 0 0 0 0 MPLD NO ILO 4 KOSHITOTAL of MPLD > SINDHUPALCHOWK > REHABILITATION 1 25 20 25 20 20 0 0 0 0

TOTAL of SINDHUPALCHOWK District 1 25 20 25 20 20 0 0 0 0

TOTAL of CENTRAL > Mountain 1 25 20 25 20 20 0 0 0 0

119

Page 125: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of CENTRAL > Region 5 325 260 325 260 260 0 0 0 0

MPLD>ARGHAKHANCHI>REHABILITATIONSITAPUR 100 ARGHAKHANCHI AC 25 20 25 20 20 0 0 0 0 MPLD NO ILO 6 WEST RAPTIWACLA KHOLA 100 ARGHAKHANCHI AC 75 60 75 60 60 0 0 0 0 MPLD NO ILO 6 WEST RAPTITOTAL of MPLD > ARGHAKHANCHI > REHABILITATION 2 100 80 100 80 80 0 0 0 0

TOTAL of ARGHAKHANCHI District 2 100 80 100 80 80 0 0 0 0

MPLD>GULMI>REHABILITATIONGWALI CHOUR 100 GULMI AC 125 100 125 100 100 0 0 0 0 MPLD NO ILO 3 GANDAKKUMAL TARI 100 GULMI AC 113 90 113 90 90 0 0 0 0 MPLD NO ILO 3 GANDAKTOTAL of MPLD > GULMI > REHABILITATION 2 238 190 238 190 190 0 0 0 0

TOTAL of GULMI District 2 238 190 238 190 190 0 0 0 0

MPLD>KASKI>REHABILITATIONK MAJUWA 100 KASKI AC 75 60 75 60 60 0 0 0 0 MPLD NO ILO 3 GANDAKLAHACHOWK 100 KASKI AC 125 100 125 100 100 0 0 0 0 MPLD NO ILO 3 GANDAKTAKANJA TAR 100 KASKI AC 188 150 188 150 150 0 0 0 0 MPLD NO ILO 3 GAMDAKTOTAL of MPLD > KASKI > REHABILITATION 3 388 310 388 310 310 0 0 0 0

TOTAL of KASKI District 3 388 310 388 310 310 0 0 0 0

MPLD>PALPA>REHABILITATIONBINAPATHE 100 PALPA AC 44 35 44 35 35 0 0 0 0 MPLD NO ILO 3 GANDAKTOTAL of MPLD > PALPA > REHABILITATION 1 44 35 44 35 35 0 0 0 0

TOTAL of PALPA District 1 44 35 44 35 35 0 0 0 0

MPLD>SYANGJA>REHABILITATIONBAGUWAKAR 100 SYANGJA AC MS 75 60 75 60 60 0 0 0 0 MPLD NO ILO 3 GANDAKS PHANT 100 SYANGJA AC 75 60 75 60 60 0 0 0 0 MPLD NO ILO 3 GANDAKTOTAL of MPLD > SYANGJA > REHABILITATION 2 150 120 150 120 120 0 0 0 0

TOTAL of SYANGJA District 2 150 120 150 120 120 0 0 0 0

TOTAL of WESTERN > Hill 10 920 735 920 735 735 0 0 0 0

TOTAL of WESTERN Region 10 920 735 920 735 735 0 0 0 0

MPLD>ACHHAM>REHABILITATIONDIGRENI 100 ACHHAM AC 25 20 25 20 20 0 0 0 0 MPLD NO ILO 2 KARNALIKOGARSOOT 100 ACHHAM AC 19 15 19 15 15 0 0 0 0 MPLD NO ILO 2 KARNALIPOITORANI 100 ACHHAM AC 25 20 25 20 20 0 0 0 0 MPLD NO ILO 2 KARNALI

120

Page 126: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TARSKUNA 100 ACHHAM AC 19 15 19 15 15 0 0 0 0 MPLD NO ILO 2 KARNALITHANTI 100 ACHHAM AC 15 12 15 12 12 0 0 0 0 MPLD NO ILO 2 KARNALITOTAL of MPLD > ACHHAM > REHABILITATION 5 103 82 103 82 82 0 0 0 0

TOTAL of ACHHAM District 5 103 82 103 82 82 0 0 0 0

MPLD>BAITADI>REHABILITATIONDHUNGAD(SAJHA) 100 BAITADI AC 25 20 25 20 20 0 0 0 0 MPLD NO ILO 1 MAHAKALIGURHADI 100 BAITADI AC 50 40 50 40 40 0 0 0 0 MPLD NO ILO 1 MAHAKALIKUMALIGAD SYADI 100 BAITADI AC 100 80 100 80 80 0 0 0 0 MPLD NO ILO 1 MAHAKALILIKHADI 100 BAITADI AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 1 MAHAKALILISKELA 100 BAITADI AC 19 15 19 15 15 0 0 0 0 MPLD NO ILO 1 MAHAKALISURKAL 100 BAITADI AC 50 40 50 40 40 0 0 0 0 MPLD NO ILO 1 MAHAKALITOTAL of MPLD > BAITADI > REHABILITATION 6 257 205 257 205 205 0 0 0 0

TOTAL of BAITADI District 6 257 205 257 205 205 0 0 0 0

MPLD>DADELDHURA>REHABILITATIONANCHOLI 100 DADELDHURA AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 1 MAHAKALI CHAUR 100 DADELDHURA AC 75 60 75 60 60 0 0 0 0 MPLD NO ILO 1 MAHAKALIJORMANA 100 DADELDHURA AC 19 15 19 15 15 0 0 0 0 MPLD NO ILO 1 MAHAKALIKHAJJAR 100 DADELDHURA AC 1 1 1 1 1 0 0 0 0 MPLD NO ILO 1 MAHAKALIKORALI 100 DADELDHURA AC 6 5 6 5 5 0 0 0 0 MPLD NO ILO 1 MAHAKALILETUM 100 DADELDHURA AC 6 5 6 5 5 0 0 0 0 MPLD NO ILO 1 MAHAKALIMELMODA 100 DADELDHURA AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 1 MAHAKALIOKHANI 100 DADELDHURA AC 8 6 8 6 6 0 0 0 0 MPLD NO ILO 1 MAHAKALIRAND GAON 100 DADELDHURA AC 156 125 156 125 125 0 0 0 0 MPLD NO ILO 1 MAHAKALISUNI KHET 100 DADELDHURA AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 1 MAHAKALI TALAI 100 DADELDHURA AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 1 MAHAKALITILETA 100 DADELDHURA AC 25 20 25 20 20 0 0 0 0 MPLD NO ILO 1 MAHAKALIRADIL 100 DADELDHURA AC 188 150 188 150 150 0 0 0 0 MPLD NO ILO 1 MAHAKALITOTAL of MPLD > DADELDHURA > REHABILITATION 13 536 427 536 427 427 0 0 0 0

TOTAL of DADELDHURA District 13 536 427 536 427 427 0 0 0 0

MPLD>DOTI>REHABILITATIONALRKOT 100 DOTI AC 11 9 11 9 9 0 0 0 0 MPLD NO ILO 2 KARNALIAMTODA 100 DOTI AC 23 18 23 18 18 0 0 0 0 MPLD NO ILO 2 KARNALIBOLASAN 100 DOTI AC 3 2 3 2 2 0 0 0 0 MPLD NO ILO 2 KARNALICHADAKOT 100 DOTI AC 25 20 25 20 20 0 0 0 0 MPLD NO ILO 2 KARNALICHANEESEN 100 DOTI AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 2 KARNALIDEULIAM 100 DOTI AC 25 20 25 20 20 0 0 0 0 MPLD NO ILO 2 KARNALIDOGOD 100 DOTI AC 100 80 100 80 80 0 0 0 0 MPLD NO ILO 2 KARNALIHODRANI 100 DOTI AC 31 25 31 25 25 0 0 0 0 MPLD NO ILO 2 KARNALIJAKHOLE KULO 100 DOTI AC 5 4 5 4 4 0 0 0 0 MPLD NO ILO 2 KARNALIKACHADA KULO 100 DOTI AC 23 18 23 18 18 0 0 0 0 MPLD NO ILO 2 KARNALI

121

Page 127: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

KUNDKO 100 DOTI AC 31 25 31 25 25 0 0 0 0 MPLD NO ILO 2 KARNALIMAKGEL 100 DOTI AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 2 KARNALIMALLOAJIT 100 DOTI AC 44 35 44 35 35 0 0 0 0 MPLD NO ILO 2 KARNALIMA TALKHAT 100 DOTI AC 3 2 3 2 2 0 0 0 0 MPLD NO ILO 2 KARNALIMULESALA 100 DOTI AC 3 2 3 2 2 0 0 0 0 MPLD NO ILO 2 KARNALI POKHARI 100 DOTI AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 2 KARNALIROI TARA 100 DOTI AC 50 40 50 40 40 0 0 0 0 MPLD NO ILO 2 KARNALIROWAKHAT 100 DOTI AC 3 2 3 2 2 0 0 0 0 MPLD NO ILO 2 KARNALISALTODA 100 DOTI AC 4 3 4 3 3 0 0 0 0 MPLD NO ILO 2 KARNALISAPORI 100 DOTI AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 2 KARNALISARA 100 DOTI AC 3 2 3 2 2 0 0 0 0 MPLD NO ILO 2 KARNALISERI KULO 100 DOTI AC 50 40 50 40 40 0 0 0 0 MPLD NO ILO 2 KARNALI TALIKHAT 100 DOTI AC 6 5 6 5 5 0 0 0 0 MPLD NO ILO 2 KARNALI TALKOT 100 DOTI AC 63 50 63 50 50 0 0 0 0 MPLD NO ILO 2 KARNALITHADICHOMA 100 DOTI AC 6 5 6 5 5 0 0 0 0 MPLD NO ILO 2 KARNALITHALI 100 DOTI AC 6 5 6 5 5 0 0 0 0 MPLD NO ILO 2 KARNALITULA KHET 100 DOTI AC 6 5 6 5 5 0 0 0 0 MPLD NO ILO 2 KARNALISERA KHET 100 DOTI AC 50 40 50 40 40 0 0 0 0 MPLD NO ILO 2 KARNALITOTAL of MPLD > DOTI > REHABILITATION 28 626 497 626 497 497 0 0 0 0

TOTAL of DOTI District 28 626 497 626 497 497 0 0 0 0

TOTAL of FAR-WESTERN > Hill 52 1522 1211 1522 1211 1211 0 0 0 0

MPLD>BAJHANG>REHABILITATIONBODDI KULO 100 BAJHANG AC 63 50 63 50 50 0 0 0 0 MPLD NO ILO 2 KARNALIBYASI 100 BAJHANG AC 56 45 56 45 45 0 0 0 0 MPLD NO ILO 2 KARNALIDEURA 100 BAJHANG AC 51 41 51 41 41 0 0 0 0 MPLD NO ILO 2 KARNALIECHELI 100 BAJHANG AC 6 5 6 5 5 0 0 0 0 MPLD NO ILO 2 KARNALIMAJ KULO 100 BAJHANG AC 44 35 44 35 35 0 0 0 0 MPLD NO ILO 2 KARNALIMARAILREGAM 100 BAJHANG AC 9 7 9 7 7 0 0 0 0 MPLD NO ILO 2 KARNALIMULKADO DEWAL 100 BAJHANG AC 100 80 100 80 80 0 0 0 0 MPLD NO ILO 2 KARNALIWAD KULO 100 BAJHANG AC 38 30 38 30 30 0 0 0 0 MPLD NO ILO 2 KARNALITOTAL of MPLD > BAJHANG > REHABILITATION 8 367 293 367 293 293 0 0 0 0

TOTAL of BAJHANG District 8 367 293 367 293 293 0 0 0 0

MPLD>BAJURA>REHABILITATIONGANKHEL 100 BAJURA AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 2 KARNALIKAGEBAGAR 100 BAJURA AC 10 8 10 8 8 0 0 0 0 MPLD NO ILO 2 KARNALIPARIJADANGA 100 BAJURA AC 9 7 9 7 7 0 0 0 0 MPLD NO ILO 2 KARNALISERAKHEL 100 BAJURA AC 10 8 10 8 8 0 0 0 0 MPLD NO ILO 2 KARNALISIMSERA 100 BAJURA AC 11 9 11 9 9 0 0 0 0 MPLD NO ILO 2 KARNALITAPRE 100 BAJURA AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 2 KARNALITITRASAN 100 BAJURA AC 8 6 8 6 6 0 0 0 0 MPLD NO ILO 2 KARNALIWARIJAGoNGA 100 BAJURA AC 9 7 9 7 7 7 0 0 0 MPLD NO ILO 2 KARNALI

122

Page 128: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of MPLD > BAJURA > REHABILITATION 8 83 65 83 65 65 7 0 0 0

TOTAL of BAJURA District 8 83 65 83 65 65 7 0 0 0

MPLD>DARCHULA>REHABILITATIONBAJH 100 DARCHULA AC 10 8 10 8 8 0 0 0 0 MPLD NO ILO 1 MAHAKALIBER 100 DARCHULA AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 1 MAHAKALIJHUSKA 100 DARCHULA AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 1 MAHAKALIKHARRA 100 DARCHULA AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 1 MAHAKALIKHIRKOT 100 DARCHULA AC 6 5 6 5 5 0 0 0 0 MPLD NO ILO 1 MAHAKALINAMASKAR 100 DARCHULA AC 6 5 6 5 5 0 0 0 0 MPLD NO ILO 1 MAHAKALITIKRAM 100 DARCHULA AC 9 7 9 7 7 0 0 0 0 MPLD NO ILO 1 MAHAKALIUKU 100 DARCHULA AC 75 60 75 60 60 0 0 0 0 MPLD NO ILO 1 MAHAKALITOTAL of MPLD > DARCHULA > REHABILITATION 8 145 115 145 115 115 0 0 0 0

TOTAL of DARCHULA District 8 145 115 145 115 115 0 0 0 0

TOTAL of FAR-WESTERN > Mountain 24 595 473 595 473 473 7 0 0 0

TOTAL of FAR-WESTERN Region 76 2117 1684 2117 1684 1684 7 0 0 0

TOTAL of MPLD 95 3901 3109 3901 3109 3109 7 0 0 0

N CARE>JHAPA>NEWBAHUNDANGI 100 JHAPA AC 485 388 485 388 388 0 0 0 0 N CARE NO B 12 SIWALIK RIVERTOTAL of N CARE > JHAPA > NEW 1 485 388 485 388 388 0 0 0 0

TOTAL of JHAPA District 1 485 388 485 388 388 0 0 0 0

N CARE>MORANG>NEWLETANG 1 100 MORANG AC 115 92 115 92 92 0 0 0 0 N CARE NO B 12 SIWALIK RIVERSUNERPUR 100 MORANG AC 63 50 63 50 50 0 0 0 0 N CARE NO SAID/ADB 12 SIWALIK RIVERTOTAL of N CARE > MORANG > NEW 2 178 142 178 142 142 0 0 0 0

N CARE>MORANG>REHABILITATIONLETANG II 100 MORANG AC 265 212 265 212 212 0 0 0 0 N CARE NO B 12 SIWALIK RIVERLETANG III 100 MORANG AC 134 107 134 107 107 0 0 0 0 N CARE NO B 12 SIWALIK RIVERSIJUWA 100 MORANG AC 124 99 124 99 99 0 0 0 0 N CARE NO B 12 SIWALIK RIVERTOTAL of N CARE > MORANG > REHABILITATION 3 523 418 523 418 418 0 0 0 0

TOTAL of MORANG District 5 701 560 701 560 560 0 0 0 0

N CARE>SUNSARI>REHABILITATIONPAKLI 100 SUNSARI AC 209 167 209 167 167 0 0 0 0 N CARE NO B 12 SIWALIK RIVERTOTAL of N CARE > SUNSARI > REHABILITATION 1 209 167 209 167 167 0 0 0 0

123

Page 129: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of SUNSARI District 1 209 167 209 167 167 0 0 0 0

TOTAL of EASTERN > Terai 7 1395 1115 1395 1115 1115 0 0 0 0

TOTAL of EASTERN Region 7 1395 1115 1395 1115 1115 0 0 0 0

N CARE>CHITWAN>NEWKUMROJ D/S 100 CHITWAN AC 488 390 488 390 390 0 0 0 0 N CARE NO B 3 GANDAKKUMROJ U/S 100 CHITWAN AC 75 60 75 60 60 0 0 0 0 N CARE NO B 3 GANDAKTOTAL of N CARE > CHITWAN > NEW 2 563 450 563 450 450 0 0 0 0

TOTAL of CHITWAN District 2 563 450 563 450 450 0 0 0 0

N CARE>DHANUSHA>NEWCHAKKAR 100 DHANUSHA AC 312 250 312 250 250 0 0 0 0 N CARE NO B 12 SIWALIK RIVERDHANUSHA DHAM 100 DHANUSHA AC 312 250 312 250 250 0 0 0 0 N CARE NO B 12 SIWALIK RIVERTOTAL of N CARE > DHANUSHA > NEW 2 624 500 624 500 500 0 0 0 0

N CARE>DHANUSHA>REHABILITATIONTULSI 100 DHANUSHA AC 88 70 88 70 70 0 0 0 0 N CARE NO B 12 SIWALIK RIVERTOTAL of N CARE > DHANUSHA > REHABILITATION 1 88 70 88 70 70 0 0 0 0

TOTAL of DHANUSHA District 3 712 570 712 570 570 0 0 0 0

N CARE>MAHOTTARI>NEWKHAYARMARA 100 MAHOTTARI AC 173 138 173 138 138 0 0 0 0 N CARE NO B 12 SIWALIK RIVERTOTAL of N CARE > MAHOTTARI > NEW 1 173 138 173 138 138 0 0 0 0

N CARE>MAHOTTARI>REHABILITATIONDOMAHAV 100 MAHOTTARI AC 1993 ID 206 165 206 165 165 0 0 0 0 N CARE NO CARE 12 SIWALIK RIVERFLOW DIVIDAR 100 MAHOTTARI AC 1990 ID 31 25 31 25 25 0 0 0 0 N CARE NO CARE 12 SIWALIK RIVERGERUKA 100 MAHOTTARI AC 1993 ED 500 400 500 400 400 0 0 0 0 N CARE NO CARE 12 SIWALIK RIVERHATHILET 100 MAHOTTARI AC 1990 ID 125 100 125 100 100 0 0 0 0 N CARE NO CARE 12 SIWALIK RIVERHATIGAUNDA 100 MAHOTTARI AC 1992 ID 91 73 91 73 73 0 0 0 0 N CARE NO CARE 12 SIWALIK RIVERPATHARA MADEPURA-4 100 MAHOTTARI AC 993 ID 356 285 356 285 285 0 0 0 0 N CARE NO CARE 12 SIWALIK RIVERPATHARA SAJA 100 MAHOTTARI AC 1994 ID 250 200 250 200 200 0 0 0 0 N CARE NO CARE 12 SIWALIK RIVERTOTAL of N CARE > MAHOTTARI > REHABILITATION 7 1559 1248 1559 1248 1248 0 0 0 0

TOTAL of MAHOTTARI District 8 1732 1386 1732 1386 1386 0 0 0 0

N CARE>SARLAHI>REHABILITATIONPARWANIPUR 100 SARLAHI AC 500 400 500 400 400 0 0 0 0 N CARE NO B 12 SIWALIK RIVERTOTAL of N CARE > SARLAHI > REHABILITATION 1 500 400 500 400 400 0 0 0 0

TOTAL of SARLAHI District 1 500 400 500 400 400 0 0 0 0

124

Page 130: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of CENTRAL > Terai 14 3507 2806 3507 2806 2806 0 0 0 0

N CARE>KAVRE>NEWBHUMUL TAR 100 KAVRE AC 25 20 25 20 20 0 0 0 0 N CARE NO B 4 KOSHI TARAMARANG 100 KAVRE AC 25 20 25 20 20 0 0 0 0 N CARE NO B 4 KOSHITOTAL of N CARE > KAVRE > NEW 2 50 40 50 40 40 0 0 0 0

N CARE>KAVRE>REHABILITATIONBALTHAL 100 KAVRE AC 25 20 25 20 20 0 0 0 0 N CARE NO B 4 KOSHIKHOPASI II 100 KAVRE AC 45 36 45 36 36 0 0 0 0 N CARE NO B 4 KOSHINAYA GAON 100 KAVRE AC ID 313 250 313 250 313 0 0 0 0 N CARE NO B 4 KOSHITOTAL of N CARE > KAVRE > REHABILITATION 3 383 306 383 306 369 0 0 0 0

TOTAL of KAVRE District 5 433 346 433 346 409 0 0 0 0

N CARE>MAKAWANPUR>NEWJHILKENI 100 MAKAWANPUR AC 30 24 30 24 24 0 0 0 0 N CARE NO B 3 GANDAKTHADE 100 MAKAWANPUR AC 13 10 13 10 10 0 0 0 0 N CARE NO B 3 GANDAKTISTUNG 100 MAKAWANPUR AC 35 28 35 28 28 0 0 0 0 N CARE NO B 3 GANDAKTOTAL of N CARE > MAKAWANPUR > NEW 3 78 62 78 62 62 0 0 0 0

N CARE>MAKAWANPUR>REHABILITATIONBARAY TAR 100 MAKAWANPUR AC 49 39 49 39 39 0 0 0 0 N CARE NO B 3 GANDAKTOTAL of N CARE > MAKAWANPUR > REHABILITATION 1 49 39 49 39 39 0 0 0 0

TOTAL of MAKAWANPUR District 4 127 101 127 101 101 0 0 0 0

N CARE>NUWAKOT>NEW BHORLE 100 NUWAKOT ACD 30 25 30 25 25 0 0 0 0 N CARE NO B 3 GANDAKJILLING 100 NUWAKOT AC 31 25 31 25 25 0 0 0 0 N CARE NO B 3 GANDAKSAMARI 100 NUWAKOT AC 38 30 38 30 30 0 0 0 0 N CARE NO B 3 GANDAKSANO BHORLE 100 NUWAKOT AC 31 25 31 25 25 0 0 0 0 N CARE NO B 3 GANDAKTOTAL of N CARE > NUWAKOT > NEW 4 130 105 130 105 105 0 0 0 0

N CARE>NUWAKOT>REHABILITATION KHOLA Y GAON 100 NUWAKOT AC 138 110 138 110 110 0 0 0 0 N CARE NO B 3 GANDAKLECHYANG 100 NUWAKOT AC 48 36 48 36 36 0 0 0 0 N CARE NO B 3 GANDAKSANDERA DEVI 100 NUWAKOT AC 100 80 100 80 80 0 0 0 0 N CARE NO B 3 GANDAKTOTAL of N CARE > NUWAKOT > REHABILITATION 3 286 226 286 226 226 0 0 0 0

TOTAL of NUWAKOT District 7 416 331 416 331 331 0 0 0 0

TOTAL of CENTRAL > Hill 16 976 778 976 778 841 0 0 0 0

TOTAL of CENTRAL Region 30 4483 3584 4483 3584 3647 0 0 0 0

125

Page 131: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

N CARE>GORKHA>REHABILITATIONPYAUDI 100 GORKHA AC 25 20 25 20 20 0 0 0 0 N CARE NO B 3 GANDAKTAKLUNG 100 GORKHA AC 18 14 18 14 14 0 0 0 0 N CARE NO B 3 GANDAKTHALECHOWK 100 GORKHA AC 1994 ID 75 60 75 60 60 0 0 0 0 N CARE NO CARE 3 GANDAKTOTAL of N CARE > GORKHA > REHABILITATION 3 118 94 118 94 94 0 0 0 0

TOTAL of GORKHA District 3 118 94 118 94 94 0 0 0 0

N CARE>LAMJUNG>NEWSUNDER BAZAR 100 LAMJUNG AC 15 12 15 12 12 0 0 0 0 N CARE NO B 3 GANDAKTOTAL of N CARE > LAMJUNG > NEW 1 15 12 15 12 12 0 0 0 0

TOTAL of LAMJUNG District 1 15 12 15 12 12 0 0 0 0

TOTAL of WESTERN > Hill 4 133 106 133 106 106 0 0 0 0

TOTAL of WESTERN Region 4 133 106 133 106 106 0 0 0 0

TOTAL of N CARE 41 6011 4805 6011 4805 4868 0 0 0 0

NISP>KAPILVASTU>REHABILITATIONKARMA 100 KAPILVASTU PC 1999 YR ID 235 200 235 200 0 0 0 0 0 NISP NO IDA 12 SIWALIK RIVERGHAGHAWA 100 KAPILVASTU PC 1999 YR ID 440 374 440 374 0 0 0 0 0 NISP NO IDA 3 GANDAKKANCHANIYA 100 KAPILVASTU PC 2000 YR ID 341 290 341 290 0 0 0 0 0 NISP NO IDA 12 SIWALIK RIVERPATHERDAIYA 100 KAPILVASTU PC 2002 YR ID 824 700 824 700 0 0 0 0 0 NISP NO IDA 12 SIWALIK RIVERMAHENDRAKOT 100 KAPILVASTU PC 2003 YR ID 506 430 506 430 0 0 0 0 0 NISP NO IDA 12 SIWALIK RIVERTOTAL of NISP > KAPILVASTU > REHABILITATION 5 2346 1994 2346 1994 0 0 0 0 0

TOTAL of KAPILVASTU District 5 2346 1994 2346 1994 0 0 0 0 0

NISP>NAWALPARASI>REHABILITATIONKUSUNDE TAR 100 NAWALPARASI PC 1999 YR ID 165 140 165 140 0 0 0 0 0 NISP NO IDA 3 GANDAKULTI KHOLA 100 NAWALPARASI PC 1999 YR ID 188 160 188 160 0 0 0 0 0 NISP NO IDA 3 GANDAKBHALUHI 100 NAWALPARASI PC 1999 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 3 GANDAKBHUMAHI 100 NAWALPARASI PC 1999 YR ID 294 250 294 250 0 0 0 0 0 NISP NO IDA 3 GANDAKBAGUBAN 100 NAWALPARASI PC 2000 YR ID 106 90 106 90 0 0 0 0 0 NISP NO IDA 3 GANDAKBEL TARI 100 NAWALPARASI PC 2000 YR ID 212 180 212 180 0 0 0 0 0 NISP NO IDA 3 GANDAKRAJAHAR 100 NAWALPARASI PC 2002 YR ID 282 240 282 240 0 0 0 0 0 NISP NO IDA 3 GANDAKJHYALBAS 100 NAWALPARASI PC 2000 YR ID 99 84 99 84 0 0 0 0 0 NISP NO IDA 3 GANDAKJANAMUKHI 100 NAWALPARASI PC 2000 YR ID 306 260 306 260 0 0 0 0 0 NISP NO IDA 3 GANDAKJULPE 100 NAWALPARASI PC 2000 YR ID 424 360 424 360 0 0 0 0 0 NISP NO IDA 3 GANDAKADARASA KULO 100 NAWALPARASI PC 2000 YR ID 494 420 494 420 0 0 0 0 0 NISP NO IDA 3 GANDAK TALLOMUL KULO 100 NAWALPARASI PC 2002 YR ID 62 53 62 53 0 0 0 0 0 NISP NO IDA 3 GANDAKPRAGATINAGAR 100 NAWALPARASI PC 2002 YR ID 388 330 388 330 0 0 0 0 0 NISP NO IDA 3 GANDAKTAMASPUR 100 NAWALPARASI PC 2003 YR ID 114 97 114 97 0 0 0 0 0 NISP NO IDA 3 GANDAKBULING TAR(TO) 100 NAWALPARASI PC 2003 YR ID 329 280 329 280 0 0 0 0 0 NISP YES IDA 3 GANDAK

126

Page 132: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of NISP > NAWALPARASI > REHABILITATION 15 3581 3044 3581 3044 0 0 0 0 0

TOTAL of NAWALPARASI District 15 3581 3044 3581 3044 0 0 0 0 0

NISP>RUPANDEHI>REHABILITATIONGAIDAHAWA 100 RUPANDEHI PC 1998 YR ID 111 94 111 94 0 0 0 0 0 NISP NO IDA 8 TINAUKANCHAN KHOLA 100 RUPANDEHI PC 2000 YR ID 200 170 200 170 0 0 0 0 0 NISP NO IDA 8 TINAULAUSI KHOLA 100 RUPANDEHI PC 2001 YR ID 353 300 353 300 0 0 0 0 0 NISP NO IDA 8 TINAUPURNIYA BANDH 100 RUPANDEHI PC 2002 YR ID 124 105 124 105 0 0 0 0 0 NISP NO IDA 8 TINAUKOTHI 100 RUPANDEHI PC 2002 YR ID 235 200 235 200 0 0 0 0 0 NISP NO IDA 8 TINAUDUMDAMUWA 100 RUPANDEHI PC 2002 YR ID 194 165 194 165 0 0 0 0 0 NISP NO IDA 8 TINAUGHAGHRA 100 RUPANDEHI PC 1999 YR ID 2353 2000 2353 2000 0 0 0 0 0 NISP NO IDA 8 TINAUKHADWA MOTIPUR 100 RUPANDEHI PC 1999 YR ID 1412 1200 1412 1200 0 0 0 0 0 NISP NO IDA 8 TINAUTOTAL of NISP > RUPANDEHI > REHABILITATION 8 4982 4234 4982 4234 0 0 0 0 0

NISP>RUPANDEHI>ON GOINGSIYARI 100 RUPANDEHI PC 2001 YR ID 941 800 0 0 0 0 0 0 0 NISP NO IDA 8 TANAUTOTAL of NISP > RUPANDEHI > ON GOING 1 941 800 0 0 0 0 0 0 0

TOTAL of RUPANDEHI District 9 5923 5034 4982 4234 0 0 0 0 0

TOTAL of WESTERN > Terai 29 11850 10072 10909 9272 0 0 0 0 0

NISP>ARGHAKHANCHI>REHABILITATIONJUMLI KULO 100 ARGHAKHANCHI PC 1999 YR ID 89 76 89 76 0 0 0 0 0 NISP NO IDA 6 WEST RAPTITHULA KHARKA 100 ARGHAKHANCHI PC 1999 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIDURGA KA URLAHARI 100 ARGHAKHANCHI PC 1998 YR ID 66 56 66 56 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIKWADI 100 ARGHAKHANCHI PC 2001 YR ID 40 34 40 34 0 0 0 0 0 NISP NO IDA 6 WEST RAPTICHUWATER 100 ARGHAKHANCHI PC 2003 YR ID 92 78 92 78 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIMAJH KHET 100 ARGHAKHANCHI PC 1998 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIAANP CHAUR 100 ARGHAKHANCHI PC 1998 YR ID 12 10 12 10 0 0 0 0 0 NISP NO IDA 6 WEST RAPTILAMA TARI 100 ARGHAKHANCHI PC 1999 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIRANUWA TARI 100 ARGHAKHANCHI PC 2000 YR ID 33 28 33 28 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIKHAKA BESI 100 ARGHAKHANCHI PC 2000 YR ID 52 44 52 44 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIDANGE GORKHE 100 ARGHAKHANCHI PC 2000 YR ID 20 17 20 17 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIDAMAR BESI 100 ARGHAKHANCHI PC 2001 YR ID 26 22 26 22 0 0 0 0 0 NISP NO IDA 6 WESTRAPTIBIKRAMSOTA 100 ARGHAKHANCHI PC 2001 YR ID 71 60 71 60 0 0 0 0 0 NISP NO IDA 6 WEST RAPTITOTAL of NISP > ARGHAKHANCHI > REHABILITATION 13 584 495 584 495 0 0 0 0 0

TOTAL of ARGHAKHANCHI District 13 584 495 584 495 0 0 0 0 0

NISP>BAGLUNG>REHABILITATIONLASEUNE GAIRI 100 BAGLUNG AC 1999 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 3 GANDAKNARANG KHOLA 100 BAGLUNG PC 2000 YR ID 53 45 53 45 0 0 0 0 0 NISP NO IDA 3 GANDAKCHAMUWA 100 BAGLUNG PC 2001 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 3 GANDAKGHUNDI KHOLA 100 BAGLUNG PC 1999 YR ID 94 80 94 80 0 0 0 0 0 NISP NO IDA 3 GANDAK

127

Page 133: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

KHOLA KHET 100 BAGLUNG PC 2000 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 3 GANDAKBAIRABANSE 100 BAGLUNG PC 2000 YR ID 59 50 59 50 0 0 0 0 0 NISP NO IDA 3 GANDAKKHOLA 100 BAGLUNG PC 2001 YR ID 59 50 59 50 0 0 0 0 0 NISP NO IDA 3 GANDAKHULUWA 100 BAGLUNG PC 2001 YR ID 33 28 33 28 0 0 0 0 0 NISP NO IDA 3 GANDAKNAULA KHET KHA BARI 100 BAGLUNG PC 2003 YR ID 86 73 86 73 0 0 0 0 0 NISP NO IDA 3 GANDAKLOWER SIRSE BAIRANSE 100 BAGLUNG PC 2001 YR ID 68 58 68 58 0 0 0 0 0 NISP NO IDA 3 GANDAKBHIM POKHARA 100 BAGLUNG PC 2002 YR ID 65 55 65 55 0 0 0 0 0 NISP NO IDA 3 GANDAKGHATTER BADHE CHAUR 100 BAGLUNG PC 2003 YR ID 21 18 21 18 0 0 0 0 0 NISP NO IDA 3 GANDAKGADAUNGAD 100 BAGLUNG PC 1999 YR ID 176 150 0 0 0 0 0 NISP NO IDA 2 KARNALITOTAL of NISP > BAGLUNG > REHABILITATION 13 819 697 643 547 0 0 0 0 0

TOTAL of BAGLUNG District 13 819 697 643 547 0 0 0 0 0

NISP>GORKHA>REHABILITATIONBUT TAR 100 GORKHA PC 1999 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 3 GANDAKMANGAL TAR 100 GORKHA PC 2002 YR ID 135 115 135 115 0 0 0 0 0 NISP NO IDA 3 GANDAKBUDHWA PHANT 100 GORKHA PC 2002 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 3 GANDAKMUCHOWK TAR 100 GORKHA PC 1999 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAKPHURBUJE TAR 100 GORKHA PC 2004 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 3 GANDAKBAKRANG BESI 100 GORKHA PC 2004 YR ID 106 90 106 90 0 0 0 0 0 NISP NO IDA 3 GANDAKBOHORA BESI 100 GORKHA PC 2001 YR ID 48 41 48 41 0 0 0 0 0 NISP NO IDA 3 GANDAKKHUDI TAR 100 GORKHA PC 2000 YR ID 31 26 31 26 0 0 0 0 0 NISP NO IDA 3 GANDAKSUBBHAKODEHI SHERAP ANT 100 GORKHA PC 2002 YR ID 74 63 74 63 0 0 0 0 0 NISP NO IDA 3 GANDAKTOTAL of NISP > GORKHA > REHABILITATION 9 641 545 641 545 0 0 0 0 0

TOTAL of GORKHA District 9 641 545 641 545 0 0 0 0 0

NISP>GULMI>REHABILITATIONAANP CHAUR 100 GULMI PC 2001 YR ID 82 70 82 70 0 0 0 0 0 NISP NO IDA 3 GANDAK CHAURASI PHANT 100 GULMI PC 1999 YR ID 106 90 106 90 0 0 0 0 0 NISP NO IDA 3 GANDAKJUHANG 100 GULMI PC 1999 YR ID 36 31 36 31 0 0 0 0 0 NISP NO IDA 3 GANDAK CHAUR PHANT 100 GULMI PC 1999 YR ID 65 55 65 55 0 0 0 0 0 NISP NO IDA 3 GANDAKSHANTIPUR THULO PHANT 100 GULMI PC 1999 YR ID 65 55 65 55 0 0 0 0 0 NISP NO IDA 3 GANDAKKUMAL TARI 100 GULMI PC 2000 YR ID 48 41 48 41 0 0 0 0 0 NISP NO IDA 3 GANDAKMACHHAKOT 100 GULMI PC 2000 YR ID 71 60 71 60 0 0 0 0 0 NISP NO IDA 3 GANDAKAURUNGA PUCHHAR 100 GULMI PC 2000 YR ID 33 28 33 28 0 0 0 0 0 NISP NO IDA 3 GANDAKBAUSEDI 100 GULMI PC 2001 YR ID 32 27 32 27 0 0 0 0 0 NISP NO IDA 3 GANDAKRAGHEWA 100 GULMI PC 2002 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 3 GANDAKARU CHAUR PANAHA 100 GULMI PC 2001 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 3 GANDAKCHECHEMI 100 GULMI PC 2001 YR ID 82 70 82 70 0 0 0 0 0 NISP NO IDA 3 GANDAKBANDIP AANP CHAUR 100 GULMI PC 2003 YR ID 59 50 59 50 0 0 0 0 0 NISP YES IDA 3 GANDAKTOTAL of NISP > GULMI > REHABILITATION 13 727 617 727 617 0 0 0 0 0

TOTAL of GULMI District 13 727 617 727 617 0 0 0 0 0

128

Page 134: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

NISP>KASKI>REHABILITATIONSARDI KHOLA PURAN CHAUR 100 KASKI PC 2001 YR ID 353 300 353 300 0 0 0 0 0 NISP NO IDA 3 GANDAKHYANGIA 100 KASKI PC 2003 YR ID 353 300 353 300 0 0 0 0 0 NISP YES IDA 3 GANDAKSURAUDI KHOLA 100 KASKI PC 1998 YR ID 29 25 29 25 0 0 0 0 0 NISP YES IDA 3 GANDAK CHAURASI KULO 100 KASKI PC 2000 YR ID 181 154 181 154 0 0 0 0 0 NISP NO IDA 3 GANDAKWARDI KHOLA 100 KASKI PC 2000 YR ID 42 36 42 36 0 0 0 0 0 NISP NO IDA 3 GANDAKPUMDI TAR 100 KASKI PC 2002 YR ID 41 35 41 35 0 0 0 0 0 NISP NO IDA 3 GANDAKCHHELANG 100 KASKI PC 1998 YR ID 82 70 82 70 0 0 0 0 0 NISP NO IDA 3 GANDAKSILIBANG 100 KASKI PC 1998 YR ID 141 120 141 120 0 0 0 0 0 NISP NO IDA 3 GANDAKARGHAUN BADAHARE 100 KASKI PC 2000 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 3 GANDAKUPALLOW DABAKI 100 KASKI PC 2001 YR ID 40 34 40 34 0 0 0 0 0 NISP NO IDA 3 GANDAKRAINCHE KHOLA 100 KASKI PC 2003 YR ID 59 50 59 50 0 0 0 0 0 NISP NO IDA 3 GANDAKTOTAL of NISP > KASKI > REHABILITATION 11 1345 1144 1345 1144 0 0 0 0 0

TOTAL of KASKI District 11 1345 1144 1345 1144 0 0 0 0 0

NISP>LAMJUNG>REHABILITATIONDHUWA KHOLA 100 LAMJUNG PC 2001 YR ID 38 32 38 32 0 0 0 0 0 NISP NO IDA 3 GANDAKBATASE 100 LAMJUNG PC 2001 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAKSIMRO KULO 100 LAMJUNG PC 2002 YR ID 32 27 32 27 0 0 0 0 0 NISP NO IDA 3 GANDAKTIN TALE 100 LAMJUNG PC 2003 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 3 GANDAKGUMBA PHANT 100 LAMJUNG PC 2002 YR ID 25 21 25 21 0 0 0 0 0 NISP NO IDA 3 GANDAKRAINAS TAR(PJM) 100 LAMJUNG PC 2001 YR ID 1000 850 1000 850 0 0 0 0 0 NISP PJM IDA 3 GANDAKRANJIT KULO 100 LAMJUNG PC 2000 YR ID 56 48 56 48 0 0 0 0 0 NISP NO IDA 3 GANDAKTINGARE 100 LAMJUNG PC 2000 YR ID 56 48 56 48 0 0 0 0 0 NISP NO IDA 3 GANDAK BARIGAUN 100 LAMJUNG PC 2001 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 3 GANDAKKARAPU TAR 100 LAMJUNG PC 2003 YR ID 135 115 135 115 0 0 0 0 0 NISP NO IDA 3 GANDAKMUNGRE 100 LAMJUNG PC 1998 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAKMAHABIR 100 LAMJUNG PC 1998 YR ID 94 80 94 80 0 0 0 0 0 NISP NO IDA 3 GANDAKSATRASAYA PHANT 100 LAMJUNG PC 2000 YR ID 42 36 42 36 0 0 0 0 0 NISP NO IDA 3 GANDAKMADI BESI 100 LAMJUNG PC 2001 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAKKHIMCHOWK 100 LAMJUNG PC 2000 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 3 GANDAKTOTAL of NISP > LAMJUNG > REHABILITATION 15 1701 1447 1701 1447 0 0 0 0 0

NISP>LAMJUNG>ON GOINGALAINCHE PHANT 100 LAMJUNG PC 1998 YR ID 104 88 0 0 0 0 0 0 0 NISP NO IDA 3 GANDAKTOTAL of NISP > LAMJUNG > ON GOING 1 104 88 0 0 0 0 0 0 0

TOTAL of LAMJUNG District 16 1805 1535 1701 1447 0 0 0 0 0

NISP>MYAGDI>REHABILITATION TARI KHET 100 MYAGDI PC 1998 YR ID 34 29 34 29 0 0 0 0 0 NISP NO IDA 3 GANDAKKASKERI 100 MYAGDI PC 1998 YR ID 12 10 12 10 0 0 0 0 0 NISP NO IDA 3 GANDAK TARA KHET(BABIYA CHAUR) 100 MYAGDI PC 1998 YR ID 14 12 14 12 0 0 0 0 0 NISP NO IDA 3 GANDAKSIMAL CHAUR 100 MYAGDI PC 1998 YR ID 26 22 26 22 0 0 0 0 0 NISP NO IDA 3 GANDAKKOT KHOLA 100 MYAGDI PC 1999 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 3 GANDAK

129

Page 135: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

HILIBANBG 100 MYAGDI PC 2002 YR ID 31 26 31 26 0 0 0 0 0 NISP NO IDA 3 GANDAKBHAKUNDE CHAUR 100 MYAGDI PC 2002 YR ID 49 42 49 42 0 0 0 0 0 NISP NO IDA 3 GANDAKCHAHARI KAMALA 100 MYAGDI PC 2002 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 3 GANDAKLURBANG 100 MYAGDI PC 2002 YR ID 15 13 15 13 0 0 0 0 0 NISP NO IDA 3 GANDAKSOLABANG 100 MYAGDI PC 2002 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 3 GANDAKLAHARI PAHARA 100 MYAGDI PC 2002 YR ID 42 36 42 36 0 0 0 0 0 NISP NO IDA 3 GANDAKTOTAL of NISP > MYAGDI > REHABILITATION 11 435 370 435 370 0 0 0 0 0

TOTAL of MYAGDI District 11 435 370 435 370 0 0 0 0 0

NISP>PALPA>REHABILITATIONCHAHALA PHANT 100 PALPA PC 2004 YR ID 89 76 89 76 0 0 0 0 0 NISP NO IDA 3 GANDAKPASKUNDA 100 PALPA PC 1999 YR ID 33 28 33 28 0 0 0 0 0 NISP NO IDA 3 GANDAKSIMAL TARI 100 PALPA PC 1999 YR ID 18 15 18 15 0 0 0 0 0 NISP NO IDA 3 GANDAKCHANDAN TARI 100 PALPA PC 1999 YR ID 13 11 13 11 0 0 0 0 0 NISP NO IDA 3 GANDAKNIKI CHAUR 100 PALPA PC 2001 YR ID 32 27 32 27 0 0 0 0 0 NISP NO IDA 3 GANDAKSAILI KULO 100 PALPA PC 2000 YR ID 20 17 20 17 0 0 0 0 0 NISP NO IDA 3 GANDAKANGHA KHOLOA 100 PALPA PC 2001 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 3 GANDAKHUNGI PHANT 100 PALPA PC 2002 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAKSIMLE BANDH 100 PALPA PC 2002 YR ID 28 24 28 24 0 0 0 0 0 NISP NO IDA 3 GANDAKRAMPUR PHANT 100 PALPA PC 2003 YR ID 888 755 888 755 0 0 0 0 0 NISP PJM IDA 3 GANDAKTHULO TANDI 100 PALPA PC 2002 YR ID 19 16 19 16 0 0 0 0 0 NISP NO IDA 3 GANDAKRAHABAS 100 PALPA PC 1999 YR ID 94 80 94 80 0 0 0 0 0 NISP NO IDA 3 GANDAKBARDALE 100 PALPA PC 2002 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 3 GANDAKDARPUK 100 PALPA PC 1999 YR ID 94 80 94 80 0 0 0 0 0 NISP NO IDA 3 GANDAKTOTAL of NISP > PALPA > REHABILITATION 14 1505 1279 1505 1279 0 0 0 0 0

TOTAL of PALPA District 14 1505 1279 1505 1279 0 0 0 0 0

NISP>PARBAT>REHABILITATIONARTHAR 100 PARBAT PC 1999 YR ID 14 12 14 12 0 0 0 0 0 NISP NO IDA 3 GANDAKPHARSE 100 PARBAT PC 1999 YR ID 39 33 39 33 0 0 0 0 0 NISP NO IDA 3 GANDAKPATI CHOUR 100 PARBAT PC 1999 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 3 GANDAKDUMRIDOT 100 PARBAT PC 2000 YR ID 18 15 18 15 0 0 0 0 0 NISP NO IDA 3 GANDAKSARANGDI 100 PARBAT PC 2001 YR ID 18 15 18 15 0 0 0 0 0 NISP NO IDA 3 GANDAKSANO BAGAR 100 PARBAT PC 2002 YR ID 33 28 33 28 0 0 0 0 0 NISP NO IDA 3 GANDAKGYANDI(TO) 100 PARBAT PC 2002 YR ID 118 100 118 100 0 0 0 0 0 NISP YES IDA 3 GANDAKAGUWA KHOLA 100 PARBAT PC 1999 YR ID 32 27 32 27 0 0 0 0 0 NISP NO IDA 3 GANDAKRATI KHOLA 100 PARBAT PC 2003 YR ID 141 120 141 120 0 0 0 0 0 NISP NO IDA 3 GANDAKBARDILANG 100 PARBAT PC 2002 YR ID 42 36 42 36 0 0 0 0 0 NISP NO IDA 3 GANDAKBUDHI KHOLA 100 PARBAT PC 2003 YR ID 282 240 282 240 0 0 0 0 0 NISP NO IDA 3 GANDAKTAKLAK TAR 100 PARBAT PC 2003 YR ID 59 50 59 50 0 0 0 0 0 NISP NO IDA 3 GANDAKTOTAL of NISP > PARBAT > REHABILITATION 12 820 696 820 696 0 0 0 0 0

TOTAL of PARBAT District 12 820 696 820 696 0 0 0 0 0

130

Page 136: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

NISP>SYANGJA>REHABILITATIONBHAKIMLE 100 SYANGJA PC 1999 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAKBIRGHA 100 SYANGJA PC 2000 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAKMAJHIMARANG 100 SYANGJA PC 2000 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 3 GANDAKKUL BANDH 100 SYANGJA PC 2000 YR ID 19 16 19 16 0 0 0 0 0 NISP NO IDA 3 GANDAKDHANU BASE 100 SYANGJA PC 2002 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAKPIPAL BANDH 100 SYANGJA PC 2002 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 3 GANDAKUDIYA CHAUR 100 SYANGJA PC 2002 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 3 GANDAKKISSAN ANDHIGHAT 100 SYANGJA PC 2002 YR ID 241 205 241 205 0 0 0 0 0 NISP YES IDA 3 GANDAKCHAPAKOT(PJM) 100 SYANGJA PC 2002 YR ID 1176 1000 1176 1000 0 0 0 0 0 NISP PJM IDA 3 GANDAKJYAGDI BAIRENI 100 SYANGJA PC 1999 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAKGWADI 100 SYANGJA PC 2000 YR ID 32 27 32 27 0 0 0 0 0 NISP NO IDA 3 GANDAKKAULE 100 SYANGJA PC 2002 YR ID 14 12 14 12 0 0 0 0 0 NISP NO IDA 3 GANDAKCHHANGCHHANGDI 100 SYANGJA PC 1999 YR ID 294 250 294 250 0 0 0 0 0 NISP NO IDA 3 GANDAKKUNTIKA 100 SYANGJA PC 1998 YR ID 71 60 71 60 0 0 0 0 0 NISP NO IDA 3 GANDAKPAKAN PHANT 100 SYANGJA PC 1998 YR ID 147 125 147 125 0 0 0 0 0 NISP NO IDA 3 GANDAKSATAUN 100 SYANGJA PC 1998 YR ID 71 60 71 60 0 0 0 0 0 NISP NO IDA 3 GANDAKTOTAL of NISP > SYANGJA > REHABILITATION 16 2287 1945 2287 1945 0 0 0 0 0

TOTAL of SYANGJA District 16 2287 1945 2287 1945 0 0 0 0 0

NISP>TANAHU>REHABILITATIONTHULO KHET 100 TANAHU PC 2000 YR ID 12 10 12 10 0 0 0 0 0 NISP NO IDA 3 GANDAKATTRAULI PUTTAT(TO) 100 TANAHU PC 2003 YR ID 529 450 529 450 0 0 0 0 0 NISP YES IDA 3 GANDAKSANGE PATAYANE 100 TANAHU PC 2004 YR ID 235 200 235 200 0 0 0 0 0 NISP YES IDA 3 GANDAKBARADI 100 TANAHU PC 1999 YR ID 71 60 71 60 0 0 0 0 0 NISP NO IDA 3 GANDAKBARRABOT 100 TANAHU PC 1999 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 3 GANDAKBARHABISE 100 TANAHU PC 2001 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 3 GANDAKSURAUDI GANPATE 100 TANAHU PC 2004 YR ID 294 250 294 250 0 0 0 0 0 NISP NO IDA 3 GANDAKBHANU SERA 100 TANAHU PC 2001 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 3 GANDAKKALIKA TAR 100 TANAHU PC 2001 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 3 GANDAKTOTAL of NISP > TANAHU > REHABILITATION 9 1364 1160 1364 1160 0 0 0 0 0

TOTAL of TANAHU District 9 1364 1160 1364 1160 0 0 0 0 0

TOTAL of WESTERN > Hill 137 12332 10483 12052 10245 0 0 0 0 0

NISP>MANANG>REHABILITATIONBHARAKA 100 MANANG PC 1999 YR ID 19 16 19 16 0 0 0 0 0 NISP NO IDA 3 GANDAKTHANCHOK 100 MANANG PC 2000 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 3 GANDAKNACHE 100 MANANG PC 2001 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAKKHANGSAR 100 MANANG PC 2001 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 3 GANDAKNASO 100 MANANG PC 2000 YR ID 18 15 18 15 0 0 0 0 0 NISP NO IDA 3 GANDAKTOTAL of NISP > MANANG > REHABILITATION 5 143 121 143 121 0 0 0 0 0

TOTAL of MANANG District 5 143 121 143 121 0 0 0 0 0

131

Page 137: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

NISP>MUSTANG>REHABILITATIONNHECHUNG 100 MUSTANG PC 1999 YR ID 13 11 13 11 0 0 0 0 0 NISP NO IDA 3 GANDAKKHAPTE 100 MUSTANG PC 2001 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 3 GANDAKHELKU DHITAP 100 MUSTANG PC 1999 YR ID 33 28 33 28 0 0 0 0 0 NISP NO IDA 3 GANDAKARAKA 100 MUSTANG PC 1999 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 3 GANDAKSAURU 100 MUSTANG PC 2000 YR ID 14 12 14 12 0 0 0 0 0 NISP NO IDA 3 GANDAKTETANG 100 MUSTANG PC 2001 YR ID 27 23 27 23 0 0 0 0 0 NISP NO IDA 3 GANDAKSAMLE 100 MUSTANG PC 2001 YR ID 13 11 13 11 0 0 0 0 0 NISP NO IDA 3 GANDAKSIJA 100 MUSTANG PC 2001 YR ID 13 11 13 11 0 0 0 0 0 NISP NO IDA 3 GANDAKKIMLING 100 MUSTANG PC 2001 YR ID 14 12 14 12 0 0 0 0 0 NISP NO IDA 3 GANDAKDHAKARJUNG 100 MUSTANG PC 2002 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 3 GANDAKPHALYAK 100 MUSTANG PC 2002 YR ID 42 36 42 36 0 0 0 0 0 NISP NO IDA 3 GANDAKSYANG 100 MUSTANG PC 2002 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAKTOTAL of NISP > MUSTANG > REHABILITATION 12 281 239 281 239 0 0 0 0 0

TOTAL of MUSTANG District 12 281 239 281 239 0 0 0 0 0

TOTAL of WESTERN > Mountain 17 424 360 424 360 0 0 0 0 0

TOTAL of WESTERN Region 183 24606 20915 23385 19877 0 0 0 0 0

NISP>BANKE>REHABILITATIONMAIN KHOLA 100 BANKE PC 2002 YR ID 41 35 41 35 0 0 0 0 0 NISP YES IDA 6 WEST RAPTIGHIYA TAL 100 BANKE PC 2002 YR ID 118 100 118 100 0 0 0 0 0 NISP YES IDA 6 WEST RAPTIBANIYABHAR 100 BANKE PC 2002 YR ID 118 100 118 100 0 0 0 0 0 NISP YES IDA 6 WEST RAPTIJHIGARI BANGESAL 100 BANKE PC 1999 YR ID 94 80 94 80 0 0 0 0 0 NISP YES IDA 6 WEST RAPTIBETAHANI 100 BANKE PC 2001 YR ID 176 150 176 150 0 0 0 0 0 NISP YES IDA 6 WEST RAPTITOTAL of NISP > BANKE > REHABILITATION 5 547 465 547 465 0 0 0 0 0

TOTAL of BANKE District 5 547 465 547 465 0 0 0 0 0

NISP>BARDIYA>REHABILITATIONREHU KHOLA 100 BARDIYA PC 2000 YR ID 235 200 235 200 0 0 0 0 0 NISP NO IDA 5 BABAIBARGADA JANTI 1 100 BARDIYA PC 2000 YR ID 508 432 508 432 0 0 0 0 0 NISP NO IDA 5 BABAIBARGADA JAMTI 2 100 BARDIYA PC 2001 YR ID 1186 1008 1186 1008 0 0 0 0 0 NISP NO IDA 5 BABAIBANDH 100 BARDIYA PC 2002 YR ID 271 230 271 230 0 0 0 0 0 NISP NO IDA 5 BABAIDHODHARI TAR TAL 100 BARDIYA PC 2001 YR ID 4500 3825 4500 3825 0 0 0 0 0 NISP NO IDA 5 BABAIKUTHURA LAGANIA 100 BARDIYA PC 1998 YR ID 471 400 471 400 0 0 0 0 0 NISP NO IDA 5 BABAITOTAL of NISP > BARDIYA > REHABILITATION 6 7171 6095 7171 6095 0 0 0 0 0

TOTAL of BARDIYA District 6 7171 6095 7171 6095 0 0 0 0 0

NISP>DANG>REHABILITATIONGAIRAGAUN 100 DANG PC 1999 YR ID 109 93 109 93 0 0 0 0 0 NISP NO IDA 5 BABAIMANUKPUR 100 DANG PC 1999 YR ID 88 75 88 75 0 0 0 0 0 NISP NO IDA 5 BABAI

132

Page 138: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

CHIREGAD 100 DANG PC 2000 YR ID 395 336 395 336 0 0 0 0 0 NISP NO IDA 5 BABAIHAPUR GURGE 100 DANG PC 2000 YR ID 125 106 125 106 0 0 0 0 0 NISP NO IDA 5 BABAILAMKULUWA 100 DANG PC 2001 YR ID 87 74 87 74 0 0 0 0 0 NISP NO IDA 5 BABAISERKATTI 100 DANG PC 2001 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 5 BABAISATGAULE SIR KULO 100 DANG PC 2001 YR ID 618 525 618 525 0 0 0 0 0 NISP NO IDA 5 BABAISALGARI 100 DANG PC 2001 YR ID 235 200 235 200 0 0 0 0 0 NISP NO IDA 5 BABAICHANTI KHOLA 100 DANG PC 2002 YR ID 153 130 153 130 0 0 0 0 0 NISP NO IDA 5 BABAICHAMAI SATGAIYA 100 DANG PC 2002 YR ID 445 378 445 378 0 0 0 0 0 NISP NO IDA 5 BABAIBASTI KHOLA 100 DANG PC 2002 YR ID 371 315 371 315 0 0 0 0 0 NISP NO IDA 5 BABAIBHAISAKURMA 100 DANG PC 2002 YR ID 249 212 249 212 0 0 0 0 0 NISP NO IDA 5 BABAIBAYALE SIM TARA 100 DANG PC 2002 YR ID 264 224 264 224 0 0 0 0 0 NISP NO IDA 5 BABAIARGHARA 100 DANG PC 2002 YR ID 219 186 219 186 0 0 0 0 0 NISP NO IDA 5 BABAIBARAU KHOLA 100 DANG PC 2002 YR ID 121 103 121 103 0 0 0 0 0 NISP NO IDA 5 BABAISIR KULO 100 DANG PC 2002 YR ID 44 37 44 37 0 0 0 0 0 NISP NO IDA 5 BABAIDUNDURE 100 DANG PC 2001 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 5 BABAIMAG KULO 3 100 DANG PC 2001 YR ID 54 46 54 46 0 0 0 0 0 NISP NO IDA 5 BABAIMAH KULO 4 100 DANG PC 2001 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 5 BABAICHUKILO PANI 100 DANG PC 2003 YR ID 36 31 36 31 0 0 0 0 0 NISP NO IDA 5 BABAIBAGAUSHIYA GAU TARIYA 100 DANG PC 2003 YR ID 61 52 61 52 0 0 0 0 0 NISP NO IDA 5 BABAIDANGALI CHHAP KULO 100 DANG PC 2002 YR ID 1021 868 1021 868 0 0 0 0 0 NISP NO IDA 5 BABAITHATI KULO 100 DANG PC 2001 YR ID 31 26 31 26 0 0 0 0 0 NISP NO IDA 5 BABAITOTAL of NISP > DANG > REHABILITATION 23 4997 4247 4997 4247 0 0 0 0 0

TOTAL of DANG District 23 4997 4247 4997 4247 0 0 0 0 0

TOTAL of MID-WESTERN > Terai 34 12715 10807 12715 10807 0 0 0 0 0

NISP>DAILEKH>REHABILITATIONLESTA CHAUR 100 DAILEKH PC 2003 YR ID 82 70 82 70 0 0 0 0 0 NISP NO IDA 2 KARNALIKALE KHOLA 100 DAILEKH PC 2000 YR ID 42 36 42 36 0 0 0 0 0 NISP NO IDA 2 KARNALIBHAWANI 100 DAILEKH PC 2002 YR ID 140 119 140 119 0 0 0 0 0 NISP NO IDA 2 KARNALIALA KHOLA 100 DAILEKH PC 2003 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 2 KARNALITOTAL of NISP > DAILEKH > REHABILITATION 4 299 255 299 255 0 0 0 0 0

NISP>DAILEKH>ON GOINGSIKARIKARA 100 DAILEKH PC 2000 YR ID 102 87 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALITOTAL of NISP > DAILEKH > ON GOING 1 102 87 0 0 0 0 0 0 0

TOTAL of DAILEKH District 5 401 342 299 255 0 0 0 0 0

NISP>JAJARKOT>REHABILITATIONDARIMPATA 100 JAJARKOT PC 2003 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 2 KARNALISANI CHAUR 100 JAJARKOT PC 2001 YR ID 18 15 18 15 0 0 0 0 0 NISP NO IDA 2 KARNALILAMTI KHOLA 100 JAJARKOT PC 2001 YR ID 20 17 20 17 0 0 0 0 0 NISP NO IDA 2 KARNALIKABRI KHET 100 JAJARKOT PC 2001 YR ID 66 56 66 56 0 0 0 0 0 NISP NO IDA 2 KARNALIKANCH TARA 100 JAJARKOT PC 2004 YR ID 16 14 16 14 0 0 0 0 0 NISP NO IDA 2 KARNALI

133

Page 139: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

NALGAD 100 JAJARKOT PC 1998 YR ID 94 80 94 80 0 0 0 0 0 NISP NO IDA 2 KARNALI BANDH KO DAHA 100 JAJARKOT PC 1999 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 2 KARNALISIRPA GAON 100 JAJARKOT PC 1999 YR ID 53 45 53 45 0 0 0 0 0 NISP NO IDA 2 KARNALIUPPER SANGTA 100 JAJARKOT PC 2004 YR ID 56 48 56 48 0 0 0 0 0 NISP NO IDA 2 KARNALITOTAL of NISP > JAJARKOT > REHABILITATION 9 376 320 376 320 0 0 0 0 0

TOTAL of JAJARKOT District 9 376 320 376 320 0 0 0 0 0

NISP>PYUTHAN>REHABILITATIONGHARI KULO THULO KULO 100 PYUTHAN PC 2002 YR ID 65 55 65 55 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIBARWANG 100 PYUTHAN PC 2002 YR ID 76 65 76 65 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIDHARMAWATI 100 PYUTHAN PC 2002 YR ID 86 73 86 73 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIGORKHE KULO 100 PYUTHAN PC 2001 YR ID 107 91 107 91 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIQUADI KULO 100 PYUTHAN PC 2001 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIRANI KULO 100 PYUTHAN PC 2001 YR ID 61 52 61 52 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIHARNA GHAT 100 PYUTHAN PC 2001 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 6 WEST RAPTITOTAL of NISP > PYUTHAN > REHABILITATION 7 548 466 548 466 0 0 0 0 0

NISP>PYUTHAN>ON GOINGLUGRI MADI 100 PYUTHAN PC 1996 YR ID 471 400 0 0 0 0 0 0 0 NISP NO IDA 6 WEST RAPTITOTAL of NISP > PYUTHAN > ON GOING 1 471 400 0 0 0 0 0 0 0

TOTAL of PYUTHAN District 8 1019 866 548 466 0 0 0 0 0

NISP>ROLPA>REHABILITATIONDHANUWA GAJULE 100 ROLPA PC 2000 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIBADA CHAUR 100 ROLPA PC 2000 YR ID 53 45 53 45 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIBHAISA CHHAPE 100 ROLPA PC 2001 YR ID 21 18 21 18 0 0 0 0 0 NISP NO IDA 6 WEST RAPTILARI KHOLA 100 ROLPA PC 2001 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIARESH KHOLA 100 ROLPA PC 2002 YR ID 94 80 94 80 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIOKHRENI SALGHARI 100 ROLPA PC 2002 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIOT 100 ROLPA PC 2001 YR ID 53 45 53 45 0 0 0 0 0 NISP NO IDA 6 WEST RAPTILODH CHOUR 100 ROLPA PC 2003 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 6 WEST RAPTITOTAL of NISP > ROLPA > REHABILITATION 8 362 308 362 308 0 0 0 0 0

TOTAL of ROLPA District 8 362 308 362 308 0 0 0 0 0

NISP>RUKUM>REHABILITATIONMACHAMI 2 100 RUKUM PC 2002 YR ID 238 202 238 202 0 0 0 0 0 NISP NO IDA 2 KARNALIRARIJUILA 100 RUKUM PC 2000 YR ID 71 60 71 60 0 0 0 0 0 NISP NO IDA 2 KARNALIBHERA KHET 100 RUKUM PC 2000 YR ID 53 45 53 45 0 0 0 0 0 NISP NO IDA 2 KARNALIBHERI KHOLA 100 RUKUM PC 2002 YR ID 59 50 59 50 0 0 0 0 0 NISP NO IDA 2 KARNALIMACHHAMI 100 RUKUM PC 1998 YR ID 355 302 355 302 0 0 0 0 0 NISP NO IDA 2 WEST RAPTIATHBISH DANDA 100 RUKUM PC 1999 YR ID 176 150 176 150 0 0 0 0 0 NISP NO IDA 2 KARNALISANI CHAUR 100 RUKUM PC 2004 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 2 KARNALIFUGURA JYUILA 100 RUKUM PC 1998 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 2 KARNALI

134

Page 140: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of NISP > RUKUM > REHABILITATION 8 1117 949 1117 949 0 0 0 0 0

NISP>RUKUM>ON GOINGBHAL KHOLA 100 RUKUM PC 1996 YR ID 82 70 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALIDADURE 100 RUKUM PC 1996 YR ID 94 80 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALITOTAL of NISP > RUKUM > ON GOING 2 176 150 0 0 0 0 0 0 0

TOTAL of RUKUM District 10 1293 1099 1117 949 0 0 0 0 0

NISP>SALYAN>REHABILITATIONRAMPUR 100 SALYAN PC 2000 YR ID 141 120 141 120 0 0 0 0 0 NISP NO IDA 5 BABAIBANSA TARI 100 SALYAN PC 2002 YR ID 79 67 79 67 0 0 0 0 0 NISP NO IDA 5 BABAIKARAGITHI 100 SALYAN PC 2002 YR ID 51 43 51 43 0 0 0 0 0 NISP NO IDA 5 BABAIBHUMKA JIULO 100 SALYAN PC 2004 YR ID 129 110 110 110 0 0 0 0 0 NISP NO IDA 5 BABAIBHANJKANDA 100 SALYAN PC 1998 YR ID 94 80 94 80 0 0 0 0 0 NISP NO IDA 5 BABAIDAMDWALI 100 SALYAN PC 2002 YR ID 188 160 188 160 0 0 0 0 0 NISP NO IDA 5 BABAI PANISERA 100 SALYAN PC 1998 YR ID 38 32 38 32 0 0 0 0 0 NISP NO IDA 5 BABAICHAIBANIYULA 100 SALYAN PC 2001 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 5 BABAIPHALLRBAN 100 SALYAN PC 2001 YR ID 13 11 13 11 0 0 0 0 0 NISP NO IDA 5 BABAIHIM CHAUR 100 SALYAN PC 1999 YR ID 61 52 61 52 0 0 0 0 0 NISP NO IDA 5 BABAITOTAL of NISP > SALYAN > REHABILITATION 10 841 715 822 715 0 0 0 0 0

TOTAL of SALYAN District 10 841 715 822 715 0 0 0 0 0

NISP>SURKHET>REHABILITATIONSAHARE 100 SURKHET PC 2000 YR ID 176 150 176 150 0 0 0 0 0 NISP NO IDA 2 KARNALIKURE KATHEGARI 100 SURKHET PC 1999 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 2 KARNALICHHINCHU 100 SURKHET PC 2000 YR ID 159 135 159 135 0 0 0 0 0 NISP NO IDA 2 KARNALIMAINTADA(exKKBIRD) 100 SURKHET PC 2002 YR ID 280 238 280 238 0 0 0 0 0 NISP NO IDA 2 KARNALISAHARE(exKBIRD) 100 SURKHET PC 2000 YR ID 252 214 252 214 0 0 0 0 0 NISP NO IDA 2 KARNALIGAM KHOLA 100 SURKHET PC 2002 YR ID 201 171 201 171 0 0 0 0 0 NISP NO IDA 2 KARNALINYAWAL KHOLA 100 SURKHET PC 2002 YR ID 141 120 141 120 0 0 0 0 0 NISP NO IDA 2 KARNALIBHASANA BANDH 100 SURKHET PC 2001 YR ID 141 120 141 120 0 0 0 0 0 NISP NO IDA 2 KARNALIMUL PANI BEL KULO 100 SURKHET PC 2002 YR ID 106 90 106 90 0 0 0 0 0 NISP NO IDA 2 KARNALIBHATTEGHARI CHANDRAPUR 100 SURKHET PC 2002 YR ID 42 36 42 36 0 0 0 0 0 NISP NO IDA 2 KARNALINEWARE 100 SURKHET PC 2002 YR ID 49 42 49 42 0 0 0 0 0 NISP NO IDA 2 KARNALILATIDHUNGA KOSHIGHAT 100 SURKHET PC 2002 YR ID 189 161 189 161 0 0 0 0 0 NISP NO IDA 2 KARNALIKOPCHI 100 SURKHET PC 2003 YR ID 176 150 176 150 0 0 0 0 0 NISP NO IDA 2 SURKHETMAHALKUNA 100 SURKHET PC 2002 YR ID 353 300 353 300 0 0 0 0 0 NISP NO IDA 2 KARNALINAREKO TAPPAR 100 SURKHET PC 2002 YR ID 45 38 45 38 0 0 0 0 0 NISP NO IDA 2 KARNALIMASINA PA TARE 100 SURKHET PC 1998 YR ID 53 45 53 45 0 0 0 0 0 NISP NO IDA 2 KARNALITOTAL of NISP > SURKHET > REHABILITATION 16 2398 2040 2398 2040 0 0 0 0 0

TOTAL of SURKHET District 16 2398 2040 2398 2040 0 0 0 0 0

TOTAL of MID-WESTERN > Hill 66 6690 5690 5922 5053 0 0 0 0 0

135

Page 141: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

NISP>DOLPA>REHABILITATIONPIMRI 100 DOLPA PC 2000 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIDAN CHAUR 100 DOLPA PC 2000 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 6 WEST RAPTIKHOR KHOLA 100 DOLPA PC 2000 YR ID 176 150 176 150 0 0 0 0 0 NISP NO IDA 6 WEST RAPTITOTAL of NISP > DOLPA > REHABILITATION 3 252 215 252 215 0 0 0 0 0

NISP>DOLPA>ON GOINGDUNAI VALLEY 100 DOLPA PC 2000 YR ID 29 25 0 0 0 0 0 0 0 NISP NO IDA 6 WESTRAPTITOTAL of NISP > DOLPA > ON GOING 1 29 25 0 0 0 0 0 0 0

TOTAL of DOLPA District 4 281 240 252 215 0 0 0 0 0

NISP>HUMLA>REHABILITATIONLAMLESINIYULA 100 HUMLA PC 2001 YR ID 75 64 75 64 0 0 0 0 0 NISP NO IDA 2 KARNALIPIYUSH LALI 100 HUMLA PC 2002 YR ID 88 75 88 75 0 0 0 0 0 NISP NO IDA 2 KARNALICHHIPRA 100 HUMLA PC 2001 YR ID 53 45 53 45 0 0 0 0 0 NISP NO IDA 2 KARNALICHARPUNATH 100 HUMLA PC 2002 YR ID 165 140 165 140 0 0 0 0 0 NISP NO IDA 2 KARNALIKODIMUL LAMPATE(NISP) 100 HUMLA PC 2001 YR ID 15 13 15 13 0 0 0 0 0 NISP NO IDA 2 KARNALITOTAL of NISP > HUMLA > REHABILITATION 5 396 337 396 337 0 0 0 0 0

TOTAL of HUMLA District 5 396 337 396 337 0 0 0 0 0

NISP>JUMLA>REHABILITATIONDEPALGAUN 100 JUMLA PC 2001 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 2 KARNALIDANSANGU 100 JUMLA PC 2002 YR ID 58 49 58 49 0 0 0 0 0 NISP NO IDA 2 KARNALICHUKENI 100 JUMLA PC 2002 YR ID 106 90 106 90 0 0 0 0 0 NISP NO IDA 2 KARNALITOTAL of NISP > JUMLA > REHABILITATION 3 211 179 211 179 0 0 0 0 0

TOTAL of JUMLA District 3 211 179 211 179 0 0 0 0 0

NISP>KALIKOT>REHABILITATIONSIPKHANA 100 KALIKOT PC 2002 YR ID 188 160 188 160 0 0 0 0 0 NISP NO IDA 2 KARNALIFAGOTI 100 KALIKOT PC 2002 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 2 KARNALITOTAL of NISP > KALIKOT > REHABILITATION 2 223 190 223 190 0 0 0 0 0

NISP>KALIKOT>ON GOINGBALI 100 KALIKOT PC 2003 YR ID 35 30 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALIKUNI 100 KALIKOT PC 2002 YR ID 188 160 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALISUKATIYA 100 KALIKOT PC 2004 YR ID 84 71 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALIBHARTA 100 KALIKOT PC 2001 YR ID 200 170 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALITOTAL of NISP > KALIKOT > ON GOING 4 507 431 0 0 0 0 0 0 0

TOTAL of KALIKOT District 6 730 621 223 190 0 0 0 0 0

136

Page 142: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

NISP>MUGU>REHABILITATIONBHUNE 100 MUGU PC 1999 YR ID 19 16 19 16 0 0 0 0 0 NISP NO IDA 2 KARNALIDASAUNDE TO SAINE PIPAL 100 MUGU PC 2000 YR ID 19 16 19 16 0 0 0 0 0 NISP NO IDA 2 KARNALIMUSEODAR TO SALLEN DADA 100 MUGU PC 2000 YR ID 65 55 65 55 0 0 0 0 0 NISP NO IDA 2 KARNALIKACHCHE 100 MUGU 1998 YR ID 21 18 21 18 0 0 0 0 0 NISP NO IDA 2 KARNALIKAWA 100 MUGU PC 1999 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 2 KARNALITOTAL of NISP > MUGU > REHABILITATION 5 171 145 171 145 0 0 0 0 0

NISP>MUGU>ON GOING TARMA 100 MUGU PC 2001 YR ID 35 30 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALIKOT DADA 100 MUGU PC 2001 YR ID 20 17 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALI TARMA 100 MUGU PC 2001 YR ID 35 30 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALIKOT DADA 100 MUGU PC 2001 YR ID 20 17 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALITOTAL of NISP > MUGU > ON GOING 4 110 94 0 0 0 0 0 0 0

TOTAL of MUGU District 9 281 239 171 145 0 0 0 0 0

TOTAL of MID-WESTERN > Mountain 27 1899 1616 1253 1066 0 0 0 0 0

TOTAL of MID-WESTERN Region 127 21304 18113 19890 16926 0 0 0 0 0

NISP>KAILALI>REHABILITATIONBANBEHARA 100 KAILALI PC 2001 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 2 KARNALIPATRENI 100 KAILALI PC 2000 YR ID 28 24 28 24 0 0 0 0 0 NISP NO IDA 2 KARNALISONAH AJRAILI 100 KAILALI PC 2001 YR ID 212 180 212 180 0 0 0 0 0 NISP NO IDA 2 KARNALIBHURSA 100 KAILALI PC 2002 YR ID 571 485 571 485 0 0 0 0 0 NISP NO IDA 2 KARNALIBIJULIYA BANDHA 100 KAILALI PC 2002 YR ID 112 95 112 95 0 0 0 0 0 NISP NO IDA 2 KARNALIBUDHIYAM 100 KAILALI PC 2002 YR ID 171 145 171 145 0 0 0 0 0 NISP NO IDA 2 KARNALIPRATAPPUR 100 KAILALI PC 1998 YR ID 765 650 765 650 0 0 0 0 0 NISP NO IDA 2 KARNALIRAJBADHUWA 100 KAILALI PC 1999 YR ID 433 368 0 0 0 0 0 NISP NO IDA 2 KARNALITOTAL of NISP > KAILALI > REHABILITATION 8 2339 1987 1906 1619 0 0 0 0 0

TOTAL of KAILALI District 8 2339 1987 1906 1619 0 0 0 0 0

NISP>KANCHANPUR>REHABILITATIONBALUWA NALA 100 KANCHANPUR PC 1999 YR ID 191 162 191 162 0 0 0 0 0 NISP NO IDA 1 MAHAKALIRAUTELA 100 KANCHANPUR PC 1999 YR ID 205 174 205 174 0 0 0 0 0 NISP NO IDA 1 MAHAKALIUPPER JARAHI 100 KANCHANPUR PC 2004 YR ID 176 150 176 150 0 0 0 0 0 NISP NO IDA 1 MAHAKALIBELDANDI 100 KANCHANPUR PC 2000 YR ID 88 75 88 75 0 0 0 0 0 NISP NO IDA 1 MAHAKALICHUNE PANI MUSE PANI 100 KANCHANPUR PC 2002 YR ID 106 90 106 90 0 0 0 0 0 NISP NO IDA 1 MAHAKALIBAIJNATH 100 KANCHANPUR PC 2002 YR ID 68 58 68 58 0 0 0 0 0 NISP NO IDA 1 MAHAKALISIDHANATH 100 KANCHANPUR PC 2002 YR ID 88 75 88 75 0 0 0 0 0 NISP NO IDA 1 MAHAKALIHATHITHALA 100 KANCHANPUR PC 1998 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 1 MAHAKALIJARAHI NALA 100 KANCHANPUR PC 1999 YR ID 176 150 176 150 0 0 0 0 0 NISP NO IDA 1 MAHAKALIKALA PANI 100 KANCHANPUR PC 1998 YR ID 471 400 471 400 0 0 0 0 0 NISP NO IDA 1 MAHAKALIMALERIYA NALA 100 KANCHANPUR PC 1998 YR ID 706 600 706 600 0 0 0 0 0 NISP NO IDA 1 MAHAKALI

137

Page 143: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of NISP > KANCHANPUR > REHABILITATION 11 2393 2034 2393 2034 0 0 0 0 0

TOTAL of KANCHANPUR District 11 2393 2034 2393 2034 0 0 0 0 0

TOTAL of FAR-WESTERN >Terai 19 4732 4021 4299 3653 0 0 0 0 0

NISP>ACHHAM>REHABILITATIONPA TALKOT 100 ACHHAM PC 2000 YR ID 59 50 59 50 0 0 0 0 0 NISP YES IDA 2 KARNALISALPATA 100 ACHHAM PC 1999 YR ID 28 24 28 24 0 0 0 0 0 NISP YES IDA 2 KARNALIBASKATTE 100 ACHHAM PC 2003 YR ID 79 67 79 67 0 0 0 0 0 NISP YES IDA 2 KARNALIBASTIBUDASEN 100 ACHHAM PC 2001 YR ID 29 25 29 25 0 0 0 0 0 NISP YES IDA 2 KARNALICHAYATADA 100 ACHHAM PC 2003 YR ID 124 105 124 105 0 0 0 0 0 NISP YES IDA 2 KARNALISAMTADA 100 ACHHAM PC 2003 YR ID 29 25 29 25 0 0 0 0 0 NISP YES IDA 2 KARNALITASHI GHUNGARKOT 100 ACHHAM PC 2004 YR ID 142 121 142 121 0 0 0 0 0 NISP YES IDA 2 KARNALITAPARWA 100 ACHHAM PC 2003 YR ID 59 50 59 50 0 0 0 0 0 NISP YES IDA 2 KARNALITOTAL of NISP > ACHHAM > REHABILITATION 8 549 467 549 467 0 0 0 0 0

TOTAL of ACHHAM District 8 549 467 549 467 0 0 0 0 0

NISP>BAITADI>REHABILITATIONSALENA 100 BAITADI PC 2001 YR ID 129 110 129 110 0 0 0 0 0 NISP NO IDA 1 MAHAKALIBASULING 100 BAITADI PC 1999 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 1 MAHAKALIGANDA GAON 100 BAITADI PC 1999 YR ID 13 11 13 11 0 0 0 0 0 NISP NO IDA 1 MAHAKALIGANMANAGAD 100 BAITADI PC 2000 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 1 MAHAKALIBATSERA 100 BAITADI PC 2000 YR ID 41 35 41 35 0 0 0 0 0 NISP NO IDA 1 MAHAKALIKALTADI 100 BAITADI PC 1999 YR ID 41 35 41 35 0 0 0 0 0 NISP NO IDA 1 MAHAKALIKALAUN 100 BAITADI PC 1999 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 1 MAHAKALISHIVLING 100 BAITADI PC 1999 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 1 MAHAKALIBARAYAL 100 BAITADI PC 2001 YR ID 59 50 59 50 0 0 0 0 0 NISP NO IDA 1 MAHAKALISHIVLING BAGADIGAD 100 BAITADI PC 2001 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 1 MAHAKALIKAFALKOT 100 BAITADI PC 2001 YR ID 27 23 27 23 0 0 0 0 0 NISP NO IDA 1 MAHAKALICHACHAR KHOLA 100 BAITADI PC 2001 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 1 MAHAKALIMELGHAT 100 BAITADI PC 2001 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 1 MAHAKALLITIKHECHAUDA 100 BAITADI PC 2001 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 1 MAHAKALISOTEGAD 100 BAITADI PC 2002 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 1 MAHAKALIGADTOLA 100 BAITADI PC 2002 YR ID 52 44 52 44 0 0 0 0 0 NISP NO IDA 1 MAHAKALIPA TALI 100 BAITADI PC 2002 YR ID 38 32 38 32 0 0 0 0 0 NISP NO IDA 1 MAHAKALIBHULKATTE 100 BAITADI PC 2002 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 1 MAHAKALIKAILPAL 100 BAITADI PC 2002 YR ID 31 26 31 26 0 0 0 0 0 NISP NO IDA 1 MAHAKALINUWAKOT 100 BAITADI 2001 YR ID 176 150 176 150 0 0 0 0 0 NISP NO IDA 1 MAHAKALIDILESHWORI(TO) 100 BAITADI PC 1998 YR ID 388 330 388 330 0 0 0 0 0 NISP YES IDA 1 MAHAKALITOTAL of NISP > BAITADI > REHABILITATION 21 1287 1096 1287 1096 0 0 0 0 0

TOTAL of BAITADI District 21 1287 1096 1287 1096 0 0 0 0 0

138

Page 144: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

NISP>DADELDHURA>REHABILITATIONUPPER PARI GAON 100 DADELDHURA PC 2003 YR ID 160 136 160 136 0 0 0 0 0 NISP NO IDA 1 MAHAKALISELTADA 100 DADELDHURA PC 2000 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 1 MAHAKALIKATHE BANDHA 100 DADELDHURA PC C2000 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 1 MAHAKALIKURMULLE 100 DADELDHURA PC 2003 YR ID 41 35 41 35 0 0 0 0 0 NISP NO IDA 1 MAHAKALIANCHAL 100 DADELDHURA PC 2003 YR ID 59 50 59 50 0 0 0 0 0 NISP NO IDA 1 MAHAKALIRADIL 100 DADELDHURA PC 2002 YR ID 76 65 76 65 0 0 0 0 0 NISP NO IDA 1 MAHAKALISAKAYAL 100 DADELDHURA PC 2000 YR ID 94 80 94 80 0 0 0 0 0 NISP NO IDA 1 MAHAKALIGALPHAGAD 100 DADELDHURA PC 2002 YR ID 353 300 353 300 0 0 0 0 0 NISP NO IDA 1 MAHAKALISIRSE 100 DADELDHURA PC 2004 YR ID 353 300 353 300 0 0 0 0 0 NISP NO IDA 1 MAHAKALIPANTURA 100 DADELDHURA PC 2003 YR ID 235 200 235 200 0 0 0 0 0 NISP NO IDA 1 MAHAKALITOTAL of NISP > DADELDHURA > REHABILITATION 10 1442 1226 1442 1226 0 0 0 0 0

TOTAL of DADELDHURA District 10 1442 1226 1442 1226 0 0 0 0 0

NISP>DOTI>REHABILITATIONGADSERIGAD 100 DOTI PC 2001 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 2 KARNALIGHOLTADA 100 DOTI PC 2000 YR ID 82 70 82 70 0 0 0 0 0 NISP NO IDA 2 KARNALIKAPHALEKHI SALENIGAD 100 DOTI PC 2000 YR ID 76 65 76 65 0 0 0 0 0 NISP NO IDA 2 KARNALIKARNASI 100 DOTI PC 2000 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 2 KARNALILASKAR 100 DOTI PC 2000 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 2 KARNALIDHANARASH KHET 100 DOTI PC 2003 YR ID 53 45 53 45 0 0 0 0 0 NISP NO IDA 2 KARNALICHIMCHETHALA PANI 100 DOTI PC 2001 YR ID 26 22 26 22 0 0 0 0 0 NISP NO IDA 2 KARNALIDEWAN KULO 100 DOTI PC 2002 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 2 KARNALIRITHA KHET 100 DOTI PC 2003 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 2 KARNALIGANDIGAD 100 DOTI PC 2001 YR ID 176 150 176 150 0 0 0 0 0 NISP NO IDA 2 KARNALIGHODELASH 100 DOTI PC 1998 YR ID 59 50 59 50 0 0 0 0 0 NISP NO IDA 2 DOTIBANDUMRASAIN(TO) 100 DOTI PC 1998 YR ID 182 155 182 155 0 0 0 0 0 NISP YES IDA 2 KARNALIDIPAYAL EAST(TO) 100 DOTI PC 1998 YR ID 65 55 65 55 0 0 0 0 0 NISP YES IDA 2 KARNALIKADAMANDU(TO) 100 DOTI PC 1998 YR ID 165 140 165 140 0 0 0 0 0 NISP YES IDA 2 KARNALILARAMANDU(TO) 100 DOTI PC 1998 YR ID 141 120 141 120 0 0 0 0 0 NISP YES IDA 2 KARNALITOTAL of NISP > DOTI > REHABILITATION 15 1230 1047 1230 1047 0 0 0 0 0

TOTAL of DOTI District 15 1230 1047 1230 1047 0 0 0 0 0

TOTAL of FAR-WESTERN > Hill 54 4508 3836 4508 3836 0 0 0 0 0

NISP>BAJHANG>REHABILITATIONKHUDIWON 100 BAJHANG PC 2001 YR ID 176 150 176 150 0 0 0 0 0 NISP NO IDA 2 KARNALISENSU 100 BAJHANG PC 2000 YR ID 53 45 53 45 0 0 0 0 0 NISP NO IDA 2 KARNALIGALAI 100 BAJHANG PC 2002 YR ID 71 60 71 60 0 0 0 0 0 NISP NO IDA 2 KARNALIAGRA GAON 100 BAJHANG PC 2000 YR ID 59 50 59 50 0 0 0 0 0 NISP NO IDA 2 KARNALIYAPKAFLESWORI 100 BAJHANG PC 1997 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 2 KARNALITOTAL of NISP > BAJHANG > REHABILITATION 5 477 405 477 405 0 0 0 0 0

TOTAL of BAJHANG District 5 477 405 477 405 0 0 0 0 0

139

Page 145: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

NISP>BAJURA>REHABILITATIONBHAM 100 BAJURA PC 2001 YR ID 18 15 18 15 0 0 0 0 0 NISP YES IDA 2 KARNALIJILLY 100 BAJURA PC 2001 YR ID 71 60 71 60 0 0 0 0 0 NISP YES IDA 2 KARNALIBRAHMATOLA 100 BAJURA PC 2001 YR ID 94 80 94 80 0 0 0 0 0 NISP YES IDA 2 KARNALIRUDEE 100 BAJURA PC 2003 YR ID 88 75 88 75 0 0 0 0 0 NISP YES IDA 2 KARNALIJAGRELUTURKE 100 BAJURA PC 2003 YR ID 94 80 94 80 0 0 0 0 0 NISP YES IDA 2 KARNALIBOLDIK 100 BAJURA PC 2004 YR ID 53 45 53 45 0 0 0 0 0 NISP YES IDA 2 KARNALIKAPREE 100 BAJURA PC 2003 YR ID 82 70 82 70 0 0 0 0 0 NISP YES IDA 2 KARNALITOTAL of NISP > BAJURA > REHABILITATION 7 500 425 500 425 0 0 0 0 0

TOTAL of BAJURA District 7 500 425 500 425 0 0 0 0 0

NISP>DARCHULA>REHABILITATIONDEWAL 100 DARCHULA PC 2001 YR ID 301 256 301 256 0 0 0 0 0 NISP YES IDA 1 MAHAKALIKIM TARI 100 DARCHULA PC 2000 YR ID 200 170 200 170 0 0 0 0 0 NISP YES IDA 1 MAHAKALILUITA 100 DARCHULA PC 2003 YR ID 113 96 113 96 0 0 0 0 0 NISP YES IDA 1 MAHAKALINAILA 100 DARCHULA PC 2003 YR ID 96 82 96 82 0 0 0 0 0 NISP YES IDA 1 MAHAKALIHIKILA 100 DARCHULA PC 2003 YR ID 176 150 176 150 0 0 0 0 0 NISP YES IDA 1 MAHAKALINAMASKAR 100 DARCHULA PC 2002 YR ID 49 42 49 42 0 0 0 0 0 NISP YES IDA 1 MAHAKALIJUDE 100 DARCHULA PC 1998 YR ID 242 206 242 206 0 0 0 0 0 NISP YES IDA 1 MAHAKALILALI 100 DARCHULA PC 2001 YR ID 467 379 467 379 0 0 0 0 0 NISP YES IDA 1 MAHAKALISIPTI 100 DARCHULA PC 2002 YR ID 235 200 235 200 0 0 0 0 0 NISP YES IDA 1 MAHAKALITOTAL of NISP > DARCHULA > REHABILITATION 9 1879 1581 1879 1581 0 0 0 0 0

TOTAL of DARCHULA District 9 1879 1581 1879 1581 0 0 0 0 0

TOTAL of FAR-WESTERN > Hill 21 2856 2411 2856 2411 0 0 0 0 0

TOTAL of FAR-WESTERN Region 94 12096 10268 11663 9900 0 0 0 0 0

TOTAL of NISP 404 58006 49296 54938 46703 0 0 0 0 0

PEOPLE>JHAPA>REHABILITATIONADUWA KHOLA BIRATPO 100 JHAPA AC 1250 1000 1250 1000 1000 0 0 0 0 PEOPLE NO GoN 12 SIWALIK RIVERTOTAL of PEOPLE > JHAPA > REHABILITATION 1 1250 1000 1250 1000 1000 0 0 0 0

TOTAL of JHAPA District 1 1250 1000 1250 1000 1000 0 0 0 0

TOTAL of EASTERN > Terai 1 1250 1000 1250 1000 1000 0 0 0 0

PEOPLE>BHOJPUR>REHABILITATIONADUWA KHOLA PAIYAPA 100 BHOJPUR AC 32 25 32 25 25 0 0 0 0 PEOPLE NO GoN 4 KOSHITOTAL of PEOPLE > BHOJPUR > REHABILITATION 1 32 25 32 25 25 0 0 0 0

TOTAL of BHOJPUR District 1 32 25 32 25 25 0 0 0 0

140

Page 146: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of EASTERN > Hill 1 32 25 32 25 25 0 0 0 0

TOTAL of EASTERN > Hill 2 1282 1025 1282 1025 1025 0 0 0 0

PEOPLE>RUPANDEHI>REHABILITATIONBETANI BAND 100 RUPANDEHI AC 250 200 250 200 200 0 0 0 0 PEOPLE NO GoN 8 TINAUMOTIPUR KHADWA 100 RUPANDEHI AC 1750 1400 1750 1400 1400 0 0 0 0 PEOPLE NO GoN 8 TINAUTOTAL of PEOPLE > RUPANDEHI > REHABILITATION 2 2000 1600 2000 1600 1600 0 0 0 0

TOTAL of RUPANDEHI District 2 2000 1600 2000 1600 1600 0 0 0 0

TOTAL of WESTERN > Terai 2 2000 1600 2000 1600 1600 0 0 0 0

PEOPLE>PARBAT>REHABILITATIONDEOPUR KADEWA 100 PARBAT AC 81 65 81 65 65 0 0 0 0 PEOPLE NO GoN 3 GANDAKDHURKOT 100 PARBAT AC 16 13 16 13 13 0 0 0 0 PEOPLE NO GoN 3 GANDAKTOTAL of PEOPLE > PARBAT > REHABILITATION 2 97 78 97 78 78 0 0 0 0

TOTAL of PARBAT District 2 97 78 97 78 78 0 0 0 0

TOTAL of WESTERN > Hill 2 97 78 97 78 78 0 0 0 0

TOTAL of WESTERN > Region 4 2097 1678 2097 1678 1678 0 0 0 0

TOTAL of PEOPLE 6 3379 2703 3379 2703 2703 0 0 0 0

SI>BARDIYA>REHABILITATIONBHAISAHI BANDH GANGAN 100 BARDIYA AC 1995 YR ED 2500 2000 2500 2000 2000 1000 0 0 0 SI NO GoN 5 BABAIRIHU KHOLA BELABA 100 BARDIYA AC 1995 YR ID 75 60 75 60 60 40 0 0 0 SI NO GoN 5 BABAITOTAL of SI > BARDIYA > REHABILITATION 2 2575 2060 2575 2060 2060 1040 0 0 0

TOTAL of BARDIYA District 2 2575 2060 2575 2060 2060 1040 0 0 0

SI>DANG>REHABILITATIONHAPUR GUNJE 100 DANG AC 1995 MS ID 133 106 133 106 106 0 0 0 0 SI NO GoN 5 BABAIKARMATUWA 100 DANG AC 1995 MS ID 75 60 75 60 60 0 0 0 0 SI NO GoN 5 BABAITOTAL of SI > DANG > REHABILITATION 2 208 166 208 166 166 0 0 0 0

TOTAL of DANG District 2 208 166 208 166 166 0 0 0 0

TOTAL of MID-WESTERN > Terai 4 2783 2226 2783 2226 2226 1040 0 0 0

SI>SURKHET>REHABILITATIONGAM KHOLA DASARTHPUR 100 SURKHET AC 1995 YR ID 144 115 144 115 115 60 0 0 0 SI NO GoN 2 KARNALITOTAL of SI > SURKHET > REHABILITATION 1 144 115 144 115 115 60 0 0 0

141

Page 147: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of SURKHET District 1 144 115 144 115 115 60 0 0 0

TOTAL of MID-WESTERN > Hill 1 144 115 144 115 115 60 0 0 0

SI>HUMLA>REHABILITATIONLAMABALU GHUEYA 100 HUMLA AC 1995 YR ID 15 12 15 12 12 5 0 0 0 SI NO GoN 2 KARNALISHREE NAGAR NANDINI 100 HUMLA AC 1995 YR ID 63 50 63 50 50 25 0 0 0 SI NO GoN 2 KARNALITUNICHA CHHATELBADA 100 HUMLA AC 1995 YR ID 88 70 88 70 70 20 0 0 0 SI NO GoN 2 KARNALITOTAL of SI > HUMLA > REHABILITATION 3 166 132 166 132 132 50 0 0 0

TOTAL of HUMLA District 3 166 132 166 132 132 50 0 0 0

SI>JUMLA>REHABILITATIONGUHYA IP CHANDAN NATH 100 JUMLA AC 1995 YR ID 63 50 63 50 50 40 0 0 0 SI NO GoN 2 KARNALITOTAL of SI > JUMLA > REHABILITATION 1 63 50 63 50 50 40 0 0 0

TOTAL of JUMLA District 1 63 50 63 50 50 40 0 0 0

SI>MUGU>REHABILITATIONGHATTE TO GHAT 100 MUGU AC 1995 YR ID 6 5 6 5 5 5 0 0 0 SI NO GoN 2 KARNALITOTAL of SI > MUGU > REHABILITATION 1 6 5 6 5 5 5 0 0 0

TOTAL of MUGU District 1 6 5 6 5 5 5 0 0 0

TOTAL of MID-WESTERN > Mountain 5 235 187 235 187 187 95 0 0 0

TOTAL of MID-WESTERN Region 10 3162 2528 3162 2528 2528 1195 0 0 0

SI>KAILALI>REHABILITATIONRANIJAMARA KULARIYA 100 KAILALI AC 1995 YR ID 50 40 50 40 40 15 0 0 0 SI NO GoN 2 KARNALITOTAL of SI > KAILALI > REHABILITATION 1 50 40 50 40 40 15 0 0 0

TOTAL of KAILALI District 1 50 40 50 40 40 15 0 0 0

TOTAL of FAR-WESTERN > Terai 1 50 40 50 40 40 15 0 0 0

TOTAL of FAR-WESTERN Region 1 50 40 50 40 40 15 0 0 0

TOTAL of SI 11 3212 2568 3212 2568 2568 1210 0 0 0

SINKALAMA>KAVRE>REHABILITATIONBASDOL KHOLA 100 KAVRE AC YR ID 107 85 107 85 85 0 0 0 0 SINKALAMA YES GoN 4 KOSHIDADDHI KHOLA 100 KAVRE AC 95 75 95 75 75 0 0 0 0 SINKALAMA YES ADB 4 KOSHIPUNYAMATI KHOLA 100 KAVRE AC YR ID 50 40 50 40 40 30 0 0 0 SINKALAMA YES GoN 4 KOSHIANDHERI KHOLA SIKHARTA 100 KAVRE AC 1992 YR ID 63 50 63 50 43 26 0 0 0 SINKALAMA YES ADB 4 KOSHI

142

Page 148: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

ANDHERI KHOLA SIMALE 100 KAVRE AC 1991 YR ID 31 25 31 25 25 15 0 0 0 SINKALAMA YES ADB 4 KOSHIBHYAKURE KHOLA 100 KAVRE AC 1993 YR ID 63 50 63 50 50 30 0 0 0 SINKALAMA YES ADB 4 KOSHICHA K KHOLA MAHADEV 100 KAVRE AC 1989 YR ID 94 75 94 75 75 45 0 0 0 SINKALAMA YES ADB 4 KOSHIDANGDUNG KHOLA 100 KAVRE AC 1991 YR ID 94 75 94 75 75 45 0 0 0 SINKALAMA YES ADB 4 KOSHIDUNE KHOLA 100 KAVRE AC 1993 YR ID 63 50 63 50 50 30 0 0 0 SINKALAMA YES ADB 4 KOSHIDHASING KHOLA 100 KAVRE AC 1989 YR ID 13 10 13 10 10 6 0 0 0 SINKALAMA YES ADB 4 KOSHIGHANTE KHOLA 100 KAVRE AC 1993 YR ID 25 20 25 20 20 12 0 0 0 SINKALAMA YES ADB 4 KOSHIGHATTE KHOLA 100 KAVRE AC 1991 YR ID 75 60 75 60 60 36 0 0 0 SINKALAMA YES ADB 4 KOSHIHWARSA KHOLA 100 KAVRE AC 1991 YR ID 31 25 31 25 25 15 0 0 0 SINKALAMA YES ADB 4 KOSHIJAMDAR KHOLA 100 KAVRE AC 1992 YR ID 38 30 38 30 12 7 0 0 0 SINKALAMA YES ADB 4 KOSHIJUKE KHOLA 100 KAVRE AC 1990 YR ID 63 50 63 50 50 30 0 0 0 SINKALAMA YES ADB 4 KOSHIKEKHAPALI KHOLA 100 KAVRE AC 1993 YR ID 50 40 50 40 40 24 0 0 0 SINKALAMA YES ADB 4 KOSHIMAJHI TAR KHOLA 100 KAVRE AC 1991 YR ID 38 30 38 30 30 18 0 0 0 SINKALAMA YES ADB 4 KOSHINARKE KHOLA 100 KAVRE AC 1991 YR ID 38 30 38 30 30 18 0 0 0 SINKALAMA YES ADB 4 KOSHINIGALE KHOLA 100 KAVRE AC 1993 YR ID 63 50 63 50 50 30 0 0 0 SINKALAMA YES ADB 4 KOSHIPIPAL TAR KHOLA 100 KAVRE AC 1989 YR ID 38 30 38 30 30 18 0 0 0 SINKALAMA YES ADB 4 KOSHIRAU KHOLA 100 KAVRE AC 1989 YR ID 35 28 35 28 28 17 0 0 0 SINKALAMA YES ADB 4 KOSHIROSI KHOLA 100 KAVRE AC 1988 YR ID 63 50 63 50 50 30 0 0 0 SINKALAMA YES ADB 4 KOSHI TAR KHOLA 100 KAVRE AC 1991 YR ID 38 30 38 30 30 18 0 0 0 SINKALAMA YES ADB 4 KOSHITHUMKI GHATTE 100 KAVRE AC 1993 YR ID 125 100 125 100 100 60 0 0 0 SINKALAMA YES ADB 4 KOSHITIL CHOUR KHOLA 100 KAVRE AC 1992 YR ID 53 42 53 42 21 13 0 0 0 SINKALAMA YES ADB 4 KOSHITOTAL of SINKALAMA > KAVRE > REHABILITATION 25 1446 1150 1446 1150 1104 573 0 0 0

TOTAL of KAVRE District 25 1446 1150 1446 1150 1104 573 0 0 0

SINKALAMA>LALITPUR>REHABILITATIONHEL TAR 100 LALITPUR AC 1990 YR ID 38 30 38 30 30 18 0 0 0 SINKALAMA YES ADB 9 BAGMATIKURMI KHOLA 100 LALITPUR AC 1990 YR ID 31 25 31 25 25 15 0 0 0 SINKALAMA YES ADB 9 BAGMATITOTAL of SINKALAMA > LALITPUR > REHABILITATION 2 69 55 69 55 55 33 0 0 0

TOTAL of LALITPUR District 2 69 55 69 55 55 33 0 0 0

SINKALAMA>MAKAWANPUR>REHABILITATIONMASINE KHOLA 100 MAKAWANPUR AC YR ID 63 50 63 50 50 25 0 0 0 SINKALAMA YES ADB 3 GANDAKNANDE KHOLA 100 MAKAWANPUR AC YR ID 63 50 63 50 50 25 0 0 0 SINKALAMA YES ADB 3 GANDAKRAPTI KHOLA 100 MAKAWANPUR AC YR ID 157 125 157 125 125 60 0 0 0 SINKALAMA YES ADB 3 GANDAKDUBO KHOLA 100 MAKAWANPUR AC 1990 YR ID 25 20 25 20 20 12 0 0 0 SINKALAMA YES ADB 3 GANDAKGADHAN KHOLA 100 MAKAWANPUR AC 1991 YR ID 31 25 31 25 25 15 0 0 0 SINKALAMA YES ADB 3 GANDAKKHAIITE KHOLA 100 MAKAWANPUR AC 1990 YR ID 125 100 125 100 100 60 0 0 0 SINKALAMA YES ADB 3 GANDAKLOHAJWAR KHOLA 100 MAKAWANPUR AC 1993 YR ID 125 100 125 100 100 60 0 0 0 SINKALAMA YES ADB 3 GANDAKMANAHARI KHOLA 100 MAKAWANPUR AC 1989 YR ID 63 50 63 50 35 21 0 0 0 SINKALAMA YES ADB 3 GANDAKTOTAL of SINKALAMA > MAKAWANPUR > REHABILITATION 8 652 520 652 520 505 278 0 0 0

TOTAL of MAKAWANPUR District 8 652 520 652 520 505 278 0 0 0

TOTAL of CENTRAL > Hill 35 2167 1725 2167 1725 1664 884 0 0 0

143

Page 149: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

SINKALAMA>SINDHUPALCHOWK>REHABILITATIONARCHALA KHOLA 100 SINDHUPALCHOWK AC YR ID 75 60 75 60 60 30 0 0 0 SINKALAMA YES ADB 4 KOSHICHHETRE KHOLA 100 SINDHUPALCHOWK AC YR ID 10 8 10 8 8 0 0 0 0 SINKALAMA YES GoN 4 KOSHIAP KHOLA 100 SINDHUPALCHOWK AC 1991 YR ID 19 15 19 15 15 9 0 0 0 SINKALAMA YES ADB 4 KOSHIBHIM TAR SAGACHOK 100 SINDHUPALCHOWK AC 1989 YR ID 125 100 125 100 100 60 0 0 0 SINKALAMA YES ADB 4 KOSHIBISINDHAV 100 SINDHUPALCHOWK AC 1989 YR ID 100 80 100 80 80 48 0 0 0 SINKALAMA YES ADB 4 KOSHICHHELAPPO KHOLA 100 SINDHUPALCHOWK AC 1992 YR ID 125 100 125 100 88 53 0 0 0 SINKALAMA YES ADB 4 KOSHIDHAD BESII 100 SINDHUPALCHOWK AC 1990 YR ID 63 50 63 50 50 30 0 0 0 SINKALAMA YES ADB 4 KOSHIGANA KHOLA 100 SINDHUPALCHOWK AC 1992 YR ID 75 60 75 60 60 36 0 0 0 SINKALAMA YES ADB 4 KOSHIGOPE KHOLA 100 SINDHUPALCHOWK AC 1993 YR ID 125 100 125 100 70 42 0 0 0 SINKALAMA YES ADB 4 KOSHIJAISI GAON 100 SINDHUPALCHOWK AC 1992 YR ID 88 70 88 70 36 22 0 0 0 SINKALAMA YES ADB 4 KOSHIKARKI TAR 100 SINDHUPALCHOWK AC 1989 YR ID 63 50 63 50 50 30 0 0 0 SINKALAMA YES ADB 4 KOSHIKHAHARE KHOLA 100 SINDHUPALCHOWK AC 1990 YR ID 113 100 113 100 90 54 0 0 0 SINKALAMA YES ADB 4 KOSHIKHALE KHOLA 100 SINDHUPALCHOWK AC 1990 YR ID 44 35 44 35 35 21 0 0 0 SINKALAMA YES ADB 4 KOSHILAPSE KHOLA 100 SINDHUPALCHOWK AC 1992 YR ID 75 60 75 60 48 29 0 0 0 SINKALAMA YES ADB 4 KOSHIMAJHI GAON 100 SINDHUPALCHOWK AC 1989 YR ID 63 50 63 50 50 30 0 0 0 SINKALAMA YES ADB 4 KOSHISINDHU KHOLA 100 SINDHUPALCHOWK AC 1989 YR ID 94 75 94 75 75 45 0 0 0 SINKALAMA YES ADB 4 KOSHISIPA TAR KHOLA 100 SINDHUPALCHOWK AC 1991 YR ID 63 50 63 50 14 10 0 0 0 SINKALAMA YES ADB 4 KOSHISUKDOL KHOLA 100 SINDHUPALCHOWK AC 1993 YR ID 125 100 125 100 70 42 0 0 0 SINKALAMA YES ADB 4 KOSHITHAMORANG KHOLA 100 SINDHUPALCHOWK AC 1989 YR ID 56 45 56 45 45 27 0 0 0 SINKALAMA YES ADB 4 KOSHITHUDO KHOLA 100 SINDHUPALCHOWK AC 1993 YR ID 113 90 113 90 54 32 0 0 0 SINKALAMA YES ADB 4 KOSHITOTAL of SINKALAMA > SINDHUPALCHOWK > REHABILITATION 20 1614 1298 1614 1298 1098 650 0 0 0

TOTAL of SINDHUPALCHOWK District 20 1614 1298 1614 1298 1098 650 0 0 0

TOTAL of CENTRAL > Mountain 20 1614 1298 1614 1298 1098 650 0 0 0

TOTAL of CENTRAL Region 55 3781 3023 3781 3023 2762 1534 0 0 0

TOTAL of SINKALAMA 55 3781 3023 3781 3023 2762 1534 0 0 0

SIP>BHOJPUR>REHABILITATIONKHASYANKHU SING 100 BHOJPUR AC 1989 YR ID 25 20 25 20 20 0 0 0 0 SIP NO GoN 4 KOSHITOTAL of SIP > BHOJPUR > REHABILITATION 1 25 20 25 20 20 0 0 0 0

TOTAL of BHOJPUR District 1 25 20 25 20 20 0 0 0 0

SIP>DHANKUTA>REHABILITATIONTHANKHUWA 100 DHANKUTA AC 1990 MS ID 50 40 50 40 40 0 0 0 0 SIP NO GoN 4 KOSHITOTAL of SIP > DHANKUTA > REHABILITATION 1 50 40 50 40 40 0 0 0 0

TOTAL of DHANKUTA District 1 50 40 50 40 40 0 0 0 0

SIP>KHOTANG>REHABILITATIONKATIKE CHOUR 100 KHOTANG AC 1993 YR ID 38 30 38 30 30 0 0 0 0 SIP NO GoN 4 KOSHI

144

Page 150: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of SIP > KHOTANG > REHABILITATION 1 38 30 38 30 30 0 0 0 0

TOTAL of KHOTANG District 1 38 30 38 30 30 0 0 0 0

TOTAL of EASTERN > Hill 3 113 90 113 90 90 0 0 0 0

TOTAL of EASTERN Region 3 113 90 113 90 90 0 0 0 0

SIP>BARA>REHABILITATIONBAGERINADI 100 BARA AC 1990 MS ED 650 520 650 520 520 0 0 0 0 SIP NO GoN 12 SIWALIK RIVERTOTAL of SIP > BARA > REHABILITATION 1 650 520 650 520 520 0 0 0 0

TOTAL of BARA District 1 650 520 650 520 520 0 0 0 0

SIP>CHITWAN>REHABILITATIONSURTANA 100 CHITWAN AC 1989 YR ID 125 100 125 100 100 50 0 0 0 SIP NO GoN 3 GANDAKTOTAL of SIP > CHITWAN > REHABILITATION 1 125 100 125 100 100 50 0 0 0

TOTAL of CHITWAN District 1 125 100 125 100 100 50 0 0 0

SIP>DHANUSHA>REHABILITATIONGAURADAHA 100 DHANUSHA AC 1989 MS ID 100 80 100 80 80 0 0 0 0 SIP NO GoN 12 SIWALIK RIVERRAMADAIYA 100 DHANUSHA AC 1989 MS ED 91 73 91 73 73 0 0 0 0 SIP NO GoN 12 SIWALIK RIVERTOTAL of SIP > DHANUSHA > REHABILITATION 2 191 153 191 153 153 0 0 0 0

TOTAL of DHANUSHA District 2 191 153 191 153 153 0 0 0 0

SIP>MAHOTTARI>REHABILITATIONATAWA 100 MAHOTTARI AC 1989 MS ID 106 85 106 85 85 0 0 0 0 SIP NO GoN 12 SIWALIK RIVERMAJHAURABISANPUR 100 MAHOTTARI AC 1989 MS ID 100 80 100 80 80 0 0 0 0 SIP NO GoN 12 SIWALIK RIVERTOTAL of SIP > MAHOTTARI > REHABILITATION 2 206 165 206 165 165 0 0 0 0

TOTAL of MAHOTTARI District 2 206 165 206 165 165 0 0 0 0

SIP>RAUTAHAT>REHABILITATIONAGUWA 100 RAUTAHAT AC 1989 MS ID 113 90 113 90 90 0 TF 0 0 SIP NO GoN 12 SIWALIK RIVERAGUWACHANDI 100 RAUTAHAT AC 1990 MS ID 63 50 63 50 8 0 0 0 0 SIP NO GoN 12 SIWALIK RIVERTOTAL of SIP > RAUTAHAT > REHABILITATION 2 176 140 176 140 98 0 0 0 0

TOTAL of RAUTAHAT District 2 176 140 176 140 98 0 0 0 0

SIP>SARLAHI>REHABILITATIONKHOKAMADOL 100 SARLAHI AC 1990 YR ED 125 100 125 100 100 60 0 0 0 SIP NO GoN 12 SIWALIK RIVERPHARAHADAWA 100 SARLAHI AC 1989 YR ID 250 200 250 200 200 20 0 0 0 SIP NO GoN 12 SIWALIK RIVERTOTAL of SIP > SARLAHI > REHABILITATION 2 375 300 375 300 300 80 0 0 0

145

Page 151: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of SARLAHI District 2 375 300 375 300 300 80 0 0 0

TOTAL of CENTRAL > Terai 10 1723 1378 1723 1378 1336 130 0 0 0

SIP>BHAKTAPUR>REHABILITATIONDHUNGRE KHOLA 100 BHAKTAPUR AC 1989 YR ID 29 23 29 23 23 3 2 0 0 SIP NO GoN 9 BAGMATITOTAL of SIP > BHAKTAPUR > REHABILITATION 1 29 23 29 23 23 3 2 0 0

TOTAL of BHAKTAPUR District 1 29 23 29 23 23 3 2 0 0

SIP>DHADING>REHABILITATIONRATOMATEMAGHI 100 DHADING AC 1990 MS ID 35 28 35 28 28 0 0 0 0 SIP NO GoN 3 GANDAKRICHET 100 DHADING AC 1989 YR ID 38 30 38 30 30 8 0 0 0 SIP NO GoN 3 GANDAKSALANG 100 DHADING AC 1989 MS ID 70 56 70 56 56 0 0 0 0 SIP NO GoN 3 GANDAKTOTAL of SIP > DHADING > REHABILITATION 3 143 114 143 114 114 8 0 0 0

TOTAL of DHADING District 3 143 114 143 114 114 8 0 0 0

SIP>MAKAWANPUR>REHABILITATIONPADAMPHOKHARI 100 MAKAWANPUR AC 1990 MS ID 250 200 250 200 200 80 0 0 0 SIP NO GoN 3 GANDAKTOTAL of SIP > MAKAWANPUR > REHABILITATION 1 250 200 250 200 200 80 0 0 0

TOTAL of MAKAWANPUR District 1 250 200 250 200 200 80 0 0 0

SIP>NUWAKOT>REHABILITATIONHATTI KHOLA 100 NUWAKOT AC 1989 MS ID 38 30 38 30 30 0 0 0 0 SIP NO GoN 3 GANDAKKUMARI GAON 100 NUWAKOT AC 1989 YR ID 81 65 81 65 65 40 0 0 0 SIP NO GoN 3 GANDAKPURANA GAON 100 NUWAKOT AC 1989 YR ID 125 100 125 100 100 40 0 0 0 SIP NO GoN 3 GANDAKURLENI 100 NUWAKOT AC 1989 YR ID 125 100 125 100 100 40 0 0 0 SIP NO GoN 3 GANDAKTOTAL of SIP > NUWAKOT > REHABILITATION 4 369 295 369 295 295 120 0 0 0

TOTAL of NUWAKOT District 4 369 295 369 295 295 120 0 0 0

SIP>RAMECHAP>REHABILITATIONBISKUMEE 100 RAMECHAP AC 1989 YR ID 46 37 46 37 37 20 0 0 0 SIP NO GoN 4 KOSHISIMLE KHOLA 100 RAMECHAP AC 1989 YR ID 44 35 44 35 35 12 0 0 0 SIP NO GoN 4 KOSHITHAN CHAUR 100 RAMECHAP AC 1989 YR ID 44 35 44 35 35 16 0 0 0 SIP NO GoN 4 KOSHITOTAL of SIP > RAMECHAP > REHABILITATION 3 134 107 134 107 107 48 0 0 0

TOTAL of RAMECHAP District 3 134 107 134 107 107 48 0 0 0

SIP>SINDHULI>REHABILITATIONTADI 100 SINDHULI AC 1989 YR ED 500 400 500 400 400 40 0 0 0 SIP NO GoN 9 BAGMATITOTAL of SIP > SINDHULI > REHABILITATION 1 500 400 500 400 400 40 0 0 0

TOTAL of SINDHULI District 1 500 400 500 400 400 40 0 0 0

146

Page 152: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of CENTRAL > Hill 13 1425 1139 1425 1139 1139 299 2 0 0

SIP>SINDHUPALCHOWK>REHABILITATIONTHULO KULO 100 SINDHUPALCHOWK AC 1993 YR ID 75 60 75 60 60 24 0 0 0 SIP YES GoN 4 KOSHITOTAL of SIP > SINDHUPALCHOWK > REHABILITATION 1 75 60 75 60 60 24 0 0 0

TOTAL of SINDHUPALCHOWK District 1 75 60 75 60 60 24 0 0 0

TOTAL of CENTRAL > Mountain 1 75 60 75 60 60 24 0 0 0

TOTAL of CENTRAL Region 24 3223 2577 3223 2577 2535 453 2 0 0

SIP>KAPILBASTU>REHABILITATIONGHIGHUWA NALA 100 KAPILBASTU AC 1989 MS ED 80 63 80 63 50 0 0 0 0 SIP NO GoN 12 SIWALIK RIVERGHORAHI MAURAMING 100 KAPILBASTU AC 1989 MS ED 118 94 118 94 75 0 0 0 0 SIP NO GoN 12 SIWALIK RIVERGHORAHIDHANKIULI 100 KAPILBASTU AC 1989 MS ED 56 45 56 45 45 0 0 0 0 SIP NO GoN 12 SIWALIK RIVERTOTAL of SIP > KAPILBASTU > REHABILITATION 3 254 202 254 202 170 0 0 0 0

TOTAL of KAPILBASTU District 3 254 202 254 202 170 0 0 0 0

SIP>NAWALPARASI>REHABILITATIONBHUTAHA KHOLA 100 NAWALPARASI AC 1989 YR ID 251 201 251 201 201 0 0 0 0 SIP NO GoN 3 GANDAKTOTAL of SIP > NAWALPARASI > REHABILITATION 1 251 201 251 201 201 0 0 0 0

TOTAL of NAWALPARASI District 1 251 201 251 201 201 0 0 0 0

SIP>RUPANDEHI>REHABILITATIONMANDRNI KHOLA 100 RUPANDEHI AC 1989 MS ID 125 100 125 100 100 0 0 0 0 SIP NO GoN 8 TINAUTINAU KHOLA 100 RUPANDEHI AC 1989 YR ID 43 34 43 34 34 25 0 0 0 SIP NO GoN 8 TINAUTOTAL of SIP > RUPANDEHI > REHABILITATION 2 168 134 168 134 134 25 0 0 0

TOTAL of RUPANDEHI District 2 168 134 168 134 134 25 0 0 0

TOTAL of WESTERN > Terai 6 673 537 673 537 505 25 0 0 0

SIP>BAGLUNG>REHABILITATIONANDHARI KHOLA 100 BAGLUNG AC 1989 YR ID 50 40 50 40 40 0 0 0 0 SIP NO GoN 3 GANDAKLOHA LHOLA 100 BAGLUNG AC 1989 YR ID 19 15 19 15 15 8 0 0 0 SIP NO GoN 3 GANDAKTOTAL of SIP > BAGLUNG > REHABILITATION 2 69 55 69 55 55 8 0 0 0

TOTAL of BAGLUNG District 2 69 55 69 55 55 8 0 0 0

SIP>GULMI>REHABILITATIONBARDI KHOLA 100 GULMI AC 1989 YR ID 188 150 188 150 150 60 0 0 0 SIP NO GoN 3 GANDAKMULKI 100 GULMI AC 1989 YR ID 19 50 19 50 50 0 0 0 0 SIP NO GoN 3 GANDAK

147

Page 153: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of SIP > GULMI > REHABILITATION 2 207 200 207 200 200 60 0 0 0

TOTAL of GULMI District 2 207 200 207 200 200 60 0 0 0

SIP>PALPA>REHABILITATIONGODEBAS 100 PALPA AC 1989 MS ID 15 12 15 12 12 0 0 0 0 SIP NO GoN 3 GANDAKKUNHAR KHOLA 100 PALPA AC 1989 YR ID 38 30 38 30 30 15 0 0 0 SIP NO GoN 3 GANDAKNIMTUNG KULO 100 PALPA AC 1989 YR ID 19 15 19 15 15 0 0 0 0 SIP NO GoN 3 GANDAKSINU KULO 100 PALPA AC 1989 YR ID 19 15 19 15 15 10 0 0 0 SIP NO GoN 3 GANDAKTHULO KULO 100 PALPA AC 1989 YR ID 19 15 19 15 15 10 0 0 0 SIP NO GoN 3 GANDAKTOTAL of SIP > PALPA > REHABILITATION 5 110 87 110 87 87 35 0 0 0

TOTAL of PALPA District 5 110 87 110 87 87 35 0 0 0

SIP>PARBAT>REHABILITATIONDHAPA KHOLA 100 PARBAT AC 1989 YR ID 188 150 188 150 150 60 0 0 0 SIP NO GoN 3 GANDAKTOTAL of SIP > PARBAT > REHABILITATION 1 188 150 188 150 150 60 0 0 0

TOTAL of PARBAT District 1 188 150 188 150 150 60 0 0 0

TOTAL of WESTERN > Hill 10 574 492 574 492 492 163 0 0 0

TOTAL of WESTERN Region 16 1247 1029 1247 1029 997 188 0 0 0

SIP>JAJARKOT>REHABILITATIONBADABHUWA 100 JAJARKOT AC 1989 YR ID 12 10 12 10 10 8 0 0 0 SIP NO GoN 2 KARNALIBURASE KHOLA 100 JAJARKOT AC 1989 YR ID 13 10 13 10 10 10 0 0 0 SIP NO GoN 2 KARNALIGAM KHOLA 100 JAJARKOT AC 1989 YR ID 107 85 107 85 85 25 0 0 0 SIP NO GoN 2 KARNALINAULI KHET 100 JAJARKOT AC 1989 YR ID 13 10 13 10 10 8 0 0 0 SIP NO GoN 2 KARNALINIBUWACHAPHAR 100 JAJARKOT AC 1989 YR ID 38 30 38 30 30 50 0 0 0 SIP NO GoN 2 KARNALITOTAL of SIP > JAJARKOT > REHABILITATION 5 183 145 183 145 145 101 0 0 0

TOTAL of JAJARKOT District 5 183 145 183 145 145 101 0 0 0

SIP>ROLPA>REHABILITATIONCHHAPNATA 100 ROLPA AC 1989 YR ID 19 15 19 15 15 5 0 0 0 SIP NO GoN 6 WEST RAPTIDHABANG 100 ROLPA AC 1989 YR ID 41 33 41 33 33 24 0 0 0 SIP NO GoN 6 WEST RAPTISERABANG 100 ROLPA AC 1989 YR ID 44 33 44 33 33 33 0 0 0 SIP NO GoN 6 WEST RAPTITOTAL of SIP > ROLPA > REHABILITATION 3 104 81 104 81 81 62 0 0 0

TOTAL of ROLPA District 3 104 81 104 81 81 62 0 0 0

SIP>RUKUM>REHABILITATIONATHABISA DADA 100 RUKUM AC 1989 YR ID 15 12 15 12 12 0 0 0 0 SIP NO GoN 2 KARNALIDAUDE DADA 100 RUKUM AC 1989 YR ID 25 20 25 20 20 0 0 0 0 SIP NO GoN 2 KARNALIKHARABANG 100 RUKUM AC 1989 YR ID 25 20 25 20 20 0 0 0 0 SIP NO GoN 2 KARNALI

148

Page 154: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

PHALATHE KHOLA 100 RUKUM AC 1989 YR ID 38 30 38 30 30 10 0 0 0 SIP NO GoN 2 KARNALISOBHA 100 RUKUM AC 1989 YR ID 16 13 16 13 13 20 0 0 0 SIP NO GoN 2 KARNALI TARAGAD 100 RUKUM AC 1989 YR ID 32 25 32 25 25 25 0 0 0 SIP NO GoN 2 KARNALITOTAL of SIP > RUKUM > REHABILITATION 6 151 120 151 120 120 55 0 0 0

TOTAL of RUKUM District 6 151 120 151 120 120 55 0 0 0

SIP>SALYAN>REHABILITATIONJIMALI 100 SALYAN AC 1990 ID 50 40 50 40 40 0 0 0 0 SIP NO GoN 5 BABAITOTAL of SIP > SALYAN > REHABILITATION 1 50 40 50 40 40 0 0 0 0

TOTAL of SALYAN District 1 50 40 50 40 40 0 0 0 0

SIP>SURKHET>REHABILITATIONRAMGHAT 100 SURKHET AC 1989 YR ID 56 45 56 45 45 0 0 0 0 SIP NO GoN 2 KARNALITOTAL of SIP > SURKHET > REHABILITATION 1 56 45 56 45 45 0 0 0 0

TOTAL of SURKHET District 1 56 45 56 45 45 0 0 0 0

16 544 431 544 431 431 218 0 0 0

SIP>JUMLA>REHABILITATIONKHA DANDABADA 100 JUMLA AC 1989 YR ID 6 4 6 4 4 2 0 0 0 SIP NO GoN 2 KARNALISUNDARGAI 100 JUMLA AC 1989 YR ID 7 5 7 5 5 5 0 0 0 SIP NO GoN 2 KARNALITHINKE 100 JUMLA AC 1989 YR ID 7 5 7 5 5 5 0 0 0 SIP NO GoN 2 KARNALITOTAL of SIP > JUMLA > REHABILITATION 3 20 14 20 14 14 12 0 0 0

TOTAL of JUMLA District 3 20 14 20 14 14 12 0 0 0

TOTAL of MID-WESTERN > Mountain 3 20 14 20 14 14 12 0 0 0

TOTAL of MID-WESTERN Region 19 564 445 564 445 445 230 0 0 0

SIP>KAILALI>REHABILITATIONJAIJALI 100 KAILALI AC 1992 YR ED 375 300 375 300 300 100 0 0 0 SIP NO GoN 2 KARNALIJARAHI 100 KAILALI AC 1992 YR ID 282 225 282 225 225 100 0 0 0 SIP NO GoN 2 KARNALITOTAL of SIP > KAILALI > REHABILITATION 2 657 525 657 525 525 200 0 0 0

TOTAL of KAILALI District 2 657 525 657 525 525 200 0 0 0

SIP>KANCHANPUR>REHABILITATIONMALERIYA NALA 100 KANCHANPUR AC 1992 YR ED 406 325 406 325 325 200 0 0 0 SIP NO GoN 1 MAHAKALITOTAL of SIP > KANCHANPUR > REHABILITATION 1 406 325 406 325 325 200 0 0 0

TOTAL of KANCHANPUR District 1 406 325 406 325 325 200 0 0 0

149

Page 155: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of FAR-WESTERN > Terai 3 1063 850 1063 850 850 400 0 0 0

SIP>ACHHAM>REHABILITATIONMAGESHWOR 100 ACHHAM AC 1989 YR ID 63 50 63 50 50 25 0 0 0 SIP NO GoN 2 KARNALITOTAL of SIP > ACHHAM > REHABILITATION 1 63 50 63 50 50 25 0 0 0

TOTAL of ACHHAM District 1 63 50 63 50 50 25 0 0 0

SIP>DADELDHURA>REHABILITATIONUGRA TARA 100 DADELDHURA AC 1992 YR ID 569 455 569 455 455 144 100 0 0 SIP NO GoN 1 MAHAKALITOTAL of SIP > DADELDHURA > REHABILITATION 1 569 455 569 455 455 144 100 0 0

TOTAL of DADELDHURA District 1 569 455 569 455 455 144 100 0 0

TOTAL of FAR-WESTERN > Hill 2 632 505 632 505 505 169 100 0 0

TOTAL of FAR-WESTERN Region 5 1695 1355 1695 1355 1355 569 100 0 0

TOTAL of SIP 67 6842 5496 6842 5496 5422 1440 102 0 0

SISP>JHAPA>NEWLOWER LELIYA KHOLA 100 JHAPA PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERGHAGRA KHOLA 100 JHAPA PC 1997 YR ID 294 250 294 250 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERRATUWA KHOLA 100 JHAPA PC 1997 YR ID 282 240 282 240 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERGAURIYA KHOLA 100 JHAPA PC 1997 YR ID 471 400 471 400 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERLOWER KISNI 100 JHAPA PC 2000 YR ID 1765 1500 0 0 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERTOTAL of SISP > JHAPA > NEW 5 3047 2590 1282 1090 0 0 0 0 0

SISP>JHAPA>REHABILITATIONUPPER LELIYA KHOLA 100 JHAPA PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERTOPGACHHI DHYANG 100 JHAPA PC 1997 YR ID 353 300 353 300 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERSINGHA BAHINI 100 JHAPA PC 1997 YR ID 88 75 88 75 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERTOTAL of SISP > JHAPA > REHABILITATION 3 676 575 676 575 0 0 0 0 0

TOTAL of JHAPA District 8 3723 3165 1958 1665 0 0 0 0 0

SISP>MORANG>NEWKESHALIYA 100 MORANG PC 1997 YR ID 212 180 212 180 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERTOTAL of SISP > MORANG > NEW 1 212 180 212 180 0 0 0 0 0

SISP>MORANG>REHABILITATIONDAHI SAMUDAYIK 100 MORANG PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERKISTI 100 MORANG PC 1997 YR ID 374 318 374 318 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERMARCHNIYA KHOLA 100 MORANG PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERJANTA BANDH 100 MORANG PC 1997 YR ID 353 300 353 300 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERBETAUNA 100 MORANG PC 1997 YR ID 259 220 259 220 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER

150

Page 156: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

JANAKALYAN 100 MORANG PC 1997 YR ID 287 244 287 244 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERRATE HOLY 100 MORANG PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERBHULKE MUHAN 100 MORANG PC 1997 YR ID 866 736 866 736 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERGAIL PAINI 100 MORANG PC 1997 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERALTAI 100 MORANG PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERKOCHENI KHOLA 100 MORANG PC 1997 YR ID 353 300 353 300 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERKAMAL JHODA 100 MORANG PC 1997 YR ID 271 230 271 230 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERHASINA 100 MORANG PC 1997 YR ID 353 300 353 300 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERTOTAL of SISP > MORANG > REHABILITATION 13 4056 3448 4056 3448 0 0 0 0 0

TOTAL of MORANG District 14 4268 3628 4268 3628 0 0 0 0 0

SISP>SAPTARI>NEWSURUNGADHAR 100 SAPTARI PC 1997 YR ID 247 210 247 210 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERTOTAL of SISP > SAPTARI > NEW 1 247 210 247 210 0 0 0 0 0

SISP>SAPTARI>REHABILITATIONDUDHAILA 100 SAPTARI PC 1997 YR ID 353 300 353 300 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERPAUDA 100 SAPTARI PC 1997 YR ID 182 155 182 155 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERTOTAL of SISP > SAPTARI > REHABILITATION 2 535 455 535 455 0 0 0 0 0

TOTAL of SAPTARI District 3 782 665 782 665 0 0 0 0 0

SISP>SIRAHA>NEWSAHAJA 100 SIRAHA PC 1997 YR ID 874 743 874 743 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERBABURAM 100 SIRAHA PC 1997 YR ID 165 140 165 140 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERTOTAL of SISP > SIRAHA > NEW 2 1039 883 1039 883 0 0 0 0 0

SISP>SIRAHA>REHABILITATIONJHIRHARI 100 SIRAHA PC 1997 YR ID 652 554 652 554 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERTOTAL of SISP > SIRAHA > REHABILITATION 1 652 554 652 554 0 0 0 0 0

TOTAL of SIRAHA District 3 1691 1437 1691 1437 0 0 0 0 0

SISP>SUNSARI>REHABILITATIONTENGRA KHOLA 100 SUNSARI PC 1997 YR ID 313 266 313 266 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERSERA SEUTI 100 SUNSARI PC 1997 YR ID 471 400 471 400 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERBIRENDRA 100 SUNSARI PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERDATTAKICHHA KHOLA 100 SUNSARI PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERKAJRA KHOLA 100 SUNSARI PC 1997 YR ID 300 255 300 255 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERSUNSARI KHOLA 100 SUNSARI PC 1997 YR ID 412 350 412 350 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERSUKUMARI 100 SUNSARI PC 1997 YR ID 200 170 200 170 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERBAJRAHA KHETI 100 SUNSARI PC 1997 YR ID 294 250 294 250 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERTOTAL of SISP > SUNSARI > REHABILITATION 8 2460 2091 2460 2091 0 0 0 0 0

TOTAL of SUNSARI District 8 2460 2091 2460 2091 0 0 0 0 0

151

Page 157: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of EASTERN > Terai 36 12924 10986 11159 9486 0 0 0 0 0

SISP>BHOJPUR>NEWKRISHI BARSA KULO 100 BHOJPUR PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 4 KOSHIHINKHUWA KHOLA 100 BHOJPUR PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 4 KOSHIBALUWA BESE 100 BHOJPUR PC 1997 YR ID 118 100 0 0 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > BHOJPUR > NEW 3 529 450 411 350 0 0 0 0 0

SISP>BHOJPUR>REHABILITATIONMARSE KULO 100 BHOJPUR PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 4 KOSHIANKHUWA KHOLA 100 BHOJPUR PC 1997 YR ID 19 16 19 16 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > BHOJPUR > REHABILITATION 2 254 216 254 216 0 0 0 0 0

TOTAL of BHOJPUR District 5 783 666 665 566 0 0 0 0 0

SISP>DHANKUTA>NEWSAFAI TAR 100 DHANKUTA PC 1997 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 4 KOSHIPAREWADIN 100 DHANKUTA PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 4 KOSHIMANGMAYA 100 DHANKUTA PC 1997 YR ID 65 55 65 55 0 0 0 0 0 SISP NO ADB 4 KOSHICHHYALUNG TANG 100 DHANKUTA PC 1997 YR ID 147 125 147 125 0 0 0 0 0 SISP NO ADB 4 KOSHILEMLEMA 100 DHANKUTA PC 1997 YR ID 29 25 29 25 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > DHANKUTA > NEW 5 476 405 476 405 0 0 0 0 0

SISP>DHANKUTA>REHABILITATIONJANKALYAN 100 DHANKUTA PC 1997 YR ID 153 130 153 130 0 0 0 0 0 SISP NO ADB 4 KOSHIKHARDEP 100 DHANKUTA PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 4 KOSHIKARUNJE 100 DHANKUTA PC 1997 YR ID 39 33 39 33 0 0 0 0 0 SISP NO ADB 4 KOSHIKHALTE BARI 100 DHANKUTA PC 1997 YR ID 100 85 100 85 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > DHANKUTA > REHABILITATION 4 468 398 468 398 0 0 0 0 0

TOTAL of DHANKUTA District 9 944 803 944 803 0 0 0 0 0

SISP>ILAM>NEWMALUM KHOLA 100 ILAM PC 1997 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 11 KANKAIBUTE KHOLA 100 ILAM PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 11 KANKAIRATUWA KHOLA 100 ILAM PC 1997 YR ID 471 400 471 400 0 0 0 0 0 SISP NO ADB 11 KANKAITOTAL of SISP > ILAM > NEW 3 765 650 765 650 0 0 0 0 0

SISP>ILAM>REHABILITATIONLAMI TARE KULO 100 ILAM PC 1997 YR ID 71 60 SISP NO ADB 11 KANKAISEWA ASEWA 100 ILAM PC 1997 YR ID 373 317 373 317 0 0 0 0 0 SISP NO ADB 11 KANKAITANGTING GOYANG 100 ILAM PC 1997 YR ID 162 138 162 138 0 0 0 0 0 SISP NO ADB 11 KANKAIKAMAL KHOLA 100 ILAM PC 1997 YR ID 294 250 294 250 0 0 0 0 0 SISP NO ADB 11 KANKAIRUNG SUNG KHOLA 100 ILAM PC 1997 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 11 KANKAITHOTNE KHOLA 100 ILAM PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 11 KANKAI

152

Page 158: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of SISP > ILAM > REHABILITATION 6 1006 855 935 795 0 0 0 0 0

TOTAL of ILAM District 9 1771 1505 1700 1445 0 0 0 0 0

SISP>KHOTANG>NEWCHEREKHE KHOLA 100 KHOTANG PC 1997 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 4 KOSHIDHI KUWA 100 KHOTANG PC 1997 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 4 KOSHIMEWA DHODHARE 100 KHOTANG PC 1997 YR ID 82 70 82 70 0 0 0 0 0 SISP NO ADB 4 KOSHIBARAH POKHARI 100 KHOTANG PC 1997 YR ID 53 45 53 45 0 0 0 0 0 SISP NO ADB 4 KOSHINAMUNA 100 KHOTANG PC 1997 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > KHOTANG > NEW 5 371 315 371 315 0 0 0 0 0

SISP>KHOTANG>REHABILITATIONMEWA-NERPA 100 KHOTANG PC 1997 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 4 KOSHIMANSINGAR 100 KHOTANG PC 1997 YR ID 141 120 141 120 0 0 0 0 0 SISP NO ADB 4 KOSHICHHEBE KHOLA 100 KHOTANG PC 1997 YR ID 129 110 129 110 0 0 0 0 0 SISP NO ADB 4 KOSHIBUNWA KHOLA 100 KHOTANG PC 1997 YR ID 94 80 94 80 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > KHOTANG > REHABILITATION 4 482 410 482 410 0 0 0 0 0

TOTAL of KHOTANG District 9 853 725 853 725 0 0 0 0 0

SISP>OKHALDHUNGA>NEWBHADAURE 100 OKHALDHUNGA PC 1997 YR ID 226 192 226 192 0 0 0 0 0 SISP NO ADB 4 KOSHICHOKTI KHOLA 100 OKHALDHUNGA PC 1997 YR ID 220 187 220 187 0 0 0 0 0 SISP NO ADB 4 KOSHIHARKAPUR TAR 100 OKHALDHUNGA PC 1997 YR ID 259 220 259 220 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > OKHALDHUNGA > NEW 3 705 599 705 599 0 0 0 0 0

SISP>OKHALDHUNGA>REHABILITATIONCHARKHU 100 OKHALDHUNGA PC 1997 YR ID 118 100 0 0 0 0 0 0 0 SISP NO ADB 4 KOSHIBIKASE 100 OKHALDHUNGA PC 1997 YR ID 241 205 241 205 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > OKHALDHUNGA > REHABILITATION 2 359 305 241 205 0 0 0 0 0

TOTAL of OKHALDHUNGA District 5 1064 904 946 804 0 0 0 0 0

SISP>PANCHTHAR>NEWDOORDIMBA 100 PANCHTHAR PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 4 KOSHISAIPHUWA KHOLA 100 PANCHTHAR PC 1997 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 4 KOSHICHILINGDIN 100 PANCHTHAR PC 1997 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 4 KOSHIPANCHAMI 100 PANCHTHAR PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 4 KOSHIPHAKTEP 100 PANCHTHAR PC 1997 YR ID 65 55 65 55 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > PANCHTHAR > NEW 5 618 525 618 525 0 0 0 0 0

SISP>PANCHTHAR>REHABILITATIONSAWA SERA 100 PANCHTHAR PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 4 KOSHITHAPA TAR 100 PANCHTHAR PC 1997 YR ID 88 75 88 75 0 0 0 0 0 SISP NO ADB 4 KOSHI DADA KULO 100 PANCHTHAR PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 4 KOSHI

153

Page 159: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

JHOLUNGE 100 PANCHTHAR PC 1997 YR ID 81 69 81 69 0 0 0 0 0 SISP NO ADB 4 KOSHILUWAFU KHOLA 100 PANCHTHAR PC 1997 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > PANCHTHAR > REHABILITATION 5 381 324 381 324 0 0 0 0 0

TOTAL of PANCHTHAR District 10 999 849 999 849 0 0 0 0 0

SISP>TERATHUM>NEWBAMBOO KHOLA 100 TERATHUM PC 1997 YR ID 106 90 106 90 0 0 0 0 0 SISP NO ADB 4 KOSHIMUGE KHOLA 100 TERATHUM PC 1997 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 4 KOSHIPAREWA KHOLA 100 TERATHUM PC 1997 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 4 KOSHIJAU BARI 100 TERATHUM PC 1997 YR ID 85 72 85 72 0 0 0 0 0 SISP NO ADB 4 KOSHISUNGNAM 100 TERATHUM PC 1997 YR ID 235 200 0 0 0 0 0 SISP NO ADB 4 KOSHIANDHERI 100 TERATHUM PC 1997 YR ID 76 65 76 65 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > TERATHUM > NEW 6 691 587 456 387 0 0 0 0 0

SISP>TERATHUM>REHABILITATIONMUSE KHOLA 100 TERATHUM PC 1997 YR ID 41 35 41 35 0 0 0 0 0 SISP NO ADB 4 KOSHIPHUGUWA KHOLA 100 TERATHUM PC 1997 YR ID 190 160 190 160 0 0 0 0 0 SISP NO ADB 4 KOSHILIKHUWA 100 TERATHUM PC 1997 YR ID 59 50 0 0 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > TERATHUM > REHABILITATION 3 290 245 231 195 0 0 0 0 0

TOTAL of TERATHUM District 9 981 832 687 582 0 0 0 0 0

SISP>UDAYAPUR>NEWYARI KHOLA 100 UDAYAPUR PC 1997 YR ID 141 120 141 120 0 0 0 0 0 SISP NO ADB 4 KOSHILATI KHOLA 100 UDAYAPUR PC 1997 YR ID 129 110 129 110 0 0 0 0 0 SISP NO ADB 4 KOSHIGHUMI TAR 100 UDAYAPUR PC 1997 YR ID 41 35 41 35 0 0 0 0 0 SISP NO ADB 4 KOSHITAWA KHOLA 100 UDAYAPUR PC 1997 YR ID 294 250 294 250 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > UDAYAPUR > NEW 4 605 515 605 515 0 0 0 0 0

SISP>UDAYAPUR>REHABILITATIONRISKU 100 UDAYAPUR PC 1997 YR ID 188 160 188 160 0 0 0 0 0 SISP NO ADB 4 KOSHIKUNTE 100 UDAYAPUR PC 1997 YR ID 41 35 41 35 0 0 0 0 0 SISP NO ADB 4 KOSHIUPPER BARUWA 100 UDAYAPUR PC 1997 YR ID 311 264 311 264 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > UDAYAPUR > REHABILITATION 3 540 459 540 459 0 0 0 0 0

TOTAL of UDAYAPUR District 7 1145 974 1145 974 0 0 0 0 0

TOTAL of EASTERN > Hill 63 8540 7258 7939 6748 0 0 0 0 0

SISP>SANKHUWASABHA>NEWJHUTRA TUPEWA 100 SANKHUWASABHA PC 1997 YR ID 353 300 0 0 0 0 0 0 0 SISP NO ADB 4 KOSHISIKTIM TAR 100 SANKHUWASABHA PC 1997 YR ID 82 70 82 70 0 0 0 0 0 SISP NO ADB 4 KOSHIRIYALE BESI 100 SANKHUWASABHA PC 1997 YR ID 76 65 76 65 0 0 0 0 0 SISP NO ADB 4 KOSHI DOVANTAR 100 SANKHUWASABHA PC 1997 YR ID 29 25 0 0 0 0 0 0 0 SISP NO ADB 4 KOSHIPATHIVAR 100 SANKHUWASABHA PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 4 KOSHI

154

Page 160: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of SISP > SANKHUWASABHA > NEW 5 716 610 334 285 0 0 0 0 0

SISP>SANKHUWASABHA>REHABILITATIONHANGDUWA KHOLA 100 SANKHUWASABHA PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 4 KOSHIPANGMA KHOLA 100 SANKHUWASABHA PC 1997 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 4 KOSHICHHAHARE KHOLA 100 SANKHUWASABHA PC 1997 YR ID 105 89 105 89 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > SANKHUWASABHA > REHABILITATION 3 411 349 411 349 0 0 0 0 0

TOTAL of SANKHUWASABHA District 8 1127 959 745 634 0 0 0 0 0

SISP>SOLUKHUMBU>NEWBARKHU KHOLA 100 SOLUKHUMBU PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 4 KOSHI BHORLENI TAR 100 SOLUKHUMBU PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 4 KOSHIKANGEL KALI BARI 100 SOLUKHUMBU PC 1997 YR ID 52 44 52 44 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > SOLUKHUMBU > NEW 3 146 124 146 124 0 0 0 0 0

SISP>SOLUKHUMBU>REHABILITATIONMUDE KHOLA 100 SOLUKHUMBU PC 1997 YR ID 112 95 112 95 0 0 0 0 0 SISP NO ADB 4 KOSHIJUKE PANI 100 SOLUKHUMBU PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > SOLUKHUMBU > REHABILITATION 2 159 135 159 135 0 0 0 0 0

TOTAL of SOLUKHUMBU District 5 305 259 305 259 0 0 0 0 0

SISP>TAPLEJUNG>NEWNAURANG KHOLA 100 TAPLEJUNG PC 1997 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 4 KOSHI DANDA GAUN 100 TAPLEJUNG PC 1997 YR ID 82 70 82 70 0 0 0 0 0 SISP NO ADB 4 KOSHICHYAMGGMENGMAYA 100 TAPLEJUNG PC 1997 YR ID 485 412 485 412 0 0 0 0 0 SISP NO ADB 4 KOSHINEBU KHOLA 100 TAPLEJUNG PC 1997 YR ID 94 80 94 80 0 0 0 0 0 SISP NO ADB 4 KOSHIKHOKSE NANGKHOLY 100 TAPLEJUNG PC 1997 YR ID 76 65 76 65 0 0 0 0 0 SISP NO ADB 4 KOSHINIGURADIN PHUL BARI 100 TAPLEJUNG PC 1997 YR ID 212 180 212 180 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > TAPLEJUNG > NEW 6 1008 857 1008 857 0 0 0 0 0

SISP>TAPLEJUNG>REHABILITATIONHIUNDE KHOLA 100 TAPLEJUNG PC 1997 YR ID 88 75 88 75 0 0 0 0 0 SISP NO ADB 4 KOSHIMEDIBUNG 100 TAPLEJUNG PC 1997 YR ID 106 90 106 90 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > TAPLEJUNG > REHABILITATION 2 194 165 194 165 0 0 0 0 0

TOTAL of TAPLEJUNG District 8 1202 1022 1202 1022 0 0 0 0 0

TOTAL of EASTERN > Mountain 21 2634 2240 2252 1915 0 0 0 0 0

TOTAL of EASTERN Region 120 24098 20484 21350 18149 0 0 0 0 0

SISP>BARA>REHABILITATIONCHHAUGHAT 100 BARA PC 1998 YR ID 294 250 294 250 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERLAUTAN 100 BARA PC 2001 YR ID 529 450 529 450 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER

155

Page 161: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

DHANSAR 100 BARA PC 2000 YR ID 429 365 429 365 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERSAPAHI 100 BARA PC 2000 YR ID 182 155 182 155 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERADUWA-KACHORWA 100 BARA PC 19999 YR ID 1340 1139 1340 1139 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERSHREEPUR 100 BARA PC 1999 YR ID 294 250 294 250 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERBENGAHI 100 BARA PC 19999 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERGERKHAHI 100 BARA PC 2000 YR ID 588 500 0 0 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERTOTAL of SISP > BARA > REHABILITATION 8 3891 3309 3303 2809 0 0 0 0 0

TOTAL of BARA District 8 3891 3309 3303 2809 0 0 0 0 0

SISP>CHITWAN>NEWYAKRANG 100 CHITWAN PC 1999 YR ID 35 30 35 30 0 0 0 0 0 SISP NO ADB 3 GANDAKTOTAL of SISP > CHITWAN > NEW 1 35 30 35 30 0 0 0 0 0

SISP>CHITWAN>REHABILITATIONCHANDRE KHOLA 100 CHITWAN PC 2001 YR ID 53 45 53 45 0 0 0 0 0 SISP NO ADB 3 GANDAKPARIU KHOLA 100 CHITWAN PC 2001 YR ID 109 93 109 93 0 0 0 0 0 SISP NO ADB 3 GANDAKRIU BAGAI 100 CHITWAN PC 2001 YR ID 129 110 129 110 0 0 0 0 0 SISP NO ADB 3 GANDAKGHANGHAR 100 CHITWAN PC 1997 YR ID 158 134 158 134 0 0 0 0 0 SISP NO ADB 3 GANDAKKHAIRE KHOLA 100 CHITWAN PC 1998 YR ID 38 32 38 32 0 0 0 0 0 SISP NO ADB 3 GANDAKDIHI TAR 100 CHITWAN PC 1998 YR ID 18 15 18 15 0 0 0 0 0 SISP NO ADB 3 GANDAKTOTAL of SISP > CHITWAN > REHABILITATION 6 505 429 505 429 0 0 0 0 0

TOTAL of CHITWAN District 7 540 459 540 459 0 0 0 0 0

SISP>DHANUSA>REHABILITATIONBALGANGA 100 DHANUSA PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERBRIJGANGA 100 DHANUSA PC 1999 YR ID 226 192 226 192 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERDUDHMATI,SINGARJO 100 DHANUSA PC 1998 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERDUDHMATI JK-13 100 DHANUSA PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERTOTAL of SISP > DHANUSA > REHABILITATION 4 755 642 755 642 0 0 0 0 0

TOTAL of DHANUSA District 4 755 642 755 642 0 0 0 0 0

SISP>MAHOTTARI>REHABILITATIONPASIJWA 100 MAHOTTARI PC 2002 YR ID 588 500 588 500 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERPACHAIN 100 MAHOTTARI PC 20002 YR ID 588 500 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERSIR KHOLA 100 MAHOTTARI PC 2000 YR ID 124 105 124 105 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERTOTAL of SISP > MAHOTTARI > REHABILITATION 3 1300 1105 712 605 0 0 0 0 0

TOTAL of MAHOTTARI District 3 1300 1105 712 605 0 0 0 0 0

SISP>PARSA>REHABILITATIONAMOA KHOLA 100 PARSA PC 2000 YR ID 159 135 0 0 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERGUL BARIA 100 PARSA PC 1997 YR ID 294 250 294 250 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERNIRMAL BASTI BRAH 100 PARSA PC 2002 YR ID 412 350 0 0 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER

156

Page 162: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

KIYASOT BAGAMUHI 100 PARSA PC 2000 YR ID 584 496 584 496 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERCHAMARI 100 PARSA PC 1997 YR ID 465 395 465 395 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERTOTAL of SISP > PARSA > REHABILITATION 5 1914 1626 1343 1141 0 0 0 0 0

TOTAL of PARSA District 5 1914 1626 1343 1141 0 0 0 0 0

SISP>RAUTAHAT>REHABILITATIONARUWA PATEBHARWA 100 RAUTAHAT PC 19997 YR ID 353 300 0 0 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERARUWA-SANTAPUR 100 RAUTAHAT PC 19997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERBHA KUWA 100 RAUTAHAT PC 19997 YR ID 465 395 0 0 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERDUDHIYAWA 100 RAUTAHAT PC 2000 YR ID 253 215 0 0 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERTOTAL of SISP > RAUTAHAT > REHABILITATION 4 1306 1110 235 200 0 0 0 0 0

TOTAL of RAUTAHAT District 4 1306 1110 235 200 0 0 0 0 0

SISP>SARLAHI>REHABILITATIONBAGDAHA 100 SARLAHI PC 1997 YR ID 294 250 294 250 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERLAXIMPUT 100 SARLAHI PC 19997 YR ID 82 70 82 70 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERPARSA 100 SARLAHI PC 1998 YR ID 806 685 806 685 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERPATTHHARKOT 100 SARLAHI PC 2000 YR ID 613 521 613 521 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERMYIAKHOR 100 SARLAHI PC 2001 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERLAUKAT-MANUSMARA 100 SARLAHI PC 19998 YR ID 441 375 441 375 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVERTOTAL of SISP > SARLAHI > REHABILITATION 6 2354 2001 2354 2001 0 0 0 0 0

TOTAL of SARLAHI District 6 2354 2001 2354 2001 0 0 0 0 0

TOTAL of CENTRAL > Terai 37 12060 10252 9242 7857 0 0 0 0 0

SISP>BHAKTAPUR>NEWKUSUME KHOLA 100 BHAKTAPUR PC 1997 YR ID 24 20 24 20 0 0 0 0 0 SISP NO ADB 9 BAGMATIGHYAMPE KHOLA 100 BHAKTAPUR PC 1997 YR ID 35 30 35 30 0 0 0 0 0 SISP NO ADB 9 BAGMATISERA PHANT 100 BHAKTAPUR PC 1997 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 9 BAGMATITHADO KHOLA 100 BHAKTAPUR PC 2001 YR ID 45 38 45 38 0 0 0 0 0 SISP NO ADB 9 BAGMATITOTAL of SISP > BHAKTAPUR > NEW 4 175 148 175 148 0 0 0 0 0

SISP>BHAKTAPUR>REHABILITATIONCHHARARE DOKE 100 BHAKTAPUR PC 2000 YR ID 52 44 52 44 0 0 0 0 0 SISP NO ADB 9 BAGMATITRIBENI 100 BHAKTAPUR PC 1998 YR ID 46 39 46 39 0 0 0 0 0 SISP NO ADB 9 BAGMATIKUTUDHAL 100 BHAKTAPUR PC 2000 YR ID 125 106 125 106 0 0 0 0 0 SISP NO ADB 9 BAGMATIMAHADEV KHOLA 100 BHAKTAPUR PC 1997 YR ID 529 450 529 450 0 0 0 0 0 SISP NO ADB 9 BAGMATITAUTHALI PHANT 100 BHAKTAPUR PC 1997 YR ID 41 35 41 35 0 0 0 0 0 SISP NO ADB 9 BAGMATIKATUNJE 100 BHAKTAPUR PC 1997 YR ID 141 120 141 120 0 0 0 0 0 SISP NO ADB 9 BAGMATITOTAL of SISP > BHAKTAPUR > REHABILITATION 6 934 794 934 794 0 0 0 0 0

TOTAL of BHAKTAPUR District 10 1109 942 1109 942 0 0 0 0 0

157

Page 163: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

SISP>DHADING>NEWJAYAPURI 100 DHADING PC 1999 YR ID 141 120 141 120 0 0 0 0 0 SISP NO ADB 3 GANDAK TALLO BESI 100 DHADING PC 1999 YR ID 35 30 35 30 0 0 0 0 0 SISP NO ADB 3 GANDAKRIMALDIHI 100 DHADING PC 1999 YR ID 80 68 80 68 0 0 0 0 0 SISP NO ADB 3 GANDAKRAUTE 100 DHADING PC 1999 YR ID 141 120 141 120 0 0 0 0 0 SISP NO ADB 3 GANDAKMANGPANG SUKAURA 100 DHADING PC 1999 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 3 GANDAKLITI KHOLA 100 DHADING PC 1999 YR ID 106 90 106 90 0 0 0 0 0 SISP NO ADB 3 GANDAKJOGE TAR 100 DHADING PC 1999 YR ID 200 170 200 170 0 0 0 0 0 SISP NO ADB 3 GANDAKPARWANG 100 DHADING PC 1999 YR ID 119 101 119 101 0 0 0 0 0 SISP NO ADB 3 GANDAKJAMUN TAR 100 DHADING PC 1999 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 3 GANDAKTOTAL of SISP > DHADING > NEW 9 999 849 999 849 0 0 0 0 0

SISP>DHADING>REHABILITATIONBHAL TAR BANSI TAR 100 DHADING PC 1999 YR ID 95 81 95 81 0 0 0 0 0 SISP NO ADB 3 GANDAK TALLO MARPAK 100 DHADING PC 1999 YR ID 129 110 129 110 0 0 0 0 0 SISP NO ADB 3 GANDAKKALLERI TAR 100 DHADING PC 1999 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 3 GANDAKGAIRA 100 DHADING PC 1999 YR ID 35 30 35 30 0 0 0 0 0 SISP NO ADB 3 GANDAKSERTUNG 100 DHADING PC 1998 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 3 GANDAKGAJURI TAR 100 DHADING PC 1998 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 3 GANDAKTOTAL of SISP > DHADING > REHABILITATION 6 730 621 730 621 0 0 0 0 0

TOTAL of DHADING District 15 1729 1470 1729 1470 0 0 0 0 0

SISP>KATHMANDU>REHABILITATIONLAPSIPHEDI 100 KATHMANDU PC 1998 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 9 BAGMATITEUDOL 100 KATHMANDU PC 2000 YR ID 29 25 29 25 0 0 0 0 0 SISP NO ADB 9 BAGMATITHADO KHOLA 100 KATHMANDU PC 1999 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 9 BAGMATIKABRE KHOLA 100 KATHMANDU PC 1999 YR ID 42 36 42 36 0 0 0 0 0 SISP NO ADB 9 BAGMATIBUKI KULO 100 KATHMANDU PC 1999 YR ID 82 70 82 70 0 0 0 0 0 SISP NO ADB 9 BAGMATIKAVRE GHATTE 100 KATHMANDU PC 1998 YR ID 135 115 135 115 0 0 0 0 0 SISP NO ADB 9 BAGMATIMATATIRTHA 100 KATHMANDU PC 1998 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 9 BAGMATIKATUWA BANDH 100 KATHMANDU PC 1998 YR ID 41 35 41 35 0 0 0 0 0 SISP NO ADB 9 BAGMATIRAJ KULO 100 KATHMANDU PC 1998 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 9 BAGMATINAGIN KHOLA 100 KATHMANDU PC 1998 YR ID 76 65 76 65 0 0 0 0 0 SISP NO ADB 9 BAGMATITAUTHALI 100 KATHMANDU PC 1999 YR ID 35 30 35 30 0 0 0 0 0 SISP NO ADB 9 BAGMATITOTAL of SISP > KATHMANDU > REHABILITATION 11 711 606 711 606 0 0 0 0 0

TOTAL of KATHMANDU District 11 711 606 711 606 0 0 0 0 0

SISP>KAVRE>NEWSIMTHALI 100 KAVRE PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 4 KOSHITUKUCHA 100 KAVRE PC 1998 YR ID 40 34 40 34 0 0 0 0 0 SISP NO ADB 4 KOSHINAU BESI PHANT 100 KAVRE PC 2002 YR ID 147 125 0 0 0 0 0 0 0 SISP NO ADB 4 KOSHIDHUNGKHARKA 100 KAVRE PC 2000 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > KAVRE > NEW 4 293 249 146 124 0 0 0 0 0

158

Page 164: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

SISP>KAVRE>REHABILITATIONTANAL 100 KAVRE PC 1997 YR ID 18 15 18 15 0 0 0 0 0 SISP NO ADB 4 KOSHIKALEDICHURETHUMKI 100 KAVRE PC 1999 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 4 KOSHIRIYALE 100 KAVRE PC 2000 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 4 KOSHIMAHANKAL 100 KAVRE PC 2002 YR ID 27 23 27 23 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > KAVRE > REHABILITATION 4 234 198 234 198 0 0 0 0 0

TOTAL of KAVRE District 8 527 447 380 322 0 0 0 0 0

SISP>LALITPUR>REHABILITATIONGODAWARI RAJ KULO 100 LALITPUR PC 2001 YR ID 206 175 206 175 0 0 0 0 0 SISP NO ADB 9 BAGMATILUBHU RAJ KULO 100 LALITPUR PC 2001 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 9 BAGMATIAPHAL BAGAR 100 LALITPUR PC 1997 YR ID 35 30 35 30 0 0 0 0 0 SISP NO ADB 9 BAGMATISERA KULO 100 LALITPUR PC 1997 YR ID 35 30 35 30 0 0 0 0 0 SISP NO ADB 9 BAGMATIGODAM CHAUR 100 LALITPUR PC 1997 YR ID 15 13 15 13 0 0 0 0 0 SISP NO ADB 9 BAGMATIPHULINGDAL 100 LALITPUR PC 1997 YR ID 80 68 80 68 0 0 0 0 0 SISP NO ADB 9 BAGMATIKHOKANA 100 LALITPUR PC 1997 YR ID 294 250 294 250 0 0 0 0 0 SISP NO ADB 9 BAGMATIHATHIBAN 100 LALITPUR PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 9 BAGMATITOTAL of SISP > LALITPUR > REHABILITATION 8 888 756 888 756 0 0 0 0 0

TOTAL of LALITPUR District 8 888 756 888 756 0 0 0 0 0

SISP>MAKWANPUR>NEWRAI GAON 100 MAKWANPUR PC 1998 YR ID 259 220 259 220 0 0 0 0 0 SISP NO ADB 3 GANDAK BHORLENI TAR 100 MAKWANPUR PC 1999 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 3 GANDAKNAM TAR 100 MAKWANPUR PC 1997 YR ID 147 125 147 125 0 0 0 0 0 SISP NO ADB 3 GANDAKTOTAL of SISP > MAKWANPUR > NEW 3 465 395 465 395 0 0 0 0 0

SISP>MAKWANPUR>REHABILITATIONPHAPAR BARI 100 MAKWANPUR PC 1999 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 3 GANDAKDILLIPUR 100 MAKWANPUR PC 1998 YR ID 134 114 134 114 0 0 0 0 0 SISP NO ADB 3 GANDAKPALUNG 100 MAKWANPUR PC 2000 YR ID 74 63 74 63 0 0 0 0 0 SISP NO ADB 3 GANDAKTOTAL of SISP > MAKWANPUR > REHABILITATION 3 326 277 326 277 0 0 0 0 0

TOTAL of MAKWANPUR District 6 791 672 791 672 0 0 0 0 0

SISP>NUWAKOT>NEWDEURALI 100 NUWAKOT PC 1999 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 3 GANDAKHIRAMANI TAR 100 NUWAKOT PC 1996 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 3 GANDAKSALME 100 NUWAKOT PC 1997 YR ID 84 71 84 71 0 0 0 0 0 SISP NO ADB 3 GANDAKKATLE DHUNGA 100 NUWAKOT PC 2001 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 3 GANDAKBALKUMARI BHUMISTA 100 NUWAKOT PC 1997 YR ID 165 140 165 140 0 0 0 0 0 SISP NO ADB 3 GANDAKTOTAL of SISP > NUWAKOT > NEW 5 414 351 414 351 0 0 0 0 0

SISP>NUWAKOT>REHABILITATIONFALAKHU KH-HARIYAL 100 NUWAKOT PC 2000 YR ID 53 45 53 45 0 0 0 0 0 SISP NO ADB 3 GANDAK

159

Page 165: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

CHHAHARE ANDARI 100 NUWAKOT PC 1999 YR ID 106 90 106 90 0 0 0 0 0 SISP NO ADB 3 GANDAKKOLPU TAR 100 NUWAKOT PC 1998 YR ID 53 45 53 45 0 0 0 0 0 SISP NO ADB 3 GANDAKLABDU DHIKURE SERA 100 NUWAKOT PC 1996 YR ID 424 360 424 360 0 0 0 0 0 SISP NO ADB 3 GANDAKKAULE BHALCHE 100 NUWAKOT PC 1996 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 3 GANDAKTOTAL of SISP > NUWAKOT > REHABILITATION 5 871 740 871 740 0 0 0 0 0

TOTAL of NUWAKOT District 10 1285 1091 1285 1091 0 0 0 0 0

SISP>RAMECHHAP>NEWCHINDE KHOLA 100 RAMECHHAP PC 1998 YR ID 94 80 94 80 0 0 0 0 0 SISP NO ADB 9 BAGMATIAMPHE KHOLA 100 RAMECHHAP PC 1998 YR ID 106 90 106 90 0 0 0 0 0 SISP NO ADB 9 BAGMATIGAIRI KHOLA 100 RAMECHHAP PC 2000 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 9 BAGMATITILAURI KHOLA 100 RAMECHHAP PC 1998 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 9 BAGMATITOTAL of SISP > RAMECHHAP > NEW 4 318 270 318 270 0 0 0 0 0

SISP>RAMECHHAP>REHABILITATIONDIMI MAIRE 100 RAMECHHAP PC 2000 YR ID 88 75 88 75 0 0 0 0 0 SISP NO ADB 9 BAGMATIDHANDE BESI 100 RAMECHHAP PC 2001 YR ID 41 35 41 35 0 0 0 0 0 SISP NO ADB 9 BAGMATIRAJMAN TAR 100 RAMECHHAP PC 1998 YR ID 88 75 88 75 0 0 0 0 0 SISP NO ADB 9 BAGMATIDARKHA KHOLA 100 RAMECHHAP PC 1999 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 9 BAGMATIGELU KHOLA 100 RAMECHHAP PC 1998 YR ID 35 30 35 30 0 0 0 0 0 SISP NO ADB 9 BAGMATIKHADKULI DAHA 100 RAMECHHAP PC 1998 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 9 BAGMATITOTAL of SISP > RAMECHHAP > REHABILITATION 6 417 355 417 355 0 0 0 0 0

TOTAL of RAMECHHAP District 10 735 625 735 625 0 0 0 0 0

SISP>SINDHULI>NEWTANDI 100 SINDHULI PC 2002 YR ID 320 272 320 272 0 0 0 0 0 SISP NO ADB 9 BAGMATITOTAL of SISP > SINDHULI > NEW 1 320 272 320 272 0 0 0 0 0

SISP>SINDHULI>REHABILITATIONDUDHAULI 100 SINDHULI PC 2002 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 9 BAGMATICHANDAHA 100 SINDHULI PC 1998 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 9 BAGMATICHANDULI 100 SINDHULI PC 2000 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 9 BAGMATIDHAP 100 SINDHULI PC 2000 YR ID 82 70 82 70 0 0 0 0 0 SISP NO ADB 9 BAGMATIBARDEO TAR 100 SINDHULI PC 2000 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 9 BAGMATITOTAL of SISP > SINDHULI > REHABILITATION 5 729 620 729 620 0 0 0 0 0

TOTAL of SINDHULI District 6 1049 892 1049 892 0 0 0 0 0

TOTAL of CENTRAL > Hill 84 8824 7501 8677 7376 0 0 0 0 0

SISP>DOLKHA>NEWBOTE KHOLA 100 DOLKHA PC 1998 YR ID 16 14 16 14 0 0 0 0 0 SISP NO ADB 9 BAGMATIBULUNG 100 DOLKHA PC 1997 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 9 BAGMATIMARBO TAR 100 DOLKHA PC 1997 YR ID 106 90 106 90 0 0 0 0 0 SISP NO ADB 9 BAGMATI

160

Page 166: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TOTAL of SISP > DOLKHA > NEW 3 240 204 240 204 0 0 0 0 0

SISP>DOLKHA>REHABILITATIONNAUSAYA BESI 100 DOLKHA PC 2002 YR ID 196 167 196 167 0 0 0 0 0 SISP NO ADB 9 BAGMATITOTAL of SISP > DOLKHA > REHABILITATION 1 196 167 196 167 0 0 0 0 0

TOTAL of DOLKHA District 4 436 371 436 371 0 0 0 0 0

SISP>RASUWA>NEWPHAMCHET(PUNG) 100 RASUWA PC 1997 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 3 GANDAKTHUMAN 100 RASUWA PC 1998 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 3 GANDAKTHULO BHARKU 100 RASUWA PC 1998 YR ID 41 35 41 35 0 0 0 0 0 SISP NO ADB 3 GANDAKMAHAGHAR 100 RASUWA PC 2000 YR ID 82 70 82 70 0 0 0 0 0 SISP NO ADB 3 GANDAKTOTAL of SISP > RASUWA > NEW 4 253 215 253 215 0 0 0 0 0

SISP>RASUWA>REHABILITATION BHORLEPUCHAR 100 RASUWA PC 1998 YR ID 48 41 48 41 0 0 0 0 0 SISP NO ADB 3 GANDAK BHORLE SIRAN 100 RASUWA PC 1997 YR ID 76 65 76 65 0 0 0 0 0 SISP NO ADB 3 GANDAKUPALLO RUPSE PANI 100 RASUWA PC 1998 YR ID 41 35 41 35 0 0 0 0 0 SISP NO ADB 3 GANDAKKAPTHALI TAR 100 RASUWA PC 1998 YR ID 24 20 24 20 0 0 0 0 0 SISP NO ADB 3 GANDAKBANUWA 100 RASUWA PC 1998 YR ID 24 20 24 20 0 0 0 0 0 SISP NO ADB 3 GANDAKGOLJUNG BESI 100 RASUWA PC 1996 YR ID 82 70 82 70 0 0 0 0 0 SISP NO ADB 3 GANDAKTOTAL of SISP > RASUWA > REHABILITATION 6 295 251 295 251 0 0 0 0 0

TOTAL of RASUWA District 10 548 466 548 466 0 0 0 0 0

SISP>SINDHUPALCHOWK>NEWKAVRE KHOLA 100 SINDHUPALCHOWK PC 1998 YR ID 88 75 88 75 0 0 0 0 0 SISP NO ADB 4 KOSHIKHAKDAL KHOLA 100 SINDHUPALCHOWK PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 4 KOSHISIURENI 100 SINDHUPALCHOWK PC 1997 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 4 KOSHITHAMRANG-RANG TAR 100 SINDHUPALCHOWK PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 4 KOSHIKUNDALE KHOLA 100 SINDHUPALCHOWK PC 1997 YR ID 88 75 88 75 0 0 0 0 0 SISP NO ADB 4 KOSHILAMA BISAUNA 100 SINDHUPALCHOWK PC 1998 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 4 KOSHIGAURING KO GATTA 100 SINDHUPALCHOWK PC 2001 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 4 KOSHIANDHERI KHOLA 100 SINDHUPALCHOWK PC 1998 YR ID 88 75 88 75 0 0 0 0 0 SISP NO ADB 4 KOSHIDHUSLUNG KHOLA 100 SINDHUPALCHOWK PC 1998 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 4 KOSHI PAKHAR KHOLA 100 SINDHUPALCHOWK PC 2001 YR ID 96 82 96 82 0 0 0 0 0 SISP NO ADB 4 KOSHIKHOLE KHOLA 100 SINDHUPALCHOWK PC 1997 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 4 KOSHIMEGATE 100 SINDHUPALCHOWK PC 1997 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 4 KOSHIMELAMCHI II 100 SINDHUPALCHOWK PC 2000 YR ID 98 83 0 0 0 0 0 0 0 SISP NO ADB 4 KOSHIMELAMCHI KHOLA 100 SINDHUPALCHOWK PC 1997 YR ID 159 135 159 135 0 0 0 0 0 SISP NO ADB 4 KOSHISIYALE BIMERE BESI 100 SINDHUPALCHOWK PC 1997 YR ID 18 15 18 15 0 0 0 0 0 SISP NO ADB 4 KOSHICHILAUNE GAIRE KHET 100 SINDHUPALCHOWK PC 1997 YR ID 18 15 18 15 0 0 0 0 0 SISP NO ADB 4 KOSHIBARUWA 100 SINDHUPALCHOWK PC 1997 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 4 KOSHILAPTU KHOLA 100 SINDHUPALCHOWK PC 1997 YR ID 72 61 72 61 0 0 0 0 0 SISP NO ADB 4 KOSHI

161

Page 167: Irrigation Database

TABLE 3Command Area of Surface Farmer’s Managed Irrigation Scheme

Gross Net Gross Net Summer Winter Spring Gross NetPerc

enta

ge

Project

Actual Completed

(AC) / Planned

Completion (PC)Year

Dev

elop

ed

Inte

nsity

Irri

gatio

n C

apab

ility

Planned Command Area

(ha.)

Developed Command Area

(ha.)Irrigated Command Area (ha.)

District

Turn

Ove

r

Fund

ing

Bas

in N

umbe

r

Basin Name

Prog

ram

meOngoing Command

Area (ha.)

TAUTHALI PANGRA TAR 100 SINDHUPALCHOWK PC 1997 YR ID 176 150 0 0 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > SINDHUPALCHOWK > NEW 19 1726 1466 1452 1233 0 0 0 0 0

SISP>SINDHUPALCHOWK>REHABILITATIONSOTE KHOLA 100 SINDHUPALCHOWK PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 4 KOSHIPENGAL 100 SINDHUPALCHOWK PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 4 KOSHIBHANSAR KULO 100 SINDHUPALCHOWK PC 1997 YR ID 96 82 96 82 0 0 0 0 0 SISP NO ADB 4 KOSHIBAGUWA SIRAN 100 SINDHUPALCHOWK PC 1997 YR ID 76 65 76 65 0 0 0 0 0 SISP NO ADB 4 KOSHIBHIM TAR 100 SINDHUPALCHOWK PC 1997 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 4 KOSHIDADE TEKANPUR 100 SINDHUPALCHOWK PC 1997 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 4 KOSHIBHAT TAR BEL TAR 100 SINDHUPALCHOWK PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 4 KOSHIHANDI KHOLA 100 SINDHUPALCHOWK PC 1997 YR ID 82 70 82 70 0 0 0 0 0 SISP NO ADB 4 KOSHIMAHADEV SUIVI 100 SINDHUPALCHOWK PC 1997 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 4 KOSHITOTAL of SISP > SINDHUPALCHOWK > REHABILITATION 9 713 607 713 607 0 0 0 0 0

TOTAL of SINDHUPALCHOWK District 28 2439 2073 2165 1840 0 0 0 0 0

TOTAL of CENTRAL > Mountain 42 3423 2910 3149 2677 0 0 0 0 0

TOTAL of CENTRAL Region 163 24307 20663 21068 17910 0 0 0 0 0

TOTAL of SISP 283 48405 41147 42418 36059 0 0 0 0 0

162

Page 168: Irrigation Database

TABLE 4Summary of total command area of Surface Farmer Managed

District TYPE ADB/N AGRIL DIDP DOI ERIP FIWUD GADP GTZ HFP IDP ILC ISP K-BIRD KHILL M/HILL MAIN MIN MIP MPLD N CARE NISP PEOPLE SISINKA-LAMA SIP SISP Total

Eastern Development RegionEastern Region Terai Ecological BeltJhapa N 779 0 0 0 0 0 0 0 0 0 0 2025 0 0 0 0 0 200 0 388 0 0 0 0 0 1090 4482

R 1968 0 0 125 0 180 0 0 0 0 0 4505 0 0 0 200 0 0 0 0 0 1000 0 0 0 575 8553Morang N 374 0 0 0 0 0 0 0 0 0 0 300 0 0 0 0 0 0 0 142 0 0 0 0 0 180 996

R 2863 330 0 1199 0 0 0 0 0 0 0 5239 0 0 0 0 1540 285 0 418 0 0 0 0 0 3448 15322Saptari N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 210 210

R 0 0 0 160 0 0 0 0 0 0 0 4330 0 0 0 0 720 0 0 0 0 0 0 0 0 455 5665Siraha N 0 0 0 0 0 0 0 0 0 0 0 200 0 0 0 0 0 0 0 0 0 0 0 0 0 883 1083

R 57 0 0 0 0 600 0 0 0 0 0 2259 0 0 0 0 2680 0 0 0 0 0 0 0 0 554 6150Sunsari N 0 0 0 0 0 0 0 0 0 0 0 110 0 0 0 0 0 0 0 0 0 0 0 0 0 0 110

R 633 150 0 200 0 600 0 0 0 0 0 3450 0 0 0 0 880 0 0 167 0 0 0 0 0 2091 8171Eastern Terai N 1153 0 0 0 0 0 0 0 0 0 0 2635 0 0 0 0 0 200 0 530 0 0 0 0 0 2363 6881

R 5521 480 0 1684 0 1380 0 0 0 0 0 19783 0 0 0 200 5820 285 0 585 0 1000 0 0 0 7123 43861Eastern Region Hill Ecological Belt

Bhojpur N 0 0 0 0 0 200 0 0 0 0 0 260 0 0 0 0 0 0 0 0 0 0 0 0 0 350 810R 0 0 0 385 0 0 0 0 0 0 0 200 0 280 0 0 0 0 0 0 0 25 0 0 20 216 1126

Dhankuta N 0 0 0 0 0 70 0 0 0 0 0 256 0 94 0 0 0 0 0 0 0 0 0 0 0 405 825R 175 0 0 689 0 0 0 0 0 0 0 340 0 229 0 0 0 115 0 0 0 0 0 0 40 398 1986

Ilam N 26 0 0 0 0 0 0 0 0 0 0 645 0 0 60 0 0 0 0 0 0 0 0 0 0 650 1381R 4 0 0 205 0 0 0 0 0 0 0 1064 0 0 870 0 0 0 220 0 0 0 0 0 0 795 3158

Khotang N 15 0 0 0 0 518 0 0 0 0 0 285 0 0 0 0 0 0 0 0 0 0 0 0 0 315 1133R 0 0 0 335 0 0 0 0 0 0 0 809 0 0 0 50 0 70 60 0 0 0 0 0 30 410 1764

Okhaldhunga N 169 0 0 0 0 29 0 0 0 0 0 55 0 0 0 0 0 0 0 0 0 0 0 0 0 599 852R 57 0 0 386 0 0 0 0 0 0 0 389 0 0 0 0 0 0 150 0 0 0 0 0 0 205 1187

Panchthar N 18 0 0 0 0 150 0 0 0 0 0 230 0 0 33 0 0 0 0 0 0 0 0 0 0 525 956R 31 0 0 50 0 0 0 0 0 0 0 714 0 0 634 0 0 0 0 0 0 0 0 0 0 324 1753

Terathum N 0 0 0 0 0 225 0 0 0 0 0 320 0 40 0 0 0 0 0 0 0 0 0 0 0 387 972R 0 0 0 171 0 430 0 0 0 0 0 336 0 360 0 0 0 0 0 0 0 0 0 0 0 195 1492

Udaypur N 14 0 0 0 0 0 0 0 0 0 0 607 0 0 0 0 0 0 0 0 0 0 0 0 0 515 1136R 40 0 0 389 0 55 0 0 0 0 0 520 0 0 0 0 0 250 0 0 0 0 0 0 0 459 1713

Eastern Hill N 242 0 0 0 0 1192 0 0 0 0 0 2658 0 134 93 0 0 0 0 0 0 0 0 0 0 3746 8065R 307 0 0 2610 0 485 0 0 0 0 0 4372 0 869 1504 50 0 435 430 0 0 25 0 0 90 3002 14179

Eastern Region Mountain Ecological Belt

Sankhuwasabha N 30 0 0 0 0 0 0 0 0 0 0 91 0 60 0 0 0 0 0 0 0 0 0 0 0 285 466R 63 0 0 537 0 0 0 0 0 0 0 588 0 340 0 0 0 0 0 0 0 0 0 0 0 349 1877

Solukhumbu N 0 0 0 0 0 0 0 0 0 0 0 40 0 0 0 0 0 0 0 0 0 0 0 0 0 124 164R 0 0 0 320 0 0 0 0 0 0 0 522 0 0 0 0 0 0 0 0 0 0 0 0 0 135 977

Taplejung N 0 0 0 0 0 0 0 0 0 0 0 370 0 0 0 0 0 0 0 0 0 0 0 0 0 857 1227R 0 0 0 0 0 0 0 0 0 0 0 360 0 0 929 0 0 0 0 0 0 0 0 0 0 165 1454

Eastern Mountain N 30 0 0 0 0 0 0 0 0 0 0 501 0 60 0 0 0 0 0 0 0 0 0 0 0 1266 1857R 63 0 0 857 0 0 0 0 0 0 0 1470 0 340 929 0 0 0 0 0 0 0 0 0 0 649 4308

Eastern Region N 1425 0 0 0 0 1192 0 0 0 0 0 5794 0 194 93 0 0 200 0 530 0 0 0 0 0 7375 16803R 5891 480 0 5151 0 1865 0 0 0 0 0 25625 0 1209 2433 250 5820 720 430 585 0 1025 0 0 90 10774 62348

157

Page 169: Irrigation Database

TABLE 4Summary of total command area of Surface Farmer Managed

District TYPE ADB/N AGRIL DIDP DOI ERIP FIWUD GADP GTZ HFP IDP ILC ISP K-BIRD KHILL M/HILL MAIN MIN MIP MPLD N CARE NISP PEOPLE SISINKA-LAMA SIP SISP Total

Central Development RegionCentral Region Terai Ecological BeltBara N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

R 0 0 0 1650 0 0 0 0 0 0 0 2271 0 0 0 0 2570 0 0 0 0 0 0 0 520 2809 9820Chitwan N 264 0 0 0 0 0 0 0 0 0 0 265 0 0 0 0 0 0 0 450 0 0 0 0 0 30 1009

R 202 0 0 1100 8155 1710 0 0 0 0 0 2219 0 0 0 0 450 0 0 0 0 0 0 0 100 429 14365Dhanusha N 0 0 0 375 0 0 0 0 0 0 0 400 0 0 0 0 200 0 0 500 0 0 0 0 0 0 1475

R 130 0 0 0 0 4305 0 0 0 0 0 400 0 0 0 0 0 0 0 70 0 0 0 0 153 642 5700Mahottari N 0 0 0 0 0 750 0 0 0 0 0 0 0 0 0 0 0 0 0 138 0 0 0 0 0 0 888

R 0 0 0 500 0 0 0 0 0 0 0 1285 0 0 0 0 0 0 0 1248 0 0 0 0 165 605 3803Parsa N 42 0 0 0 0 90 0 0 0 0 0 150 0 0 0 0 0 0 0 0 0 0 0 0 0 0 282

R 208 0 0 430 0 0 0 0 0 0 0 2143 0 0 0 0 1070 0 0 0 0 0 0 0 0 1141 4992Rautahat N 0 0 0 0 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8

R 0 0 0 50 0 0 0 0 0 0 0 2567 0 0 0 0 3056 305 0 0 0 0 0 0 140 200 6318Sarlahi N 0 0 0 0 0 2500 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2500

R 740 0 0 350 0 0 0 0 0 0 0 1751 0 0 0 0 40 0 0 400 0 0 0 0 300 2001 5582Central Terai N 306 0 0 375 0 3348 0 0 0 0 0 815 0 0 0 0 200 0 0 1088 0 0 0 0 0 30 6162

R 1280 0 0 4080 8155 6015 0 0 0 0 0 12636 0 0 0 0 7186 305 0 1718 0 0 0 0 1378 7827 50580Central Region Hill Ecological Belt

Bhaktapur N 0 0 0 0 0 33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 148 181R 0 0 0 25 0 0 0 0 0 0 0 908 0 0 0 0 1150 0 0 0 0 0 0 0 23 794 2900

Dhading N 326 0 0 0 0 0 0 185 0 0 0 290 0 0 0 0 0 186 0 0 0 0 0 0 0 849 1836R 778 0 0 20 0 100 0 0 0 0 0 312 0 0 0 12 0 25 200 0 0 0 0 0 114 621 2182

Kathmandu N 25 0 0 0 0 250 0 0 0 0 0 461 0 0 0 0 0 0 0 0 0 0 0 0 0 0 736R 20 0 0 243 0 0 0 0 0 0 0 797 0 0 0 0 160 0 0 0 0 0 0 0 0 606 1826

Kavre N 84 0 0 0 0 135 0 0 0 0 0 253 0 0 0 0 0 300 0 40 0 0 0 0 0 124 936R 216 0 0 67 0 0 0 0 0 0 0 771 0 0 0 0 0 125 0 306 0 0 0 1150 0 198 2833

Lalitpur N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0R 0 0 0 208 0 0 0 0 0 0 0 1543 0 0 0 0 905 0 0 0 0 0 0 55 0 756 3467

Makawanpur N 0 0 0 50 0 0 0 0 0 0 0 369 0 0 0 0 0 55 0 62 0 0 0 0 0 395 931R 25 0 0 165 0 0 0 0 0 0 0 767 0 0 0 0 0 100 0 39 0 0 0 520 200 277 2093

Nuwakot N 5 0 0 0 0 920 0 0 0 0 0 470 0 0 0 0 0 0 0 105 0 0 0 0 0 351 1851R 466 0 0 165 0 0 0 0 0 0 0 839 0 0 0 0 240 0 0 226 0 0 0 0 295 740 2971

Ramechap N 90 0 0 0 0 424 0 0 0 0 0 480 0 0 0 0 0 0 0 0 0 0 0 0 0 270 1264R 72 0 0 197 0 54 0 0 0 0 0 813 0 0 0 50 0 0 40 0 0 0 0 0 107 355 1688

Sindhuli N 68 0 0 0 0 414 0 0 0 0 0 610 0 0 0 0 0 0 0 0 0 0 0 0 0 272 1364R 25 0 0 610 0 236 0 0 0 0 0 270 0 0 0 0 0 20 0 0 0 0 0 0 400 620 2181

Central Hill N 598 0 0 50 0 2176 0 185 0 0 0 2933 0 0 0 0 0 541 0 207 0 0 0 0 0 2409 9099R 1602 0 0 1700 0 390 0 0 0 0 0 7020 0 0 0 62 2455 270 240 571 0 0 0 1725 1139 4967 22141

Central Region Mountain Ecological Belt

Dolakha N 0 0 0 0 0 0 0 0 0 0 0 923 0 0 0 0 0 0 0 0 0 0 0 0 0 204 1127R 372 0 0 240 0 20 0 0 0 0 0 515 0 0 0 0 0 150 0 0 0 0 0 0 0 167 1464

Rasuwa N 0 0 0 0 0 30 0 0 0 0 0 294 0 0 0 0 0 0 0 0 0 0 0 0 0 215 539R 0 0 0 0 0 0 0 0 0 0 0 160 0 0 0 0 0 0 0 0 0 0 0 0 0 251 411

158

Page 170: Irrigation Database

TABLE 4Summary of total command area of Surface Farmer Managed

District TYPE ADB/N AGRIL DIDP DOI ERIP FIWUD GADP GTZ HFP IDP ILC ISP K-BIRD KHILL M/HILL MAIN MIN MIP MPLD N CARE NISP PEOPLE SISINKA-LAMA SIP SISP Total

Sindhupalchowk N 49 0 0 0 0 100 0 0 0 0 0 452 0 0 0 0 0 0 0 0 0 0 0 0 0 1233 1834R 42 0 0 575 0 0 0 0 0 0 0 415 0 0 0 0 0 0 20 0 0 0 0 1298 60 607 3017

Central Mountain N 49 0 0 0 0 130 0 0 0 0 0 1669 0 0 0 0 0 0 0 0 0 0 0 0 0 1652 3500R 414 0 0 815 0 20 0 0 0 0 0 1090 0 0 0 0 0 150 20 0 0 0 0 1298 60 1025 4892

Central Region N 953 0 0 425 0 5654 0 185 0 0 0 5417 0 0 0 0 200 541 0 1295 0 0 0 0 0 4091 18761R 3296 0 0 6595 8155 6425 0 0 0 0 0 20746 0 0 0 62 9641 725 260 2289 0 0 0 3023 2577 13819 77613

Western Development RegionWestern Region Terai Ecological BeltKapilvastu N 187 0 0 150 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 337

R 0 0 0 496 0 150 0 0 0 0 3750 0 0 0 0 0 1400 0 0 0 1994 0 0 0 202 0 7992Nawalparasi N 91 0 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 191

R 554 0 0 305 0 0 0 0 0 0 2186 0 0 0 0 200 280 0 0 0 3044 0 0 0 201 0 6770Rupandehi N 15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15

R 662 0 0 1730 0 220 0 0 0 0 1550 0 0 0 0 200 6200 612 0 0 4234 1600 0 0 134 0 17142Western Terai N 293 0 0 150 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 543

R 1216 0 0 2531 0 370 0 0 0 0 7486 0 0 0 0 400 7880 612 0 0 9272 1600 0 0 537 0 31904Western Region Hill Ecological Belt

Arghakhanchi N 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50R 13 0 0 114 0 106 0 0 0 0 924 0 0 0 0 0 0 0 80 0 495 0 0 0 0 0 1732

Baglung N 9 0 224 0 0 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 293R 33 0 282 216 0 85 0 0 0 0 0 0 0 0 0 0 60 0 0 0 547 0 0 0 55 0 1278

Gorkha N 147 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 147R 137 0 0 0 0 0 0 0 368 0 1341 0 0 0 0 50 0 0 0 94 545 0 0 0 0 0 2535

Gulmi N 67 0 0 0 0 44 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 111R 37 0 0 143 0 0 0 0 0 0 726 0 0 0 0 0 0 0 190 0 617 0 0 0 200 0 1913

Kaski N 36 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 36R 40 0 0 257 0 0 0 0 0 0 1128 0 0 0 0 0 0 0 310 0 1144 0 0 0 0 0 2879

Lamjung N 0 0 0 0 0 0 95 0 0 0 0 0 0 0 0 0 0 0 0 12 0 0 0 0 0 0 107R 15 60 200 0 0 0 0 513 0 1559 0 0 0 0 50 144 0 0 0 1447 0 0 0 0 0 3988

Myagdi N 0 0 160 0 0 25 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 185R 13 0 305 496 0 150 0 0 0 0 0 0 0 0 0 0 20 0 0 0 370 0 0 0 0 0 1354

Palpa N 0 0 0 0 0 14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14R 80 0 0 490 0 15 0 0 0 0 0 0 0 0 0 0 0 150 35 0 1279 0 0 0 87 0 2136

Parbat N 0 0 80 0 0 120 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 200R 54 0 476 187 0 298 0 0 0 0 699 0 0 0 0 0 0 105 0 0 696 78 0 0 150 0 2743

Syangja N 7 0 0 0 0 0 15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22R 52 0 0 0 0 0 0 0 579 0 1293 0 0 0 0 0 0 0 120 0 1945 0 0 0 0 0 3989

Tanahu N 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20R 28 0 0 51 0 0 10 0 281 0 1098 0 0 0 0 30 0 0 0 0 1160 0 0 0 0 0 2658

Western Hill N 336 0 464 0 0 263 110 0 0 0 0 0 0 0 0 0 0 0 0 12 0 0 0 0 0 0 1185R 502 60 1063 2154 0 654 10 0 1741 0 8768 0 0 0 0 130 224 255 735 94 10245 78 0 0 492 0 27205

Western Region Mountain Ecological Belt

Manang N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0R 0 0 0 87 0 0 0 0 0 0 140 0 0 0 0 0 0 0 0 0 121 0 0 0 0 0 348

Mustang N 0 0 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 55R 21 0 597 73 0 0 0 0 0 0 0 0 0 0 0 85 0 0 0 0 239 0 0 0 0 0 1015

Western Mountain N 0 0 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 55R 21 0 597 160 0 0 0 0 0 0 140 0 0 0 0 85 0 0 0 0 360 0 0 0 0 0 1363

159

Page 171: Irrigation Database

TABLE 4Summary of total command area of Surface Farmer Managed

District TYPE ADB/N AGRIL DIDP DOI ERIP FIWUD GADP GTZ HFP IDP ILC ISP K-BIRD KHILL M/HILL MAIN MIN MIP MPLD N CARE NISP PEOPLE SISINKA-LAMA SIP SISP Total

Western Region N 629 0 519 150 0 363 110 0 0 0 0 0 0 0 0 0 0 0 0 12 0 0 0 0 0 0 1783R 1739 60 1660 4845 0 1024 10 0 1741 0 16394 0 0 0 0 615 8104 867 735 94 19877 1678 0 0 1029 0 60472

Mid-Western Development RegionMid-Western Region Terai Ecological BeltBanke N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

R 0 0 0 20 0 60 0 0 0 2580 935 0 0 0 0 0 400 0 0 0 465 0 0 0 0 0 4460Bardiya N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

R 213 0 0 22170 0 0 0 0 0 0 1300 0 0 0 0 0 80 0 0 0 6095 0 2060 0 0 0 31918Dang N 192 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 192

R 1610 0 0 7813 0 0 0 0 0 0 2084 0 0 0 0 1040 500 500 0 0 4247 0 166 0 0 0 17960Mid-Western Terai N 192 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 192

R 1823 0 0 30003 0 60 0 0 0 2580 4319 0 0 0 0 1040 980 500 0 0 10807 0 2226 0 0 0 54338Mid-Western Region Hill Ecological Belt

Dailekh N 0 0 0 46 0 0 0 0 0 0 0 0 15 0 0 0 0 0 0 0 0 0 0 0 0 0 61R 0 0 0 130 0 0 0 0 0 271 80 0 104 0 0 0 0 0 0 0 255 0 0 0 0 0 840

Jajarkot N 0 0 0 0 0 150 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 150R 40 0 0 219 0 0 0 0 0 0 225 0 0 0 0 0 0 0 0 0 320 0 0 0 145 0 949

Pyuthan N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0R 255 60 11 0 0 0 0 0 0 395 0 0 0 0 0 0 70 0 0 466 0 0 0 0 0 1257

Rolpa N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0R 58 0 0 229 0 60 0 0 0 0 275 0 0 0 0 0 0 0 0 0 308 0 0 0 81 0 1011

Rukum N 0 0 0 0 0 15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15R 0 0 0 125 0 40 0 0 0 0 110 0 0 0 0 0 0 0 0 0 949 0 0 0 120 0 1344

Salyan N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0R 119 0 0 75 0 81 0 0 0 0 226 0 0 0 0 0 20 80 0 0 715 0 0 0 40 0 1356

Surkhet N 19 0 0 0 0 0 0 0 0 0 0 0 494 0 0 0 0 0 0 0 0 0 0 0 0 0 513R 41 0 0 254 0 0 0 0 0 347 1013 0 615 0 0 0 0 150 0 0 2040 0 115 0 45 0 4620

Mid-Western Hill N 19 0 0 46 0 165 0 0 0 0 0 0 509 0 0 0 0 0 0 0 0 0 0 0 0 0 739R 513 60 0 1043 0 181 0 0 0 618 2324 0 719 0 0 0 20 300 0 0 5053 0 115 0 431 0 11377

Mid-Western Region Mountain Ecological Belt

Dolpa N 0 0 0 70 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 77R 0 0 0 297 0 0 0 0 0 0 22 0 0 0 0 0 0 0 0 0 215 0 0 0 0 0 534

Humla N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0R 0 0 0 86 0 0 0 0 0 0 20 0 0 0 0 0 0 0 0 0 337 0 132 0 0 0 575

Jumla N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0R 0 0 0 35 0 0 0 0 0 0 0 0 175 0 0 0 0 135 0 0 179 0 50 0 14 0 588

Kalikot N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0R 0 0 0 153 0 655 0 0 0 485 0 0 0 0 0 0 0 0 0 0 190 0 0 0 0 0 1483

Mugu N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0R 0 0 0 25 0 0 0 0 0 0 60 0 0 0 0 0 0 0 0 0 145 0 5 0 0 0 235

Mid-Western Mountain N 0 0 0 70 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 77R 0 0 0 596 0 655 0 0 0 485 102 0 175 0 0 0 0 135 0 0 1066 0 187 0 14 0 3415

Mid-Western Region N 211 0 0 116 0 172 0 0 0 0 0 0 509 0 0 0 0 0 0 0 0 0 0 0 0 0 1008R 2336 60 0 31642 0 896 0 0 0 3683 6745 0 894 0 0 1040 1000 935 0 0 16926 0 2528 0 445 0 69130

160

Page 172: Irrigation Database

TABLE 4Summary of total command area of Surface Farmer Managed

District TYPE ADB/N AGRIL DIDP DOI ERIP FIWUD GADP GTZ HFP IDP ILC ISP K-BIRD KHILL M/HILL MAIN MIN MIP MPLD N CARE NISP PEOPLE SISINKA-LAMA SIP SISP Total

Far-Western Development RegionFar-Western Region Terai Ecological BeltKailali N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

R 60 0 0 2850 0 250 0 0 0 0 3340 0 0 0 0 0 4650 0 0 0 1619 0 40 0 525 0 13334Kanchanpur N 103 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 103

R 35 0 0 0 0 0 0 0 0 0 500 0 0 0 0 0 720 0 0 0 2034 0 0 0 325 0 3614Far-Western Terai N 103 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 103

R 95 0 0 2850 0 250 0 0 0 0 3840 0 0 0 0 0 5370 0 0 0 3653 0 40 0 850 0 16948Far-Western Region Hill Ecological Belt

Achham N 133 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 133R 0 0 0 95 0 128 0 0 0 0 445 0 0 0 0 0 0 0 82 0 467 0 0 0 50 0 1267

Baitadi N 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30R 25 0 0 160 0 210 0 0 0 0 275 0 0 0 0 150 0 85 205 0 1096 0 0 0 0 0 2206

Dadeldhura N 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7R 17 0 0 0 0 0 0 0 0 0 605 0 0 0 0 0 0 0 427 0 1226 0 0 0 455 0 2730

Doti N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0R 0 0 0 60 0 245 0 0 0 0 0 0 0 0 0 0 0 120 497 0 1047 0 0 0 0 0 1969

Far-Western Hill N 170 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 170R 42 0 0 315 0 583 0 0 0 0 1325 0 0 0 0 150 0 205 1211 0 3836 0 0 0 505 0 8172

Far-Western Region Mountain Ecological Belt

Bajhang N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0R 0 0 0 0 0 25 0 0 0 0 326 0 0 0 0 0 0 0 293 0 405 0 0 0 0 0 1049

Bajura N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0R 0 0 0 0 0 0 0 0 0 0 165 0 0 0 0 0 0 0 65 0 425 0 0 0 0 0 655

Darchula N 22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22R 0 0 0 95 0 0 0 0 0 0 382 0 0 0 0 0 0 105 115 0 1581 0 0 0 0 0 2278

Far-Western Mountain N 22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22R 0 0 0 95 0 25 0 0 0 0 873 0 0 0 0 0 0 105 473 0 2411 0 0 0 0 0 3982

Far-Western Region N 295 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 295R 137 0 0 3260 0 858 0 0 0 0 6038 0 0 0 0 150 5370 310 1684 0 9900 0 40 0 1355 0 29102

Total N 3513 0 519 691 0 7381 110 185 0 0 0 11211 509 194 93 0 200 741 0 1837 0 0 0 0 0 11466 38650R 13399 600 1660 51493 8155 11068 10 0 1741 3683 29177 46371 894 1209 2433 2117 29935 3557 3109 2968 46703 2703 2568 3023 5496 24593 298665

161

Page 173: Irrigation Database

TABLE 5

No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha No haJhapa 253 759 1175 4112.5 1428 4871.5 4268 15923 5696 20794.5Morang 428 1284 749 2621.5 1177 3905.5 4845 18250 6022 22155.5Sunsari 139 941 13 39 588 2058 740 3038 4822 18574 5562 21612Udaypur 130 650 0 0 130 650 8 24 138 674Saptari 1140 5700 178 1211 111 278 206 721 1635 7910 1349 3477 2984 11387Siraha 1055 5275 158 1083 279 698 151 528.5 1643 7584.5 1453 5579 3096 13163.5Dhanusa 162 404 404 1414 566 1818 787 5509 1299 4115 2652 11442Mahottari 100 250 582 2037 682 2287 545 3815 450 1537 1677 7639Sarlahi 118 782 156 390 637 2229.5 911 3401.5 1255 8785 1106 3928 3272 16114.5Rautahat 122 838 304 760 654 2289 1080 3887 2 14 2975 9437 4057 13338Bara 3 14 294 735 996 3486 1293 4235 5430 17074 6723 21309Parsa 1 4 128 320 656 2296 785 2620 825 2448 1610 5068Chitwan 197 493 202 707 399 1200 2 14 604 1799 1005 3013Nawalparasi 25 150 420 1054 445 1204 1513 4879 1958 6083Rupandehi 271 678 271 678 4022 14234 4293 14912Kapilvastu 50 300 2 12 86 215 138 527 646 2269 784 2796Dang 21 217 8 56 169 378 15 220 213 871 541 1977 754 2848Banke 175 433 175 433 2553 7740 2728 8173Bardiya 158 395 158 395 2379 7440 2537 7835Kailali 50 200 18 180 27 280 290 1220 15 37 400 1917 6109 16807 6509 18724Kanchanpur 32 128 101 253 25 150 158 531 3476 10388 3634 10919Makwanpur 0 0 2 14 10 39 12 53Sindhuli 0 0 1 4 1 4Tanahu 0 0 1 1 1 1Total 82 328 2325 11625 114 847 715 4855 41 366 4095 11036 7000 24500 15 220 25 150 15 37 14427 53964 2593 18151 50685 167943 67705 240058

Irri

gatio

n L

ine

of C

redi

t (I

DA

)

19

93-1

998

Bai

sebi

chhu

wa

I.P.(D

ON

) 20

37 -

2040

BS

CG

ISP

(AD

B)

1996

-200

7

AD

BN

Satb

ariy

a I.P

. (D

ON

)

20

43 -2

044

BS

DO

I Tot

al

Moh

ana

I.P. (

AD

B)

2054

- 205

6

Agr

icul

tral

Dev

elop

men

t Pr

ojec

t, Ja

nakp

ur

APP

(SA

PL/A

DB

/GO

N)

1997

- 20

15

Dis

tric

t

Status of Shallow Tubewell in Nepal up-to 2005/06

Com

mun

ity S

hallo

w

Tub

ewel

l Pro

ject

(IFA

D)

1995

-200

0

Nep

al Ir

riga

tion

Sect

or

Proj

ect (

IDA

)

19

98-2

004

Gra

nd T

otal

Kai

lali

Kan

chan

pur

Tub

ewel

l I.P

. (U

SAID

)

1973

-197

6

Saga

rmat

h In

tegr

ated

Rur

al D

evel

opm

ent

Proj

ect (

AD

B/I

FAD

)

20

36-2

042

BS

162

Page 174: Irrigation Database

TABLE 6

No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha No haJhapa 4 180 2 60 6 240 6 240Morang 6 270 6 270 6 270Sunsari 1 40 1 40 1 40Udaypur 0 0 0 0Saptari 3 80 3 80 3 80Siraha 12 470 7 150 19 620 19 620Dhanusa 0 0 62 2790 62 2790Mahottari 49 773 6 200 55 973 7 315 62 1288Sarlahi 3 50 3 50 12 540 15 590Rautahat 1 40 1 40 1 40Bara 2 80 1 40 28 500 31 620 31 620Parsa 2 48 2 48 2 48Chitwan 7 280 7 280 7 280Nawalparasi 28 700 16 460 44 1160 44 1160Rupandehi 169 20309 25 600 194 20909 194 20909Kapilvastu 3 60 46 1130 11 330 2 80 62 1600 62 1600Dang 9 385 30 1150 3 70 3 70 45 1675 45 1675Banke 10 480 17 680 24 940 7 280 58 2380 58 2380Bardiya 9 360 6 240 15 600 15 600Kailali 7 140 29 1100 10 400 3 120 2 80 51 1840 51 1840Kanchanpur 3 70 24 960 27 1030 27 1030Makwanpur 0 0 0 0Sindhuli 0 0 0 0Tanahu 0 0 0 0Total 10 210 169 20309 15 550 3 60 52 823 29 1100 112 3455 17 680 143 4928 46 1670 28 500 3 100 3 70 630 34455 81 3645 711 38100

Kap

ilvas

tu N

alku

p

Pr

ojec

t

(G

oN)

2038

- 20

49

Nep

al Ir

riga

tion

Sect

or

Proj

ect (

IDA

)

19

98-2

004

Rah

at D

TW

(IN

DIA

)

2003

-200

8

Total

Apa

reso

ta (B

arga

daw

a)

GoN

204

5 - 2

049

Nar

ayan

i Zon

e Ir

riga

tion

D

evel

omen

t Pro

ject

(I

ndia

& W

B)

1997

6-78

& 1

984-

89

Agr

icul

tral

Dev

elop

men

t Pr

ojec

t, Ja

nakp

ur

Tot

al D

OI

Kai

lali

Kan

chan

pur

Tub

ewel

l I.P

. (U

SAID

)

1973

-197

6

Saga

rmat

h In

tegr

ated

Rur

al D

evel

opm

ent

Proj

ect (

AD

B/I

FAD

)

20

36-2

042

BS

Irri

gatio

n L

ine

of C

redi

t (I

DA

)

19

93-1

998

Status of Deep Tubewell in Nepal up-to 2005/06

APP

(SA

PL/A

DB

/GO

N)

1997

- 20

15

Dis

tric

t

Bha

irah

awa

Lum

bani

G

roun

d W

ater

Pro

ject

(I

DA

) 197

3 - 2

000

Mah

otta

ri N

alku

p

Proj

ect (

GoN

)

20

39 -

2045

Seti

Inte

grat

ed R

ural

D

evel

opm

ent P

roje

ct

(AD

B) 1

986-

1996

Irri

gatio

n D

evel

opm

ent

Proj

ect (

EU

)

19

98-2

004

163

Page 175: Irrigation Database

TABLE 7Present Level of Irrigation Development

NEW REH STW DTW TOTAL

Eastern Development RegionEastern Region Terai Ecological BeltJhapa 109529 109530 4482 8553 46951 59986 8000 67986 20794.5 240 21034.5 1153 90174Morang 102938 99959 996 15322 17068 33386 33500 66886 22155.5 270 22425.5 440 89752Saptari 76949 76950 210 5665 1863 7738 36425 44163 11387 80 11467 168 55798Siraha 77726 77726 1083 6150 3186 10419 14815 25234 13163.5 620 13783.5 89 39107Sunsari 71757 70629 110 8171 557 8838 34500 43338 21612 40 21652 167 65157Eastern Terai 438899 434794 6881 43861 69625 120367 127240 247607 89112.5 1250 90362.5 2017 339987Eastern Region Hill Ecological Belt 0Bhojpur 34676 6820 810 1126 361 2297 0 2297 0 0 0 210 2507Dhankuta 26797 7495 825 1986 2228 5039 0 5039 0 0 0 205 5244Ilam 36405 12742 1381 3158 975 5514 0 5514 0 0 0 1338 6852Khotang 37950 8859 1133 1764 1750 4647 200 4847 0 0 0 33 4880Okhaldhunga 24151 4478 852 1187 1311 3350 240 3590 0 0 0 9 3599Panchthar 32252 7241 956 1753 5337 8046 0 8046 0 0 0 647 8693Terathum 21662 6282 972 1492 2253 4717 0 4717 0 0 0 215 4932Udaypur 30773 18408 1136 1713 7969 10818 390 11208 674 0 674 91 11973Eastern Hill 244666 72325 8065 14179 22184 44428 830 45258 674 0 674 2748 48680Eastern Region Mountain Ecological Belt 0Sankhuwasabha 25972 5170 466 1877 3818 6161 0 6161 0 0 0 176 6337Solukhumbu 17734 2038 164 977 2712 3853 0 3853 0 0 0 29 3882Taplejung 22102 7443 1227 1454 4586 7267 0 7267 0 0 0 491 7758Eastern Mountain 65808 14651 1857 4308 11116 17281 0 17281 0 0 0 696 17977Eastern Region 749373 521770 16803 62348 102925 182076 128070 310146 89786.5 1250 91036.5 5461 406643.5Central Development Region 0Central Region Terai Ecological Belt 0Bara 61766 60390 0 9820 8802 18622 13720 32342 21309 620 21929 54 54325Chitwan 44537 41963 1009 14365 0 15374 10900 26274 3013 280 3293 56 29623Dhanusha 72925 72925 1475 5700 8457 15632 14500 30132 11442 2790 14232 707 45071Mahottari 60649 60633 888 3803 22253 26944 0 26944 7639 1288 8927 781 36652Parsa 48374 48374 282 4992 2356 7630 16180 23810 5068 48 5116 128 29054Rautahat 56390 56141 8 6318 1249 7575 33200 40775 13338 40 13378 55 54208Sarlahi 73710 73521 2500 5582 15478 23560 28400 51960 16114.5 590 16704.5 73 68738Central Terai 418351 413947 6162 50580 58595 115337 116900 232237 77923.5 5656 83579.5 1854 317671Central Region Hill Ecological Belt 0Bhaktapur 7223 6274 181 2900 0 3081 1205 4286 0 0 0 33 4319Dhading 36190 10839 1836 2182 3006 7024 360 7384 0 0 0 291 7675Kathmandu 17104 14069 736 1826 0 2562 2130 4692 0 0 0 437 5129Kavre 29921 7958 936 2833 402 4171 0 4171 0 0 0 207 4378Lalitpur 11068 7425 0 3467 0 3467 1410 4877 0 0 0 47 4924Makawanpur 35776 23502 931 2093 222 3246 0 3246 53 0 53 34 3333Nuwakot 31783 15047 1851 2971 380 5202 1172 6374 0 0 0 33 6407Ramechap 32276 4248 1264 1688 2434 5386 0 5386 0 0 0 1 5387Sindhuli 34333 20652 1364 2181 7119 10664 60 10724 4 0 4 0 10728Central Hill 235674 110014 9099 22141 13563 44803 6337 51140 57 0 57 1083 52280Central Region Mountain Ecological Belt 0Dolakha 24042 4911 1127 1464 2311 4902 175 5077 0 0 0 124 5201Rasuwa 5201 836 539 411 675 1625 0 1625 0 0 0 8 1633Sindhupalchowk 33820 12276 1834 3017 3069 7920 0 7920 0 0 0 84 8004Central Mountain 63063 18023 3500 4892 6055 14447 175 14622 0 0 0 216 14838Central Region 717088 541984 18761 77613 78213 174587 123412 297999 77980.5 5656 83636.5 3153 384788.5Western Development Region 0Western Region Terai Ecological Belt 0Kapilvastu 84785 84453 337 7992 12412 20741 6900 27641 2796 1600 4396 71 32108Nawalparasi 55238 50690 191 6770 12220 19181 13830 33011 6083 1160 7243 79 40333Rupandehi 88416 87979 15 17142 18437 35594 7300 42894 14912 20909 35821 173 78888Western Terai 228439 223122 543 31904 43069 75516 28030 103546 23791 23669 47460 322.88 151329Western Region Hill Ecological Belt 0Arghakhanchi 20020 4799 50 1732 654 2436 0 2436 0 0 0 415 2851Baglung 26522 7780 293 1278 190 1761 0 1761 0 0 0 149 1910Gorkha 33914 11027 147 2535 711 3393 489 3882 0 0 0 118 4000Gulmi 25606 4240 111 1913 0 2024 160 2184 0 0 0 370 2554Kaski 31405 15960 36 2879 4044 6959 3740 10699 0 0 0 89 10788Lamjung 23848 11937 107 3988 0 4095 714 4809 0 0 0 128 4937Myagdi 15740 3685 185 1354 98 1637 0 1637 0 0 0 90 1727Palpa 30354 8857 14 2136 1231 3381 282 3663 0 0 0 333 3996Parbat 15231 6455 200 2743 118 3061 425 3486 0 0 0 49 3535Syangja 31018 9848 22 3989 0 4011 0 4011 0 0 0 45 4056Tanahu 33972 14496 20 2658 0 2678 790 3468 1 1 174 3643Western Hill 287630 99084 1185 27205 7046 35436 6600 42036 1 0 1 1960.35 43997Western Region Mountain Ecological Belt 0Manang 718 121 0 348 0 348 0 348 0 0 0 0 348Mustang 4221 159 55 1015 263 1333 51 1384 0 0 0 2 1386

TOTAL IRRIGABLE

DOI SURFACE

NON-CONVENT

IONALTOTAL FMIS

TOTAL IRRIGATED AREA (HA)

DISTRICT TOTAL SURFACE

GRONDWATERAGENCIES ASSITED NON-

ASSITED

SURFACE FMIS

OVERALL TOTAL

164

Page 176: Irrigation Database

TABLE 7Present Level of Irrigation Development

NEW REH STW DTW TOTAL

TOTAL IRRIGABLE

DOI SURFACE

NON-CONVENT

IONALTOTAL FMIS

TOTAL IRRIGATED AREA (HA)

DISTRICT TOTAL SURFACE

GRONDWATERAGENCIES ASSITED NON-

ASSITED

SURFACE FMIS

OVERALL TOTAL

Western Mountain 4939 280 55 1363 263 1681 51 1732 0 0 0 2 1734Western Region 521008 322486 1783 60472 50378 112633 34681 147314 23792 23669 47461 2285.23 197060.23Mid-Western Development Region 0Mid-Western Region Terai Ecological Belt 0Banke 49525 48550 0 4460 1669 6129 1250 7379 8173 2380 10553 320 18252Bardiya 52836 52660 0 31918 0 31918 960 32878 7835 600 8435 152 41465Dang 64522 59505 192 17960 13756 31908 2585 34493 2848 1675 4523 288 39304Mid-Western Terai 166883 160715 192 54338 15425 69955 4795 74750 18856 4655 23511 760 99021Mid-Western Region Hill Ecological Belt 0Dailekh 28373 7075 61 840 1957 2858 0 2858 0 0 0 27 2885Jajarkot 21114 4143 150 949 350 1449 0 1449 0 0 0 10 1459Pyuthan 23197 7037 0 1257 2476 3733 340 4073 0 0 0 9 4082Rolpa 29651 3980 0 1011 0 1011 0 1011 0 0 0 36 1047Rukum 23592 4170 15 1344 41 1400 600 2000 0 0 0 37 2037Salyan 28033 5282 0 1356 1440 2796 0 2796 0 0 0 40 2836Surkhet 31231 19275 513 4620 5242 10375 387 10762 0 0 0 125 10887Mid-Western Hill 185191 50962 739 11377 11506 23622 1327 24949 0 0 0 283.95 25233Mid-Western Region Mountain Ecological Belt 0Dolpa 4996 544 77 534 546 1157 0 1157 0 0 0 21 1178Humla 4983 969 0 575 0 575 0 575 0 0 0 7 582Jumla 12642 4765 0 588 1006 1594 0 1594 0 0 0 13 1607Kalikot 13126 3084 0 1483 240 1723 0 1723 0 0 0 4 1727Mugu 9616 2030 0 235 735 970 0 970 0 0 0 0 970Mid-Western Mountain 45363 11392 77 3415 2527 6019 0 6019 0 0 0 45 6064Mid-Western Region 397437 223069 1008 69130 29458 99596 6122 105718 18856 4655 23511 1088.95 130318Far-Western Development Region 0Far-Western Region Terai Ecological Belt 0Kailali 66723 64112 0 13334 15688 29022 7133 36155 18724 1840 20564 263 56982Kanchanpur 40970 40891 103 3614 2270 5987 11600 17587 10919 1030 11949 472 30008Far-Western Terai 107693 105003 103 16948 17958 35009 18733 53742 29643 2870 32513 735 86990Far-Western Region Hill Ecological Belt 0Achham 31982 10972 133 1267 1099 2499 871 3370 0 0 0 1 3371Baitadi 25543 7450 30 2206 0 2236 395 2631 0 0 0 223 2854Dadeldhura 16032 7266 7 2730 0 2737 0 2737 0 0 0 27 2764Doti 27562 10468 0 1969 554 2523 603 3126 0 0 0 9 3135Far-Western Hill 101119 36156 170 8172 1653 9995 1869 11864 0 0 0 259.84 12124Far-Western Region Mountain Ecological Belt 0Bajhang 22642 7549 0 1049 643 1692 1354 3046 0 0 0 4 3050Bajura 12181 3584 0 655 3120 3775 280 4055 0 0 0 0 4055Darchula 13201 4239 22 2278 0 2300 0 2300 0 0 0 24 2324Far-Western Mountain 48024 15372 22 3982 3763 7767 1634 9401 0 0 0 28 9429Far-Western Region 256836 156531 295 29102 23374 52771 22236 75007 29643 2870 32513 1022.84 108542.84Total 2641742 1765840 38650 298665 284348 621663 314521 936184 240058 38100 278158 13011.02 1227353.02

165

Page 177: Irrigation Database

TABLE 8

No. Ha. No. Ha. No. Ha. No. Ha. No. Ha. No. Ha. No. Ha.Eastern Development RegionEastern Region Terai Ecological BeltJhapa 2 1 0 0 2230 1115 2 37 0 0 0 0 0 0 1153Morang 111 56 0 0 725 363 1 21 0 0 0 0 0 0 440Saptari 2 1 1 2 330 165 0 0 0 0 0 0 0 0 168Siraha 0 0 0 0 178 89 0 0 0 0 0 0 0 0 89Sunsari 40 20 0 0 254 127 1 20 0 0 0 0 0 0 167Eastern Terai 155 78 1 2 3717 1859 4 78 0 0 0 0 0 0 2017Eastern Region Hill Ecological BeltBhojpur 391 196 0 0 0 0 1 14 0 0 0 0 0 0 210Dhankuta 300 150 0 0 0 0 4 55 0 0 0 0 0 0 205Ilam 2647 1324 0 0 0 0 1 14 0 0 0 0 0 0 1338Khotang 45 23 0 0 0 0 1 10 0 0 0 0 0 0 33Okhaldhunga 6 3 0 0 0 0 1 6 0 0 0 0 0 0 9Panchthar 1286 643 0 0 0 0 1 4 0 0 0 0 0 0 647Terathum 399 200 0 0 0 0 1 15 0 0 0 0 0 0 215Udaypur 32 16 0 0 88 44 2 31 0 0 0 0 0 0 91Eastern Hill 5106 2555 0 0 88 44 12 149 0 0 0 0 0 0 2748Eastern Region Mountain Ecological BeltSankhuwasabha 351 176 0 0 0 0 0 0 0 0 0 0 0 0 176Solukhumbu 58 29 0 0 0 0 0 0 0 0 0 0 0 0 29Taplejung 981 491 0 0 0 0 0 0 0 0 0 0 0 0 491Eastern Mountain 1390 696 0 0 0 0 0 0 0 0 0 0 0 0 696Eastern Region 6651 3329 1 2 3805 1903 16 227 0 0 0 0 0 0 5461Central Development RegionCentral Region Terai Ecological BeltBara 0 0 7 14 79 40 0 0 0 0 0 0 0 0 54Chitwan 33 17 0 0 45 23 2 16 0 0 0 0 0 0 56Dhanusha 14 7 289 578 244 122 0 0 0 0 0 0 0 0 707Mahottari 20 10 350 700 142 71 0 0 0 0 0 0 0 0 781Parsa 62 31 0 0 193 97 0 0 0 0 0 0 0 0 128Rautahat 0 0 0 0 60 30 1 25 0 0 0 0 0 0 55Sarlahi 1 1 2 4 115 58 1 10 0 0 0 0 0 0 73Central Terai 130 66 648 1296 878 441 4 51 0 0 0 0 0 0 1854Central Region Hill Ecological BeltBhaktapur 17 9 0 0 48 24 0 0 0 0 0 0 0 0 33Dhading 437 219 0 0 0 0 5 72 0 0 0 0 0 0 291Kathmandu 18 9 0 0 836 418 1 10 0 0 0 0 0 0 437Kavre 141 71 0 0 1 1 9 135 0 0 0 0 0 0 207Lalitpur 66 33 0 0 28 14 0 0 0 0 0 0 0 0 47Makawanpur 22 11 0 0 2 1 1 22 0 0 0 0 0 0 34Nuwakot 36 18 0 0 0 0 2 15 0 0 0 0 0 0 33Ramechap 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1Sindhuli 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Central Hill 738 371 0 0 915 458 18 254 0 0 0 0 0 0 1083Central Region Mountain Ecological BeltDolakha 32 16 0 0 0 0 8 108 0 0 0 0 0 0 124Rasuwa 16 8 0 0 0 0 0 0 0 0 0 0 0 0 8Sindhupalchowk 58 29 0 0 0 0 4 55 0 0 0 0 0 0 84Central Mountain 106 53 0 0 0 0 12 163 0 0 0 0 0 0 216Central Region 974 490 648 1296 1793 899 34 468 0 0 0 0 0 0 3153Western Development RegionWestern Region Terai Ecological BeltKapilvastu 13 7 4 8 111 56 0 0 0 0 0 0 0 0 71Nawalparasi 7 4 17 34 66 33 0 0 0 0 0 0 3 7.88 78.88Rupandehi 2 1 72 144 55 28 0 0 0 0 0 0 0 173Western Terai 22 12 93 186 232 117 0 0 0 0 0 0 3 7.88 322.9

Rower Total Ha.

Non Conventional ProjectsDOI Upto (2005/06)

LILI-Helvetas

CEAPRED (2005/06)

VDRC-MIT (2005/06)

ADB/N (upto 1996)District Sprinkler Artesan

166

Page 178: Irrigation Database

TABLE 8

No. Ha. No. Ha. No. Ha. No. Ha. No. Ha. No. Ha. No. Ha.Rower Total

Ha.

Non Conventional ProjectsDOI Upto (2005/06)

LILI-Helvetas

CEAPRED (2005/06)

VDRC-MIT (2005/06)

ADB/N (upto 1996)District Sprinkler Artesan

Western Region Hill Ecological BeltArghakhanchi 830 415 0 0 0 0 0 0 0 0 0 0 0 0 415Baglung 272 136 0 0 0 0 2 13 0 0 0 0 0 0 149Gorkha 209 105 0 0 17 9 0 0 0 0 0 0 2 3.95 118Gulmi 740 370 0 0 0 0 0 0 0 0 0 0 0 0 370Kaski 155 78 0 0 19 10 0 0 0 0 0 0 2 1.2 89.2Lamjung 227 114 0 0 1 1 2 13 0 0 0 0 0 0 128Myagdi 180 90 0 0 0 0 0 0 0 0 0 0 0 0 90Palpa 634 317 0 0 1 1 2 15 0 0 0 0 0 0 333Parbat 32 16 0 0 0 0 4 33 0 0 0 0 0 0 49Syangja 62 31 0 0 1 1 1 13 0 0 0 0 0 0 45Tanahu 247 124 0 0 12 6 3 36 0 0 0 0 7 8.2 174.2Western Hill 3588 1796 0 0 51 28 14 123 0 0 0 0 11 13.4 1960Western Region Mountain Ecological BeltManang 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Mustang 4 2 0 0 0 0 0 0 0 0 0 0 0 0 2Western Mountain 4 2 0 0 0 0 0 0 0 0 0 0 0 0 2Western Region 3614 1810 93 186 283 145 14 123 0 0 0 0 14 21.2 2285Mid-Western Development RegionMid-Western Region Terai Ecological BeltBanke 2 1 14 28 552 276 1 15 0 0 0 0 0 0 320Bardiya 98 49 0 0 205 103 0 0 0 0 0 0 0 0 152Dang 78 39 0 0 498 249 0 0 0 0 0 0 0 0 288Mid-Western Terai 178 89 14 28 1255 628 1 15 0 0 0 0 0 0 760Mid-Western Region Hill Ecological BeltDailekh 35 18 0 0 0 0 0 0 1 8.5 0 0 0 0 26.5Jajarkot 20 10 0 0 0 0 0 0 0 0 0 0 0 0 10Pyuthan 18 9 0 0 0 0 0 0 0 0 0 0 0 0 9Rolpa 72 36 0 0 0 0 0 0 0 0 0 0 0 0 36Rukum 74 37 0 0 0 0 0 0 0 0 0 0 0 0 37Salyan 51 26 0 0 0 0 2 14 0 0 0 0 0 0 40Surkhet 37 19 0 0 35 18 2 31 3 57.45 0 0 0 0 125.5Mid-Western Hill 307 155 0 0 35 18 4 45 4 65.95 0 0 0 0 284Mid-Western Region Mountain Ecological BeltDolpa 41 21 0 0 0 0 0 0 0 0 0 0 0 0 21Humla 0 0 0 0 0 0 2 7 0 0 0 0 0 0 7Jumla 22 11 0 0 3 2 0 0 0 0 0 0 0 0 13Kalikot 8 4 0 0 0 0 0 0 0 0 0 0 0 0 4Mugu 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Mid-Western Mountai 71 36 0 0 3 2 2 7 0 0 0 0 0 0 45Mid-Western Region 556 280 14 28 1293 648 7 67 4 65.95 0 0 0 0 1089Far-Western Development RegionFar-Western Region Terai Ecological BeltKailali 0 0 0 0 496 248 1 15 0 0 0 0 0 0 263Kanchanpur 20 10 0 0 853 427 2 35 0 0 0 0 0 0 472Far-Western Terai 20 10 0 0 1349 675 3 50 0 0 0 0 0 0 735Far-Western Region Hill Ecological Belt 0Achham 2 1 0 0 0 1Baitadi 25 13 0 0 0 0 1 15 0 0 31 194.84 0 0 222.8Dadeldhura 8 4 0 0 0 0 2 23 0 0 0 0 0 0 27Doti 17 9 0 0 0 0 0 0 0 0 0 0 0 0 9Far-Western Hill 52 27 0 0 0 0 3 38 0 0 31 194.84 0 0 259.8Far-Western Region Mountain Ecological Belt 0Bajhang 8 4 0 0 0 0 0 0 0 0 0 0 0 0 4Bajura 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Darchula 6 3 0 0 0 0 2 21 0 0 0 0 0 0 24Far-Western Mountain 14 7 0 0 0 0 2 21 0 0 0 0 0 0 28Far-Western Region 86 44 0 0 1349 675 8 109 0 0 31 194.84 0 0 1023Total 11881 5953 756 1512 8523 4270 79 994 4 65.95 31 194.84 14 21.2 13011

167

Page 179: Irrigation Database

TABLE 8.1

Program Type District Project Name VDC Type CA YearDailekh Khamekhola Bansi-5 New 8.5 2006Surkhet Talbari Chhinchu Reh 34 2006Surkhet Jhilmile Chhinchu Reh 19.1 2006

Pond irrigation Surkhet Phalate Chhinchu-7 New 4.35 2006Baitadi Okhaligaun DCM - 6 13 96/97Baitadi Kaparta DCM - 4 10 97/98Baitadi Rampatal DCM - 2 3.6 98/99Baitadi Tundikanda Durgabhawani - 9 3 98/99Baitadi Sutegad Dehimandu - 7 12 99/00Baitadi Jhokali Gurukhola - 2 24 99/00Baitadi Thalalgaun Dehimandu - 9 5 97/98Baitadi Saudali Dehimandu - 9 4.5 97/98Baitadi Melau Dehimandu - 8 0.5 98/99Baitadi Mudap Gurukhola - 7 1.22 98/99Baitadi Dodar Kedar Gurukhola - 9 2 98/99Baitadi Pali Gurukhola - 9 2.3 98/99Baitadi Balgad Durgabhawani - 7 2.8 98/99Baitadi Takgaun Durgabhawani - 6 5 99/00Baitadi Bagurad Gurukhola - 3 3.5 99/00Baitadi Barnaula DCM -1 4.5 99/00Baitadi Dewalhat DCM - 1 0.25 99/00Baitadi Babet DCM -1 1 99/00Baitadi Pallachaudali DCM - 4 1.27 99/00Baitadi Rosera DCM - 6 1.5 99/00Baitadi Sukutti DCM - 7 3.6 99/00Baitadi Jukepani Siddheswar - 9 3.5 2000/01Baitadi Daisili Siddapur - 2 7.5 2000/01Baitadi Gailekgaun Siddapur - 2 3.4 2000/01Baitadi Sargadh Dehimandu-3 4.3 2000/01Baitadi Kumaligad Sprinkle Dehimandu-3 0.5 2000/01Baitadi Nagadibata Patan - 1 10 2000/01Baitadi Sillauda Basantpur - 7 3.6 2000/01Baitadi Gwallek Darshan Gwallek - 7 4.6 2000/01Baitadi Pujaragaun Durgasthan - 3 42.5 2000/01Baitadi Taak DCM - 6 10.4 2000/01

Type of Scheme Program District Project Name CA

Water Harvesting Tank VDRC-MIT Tanahu Sandhebagar 3.75

VDRC-MIT Tanahu Ghiring Thok 1VDRC-MIT Tanahu Dukudanda 0.5VDRC-MIT Kaski Keoradi 0.6VDRC-MIT Kaski Dhanubas 0.6VDRC-MIT Gorkha Plaing 2.55

Motor Pump Scheme VDRC-MIT Tanahu Gauritar 0.1

VDRC-MIT Tanahu Debghat 0.65VDRC-MIT Tanahu Dhapani 1.1VDRC-MIT Tanahu Pipaltar (tubewell) 1.1VDRC-MIT Gorkha Gumlek 1.4

Drip Irrigation Scheme VDRC-MIT Nawalparasi 87 Nos 2.4375

Cemented Tank VDRC-MIT Nawalparasi Ghaderitandi Micro Irrigation 3.6

Pedal Pump VDRC-MIT Nawalparasi Diff. VDCs 1.8

Detail of Non Conventional Projects

LILI-Helvetas Canal Irrigation

CEAPRED Macro Scheme

Micro Scheme

168

Page 180: Irrigation Database

TABLE 9Planned vs Developed Command Area

Gross Net Gross Net Summer Winter Spring Gross Net Gross Net(A) FMIS

ADB/N 352 21178 16957 21174 16912 16631 2601 1124 3 0 4 45AGRIL 5 750 600 750 600 600 0 0 0 0 0 0DIDP 65 2795 2221 2742 2179 2179 1425 355 53 42 53 42DOI 329 72172 58384 64422 52184 38759 52564 2137 7750 6200 7750 6200 Babai I.PERIP 100 11400 9104 10215 8155 5169 4023 829 4927 3935 1185 949FIWUD 197 23090 18449 23090 18449 18449 0 0 0 0 0 0GADP 6 150 120 150 120 120 0 0 0 0 0 0GTZ 1 231 185 231 185 185 0 0 0 0 0 0HFP 43 2188 1741 2188 1741 1741 0 0 0 0 0 0IDP 15 4333 3683 4333 3683 0 0 0 0 0 0 0ILC 282 34973 29185 34866 29177 25060 4533 1193 27 121 107 8ISP 376 71490 57753 70676 57582 52828 19974 5472 6825 5415 814 171K-BIRD 16 1754 1403 1754 1403 1403 666 0 0 0 0 0KHILL 33 1759 1403 1759 1403 1403 0 0 0 0 0 0M/HILL 46 3602 2878 3162 2526 2409 1202 175 440 352 440 352MAIN 19 2645 2117 2645 2117 2117 0 0 0 0 0 0MIN 94 37667 30135 37667 30135 30135 0 0 0 0 0 0MIP 65 20277 19769 4336 4298 0 0 0 0 0 15941 15471 On-going ProjectMPLD 95 3901 3109 3901 3109 3109 7 0 0 0 0 0N CARE 41 6011 4805 6011 4805 4868 0 0 0 0 0 0NISP 404 58006 49296 54938 46703 0 0 0 0 0 3068 2593 Carry-over ProjectPEOPLE 6 3379 2703 3379 2703 2703 0 0 0 0 0 0SI 11 3212 2568 3212 2568 2568 1210 0 0 0 0 0SINKA 55 3781 3023 3781 3023 2762 1534 0 0 0 0 0SIP 67 6842 5496 6842 5496 5422 1440 102 0 0 0 0SISP 283 48405 41147 42418 36059 0 0 0 0 0 5987 5088 Carry-over ProjectTotal of (A) 3006 445991 368234 410642 337315 220620 91179 11387 20025 16065 35349 30919(B) DOI 178 389361 314571 389579 324171 224955 92336 3600 500 400 -218 -9600Total of (A) +(B) 3184 835352 682805 800221 661486 445575 183515 14987 20525 16465 35131 21319

Project RemarksArea to be developedCommand Area Irrigate (ha) Ongoing No of Project Planned Developed

169