Page 1: Introducing PWE March 2012
Page 2: Introducing PWE March 2012

t tcontents

• about us• quality policy, HSE & Environ• organization & staff• profile, capabilities & service• organization & staff• experience• contact details

nment policy

s

EN ISO 9001:2008EN ISO 9001:2008Certificate Reg. No 20 100 112006707

EN ISO 14001:2004Certificate Reg. No 20 104 112006708

OHSAS 18001:2007Certificate Reg. No 20 116 112006709

Page 3: Introducing PWE March 2012

b tabout us

• Pureworld Engineering - industrial engineering• Pureworld Engineering - industrial engineering company operating in Romania. The parent Company of Pureworld Engineering is JMG Investments, based in Switzerland, and Gibbs International Inc, USA is the major shareholder of JMG Investments.

• Pureworld’s endeavor towards excellence in t ti lit f t fconstruction quality, safety, performance,

employee satisfaction and social responsibility has enabled it to be the a trusted company for Engineering and Procurement servicesEngineering and Procurement services.

• Pureworld has a strong bias towards oil and gas related activities and is a leader in the provision of engineering and procurement services with g g pdistinctive capabilities in the design of projects with technological competencies.

• Pureworld have partnerships with international fEPC firms.

Page 4: Introducing PWE March 2012

b tabout us

• Core competencies are basic engineering, detail

engineering and procurement assistance.

• Engineering and project management for the oil

and gas, power, biofuels and renewable energy,

i l d i d t iminerals and process industries.

• Working as a team for more than 20 years.

• Company structure covers all disciplines involved

in the development of industrial projects.

• Strong team for Plant 3D CAD Modeling.

• Cooperating with other engineering companies• Cooperating with other engineering companies

worldwide as a sub-contractor, with experience in

multi-office jobs.

Page 5: Introducing PWE March 2012

lit li HSE & E iquality policy, HSE & Enviro

Quality Management System

Pureworld’s general management has set up a QualityPureworld s general management has set up a Quality Management System in compliance with ISO 9001 standard. This QMS system is configured to continually improve its effectiveness at each stage of the work cycle andits effectiveness at each stage of the work cycle, and to ensure the involvement and professional development of personnel at all levels.All Pureworld employees are responsible for developing and delivering a high quality products anddeveloping and delivering a high quality products and services.

EN ISOCertificate RegCertificate Reg.

EN ISOCertificate Reg.

OHSASCertificate Reg.

t lionment policy

HSE & Environment policy

Pureworld designates as essential corporate objectivesPureworld designates as essential corporate objectives a continuous improvement of the HSE policy in our a activities.We are committed to the health and welfare of persons, the safety of plants and the prevention of thethe safety of plants and the prevention of the environment.Our activity is in compliance with OHSAS 18001.Pureworld is committed to leading the industry in minimizing the impact of its activities on theminimizing the impact of its activities on the environment, complying ISO 14001.

O 9001:2008No 20 100 112006707No 20 100 112006707

O 14001:2004No 20 104 112006708

S 18001:2007No 20 116 112006709

Page 6: Introducing PWE March 2012

i ti & t fforganization & staff

Page 7: Introducing PWE March 2012

i ti & t ffDISCIPLINE

organization & staff

Process engineering

Piping & Mechanical

Civil & Structural

Instrumentation and control

ElectricalElectrical

Procurement

Project management / Cost control and Planning

Project management

Administration, other

TOTAL – permanent staffTOTAL permanent staff

Temporary staff – civil

Temporary staff – Instrumentation and control

Temporary staff – piping

Temporary staff – process

TOTAL – temporary staff

TOTAL

ACTUAL FORECAST 2012

12 14

10 15

6 7

3 4

2 42 4

0 1

2 3

2 3

4 5

41 5441 54

3

3

3

2

11

52

Page 8: Introducing PWE March 2012

fil biliti & iprofile, capabilities & servicindustries / services provided

Upstream an downstream

Petrochemical and Chemical Plants

Petrochemical and Chemical Plants

Industrial Processes

Power Generation

Environmental

S

ces

Feasibility & Concept Studies

HAZOP StudiesHAZOP Studies

Basic Engineering

Detail Design

Environmental Studies and Projects

Revamping, Modification and Retrofitting Plants

Evaluation of Plant and Assets

Project Management

Field Supervision

P j t C t l (C t C t l Pl i d S h d li )Project Controls (Cost Control, Planning and Scheduling)

Assistance for Authorities Permits

Assistance for Pre-commissioning, Commissioning and

Start-up Activities

Page 9: Introducing PWE March 2012

fil biliti & iprofile, capabilities & servicexpertise

PROCESS

Feasibility & Concept Studies

IN

P

HAZOP Studies

Process and Environmental Studies

Basic Engineering

I

F

DBasic Engineering

Process Simulation

Process Flow Diagram PFD

D

P

Re

Piping and Instrument Diagram P&ID

Hydraulic Studies

Safety Analysis

I

fo

Thermal and Hydraulic Rating of Heat Exchangers Fired

Heaters

Surge and Pulsation AnalysisSurge and Pulsation Analysis

Operating Manuals

F

I

ces

NSTRUMENTATION AND CONTROL

P&ID Control System Definition

Instrument Data Base Management

Field Instrument Data Sheet (Sizing)/Specification/Requisition

DCS/ESD/F&G/Metering System Management/SupervisionDCS/ESD/F&G/Metering System Management/Supervision

Package Specification and Vendor Document and Drawing

eview

Instrumentation Detail Design Document and Drawings, as

ollows

Hook-up Drawings and Material Take-offg

Loop and Wiring Diagrams

Layout Drawings for Field Instruments, Control and

Technical Room Analyzer House etcTechnical Room, Analyzer House, etc.

Main and Secondary Cable Routing and Cable List

FAT and SAT Activities

Intrinsic Safety System Documentation

Page 10: Introducing PWE March 2012

fil biliti & iprofile, capabilities & servicexpertise

PIPING

Equipment LayoutEquipment Layout

Piping and Equipment Layout Studies

Analysis of allowable forces & moments on equipment

nozzles

Pipe stress analysis (static, dynamic & seismic above

ground & underground)g g )

Standard & Special supports; Special items (Expansion

joints; Spring support, etc.)

Pi i M t i l T k OffPiping Material Take Off

Isometric & General Arrangements

PDS & PDMS 3D Modeling Equipment, Pipes, Supports

(over 30 years cumulated experience of the people as 3D

software users)

Model review (30% 60% 90%)Model review (30%, 60%, 90%)

Clash check analysis

ces

MECHANICAL

Static Equipment calculation: Mechanical design anchorStatic Equipment calculation: Mechanical design, anchor

bolts, Weights for columns, Drums, Heat Exchangers, Fired

Heaters, Tanks

Rotating Machines: Process Pumps, Compressors

Specification, Datasheets, Inquire & Requisition, Bid

Analysisy

Sketches & Guide drawings for: Nozzles orientation, Clips

for piping, supports and platforms

D t il d D i & V d d t R iDetailed Drawings & Vendor document Review

Remaining Lifetime Assessment

Insulation & Painting take-off

Shop/Site Technical Assistance

Page 11: Introducing PWE March 2012

fil biliti & iprofile, capabilities & servicexpertise

CIVIL

Layouts

Static and dynamic analysis for wind & seismic loads

Detail design for:Detail design for:

Concrete structures

Foundation and structure reinforcement and

f kformwork

Roads and pavement

Sewerage and water drainage

Plumbing and water supply

Material take-off

Field supervisionField supervision

Load capacity analysis and expertise for existing buildings

and concrete structures

ces

STEEL STRUCTURES

Main steel Structure guide drawings

Static and dynamic analysis for wind & seismic loads

Platform & miscellaneous steel work drawings

Steel structure shop drawings and follow-up

Material take-off

Load capacity analysis and expertise for steel structures

Page 12: Introducing PWE March 2012

fil biliti & iprofile, capabilities & servicexpertise

ELECTRICAL

Studies and calculations (short circuit level cable sizingStudies and calculations (short circuit level, cable sizing,

cable ampacity)

Consumer list and load balance

General one-line diagram

Diagrams (switchboards & MCC single line, schematic

diagrams)

Hazardous area classification

Specifications/Data sheets, Inquires, Requisition, Bid

AnalysisAnalysis

Substation detailed layout

Cable list

Lighting, Earthing, Lightning, Communication system

Heat tracing system

Installation drawings, details and material take-offg ,

ces

Page 13: Introducing PWE March 2012

j t t lproject control

Pureworld will provide experienced personnel to support t Projcontrol, earned values, change control. For this purpose we us

1. Initial - the schedule will be based on milestone schedule a

2. Progress Reporting - provide weekly/monthly reports, with Progress status actual vs plannedProgress status actual vs. plannedProgress “S” curveDescription of the work performed during previous period / DDocument control registerProject ScheduleProject ScheduleAwaited information/hold points and Need ListChange Order statusInvoicing status

3. The planning documents are prepared by the Project ControLeads of the Engineering/Design Disciplines.Milestones ScheduleTi S h d l l l I O ll P j t S h d l / Ti S hTime Schedule level I – Overall Project Schedule / Time ScheTime Schedule level III – detailed at package levelThe Schedule is presenting the project milestones, all key actidurations, the critical path and float.Th P j t h d l i i di ll d t d ith t l lThe Project schedule is periodically updated with actual values

ject Managers in the areas of network scheduling, cost se PRIMAVERA/Microsoft Project .

and will be create for the support of execution phase.

the following content:

Description of the work to be done during next period

ols/Planning Engineer, based on information provided by the

d l l l II d t il d b di i liedule level II – detailed by discipline

vities with corresponding start/completion dates and

d it i tt h t t th M thl R ts and it is attachment to the Monthly Report.

Page 14: Introducing PWE March 2012

REFERENCES LISTiexperience

Client Project name

Rompetrol Petromidia Refinery Particulate emission reduction at FCC plant ROMPRAFINARE

Li i PEL L ll N LNG lLitwin PEL - Lamprell New LNG plant

ADCO Abu DhabiLitwin PEL - Lamprell

Engineering Services for miscellaneous PMRFs BABATCH – 4

GASCO Abu Dhabi EPC of Habshan Oily Water SumpLitwin PEL - Lamprell

EPC of Habshan Oily Water Sump

GASCO Abu DhabiLitwin PEL - Lamprell

Stress vibration analysis & pipe supports adequacy

Enereco Italy Various Upstream projectsEnereco Italy Process Specification PreparationEnereco Italy Process Specification PreparationEnereco Italy Process Specification PreparationOMV PetromEnreco Italy

OMV Petrom Surface Facilities Development Progr

OMV Petrom OMV Petrom Surface Facilities Development ProgrEnreco Italy

OMV Petrom Surface Facilities Development Progr

Project location ScopePETROL Romania Pre-feasibility Study

Djib i 3D d lliDjibouti 3D modellingAB

UAE Engineering & Design

UAE Engineering & DesignUAE Engineering & Design

y study UAE Engineering & Design

Irak Engineering & DesignTurkmenistan EngineeringTurkmenistan EngineeringKazahstan Engineering

ram Romania Authority Engineering

ram Romania Feed, Basic Engineering & Detail ram RomaniaDesign Services

Page 15: Introducing PWE March 2012

REFERENCES LISTi t i

Client Project name

previous team experience –

jCoffeyville Refinery - CCR Platformer Unit GasHydrotreaterPlacid Refinery - New Gasoline Hydrotreater USinclair Refinery - Gasoline Hydrotreater UnitP&ID'S updating for Ethoxylation Unit RevampFortron Industries - DB6 ExpansionTesoro Salt Lake City Benzene ReductionCelanese/Bishop Facility - Weak Formaldehyd

MUSTANG ENGINEERING

Recovery UnitHydrocracker Unit, KhersonHydrotreater Unit, GdanskHydrotreater Unit, Fort Hills Oil SandsHydrotreater Unit, CPC RDSLC Finner Unit, North WestHydrocracker Unit, NizhnekamskHydrocracker Unit, EngenCHEVRON LUMMUS GLOBAL DHC & MHC Hydrocracker Unit, JubailHydrocracker and Hydrotreater Unit, Tuape, RLC Finner Unit, CaltexHydrocracker Unit, MOL

(CLG)

Hydrocracker Unit and Hydrogen Plant, KomsIsodewaxing Unit, TanekoHydrocracker Unit, MazeikinEthylene Plant, TianjinEthylene Plant, ZhenhaiFCC Unit, Paradip, INDMAXFCC Unit, BRPL, INDMAX

LUMMUS TECHONLOGY

j t

Project location Scope

– projects

j psoline

USA - COFFEYVILLE, KANSAS Engineering & DesignUnit USA - TULSA Engineering & Design

USA - SINCLAIR, TULSA Engineering & Designp USA - CLARIANT CLEAR LAKE Detail Design

USA - WILMINGTON Detail DesignUSA - SALT LAKE CITY Engineering & Design

de USA - BISHOP TEXAS Detail DesignUkraine Basic Engineering ServicesPoland Basic Engineering ServicesCanada Basic Engineering ServicesTaiwan Basic Engineering ServicesCanada Basic Engineering ServicesTatarstan Basic Engineering ServicesSouth Africa Basic Engineering ServicesSaudi Arabia Basic Engineering Services

Rosneft Russia Basic Engineering ServicesKorea Basic Engineering ServicesHungary Basic Engineering Services

omolsk Russia Basic Engineering ServicesRussia Basic Engineering ServicesLithuania Basic Engineering ServicesChina Basic Engineering ServicesChina Basic Engineering ServicesIndia Basic Engineering ServicesIndia Basic Engineering Services

Page 16: Introducing PWE March 2012

REFERENCES LISTi t i

Client Project name

previous team experience –

Client Project nameJet Fuel Htdrotreating (Petromidia refinPiping revamp in FCC unit (PetromidiaFCC cooling towers revamp (PetromidH d ifi i i (P idi

ROMINSERV - ROMPETROL GROUPHydrogen purification unit (Petromidia Upgrading Loading and Transfer CapacPetromidia 9 Berth (Petromidia refineryGasoline Specification Improvement PIzmir refineryTUPRAS Izmir refineryOxygenate Tanks, Loading and Transf

SP1BIS PROJECTLeuna - MMA Project

TUPRAS

LITWIN FRANCELavan FEED Project

BATEMAN KAZAKSTANPKKR -Kumkol South EOR Project - HMiscible Flood

ENERECO - Italy Pancevo RefinerySAINT GOBAIN - ISOVER Minearl Wool Unit

PENSPEN INTERNATIONALVibration Study and Stress analysis foH2S Strippers

PETROSTAR IDO Flowstation Electrical & InstrumenKNORR - UNILEVER Aeration Unit

Design of HP Flare KO Drum VesselsCalculation & Shop DrawingsDesign of Atmospheric KO Drum VessC l l ti & Sh D i

ALCON Nigeria

Calculation & Shop DrawingsJACOBS France Pirelli Unit - Feasibility StudyOMV - PETROM Stress analysis - Arpechim refinery

j t

Project location Scope

– projects

Project location Scopenery) Romania Engineering & Designa refinery) Romania Engineering & Designia refinery) Romania Engineering & Design

fi ) R i E i i & D irefinery) Romania Engineering & Designcity of y) Romania Engineering & Design

Project GSIP - Turkey Engineering & DesignTurkey Engineering & Design

fer System Turkey Engineering & DesignAlgeria Engineering & DesignGermany Engineering & DesignIran Engineering & Design

Hydrocarbon Kazakhstan Front End Engineering DesignSerbia Basic Engineering ServicesRomania Engineering & Design

or 14" Header to UAE

ntaion Building Nigeria Engineering & DesignRomania Engineering & Design

(Mechanical Nigeria Engineering & Design

sel (Mechanical Ni i E i i & D iNigeria Engineering & DesignRomaniaRomania Engineering

Page 17: Introducing PWE March 2012

ft & h d bsoftware & hardware capab

GENERAL PROCESS ELECTRICAL CIVIL&STRUCTURAL INSTRUMENTATIONMicrosoft Windows HYSIS SKM PowerTools Foundation 3D SP Intrumentation (Ic oso t do s S S SKM PowerTools ou dat o 3 SP Intrumentation (IMicrosoft Office PROII Groundmat DSAnchor InstruCalcMicrosoft Outlook HTRI ETAP Combined 3DMicrosoft Server AFT  Impulse Visual Lighting MAT 3D

ChemCAD AmpCalcSP P&ID LitePro MathCAD

Calculux Descon BraceVisual DesconWinCEAG SAP2000TraceCalc® ProCalcWare

File Server with high storage capacity

E il E hE-mail server - Exchange

RDB Server

High capacity storage server

PC workstations and 3D CAD workstationsPC workstations and 3D CAD workstations

A4 – A0 copier/printer/scanner network device

bilitibilities

N MECHANICAL PIPING/STRESSCAD PROJECT CONTROL DATABASE REMOTE

NTOOLS) Caesar II PDS  Microsoft Project Oracle CITRIXNTOOLS) Caesa PDS  Microsoft Project Oracle CITRIXFEPipe PDMS  Primavera SQLPipePlus AutoCad

PCC‐Red Bag NozzlePro NavisWorksIsogen Microstation

Internet access 50Mbp/s CRC

VPNVPN

Data exchange process with clients using FTP (File Transmission

Protocol)

Security Router & Firewall for VPNSecurity - Router & Firewall for VPN

Phone system with IP and video phone capability

Page 18: Introducing PWE March 2012

ffi l ti & t toffice location & contacts

S.C. PU

AddressAddress

Phone:Fax:E-mail:E-mail:

REWORLD ENGINEERING S.R.L.

s: 1A Eroilor Square Ploiesti Prahova Romanias: 1A Eroilor Square, Ploiesti, Prahova, Romania“Petrom Building”+40 344 148 004+40 344 148 005office@pureworld [email protected]

EN ISO 9001:2008EN ISO 9001:2008Certificate Reg. No 20 100 112006707

EN ISO 14001:2004Certificate Reg. No 20 104 112006708

OHSAS 18001:2007Certificate Reg. No 20 116 112006709