in'this'issue: vrf'zoning:'perfect'hvac' solution'for...

15
Winter 2013 Home Subscribe Email to a Friend Print This Issue Last Issue IN THIS ISSUE: VRF Zoning: Perfect HVAC Solution for Historic Renovations Adding or updating an HVAC system in a historic building can present significant challenges. Historic structures often lack space for ductwork, and their electrical systems were not designed to accommodate central cooling and heating equipment. What's more, installation of ducts and heavy equipment can blemish stunning architecture. Interview with an Architect: Kurt Haapala, Principal, Mahlum Architects Mitsubishi Electric US Cooling & Heating Division interviewed Kurt Haapala, AIA, LEED AP, principal, Mahlum Architects . . . VRF Zoning System Protects Colorado’s History Established in 1879, the Colorado Historical Society has long served as the state’s memory keeper. In 2008, the society sought . . . Retiree’s Renovated Home Reduces Energy Usage by 80 Percent When Catherine O’Neill retired, she wanted to create a comfortable home with a distinct energyVefficiency statement. New SPSeries Addition Is Only 5Pton, SinglePphase System on the Market Mitsubishi Electric has announced an addition to its Variable Refrigerant Flow (VRF) zoning SVSeries cooling and heating systems. Mitsubishi Electric Showcases New 5Pton Outdoor Unit at Greenbuild In November, Mitsubishi Electric showcased its new SVSeries PUMYVP60 model at the leading green building trade show . . . LEED Version 4 Testing Underway Testing of the new Leadership in Energy and Environmental Design (LEED) construction rating system is underway, with version 4 standards expected to launch . . . R2PSeries Named Product Innovation Award Winner The Mitsubishi Electric R2VSeries recently was honored by Architectural Products magazine with a Product Innovation Award . . . Featured Video HGTV designer Cortney Novogratz discusses design considerations for installing Mitsubishi Electric units. Mitsubishi Electric recently developed a white paper for Architect magazine that outlines the many benefits of Variable Refrigerant Flow (VRF) zoning technology and how architects can garner a substantial number of points toward LEED certification by specifying the systems. Click here to read the white paper. Check Us Out on: Join our communities and follow the latest in Mitsubishi Electric systems and industry news. Return to Top | www.MEHVAC.com Subscribe Email to a Friend Print This Issue Last Issue © 2013 Mitsubishi Electric & Electronics USA, Inc.

Upload: vuongdat

Post on 21-Aug-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Winter'2013 Home % Subscribe % Email%to%a%Friend % Print%This%Issue % Last%Issue

IN'THIS'ISSUE:

VRF'Zoning:'Perfect'HVAC'

Solution'for'Historic

RenovationsAdding%or%updating%an%HVAC%system%in%a%historic%building%canpresent%significant%challenges.%Historic%structures%often%lack%spacefor%ductwork,%and%their%electrical%systems%were%not%designed%toaccommodate%central%cooling%and%heating%equipment.%What'smore,%installation%of%ducts%and%heavy%equipment%can%blemishstunning%architecture.

%

Interview'with'an'Architect:

Kurt'Haapala,'Principal,'Mahlum'Architects

Mitsubishi%Electric%US%Cooling%&%Heating%Divisioninterviewed%Kurt%Haapala,%AIA,%LEED%AP,%principal,Mahlum%Architects%.%.%. %

VRF'Zoning'System'Protects'Colorado’s'History

Established%in%1879,%the%Colorado%Historical%Societyhas%long%served%as%the%state’s%memory%keeper.%In2008,%the%society%sought%.%.%.

Retiree’s'Renovated'Home'Reduces

Energy'Usage'by'80'Percent

When%Catherine%O’Neill%retired,%she%wanted%tocreate%a%comfortable%home%with%a%distinctenergyVefficiency%statement.

New'SPSeries'Addition'Is'Only'5Pton,

SinglePphase'System'on'the'Market

Mitsubishi%Electric%has%announced%an%addition%toits%Variable%Refrigerant%Flow%(VRF)%zoning%SVSeriescooling%and%heating%systems.

Mitsubishi'Electric'Showcases'New'5Pton'

Outdoor'Unit'at'Greenbuild

In%November,%Mitsubishi%Electric%showcased%itsnew%SVSeries%PUMYVP60%model%at%the%leading%greenbuilding%trade%show%.%.%.

LEED'Version'4'Testing'Underway

Testing%of%the%new%Leadership%in%Energy%andEnvironmental%Design%(LEED)%construction%ratingsystem%is%underway,%with%version%4%standardsexpected%to%launch%.%.%.

R2PSeries'Named'Product'Innovation

Award'Winner

The%Mitsubishi%Electric%R2VSeries%recently%washonored%by%Architectural%Products%magazine%with%aProduct%Innovation%Award%.%.%.

Featured'Video%HGTV%designer%Cortney%Novogratzdiscusses%design%considerations%forinstalling%Mitsubishi%Electric%units.

Mitsubishi% Electric% recently% developed% a% white% paper% for% Architectmagazine% that% outlines% the% many% benefits% of% Variable% RefrigerantFlow% (VRF)% zoning% technology% and% how% architects% can% garner% asubstantial%number%of%points%toward%LEED%certification%by%specifyingthe%systems.%Click%here%to%read%the%white%paper.

Check'Us'Out'on:

Join%our%communities%and%followthe%latest%in%Mitsubishi%Electricsystems%and%industry%news.

Return%to%Top%|%www.MEHVAC.com% Subscribe% Email%to%a%Friend% Print%This%Issue% Last%Issue©%2013%Mitsubishi%Electric%&%Electronics%USA,%Inc.

Winter'2013 Home% Subscribe% Email%to%a%Friend% Print%This%Issue% Last%Issue

VRF'Zoning:'Perfect'HVAC'Solution'for'HistoricRenovationsAdding%or%updating%an%HVAC%system%in%a%historic%building%can%present%significantchallenges.%Historic%structures%often%lack%space%for%ductwork,%and%their%electricalsystems%were%not%designed%to%accommodate%central%cooling%and%heatingequipment.%What's%more,%installation%of%ducts%and%heavy%equipment%can%blemishstunning%architecture..

Mitsubishi%Electric's%CITY%MULTI%Variable%Refrigerant%Flow%(VRF)%zoning%systemsmeet%all%these%challenges.%The%solutions%are%flexible%and%modular,%and%arespecifically%designed%to%minimize%disruption%to%the%building%and%preserve%itsaesthetic%integrity.%The%systems%are%easy%to%install,%especially%in%structures%withdelicate%plaster%walls%and%stately%brick%facades.

Mitsubishi%Electric%VRF%zoning%systems%require%only%a%small%opening%in%the%wall%orrooftop%for%connection%of%piping%from%the%outdoor%unit%to%the%Branch%Circuit%(BC)Controller,%so%there%is%minimal%impact%on%the%building%envelope.%The%indoor%unitscan%be%mounted%just%about%anywhere%(on%or%behind%a%wall,%in%the%ceiling%or%on%thefloor),%and%a%variety%of%styles%are%available.%Likewise,%the%outdoor%condensing%unitsare%compact%and%lightweight,%so%they%can%easily%be%placed%on%a%roof%withoutcompromising%the%building’s%structural%integrity.%WaterSsource%condensing%unitsare%available%to%provide%heat%exchange%from%an%available%water%loop.%These%unitsmount%inside%a%mechanical%room%for%easy%access%and%zero%impact%on%the%buildingenvelope.

VRF%zoning%systems%have%a%number%of%other%benefits.%They%take%advantage%ofinnovative%INVERTERSdriven%technology,%which%provides%superior%control%of%roomcomfort%and%energy%efficiency%by%varying%the%amount%of%refrigerant%needed

ARTICLES'IN'THIS'ISSUE:

VRF'Zoning:'Perfect'HVACSolution'for'Historic'Renovations

Interview'with'an'Architect:Kurt'Haapala,'Principal,Mahlum'Architects

VRF'Zoning'SystemProtects'Colorado's'History

Retiree's'Renovated'HomeReduces'Energy'Usageby'80'Percent

New'SQSeries'AdditionIs'Only'5Qton,'SingleQphaseSystem'on'the'Market

Mitsubishi'Electric'ShowcasesNew'5Qton'Outdoor'Unitat'Greenbuild

LEED'Version'4'TestingUnderway

R2QSeries'Named'ProductInnovation'Award'Winner

We'Appreciate'Your'Feedback

Was%the%information%in%this%article%useful?

%Yes% %No

Please%explain%your%response.%Thank%you.

throughout%the%system.%The%BC%Controller%directs%refrigerant%through%piping%to%thezones%to%be%cooled%or%heated.%They%can%simultaneously%cool%some%zones%whileheating%others.%VRF%systems%are%designed%for%quiet%operation.%The%INVERTERSdriven%compressor%motor%ramps%up%and%down%smoothly%to%meet%the%needs%of%thespaces%served,%versus%conventional%compressors%that%bang%on%and%off.%Thecompressor%is%housed%in%its%own%compartment,%surrounded%by%soundSdampeninginsulation,%to%further%reduce%noise.%Likewise,%the%indoor%units%use%fan%technologythat%can%deliver%air%quieter%than%a%human%whisper.

Best%of%all,%the%total%VRF%zoning%system%installed%cost%is%less%than%or%equal%to%thetotal%installed%cost%of%most%conventional%systems.%Also,%maintenance%is%minimalthanks%to%easyStoSaccess%filters,%minimal%ductwork%and%simple%wiring.

Vic%Amoroso,%president%of%A&J%Associates,%PC,%installed%a%Mitsubishi%Electric%VRFzoning%waterSsource%system%in%the%Muscatine%County%Courthouse,%Muscatine,Iowa.%Built%in%1907,%the%building%has%24SinchSthick%limestone%walls.

"There%are%so%many%benefits%to%this%system,"%the%40Syear%HVAC%design%engineersaid.%"First%of%all,%there%is%the%historic%preservation%accommodation%of%thistechnology,%which%is%the%least%intrusive%of%other%systems.%Then%there%is%the%superSquiet%aspect%of%the%indoor%units,%ideal%for%an%office%environment.%It's%so%quiet%thatpeople%often%ask%if%it%is%operating.%There%is%also%the%unique%INVERTERSdrivencompressor%that%varies%its%speed%to%match%the%indoor%cooling%or%heating%demand.”

“Perhaps%best%of%all,%we%were%able%to%remove%that%hideous%chiller%on%thecourthouse's%roof%that%spoiled%its%classic%lines,"%added%Sherry%Seright,%budgetdirector%for%Muscatine%County.%"The%diminutive%demands%of%this%VRF%zoningsystem%have%helped%us%bring%back%the%grandeur%of%our%courthouse.”

What%would%you%like%to%seein%our%next%issue?

If%you%would%like%more%information,%please%enter%your%email.

Submit

Featured'Video%HGTV%designer%Cortney%Novogratzdiscusses%design%considerations%forinstalling%Mitsubishi%Electric%units.

Mitsubishi% Electric% recently% developed% a% white% paper% for% Architectmagazine% that% outlines% the% many% benefits% of% Variable% RefrigerantFlow% (VRF)% zoning% technology% and% how% architects% can% garner% asubstantial%number%of%points%toward%LEED%certification%by%specifyingthe%systems.%Click%here%to%read%the%white%paper.

Check'Us'Out'on:

Join%our%communities%and%followthe%latest%in%Mitsubishi%Electricsystems%and%industry%news.

Return%to%Top%|%www.MEHVAC.com%©%2013%Mitsubishi%Electric%&%Electronics%USA,%Inc.

Subscribe% Email%to%a%Friend% Print%This%Issue% Last%Issue

An'Architect’s'Perspective

To%bring%the%East%62nd%Street%Historic%Mansions%in%New%York%City%up%to%the%highestsustainability%standards,%architect%Joseph%Pell%Lombardi%sought%an%innovativeHVAC%technology%to%replace%the%brownstones’%circaS1920%equipment.%He%choseMitsubishi%Electric%VRF%zoning%systems.

“For%my%extensive%work%in%conservation%and%preservation,%this%technology%isremarkable,”%Lombardi%said.%“With%outdoor%units%on%the%roof%and%tiny%pipesconnecting%the%indoor%units,%the%architectural%integrity%of%my%legacy%buildings%ispreserved.”

“This%is%an%outstanding%system%for%landmark%buildings,”%added%Dennis%Nico,director%of%facilities,%14S62%Realty%Corp.,%which%owns%the%brownstones.%“I%haveheard%lots%of%compliments%from%our%new%tenants.%They%find%the%VRF%systemcomfortable%and%easy%to%use.”

For%more%case%study%examples,%click%here.

Winter'2013 Home% Subscribe% Email%to%a%Friend% Print%This%Issue% Last%Issue

Interview'with'an'Architect:Kurt'Haapala,'Principal,'Mahlum'ArchitectsMitsubishi%Electric%US%Cooling%&%Heating%Divisioninterviewed%Kurt%Haapala,%AIA,%LEED%AP,%principal,Mahlum%Architects,%Portland,%Ore.,%for%insights%onhow%he%incorporates%Variable%Refrigerant%Flow%(VRF)zoning%systems%into%his%ecoNfriendly%designs.%Haapalahas%used%Mitsubishi%Electric%VRF%zoning%systems%since2004,%including%in%two%buildings%at%PacificUniversity—Burlingham%Hall%and%Gilbert%Hall—thatboth%earned%LEED%Gold%certification.

Mitsubishi'Electric'US'Cooling'&'Heating'Division(ME):%What%types%of%projects%does%your%firm%design?Kurt'Haapala'(KH):%We%work%on%a%large%range%of%sustainable%designs,%includinghigher%education%institutions,%research%facilities%and%healthcare%buildings.%I%workon%higher%education%buildings.

ME:%In%what%percentage%of%projects%do%you%use%VRF%zoning%systems?KH:%I%would%say%50%to%60%percent%of%the%higher%education%projects%I%design.

ME:%As%an%architect,%what%do%you%see%as%the%benefits%of%using%VRF%zoning%systems?KH:%The%flexibility,%the%user%comfort.%Those%are%the%big%features,%especially%in%aresidence%hall%where%you%might%have%Susan%in%one%unit%that's%facing%north%andthat’s%hot%and%needs%cooling,%and%Mark%in%a%unit%facing%south%and%who%has%adifferent%[comfort]%tolerance.%With%VRF%systems,%their%climate%preferences%do%notimpact%each%other.

ME:%VRF%zoning%systems%are%very%efficient.%How%do%they%compare%with%other%HVACsystems?%KH:%For%universities%that%don't%have%a%campuswide%infrastructure%but%areinterested%in%sustainability,%a%VRF%system%makes%the%short%list%instantly.%There%areother%systems,%such%as%groundNsource%heat%pumps,%that%are%even%more%efficient,but%they%come%with%a%higher%first%cost.%VRF%systems%hit%a%sweet%spot%of%bridgingaffordability%with%sustainability.

ME:%Do%you%see%any%challenges%working%with%VRF%zoning%systems?%KH:%The%No.%1%challenge%when%you%have%a%large%project%is%finding%a%place%for%thechillers.%It’s%an%aesthetic%challenge.%We%have%to%make%sure%we%have%the%rightmakeup%air%coming%in%and%the%right%clearances,%and%yet%find%a%place%where%they'renot%too%visually%obtrusive.

ME:%Have%you%worked%on%a%project%in%which%there%were%any%issues%that%a%VRFzoning%system%solved?KH:%Ackerman%Hall,%Western%Oregon%University,%is%a%good%example.%It's%the%firstLEED%Platinum%residence%hall%in%the%nation,%so%it%had%very%high%sustainability%goals.It%is%also%on%a%campus%that%has%a%campuswide%steam%system,%so%we%were%instructed

ARTICLES'IN'THIS'ISSUE:

VRF'Zoning:'Perfect'HVACSolution'for'Historic'Renovations

Interview'with'an'Architect:Kurt'Haapala,'Principal,Mahlum'Architects

VRF'Zoning'SystemProtects'Colorado's'History

Retiree's'Renovated'HomeReduces'Energy'Usageby'80'Percent

New'SUSeries'AdditionIs'Only'5Uton,'SingleUphaseSystem'on'the'Market

Mitsubishi'Electric'ShowcasesNew'5Uton'Outdoor'Unitat'Greenbuild

LEED'Version'4'TestingUnderway

R2USeries'Named'ProductInnovation'Award'Winner

We'Appreciate'Your'Feedback

Was%the%information%in%this%article%useful?

%Yes% %No

Please%explain%your%response.%Thank%you.

to%tie%into%the%central%plan%for%the%heating%for%the%student%rooms.%But%there%wasconcern%about%the%academic%spaces,%and%it%was%clear%those%spaces%needed%cooling.The%building%has%a%hybrid%system,%but%its%primary%goals%were%to%create%comfortableliving%environments%and%to%achieve%the%highest%levels%of%sustainability.%TheMitsubishi%Electric%VRF%system%was%able%to%fit%in%as%one%of%the%big%players%in%theoverall%project.

ME:%So,%there%are%projects%where%a%system%is%in%place%and%you%have%to%fit%in%a%VRFzoning%system?%KH:%When%we’re%designing%in%a%campus%setting,%the%first%thing%we%need%to%know%iswhat%are%the%utilities,%what%are%the%systems,%what%are%the%campuswideinfrastructures%that%we%are%tying%into—or%if%these%existing%systems%are%antiquatedand%that%they%don’t%want%us%to%tie%into.

ME:%How%does%a%VRF%zoning%system%gain%points%toward%LEED%certification?%KH:%It%touches%a%number%of%the%LEED%checklist%points,%so%that’s%a%benefit%to%adesign%team%that%is%looking%to%move%the%project%toward%LEED%certification.%But%theintrinsic%benefit%is%more%the%thermal%comfort,%the%controllability%for%the%users,which,%again,%hits%LEED%thermal%comfort%points.%For%me,%it%comes%down%to%studentcomfort%and%satisfaction.

ME:%Besides%contributing%to%LEED%certification,%what%were%the%overall%results%ofusing%the%VRF%zoning%systems%in%your%projects??%KH:%One%of%the%results%is%ease%of%maintenance.%I%know%for%a%fact%that%ChuckCarpenter,%who%is%one%of%the%primary%maintenance%staff%at%Pacific%University,%lovesthe%system.%It%has%not%failed%him—the%filters%are%easy%to%change,%and%it’s%been%avery%easy%system%for%him%to%monitor%with%the%controls%package.%He%was%veryinvolved%in%the%design%and%very%passionate%about%his%facilities.%He%used%to%tell%methat%he’d%get%up%in%the%morning%and%have%his%coffee%at%home,%pull%up%the%systemand%see%how%the%two%buildings%were%working.%And%then%when%he%got%to%work,%ifthere%needed%to%be%any%adjustments,%he%could%easily%make%them.

ME:%How%do%you%decide%on%a%type%of%HVAC%system%for%a%project?%What%makes%youultimately%decide%on%VRF%zoning?%KH:%A%lot%of%the%time,%it%boils%down%to%affordability.%We%present%a%matrix%for%ourclients%that%goes%through%first%cost,%lifecycle%cost,%longNterm%energy%efficiency,%easeof%maintenance%and%availability%of%parts.%We%put%this%matrix%in%front%of%them%withthe%different%systems%option—VRF,%groundNsource,%radiant%panel%systems—andexplain%the%benefits%and%drawbacks%of%each%one.%First%cost%is%a%huge%thing,especially%with%today’s%new%economy.%But%no%one%wants%to%just%go%with%the%lowest,cheapest%system,%because%they%know%they’re%going%to%pay%for%it%later%as%the%cost%ofenergy%continues%to%rise.%Sure,%there%are%cheaper%heating%and%cooling%systemsthan%VRF%zoning%systems,%but%they%don’t%have%the%same%kind%of%maintenanceprogram.%They’re%not%as%energy%efficient.%If%you’re%throwing%away%the%system%in%15years,%what’s%the%point?

What%would%you%like%to%seein%our%next%issue?

If%you%would%like%more%information,%please%enter%your%email.

Submit

Featured'Video%HGTV%designer%Cortney%Novogratzdiscusses%design%considerations%forinstalling%Mitsubishi%Electric%units.

Mitsubishi% Electric% recently% developed% a% white% paper% for% Architectmagazine% that% outlines% the% many% benefits% of% Variable% RefrigerantFlow% (VRF)% zoning% technology% and% how% architects% can% garner% asubstantial%number%of%points%toward%LEED%certification%by%specifyingthe%systems.%Click%here%to%read%the%white%paper.

Check'Us'Out'on:

Join%our%communities%and%followthe%latest%in%Mitsubishi%Electricsystems%and%industry%news.

Return%to%Top%|%www.MEHVAC.com%©%2013%Mitsubishi%Electric%&%Electronics%USA,%Inc.

Subscribe% Email%to%a%Friend% Print%This%Issue% Last%Issue

ME:%What%advice%would%you%give%an%architect%who’s%thinking%about%using%VRFzoning%systems%for%the%first%time?%KH:%I%would%say,%listen%to%your%mechanical%engineer.%But%do%your%homework%so%youunderstand%the%system%and%can%present%it%to%the%client%in%a%way%that%gives%themthe%pros%and%cons.%You%need%to%be%up%to%speed%on%the%technology.%That’s%not%adrawback.%I%think%all%of%the%newer%systems%are%more%complex,%like%our%cars%andcomputers.%It’s%just%part%of%the%evolution%of%our%built%environment.

Winter'2013 Home% Subscribe% Email%to%a%Friend% Print%This%Issue% Last%Issue

VRF'Zoning'System'Protects'Colorado’s'History

Established%in%1879,%the%Colorado%Historical%Society%has%long%served%as%the%state’smemory%keeper.%In%2008,%the%society%sought%to%reinvent%itself%for%a%21stIcenturyaudience%and,%four%years%later,%the%stunning%200,000IsquareIfoot,%$110%millionHistory%Colorado%Center%opened.%Designed%by%Tryba%Architects,%Denver,%thecenter’s%architecture%is%meant%to%be%as%monumental%as%its%exhibitions,%and%is%slatedfor%LEED®%Gold%certification.

To%meet%the%design%and%highItech%exhibit%requirements,%Craig%Watts,%PE,%LEED%AP,principal%with%MKK%Consulting%Engineers%(MKK),%Denver,%sought%a%flexible,%highIperformance%HVAC%system.%History%Colorado%also%needed%consistent%temperaturecontrol%for%when%Rocky%Mountain%temperatures%dip%below%zero.

MKK%specified%a%Variable%Refrigerant%Flow%(VRF)%zoning%system%from%MitsubishiElectric%Cooling%&%Heating.%The%system%was%equipped%with%a%Low%Ambient%CoolingKit,%which%guarantees%performance%to%minus%10%degrees%Fahrenheit.

Mitsubishi%Electric%VRF%zoning%systems%are%ideal%for%applications%that%requireprecise%temperature%control.%The%INVERTERIdriven%compressor%technologyresponds%instantly%to%indoor%and%outdoor%temperature%changes,%varying%theirspeed%to%meet%load%requirements%and%maintain%a%set%temperature.

Providing%cooling%to%server%rooms%and%electrical%closets%is%a%challenge,%especiallywhen%they%are%located%throughout%a%building.%The%Mitsubishi%Electric%system%haslong%piping%line%lengths,%so%rooms%can%easily%be%connected%to%one%system.

“This%approach%helped%us%save%on%installation%costs%by%reducing%the%amount%ofequipment,%electrical%wiring%and%piping%on%the%project,”%said%Chris%Zalinger,%projectmanager,%RK%Mechanical,%Denver.

Operating%an%airIcooled%airIconditioning%system%in%cold%weather%presents%a%unique

ARTICLES'IN'THIS'ISSUE:

VRF'Zoning:'Perfect'HVAC

Solution'for'Historic'Renovations

Interview'with'an'Architect:

Kurt'Haapala,'Principal,

Mahlum'Architects

VRF'Zoning'System

Protects'Colorado's'History

Retiree's'Renovated'Home

Reduces'Energy'Usage

by'80'Percent

New'SRSeries'Addition

Is'Only'5Rton,'SingleRphase

System'on'the'Market

Mitsubishi'Electric'Showcases

New'5Rton'Outdoor'Unit

at'Greenbuild

LEED'Version'4'Testing

Underway

R2RSeries'Named'Product

Innovation'Award'Winner

We'Appreciate'Your'Feedback

Was%the%information%in%this%article%useful?

%Yes% %No

Please%explain%your%response.%Thank%you.

Featured'Video%

HGTV%designer%Cortney%Novogratzdiscusses%design%considerations%forinstalling%Mitsubishi%Electric%units.

Mitsubishi% Electric% recently% developed% a% white% paper% for% Architectmagazine% that% outlines% the% many% benefits% of% Variable% RefrigerantFlow% (VRF)% zoning% technology% and% how% architects% can% garner% asubstantial%number%of%points%toward%LEED%certification%by%specifyingthe%systems.%Click%here%to%read%the%white%paper.

Check'Us'Out'on:

Join%our%communities%and%followthe%latest%in%Mitsubishi%Electricsystems%and%industry%news.

Return%to%Top%|%www.MEHVAC.com%©%2013%Mitsubishi%Electric%&%Electronics%USA,%Inc.

Subscribe% Email%to%a%Friend% Print%This%Issue% Last%Issue

set%of%challenges,%like%maintaining%adequate%system%head%pressure%and%battlinguncontrollable%winds.%The%Mitsubishi%Electric%VRF%zoning%system%solved%thoseissues.

“I%knew%the%Low%Ambient%Cooling%Kit%was%vital%to%the%success%of%the%dataprotection%installation,”%Watts%said.%“It%also%became%clear%that%a%competitor’ssystem%did%not%have%the%technology%to%meet%this%need.%Having%the%kit%made%mychoice%simple.”

Likewise,%History%Colorado’s%Mitsubishi%Electric%system%performs%admirably%duringthe%summer%months.%“Even%though%we%had%record%heat%last%summer%in%Denver,%wehave%not%had%a%single%issue%related%to%the%units,”%said%Chief%Building%Engineer%DougCrowell.%“I%am%pleased%and%impressed%with%the%excellent%performance.”

To%view%the%full%version%of%the%case%study,%click%here.

What%would%you%like%to%seein%our%next%issue?

If%you%would%like%more%information,%please%enter%your%email.

Submit

Winter'2013 Home% Subscribe% Email%to%a%Friend% Print%This%Issue% Last%Issue

Retiree’s'Renovated'Home'Reduces'Energy'Usage'by'80'PercentWhen%Catherine%O’Neill%retired,%she%wanted%to%create%a%comfortable%home%with%adistinct%energyCefficiency%statement.%In%a%culCdeCsac%of%ranch%houses%near%historicdowntown%Sonoma,%Calif.,%she%purchased%a%runCdown%1962%farmhouse%that%hadnot%been%lived%in%for%years%but%that%had%“good%bones.”

To%transform%the%neglected%house%into%a%showcase%for%energy%efficiency,%O’Neillturned%to%Rick%Milburn,%founder%of%PassivWorks,%Inc.,%Vineberg,%Calif.%Togetherthey%decided%to%rebuild%the%home%to%the%Passive%House%(Passivhaus)%Standarddeveloped%in%Germany%in%1988.%Compared%to%traditional%dwellings,%a%PassiveHouse%reduces%overall%energy%usage%by%60%to%70%percent%and%heat%usage%by%90percent.

Using%energyCmodeling%data,%Milburn%decided%on%a%number%of%innovativeconstruction%techniques%and%products%to%make%the%home%extremely%airtight.Because%the%Passive%House%standard%for%air%leakage%is%extremely%low%and%thehomes%are%virtually%airtight,%the%O’Neill%house%was%wrapped%in%earthCfriendlyplywood%sheathing%and%another%barrier,%and%the%walls%were%stuffed%with%fiberglassinsulation.%Plus,%all%joints%were%tightly%sealed%with%building%tape.

The%O’Neill%farmhouse%also%was%dressed%with%a%premium%insulated%metal%roof%andtripleCpane%windows.%After%the%windows%were%installed,%an%airCtightness%test%foundthat%the%house%performed%30%percent%better%than%Passive%House%Standardrequirements.

Mitsubishi'Electric'System'a'Good'Match

Although%the%home’s%electricity%is%supplied%by%solar%panels,%for%backup%cooling%andheating%Milburn%installed%a%residential%system%without%ductwork%from%MitsubishiElectric.%“The%Mitsubishi%Electric%technology%is%the%most%wellCmatched%system%formeeting%[Passive%House]%energyCefficiency%goals,”%Milburn%said.%“Their%miniCsplitsystems%are%unique%for%meeting%small%cooling%and%heating%loads.%Plus,%the%indoor

ARTICLES'IN'THIS'ISSUE:

VRF'Zoning:'Perfect'HVACSolution'for'Historic'Renovations

Interview'with'an'Architect:Kurt'Haapala,'Principal,Mahlum'Architects

VRF'Zoning'SystemProtects'Colorado's'History

Retiree's'Renovated'HomeReduces'Energy'Usageby'80'Percent

New'SSSeries'AdditionIs'Only'5Ston,'SingleSphaseSystem'on'the'Market

Mitsubishi'Electric'ShowcasesNew'5Ston'Outdoor'Unitat'Greenbuild

LEED'Version'4'TestingUnderway

R2SSeries'Named'ProductInnovation'Award'Winner

We'Appreciate'Your'Feedback

Was%the%information%in%this%article%useful?

%Yes% %No

Please%explain%your%response.%Thank%you.

Featured'Video%HGTV%designer%Cortney%Novogratzdiscusses%design%considerations%forinstalling%Mitsubishi%Electric%units.

Mitsubishi% Electric% recently% developed% a% white% paper% for% Architectmagazine% that% outlines% the% many% benefits% of% Variable% RefrigerantFlow% (VRF)% zoning% technology% and% how% architects% can% garner% asubstantial%number%of%points%toward%LEED%certification%by%specifyingthe%systems.%Click%here%to%read%the%white%paper.

Check'Us'Out'on:

Join%our%communities%and%followthe%latest%in%Mitsubishi%Electricsystems%and%industry%news.

Return%to%Top%|%www.MEHVAC.com%©%2013%Mitsubishi%Electric%&%Electronics%USA,%Inc.

Subscribe% Email%to%a%Friend% Print%This%Issue% Last%Issue

and%outdoor%units%are%so%quiet%you%can’t%tell%they%are%in%operation.”

Besides%superior%efficiency,%the%single,%indoor%wallCmounted%unit%is%connected%withtwo%small%pipes%to%the%outdoor%unit,%so%walls%were%not%torn%up%to%add%ducts.%“Theunits%are%so%compact—the%outdoor%unit’s%the%size%of%a%suitcase,”%said%the%projectarchitect,%Jarrod%M.%Denton,%AIA,%Signum%Architecture,%St.%Helena,%Calif.

The%O’Neill%house%achieved%an%80%percent%reduction%in%energy%use%when%comparedto%a%typical%California%home.%The%retiree’s%combined%gas%and%electric%bills%averageless%than%$20%a%month.%Recently,%the%house%was%selected%by%the%U.S.%Departmentof%Energy%as%a%prototype%home%for%building%professionals%to%learn%from.

The%homeowner%is%thrilled:%“My%favorite%thing%about%my%house%is%that…it%is%notonly%highly%energy%efficient,%but%it’s%also%beautiful,%inviting%and%comfortable.”

To%view%the%full%version%of%the%case%study,%click%here.

What%would%you%like%to%seein%our%next%issue?

If%you%would%like%more%information,%please%enter%your%email.

Submit

Winter'2013 Home% Subscribe% Email%to%a%Friend% Print%This%Issue% Last%Issue

New'S/Series'Addition'Is'Only'5/ton,

Single/phase'System'on'the'Market

Mitsubishi%Electric%has%announced%anaddition%to%its%Variable%Refrigerant%Flow(VRF)%zoning%SBSeries%cooling%and%heatingsystems.%The%updated%SBSeries%PUMYBP60model%is%the%only%5Bton,%singleBphase%VRFzoning%system%available%for%homes%and%lightcommercial%spaces.%The%following%are%keyfeatures%of%the%new%SBSeries%model:

Features%INVERTERBdriven%compressorand%intelligent%microcompressor%controls.

Operates%at%as%low%as%22%percent%of%totalsystem%capacity.

Operates%down%to%minus%4%degrees%Fahrenheit.

Has%extended%line%length%to%492%feet.

Features%improved%efficiency%at%16.7%SEER.

Can%connect%to%up%to%12%indoor%units.

Is%compatible%with%all%Mitsubishi%Electric%indoor%unit%styles.

Is%compatible%with%the%CITY%MULTI®%Controls%Network%(CMCN).%The%SBSeriesopens%up%the%benefits%of%VRF%zoning%technology%to%lowBto%midBrise%commercialbuildings%and%larger%homes.%To%learn%more%about%the%SBSeries,%visitmitsubishipro.com.

ARTICLES'IN'THIS'ISSUE:

VRF'Zoning:'Perfect'HVAC

Solution'for'Historic'Renovations

Interview'with'an'Architect:

Kurt'Haapala,'Principal,

Mahlum'Architects

VRF'Zoning'System

Protects'Colorado's'History

Retiree's'Renovated'Home

Reduces'Energy'Usage

by'80'Percent

New'S/Series'Addition

Is'Only'5/ton,'Single/phase

System'on'the'Market

Mitsubishi'Electric'Showcases

New'5/ton'Outdoor'Unit

at'Greenbuild

LEED'Version'4'Testing

Underway

R2/Series'Named'Product

Innovation'Award'Winner

Featured'Video%HGTV%designer%Cortney%Novogratzdiscusses%design%considerations%forinstalling%Mitsubishi%Electric%units.

Mitsubishi% Electric% recently% developed% a% white% paper% for% Architectmagazine% that% outlines% the% many% benefits% of% Variable% RefrigerantFlow% (VRF)% zoning% technology% and% how% architects% can% garner% asubstantial%number%of%points%toward%LEED%certification%by%specifyingthe%systems.%Click%here%to%read%the%white%paper.

Check'Us'Out'on:

Join%our%communities%and%followthe%latest%in%Mitsubishi%Electricsystems%and%industry%news.

Return%to%Top%|%www.MEHVAC.com%©%2013%Mitsubishi%Electric%&%Electronics%USA,%Inc.

Subscribe% Email%to%a%Friend% Print%This%Issue% Last%Issue

Winter'2013 Home% Subscribe% Email%to%a%Friend% Print%This%Issue% Last%Issue

Mitsubishi'Electric'Showcases'New'5:ton'OutdoorUnit'at'GreenbuildIn%November,%Mitsubishi%Electric%showcased%its%new%CITY%MULTI%SASeries%PUMYAP60%model%at%the%leading%building%trade%show,%and%hundreds%of%attendees%visitedthe%booth%for%a%closer%lgreenook%at%the%Variable%Refrigerant%Flow%(VRF)%zoningsystem.

The%2012%Greenbuild%International%Conference%and%Expo%drew%more%than%30,000building%professionals%to%San%Francisco’s%Moscone%Convention%Center,%Nov.%14A16.The%event%featured%networking%opportunities,%inspiring%speakers,%workshops,tours%of%some%of%San%Francisco’s%greenest%buildings%and%a%chance%for%pros%to%learnabout%the%latest%in%green%building%practices,%products%and%technologies.

Sponsored%by%the%U.S.%Green%Building%Council,%Greenbuild%is%the%world's%largestconference%and%exposition%dedicated%to%green%building%design,%construction%andproducts.%San%Francisco%was%an%ideal%choice%for%the%event%because%it%has%beennamed%the%greenest%city%in%North%America%and%has%the%largest%number%USGBCLEED®%certified%buildings,%including%two%structures%in%the%Moscone%Center.

The%Mitsubishi%Electric%booth%featured%the%only%5Aton,%singleAphase%VRF%zoningsystem%designed%for%light%commercial%and%large%residential%applications.%Boothvisitors%were%impressed%that%Mitsubishi%Electric’s%VRF%zoning%systems%can%helpnew%and%renovated%buildings%earn%valuable%LEED%points%in%the%Energy%&Atmosphere%(EA)%and%Indoor%Environmental%Quality%(IEQ)%categories.

ARTICLES'IN'THIS'ISSUE:

VRF'Zoning:'Perfect'HVACSolution'for'Historic'Renovations

Interview'with'an'Architect:Kurt'Haapala,'Principal,Mahlum'Architects

VRF'Zoning'SystemProtects'Colorado's'History

Retiree's'Renovated'HomeReduces'Energy'Usageby'80'Percent

New'S:Series'AdditionIs'Only'5:ton,'Single:phaseSystem'on'the'Market

Mitsubishi'Electric'ShowcasesNew'5:ton'Outdoor'Unitat'Greenbuild

LEED'Version'4'TestingUnderway

R2:Series'Named'ProductInnovation'Award'Winner

Featured'Video%HGTV%designer%Cortney%Novogratzdiscusses%design%considerations%forinstalling%Mitsubishi%Electric%units.

Mitsubishi% Electric% recently% developed% a% white% paper% for% Architectmagazine% that% outlines% the% many% benefits% of% Variable% RefrigerantFlow% (VRF)% zoning% technology% and% how% architects% can% garner% asubstantial%number%of%points%toward%LEED%certification%by%specifyingthe%systems.%Click%here%to%read%the%white%paper.

Check'Us'Out'on:

Join%our%communities%and%followthe%latest%in%Mitsubishi%Electricsystems%and%industry%news.

Return%to%Top%|%www.MEHVAC.com%©%2013%Mitsubishi%Electric%&%Electronics%USA,%Inc.

Subscribe% Email%to%a%Friend% Print%This%Issue% Last%Issue

Winter'2013 Home% Subscribe% Email%to%a%Friend% Print%This%Issue% Last%Issue

LEED'Version'4'Testing'Underway

Testing%of%the%new%Leadership%in%Energy%andEnvironmental%Design%(LEED)%construction%ratingsystem%is%underway,%with%version%4%standardsexpected%to%launch%in%2013.

With%the%exception%of%new%federal%buildings,%LEEDcertification%is%voluntary%and%provides%a%standard%forenergyKefficient%and%environmentally%friendly%projects.Levels%of%certification%are%based%on%the%total%points%abuilding%achieves%on%a%100Kpoint%scale.

The%v4%proposal%includes%allocating%nearly%20%percent%of%all%points%to%optimizingenergy%performance%over%ASHRAE%90.1K2010,%a%move%that%would%increase%theemphasis%on%energy%efficiency%from%previous%versions,%according%to%the%U.S.%GreenBuilding%Council,%which%administers%the%program.%The%current%draft%also%grants%upto%nine%points%if%a%building%is%constructed%with%higherKquality%materials.

Other%anticipated%changes%include%the%following:

Added'market'sectors:%Data%centers,%warehouses%and%distribution%centers,hospitality%facilities%(e.g.,%hotels),%existing%schools,%existing%retail%and%LEED%forHomes%MidKRise.

Increased'technical'rigor:%Revisions%to%credit%weights,%new%credit%categoriesfocusing%on%integrated%design,%life%cycle%analysis%of%materials%and%an%increasedemphasis%on%measurement%and%performance.

Streamlined'services:%Enhancements%to%the%LEED%Online%platform%to%make%itmore%intuitive%and%new%tools%to%make%the%LEED%documentation%process%moreefficient.

ARTICLES'IN'THIS'ISSUE:

VRF'Zoning:'Perfect'HVAC

Solution'for'Historic'Renovations

Interview'with'an'Architect:

Kurt'Haapala,'Principal,

Mahlum'Architects

VRF'Zoning'System

Protects'Colorado's'History

Retiree's'Renovated'Home

Reduces'Energy'Usage

by'80'Percent

New'STSeries'Addition

Is'Only'5Tton,'SingleTphase

System'on'the'Market

Mitsubishi'Electric'Showcases

New'5Tton'Outdoor'Unit

at'Greenbuild

LEED'Version'4'Testing

Underway

R2TSeries'Named'Product

Innovation'Award'Winner

Featured'Video%HGTV%designer%Cortney%Novogratzdiscusses%design%considerations%forinstalling%Mitsubishi%Electric%units.

Mitsubishi% Electric% recently% developed% a% white% paper% for% Architectmagazine% that% outlines% the% many% benefits% of% Variable% RefrigerantFlow% (VRF)% zoning% technology% and% how% architects% can% garner% asubstantial%number%of%points%toward%LEED%certification%by%specifyingthe%systems.%Click%here%to%read%the%white%paper.

Check'Us'Out'on:

Join%our%communities%and%followthe%latest%in%Mitsubishi%Electricsystems%and%industry%news.

Return%to%Top%|%www.MEHVAC.com%©%2013%Mitsubishi%Electric%&%Electronics%USA,%Inc.

Subscribe% Email%to%a%Friend% Print%This%Issue% Last%Issue

Winter'2013 Home% Subscribe% Email%to%a%Friend% Print%This%Issue% Last%Issue

R2-Series'Named'Product'Innovation

Award'Winner

The%Mitsubishi%Electric%R2<Series%recentlywas%honored%by%Architectural+Productsmagazine%with%a%Product%Innovation%Award,which%recognizes%product%ingenuity%in%thebuilt%environment.%The%Product%InnovationAwards%span%all%product%categories%in%thecommercial%building%sector,%and%winners%areselected%by%experts%in%the%field.

Each%R2<Series%system%uses%VariableRefrigerant%Flow%(VRF)%zoning%technology%tosimultaneously%cool%and%heat%up%to%50%zoneswithin%a%building.%The%product%providesenergy<saving,%heat<recovery%operation%through%the%use%of%the%Branch%Circuit%(BC)Controller.

The%R2<Series%minimizes%wasted%energy%by%redirecting%waste%heat%that%wouldtypically%be%expelled%outdoors,%thus%resulting%in%optimum%energy%usage.%Thesystem%has%an%outdoor%temperature%range%of%minus%4%degrees%Fahrenheit%to%60degrees%Fahrenheit%when%heating,%and%23%degrees%Fahrenheit%to%115%degreesFahrenheit%when%cooling.%The%increased%temperature%range%of%this%series%offersdesign%capabilities%for%larger%systems.

ARTICLES'IN'THIS'ISSUE:

VRF'Zoning:'Perfect'HVAC

Solution'for'Historic'Renovations

Interview'with'an'Architect:

Kurt'Haapala,'Principal,

Mahlum'Architects

VRF'Zoning'System

Protects'Colorado's'History

Retiree's'Renovated'Home

Reduces'Energy'Usage

by'80'Percent

New'S-Series'Addition

Is'Only'5-ton,'Single-phase

System'on'the'Market

Mitsubishi'Electric'Showcases

New'5-ton'Outdoor'Unit

at'Greenbuild

LEED'Version'4'Testing

Underway

R2-Series'Named'Product

Innovation'Award'Winner

Featured'Video%HGTV%designer%Cortney%Novogratzdiscusses%design%considerations%forinstalling%Mitsubishi%Electric%units.

Mitsubishi% Electric% recently% developed% a% white% paper% for% Architectmagazine% that% outlines% the% many% benefits% of% Variable% RefrigerantFlow% (VRF)% zoning% technology% and% how% architects% can% garner% asubstantial%number%of%points%toward%LEED%certification%by%specifyingthe%systems.%Click%here%to%read%the%white%paper.

Check'Us'Out'on:

Join%our%communities%and%followthe%latest%in%Mitsubishi%Electricsystems%and%industry%news.

Return%to%Top%|%www.MEHVAC.com%©%2013%Mitsubishi%Electric%&%Electronics%USA,%Inc.

Subscribe% Email%to%a%Friend% Print%This%Issue% Last%Issue