Gordon M. Kranz, President, Enlightened Integrated Program Management2017 Project Management Symposium
INTEGRATED PROGRAM & PROJECT MANAGEMENT A STRATEGIC APPROACH
-
Agenda
IPM Overview Managing to Business Objectives Hierarchical Decomposition of Work Measuring for Success A Few Examples
5/4/2017 2017 Enlightened Integrated Program Management, LLC All Rights Reserved 2
-
Integrated Project Management
Integrated Program Management (IPM) A disciplined approach for boosting project and program
performance. IPM integrates all stakeholder perspectives into a joint execution plan
providing cross functional situational awareness of a projects health and status
Key Characteristics Integrated Program Management is an environment of collaboration Structured communications plan clearly understood by all
stakeholders
5/4/2017 2017 Enlightened Integrated Program Management, LLC All Rights Reserved 3
-
The Process
5/4/2017 Integrated PM Training Slide 4 2017 Enlightened Integrated Program Management, LLC All Rights Reserved
-
Integrated Program Management
5/4/2017 2017 Enlightened Integrated Program Management, LLC All Rights Reserved 5
-
Managing to Business Objectives
Business Strategy and Objectives Drive the Work Success Matures / Changes the Objectives
Chief Engineer Example
5/4/2017 2017 Enlightened Integrated Program Management, LLC All Rights Reserved 6
-
Business Objectives Become the Premier Avionics Supplier for commercial and military applicationsCommercial Avionics Portfolio Maintain and grow commercial avionics business overseas
Gulfstream AvionicsDesign, build, test and install GulfStream Control and Displays, Navigation, Communications System
Airbus Avionics Peform technolgy resfresh on Airbus Navigation and Digital Map SystemsOther Commercial Aircraft
Military Avionics Portfolio Grow US military Avionics Business
C-17 AvionicsPerform Technology refresh of C-17 Navigation System to leverage latest GPS Satellite capabilities
JSF Avionics Design, Build, Test, and Install JSF C4ISR Computer
Simple ExampleBusiness
ObjectivesPortfolio
Portfolio
Projects
Projects
5/4/2017 2017 Enlightened Integrated Program Management, LLC All Rights Reserved 7
-
Key Components of IPM Business to Project Traceability
Hierarchical work decomposition Flow of technical objectives to task completion in the
Schedule Integrated Analysis of cost, schedule, technical, and risk
5/4/2017 2017 Enlightened Integrated Program Management, LLC All Rights Reserved 8
Disciplined project planning and execution ensure project and business objectives are met
-
Risk & Risk Assessment- Level of Detail- Program Oversight
level of detail
Technical- TPMs
- Specifications- Design docs
- Performance char.
Earned Value Cost and Schedule Status
WBSScheduleIMP / IMS
Traceability Centers around the Work Breakdown Structure (WBS)
5/4/2017 Integrated PM Training Slide 9
WBS is the common language between all project domains
2017 Enlightened Integrated Program Management, LLC All Rights Reserved
-
Program WBS Considerations
5/4/2017 Integrated PM Training Slide 10
Interesting Observations / Considerations- Static model of the system
- Operational and Schedule Interdependencies are not shown
- Decomposed to Manageable Segments:- Software Development at Separate WBS Levels
(Supports Agile SW Development)- Considerations
- Cost, Schedule, Resources- Is Configuration Item?- Is sub-contracted?- Risk element that PM team needs visibility.
B.3 Work Breakdown Structure Levels Electronic SystemsWBS # Level Title WBS Dictionary
1 WBS Mission Computer SystemDesign, Build, and Test Ruggedized Mission Computer
1.1 WBS Mission Computer/ProcessingDesign, Build and Test Processing for C4ISR applicatio
1.1.1 WBS Mission Computer General Purpose Procure, test, and integrate off the shelf ruggedized processor. 2Ghz, 256G, etc
1.1.2 WBS Mission Computer Mass StorageDevelop embedded mass storage solid state drive 1 Terabyte
1.1.3 WBS Mission Computer Nework I/O Procure and integrated off the shelf ethernet
1.1.4 WBS Mission Computer Software Release Integrated Linux red hat, develop Built in Test, develop middleware network services.
1.1.5 WBS Mission Computer Integration, Asse Integrate and perform environmental testing
1.2 WBS Platform IntegrationSupport integration of the Mission Computer on to the Air Vehicle
1.3 WBS Systems EngineeringDevelop Specifications, Perform Requirements Traceability, Cnduct Technical Reviews
1.4 WBS Program ManagementConduct Monthly PMRs, Establish Risk Mgt Process, Develop Program Mgt Plan
1.5 WBS System Test and Evaluation1.6 WBS Training1.7 WBS Data1.8 WBS Peculiar Support Equipment1.9 WBS Common Support Equipment1.1 WBS Operational/Site Activation1.11 WBS Industrial Facilities1.12 WBS Initial Spares and Repair Parts
2017 Enlightened Integrated Program Management, LLC All Rights Reserved
-
Time Phased PlanningTypical DoD Approach
5/4/2017 Integrated PM Training Slide 11
Requirements
Design
Build
Test
Production
Event Based Planning Allows for Top Down Incremental Program Planning and Execution
SOW, WBS, Specifications
(Ref DAU)
2017 Enlightened Integrated Program Management, LLC All Rights Reserved
-
Example Integrated Master Plan-> Integrated Master Schedule
5/4/2017 Integrated PM Training Slide 12 2017 Enlightened Integrated Program Management, LLC All Rights Reserved
-
Incremental IMS Maturity
5/4/2017 Integrated PM Training Slide 13 2017 Enlightened Integrated Program Management, LLC All Rights Reserved
-
Establishing Incremental Objective Criteria
SOW/Spec RAM IMP IMS
Contractor Shall Conduct Technical Reviews
Conduct SFR, PDR, CDR, TRR
Entrance and exit criteria for each event put into IMP (i.e. Specs baselined, etc.) Acceptance Criteria defined
Tasks associated with each Acceptant criteria defined with objective completion criteria associated with AC.
Mission Computer Shall Weight no more than 50lbs
Develop system component architecture. 50lbs allocated to each sub-system.
Each sub-system weight allocations estimated monthly. GPP = 3lbs
Perform trade studies, analysis on latest designProcure GPP to meet functionality and weights 3 lbs
Mission computer shall be able to support C4ISR Processing in a tactical environment
Develop System Functional Design
Develop sub-system specification
Complete Draft SpecReviewUpdateBaseline
5/4/2017 2017 Enlightened Integrated Program Management, LLC All Rights Reserved 14
-
Agile Traceability Example
NDIA An Industry Practice Guide for Agile on Earned Value Management Programs v1.1 March 31, 2017
- Roadmap Identifies Key Events (Releases)
- Establishes Backlog Priority
EPIC B EPIC E
EPIC IEPIC F
EPICS C,H
EPICS D, G
Feature A1
A2EPIC A
Product Backlog
5/4/2017 2017 Enlightened Integrated Program Management, LLC All Rights Reserved 15
Work Flows from Prioritized Backlog into Sprints
-
Program Status and Health are determined by cross functional analysis
Lets take a look at three domains Cost Schedule Risk Technical Performance Measures
Integrated Analysis
5/4/2017 2017 Enlightened Integrated Program Management, LLC All Rights Reserved 16
-
WBS
OBS
IMSBAC
BCWS
Technical Planning, Scheduling and Cost Estimation
Distribution of technical task create the time phased budget
Progress on tasks must relate to cost baseline
Accumulation of the estimates for each chunk of work
Planning and Estimation
Building the Time Phased Plan
5/4/2017 2017 Enlightened Integrated Program Management, LLC All Rights Reserved 17
-
Time Phased Risk Burn Down Plan
25
20
15
10
5
02016 Qtr1
2016 Qtr2
2016 Qtr3
2016 Qtr4
2017 Qtr1
2017 Qtr2
2017 Qtr3
2017 Qtr4
2018 Qtr1
2018 Qtr2
2018 Qtr3
2018 Qtr4
2019 Qtr1
2019 Qtr2
2019 Qtr3
Step #1234
1-Jun-1715-Nov-17 1-Jul-18
DescriptionEstablish Root CauseEvaluate Alternative ResolutionsSelect AlternativeImplement alternative
Start Date Stop Date15-May-16 20-Aug-1620-Aug-16 31-Jan-17
InprocessPendingPendingPending
31-Jan-17
Risk Burn Down
Risk
Sco
re
Status
1
2
3
4
5/4/2017 2017 Enlightened Integrated Program Management, LLC All Rights Reserved 18
Sheet1
Risk Burn Down
Risk Score
25
20
15
10
5
0
2016 Qtr1 2016 Qtr22016 Qtr32016 Qtr42017 Qtr12017 Qtr22017 Qtr32017 Qtr42018 Qtr12018 Qtr22018 Qtr32018 Qtr42019 Qtr12019 Qtr22019 Qtr3
Step #DescriptionStatusStart DateStop Date
1Establish Root CauseInprocess15-May-1620-Aug-16
2Evaluate Alternative ResolutionsPending20-Aug-1631-Jan-17
3Select AlternativePending31-Jan-171-Jun-17
4Implement alternativePending15-Nov-171-Jul-18
1
2
3
4
-
Time Phased TPM Estimates
Within Plan
Outside of Plan
Technical Tasks Defined in the Schedule are related to maturing design
5/4/2017 2017 Enlightened Integrated Program Management, LLC All Rights Reserved 19
-
Integrated Analysis Examples
25
20
15
10
5
02016 Qtr1
2016 Qtr2
2016 Qtr3
2016 Qtr4
2017 Qtr1
2017 Qtr2
2017 Qtr3
2017 Qtr4
2018 Qtr1
2018 Qtr2
2018 Qtr3
2018 Qtr4
2019 Qtr1
2019 Qtr2
2019 Qtr3
Step #1234
1-Jun-1715-Nov-17 1-Jul-18
DescriptionEstablish Root CauseEvaluate Alternative ResolutionsSelect AlternativeImplement alternative
Start Date Stop Date15-May-16 20-Aug-1620-Aug-16 31-Jan-17
InprocessPendingPendingPending
31-Jan-17
Risk Burn Down
Risk
Sco
re
Status
1
2
3
4
Risk
TechnicalCo
stSchedule
5/4/2017 2017 Enlightened Integrated Program Management, LLC All Rights Reserved 20
-
Business objectives establish direction and motivation. Disciplined IPM and integrated analysis provides insight to
health and status of the program. Health and Status of the Program informs business objectives.
Conclusion
5/4/2017 2017 Enlightened Integrated Program Management, LLC All Rights Reserved 21
-
QUESTIONS?
Gordon M. KranzEnlightened Integrated Program [email protected]@agileforgovernment.com
5/4/2017 2017 Enlightened Integrated Program Management, LLC All Rights Reserved 22
mailto:[email protected]:[email protected]
Integrated Program & Project Management A Strategic ApproachAgendaIntegrated Project ManagementThe ProcessIntegrated Program ManagementManaging to Business ObjectivesSimple ExampleKey Components of IPM Business to Project TraceabilityTraceability Centers around the Work Breakdown Structure (WBS)Program WBS ConsiderationsTime Phased PlanningTypical DoD ApproachExample Integrated Master Plan-> Integrated Master ScheduleIncremental IMS MaturityEstablishing Incremental Objective CriteriaAgile Traceability ExampleIntegrated AnalysisBuilding the Time Phased PlanTime Phased Risk Burn Down PlanTime Phased TPM EstimatesIntegrated Analysis ExamplesConclusionQuestions?