Page 1: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 1

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/

Shiven Sompura, Hakob Avetisyan 2017 Project Management Symposium

LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENT

Page 2: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 2

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/

• Introduction • Advantages of Precast Concrete

Pavement• LCCA Methodology • LCCA Model • Case Study • Result and Analysis

Contents

Page 3: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 3

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/

INTRODUCTION

Page 4: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 4

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/

• Two priorities of construction projects are time and cost consideration.

• Traditional methods causes inconvenience.• Precast concrete panels (PCP) are fabricated offsite,

transported to site, and installed on prepared subbase at site.• PCP are also used for retrofitting pavements, maintenance of

pavements, construction of new pavements, urban street rehabilitation, isolated repair, intersections and ramp rehabilitation.

Page 5: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 5

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/

ADVANTAGES OF PRECAST CONCRETE PAVEMENT

Page 6: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 6

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/ • Faster construction.

• Thinner slabs.• Durability.• Longer construction season throughout the year. • Reduces the project duration.

Page 7: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 7

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/

LCCA METHODOLOGY

Page 8: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 8

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/

• LCCA provides an approach for computing the cost of a product or its serviceability

• It is used to compare design alternatives over its life of each alternative considering cost and benefit parameter

• Two types of cost: User cost and Agency cost • Agency costs are cost paid by department of transportation • User costs are cost which are associated with public

motorists

Page 9: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 9

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/

Elements to perform LCCA:• Set up alternative design strategies • Establish activity timings • Evaluation of agency costs • Estimation of user costs • Determine the life cycle cost

Page 10: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 10

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/

A flowchart describing LCCA process for pavement selection Scheving, A. G. (2011).

Page 11: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 11

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/

A flowchart describing selection of Pavement Alternative.

Page 12: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 12

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/

Economic analysis components1. Evaluation methods 2. Analysis period3. Discount rate 4. Sensitivity analysis Costs Factors • Agency cost: 1. Initial construction cost, 2. Maintenance and rehabilitation cost • User cost: 1. Vehicle operating cost, 2. User delay cost, 3. Crash cost Salvage Value

Page 13: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 13

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/

Evaluation methods:• Economic Analysis techniques • Net Present Worth (NPW) method• The Internal Rate of Return method (IRR)• Benefit-Cost Ratio (B/C)• Equivalent Uniform Annual Cost (EUAC) • Net Present Worth is also called Net Present Value (NPV).

𝑁𝑁𝑁𝑁𝑁𝑁 = 𝐶𝐶𝐶𝐶 + �𝑛𝑛=1

𝑁𝑁𝑀𝑀𝑀𝑀 + 𝑂𝑂𝑀𝑀 + 𝑈𝑈𝑀𝑀

1 + 𝑖𝑖 𝑛𝑛 −𝑆𝑆

1 + 𝑖𝑖 𝑁𝑁

Where, CO = Initial construction cost; n= specific year of expenditure; i= discount rate; Mn= maintenance cost in year n; On= operating cost in year n; Un= user cost in year n; S= Salvage value; N= Total analysis period (Scheving, A. G., 2011).

Page 14: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 14

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/

LCCA MODEL

Page 15: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 15

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/

𝑳𝑳𝑳𝑳𝑳𝑳𝑳𝑳 = 𝑰𝑰 + 𝑴𝑴&𝑵𝑵 + 𝑼𝑼 + 𝑶𝑶 + 𝑺𝑺where:I= Initial construction cost, M&N= present value of maintenance and rehabilitation cost, U= present value of user cost, O= present value of operating cost, S= present salvage value.

Page 16: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 16

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/

CASE STUDY

Page 17: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 17

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/

• In this model, hypothetical dimensions of pavements are considered.

• The quantity calculations are carried for the length of a one-mile road

• the comparison is done between different pavement alternative design models such as Precast Prestressed Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP), Jointed Plain Concrete Pavement (JPCP) and Continuous Reinforced Concrete Pavement (CRCP).

• The dimensions for the prefabricated precast panel are 40ft x 8ft x 1ft.

• The model considered an overall discount rate of 4%. • The salvage value was not taken into consideration for this

model.• All the future costs were converted to present value with the

help of the NPW equation.

Page 18: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 18

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/

RESULT AND ANALYSIS

Page 19: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 19

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/ Cost calculation

Activity PPCP JPCP JPPCP CRCP

Initial Construction Cost ($) 2,741,715.57 1,931,412.01 2,623,804.82 2,018,207.43

Maintenance and Rehabilitation Cost ($)

379,493.99 872,140.29 379,493.99 872,140.29

User costs ($) 1,037,382.55 2,652,537.02 1,037,382.55 2,652,537.02

Life Cycle Cost ($) 4,158,592.11 5,456,089.32 4,040,681.36 5,542,884.74

Page 20: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 20

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/ Construction duration

calculation

Activity Precast (Days) Onsite (Days) Aggregate 6 13

LCB 10 10Concrete Slab 19 55Total Duration 35 88

Activity Precast (Days) Onsite (Days)

Aggregate 6 13

LCB 10 10

Concrete Slab 19 55

Total Duration 35 88

Page 21: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 21

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/ Analysis

$4158592.111

$5456089.323

$4040681.36

$5542884.742

0

1000000

2000000

3000000

4000000

5000000

6000000

PPCP JPCP JPPCP CRCP

Cos

t,Cur

eent

Val

ue ($

)

Various Design Alternatives

Life Cycle Cost Comparison

Page 22: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 22

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/ Analysis

$2741715.571

$1931412.013

$2623804.82

$2018207.432

0

500000

1000000

1500000

2000000

2500000

3000000

PPCP JPCP JPPCP CRCP

Initi

al C

onst

ruct

ion

Cos

t ($)

Design Alternatives

Initial Construction Cost Comparison

Page 23: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 23

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/

• Life Cycle Cost of precast concrete pavement for both alternatives are less than the traditional method.

• Duration for onsite casting is 88 days which is way higher than the precast concrete which is 35 days.

Analysis

Page 24: LIFE CYCLE COST ANALYSIS OF PRECAST CONCRETE PAVEMENTpmsymposium.umd.edu/pm2017/wp-content/uploads/... · Concrete Pavement (PPCS), Joint Plain Precast Concrete Pavement (JPPCP),

Sompura & AvetisyanUMD Project Management SymposiumMay 4-5, 2017Slide 24

htt

p://

pm

sym

po

siu

m.u

md

.ed

u/p

m20

17/

QUESTIONS