integrated catchment management group - bay of plenty · pdf fileintegrated catchment...

29
Integrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Upload: vukhanh

Post on 05-Mar-2018

249 views

Category:

Documents


9 download

TRANSCRIPT

Page 1: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Inte

grat

ed C

atch

men

t M

anag

emen

t Gro

up

Integrated Catchment Management Group

Te Rōpū Whakahaere Whaitua Awa

Page 2: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Integrated Catchment Management Group of ActivitiesWhat we do

Integrated Catchment Management is a new set of activities that integratesservices in five catchments across the Bay of Plenty (Tauranga, Rotorua,Rangitāiki, Kaituna and the eastern catchments) to protect the natural characterof catchments, harbours and associated coastal environments. The activitiesincorporate work previously provided through the Sustainable Water, LandUse, Coastal and Biodiversity Programmes.

There is a regional component to these activities to ensure they operateeffectively and efficiently in a coordinated way.

Why we do these activities

The key issues that the Integrated Catchment Management activities addressare water quality and quantity, erosion control and soil conservation, biodiversityprotection and enhancement as well as coastal protection and enhancement.Sediment, nutrients and bacteria are key contaminants of water from a rangeof land uses. These issues will be addressed primarily through landowneragreements, tangata whenua and industry partnerships, community groupsand volunteer activity.

Key challenges

The key challenges we face in the next 10 years are:

Implementing the National Policy Statement for Freshwater Management,meaning new policies and regulations that are likely to affect the wayour natural resources are used and managed.

Balancing economic growth aspirations with environmental protection.

Addressing gaps in our understanding of nutrient and sedimentdischarges from land runoff and the effects they have on our freshwaterand coastal areas.

Achieving co-ordinated management of our catchments to address themain issues of concern to the community and iwi across a variety ofpartners and agencies.

Managing competing uses and values in the catchments and theirwaterways.

Unknown specific effects of climate change (such as sea level rise andchanges in frequency and severity of droughts and floods) and addressingthe effect of these changes on current and future needs.

Ensuring we have the right science information to make the rightdecisions.

Managing the effect of dominant land uses in the catchments that mayaffect water quantity and quality.

Addressing on-going management of soil health, which is critical tomaintaining a productive land and soil base.

Behavioural change of landowners to meet the future demands. This isa nationally recognised issue.

Significant negative effects of the activities

The Council’s Integrated Catchment Management activities may have thefollowing negative effects:

Potential income for private landowners may be reduced where land isretired under riparian or biodiversity management plans, or land use haschanged to implement catchment action plans.

Improving andmaintaining water quality, managing erosion and protectinghigh value ecological sites will have economic costs for our communities,both in rates as well as restrictions to production of land.

If the community doesn’t engage in decision making about targets forintegrated catchment activities, how money will be spent and on what,

Integrated Catchment Management Group of Activities

45

Page 3: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

then decisions may be made which don’t represent the community's trueaspirations for managing natural resources.

Making the change to more sustainable land uses and land use practicemay have economic, cultural and social costs for individual landowners,and possibly the regional economy. This will be primarily throughimplementing water quality and quantity requirements under the NationalPolicy Statement for Freshwater Management.

A capped budget supporting biodiversity work will not allow for anincrease in habitat, and site management and protection in individualcatchments. This will affect stopping the decline regionally of ourthreatened habitats and affect our ability to endure climate change andreduce the impact of hazards.

Limiting economic growth potential for under-used land.

Risks

The risks that threaten our expected future or outlook are:

Not enough voluntary uptake of riparian management and biodiversitymanagement plans needed to achieve catchment action plan objectives.

Opposition to some actions required to improve water quality, particularlyif new land use rules are introduced (for instance in the Rotorua lakes).

Possible land use intensification in those catchments not protected byland use policies or rules.

Differing competing values within a community that cannot easily bereconciled.

Sedimentation may increase in waterways and coastal harbours at anunmanageable rate through climate change and intensified land use.

Sea level rise and other climate change-related implications having largerthan anticipated impact within the period of this Plan.

Large storm surges or a significant tsunami.

Bay of Plenty Regional Council

46

Page 4: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Tauranga Harbour Activity What we do

The Tauranga Harbour activity integrates service delivery within the TaurangaHarbour and its catchments, fromWaihī to Pāpāmoa Beach and inland throughthe Kaimai Range. The catchment also includes Tauranga City, the largesturban centre in the Bay of Plenty. A specific Tauranga Harbour Programmehas been established to coordinate activities across the Regional Council thatinclude Tauranga Harbour.

As an outcome of the Tauranga Moana Iwi Collective Deed of Settlement, aTauranga Moana co-governance group will be established. A key function ofthe Group will be to prepare a Tauranga Moana Framework Document. Thisactivity will support operational actions of the Document.

Where we want to be

Target

Year Four to Year Ten2018/19 to 2024/25

Year Three 2017/18Year Two 2016/17Year One 2015/16Result at 2013/14Key performance indicatorsLevels of service

25171513New measureNumber of coastal, wetland, forest orgeothermal High Value Ecological sites

The Council works with iwi,landowners and the community

(HVES) where biodiversity is activelygroups to improve Taurangamanaged within the Tauranga Harbourcatchment.

Harbour's indigenous biodiversity,including coastal margins

71433935New measureNumber of coastal, wetland, forest orgeothermal non-High Value Ecologicalsites (non-HVES) where biodiversity isactively managed within the TaurangaHarbour catchment.

Integrated Catchment Management Group of Activities

47

Page 5: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Target

Year Four to Year Ten2018/19 to 2024/25

Year Three 2017/18Year Two 2016/17Year One 2015/16Result at 2013/14Key performance indicatorsLevels of service

50505050New measureNumber of additional kilometres ofwaterway margin in the TaurangaHarbour catchment protected to reducesediment, nutrient and/or bacterial

contamination of water(1).

1. Includes streams, drains, wetlands, lakes, estuaries and the open coast.

What we are going to do

Each year we will:

Support the Tauranga Moana Governance Group and carry out theTauranga Moana Framework Document.

Coordinate the Council’s various work in the Tauranga Harbourcatchment, and work with partners and stakeholders to manage thecatchment’s resources.

Support established community groups, technical groups and interagencyforums, in particular Estuary and Coast Care groups and the KaimaiMamakū Catchments Forum.

Maintain Tauranga Harbour management and research partnershipswith the University of Waikato Chair of Coastal Science, IntercoastResearch Centre/Bremen University, Manaaki Taha Moana and Bay ofPlenty Polytechnic.

Provide incentives to landowners for work that addresses biodiversityvalues and encourages sustainable land management practicesthroughout the catchment, including Tauranga Harbour’s estuary margin.

Provide sustainable land use management, including protecting anadditional 50km of waterway margins in the catchment each year, andsupport nutrient management planning on individual properties.

Provide biodiversity management, including establishing an additionaltwo high-value ecological sites and four community-led sites each year.

Stabilise active stream bank erosion to protect property and reducesedimentation, and promote methods to address Tauranga Harbourcoastal erosion.

Manage mangroves, including 600 hectares of mechanical mangroveseedling maintenance each year.

Support initiatives to clear accumulations of sea lettuce and litter fromaround Tauranga Harbour.

Year One 2015/16- Key Projects

Implement the Tauranga Harbour Sediment Monitoring project to assesseffectiveness of catchment management tools to reduce suspendedsediment loads to the Harbour.

Trial effectiveness of small-scale sediment control interventions, suchas constructed bunds, grass filter strips and wetlands.

Support establishing the Tauranga Moana Governance Group andcontribute to development of Ngā Tai ki Mauao.

Review and revise the 16 sub-catchment action plans.

Opureora Channel dredging.

Bay of Plenty Regional Council

48

Page 6: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Year Two 2016/17- Key Projects

Convene the Tauranga Harbour Symposium.

Review the Te Awanui Tauranga Harbour Programme.

Year Three 2017/18- Key Projects

Develop an implementation plan for operations specified in Ngā Tai kiMauao.

Years Four to Ten 2018/19 - 2024/25 - Key Projects

Convene the Tauranga Harbour Symposium.

How we will fund the activity

Operating funding is 70 percent general funds; 30 percent other revenue.

Integrated Catchment Management Group of Activities

49

Page 7: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Tauranga Harbour Activity Financial Statement

2024/252023/242022/232021/222020/212019/202018/192017/182016/172015/16Annual Plan

2014/15$000$000$000$000$000$000$000$000$000$000$000

Activity operating revenue69676563615958565554NewOperating grants and subsidies192

2,1332,0601,9931,9321,8751,8221,7731,7281,6851,645Not ApplicableOther revenue236

2,2022,1272,0581,9941,9361,8811,8311,7841,7401,699Total activity operating revenue428

Operating expenditure by sub activity3,9143,7903,6733,5663,4713,3843,3033,2173,1323,080Not ApplicableSustainable Land Use1,502795770747725708694681661636603Not ApplicableBiodiversity644

2,0941,9722,0751,8691,9141,7881,8351,7111,7472,221Not ApplicableSustainable Coastal Implementation2,171343334326317314312313302284253NewSustainable Water0

7,1476,8656,8216,4766,4066,1786,1335,8915,7986,157Total operating expenditure4,316

4,9444,7384,7634,4824,4704,2964,3024,1064,0584,459Net deficit to fund3,888

Funding required2,2382,0842,0191,8841,8021,6501,5901,4951,4131,410General rates1,4242,8652,6862,5652,4212,3332,2352,2892,2962,3552,561Investment income allocated2,461(159)(33)179178335412423315290488(Increase) decrease in reserves3

4,9444,7384,7634,4824,4704,2964,3024,1064,0584,459Total funding required3,888

Bay of Plenty Regional Council

50

Page 8: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Rotorua Lakes Activity

What we do

The Rotorua Lakes activity integrates the delivery of services within the RotoruaLakes catchments. Importantly, the work is undertaken through the RotoruaTe Arawa Lakes Programme, a partnership between Te Arawa Lakes Trust,

Rotorua Lakes Council and Bay of Plenty Regional Council. The Programmeis also part-funded through a Deed of Funding Agreement with the Crown.

For this Long Term Plan the key objectives of the Rotorua Te Arawa LakesProgramme are:

Meeting the Trophic Level Indices for each lake, which are set in theRegional Water and Land Plan, and

Achieving nutrient reduction targets set in the Regional Policy Statementfor Lake Rotorua, and other individual lake action plans.

Challenges and risks that are specific to this activity include:

Achieving sustainable land-use change and land management changein Lake Rotorua's catchment.

Finding cost-effective and achievable engineering solutions of nitrogenreduction in Lake Rotorua's catchment.

Purchasing nitrogen reductions within Lake Rotorua catchment to achieveIntegrated Framework targets.

Where we want to be

Target

Year Four to Year Ten2018/19 to 2024/25

Year Three 2017/18Year Two 2016/17Year One 2015/16Result at 2013/14Key performance indicatorsLevels of service

75%13%12%6%New measurePercentage reduction in exports ofnitrogen from the Lake Rotorua

Water quality in the Rotorua lakesmakes long-term progress towards

catchment in accordance with theeach lakes Trophic Level IndexIntegrated Framework and engineeringsolutions target.

(TLI) in the Regional Water andLand Plan.

Integrated Catchment Management Group of Activities

51

Page 9: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Target

Year Four to Year Ten2018/19 to 2024/25

Year Three 2017/18Year Two 2016/17Year One 2015/16Result at 2013/14Key performance indicatorsLevels of service

16161616New measureNumber of coastal, wetland, forest orgeothermal High Value Ecological sites

The Council works with iwi,landowners and the community

(HVES) where biodiversity is activelygroups to improve the regionsindigenous biodiversity. managed within the Rotorua Lakes

catchment.

15151515New measureNumber of coastal, wetland, forest orgeothermal non-High Value Ecologicalsites (non-HVES) where biodiversity isactively managed within the RotoruaLakes catchment.

What are we going to do

Each year we will:

Continue to implement the Rotorua Lakes programme, including lakewater quality action plans, investigate lake restoration options, supportthe Chair in Lakes Water Quality at the University of Waikato andmonitoring interventions.

Harvest lake weed in priority amenity areas.

Determine nutrient benchmarks in all priority lake catchments.

Proactively minimise algae blooms.

Commission and operate the full scale Tikitere de-nitrification plant, andoperate P-locking plants in Lake Rotorua and Lake Rotomā.

Run the Advice and Support project to support landowners affected byLake Rotorua catchment rules.

Run the gorse project to convert gorse land within the Lake Rotoruacatchment to trees.

Work with landowners and industry to reduce nutrient loss from agricultureand to reduce nutrients entering the lake.

Purchase nitrogen in the Lake Rotorua catchment to meet IntegratedFramework targets.

Year One 2015/16- Key Projects

Advice and Support Project - provide landowners with access to expertadvice for business planning and development of Nitrogen ManagementPlans.

The Gorse Conversion Project - fund conversion of mature gorse toproduction forestry, native bush or other low nitrogen leaching activities.

Implement the $40 million Incentives Scheme to permanently remove100 tonnes of nitrogen from the Lake Rotorua catchment.

Lake Tarawera Restoration Plan.

Bay of Plenty Regional Council

52

Page 10: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Year Two 2016/17- Key Projects

Advice and Support Project - providing landowners with access to expertadvice for business planning and development of Nitrogen ManagementPlans

The Gorse Conversion Project - funding the conversion of mature gorseto production forestry, native bush or other low nitrogen leaching activities

Implement the $40 million Incentives Scheme to permanently remove100 tonnes of nitrogen from the Lake Rotorua catchment

Year Three 2017/18- Key Projects

Advice and Support Project - provide landowners with access to expertadvice for business planning and development of Nitrogen ManagementPlans.

The Gorse Conversion Project - fund conversion of mature gorse toproduction forestry, native bush or other low nitrogen leaching activities.

Implement the $40 million Incentives Scheme to permanently remove100 tonnes of nitrogen from the Lake Rotorua catchment.

Years Four to Ten 2018/19 - 2024/25 - Key Projects

Advice and Support Project - provide landowners with access to expertadvice for business planning and development of Nitrogen ManagementPlans.

The Gorse Conversion Project - fund conversion of mature gorse toproduction forestry, native bush or other low nitrogen leaching activities.

Implement the $40 million Incentives Scheme to permanently remove100 tonnes of nitrogen from the Lake Rotorua catchment.

Construction of the Tikitere Zeolite Plant.

How we will fund the activity

Many of the projects on the four priority lakes - Rotorua, Rotoiti, Rotoehu andŌkāreka - are funded from the Rotorua Lakes Deed: 50 percent from CentralGovernment (through theMinistry for the Environment); 25 percent from generalfunds - land value-based rate, and 25 percent from targeted rates.

Projects not covered by the Rotorua Lakes Deed are funded 50 percent generalfunds and 50 percent targeted rates from the Rotorua District (differentiatedby land area).

Integrated Catchment Management Group of Activities

53

Page 11: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Rotorua Lakes Activity Financial Statement

2024/252023/242022/232021/222020/212019/202018/192017/182016/172015/16Annual Plan

2014/15$000$000$000$000$000$000$000$000$000$000$000

Activity operating revenue4,7404,5925,2174,5154,8935,0604,8544,0143,0332,685NewTargeted rates2,094

0000000000NewExternal interest income150005,2975,9126,3666,0624,5653,8013,467NewOperating grants and subsidies2,572

374361350339329319311303296568NewOther revenue231

5,1144,9545,56610,15111,13311,74611,2278,8837,1296,721Total activity operating revenue4,911

Operating expenditure by sub activity1,4611,4181,3791,1741,1531,1301,1131,0741,026861Not ApplicableSustainable Land Use442820794771750736725718693658612Not ApplicableBiodiversity612

7,5247,3378,67715,66917,10917,96217,33314,16312,47511,729NewSustainable Water8,337

9,8059,54910,82717,59418,99719,81619,16515,92914,15813,203Total operating expenditure9,391

4,6904,5965,2607,4437,8648,0707,9387,0477,0296,482Net deficit to fund4,479

Funding required2,1502,0222,2041,8901,9561,9211,7731,4491,2141,324General rates8792,7522,6052,8002,4292,5332,6012,5532,2262,0232,406Investment income allocated1,519(212)(30)2563,1243,3753,5493,6123,3713,7922,752(Increase) decrease in reserves2,082

4,6904,5965,2607,4437,8648,0707,9387,0477,0296,482Total funding required4,479

Bay of Plenty Regional Council

54

Page 12: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

2024/252023/242022/232021/222020/212019/202018/192017/182016/172015/16TypeAnnual Plan

2014/15$000$000$000$000$000$000$000$000$000$000$000

Capital expenditure detail0000004,350500150150ImprovementTikitere Diversion CPTLTIKD D3,0150000000000ImprovementLake Tikitapu Stormwater Catchment530000000000ImprovementLake Okareka Outlet Structure2680000000000NewLake Rotoehu Hornwort Weed Harvester460000000000NewNutrient Assessment Benchmarking Databas25500000000750NewLake Rerewhakaaitu Treatment Wall (ND)000000000190NewLake Rotokakahi Monitoring Bore ND0

0000004,350500244150Total capital expenditure3,636

Other capital funding applied000000(2,175)(250)(169)(75)Increase (decrease) in reserves(2,113)

0000002,1752507575Total capital funding applied1,523

Sources of capital funding0000002,1752507575Subsidies and grants for capital expenditure1,523

0000002,1752507575Total sources of capital funding1,523

Integrated Catchment Management Group of Activities

55

Page 13: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Kaituna Activity What we do

The Kaituna Activity integrates service delivery in the Kaituna, Waitahanui,Pongakawa / Waihī Estuaries.

Te Maru o Kaituna (Kaituna River Authority) has just been established bystatute under the Tapuika Treaty settlement. This will set up a newco-governance structure for the catchment involving local iwi and localgovernment. The Authority's key function will be to oversee revision of theKaituna River and Ongatoro/Maketū Estuary Strategy (2009). This activity willsupport operations prioritised through the Strategy.

A specific risk is failing to reach agreement on a workable compromise tore-divert the Kaituna through Ongatoro/Maketū estuary.

Where we want to be

Target

Year Four to Year Ten2018/19 to 2024/25

Year Three 2017/18Year Two 2016/17Year One 2015/16Result at 2013/14Key performance indicatorsLevels of service

9655New measureNumber of coastal, wetland, forest orgeothermal High Value Ecological sites

The Council works with iwi,landowners and community groups

(HVES) where biodiversity is activelyto maintain and improve watermanaged within the Kaituna, WaihīEstuary and Waitahanui catchments.

quality, indigenous biodiversity andcoastal margins in the Kaituna,Waihī Estuary and Waitahanuicatchments.

28141210New measureNumber of coastal, wetland, forest orgeothermal non-High Value Ecologicalsites (non-HVES) where biodiversity isactively managed within the Kaituna,Waihī Estuary and Waitahanuicatchments.

Bay of Plenty Regional Council

56

Page 14: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Target

Year Four to Year Ten2018/19 to 2024/25

Year Three 2017/18Year Two 2016/17Year One 2015/16Result at 2013/14Key performance indicatorsLevels of service

31313131New measureNumber of additional kilometres ofwaterway margin in the Kaituna, WaihīEstuary and Waitahanui catchmentsprotected to reduce sediment, nutrientand/or bacterial contamination of

water(1).

1. Includes streams, drains, wetlands, lakes, estuaries and the open coast.

What we are going to do

Each year we will:

Manage the biodiversity programme, including advisory service,maintaining active Biodiversity Management Plans, new BiodiversityManagement Plans, Care group and Environmental Enhancement Fundsupport.

Manage the sustainable land use programme, including advisory service,maintaining active Riparian Management Plans, new RiparianManagement Plans, streamworks and Care group support.

Assess nutrient management planning on dairy and drystock farms basedon set number of farms per year.

Manage the Coast Care programme, including dune restoration.

Support Te Maru o Kaituna River Authority and industry / iwi partnershipprojects, and implement Kaituna Strategy.

Monitor existing agreements with landowners.

Arawa wetland Biodiversity Management Plan (protect and enhanceexisting significant wetland).

Fish Passage improvement (3 barriers removed or substantiallyimproved).

Year One 2015/16 - Key Projects

Kaituna River Re-diversion andOngatoro / Maketū Estuary EnhancementProject (20 percent of river re-diverted, plus 20ha of wetland, 6kmwaterway margin protected).

Papahikahawai Island Biodiversity Management Plan.

Stopbank re-alignment to Diagonal Drain and TEL (will allow wetlandcreation, enhance existing wetland, improve flood storage).

Year Two 2016/17 - Key Projects

Kaituna River Re-diversion andOngatoro / Maketū Estuary EnhancementProject (20 percent of river re-diverted, plus 20ha of wetland, 6kmwaterway margin protected).

Implement Papahikahawai Island Biodiversity Management Plan.

Stopbank re-alignment to Diagonal Drain and TEL (will allow wetlandcreation, enhance existing wetland, improve flood storage).

Integrated Catchment Management Group of Activities

57

Page 15: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Year Three 2017/18 - Key Projects

Pongakawa catchment detention bunds (sediment, phosphorus and floodpeak reductions)

Kaituna River Re-diversion andOngatoro / Maketū Estuary EnhancementProject (20 percent of river re-diverted, plus 20ha of wetland, 6kmwaterway margin protected).

Implement Papahikahawai Island Biodiversity Management Plan.

Stopbank re-alignment to Diagonal Drain and TEL (will allow wetlandcreation, enhance existing wetland, improve flood storage).

Wetland creation projects (15ha at Rangiuru with Quayside), 30ha northof Pah Rd (plus 38ha by DOC), 10ha other sites combined).

Years Four to Ten 2018/19 - 2024/25 - key projects

Implement Papahikahawai Island Biodiversity Management Plan.

Stopbank re-alignment to Diagonal Drain and TEL (will allow wetlandcreation, enhance existing wetland, improve flood storage).

Wetland creation projects (15ha at Rangiuru with Quayside), 30ha northof Pah Rd (plus 38ha by DOC), 10ha other sites combined).

How we will fund the activity

Project costs for the Kaituna/Maketū Estuary strategy are funded throughinvestment reserves, 98 percent general funds; 1 percent fees and charges;1 percent grants and subsidies.

Capital work for the Kaituna River diversion in the Ongatoro/Maketū Estuarywill provide protection long-term. This work is funded through existing reserves.Future reserves are built up over time through the operating funding mix.

Bay of Plenty Regional Council

58

Page 16: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Kaituna Activity Financial Statement

2024/252023/242022/232021/222020/212019/202018/192017/182016/172015/16Annual Plan

2014/15$000$000$000$000$000$000$000$000$000$000$000

Activity operating revenue33333333333333333333Not ApplicableOperating grants and subsidies770000000000Not ApplicableOther revenue10

38363534333932302322NewFees and charges0

71696867667265635655Total activity operating revenue86

Operating expenditure by sub activity1,1811,1471,1131,0791,0651,0611,022984949911Not ApplicableSustainable Land Use5379367356359351607657588444357NewBiodiversity71

1,1241,1371,0901,0991,1631,1011,1041,016844809Not ApplicableSustainable Coastal Implementation869210204199193190187187182174159NewSustainable Water0

2,8952,8552,7582,7302,7692,9552,9702,7702,4122,235Total operating expenditure945

2,8242,7862,6902,6632,7032,8832,9052,7072,3572,180Net deficit to fund859

Funding required1,2851,2271,1331,1121,0761,0931,063979818782General rates1121,6461,5811,4391,4291,3941,4801,5301,5051,3631,421Investment income allocated193(107)(22)118123233309312223176(24)(Increase) decrease in reserves554

2,8242,7862,6902,6632,7032,8832,9052,7072,3572,180Total funding required859

Integrated Catchment Management Group of Activities

59

Page 17: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

2024/252023/242022/232021/222020/212019/202018/192017/182016/172015/16TypeAnnual Plan

2014/15$000$000$000$000$000$000$000$000$000$000$000

Capital expenditure detail00000004203,693690ImprovementKaituna River Re-diversion and Ongatoro0000003,0201,260000ImprovementDiagonal drain stopbank shift Kaituna000000001,98500ImprovementNZTA wetland (Pamment severance)000000033032200ImprovementRangiuru Industrial Park wetland000001711660000ImprovementDetention Dams Wharere/Puanene/Mangatoet0

26252423232222212020ImprovementFish passage - construction000910000000ImprovementAFFCO wetland construction000000440000ImprovementPongakawa Bush Rd stormwater RMP00000000001,260ImprovementKaituna River Re-diversion and Ongatoro0

2625115231943,2531,6112,7483,7141,970Total capital expenditure0

Other capital funding applied(26)(25)(115)(23)(194)(3,253)(1,611)(2,748)(3,714)(1,970)Increase (decrease) in reserves0

0000000000Total capital funding applied0

Sources of capital funding0000000000Total sources of capital funding0

Bay of Plenty Regional Council

60

Page 18: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Rangitaiki Activity What we do

The Rangitāiki Activity integrates services within the Rangitāiki catchment.The Rangitāiki River is the longest river in the Bay of Plenty. It begins near thecentre of the North Island and flows out to sea at Okorero (Thornton). The rivercatchment is formed by a large number of tributaries, including the Whirinaki,Wheao and Horomanga rivers.

The Rangitāiki River Forum was formed in May 2012 and is a co-governancepartnership of representatives from Ngāti Whare, Ngāti Manawa, Ngāti Awa,Tūwharetoa (Bay of Plenty), as well as councillors from Bay of Plenty RegionalCouncil and Whakatāne District Council.

The Forum has developed “Te Ara Whānui O Rangitāiki - Pathways of theRangitāiki”, a document that sets out the communities’ vision, desired outcomesand objectives for the Rangitāiki catchment. This activity will support theoperational actions of the document.

Where we want to be

Target

Year Four to Year Ten2018/19 to 2024/25

Year Three 2017/18Year Two 2016/17Year One 2015/16Result at 2013/14Key performance indicatorsLevels of service

5543New measureNumber of coastal, wetland, forest orgeothermal High Value Ecological sites

The Council works with iwi,landowners and community groups

(HVES) where biodiversity is activelyto maintain and improve watermanaged within the Rangitāikicatchment.

quality, indigenous biodiversity andcoastal margins in the Rangitāikicatchment. 6654New measureNumber of coastal, wetland, forest or

geothermal non-High Value Ecologicalsites (non-HVES) where biodiversity isactively managed within the Rangitāikicatchment.

Integrated Catchment Management Group of Activities

61

Page 19: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Target

Year Four to Year Ten2018/19 to 2024/25

Year Three 2017/18Year Two 2016/17Year One 2015/16Result at 2013/14Key performance indicatorsLevels of service

10101010New measureNumber of additional kilometres ofwaterway margin in the Rangitāikicatchment protected to reducesediment, nutrient and/or bacterial

contamination of water(1).

1. Includes streams, drains, wetlands, lakes, estuaries and the open coast.

What we are going to do

Each year we will:

Manage the biodiversity programme, including advisory service, deliveryand maintenance of active Biodiversity Management Plans, newBiodiversity Management Plans and support Care groups.

Manage the sustainable land use programme, including advisory service,delivery and maintenance of active Riparian Management Plans, newRiparian Management Plans, streamworks and support Care groups.

Assess nutrient management planning on dairy and drystock farms basedon set number of farms per year.

Manage and implement the Coast Care programme including dunerestoration.

Support the Rangitāiki River Forum and industry / iwi partnership projects,and implement Te AraWhānui O Rangitāiki –Pathways to the Rangitāiki.

Monitor existing agreements with landowners.

Support current Environmental Enhancement Fund projects anddevelopment of new EFF projects.

Year One 2015/16 - Key Projects

Support the Rangitāiki River Forum and industry / iwi partnership projects,and implement Te AraWhānui O Rangitāiki – Pathways to the Rangitāiki.

Stage 3 floodway widening and bridge restriction removal.

Year Two 2016/17 - Key Projects

Deliver action and support to and the Rangitāiki River Forum and industry/ iwi partnership projects, and implement Te Ara Whānui O Rangitāiki –Pathways to the Rangitāiki.

Stage 3 floodway widening and spillway consent variation.

Bay of Plenty Regional Council

62

Page 20: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Year Three 2017/18 - Key Projects

Support the Rangitāiki River Forum and industry / iwi partnership projects,and implement Te AraWhānui O Rangitāiki – Pathways to the Rangitāiki.

Rangitāiki floodway stopbank top ups.

Years Four to Ten 2018/19 - 2024/25 - Key Projects

Rangitāiki floodway stopbank top ups continued.

Spillway upgrade.

How we will fund the activity

Operating funding is 74 percent general funds; 26 percent other revenue.

Integrated Catchment Management Group of Activities

63

Page 21: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Rangitaiki Activity Financial Statement

2024/252023/242022/232021/222020/212019/202018/192017/182016/172015/16Annual Plan

2014/15$000$000$000$000$000$000$000$000$000$000$000

Activity operating revenue78757370686665636160NewOther revenue0

320309299290281274266259253247NewFees and charges0

398384372360350340331322315307Total activity operating revenue0

Operating expenditure by sub activity873849822801782763746728708678NewSustainable Land Use16329319309299292285279273264253NewBiodiversity0148145141136134132129126122114NewSustainable Coastal Implementation0180175170164162159160155149136NewSustainable Water9

1,5301,4881,4421,4011,3711,3391,3141,2821,2431,181Total operating expenditure25

1,1321,1031,0701,0411,021999983960929874Net deficit to fund25

Funding required512485453437411384363349323314General rates9656625576562533520523537539570Investment income allocated16(36)(8)40417796977466(9)(Increase) decrease in reserves0

1,1321,1031,0701,0411,021999983960929874Total funding required25

Bay of Plenty Regional Council

64

Page 22: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Other Eastern Catchments Activity What we do

The Eastern Catchments Activity integrates services in Ōhiwa Harbour andother eastern Catchments. In particular, it supports operations of the ŌhiwaHarbour strategy and Tarawera River catchment plan.

Where we want to be

Target

Year Four to Year Ten2018/19 to 2024/25

Year Three 2017/18Year Two 2016/17Year One 2015/16Result at 2013/14Key performance indicatorsLevels of service

29292826New measureNumber of coastal, wetland, forest orgeothermal High Value Ecological sites

The Council works with iwi,landowners and community groups

(HVES) where biodiversity is activelyto maintain and improve watermanaged within the eastern Bay ofPlenty catchments.

quality, indigenous biodiversity andcoastal margins in eastern Bay ofPlenty catchments other thanRangitāiki.

15151413New measureNumber of coastal, wetland, forest orgeothermal non-High Value Ecologicalsites (non-HVES) where biodiversity isactively managedwithin the eastern Bayof Plenty catchments.

Integrated Catchment Management Group of Activities

65

Page 23: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Target

Year Four to Year Ten2018/19 to 2024/25

Year Three 2017/18Year Two 2016/17Year One 2015/16Result at 2013/14Key performance indicatorsLevels of service

1010104.3New measureNumber of additional kilometres ofwaterway margin in the easterncatchments protected to reducesediment, nutrient and/or bacterial

contamination of water(1).

1. Includes streams, drains, wetlands, lakes, estuaries and the open coast.

What we are going to do

Each year we will:

Manage the biodiversity programme, including advisory service, deliveryand maintenance of active Biodiversity Management Plans, newBiodiversity Management Plans and support Care groups.

Manage the sustainable land use programme, including advisory service,delivery and maintenance of active Riparian Management Plans, newRiparian Management Plans, streamworks and support Care groups.

Assess nutrient management planning on dairy and drystock farms basedon set number of farms per year.

Manage the Coast Care programme, including dune restoration.

Support the Ōhiwa Harbour Implementation Forum and industry / iwipartnership projects, and implement the Ōhiwa Harbour Strategy.

Monitor existing agreements with landowners.

Support current EEF and development of new EFF projects.

Year One 2015/16 - Key Projects

Deliver action and support to and the Ōhiwa Harbour ImplementationForum and industry / iwi partnership projects, and implement the ŌhiwaHarbour Strategy

Year Two 2016/17 - Key Projects

Support the Ōhiwa Harbour Implementation Forum and industry / iwipartnership projects, and implement the Ōhiwa Harbour Strategy.

Year Three 2017/18 - Key Projects

Support the Ōhiwa Harbour Implementation Forum and industry / iwipartnership projects, and implement the Ōhiwa Harbour Strategy.

How we will fund the activity

75 percent general funds; 25 percent other public funding.

Bay of Plenty Regional Council

66

Page 24: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Other Eastern Catchments Activity Financial Statement

2024/252023/242022/232021/222020/212019/202018/192017/182016/172015/16Annual Plan

2014/15$000$000$000$000$000$000$000$000$000$000$000

Activity operating revenue904873845818794772751732714697NewOther revenue445

904873845818794772751732714697Total activity operating revenue445

Operating expenditure by sub activity1,5401,4941,4501,4071,3771,3471,3181,2811,2481,196Not ApplicableSustainable Land Use8711,3801,3351,2921,2521,2181,1861,1561,1271,0951,062NewBiodiversity796375363353342334327321312301286Not ApplicableSustainable Coastal Implementation269291283275267264259261253241218NewSustainable Water0

3,5873,4753,3703,2683,1923,1183,0562,9732,8862,762Total operating expenditure1,936

2,6832,6022,5252,4502,3982,3462,3052,2412,1722,065Net deficit to fund1,491

Funding required1,2141,1451,0711,030966901852816756741General rates5451,5551,4751,3601,3231,2521,2201,2271,2531,2601,346Investment income allocated943(86)(18)9597180225227172155(22)(Increase) decrease in reserves3

2,6832,6022,5252,4502,3982,3462,3052,2412,1722,065Total funding required1,491

Integrated Catchment Management Group of Activities

67

Page 25: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Land and Water Framework Activity What we do

We are coordinating some aspects of integrated catchment management ata regional level, as the actions and projects cover multiple catchments. Thekey programme is theWater Programme, which has been established to deliverthe National Policy Statement for Freshwater Management and will set waterquality and quantity limits across the region.

In addition some co-ordination tasks for sustainable land use projects andbiodiversity projects are relevant across all the catchments.

Where we want to be

Target

Year Four to Year Ten2018/19 to 2024/25

Year Three 2017/18Year Two 2016/17Year One 2015/16Result at 2014/15Key performance indicatorsLevels of service

9222New measureNumber of notified plan changes whichare actively being progressed (or

The Council maintains andimproves the water quality of our

completed) with community forFreshwater Quality / Quantity limits.

harbours, estuaries, lakes, riversand streams to be fit for natural,cultural, social and productiveuses.

Bay of Plenty Regional Council

68

Page 26: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

What we are going to do

Each year we will:

Ensure there is governance in place to support water quality and quantitylimit setting across the Council.

Ensure biodiversity and sustainable land use projects are coordinatedacross the catchments where regional integration is required.

Year One 2015/16 - Key Projects

Carry out water quality and quantity limit setting process (in accordancewith the National Policy Statement for Freshwater) for the Kaituna andthe Rangitāiki catchments.

Complete a project with the Department of Conservation redefiningbiodiversity management, operationals and monitoring for the Bay ofPlenty.

Complete the biodiversity programme review.

Year Two 2016/17 - Key Projects

Water quality and quantity limit setting (in accordance with the NationalPolicy Statement for Freshwater) for the Kaituna and the Rangitāikicatchments.

Year Three 2017/18 - Key Projects

Finalise water quality and quantity limit setting (in accordance with theNational Policy Statement for Freshwater) for the Kaituna and theRangitāiki catchments.

Years Four to Ten 2018/19 - 2024/25 - Key Projects

Water quality and quantity limit setting (in accordance with the NationalPolicy Statement for Freshwater) for the remaining catchments.

How we will fund the activity

Operating funding is 100 percent general funds.

Integrated Catchment Management Group of Activities

69

Page 27: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Land and Water Framework Activity Financial Statement

2024/252023/242022/232021/222020/212019/202018/192017/182016/172015/16Annual Plan

2014/15$000$000$000$000$000$000$000$000$000$000$000

Activity operating revenue0000000000Total activity operating revenue0

Operating expenditure by sub activity431391409401395388384373359332NewSustainable Land Use310211202199194191188187181172157NewBiodiversity172171167162158156155154149140127NewSustainable Coastal Implementation0

2,4052,3302,2642,1982,1512,1022,0762,0191,9621,779NewSustainable Water24

3,2183,0893,0342,9502,8922,8332,8012,7232,6322,394Total operating expenditure505

3,2183,0893,0342,9502,8922,8332,8012,7232,6322,394Net deficit to fund505

Funding required1,4561,3591,2861,2401,1661,0881,035991917859General rates1841,8651,7511,6341,5931,5101,4741,4911,5231,5281,561Investment income allocated318(103)(21)114117217272275209188(26)(Increase) decrease in reserves3

3,2183,0893,0342,9502,8922,8332,8012,7232,6322,394Total funding required505

Bay of Plenty Regional Council

70

Page 28: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

Integrated Catchment Management GroupFinancial Statement

2024/252023/242022/232021/222020/212019/202018/192017/182016/172015/16Annual Plan

2014/15$000$000$000$000$000$000$000$000$000$000$000

Activity operating revenue4,7404,5925,2174,5154,8935,0604,8544,0143,0332,685Targeted rates2,094

0000000000External interest income15102100985,3936,0066,4596,1534,6553,8893,554Operating grants and subsidies2,840

3,4883,3703,2603,1593,0662,9802,9002,8262,7562,970Other revenue922358346334324315313298289276269Fees and charges0

8,6898,4078,90913,39114,27914,81114,20511,7859,9539,479Total activity operating revenue5,870

Operating expenditure by activity7,1476,8656,8216,4766,4066,1786,1335,8915,7986,157Tauranga Harbour4,3169,8059,54910,82717,59418,99719,81619,16515,92914,15813,203Rotorua Lakes9,3912,8952,8552,7582,7302,7692,9552,9702,7702,4122,235Kaituna9451,5301,4881,4421,4011,3711,3391,3141,2821,2431,181Rangitaiki253,5873,4753,3703,2683,1923,1183,0562,9732,8862,762Other Catchments1,9363,2183,0893,0342,9502,8922,8332,8012,7232,6322,394Land and Water Framework505

28,18127,32128,25134,42035,62736,23935,44031,56929,13027,932Total operating expenditure17,118

19,49218,91419,34221,02921,34821,42821,23519,78419,17718,454Net deficit to fund11,248

Funding required8,8568,3238,1667,5937,3777,0376,6766,0795,4425,430General rates3,15311,33910,72310,3749,7579,5549,5309,6139,3409,0689,865Investment income allocated5,450(703)(132)8013,6794,4174,8624,9464,3654,6673,159(Increase) decrease in reserves2,645

19,49218,91419,34221,02921,34821,42821,23519,78419,17718,454Total funding required11,248

Integrated Catchment Management Group of Activities

71

Page 29: Integrated Catchment Management Group - Bay of Plenty · PDF fileIntegrated Catchment Management Group Integrated Catchment Management Group Te Rōpū Whakahaere Whaitua Awa

2024/252023/242022/232021/222020/212019/202018/192017/182016/172015/16Annual Plan

2014/15$000$000$000$000$000$000$000$000$000$000$000

Capital expenditure by activity0000004,350500244150Rotorua Lakes3,636

2625115231943,2531,6112,7483,7141,970Kaituna0

2625115231943,2535,9613,2483,9582,120Total capital expenditure3,636

Other capital funding applied(26)(25)(115)(23)(194)(3,253)(3,786)(2,998)(3,883)(2,045)Increase (decrease) in reserves(2,113)

0000002,1752507575Total capital funding applied1,523

Sources of capital funding0000002,1752507575Subsidies and grants for capital expenditure1,523

0000002,1752507575Total sources of capital funding1,523

Bay of Plenty Regional Council

72