    Station Name:Bukhel Date of Installation : 2064/1/05

    Item Description Model No. Unit

    Qty. as

    per

    BOQ

    Qty.

    UsedStatus

    Qty.

    LeftRemarks

    2.4.1 Base band Sub system-lot

    2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0

    2.4.1.2 Wireless Channel Board(64) CHM64 Piece 1 1 Installed 0 2 CSMB in this board=64channels

    2.4.1.3 Wireless Channel Board(96) CHM96 Piece 0

    2.4.1.4 Wireless Channel Board(128) CHM128 Piece 1 1 Installed 04 CSMB in this board=128

    channels

    2.4.1.5 Site Alarm Board SAM Piece 1 1 Installed 0

    2.4.1.6 Communication Control Board CCM Piece 2 2 Installed 0

    2.4.2 E1 interface card for the BTS-lot

    2.4.2.1 Channel Data Service Unit(2E1) BTS-CDSU(2) Piece 1 1 Installed 0

    2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 1 Installed 0

    2.4.3 Radio subsystem-lot

    2.4.3.1 Radio Frequency Interface Board RFIM Piece 1 1 Installed 0

    2.4.3.2 TRx ModuleTxRxCIQUFS

    RFCMSet 3 3 Installed 0

    2.4.3.3 TRx Mother Board BTRX Piece 1 1 Installed 0

    2.4.3.4 Radio Front End (Duplexer) RFE-DUP Piece 3 3 Installed 0

    2.4.3.5 Radio Front End (Diversity) RFE-DIV Piece 3 3 Installed 0

    2.4.3.6 Radio Front End(Combiner) RFE-COM Piece 0 0

    2.4.3.7 RFE Mother Board BRFE Piece 1 1 Installed 0

    2.4.4 Power supply Subsystem-lot

    2.4.4.1 Power Supply Module(B) PSMB Piece 2 2 Installed 0

    2.4.4.2 Radio Power Board(+27V) PPM Piece 3 3 Installed 0

    2.4.4.3 Power Module (+/- 12V) PSMC Piece 2 2 Installed 0

    Nepal Telecom

    Directorate of Wireless Telephone

    Chhauni, Kathmandu

    Installation Report for 1C3S BTS

    2.4 1C3S BTS

    BOQ of BTS Hardware

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    2/40

    Item Description Model No. Unit

    Qty. as

    per

    BOQ

    Qty.

    UsedStatus

    Qty.

    LeftRemarks

    2.4.4.4 Power Distribution Board PSMD Piece 1 1 Installed 0

    2.4.4.5 PPM Mother Board BPOWER Piece 1 1 Installed 0

    2.4.5 TFS Subsystem-lot

    2.4.5.1 Frequency Distribution Board FDM Piece 1 1 Installed 0

    2.4.5.2 Time Control Board TCM Piece 1 1 Installed 0

    2.4.5.3 GPS Receiver GPSTM Set 1 1 Installed 0

    2.4.5.4 GPS Antenna,Feeder Cable Set 1 1 Installed 0

    2.4.6 BTS Power modulelot

    2.4.6.1 High Power Amplifier HPA Set 3 3 BTS Rack 0

    2.4.7 BTS Software-lot

    2.4.7.1 BTS System Software Set 1 1 0

    2.4.7.2 BTS Functional Software Per Channel Set 192 192

    Installed in

    CHM module 0

    2.4.8 Installation Material-lot

    2.4.8.1 S222 Installation Material(including Rack) Set 1 1 Installed 0

    2.4.8.2 Digital Trunk Cable(BTS-BSC)75/20m Piece 2 0 Not Installed 2

    2.4.8.3 48V Power Cable BV-25/15m Piece 2 2 Installed 0

    2.4.8.4 GND Power Cable BV-35/15m Piece 1 1 Installed 0

    2.4.9 Anttena System -lot

    65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list)

    2.4.9.1 >=17dBi MOBILE set 3 3 Installed 0

    2.4.9.2 Antenna Feeder set 6 6 Installed 0

    7.4.4

    7.4.4.1 Rectifier module ZXD2400 50A(V3.0) Set 8 8 Installed 0

    7.4.4.2 Centralized supervision unit ZXDU500-CSU Set 1 1 Installed 0

    7.4.4.3 Rectifier cabinet (include AC/DC distribution) Set 1 1 Installed 0

    7.4.4.4 Storage battery(inlcuding battery rack) GFM-600 Set 2 2 Installed 0

    BOQ of BTS Installation Material

    BOQ of Antenna & Feeder

    BOQ of BTS Software

    Power Supply System for 1C3S BTS

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    3/40

    Item Description Model No. Unit

    Qty. as

    per

    BOQ

    Qty.

    UsedStatus

    Qty.

    LeftRemarks

    7.4.4.5Three phase,classs-B type Lightning-arrestor with

    boxZXDL01 T010 Set 1 1 Installed 0

    7.5.2 Single Phase A/C for 2C3S BTS sites (5 KW) RCM20B/A4LC20B / Set 1 0 Not Installed 1 Central store, chauni

    Installatiopn Material

    15. BOQ of Installatiopn Material

    1 AMS Set 1 1 installed 0 1 set = 3 pcs

    2 Cable runway 30cm*20m, Iron Set 1 0 Not Installed 1 Central store, chauni

    3 Cable Ladder 30cm*6m, Aluminium Set 1 1 Installed 0 Iron made ladder used

    4 DDF(BTS) Set 0 0

    5 Pole Tower 18 m Set 1 1 installed 0

    17.2 Grounding Materials BTS sites ZGD-II-1(30) set 1 1 installed 0 Central store, chauni

    2

    2.1 16 square mm BVV cable BVV-16*3 +10*1 m 20 20 installed 0 25 sq.mm *3.5,

    2.2 16 square mm bareconnecting terminal DT-1-16 set 5 5 installed 0

    2.3 25 square mm BVR cable (yellow & Green) BVR-25-98/0.58 m 5 5 installed 0 35 sq.mm used

    2.4 25 square mm bare connecting terminal DT-1-25 set 2 2 installed 02.5 50sq.mm BVR cable (Red) BVR-50-360/0.50 m 10 10 installed

    2.6 50 square mm bare connecting terminal DT-1-50 set 4 4 installed 0

    2.7 Earthing bus bar set 1 1 installed 0

    2.8 50 square mm BVR cable (red) BVR-50-360/0.50 m 10 10 installed 0

    2.9 50 square mm BVR cable (Blue) BVR-50-360/0.51 m 10 10 installed 0

    2.10 50 square mm bare connecting terminal DT-1-50 set 8 8installed

    070 square mm bare

    connecting terminal used

    Installed By: Checked By: Approved By:

    Narayan Prasad Kusi

    Engineer, DWT, NT

    70 square mm BVR cable

    used

    17. BOQ of Grounding Materials

    Installation Materials for ZXDU500

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    4/40

    Station Name: Mahadevtar Date of Installation : 2066-0

    Item Description Model No. UnitQty. as

    per

    Qty.

    UsedStatus Qty. Left

    2.4.1 Base band Sub system-lot

    2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0

    2.4.1.2 Wireless Channel Board(64) CHM64 Piece 2 2 Installed 0

    2.4.1.3 Wireless Channel Board(96) CHM96 Piece 0

    2.4.1.4 Wireless Channel Board(128) CHM128 Piece 2 2 Installed 0

    2.4.1.5 Site Alarm Board SAM Piece 1 1 Installed 0

    2.4.1.6 Communication Control Board CCM Piece 2 2 Installed 0

    2.4.2 E1 interface card for the BTS-lot

    2.4.2.1 Channel Data Service Unit(2E1)BTS-

    CDSU(2)Piece 1 1 Installed 0

    2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 1 Installed 0

    2.4.3 Radio subsystem-lot

    2.4.3.1 Radio Frequency Interface Board RFIM Piece 2 2 Installed 0

    2.4.3.2 TRx Module

    TxRxCI

    QUFSRFCM

    Set 6 6 Installed 0

    2.4.3.3 TRx Mother Board BTRX Piece 1 1 Installed 0

    2.4.3.4 Radio Front End (Duplexer) RFE-DUP Piece 6 6 Installed 0

    2.4.3.5 Radio Front End (Diversity) RFE-DIV Piece 0 0 Installed 0

    2.4.3.6 Radio Front End(Combiner) RFE-COM Piece 0 0

    2.4.3.7 RFE Mother Board BRFE Piece 1 1 Installed 0

    2

    Nepal Telecom

    Directorate of Wireless Telephone

    Chhauni, KathmanduInstallation Report for 2C3S BTS

    1. 2C3S BTS

    BOQ of BTS Hardware

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    5/40

    2.4.7.2 BTS Functional Software Per Channel Set 384 384

    Installed in

    CHM

    module

    0

    2.4.8 Installation Material-lot

    2.4.8.1S222 Installation Material(including

    Rack)Set 1 1 Installed 0

    2.4.8.2-

    Piece 4 4 Installed 0

    2.4.8.3 48V Power Cable BV-25/15m Piece 2 2 Installed 0

    2.4.8.4 GND Power Cable BV-35/15m Piece 1 1 Installed 0

    2.4.9 Anttena System -lot

    65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list)

    2.4.9.1 Antenna (65 degree), Gain >=17dBi MOBILE set 3 3 Installed 0

    2.4.9.2 Antenna Feeder set 1 1 Installed 0

    BOQ of Installatiopn Material

    1 Internal Ladder Set 1 1 Installed 0

    2 4m Pole segment at top of 5m Tripod Tower Set 1 1 Installed 0

    3 Feeder window Set 1 1 Installed 0

    4 Modem Rack Set 1 1 Installed 0

    5 HDSL Modem( Realtime) Pair 1 1 Installed 0

    1 Storage Battery(inlcuding battery rack) GFM-600 Set 2 2 Installed 0

    2 MCB 63A S 1 1 I ll d 0

    BOQ of BTS Installation Material

    BOQ of Antenna & Feeder

    Power Supply System for 2C3S BTS

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    6/40

    Narayan Prasad Kusi

    Engineer, DWT, NT

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    7/40

    5-10

    Remarks

    2 CSMB in this board=64

    channels

    4 CSMB in this board=128

    channels

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    8/40

    For mounting CDMA Antennas

    For Modem

    1 Pair=2set [1 set Installed

    at Mahadevtar station and 1

    set at Gongabu Exchange]

    Installed in Rectifier for

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    9/40

    Station Name: Kamalnetra (Bhimsengola) Date of Installation : 2066-

    Item Description Model No. UnitQty. as

    per

    Qty.

    UsedStatus Qty. Left Remarks

    2.4.1 Base band Sub system-lot

    2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0

    2.4.1.2 Wireless Channel Board(64) CHM64 Piece 0 0 0

    2.4.1.3 Wireless Channel Board(96) CHM96 Piece 2 2 Installed 0 3 CSMB in this board=96channels

    2.4.1.4 Wireless Channel Board(128) CHM128 Piece 0 0 0

    2.4.1.5 Site Alarm Board SAM Piece 1 1 Installed 0

    2.4.1.6 Communication Control Board CCM Piece 2 2 Installed 0

    2.4.2 E1 interface card for the BTS-lot

    2.4.2.1 Channel Data Service Unit(2E1)BTS-

    CDSU(2)Piece 1 1 Installed 0

    2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 1 Installed 0

    2.4.3 Radio subsystem-lot

    2.4.3.1 Radio Frequency Interface Board RFIM Piece 2 2 Installed 0

    2.4.3.2 TRx Module

    TxRxCI

    QUFS

    RFCM

    Set 6 6 Installed 0

    2.4.3.3 TRx Mother Board BTRX Piece 1 1 Installed 0

    2.4.3.4 Radio Front End (Duplexer) RFE-DUP Piece 6 6 Installed 0

    2.4.3.5 Radio Front End (Diversity) RFE-DIV Piece 0 0 Installed 0

    2.4.3.6 Radio Front End(Combiner) RFE-COM Piece 0 0

    2.4.3.7 RFE Mother Board BRFE Piece 1 1 Installed 0

    2.4.4 Power supply Subsystem-lot

    2.4.4.1 Power Supply Module(B) PSMB Piece 2 2 Installed 0

    2.4.4.2 Radio Power Board(+27V) PPM Piece 5 5 Installed 02.4.4.3 Power Module (+/- 12V) PSMC Piece 2 2 Installed 0

    2.4.4.4 Power Distribution Board PSMD Piece 1 1 Installed 0

    2.4.4.5 PPM Mother Board BPOWER Piece 1 1 Installed 0

    2.4.5 TFS Subsystem-lot

    2.4.5.1 Frequency Distribution Board FDM Piece 1 1 Installed 0

    2.4.5.2 Time Control Board TCM Piece 1 1 Installed 0

    2.4.5.3 GPS Receiver GPSTM Set 1 1 Installed 0

    2.4.5.4 GPS Antenna,Feeder Cable Set 1 1 Installed 0

    Nepal Telecom

    Directorate of Wireless Telephone

    Chhauni, Kathmandu

    Installation Report for 2C3S BTS

    1. 2C3S BTS

    BOQ of BTS Hardware

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    10/40

    2.4.9.2 Antenna Feeder set 1 1 Installed 0

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    11/40

    BOQ of Installatiopn Material

    1 Internal Ladder Set 1 1 Installed 0

    2 Feeder Hole Set 1 1 Installed 0

    3 Modem Rack Set 1 1 Installed 0 For Modem

    4 HDSL Modem Pair 1 1 Installed 0

    =

    at Kamalnetra station and 1

    1 MCB 63A Set 1 1 Installed 0Installed in GSM Rectifier

    ZXDU68 for CDMA BTS

    1 Earthing Cable 35 mm2 Set 1 1 Installed 0

    2 Earthing Cable 16 mm2 Set 1 1 Installed 0

    3 Coaxial Cable 7/8 inch Set 1 1 Installed 0

    4 Load Cable (Blue and black) Set 1 1 Installed 0

    cabinet no:7; Primary Pair =26/72

    Note:

    Installed By: Checked By:

    Narayan Prasad Kusi

    Engineer, DWT, NT

    The power system with 800AH*2 banks battery and ZXDU68 rectifier of GSM Station is shared for operating this BTS station.

    E1 Information: Central office2-14-6 to chabahil 2-5-19

    Power Supply System for 2C3S BTS

    Other Installation Materials

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    12/40

    Station Name: Mangalbazar Date of Installation : 2066-

    Item Description Model No. UnitQty. as

    er

    Qty.

    UsedStatus Qty. Left Remarks

    2.4.1 Base band Sub system-lot

    2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0

    2.4.1.2 Wireless Channel Board(64) CHM64 Piece 2 2 Installed 0

    2 CSMB in this board=64

    channels2.4.1.3 Wireless Channel Board(96) CHM96 Piece 0

    2.4.1.4 Wireless Channel Board(128) CHM128 Piece 2 2 Installed 04 CSMB in this board=128

    channels

    2.4.1.5 Site Alarm Board SAM Piece 1 1 Installed 0

    2.4.1.6 Communication Control Board CCM Piece 2 2 Installed 0

    2.4.2 E1 interface card for the BTS-lot

    2.4.2.1 Channel Data Service Unit(2E1)BTS-

    CDSU(2)Piece 1 1 Installed 0

    2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 1 Installed 0

    2.4.3 Radio subsystem-lot2.4.3.1 Radio Frequency Interface Board RFIM Piece 2 2 Installed 0

    2.4.3.2 TRx Module

    TxRxCI

    QUFS

    RFCM

    Set 6 6 Installed 0

    2.4.3.3 TRx Mother Board BTRX Piece 1 1 Installed 0

    2.4.3.4 Radio Front End (Duplexer) RFE-DUP Piece 6 6 Installed 0

    2.4.3.5 Radio Front End (Diversity) RFE-DIV Piece 0 0 Installed 0

    2.4.3.6 Radio Front End(Combiner) RFE-COM Piece 0 0

    2.4.3.7 RFE Mother Board BRFE Piece 1 1 Installed 0

    2.4.4 Power supply Subsystem-lot

    2.4.4.1 Power Supply Module(B) PSMB Piece 2 2 Installed 0

    2.4.4.2 Radio Power Board(+27V) PPM Piece 5 5 Installed 0

    2.4.4.3 Power Module (+/- 12V) PSMC Piece 2 2 Installed 0

    2.4.4.4 Power Distribution Board PSMD Piece 1 1 Installed 0

    2.4.4.5 PPM Mother Board BPOWER Piece 1 1 Installed 0

    2.4.5 TFS Subsystem-lot

    2.4.5.1 Frequency Distribution Board FDM Piece 1 1 Installed 0

    2.4.5.2 Time Control Board TCM Piece 1 1 Installed 0

    2 4 5 3 GPS Receiver GPSTM Set 1 1 Installed 0

    Nepal Telecom

    Directorate of Wireless Telephone

    Chhauni, Kathmandu

    Installation Report for 2C3S BTS

    1. 2C3S BTS

    BOQ of BTS Hardware

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    13/40

    2.4.9.1 Antenna (65 degree), Gain >=17dBi MOBILE set 3 3 Installed 0

    2.4.9.2 Antenna Feeder set 1 1 Installed 0

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    14/40

    1 Earthing Cable 35 mm2 Set 1 1 Installed 0

    2 Earthing Cable 16 mm2 Set 1 1 Installed 0

    3 Coaxial Cable 7/8 inch Set 1 1 Installed 0

    4 Load Cable (Blue and black) Set 1 1 Installed 0

    1Micro BTS Racks(2 Racks in 2C1O

    BTS)Set 2 2

    Dismantled Stored at the Chauni office

    2 48V LPU Set 2 2 Dismantled Stored at the Chauni office

    3 Omni Antennas Set 1 1 Dismantled 1set = 2 omni Antennas

    4 GPS Antenna Set 1 1 Dismantled Stored at the Chauni office

    Note:

    Installed By: Checked By:

    Narayan Prasad Kusi

    Engineer, DWT, NT

    Before, CDMA 2C1O BTS was in operation in this station. Due to traffic overlaod and Coverage problem, the whole set of CDMA

    2C1O Micro BTS has been dismantled and this 2C3S BTS was installed.

    Dismantled Materials

    Other Installation Materials

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    15/40

    Station Name: Hyumat Date of Installation : 2066-

    Item Description Model No. UnitQty. as

    per

    Qty.

    UsedStatus Qty. Left

    2.4.1 Base band Sub system-lot

    2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0

    2.4.1.2 Wireless Channel Board(64) CHM64 Piece 2 2 Installed 0

    2.4.1.3 Wireless Channel Board(96) CHM96 Piece 0 0

    2.4.1.4 Wireless Channel Board(128) CHM128 Piece 2 2 Installed 0

    2.4.1.5 Site Alarm Board SAM Piece 1 1 Installed 0

    2.4.1.6 Communication Control Board CCM Piece 2 2 Installed 02.4.2 E1 interface card for the BTS-lot

    2.4.2.1 Channel Data Service Unit(2E1)BTS-

    CDSU(2)Piece 1 1 Installed 0

    2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 1 Installed 0

    2.4.3 Radio subsystem-lot

    2.4.3.1 Radio Frequency Interface Board RFIM Piece 2 2 Installed 0

    2.4.3.2 TRx Module

    TxRxCI

    QUFSRFCM

    Set 6 6 Installed 0

    2.4.3.3 TRx Mother Board BTRX Piece 1 1 Installed 0

    2.4.3.4 Radio Front End (Duplexer) RFE-DUP Piece 6 6 Installed 0

    2.4.3.5 Radio Front End (Diversity) RFE-DIV Piece 0 0 Installed 0

    2.4.3.6 Radio Front End(Combiner) RFE-COM Piece 0 0

    2.4.3.7 RFE Mother Board BRFE Piece 1 1 Installed 0

    2

    Nepal Telecom

    Directorate of Wireless Telephone

    Chhauni, KathmanduInstallation Report for 2C3S BTS

    1. 2C3S BTS

    BOQ of BTS Hardware

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    16/40

    2.4.7.2 BTS Functional Software Per Channel Set 384 384

    Installed in

    CHM

    module

    0

    2.4.8 Installation Material-lot

    2.4.8.1S222 Installation Material(including

    Rack)Set 1 1 Installed 0

    2.4.8.2-

    Piece 4 4 Installed 0

    2.4.8.3 48V Power Cable BV-25/15m Piece 2 2 Installed 0

    2.4.8.4 GND Power Cable BV-35/15m Piece 1 1 Installed 0

    2.4.9 Anttena System -lot

    65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list)

    2.4.9.1 Antenna (65 degree), Gain >=17dBi MOBILE set 3 3 Installed 0

    2.4.9.2 Antenna Feeder set 1 1 Installed 0

    BOQ of Installatiopn Material

    1 Internal Ladder Set 1 1 Installed 0

    2 Feeder Hole Set 1 1 Installed 0

    3 Modem Rack Set 1 1 Installed 0

    4 HDSL Modem Pair 1 1 Installed 0

    1 MCB 63A Set 1 1 Installed 0

    BOQ of BTS Installation Material

    BOQ of Antenna & Feeder

    Power Supply System for 2C3S BTS

    O i i

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    17/40

    Engineer, DWT, NT

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    18/40

    Remarks

    2 CSMB in this board=64

    channels

    4 CSMB in this board=128

    channels

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    19/40

    For Modem=

    at Kamalnetra station and 1

    Installed in GSM Rectifier

    ZXDU68 for CDMA BTS

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    20/40

    Station Name: Date of Installation : 2010-12-13

    Item Description Model No. Unit

    Qty. as

    per

    BOQ

    Qty.

    UsedStatus Qty. Left Remarks

    2.4.1 Base band Sub system-lot

    2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0

    2.4.1.2 Wireless Channel Board(64) CHM64 Piece 2 2 Installed 0 2 CSMB in this board=64 channels

    2.4.1.3 Wireless Channel Board(96) CHM96 Piece 0

    2.4.1.4 Wireless Channel Board(128) CHM128 Piece 2 2 Installed 0=

    2.4.1.5 Site Alarm Board SAM Piece 1 1 Installed 02.4.1.6 Communication Control Board CCM Piece 2 2 Installed 0

    2.4.2 E1 interface card for the BTS-lot

    2.4.2.1 Channel Data Service Unit(2E1) BTS-CDSU(2) Piece 1 1 Installed 0

    2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 1 Installed 0

    2.4.3 Radio subsystem-lot

    2.4.3.1 Radio Frequency Interface Board RFIM Piece 2 2 Installed 0

    2.4.3.2 TRx ModuleTxRxCIQUFS

    RFCMSet 6 6 Installed 0

    2.4.3.3 TRx Mother Board BTRX Piece 1 1 Installed 0

    2.4.3.4 Radio Front End (Duplexer) RFE-DUP Piece 6 6 Installed 02.4.3.5 Radio Front End (Diversity) RFE-DIV Piece 0 0 Installed 0

    2.4.3.6 Radio Front End(Combiner) RFE-COM Piece 0 0

    2.4.3.7 RFE Mother Board BRFE Piece 1 1 Installed 0

    2.4.4 Power supply Subsystem-lot

    2.4.4.1 Power Supply Module(B) PSMB Piece 2 2 Installed 0

    2.4.4.2 Radio Power Board(+27V) PPM Piece 5 5 Installed 0

    2.4.4.3 Power Module (+/- 12V) PSMC Piece 2 2 Installed 0

    2.4.4.4 Power Distribution Board PSMD Piece 1 1 Installed 0

    2.4.4.5 PPM Mother Board BPOWER Piece 1 1 Installed 0

    2.4.5TFS Subsystem-lot2.4.5.1 Frequency Distribution Board FDM Piece 1 1 Installed 0

    2.4.5.2 Time Control Board TCM Piece 1 1 Installed 0

    2.4.5.3 GPS Receiver GPSTM Set 1 1 Installed 0

    2.4.5.4 GPS Antenna,Feeder Cable Set 1 1 Installed 0

    2.4.6 BTS Power modulelot

    2.4.6.1 High Power Amplifier HPA Set 6 6 BTS Rack 0

    Installation Report for 2C3S BTS

    1. 2C3S BTS

    BOQ of BTS Hardware

    BOQ of BTS Software

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    21/40

    Station Name:Patan Dhoka Date of Installation : 2066/08/01

    Item Description Model No. UnitQty. as

    per

    Qty.

    UsedStatus Qty. Left Remarks

    2.4.1 Base band Sub system-lot

    2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0

    2.4.1.2 Wireless Channel Board(64) CHM64 Piece 1 1 Installed 02 CSMB in this board=64

    channels

    2.4.1.3 Wireless Channel Board(96) CHM96 Piece 0

    2.4.1.4 Wireless Channel Board(128) CHM128 Piece 1 1 Installed 04 CSMB in this board=128

    channels

    2.4.1.5 Site Alarm Board SAM Piece 1 1 Installed 0

    2.4.1.6 Communication Control Board CCM Piece 2 2 Installed 0

    2.4.2 E1 interface card for the BTS-lot

    2.4.2.1 Channel Data Service Unit(2E1)BTS-

    CDSU(2)Piece 1 1 Installed 0

    2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 1 Installed 0

    2.4.3 Radio subsystem-lot

    2.4.3.1 Radio Frequency Interface Board RFIM Piece 1 1 Installed 0

    2.4.3.2 TRx Module

    TxRxCI

    QUFS

    RFCM

    Set 3 3 Installed 0

    2.4.3.3 TRx Mother Board BTRX Piece 1 1 Installed 0

    2.4.3.4 Radio Front End (Duplexer) RFE-DUP Piece 3 3 Installed 0

    2.4.3.5 Radio Front End (Diversity) RFE-DIV Piece 3 3 Installed 0

    2.4.3.6 Radio Front End(Combiner) RFE-COM Piece 0 0

    2.4.3.7 RFE Mother Board BRFE Piece 1 1 Installed 0

    2.4.4 Power supply Subsystem-lot

    2.4.4.1 Power Supply Module(B) PSMB Piece 2 2 Installed 0

    2.4.4.2 Radio Power Board(+27V) PPM Piece 3 3 Installed 02.4.4.3 Power Module (+/- 12V) PSMC Piece 2 2 Installed 0

    2.4.4.4 Power Distribution Board PSMD Piece 1 1 Installed 0

    2.4.4.5 PPM Mother Board BPOWER Piece 1 1 Installed 0

    2.4.5 TFS Subsystem-lot

    2.4.5.1 Frequency Distribution Board FDM Piece 1 1 Installed 0

    2.4.5.2 Time Control Board TCM Piece 1 1 Installed 0

    2.4.5.3 GPS Receiver GPSTM Set 1 1 Installed 0

    2.4.5.4 GPS Antenna,Feeder Cable Set 1 1 Installed 0

    Nepal Telecom

    Directorate of Wireless Telephone

    Chhauni, Kathmandu

    Installation Report for 1C3S BTS

    1. 1C3S BTS

    BOQ of BTS Hardware

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    22/40

    Item Description Model No. UnitQty. as

    per

    Qty.

    UsedStatus Qty. Left Remarks

    2.4.6.1 High Power Amplifier HPA Set 3 3 BTS Rack 0

    2.4.7 BTS Software-lot

    2.4.7.1 BTS System Software Set 1 1 0

    2.4.7.2 BTS Functional Software Per Channel Set 192 192

    Installed in

    CHM

    module

    0

    2.4.8 Installation Material-lot

    2.4.8.1S222 Installation Material(including

    Rack)Set 1 1 Installed 0

    2.4.8.2-

    Piece 2 2 Installed 0

    2.4.8.3 48V Power Cable BV-25/15m Piece 2 2 Installed 0

    2.4.8.4 GND Power Cable BV-35/15m Piece 1 1 Installed 0

    2.4.9 Anttena System -lot

    65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list)

    2.4.9.1 Antenna (65 degree), Gain >=17dBi MOBILE set 3 3 Installed 0

    2.4.9.2 Antenna Feeder set 1 1 Installed 0

    BOQ of Installatiopn Material

    1 Internal Ladder 30cm*12m Set 1 1 Installed 0

    2 Cable Ladder 0cm*6m, Iro Set 1 1 Installed 0 Iron made ladder used

    3 DDF(BTS) Set 2 2 Installed 0 or BTS room and ONU roo

    4 Tripod Pole Tower 18 m with 3 set AMS Set 1 1 installed 0

    5 AMS Set 1 1 installed 0 1 set = 3 pcs

    6 AC PDB Set 22 Installed 0

    1 For BTS Room and 1 for

    Main Supply

    7 MCB [32A] Set 4 4 Installed 0

    8 MCB [16A] Set 2 2 Installed 0

    9 MCB [10A] Set 2 2 Installed 0

    10 MCB [6] Set 2 2 Installed 0

    11 E1 Cable ( 8 core) 100m Set 1 1 Installed 0

    12 3-Phase Power Cable( Meter box to BTS 40m Set 1 1 Installed 0

    BOQ of BTS Software

    BOQ of BTS Installation Material

    BOQ of Antenna & Feeder

    Installed at two AC PDBs,

    for power distribution from

    main supply and for power

    distn for BTS and Internal

    wiring

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    23/40

    Item Description Model No. UnitQty. as

    per

    Qty.

    UsedStatus Qty. Left Remarks

    1 Rectifier moduleZXD2400

    50A(V3.0)Set 8 8 Installed 0

    2 Centralized supervision unit ZXDU500-CSU Set 1 1 Installed 0

    3Rectifier cabinet (include AC/DC

    distribution)Set 1 1 Installed 0

    4 Storage battery(inlcuding battery rack) GFM-600 Set 2 2 Installed 0

    5Three phase,classs-B type Lightning-

    arrestor with box

    ZXDL01

    T010Set 1 1 Installed 0

    6 Single Phase A/C for 2C3S BTS sites (5 RCM20B/A4 Set 1 0 Not 1 Central store, chauni

    1 16 square mm BVV cableBVV-16*3

    +10*1m 20 20

    installed0 25 sq.mm *3.5,

    2 16 square mm bareconnecting terminal DT-1-16 set 5 5 installed 0

    325 square mm BVR cable (yellow &

    Green)

    BVR-25-

    98/0.58m 5 5

    installed0 35 sq.mm used

    4 25 square mm bare connecting terminal DT-1-25 set 2 2 installed 0

    5 50sq.mm BVR cable (Red)BVR-50-

    360/0.50m 10 10 installed

    6 50 square mm bare connecting terminal DT-1-50 set 4 4 installed 0

    7 Earthing bus bar set 1 1 installed 0

    8 50 square mm BVR cable (red)BVR-50-

    360/0.50m 10 10

    installed0

    9 50 square mm BVR cable (Blue)BVR-50-

    360/0.51m 10 10

    installed0

    10 50 square mm bare connecting terminal DT-1-50 set 8 8installed

    070 square mm bare

    connecting terminal used

    Installed By: Checked By: Approved By:

    Narayan Prasad Kusi

    Engineer, DWT, NT

    Installation Materials for ZXDU500

    70 square mm BVR cable

    used

    Power Supply System for 1C3S BTS

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    24/40

    Station Name:Patandhoka Date of Upgradation : 2066/08/03

    Item Description Model No Unit

    Qty. as

    per

    BOQ

    Qty.

    Used

    StatusQty.

    Left

    Remarks

    1Wireless Channel

    Board(64)CHM64 Piece 1 1

    Installe

    d0

    2 CSMB in this

    board=64 channels

    2Wireless Channel

    Board(128)CHM128 Piece 1 1

    Installe

    d0

    4 CSMB in this

    board=128 channels

    3Radio Frequency

    Interface BoardRFIM Piece 1 1

    Installe

    d0

    4 TRx Module TRX Set 3 3Installe

    d 0

    5Radio Front End

    (Duplexer)

    RFE-

    DUPPiece 3 3

    Installe

    d0

    6Radio Power

    Board(+27V)PPM Piece 2 2

    Installe

    d0

    7 High Power Amplifier HPA Set 3 3BTS

    Rack0

    8 BTS System Software Set 1 1Installe

    d0

    9 BTS Functional SoftwarePer

    ChannelSet 192 192

    Installe

    d in

    CHM

    module

    0

    Installed By: Checked By: Approved By:

    BTS Hardware

    Nepal Telecom

    Directorate of Wireless Telephone

    Chhauni, Kathmandu

    Upgradation Report (Upgrade from 1C3S BTS to 2C3S BTS)

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    25/40

    Station Name:Pardi (Upgrade from 1C3S BTS to 2C3S BTS)

    Date of Upgradation : 2064/3/23

    Item Description Model No. UnitQty. as

    per BOQ

    Qty.

    UsedStatus Qty. Left Remarks

    1Wireless Channel

    Board(64)CHM64 Piece 1 1 Installed 0

    2 CSMB in this

    board=64

    channels

    2Wireless Channel

    Board(128)CHM128 Piece 1 1 Installed 0

    4 CSMB in this

    board=128

    channels

    3Radio Frequency Interface

    BoardRFIM Piece 1 1 Installed 0

    4 TRx Module TRX Set 3 3 Installed 0

    5Radio Front End

    (Duplexer)RFE-DUP Piece 3 3 Installed 0

    6 PPM Piece 2 2 Installed 0

    7 High Power Amplifier HPA Set 3 3 BTS Rack 0

    8 BTS System Software Set 1 1 0

    9 BTS Functional Software Per Channel Set 192 192

    Installed

    in CHM

    module

    0

    Station Name:Rithepani(Upgrade from 1C3S BTS to 2C3S BTS)

    Date of Upgradation : 2064/3/23

    Item Description Model No. UnitQty. as

    per BOQ

    Qty.

    UsedStatus Qty. Left Remarks

    1Wireless Channel

    CHM64 Pi 1 1 I ll d 0

    2 CSMB in this

    b d 64

    BTS Hardware

    Nepal Telecom

    Directorate of Wireless Telephone

    Chhauni, Kathmandu

    Upgradation Report

    BTS Hardware

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    26/40

    2.4 1C3S BTS Sanga

    Item Description Model No. Unit Qty. Site Qty.Qty.

    leftRemarks

    BOQ of BTS Hardware

    2.4.1 Base band Sub system-lot

    2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0 0

    2.4.1.2 Wireless Channel Board(64) CHM64 Piece 1 BTS rack 1 0

    2.4.1.3 Wireless Channel Board(96) CHM96 Piece 0 0 0

    2.4.1.4 Wireless Channel Board(128) CHM128 Piece 1 BTS rack 1 0

    2.4.1.5 Site Alarm Board SAM Piece 1 BTS rack 1 0

    2.4.1.6 Communication Control Board CCM Piece 2 BTS rack 2 0

    Sub-Total

    2.4.2 E1 interface card for the BTS-lot

    2.4.2.1 Channel Data Service Unit(4E1)BTS-

    CDSU(4)Piece 1 BTS rack 1 0

    2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 BTS rack 1 0

    Sub-Total

    2.4.3 Radio subsystem-lot

    2.4.3.1 Radio Frequency Interface Board RFIM Piece 1 BTS rack 1 0

    2.4.3.2 TRx Module

    TxRx

    CIQUF

    SRFC

    M

    Set 3 BTS rack 3 0

    Hardware Completion and BOQ Reference for

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    27/40

    2.4.4.4 Power Distribution Board PSMD Piece 1 BTS rack 1 0

    2.4.4.5 PPM Mother BoardBPOWE

    RPiece 1 BTS rack 1 0

    Sub-Total

    2.4.5 TFS Subsystem-lot

    2.4.5.1 Frequency Distribution Board FDM Piece 1 BTS rack 1 0

    2.4.5.2 Time Control Board TCM Piece 1 BTS rack 1 0

    2.4.5.3 GPS Receiver GPSTM Set 1 BTS rack 1 0

    2.4.5.4 GPS Antenna,Feeder Cable Set 1 Installed 1 0

    Refer to

    Annex for

    GPS FeederCable

    Sub-Total

    2.4.6 BTS Power module lot

    2.4.6.1 High Power Amplifier HPA Set 3 BTS rack 3 0

    Sub-Total

    BTS Hardware Total

    BOQ of BTS Software

    2.4.7 BTS Software-lot

    2.4.7.1 BTS System Software Set 1 1 0

    2.4.7.2 BTS Functional SoftwarePer

    ChannelSet 192

    Installed in

    CHM192 0

    Sub-Total

    BOQ of BTS Installation Material

    2.4.8 Installation Material-lot

    2.4.8.1S111 Installation Material(including

    Rack)Set 1

    Installed1 0

    2.4.8.2Digital Trunk Cable(BTS-

    BSC)75/20mPiece 2

    Installed

    2 0

    Refer to

    Annex for DT

    Cable

    2.4.8.3 48V Power Cable BV-25/15m Piece 2

    I t ll d

    2 0

    Refer to

    Annex for DC

    C bl

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    28/40

    65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list)

    2.4.9.1 >=17dBi MOBILE set 3 Installed 3 0

    2.4.9.2 Antenna Feeder set 6 Installed 6 0Refer to

    Annex for

    Feeder Cable

    Sub-Total

    Discount

    1C3S BTS Total

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    29/40

    Invoice Package S/N(SN) Remarks Box No.

    ZTE20041213NP-1 CD0401888961(3)

    2 CSMB in

    this board=64channels 895

    ZTE20041213NP-1 CD0401888961(3)

    4 CSMB in

    this

    board=128

    channels

    895

    ZTE20041213NP-1 CD0401888961(8) 895

    ZTE20041213NP-1

    CD0401888961(11)

    895

    ZTE20041213NP-1 CD0401888961(9) 895

    ZTE20041213NP-1 CD0401888961(17) 895

    ZTE20041213NP-1 CD0401888961(10) 895

    ZTE20041213NP-1 CD0401888960(8)

    BTS-Sanga

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    30/40

    ZTE20041213NP-1 CD0401888960(13) 921

    ZTE20041213NP-1 CD0401888961(14) 895

    ZTE20041213NP-1 CD0401888961(6) 895

    ZTE20041213NP-1 CD0401888961(5) 895

    ZTE20041213NP-1 CD0401888961(7) 895

    ZTE20041213NP-1 CD0401934170(3) 645

    ZTE20041213NP-1 CD0401888960(7) 921

    ZTE20041220NP-1 CD0401934170(18) 645

    ZTE20041220NP-1 CD0401934170(18) 645

    ZTE20041213NP-1CD0401888961(1)

    895

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    31/40

    ZTE20041213NP-1 CD0401954834 968

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    32/40

    Station Name: Mangalapur Date of Installation : 2062/07/07 (2005 Oct. 24)

    Item Description Model No. Unit

    Qty. as

    per

    BOQ

    Qty.

    UsedStatus

    Qty.

    LeftRemarks

    2.4.1 Base band Sub system-lot

    2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0

    2.4.1.2 Wireless Channel Board(64) CHM64 Piece 1 1 Installed 0 2 CSMB in this board=64 channels2.4.1.3 Wireless Channel Board(96) CHM96 Piece 0

    2.4.1.4 Wireless Channel Board(128) CHM128 Piece 1 1 Installed 0 4 CSMB in this board=128 channels

    2.4.1.5 Site Alarm Board SAM Piece 1 1 Installed 0

    2.4.1.6 Communication Control Board CCM Piece 2 2 Installed 0

    2.4.2 E1 interface card for the BTS-lot

    2.4.2.1 Channel Data Service Unit(4E1) BTS-CDSU(4) Piece 1 1 Installed 0

    2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 1 Installed 0

    2.4.3 Radio subsystem-lot

    2.4.3.1 Radio Frequency Interface Board RFIM Piece 1 1 Installed 0

    2.4.3.2 TRx ModuleTxRxCIQUFS

    RFCMSet 3 3 Installed 0

    2.4.3.3 TRx Mother Board BTRX Piece 1 1 Installed 0

    2.4.3.4 Radio Front End (Duplexer) RFE-DUP Piece 3 3 Installed 0

    2.4.3.5 Radio Front End (Diversity) RFE-DIV Piece 3 3 Installed 0

    2.4.3.6 Radio Front End(Combiner) RFE-COM Piece 0 0

    2.4.3.7 RFE Mother Board BRFE Piece 1 1 Installed 0

    2.4.4 power supply Subsystem-lot

    2.4.4.1 Power Supply Module(B) PSMB Piece 2 2 Installed 0

    2.4.4.2 Radio Power Board(+27V) PPM Piece 3 3 Installed 0

    2.4.4.3 Power Module (+/- 12V) PSMC Piece 2 2 Installed 0

    2.4.4.4 Power Distribution Board PSMD Piece 1 1 Installed 0

    2.4.4.5 PPM Mother Board BPOWER Piece 1 1 Installed 0

    Nepal Telecom

    Directorate of Wireless Telephone

    Chhauni, Kathmandu

    Installation Report for 1C3S BTS

    2.4 1C3S BTS

    BOQ of BTS Hardware

    Mangalapur Page: 32 of 40

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    33/40

    Item Description Model No. Unit

    Qty. as

    per

    BOQ

    Qty.

    UsedStatus

    Qty.

    LeftRemarks

    2.4.5 TFS Subsystem-lot

    2.4.5.1 Frequency Distribution Board FDM Piece 1 1 Installed 0

    2.4.5.2 Time Control Board TCM Piece 1 1 Installed 0

    2.4.5.3 GPS Receiver GPSTM Set 1 1 Installed 0

    2.4.5.4 GPS Antenna,Feeder Cable Set 1 1 Installed 0

    2.4.6 BTS Power modulelot

    2.4.6.1 High Power Amplifier HPA Set 3 3 BTS Rack 0

    2.4.7 BTS Software-lot

    2.4.7.1 BTS System Software Set 1 1 0

    2.4.7.2 BTS Functional Software Per Channel Set 192 192Installed in

    CHM module0

    2.4.8 Installation Material-lot2.4.8.1 S222 Installation Material(including Rack) Set 1 1 Installed 0

    2.4.8.2 Digital Trunk Cable(BTS-BSC)75/20m Piece 2 2 Installed 0

    2.4.8.3 48V Power Cable BV-25/15m Piece 2 2 Installed 0

    2.4.8.4 GND Power Cable BV-35/15m Piece 1 1 Installed 0

    2.4.9 Anttena System -lot

    65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list)

    2.4.9.1 >=17dBi MOBILE set 3 3 Installed 0

    2.4.9.2 Antenna Feeder set 6 6 Installed 0

    7.4.4

    7.4.4.1 Rectifier module ZXD2400 50A(V3.0) Set 8

    7.4.4.2 Centralized supervision unit ZXDU500-CSU Set 1

    7.4.4.3 Rectifier cabinet (include AC/DC distribution) Set 1

    7.4.4.4 Storage battery(inlcuding battery rack) GFM-600 Set 2

    7.4.4.5Three phase,classs-B type Lightning-arrestor with

    boxZXDL01 T010 Set 1

    BOQ of BTS Software

    BOQ of BTS Installation Material

    BOQ of Antenna & Feeder

    Power Supply System for 1C3S BTS

    Installed By WDR, Bhairahawa

    Mangalapur Page: 33 of 40

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    34/40

    Item Description Model No. Unit

    Qty. as

    per

    BOQ

    Qty.

    UsedStatus

    Qty.

    LeftRemarks

    7.5.2 Single Phase A/C for 2C3S BTS sites (5 KW)RCM20B/A4LC20B /

    HilltakeSet 1

    Installatiopn Material15. BOQ of Installatiopn Material

    1 AMS Set 1 1 installed 0 1 set = 3 pcs

    2 Cable runway 30cm*20m, Iron Set 1 0 Not Installed 1 WDR Store , Bhairahawa

    3 Cable Ladder 30cm*10m, Aluminium Set 1 1 Installed 0 Iron made ladder used

    4 DDF(BTS) Set 1 1 Installed 0

    17.2 Grounding Materials BTS sites ZGD-II-1(30) set 1 0 Not Installed 1 WDR Store , Bhairahawa

    2

    2.1 16 square mm BVV cable BVV-16*3 +10*1 m 20

    2.2 16 square mm bareconnecting terminal DT-1-16 set 5

    2.3 25 square mm BVR cable (yellow & Green) BVR-25-98/0.58 m 5

    2.4 25 square mm bare connecting terminal DT-1-25 set 2

    2.5 50sq.mm BVR cable (Red) BVR-50-360/0.50 m 10

    2.6 50 square mm bare connecting terminal DT-1-50 set 4

    2.7 Earthing bus bar set 1

    2.8 50 square mm BVR cable (red) BVR-50-360/0.50 m 10

    2.9 50 square mm BVR cable (Blue) BVR-50-360/0.51 m 10

    2.10 50 square mm bare connecting terminal DT-1-50 set 8

    Installed By:

    Surendra K. Karmacharya

    Engineer, DWT, NT

    Installation Materials for ZXDU500

    Installed By WDR, Bhairahawa

    17. BOQ of Grounding Materials

    Mangalapur Page: 34 of 40

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    35/40

    Station Name: Chamere Date of Installation : 2063/11/17

    Item Description Model No. Unit

    Qty. as

    per

    BOQ

    Qty.

    UsedStatus

    Qty.

    LeftRemarks

    2.4.1 Base band Sub system-lot

    2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0

    2.4.1.2 Wireless Channel Board(64) CHM64 Piece 1 1 Installed 0 2 CSMB in this board=64 channels

    2.4.1.3 Wireless Channel Board(96) CHM96 Piece 02.4.1.4 Wireless Channel Board(128) CHM128 Piece 1 1 Installed 0 4 CSMB in this board=128 channels

    2.4.1.5 Site Alarm Board SAM Piece 1 1 Installed 0

    2.4.1.6 Communication Control Board CCM Piece 2 2 Installed 0

    2.4.2 E1 interface card for the BTS-lot

    2.4.2.1 Channel Data Service Unit(2E1) BTS-CDSU(2) Piece 1 1 Installed 0

    2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 1 Installed 0

    2.4.3 Radio subsystem-lot

    2.4.3.1 Radio Frequency Interface Board RFIM Piece 1 1 Installed 0

    2.4.3.2 TRx ModuleTxRxCIQUFS

    RFCMSet 3 3 Installed 0

    2.4.3.3 TRx Mother Board BTRX Piece 1 1 Installed 02.4.3.4 Radio Front End (Duplexer) RFE-DUP Piece 3 3 Installed 0

    2.4.3.5 Radio Front End (Diversity) RFE-DIV Piece 3 3 Installed 0

    2.4.3.6 Radio Front End(Combiner) RFE-COM Piece 0 0

    2.4.3.7 RFE Mother Board BRFE Piece 1 1 Installed 0

    2.4.4 Power supply Subsystem-lot

    2.4.4.1 Power Supply Module(B) PSMB Piece 2 2 Installed 0

    2.4.4.2 Radio Power Board(+27V) PPM Piece 3 3 Installed 0

    2.4.4.3 Power Module (+/- 12V) PSMC Piece 2 2 Installed 0

    2.4.4.4 Power Distribution Board PSMD Piece 1 1 Installed 0

    2.4.4.5 PPM Mother Board BPOWER Piece 1 1 Installed 0

    2.4.5 TFS Subsystem-lot

    Nepal Telecom

    Directorate of Wireless Telephone

    Chhauni, Kathmandu

    Installation Report for 1C3S BTS

    2.4 1C3S BTS

    BOQ of BTS Hardware

    Chamere Page:35/40

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    36/40

    Item Description Model No. Unit

    Qty. as

    per

    BOQ

    Qty.

    UsedStatus

    Qty.

    LeftRemarks

    2.4.5.1 Frequency Distribution Board FDM Piece 1 1 Installed 0

    2.4.5.2 Time Control Board TCM Piece 1 1 Installed 0

    2.4.5.3 GPS Receiver GPSTM Set 1 1 Installed 0

    2.4.5.4 GPS Antenna,Feeder Cable Set 1 1 Installed 02.4.6 BTS Power modulelot

    2.4.6.1 High Power Amplifier HPA Set 3 3 BTS Rack 0

    2.4.8 Installation Material-lot

    2.4.8.1 S222 Installation Material(including Rack) Set 1 1 Installed 0

    2.4.8.2 Digital Trunk Cable(BTS-BSC)75/20m Piece 2 0 Not Installed 2

    2.4.8.3 48V Power Cable BV-25/15m Piece 2 2 Installed 0

    2.4.8.4 GND Power Cable BV-35/15m Piece 1 1 Installed 0

    2.4.9 Anttena System -lot

    65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list)

    2.4.9.1 >=17dBi MOBILE set 3 3 Installed 0

    2.4.9.2 Antenna Feeder set 6 6 Installed 0

    7.4.4

    7.4.4.1 Rectifier module ZXD2400 50A(V3.0) Set 8 8 Installed 0

    7.4.4.2 Centralized supervision unit ZXDU500-CSU Set 1 1 Installed 0

    7.4.4.3 Rectifier cabinet (include AC/DC distribution) Set 1 1 Installed 0

    7.4.4.4 Storage battery(inlcuding battery rack) GFM-600 Set 2 2 Installed 0

    7.4.4.5Three phase,classs-B type Lightning-arrestor with

    boxZXDL01 T010 Set 1 1 Installed 0

    7.5.2 Single Phase A/C for 2C3S BTS sites (5 KW)RCM20B/A4LC20B /

    HilltakeSet 1 0 Not Installed 1 MWDR Store , Nepalgunj

    Installatiopn Material

    15. BOQ of Installatiopn Material1 AMS Set 1 1 installed 0 1 set = 3 pcs

    2 Cable runway 30cm*20m, Iron Set 1 0 Not Installed 1 WDR store, Bhairahawa

    3 Cable Ladder 30cm*10m, Aluminium Set 1 1 Installed 0 Iron made ladder used

    BOQ of Antenna & Feeder

    Power Supply System for 1C3S BTS

    BOQ of BTS Installation Material

    Chamere Page:36/40

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    37/40

    Item Description Model No. Unit

    Qty. as

    per

    BOQ

    Qty.

    UsedStatus

    Qty.

    LeftRemarks

    4 DDF(BTS) Set 0 0

    17.2 Grounding Materials BTS sites ZGD-II-1(30) set 1 0 Not Installed 1 WDR Store , Bhairahawa

    2

    2.1 16 square mm BVV cable BVV-16*3 +10*1 m 20 20installed

    0 25 sq.mm *3.5,

    2.2 16 square mm bareconnecting terminal DT-1-16 set 5 5 installed 0

    2.3 25 square mm BVR cable (yellow & Green) BVR-25-98/0.58 m 5 5 installed 0 35 sq.mm used

    2.4 25 square mm bare connecting terminal DT-1-25 set 2 2 installed 0

    2.5 50sq.mm BVR cable (Red) BVR-50-360/0.50 m 10 0 Not Installed 10 WDR Store , Bhairahawa2.6 50 square mm bare connecting terminal DT-1-50 set 4 4 installed 0

    2.7 Earthing bus bar set 1 0 Not installed 0 MWDR store, Nepalgunj

    2.8 50 square mm BVR cable (red) BVR-50-360/0.50 m 10 10 installed 0

    2.9 50 square mm BVR cable (Blue) BVR-50-360/0.51 m 10 10 installed 0

    2.10 50 square mm bare connecting terminal DT-1-50 set 8 8installed

    070 square mm bare connecting terminal

    used

    Installed By:

    Sumit Thapa

    Engineer, DWT, NT

    70 square mm BVR cable used

    17. BOQ of Grounding Materials

    Installation Materials for ZXDU500

    Chamere Page:37/40

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    38/40

    Station Name: Lalmatiya Date of Installation : 2063/11/08

    Item Description Model No. Unit

    Qty. as

    per

    BOQ

    Qty.

    UsedStatus

    Qty.

    LeftRemarks

    2.4.1 Base band Sub system-lot

    2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0

    2.4.1.2 Wireless Channel Board(64) CHM64 Piece 1 1 Installed 0 2 CSMB in this board=64 channels

    2.4.1.3 Wireless Channel Board(96) CHM96 Piece 0

    2.4.1.4 Wireless Channel Board(128) CHM128 Piece 1 1 Installed 0 4 CSMB in this board=128 channels

    2.4.1.5 Site Alarm Board SAM Piece 1 1 Installed 0

    2.4.1.6 Communication Control Board CCM Piece 2 2 Installed 0

    2.4.2 E1 interface card for the BTS-lot

    2.4.2.1 Channel Data Service Unit(2E1) BTS-CDSU(2) Piece 1 1 Installed 0

    2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 1 Installed 0

    2.4.3 Radio subsystem-lot

    2.4.3.1 Radio Frequency Interface Board RFIM Piece 1 1 Installed 0

    2.4.3.2 TRx ModuleTxRxCIQUFS

    RFCMSet 3 3 Installed 0

    2.4.3.3 TRx Mother Board BTRX Piece 1 1 Installed 0

    2.4.3.4 Radio Front End (Duplexer) RFE-DUP Piece 3 3 Installed 0

    2.4.3.5 Radio Front End (Diversity) RFE-DIV Piece 3 3 Installed 0

    2.4.3.6 Radio Front End(Combiner) RFE-COM Piece 0 0

    2.4.3.7 RFE Mother Board BRFE Piece 1 1 Installed 0

    2.4.4 power supply Subsystem-lot

    2.4.4.1 Power Supply Module(B) PSMB Piece 2 2 Installed 0

    2.4.4.2 Radio Power Board(+27V) PPM Piece 3 3 Installed 0

    2.4.4.3 Power Module (+/- 12V) PSMC Piece 2 2 Installed 0

    2.4.4.4 Power Distribution Board PSMD Piece 1 1 Installed 0

    2.4.4.5 PPM Mother Board BPOWER Piece 1 1 Installed 0

    Nepal Telecom

    Directorate of Wireless Telephone

    Chhauni, Kathmandu

    Installation Report for 1C3S BTS

    2.4 1C3S BTS

    BOQ of BTS Hardware

    Lalmatiya Page:38/40

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    39/40

    Item Description Model No. Unit

    Qty. as

    per

    BOQ

    Qty.

    UsedStatus

    Qty.

    LeftRemarks

    2.4.5 TFS Subsystem-lot

    2.4.5.1 Frequency Distribution Board FDM Piece 1 1 Installed 0

    2.4.5.2 Time Control Board TCM Piece 1 1 Installed 0

    2.4.5.3 GPS Receiver GPSTM Set 1 1 Installed 02.4.5.4 GPS Antenna,Feeder Cable Set 1 1 Installed 0

    2.4.6 BTS Power modulelot

    2.4.6.1 High Power Amplifier HPA Set 3 3 BTS Rack 0

    2.4.8 Installation Material-lot

    2.4.8.1 S222 Installation Material(including Rack) Set 1 1 Installed 0

    2.4.8.2 Digital Trunk Cable(BTS-BSC)75/20m Piece 0 0 0

    2.4.8.3 48V Power Cable BV-25/15m Piece 2 2 Installed 0

    2.4.8.4 GND Power Cable BV-35/15m Piece 1 1 Installed 0

    2.4.9 Anttena System -lot

    65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list)

    2.4.9.1 >=17dBi MOBILE set 3 3 Installed 0

    2.4.9.2 Antenna Feeder set 6 6 Installed 0

    Installatiopn Material

    15. BOQ of Installatiopn Material

    1 AMS Set 1 1 installed 0 1 set = 3 pcs

    2 Cable runway 30cm*20m, Iron Set 1 0 Not Installed 1 WDR Store , Bhairahawa3 Cable Ladder 30cm*10m, Aluminium Set 1 0 Not Installed 1 WDR Store , Bhairahawa

    4 DDF(BTS) Set 0 0 0

    17.2 Grounding Materials BTS sites ZGD-II-1(30) set 1 0 Not Installed 1 WDR Store , Bhairahawa

    Installed By:Sumit Thapa

    Engineer, DWT, NT

    17. BOQ of Grounding Materials

    BOQ of BTS Installation Material

    BOQ of Antenna & Feeder

    Lalmatiya Page:39/40

  • 8/3/2019 Installation Report of 2C3S and 1C3S BTS

    40/40

    Item Description Model No. Unit

    Qty. as

    per

    BOQ

    Qty.

    UsedStatus

    Qty.

    LeftRemarks

    Lalmatiya Page:40/40