installation report of 2c3s and 1c3s bts
TRANSCRIPT
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
1/40
Station Name:Bukhel Date of Installation : 2064/1/05
Item Description Model No. Unit
Qty. as
per
BOQ
Qty.
UsedStatus
Qty.
LeftRemarks
2.4.1 Base band Sub system-lot
2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0
2.4.1.2 Wireless Channel Board(64) CHM64 Piece 1 1 Installed 0 2 CSMB in this board=64channels
2.4.1.3 Wireless Channel Board(96) CHM96 Piece 0
2.4.1.4 Wireless Channel Board(128) CHM128 Piece 1 1 Installed 04 CSMB in this board=128
channels
2.4.1.5 Site Alarm Board SAM Piece 1 1 Installed 0
2.4.1.6 Communication Control Board CCM Piece 2 2 Installed 0
2.4.2 E1 interface card for the BTS-lot
2.4.2.1 Channel Data Service Unit(2E1) BTS-CDSU(2) Piece 1 1 Installed 0
2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 1 Installed 0
2.4.3 Radio subsystem-lot
2.4.3.1 Radio Frequency Interface Board RFIM Piece 1 1 Installed 0
2.4.3.2 TRx ModuleTxRxCIQUFS
RFCMSet 3 3 Installed 0
2.4.3.3 TRx Mother Board BTRX Piece 1 1 Installed 0
2.4.3.4 Radio Front End (Duplexer) RFE-DUP Piece 3 3 Installed 0
2.4.3.5 Radio Front End (Diversity) RFE-DIV Piece 3 3 Installed 0
2.4.3.6 Radio Front End(Combiner) RFE-COM Piece 0 0
2.4.3.7 RFE Mother Board BRFE Piece 1 1 Installed 0
2.4.4 Power supply Subsystem-lot
2.4.4.1 Power Supply Module(B) PSMB Piece 2 2 Installed 0
2.4.4.2 Radio Power Board(+27V) PPM Piece 3 3 Installed 0
2.4.4.3 Power Module (+/- 12V) PSMC Piece 2 2 Installed 0
Nepal Telecom
Directorate of Wireless Telephone
Chhauni, Kathmandu
Installation Report for 1C3S BTS
2.4 1C3S BTS
BOQ of BTS Hardware
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
2/40
Item Description Model No. Unit
Qty. as
per
BOQ
Qty.
UsedStatus
Qty.
LeftRemarks
2.4.4.4 Power Distribution Board PSMD Piece 1 1 Installed 0
2.4.4.5 PPM Mother Board BPOWER Piece 1 1 Installed 0
2.4.5 TFS Subsystem-lot
2.4.5.1 Frequency Distribution Board FDM Piece 1 1 Installed 0
2.4.5.2 Time Control Board TCM Piece 1 1 Installed 0
2.4.5.3 GPS Receiver GPSTM Set 1 1 Installed 0
2.4.5.4 GPS Antenna,Feeder Cable Set 1 1 Installed 0
2.4.6 BTS Power modulelot
2.4.6.1 High Power Amplifier HPA Set 3 3 BTS Rack 0
2.4.7 BTS Software-lot
2.4.7.1 BTS System Software Set 1 1 0
2.4.7.2 BTS Functional Software Per Channel Set 192 192
Installed in
CHM module 0
2.4.8 Installation Material-lot
2.4.8.1 S222 Installation Material(including Rack) Set 1 1 Installed 0
2.4.8.2 Digital Trunk Cable(BTS-BSC)75/20m Piece 2 0 Not Installed 2
2.4.8.3 48V Power Cable BV-25/15m Piece 2 2 Installed 0
2.4.8.4 GND Power Cable BV-35/15m Piece 1 1 Installed 0
2.4.9 Anttena System -lot
65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list)
2.4.9.1 >=17dBi MOBILE set 3 3 Installed 0
2.4.9.2 Antenna Feeder set 6 6 Installed 0
7.4.4
7.4.4.1 Rectifier module ZXD2400 50A(V3.0) Set 8 8 Installed 0
7.4.4.2 Centralized supervision unit ZXDU500-CSU Set 1 1 Installed 0
7.4.4.3 Rectifier cabinet (include AC/DC distribution) Set 1 1 Installed 0
7.4.4.4 Storage battery(inlcuding battery rack) GFM-600 Set 2 2 Installed 0
BOQ of BTS Installation Material
BOQ of Antenna & Feeder
BOQ of BTS Software
Power Supply System for 1C3S BTS
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
3/40
Item Description Model No. Unit
Qty. as
per
BOQ
Qty.
UsedStatus
Qty.
LeftRemarks
7.4.4.5Three phase,classs-B type Lightning-arrestor with
boxZXDL01 T010 Set 1 1 Installed 0
7.5.2 Single Phase A/C for 2C3S BTS sites (5 KW) RCM20B/A4LC20B / Set 1 0 Not Installed 1 Central store, chauni
Installatiopn Material
15. BOQ of Installatiopn Material
1 AMS Set 1 1 installed 0 1 set = 3 pcs
2 Cable runway 30cm*20m, Iron Set 1 0 Not Installed 1 Central store, chauni
3 Cable Ladder 30cm*6m, Aluminium Set 1 1 Installed 0 Iron made ladder used
4 DDF(BTS) Set 0 0
5 Pole Tower 18 m Set 1 1 installed 0
17.2 Grounding Materials BTS sites ZGD-II-1(30) set 1 1 installed 0 Central store, chauni
2
2.1 16 square mm BVV cable BVV-16*3 +10*1 m 20 20 installed 0 25 sq.mm *3.5,
2.2 16 square mm bareconnecting terminal DT-1-16 set 5 5 installed 0
2.3 25 square mm BVR cable (yellow & Green) BVR-25-98/0.58 m 5 5 installed 0 35 sq.mm used
2.4 25 square mm bare connecting terminal DT-1-25 set 2 2 installed 02.5 50sq.mm BVR cable (Red) BVR-50-360/0.50 m 10 10 installed
2.6 50 square mm bare connecting terminal DT-1-50 set 4 4 installed 0
2.7 Earthing bus bar set 1 1 installed 0
2.8 50 square mm BVR cable (red) BVR-50-360/0.50 m 10 10 installed 0
2.9 50 square mm BVR cable (Blue) BVR-50-360/0.51 m 10 10 installed 0
2.10 50 square mm bare connecting terminal DT-1-50 set 8 8installed
070 square mm bare
connecting terminal used
Installed By: Checked By: Approved By:
Narayan Prasad Kusi
Engineer, DWT, NT
70 square mm BVR cable
used
17. BOQ of Grounding Materials
Installation Materials for ZXDU500
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
4/40
Station Name: Mahadevtar Date of Installation : 2066-0
Item Description Model No. UnitQty. as
per
Qty.
UsedStatus Qty. Left
2.4.1 Base band Sub system-lot
2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0
2.4.1.2 Wireless Channel Board(64) CHM64 Piece 2 2 Installed 0
2.4.1.3 Wireless Channel Board(96) CHM96 Piece 0
2.4.1.4 Wireless Channel Board(128) CHM128 Piece 2 2 Installed 0
2.4.1.5 Site Alarm Board SAM Piece 1 1 Installed 0
2.4.1.6 Communication Control Board CCM Piece 2 2 Installed 0
2.4.2 E1 interface card for the BTS-lot
2.4.2.1 Channel Data Service Unit(2E1)BTS-
CDSU(2)Piece 1 1 Installed 0
2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 1 Installed 0
2.4.3 Radio subsystem-lot
2.4.3.1 Radio Frequency Interface Board RFIM Piece 2 2 Installed 0
2.4.3.2 TRx Module
TxRxCI
QUFSRFCM
Set 6 6 Installed 0
2.4.3.3 TRx Mother Board BTRX Piece 1 1 Installed 0
2.4.3.4 Radio Front End (Duplexer) RFE-DUP Piece 6 6 Installed 0
2.4.3.5 Radio Front End (Diversity) RFE-DIV Piece 0 0 Installed 0
2.4.3.6 Radio Front End(Combiner) RFE-COM Piece 0 0
2.4.3.7 RFE Mother Board BRFE Piece 1 1 Installed 0
2
Nepal Telecom
Directorate of Wireless Telephone
Chhauni, KathmanduInstallation Report for 2C3S BTS
1. 2C3S BTS
BOQ of BTS Hardware
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
5/40
2.4.7.2 BTS Functional Software Per Channel Set 384 384
Installed in
CHM
module
0
2.4.8 Installation Material-lot
2.4.8.1S222 Installation Material(including
Rack)Set 1 1 Installed 0
2.4.8.2-
Piece 4 4 Installed 0
2.4.8.3 48V Power Cable BV-25/15m Piece 2 2 Installed 0
2.4.8.4 GND Power Cable BV-35/15m Piece 1 1 Installed 0
2.4.9 Anttena System -lot
65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list)
2.4.9.1 Antenna (65 degree), Gain >=17dBi MOBILE set 3 3 Installed 0
2.4.9.2 Antenna Feeder set 1 1 Installed 0
BOQ of Installatiopn Material
1 Internal Ladder Set 1 1 Installed 0
2 4m Pole segment at top of 5m Tripod Tower Set 1 1 Installed 0
3 Feeder window Set 1 1 Installed 0
4 Modem Rack Set 1 1 Installed 0
5 HDSL Modem( Realtime) Pair 1 1 Installed 0
1 Storage Battery(inlcuding battery rack) GFM-600 Set 2 2 Installed 0
2 MCB 63A S 1 1 I ll d 0
BOQ of BTS Installation Material
BOQ of Antenna & Feeder
Power Supply System for 2C3S BTS
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
6/40
Narayan Prasad Kusi
Engineer, DWT, NT
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
7/40
5-10
Remarks
2 CSMB in this board=64
channels
4 CSMB in this board=128
channels
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
8/40
For mounting CDMA Antennas
For Modem
1 Pair=2set [1 set Installed
at Mahadevtar station and 1
set at Gongabu Exchange]
Installed in Rectifier for
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
9/40
Station Name: Kamalnetra (Bhimsengola) Date of Installation : 2066-
Item Description Model No. UnitQty. as
per
Qty.
UsedStatus Qty. Left Remarks
2.4.1 Base band Sub system-lot
2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0
2.4.1.2 Wireless Channel Board(64) CHM64 Piece 0 0 0
2.4.1.3 Wireless Channel Board(96) CHM96 Piece 2 2 Installed 0 3 CSMB in this board=96channels
2.4.1.4 Wireless Channel Board(128) CHM128 Piece 0 0 0
2.4.1.5 Site Alarm Board SAM Piece 1 1 Installed 0
2.4.1.6 Communication Control Board CCM Piece 2 2 Installed 0
2.4.2 E1 interface card for the BTS-lot
2.4.2.1 Channel Data Service Unit(2E1)BTS-
CDSU(2)Piece 1 1 Installed 0
2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 1 Installed 0
2.4.3 Radio subsystem-lot
2.4.3.1 Radio Frequency Interface Board RFIM Piece 2 2 Installed 0
2.4.3.2 TRx Module
TxRxCI
QUFS
RFCM
Set 6 6 Installed 0
2.4.3.3 TRx Mother Board BTRX Piece 1 1 Installed 0
2.4.3.4 Radio Front End (Duplexer) RFE-DUP Piece 6 6 Installed 0
2.4.3.5 Radio Front End (Diversity) RFE-DIV Piece 0 0 Installed 0
2.4.3.6 Radio Front End(Combiner) RFE-COM Piece 0 0
2.4.3.7 RFE Mother Board BRFE Piece 1 1 Installed 0
2.4.4 Power supply Subsystem-lot
2.4.4.1 Power Supply Module(B) PSMB Piece 2 2 Installed 0
2.4.4.2 Radio Power Board(+27V) PPM Piece 5 5 Installed 02.4.4.3 Power Module (+/- 12V) PSMC Piece 2 2 Installed 0
2.4.4.4 Power Distribution Board PSMD Piece 1 1 Installed 0
2.4.4.5 PPM Mother Board BPOWER Piece 1 1 Installed 0
2.4.5 TFS Subsystem-lot
2.4.5.1 Frequency Distribution Board FDM Piece 1 1 Installed 0
2.4.5.2 Time Control Board TCM Piece 1 1 Installed 0
2.4.5.3 GPS Receiver GPSTM Set 1 1 Installed 0
2.4.5.4 GPS Antenna,Feeder Cable Set 1 1 Installed 0
Nepal Telecom
Directorate of Wireless Telephone
Chhauni, Kathmandu
Installation Report for 2C3S BTS
1. 2C3S BTS
BOQ of BTS Hardware
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
10/40
2.4.9.2 Antenna Feeder set 1 1 Installed 0
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
11/40
BOQ of Installatiopn Material
1 Internal Ladder Set 1 1 Installed 0
2 Feeder Hole Set 1 1 Installed 0
3 Modem Rack Set 1 1 Installed 0 For Modem
4 HDSL Modem Pair 1 1 Installed 0
=
at Kamalnetra station and 1
1 MCB 63A Set 1 1 Installed 0Installed in GSM Rectifier
ZXDU68 for CDMA BTS
1 Earthing Cable 35 mm2 Set 1 1 Installed 0
2 Earthing Cable 16 mm2 Set 1 1 Installed 0
3 Coaxial Cable 7/8 inch Set 1 1 Installed 0
4 Load Cable (Blue and black) Set 1 1 Installed 0
cabinet no:7; Primary Pair =26/72
Note:
Installed By: Checked By:
Narayan Prasad Kusi
Engineer, DWT, NT
The power system with 800AH*2 banks battery and ZXDU68 rectifier of GSM Station is shared for operating this BTS station.
E1 Information: Central office2-14-6 to chabahil 2-5-19
Power Supply System for 2C3S BTS
Other Installation Materials
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
12/40
Station Name: Mangalbazar Date of Installation : 2066-
Item Description Model No. UnitQty. as
er
Qty.
UsedStatus Qty. Left Remarks
2.4.1 Base band Sub system-lot
2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0
2.4.1.2 Wireless Channel Board(64) CHM64 Piece 2 2 Installed 0
2 CSMB in this board=64
channels2.4.1.3 Wireless Channel Board(96) CHM96 Piece 0
2.4.1.4 Wireless Channel Board(128) CHM128 Piece 2 2 Installed 04 CSMB in this board=128
channels
2.4.1.5 Site Alarm Board SAM Piece 1 1 Installed 0
2.4.1.6 Communication Control Board CCM Piece 2 2 Installed 0
2.4.2 E1 interface card for the BTS-lot
2.4.2.1 Channel Data Service Unit(2E1)BTS-
CDSU(2)Piece 1 1 Installed 0
2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 1 Installed 0
2.4.3 Radio subsystem-lot2.4.3.1 Radio Frequency Interface Board RFIM Piece 2 2 Installed 0
2.4.3.2 TRx Module
TxRxCI
QUFS
RFCM
Set 6 6 Installed 0
2.4.3.3 TRx Mother Board BTRX Piece 1 1 Installed 0
2.4.3.4 Radio Front End (Duplexer) RFE-DUP Piece 6 6 Installed 0
2.4.3.5 Radio Front End (Diversity) RFE-DIV Piece 0 0 Installed 0
2.4.3.6 Radio Front End(Combiner) RFE-COM Piece 0 0
2.4.3.7 RFE Mother Board BRFE Piece 1 1 Installed 0
2.4.4 Power supply Subsystem-lot
2.4.4.1 Power Supply Module(B) PSMB Piece 2 2 Installed 0
2.4.4.2 Radio Power Board(+27V) PPM Piece 5 5 Installed 0
2.4.4.3 Power Module (+/- 12V) PSMC Piece 2 2 Installed 0
2.4.4.4 Power Distribution Board PSMD Piece 1 1 Installed 0
2.4.4.5 PPM Mother Board BPOWER Piece 1 1 Installed 0
2.4.5 TFS Subsystem-lot
2.4.5.1 Frequency Distribution Board FDM Piece 1 1 Installed 0
2.4.5.2 Time Control Board TCM Piece 1 1 Installed 0
2 4 5 3 GPS Receiver GPSTM Set 1 1 Installed 0
Nepal Telecom
Directorate of Wireless Telephone
Chhauni, Kathmandu
Installation Report for 2C3S BTS
1. 2C3S BTS
BOQ of BTS Hardware
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
13/40
2.4.9.1 Antenna (65 degree), Gain >=17dBi MOBILE set 3 3 Installed 0
2.4.9.2 Antenna Feeder set 1 1 Installed 0
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
14/40
1 Earthing Cable 35 mm2 Set 1 1 Installed 0
2 Earthing Cable 16 mm2 Set 1 1 Installed 0
3 Coaxial Cable 7/8 inch Set 1 1 Installed 0
4 Load Cable (Blue and black) Set 1 1 Installed 0
1Micro BTS Racks(2 Racks in 2C1O
BTS)Set 2 2
Dismantled Stored at the Chauni office
2 48V LPU Set 2 2 Dismantled Stored at the Chauni office
3 Omni Antennas Set 1 1 Dismantled 1set = 2 omni Antennas
4 GPS Antenna Set 1 1 Dismantled Stored at the Chauni office
Note:
Installed By: Checked By:
Narayan Prasad Kusi
Engineer, DWT, NT
Before, CDMA 2C1O BTS was in operation in this station. Due to traffic overlaod and Coverage problem, the whole set of CDMA
2C1O Micro BTS has been dismantled and this 2C3S BTS was installed.
Dismantled Materials
Other Installation Materials
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
15/40
Station Name: Hyumat Date of Installation : 2066-
Item Description Model No. UnitQty. as
per
Qty.
UsedStatus Qty. Left
2.4.1 Base band Sub system-lot
2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0
2.4.1.2 Wireless Channel Board(64) CHM64 Piece 2 2 Installed 0
2.4.1.3 Wireless Channel Board(96) CHM96 Piece 0 0
2.4.1.4 Wireless Channel Board(128) CHM128 Piece 2 2 Installed 0
2.4.1.5 Site Alarm Board SAM Piece 1 1 Installed 0
2.4.1.6 Communication Control Board CCM Piece 2 2 Installed 02.4.2 E1 interface card for the BTS-lot
2.4.2.1 Channel Data Service Unit(2E1)BTS-
CDSU(2)Piece 1 1 Installed 0
2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 1 Installed 0
2.4.3 Radio subsystem-lot
2.4.3.1 Radio Frequency Interface Board RFIM Piece 2 2 Installed 0
2.4.3.2 TRx Module
TxRxCI
QUFSRFCM
Set 6 6 Installed 0
2.4.3.3 TRx Mother Board BTRX Piece 1 1 Installed 0
2.4.3.4 Radio Front End (Duplexer) RFE-DUP Piece 6 6 Installed 0
2.4.3.5 Radio Front End (Diversity) RFE-DIV Piece 0 0 Installed 0
2.4.3.6 Radio Front End(Combiner) RFE-COM Piece 0 0
2.4.3.7 RFE Mother Board BRFE Piece 1 1 Installed 0
2
Nepal Telecom
Directorate of Wireless Telephone
Chhauni, KathmanduInstallation Report for 2C3S BTS
1. 2C3S BTS
BOQ of BTS Hardware
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
16/40
2.4.7.2 BTS Functional Software Per Channel Set 384 384
Installed in
CHM
module
0
2.4.8 Installation Material-lot
2.4.8.1S222 Installation Material(including
Rack)Set 1 1 Installed 0
2.4.8.2-
Piece 4 4 Installed 0
2.4.8.3 48V Power Cable BV-25/15m Piece 2 2 Installed 0
2.4.8.4 GND Power Cable BV-35/15m Piece 1 1 Installed 0
2.4.9 Anttena System -lot
65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list)
2.4.9.1 Antenna (65 degree), Gain >=17dBi MOBILE set 3 3 Installed 0
2.4.9.2 Antenna Feeder set 1 1 Installed 0
BOQ of Installatiopn Material
1 Internal Ladder Set 1 1 Installed 0
2 Feeder Hole Set 1 1 Installed 0
3 Modem Rack Set 1 1 Installed 0
4 HDSL Modem Pair 1 1 Installed 0
1 MCB 63A Set 1 1 Installed 0
BOQ of BTS Installation Material
BOQ of Antenna & Feeder
Power Supply System for 2C3S BTS
O i i
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
17/40
Engineer, DWT, NT
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
18/40
Remarks
2 CSMB in this board=64
channels
4 CSMB in this board=128
channels
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
19/40
For Modem=
at Kamalnetra station and 1
Installed in GSM Rectifier
ZXDU68 for CDMA BTS
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
20/40
Station Name: Date of Installation : 2010-12-13
Item Description Model No. Unit
Qty. as
per
BOQ
Qty.
UsedStatus Qty. Left Remarks
2.4.1 Base band Sub system-lot
2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0
2.4.1.2 Wireless Channel Board(64) CHM64 Piece 2 2 Installed 0 2 CSMB in this board=64 channels
2.4.1.3 Wireless Channel Board(96) CHM96 Piece 0
2.4.1.4 Wireless Channel Board(128) CHM128 Piece 2 2 Installed 0=
2.4.1.5 Site Alarm Board SAM Piece 1 1 Installed 02.4.1.6 Communication Control Board CCM Piece 2 2 Installed 0
2.4.2 E1 interface card for the BTS-lot
2.4.2.1 Channel Data Service Unit(2E1) BTS-CDSU(2) Piece 1 1 Installed 0
2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 1 Installed 0
2.4.3 Radio subsystem-lot
2.4.3.1 Radio Frequency Interface Board RFIM Piece 2 2 Installed 0
2.4.3.2 TRx ModuleTxRxCIQUFS
RFCMSet 6 6 Installed 0
2.4.3.3 TRx Mother Board BTRX Piece 1 1 Installed 0
2.4.3.4 Radio Front End (Duplexer) RFE-DUP Piece 6 6 Installed 02.4.3.5 Radio Front End (Diversity) RFE-DIV Piece 0 0 Installed 0
2.4.3.6 Radio Front End(Combiner) RFE-COM Piece 0 0
2.4.3.7 RFE Mother Board BRFE Piece 1 1 Installed 0
2.4.4 Power supply Subsystem-lot
2.4.4.1 Power Supply Module(B) PSMB Piece 2 2 Installed 0
2.4.4.2 Radio Power Board(+27V) PPM Piece 5 5 Installed 0
2.4.4.3 Power Module (+/- 12V) PSMC Piece 2 2 Installed 0
2.4.4.4 Power Distribution Board PSMD Piece 1 1 Installed 0
2.4.4.5 PPM Mother Board BPOWER Piece 1 1 Installed 0
2.4.5TFS Subsystem-lot2.4.5.1 Frequency Distribution Board FDM Piece 1 1 Installed 0
2.4.5.2 Time Control Board TCM Piece 1 1 Installed 0
2.4.5.3 GPS Receiver GPSTM Set 1 1 Installed 0
2.4.5.4 GPS Antenna,Feeder Cable Set 1 1 Installed 0
2.4.6 BTS Power modulelot
2.4.6.1 High Power Amplifier HPA Set 6 6 BTS Rack 0
Installation Report for 2C3S BTS
1. 2C3S BTS
BOQ of BTS Hardware
BOQ of BTS Software
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
21/40
Station Name:Patan Dhoka Date of Installation : 2066/08/01
Item Description Model No. UnitQty. as
per
Qty.
UsedStatus Qty. Left Remarks
2.4.1 Base band Sub system-lot
2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0
2.4.1.2 Wireless Channel Board(64) CHM64 Piece 1 1 Installed 02 CSMB in this board=64
channels
2.4.1.3 Wireless Channel Board(96) CHM96 Piece 0
2.4.1.4 Wireless Channel Board(128) CHM128 Piece 1 1 Installed 04 CSMB in this board=128
channels
2.4.1.5 Site Alarm Board SAM Piece 1 1 Installed 0
2.4.1.6 Communication Control Board CCM Piece 2 2 Installed 0
2.4.2 E1 interface card for the BTS-lot
2.4.2.1 Channel Data Service Unit(2E1)BTS-
CDSU(2)Piece 1 1 Installed 0
2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 1 Installed 0
2.4.3 Radio subsystem-lot
2.4.3.1 Radio Frequency Interface Board RFIM Piece 1 1 Installed 0
2.4.3.2 TRx Module
TxRxCI
QUFS
RFCM
Set 3 3 Installed 0
2.4.3.3 TRx Mother Board BTRX Piece 1 1 Installed 0
2.4.3.4 Radio Front End (Duplexer) RFE-DUP Piece 3 3 Installed 0
2.4.3.5 Radio Front End (Diversity) RFE-DIV Piece 3 3 Installed 0
2.4.3.6 Radio Front End(Combiner) RFE-COM Piece 0 0
2.4.3.7 RFE Mother Board BRFE Piece 1 1 Installed 0
2.4.4 Power supply Subsystem-lot
2.4.4.1 Power Supply Module(B) PSMB Piece 2 2 Installed 0
2.4.4.2 Radio Power Board(+27V) PPM Piece 3 3 Installed 02.4.4.3 Power Module (+/- 12V) PSMC Piece 2 2 Installed 0
2.4.4.4 Power Distribution Board PSMD Piece 1 1 Installed 0
2.4.4.5 PPM Mother Board BPOWER Piece 1 1 Installed 0
2.4.5 TFS Subsystem-lot
2.4.5.1 Frequency Distribution Board FDM Piece 1 1 Installed 0
2.4.5.2 Time Control Board TCM Piece 1 1 Installed 0
2.4.5.3 GPS Receiver GPSTM Set 1 1 Installed 0
2.4.5.4 GPS Antenna,Feeder Cable Set 1 1 Installed 0
Nepal Telecom
Directorate of Wireless Telephone
Chhauni, Kathmandu
Installation Report for 1C3S BTS
1. 1C3S BTS
BOQ of BTS Hardware
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
22/40
Item Description Model No. UnitQty. as
per
Qty.
UsedStatus Qty. Left Remarks
2.4.6.1 High Power Amplifier HPA Set 3 3 BTS Rack 0
2.4.7 BTS Software-lot
2.4.7.1 BTS System Software Set 1 1 0
2.4.7.2 BTS Functional Software Per Channel Set 192 192
Installed in
CHM
module
0
2.4.8 Installation Material-lot
2.4.8.1S222 Installation Material(including
Rack)Set 1 1 Installed 0
2.4.8.2-
Piece 2 2 Installed 0
2.4.8.3 48V Power Cable BV-25/15m Piece 2 2 Installed 0
2.4.8.4 GND Power Cable BV-35/15m Piece 1 1 Installed 0
2.4.9 Anttena System -lot
65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list)
2.4.9.1 Antenna (65 degree), Gain >=17dBi MOBILE set 3 3 Installed 0
2.4.9.2 Antenna Feeder set 1 1 Installed 0
BOQ of Installatiopn Material
1 Internal Ladder 30cm*12m Set 1 1 Installed 0
2 Cable Ladder 0cm*6m, Iro Set 1 1 Installed 0 Iron made ladder used
3 DDF(BTS) Set 2 2 Installed 0 or BTS room and ONU roo
4 Tripod Pole Tower 18 m with 3 set AMS Set 1 1 installed 0
5 AMS Set 1 1 installed 0 1 set = 3 pcs
6 AC PDB Set 22 Installed 0
1 For BTS Room and 1 for
Main Supply
7 MCB [32A] Set 4 4 Installed 0
8 MCB [16A] Set 2 2 Installed 0
9 MCB [10A] Set 2 2 Installed 0
10 MCB [6] Set 2 2 Installed 0
11 E1 Cable ( 8 core) 100m Set 1 1 Installed 0
12 3-Phase Power Cable( Meter box to BTS 40m Set 1 1 Installed 0
BOQ of BTS Software
BOQ of BTS Installation Material
BOQ of Antenna & Feeder
Installed at two AC PDBs,
for power distribution from
main supply and for power
distn for BTS and Internal
wiring
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
23/40
Item Description Model No. UnitQty. as
per
Qty.
UsedStatus Qty. Left Remarks
1 Rectifier moduleZXD2400
50A(V3.0)Set 8 8 Installed 0
2 Centralized supervision unit ZXDU500-CSU Set 1 1 Installed 0
3Rectifier cabinet (include AC/DC
distribution)Set 1 1 Installed 0
4 Storage battery(inlcuding battery rack) GFM-600 Set 2 2 Installed 0
5Three phase,classs-B type Lightning-
arrestor with box
ZXDL01
T010Set 1 1 Installed 0
6 Single Phase A/C for 2C3S BTS sites (5 RCM20B/A4 Set 1 0 Not 1 Central store, chauni
1 16 square mm BVV cableBVV-16*3
+10*1m 20 20
installed0 25 sq.mm *3.5,
2 16 square mm bareconnecting terminal DT-1-16 set 5 5 installed 0
325 square mm BVR cable (yellow &
Green)
BVR-25-
98/0.58m 5 5
installed0 35 sq.mm used
4 25 square mm bare connecting terminal DT-1-25 set 2 2 installed 0
5 50sq.mm BVR cable (Red)BVR-50-
360/0.50m 10 10 installed
6 50 square mm bare connecting terminal DT-1-50 set 4 4 installed 0
7 Earthing bus bar set 1 1 installed 0
8 50 square mm BVR cable (red)BVR-50-
360/0.50m 10 10
installed0
9 50 square mm BVR cable (Blue)BVR-50-
360/0.51m 10 10
installed0
10 50 square mm bare connecting terminal DT-1-50 set 8 8installed
070 square mm bare
connecting terminal used
Installed By: Checked By: Approved By:
Narayan Prasad Kusi
Engineer, DWT, NT
Installation Materials for ZXDU500
70 square mm BVR cable
used
Power Supply System for 1C3S BTS
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
24/40
Station Name:Patandhoka Date of Upgradation : 2066/08/03
Item Description Model No Unit
Qty. as
per
BOQ
Qty.
Used
StatusQty.
Left
Remarks
1Wireless Channel
Board(64)CHM64 Piece 1 1
Installe
d0
2 CSMB in this
board=64 channels
2Wireless Channel
Board(128)CHM128 Piece 1 1
Installe
d0
4 CSMB in this
board=128 channels
3Radio Frequency
Interface BoardRFIM Piece 1 1
Installe
d0
4 TRx Module TRX Set 3 3Installe
d 0
5Radio Front End
(Duplexer)
RFE-
DUPPiece 3 3
Installe
d0
6Radio Power
Board(+27V)PPM Piece 2 2
Installe
d0
7 High Power Amplifier HPA Set 3 3BTS
Rack0
8 BTS System Software Set 1 1Installe
d0
9 BTS Functional SoftwarePer
ChannelSet 192 192
Installe
d in
CHM
module
0
Installed By: Checked By: Approved By:
BTS Hardware
Nepal Telecom
Directorate of Wireless Telephone
Chhauni, Kathmandu
Upgradation Report (Upgrade from 1C3S BTS to 2C3S BTS)
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
25/40
Station Name:Pardi (Upgrade from 1C3S BTS to 2C3S BTS)
Date of Upgradation : 2064/3/23
Item Description Model No. UnitQty. as
per BOQ
Qty.
UsedStatus Qty. Left Remarks
1Wireless Channel
Board(64)CHM64 Piece 1 1 Installed 0
2 CSMB in this
board=64
channels
2Wireless Channel
Board(128)CHM128 Piece 1 1 Installed 0
4 CSMB in this
board=128
channels
3Radio Frequency Interface
BoardRFIM Piece 1 1 Installed 0
4 TRx Module TRX Set 3 3 Installed 0
5Radio Front End
(Duplexer)RFE-DUP Piece 3 3 Installed 0
6 PPM Piece 2 2 Installed 0
7 High Power Amplifier HPA Set 3 3 BTS Rack 0
8 BTS System Software Set 1 1 0
9 BTS Functional Software Per Channel Set 192 192
Installed
in CHM
module
0
Station Name:Rithepani(Upgrade from 1C3S BTS to 2C3S BTS)
Date of Upgradation : 2064/3/23
Item Description Model No. UnitQty. as
per BOQ
Qty.
UsedStatus Qty. Left Remarks
1Wireless Channel
CHM64 Pi 1 1 I ll d 0
2 CSMB in this
b d 64
BTS Hardware
Nepal Telecom
Directorate of Wireless Telephone
Chhauni, Kathmandu
Upgradation Report
BTS Hardware
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
26/40
2.4 1C3S BTS Sanga
Item Description Model No. Unit Qty. Site Qty.Qty.
leftRemarks
BOQ of BTS Hardware
2.4.1 Base band Sub system-lot
2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0 0
2.4.1.2 Wireless Channel Board(64) CHM64 Piece 1 BTS rack 1 0
2.4.1.3 Wireless Channel Board(96) CHM96 Piece 0 0 0
2.4.1.4 Wireless Channel Board(128) CHM128 Piece 1 BTS rack 1 0
2.4.1.5 Site Alarm Board SAM Piece 1 BTS rack 1 0
2.4.1.6 Communication Control Board CCM Piece 2 BTS rack 2 0
Sub-Total
2.4.2 E1 interface card for the BTS-lot
2.4.2.1 Channel Data Service Unit(4E1)BTS-
CDSU(4)Piece 1 BTS rack 1 0
2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 BTS rack 1 0
Sub-Total
2.4.3 Radio subsystem-lot
2.4.3.1 Radio Frequency Interface Board RFIM Piece 1 BTS rack 1 0
2.4.3.2 TRx Module
TxRx
CIQUF
SRFC
M
Set 3 BTS rack 3 0
Hardware Completion and BOQ Reference for
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
27/40
2.4.4.4 Power Distribution Board PSMD Piece 1 BTS rack 1 0
2.4.4.5 PPM Mother BoardBPOWE
RPiece 1 BTS rack 1 0
Sub-Total
2.4.5 TFS Subsystem-lot
2.4.5.1 Frequency Distribution Board FDM Piece 1 BTS rack 1 0
2.4.5.2 Time Control Board TCM Piece 1 BTS rack 1 0
2.4.5.3 GPS Receiver GPSTM Set 1 BTS rack 1 0
2.4.5.4 GPS Antenna,Feeder Cable Set 1 Installed 1 0
Refer to
Annex for
GPS FeederCable
Sub-Total
2.4.6 BTS Power module lot
2.4.6.1 High Power Amplifier HPA Set 3 BTS rack 3 0
Sub-Total
BTS Hardware Total
BOQ of BTS Software
2.4.7 BTS Software-lot
2.4.7.1 BTS System Software Set 1 1 0
2.4.7.2 BTS Functional SoftwarePer
ChannelSet 192
Installed in
CHM192 0
Sub-Total
BOQ of BTS Installation Material
2.4.8 Installation Material-lot
2.4.8.1S111 Installation Material(including
Rack)Set 1
Installed1 0
2.4.8.2Digital Trunk Cable(BTS-
BSC)75/20mPiece 2
Installed
2 0
Refer to
Annex for DT
Cable
2.4.8.3 48V Power Cable BV-25/15m Piece 2
I t ll d
2 0
Refer to
Annex for DC
C bl
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
28/40
65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list)
2.4.9.1 >=17dBi MOBILE set 3 Installed 3 0
2.4.9.2 Antenna Feeder set 6 Installed 6 0Refer to
Annex for
Feeder Cable
Sub-Total
Discount
1C3S BTS Total
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
29/40
Invoice Package S/N(SN) Remarks Box No.
ZTE20041213NP-1 CD0401888961(3)
2 CSMB in
this board=64channels 895
ZTE20041213NP-1 CD0401888961(3)
4 CSMB in
this
board=128
channels
895
ZTE20041213NP-1 CD0401888961(8) 895
ZTE20041213NP-1
CD0401888961(11)
895
ZTE20041213NP-1 CD0401888961(9) 895
ZTE20041213NP-1 CD0401888961(17) 895
ZTE20041213NP-1 CD0401888961(10) 895
ZTE20041213NP-1 CD0401888960(8)
BTS-Sanga
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
30/40
ZTE20041213NP-1 CD0401888960(13) 921
ZTE20041213NP-1 CD0401888961(14) 895
ZTE20041213NP-1 CD0401888961(6) 895
ZTE20041213NP-1 CD0401888961(5) 895
ZTE20041213NP-1 CD0401888961(7) 895
ZTE20041213NP-1 CD0401934170(3) 645
ZTE20041213NP-1 CD0401888960(7) 921
ZTE20041220NP-1 CD0401934170(18) 645
ZTE20041220NP-1 CD0401934170(18) 645
ZTE20041213NP-1CD0401888961(1)
895
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
31/40
ZTE20041213NP-1 CD0401954834 968
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
32/40
Station Name: Mangalapur Date of Installation : 2062/07/07 (2005 Oct. 24)
Item Description Model No. Unit
Qty. as
per
BOQ
Qty.
UsedStatus
Qty.
LeftRemarks
2.4.1 Base band Sub system-lot
2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0
2.4.1.2 Wireless Channel Board(64) CHM64 Piece 1 1 Installed 0 2 CSMB in this board=64 channels2.4.1.3 Wireless Channel Board(96) CHM96 Piece 0
2.4.1.4 Wireless Channel Board(128) CHM128 Piece 1 1 Installed 0 4 CSMB in this board=128 channels
2.4.1.5 Site Alarm Board SAM Piece 1 1 Installed 0
2.4.1.6 Communication Control Board CCM Piece 2 2 Installed 0
2.4.2 E1 interface card for the BTS-lot
2.4.2.1 Channel Data Service Unit(4E1) BTS-CDSU(4) Piece 1 1 Installed 0
2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 1 Installed 0
2.4.3 Radio subsystem-lot
2.4.3.1 Radio Frequency Interface Board RFIM Piece 1 1 Installed 0
2.4.3.2 TRx ModuleTxRxCIQUFS
RFCMSet 3 3 Installed 0
2.4.3.3 TRx Mother Board BTRX Piece 1 1 Installed 0
2.4.3.4 Radio Front End (Duplexer) RFE-DUP Piece 3 3 Installed 0
2.4.3.5 Radio Front End (Diversity) RFE-DIV Piece 3 3 Installed 0
2.4.3.6 Radio Front End(Combiner) RFE-COM Piece 0 0
2.4.3.7 RFE Mother Board BRFE Piece 1 1 Installed 0
2.4.4 power supply Subsystem-lot
2.4.4.1 Power Supply Module(B) PSMB Piece 2 2 Installed 0
2.4.4.2 Radio Power Board(+27V) PPM Piece 3 3 Installed 0
2.4.4.3 Power Module (+/- 12V) PSMC Piece 2 2 Installed 0
2.4.4.4 Power Distribution Board PSMD Piece 1 1 Installed 0
2.4.4.5 PPM Mother Board BPOWER Piece 1 1 Installed 0
Nepal Telecom
Directorate of Wireless Telephone
Chhauni, Kathmandu
Installation Report for 1C3S BTS
2.4 1C3S BTS
BOQ of BTS Hardware
Mangalapur Page: 32 of 40
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
33/40
Item Description Model No. Unit
Qty. as
per
BOQ
Qty.
UsedStatus
Qty.
LeftRemarks
2.4.5 TFS Subsystem-lot
2.4.5.1 Frequency Distribution Board FDM Piece 1 1 Installed 0
2.4.5.2 Time Control Board TCM Piece 1 1 Installed 0
2.4.5.3 GPS Receiver GPSTM Set 1 1 Installed 0
2.4.5.4 GPS Antenna,Feeder Cable Set 1 1 Installed 0
2.4.6 BTS Power modulelot
2.4.6.1 High Power Amplifier HPA Set 3 3 BTS Rack 0
2.4.7 BTS Software-lot
2.4.7.1 BTS System Software Set 1 1 0
2.4.7.2 BTS Functional Software Per Channel Set 192 192Installed in
CHM module0
2.4.8 Installation Material-lot2.4.8.1 S222 Installation Material(including Rack) Set 1 1 Installed 0
2.4.8.2 Digital Trunk Cable(BTS-BSC)75/20m Piece 2 2 Installed 0
2.4.8.3 48V Power Cable BV-25/15m Piece 2 2 Installed 0
2.4.8.4 GND Power Cable BV-35/15m Piece 1 1 Installed 0
2.4.9 Anttena System -lot
65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list)
2.4.9.1 >=17dBi MOBILE set 3 3 Installed 0
2.4.9.2 Antenna Feeder set 6 6 Installed 0
7.4.4
7.4.4.1 Rectifier module ZXD2400 50A(V3.0) Set 8
7.4.4.2 Centralized supervision unit ZXDU500-CSU Set 1
7.4.4.3 Rectifier cabinet (include AC/DC distribution) Set 1
7.4.4.4 Storage battery(inlcuding battery rack) GFM-600 Set 2
7.4.4.5Three phase,classs-B type Lightning-arrestor with
boxZXDL01 T010 Set 1
BOQ of BTS Software
BOQ of BTS Installation Material
BOQ of Antenna & Feeder
Power Supply System for 1C3S BTS
Installed By WDR, Bhairahawa
Mangalapur Page: 33 of 40
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
34/40
Item Description Model No. Unit
Qty. as
per
BOQ
Qty.
UsedStatus
Qty.
LeftRemarks
7.5.2 Single Phase A/C for 2C3S BTS sites (5 KW)RCM20B/A4LC20B /
HilltakeSet 1
Installatiopn Material15. BOQ of Installatiopn Material
1 AMS Set 1 1 installed 0 1 set = 3 pcs
2 Cable runway 30cm*20m, Iron Set 1 0 Not Installed 1 WDR Store , Bhairahawa
3 Cable Ladder 30cm*10m, Aluminium Set 1 1 Installed 0 Iron made ladder used
4 DDF(BTS) Set 1 1 Installed 0
17.2 Grounding Materials BTS sites ZGD-II-1(30) set 1 0 Not Installed 1 WDR Store , Bhairahawa
2
2.1 16 square mm BVV cable BVV-16*3 +10*1 m 20
2.2 16 square mm bareconnecting terminal DT-1-16 set 5
2.3 25 square mm BVR cable (yellow & Green) BVR-25-98/0.58 m 5
2.4 25 square mm bare connecting terminal DT-1-25 set 2
2.5 50sq.mm BVR cable (Red) BVR-50-360/0.50 m 10
2.6 50 square mm bare connecting terminal DT-1-50 set 4
2.7 Earthing bus bar set 1
2.8 50 square mm BVR cable (red) BVR-50-360/0.50 m 10
2.9 50 square mm BVR cable (Blue) BVR-50-360/0.51 m 10
2.10 50 square mm bare connecting terminal DT-1-50 set 8
Installed By:
Surendra K. Karmacharya
Engineer, DWT, NT
Installation Materials for ZXDU500
Installed By WDR, Bhairahawa
17. BOQ of Grounding Materials
Mangalapur Page: 34 of 40
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
35/40
Station Name: Chamere Date of Installation : 2063/11/17
Item Description Model No. Unit
Qty. as
per
BOQ
Qty.
UsedStatus
Qty.
LeftRemarks
2.4.1 Base band Sub system-lot
2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0
2.4.1.2 Wireless Channel Board(64) CHM64 Piece 1 1 Installed 0 2 CSMB in this board=64 channels
2.4.1.3 Wireless Channel Board(96) CHM96 Piece 02.4.1.4 Wireless Channel Board(128) CHM128 Piece 1 1 Installed 0 4 CSMB in this board=128 channels
2.4.1.5 Site Alarm Board SAM Piece 1 1 Installed 0
2.4.1.6 Communication Control Board CCM Piece 2 2 Installed 0
2.4.2 E1 interface card for the BTS-lot
2.4.2.1 Channel Data Service Unit(2E1) BTS-CDSU(2) Piece 1 1 Installed 0
2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 1 Installed 0
2.4.3 Radio subsystem-lot
2.4.3.1 Radio Frequency Interface Board RFIM Piece 1 1 Installed 0
2.4.3.2 TRx ModuleTxRxCIQUFS
RFCMSet 3 3 Installed 0
2.4.3.3 TRx Mother Board BTRX Piece 1 1 Installed 02.4.3.4 Radio Front End (Duplexer) RFE-DUP Piece 3 3 Installed 0
2.4.3.5 Radio Front End (Diversity) RFE-DIV Piece 3 3 Installed 0
2.4.3.6 Radio Front End(Combiner) RFE-COM Piece 0 0
2.4.3.7 RFE Mother Board BRFE Piece 1 1 Installed 0
2.4.4 Power supply Subsystem-lot
2.4.4.1 Power Supply Module(B) PSMB Piece 2 2 Installed 0
2.4.4.2 Radio Power Board(+27V) PPM Piece 3 3 Installed 0
2.4.4.3 Power Module (+/- 12V) PSMC Piece 2 2 Installed 0
2.4.4.4 Power Distribution Board PSMD Piece 1 1 Installed 0
2.4.4.5 PPM Mother Board BPOWER Piece 1 1 Installed 0
2.4.5 TFS Subsystem-lot
Nepal Telecom
Directorate of Wireless Telephone
Chhauni, Kathmandu
Installation Report for 1C3S BTS
2.4 1C3S BTS
BOQ of BTS Hardware
Chamere Page:35/40
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
36/40
Item Description Model No. Unit
Qty. as
per
BOQ
Qty.
UsedStatus
Qty.
LeftRemarks
2.4.5.1 Frequency Distribution Board FDM Piece 1 1 Installed 0
2.4.5.2 Time Control Board TCM Piece 1 1 Installed 0
2.4.5.3 GPS Receiver GPSTM Set 1 1 Installed 0
2.4.5.4 GPS Antenna,Feeder Cable Set 1 1 Installed 02.4.6 BTS Power modulelot
2.4.6.1 High Power Amplifier HPA Set 3 3 BTS Rack 0
2.4.8 Installation Material-lot
2.4.8.1 S222 Installation Material(including Rack) Set 1 1 Installed 0
2.4.8.2 Digital Trunk Cable(BTS-BSC)75/20m Piece 2 0 Not Installed 2
2.4.8.3 48V Power Cable BV-25/15m Piece 2 2 Installed 0
2.4.8.4 GND Power Cable BV-35/15m Piece 1 1 Installed 0
2.4.9 Anttena System -lot
65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list)
2.4.9.1 >=17dBi MOBILE set 3 3 Installed 0
2.4.9.2 Antenna Feeder set 6 6 Installed 0
7.4.4
7.4.4.1 Rectifier module ZXD2400 50A(V3.0) Set 8 8 Installed 0
7.4.4.2 Centralized supervision unit ZXDU500-CSU Set 1 1 Installed 0
7.4.4.3 Rectifier cabinet (include AC/DC distribution) Set 1 1 Installed 0
7.4.4.4 Storage battery(inlcuding battery rack) GFM-600 Set 2 2 Installed 0
7.4.4.5Three phase,classs-B type Lightning-arrestor with
boxZXDL01 T010 Set 1 1 Installed 0
7.5.2 Single Phase A/C for 2C3S BTS sites (5 KW)RCM20B/A4LC20B /
HilltakeSet 1 0 Not Installed 1 MWDR Store , Nepalgunj
Installatiopn Material
15. BOQ of Installatiopn Material1 AMS Set 1 1 installed 0 1 set = 3 pcs
2 Cable runway 30cm*20m, Iron Set 1 0 Not Installed 1 WDR store, Bhairahawa
3 Cable Ladder 30cm*10m, Aluminium Set 1 1 Installed 0 Iron made ladder used
BOQ of Antenna & Feeder
Power Supply System for 1C3S BTS
BOQ of BTS Installation Material
Chamere Page:36/40
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
37/40
Item Description Model No. Unit
Qty. as
per
BOQ
Qty.
UsedStatus
Qty.
LeftRemarks
4 DDF(BTS) Set 0 0
17.2 Grounding Materials BTS sites ZGD-II-1(30) set 1 0 Not Installed 1 WDR Store , Bhairahawa
2
2.1 16 square mm BVV cable BVV-16*3 +10*1 m 20 20installed
0 25 sq.mm *3.5,
2.2 16 square mm bareconnecting terminal DT-1-16 set 5 5 installed 0
2.3 25 square mm BVR cable (yellow & Green) BVR-25-98/0.58 m 5 5 installed 0 35 sq.mm used
2.4 25 square mm bare connecting terminal DT-1-25 set 2 2 installed 0
2.5 50sq.mm BVR cable (Red) BVR-50-360/0.50 m 10 0 Not Installed 10 WDR Store , Bhairahawa2.6 50 square mm bare connecting terminal DT-1-50 set 4 4 installed 0
2.7 Earthing bus bar set 1 0 Not installed 0 MWDR store, Nepalgunj
2.8 50 square mm BVR cable (red) BVR-50-360/0.50 m 10 10 installed 0
2.9 50 square mm BVR cable (Blue) BVR-50-360/0.51 m 10 10 installed 0
2.10 50 square mm bare connecting terminal DT-1-50 set 8 8installed
070 square mm bare connecting terminal
used
Installed By:
Sumit Thapa
Engineer, DWT, NT
70 square mm BVR cable used
17. BOQ of Grounding Materials
Installation Materials for ZXDU500
Chamere Page:37/40
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
38/40
Station Name: Lalmatiya Date of Installation : 2063/11/08
Item Description Model No. Unit
Qty. as
per
BOQ
Qty.
UsedStatus
Qty.
LeftRemarks
2.4.1 Base band Sub system-lot
2.4.1.1 Wireless Channel Board(32) CHM32 Piece 0
2.4.1.2 Wireless Channel Board(64) CHM64 Piece 1 1 Installed 0 2 CSMB in this board=64 channels
2.4.1.3 Wireless Channel Board(96) CHM96 Piece 0
2.4.1.4 Wireless Channel Board(128) CHM128 Piece 1 1 Installed 0 4 CSMB in this board=128 channels
2.4.1.5 Site Alarm Board SAM Piece 1 1 Installed 0
2.4.1.6 Communication Control Board CCM Piece 2 2 Installed 0
2.4.2 E1 interface card for the BTS-lot
2.4.2.1 Channel Data Service Unit(2E1) BTS-CDSU(2) Piece 1 1 Installed 0
2.4.2.2 BDS mother Board(4E1) BBDS(4) Piece 1 1 Installed 0
2.4.3 Radio subsystem-lot
2.4.3.1 Radio Frequency Interface Board RFIM Piece 1 1 Installed 0
2.4.3.2 TRx ModuleTxRxCIQUFS
RFCMSet 3 3 Installed 0
2.4.3.3 TRx Mother Board BTRX Piece 1 1 Installed 0
2.4.3.4 Radio Front End (Duplexer) RFE-DUP Piece 3 3 Installed 0
2.4.3.5 Radio Front End (Diversity) RFE-DIV Piece 3 3 Installed 0
2.4.3.6 Radio Front End(Combiner) RFE-COM Piece 0 0
2.4.3.7 RFE Mother Board BRFE Piece 1 1 Installed 0
2.4.4 power supply Subsystem-lot
2.4.4.1 Power Supply Module(B) PSMB Piece 2 2 Installed 0
2.4.4.2 Radio Power Board(+27V) PPM Piece 3 3 Installed 0
2.4.4.3 Power Module (+/- 12V) PSMC Piece 2 2 Installed 0
2.4.4.4 Power Distribution Board PSMD Piece 1 1 Installed 0
2.4.4.5 PPM Mother Board BPOWER Piece 1 1 Installed 0
Nepal Telecom
Directorate of Wireless Telephone
Chhauni, Kathmandu
Installation Report for 1C3S BTS
2.4 1C3S BTS
BOQ of BTS Hardware
Lalmatiya Page:38/40
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
39/40
Item Description Model No. Unit
Qty. as
per
BOQ
Qty.
UsedStatus
Qty.
LeftRemarks
2.4.5 TFS Subsystem-lot
2.4.5.1 Frequency Distribution Board FDM Piece 1 1 Installed 0
2.4.5.2 Time Control Board TCM Piece 1 1 Installed 0
2.4.5.3 GPS Receiver GPSTM Set 1 1 Installed 02.4.5.4 GPS Antenna,Feeder Cable Set 1 1 Installed 0
2.4.6 BTS Power modulelot
2.4.6.1 High Power Amplifier HPA Set 3 3 BTS Rack 0
2.4.8 Installation Material-lot
2.4.8.1 S222 Installation Material(including Rack) Set 1 1 Installed 0
2.4.8.2 Digital Trunk Cable(BTS-BSC)75/20m Piece 0 0 0
2.4.8.3 48V Power Cable BV-25/15m Piece 2 2 Installed 0
2.4.8.4 GND Power Cable BV-35/15m Piece 1 1 Installed 0
2.4.9 Anttena System -lot
65 or 90 -degree Dual-polarization Directional Antenna( Refer to Ant. & Feeder cable list)
2.4.9.1 >=17dBi MOBILE set 3 3 Installed 0
2.4.9.2 Antenna Feeder set 6 6 Installed 0
Installatiopn Material
15. BOQ of Installatiopn Material
1 AMS Set 1 1 installed 0 1 set = 3 pcs
2 Cable runway 30cm*20m, Iron Set 1 0 Not Installed 1 WDR Store , Bhairahawa3 Cable Ladder 30cm*10m, Aluminium Set 1 0 Not Installed 1 WDR Store , Bhairahawa
4 DDF(BTS) Set 0 0 0
17.2 Grounding Materials BTS sites ZGD-II-1(30) set 1 0 Not Installed 1 WDR Store , Bhairahawa
Installed By:Sumit Thapa
Engineer, DWT, NT
17. BOQ of Grounding Materials
BOQ of BTS Installation Material
BOQ of Antenna & Feeder
Lalmatiya Page:39/40
-
8/3/2019 Installation Report of 2C3S and 1C3S BTS
40/40
Item Description Model No. Unit
Qty. as
per
BOQ
Qty.
UsedStatus
Qty.
LeftRemarks
Lalmatiya Page:40/40