Contents

1. Antenna installation ....................................................... 3

1.1 procedure ............................................................... 3

1.2 PICTURES ............................................................. 4

2. FEEDER CABLES ........................................................ 5

3. BATTERY INSTALLATION............................................ 9

4. DDF INSTALLATION................................................... 11

5. RACKS INSTALLATION.............................................. 13

6. BTS POWER CABLE INSTALLATION........................ 14

7. AC DISTRIBUTION BOX ............................................ 15

8. GROUND CABLES..................................................... 16

8.1 Inside eathing system........................................... 17

8.2 outside earthing system........................................ 18

9. PARTS OF THE INSTALLATION ACCESSORY

MATERIALS LIST ........................................................... 20

Page 3: BTS Installation

1. Antenna installation

1.1 procedure

Start

D irectional an tenna

nitia l assem b lin g of the d irec tion al an ten na in s talla tion accessories

In atalla tion sea lin g of th e an tenn a jum p er

A ntenna fix ing

E nd

A ntenna hoisting and handling

In stalla tion p osition d eterm in ation

O m ni- antenna

A djustm ent of the d irection al an tenn a d irection an d tilt an gle

I ni t i al f i x i ng of t he omni - ant enna

V ertical ad justm en t o f the om n i-an ten na

In itia l fix in g of the d irection al an tenn a

Page 4: BTS Installation

1.2 PICTURES

remark: waterproof self-conglutinant adhesive tape should be covered carefully to make sure the function available.

Antenna should be fixed well

waterproof

self-conglutina

Page 5: BTS Installation

2. FEEDER CABLES

remark: the radius should be more than 400mm

remark:

The normal distance between cable clips should be 3 steps on the cable tray. But in the picture ,it is 2 steps.

R>400mm

Page 6: BTS Installation

remark: Pay attention to the cable radius. It is should be more than 400mm.

Page 7: BTS Installation

remark: the lighting arrestor installation

Page 8: BTS Installation

remark: A: CELL 1 ; B: CELL 2; C: CELL 3 The antenna degree according to the survey report.

A B

C

Page 9: BTS Installation

3. BATTERY INSTALLATION

remark: when we install the battery, we should not put any tools or iron sticks on the battery, it is very dangerous.

remark: each battery should be connected to one sensor, pay attention to the sequence.

battery temperature sensor

Page 10: BTS Installation
Page 11: BTS Installation

remark: battery cables arrangement

4. DDF INSTALLATION

E1 CABLE AND GND CABLE

Page 12: BTS Installation

remark: one E1 cable including 8 cores,4 pairs. The SN 1,2,…8. for instance,1,5 is the first pair ,2,6 the second pair for 1E1.in the picture, the ground cable was not connected yet.

Page 13: BTS Installation

5. RACKS INSTALLATION

remark: the face of the two racks should be the same plane. In this site, there are one rectifier rack

Page 14: BTS Installation

and one BTS rack.

6. BTS POWER CABLE INSTALLATION

Page 15: BTS Installation

0V(BTS MARK:GND) :BLACK COLOR; -48V(BTS MARK:PWR):GREEN COLOR

7. AC DISTRIBUTION BOX

AC CABLE

Page 16: BTS Installation

remark: for equipment installation, we just need to consider the AC cables

8. GROUND CABLES

There are two GND systems. One for antenna and feeder cables, the other for inside equipment(inside earthing system).

Page 17: BTS Installation

8.1 Inside eathing system

Input

remark: in the shelter, the two ground bars should be connected with cable( ).this two ground bars are just for the equipment. All of the equipment ground cables should be connect to the two

Inside earthing system input bar

Connect to earthing system

Page 18: BTS Installation

ground bar. When we install the GND cables, we should confirm the cable diameter and the length and the color.

8.2 outside earthing system

antenna and feeder cable and tower earthing system

GND 1

GND 2

Page 19: BTS Installation

GND 3

OUTSIDE GND BAR

ARRESTOR GND CABLE (TO OUSIDE GSNBAR)

Page 20: BTS Installation

9. PARTS OF THE INSTALLATION

ACCESSORY MATERIALS LIST

Name Quantity Function Remark

nylon strip 300 Fix the cables

Circular exposed junction

port(copper connector)

20(70mm2) Battery and GND cables

M8×15 bolts 20 DDF

Small bolts 20 Cable slot Feeder cable GND clips

20 Feeder cable

Cable slot 6m AC cable GND cable 1m(16mm2) DDF BOX GND DC CABLE(0V) 3m(25mm2) BTS DC POWER DC CABLE(-48V) 3m(25mm2) BTS DC POWER GND cable 10m(35mm2) BTS-GND

RECTIFIER-GND(AC)YELLOW AND

GREEN DC CABLE(0V) 15(70mm2) Battery cable DC CABLE(-48V) 15(70mm2) Battery cable GND cable 10m(70mm2) BAR-BAR

RECTIFIRER-GND (DC)

Remark: other materials can be listed in the table.