Improving permitting, inspection and enforcement
Regional Environmental Protection Agency’s (REPA) etablished on
1st January 2013
Pieter-Jan van Zanten
Introduction
3 October 2013
•Pieter-Jan van Zanten•Content• History• ‘Wahr’, ‘Ist’ and ‘Soll’• National coöperation• International coöperation• First achievements• Questions and discussion
Pieter-Jan van Zanten3 October 2013
What happened?????
Pieter-Jan van Zanten
Professional P, I, and E needs:
3 October 2013
• Organization (less, more powerfull, etc) • Capacity• Skilled staff• Back-up from politics and senior-staff• Dedication• Solid funding• ....
And Cooperation in- and between agency’s, police, etc
Pieter-Jan van Zanten
About cooperation:http://www.youtube.com/watch?v=aofjMGfZ53M
3 October 2013
Pieter-Jan van Zanten
‘Wahr’ situation
3 October 2013
11 (19) 25 12 408
Pieter-Jan van Zanten3 October 2013
Seveso-directive Environmental+ Law
‘Ist’ situation
Pieter-Jan van Zanten3 October 2013
‘Soll’ situation
• Established, professional and well known institutes • Obvious partner in permitting, inspection and enforcement• Good cooperation with Public Prossecutor, Police and other inspectorates• Meeting (inter)national quality standards• Efficient with scarce resources• Merging of Seveso- and Environmenmental+ REPA? (less REPA’s?)• ......• ......
Pieter-Jan van Zanten
Development of:
3 October 2013
• Quality standards for organization, staff and processes;• (permanent) education• Defining service levels in- and externaly• ICT-infrastructure
But most of all:
Pieter-Jan van Zanten
REPA in national perspective
3 October 2013
• Planning on bases:• risk-orientation• case-type (i.e. accountmanagement, permitting, inspection, etc)• products- and services (industry, agri, construction, etc)
• Cooperation on inspection and enforcement with Public Prossecutor, Police and other inspection agency’s;• Chain-approach on toxic waste, soil, asbestos, etc
Pieter-Jan van Zanten
REPA in international perspective
3 October 2013
Operating in context:•7th EAP• Seveso III• Minimum criteria for environmental inspections• Developping IPPC directive• Developping IED, BAT-reference documents
Pieter-Jan van Zanten
International cooperation
3 October 2013
• Cooperation on inspection and enforcement with Public Prossecutor, Police and other inspection agency’s;• Chain-approach on toxic waste, soil, asbestos, etc
Pieter-Jan van Zanten
Enforcement priorities and projects:
3 October 2013
• Polluted soil• Asbestos• Air scrubbers at mega farms
Pieter-Jan van Zanten
Questions?