ILIAS WG1 meeting Han/Ruthe
Harald LückHarald Lück
ILIAS WG1 meeting, Sep. 2004, Hannover/Ruthe
GEO Status (Update)
ILIAS WG1 meeting Han/Ruthe
Installation Status
12W lasermode cleaner
interferometer with dual recycling
output mode cleaner
detector
attenuated to 2W
MPR ~1% Transmissi
on
ILIAS WG1 meeting Han/Ruthe
Sensitivity changes between WG1 meetings
ILIAS WG1 meeting Han/Ruthe
Changes since last meeting
• installation of suspended output optics
• HPD in separate vacuum vessel
• new sensor (HPD) for MI length control
• 2f local oscillator (optional)
• new gain distribution in MI length control
ILIAS WG1 meeting Han/Ruthe
Output optics / vacuum tank high-power diode - TCOc
MSR
BDO2
BDO1
BDO3
BDOMCa
BDOMCb
OMC
PDO
PDOMCa
PDOMCb
PDOT
Output MC not installed (yet?)
ILIAS WG1 meeting Han/Ruthe
central building / control room
W/O output optics Stomp in Ctrl. room
ILIAS WG1 meeting Han/Ruthe
Noise Projections: the analytical way
102
103
10-22
10-21
10-20
10-19
10-18
10-17
Frequency [Hz]
hP(f)MID IM FBMID AA ROTMID AA TILTMID CAL InjMID elec FBMID FB HVAHPD darkSRC FB MSRShot DC IPDPR ampPDOHP amp
ILIAS WG1 meeting Han/Ruthe
Changing MID loop electronics
ILIAS WG1 meeting Han/Ruthe
Changing SR loop – UG ~35Hz
ILIAS WG1 meeting Han/Ruthe
‘2f LO’ for MID Demodulation
ILIAS WG1 meeting Han/Ruthe
Laser amplitude noise & stab.
Red = Inner and outer loop running Blue = only inner loop running Green = both loops off
ILIAS WG1 meeting Han/Ruthe
Variation of SR Modulation Index
ILIAS WG1 meeting Han/Ruthe
Effect of changing the heater power
ILIAS WG1 meeting Han/Ruthe
ROC- Correction of MFe
71W
OptimalCompensationContrast enhanced
ILIAS WG1 meeting Han/Ruthe
Sensitivity for changing ROC of MFE
ILIAS WG1 meeting Han/Ruthe
GEO600 next steps
repairing leak in central building Set up new office container improve sensitivity towards S4 increase injected power increase power recycling factor
lock acquisition might cause problems simulations and testing needed, maybe OMC
required
ILIAS WG1 meeting Han/Ruthe
construction work
ILIAS WG1 meeting Han/Ruthe
Central Building
new office container
6 desks, common area
toillets
ILIAS WG1 meeting Han/Ruthe
GEO600 next steps
repairing leak in central building (almost done) Set up new office container improve sensitivity towards S4 increase injected power implement segmented heater increase power recycling factor (300 -> 2000)
lock acquisition might cause problems simulations and testing needed, maybe OMC
required